§ 2864. Master plans for major military installations
§ 2864. Master plans for major military installations
(a) Plans Required.—
(1) At a time interval prescribed by the Secretary concerned (but not less frequently than once every 10 years), the commander of each major military installation under the jurisdiction of the Secretary shall ensure that an installation master plan is developed to address environmental planning, sustainable design and development, sustainable range planning, real property master planning, military installation resilience, and transportation planning.
(2) To address the requirements under paragraph (1), each installation master plan shall include consideration of—
(A) planning for compact and infill development;
(B) horizontal and vertical mixed-use development;
(C) the full lifecycle costs of real property planning decisions;
(D) capacity planning through the establishment of growth boundaries around cantonment areas to focus development towards the core and preserve range and training space; and
(E) energy and climate resiliency efforts and military installation resilience.
(3)
(A) The commander of a major military installation shall develop and update the master plan for that major military installation in consultation with representatives of the government of the State in which the installation is located and representatives of local governments in the vicinity of the installation to improve cooperation and consistency between the Department of Defense and such governments in addressing each component of the master plan described in paragraph (1).
(B) The consultation required by subparagraph (A) is in addition to the consultation specifically required by subsection (b)(1) in connection with the transportation component of the master plan for a major military installation.
(b) Transportation Component.—
(1) The transportation component of the master plan for a major military installation shall be developed and updated in consultation with the metropolitan planning organization designated for the metropolitan planning area in which the military installation is located.
(2) To address the requirements under subsection (a) and paragraph (1), each installation master plan shall include consideration of ways to diversify and connect transit systems.
(c) Military Installation Resilience Component.— To address military installation resilience under subsection (a)(1), each installation master plan shall discuss the following:
(1) Risks and threats to military installation resilience that exist at the time of the development of the plan and that are projected for the future, including from extreme weather events, mean sea level fluctuation, wildfires, flooding, and other changes in environmental conditions.
(2) Assets or infrastructure located on the military installation vulnerable to the risks and threats described in paragraph (1), with a special emphasis on assets or infrastructure critical to the mission of the installation and the mission of members of the armed forces.
(3) Lessons learned from the impacts of extreme weather events, including changes made to the military installation to address such impacts, since the prior master plan developed under this section.
(4) Ongoing or planned infrastructure projects or other measures, as of the time of the development of the plan, to mitigate the impacts of the risks and threats described in paragraph (1).
(5) Community infrastructure and resources located outside the installation (such as medical facilities, transportation systems, and energy infrastructure) that are—
(A) necessary to maintain mission capability or that impact the resilience of the military installation; and
(B) vulnerable to the risks and threats described in paragraph (1).
(6) Agreements in effect or planned, as of the time of the development of the plan, with public or private entities for the purpose of maintaining or enhancing military installation resilience or resilience of the community infrastructure and resources described in paragraph (5).
(7) Extent of current coordination efforts and plans for additional coordination, as of the time of the development of the plan, with public or private entities for the purpose of maintaining or enhancing military installation resilience or resilience of the community infrastructure and resources described in paragraph (5).
(8) Projections from recognized governmental and scientific entities such as the Census Bureau, the National Academies of Sciences, the United States Geological Survey, and the United States Global Change Research Office (or any similar successor entities) with respect to future risks and threats (including the risks and threats described in paragraph (1)) to the resilience of any project considered in the installation master plan during the 50-year lifespan of the installation.
(d) Report.— Not later than March 1 of each year, the Secretary of Defense shall submit to the congressional defense committees a report listing all master plans completed pursuant to this section in the prior calendar year.
(e) Definitions.— In this section:
(1) The term “major military installation” has the meaning given to the term “large site” in the most recent version of the Department of Defense Base Structure Report issued before the time interval prescribed for development of installation master plans arises under subsection (a).
(2) The terms “metropolitan planning area” and “metropolitan planning organization” have the meanings given those terms in section 134(b) of title 23 and section 5303(b) of title 49.
(3) The term “energy and climate resiliency” means anticipation, preparation for, and adaptation to utility disruptions and changing environmental conditions and the ability to withstand, respond to, and recover rapidly from utility disruptions while ensuring the sustainment of mission-critical operations.
(4) The term “military installation resilience” has the meaning given that term in section 101(e) 11 See References in Text note below. of this title.
(Added Pub. L. 112–239, div. B, title XXVIII, § 2802(a), Jan. 2, 2013, 126 Stat. 2147; amended Pub. L. 113–66, div. B, title XXVIII, § 2811, Dec. 26, 2013, 127 Stat. 1013; Pub. L. 115–232, div. B, title XXVIII, § 2805(d), Aug. 13, 2018, 132 Stat. 2263; Pub. L. 116–92, div. B, title XXVIII, § 2801(a), Dec. 20, 2019, 133 Stat. 1879; Pub. L. 117–81, div. B, title XXVIII, §§ 2831, 2832, Dec. 27, 2021, 135 Stat. 2198; Pub. L. 118–31, div. A, title XVIII, § 1801(a)(23), Dec. 22, 2023, 137 Stat. 684; Pub. L. 119–60, div. B, title XXVIII, § 2848(b), Dec. 18, 2025, 139 Stat. 1319.)
Editorial Notes
References in Text
Section 101(e) of this title, referred to in subsec. (e)(4), was redesignated section 101(f) of this title, and a new subsec. (e) of section 101 was added, by Pub. L. 118–31, div. A, title XVII, § 1713(a), Dec. 22, 2023, 137 Stat. 625.
Prior Provisions
A prior section 2864, added Pub. L. 101–189, div. B, title XXVIII, § 2807(a), Nov. 29, 1989, 103 Stat. 1648; amended Pub. L. 104–106, div. A, title X, § 1062(g), Feb. 10, 1996, 110 Stat. 444, related to military construction contracts on Guam, prior to repeal by Pub. L. 109–364, div. B, title XXVIII, § 2810(a), Oct. 17, 2006, 120 Stat. 2470.
Amendments
2025—Subsecs. (e), (f). Pub. L. 119–60 redesignated subsec. (f) as (e) and struck out former subsec. (e). Prior to amendment, text of subsec. (e) read as follows: “Nothing in this section shall supersede the requirements of section 2859(a) of this title.”
2023—Subsec. (f)(4), (6). Pub. L. 118–31 redesignated par. (6) as (4).
2021—Subsec. (a)(2)(E). Pub. L. 117–81, § 2832(a), inserted “and military installation resilience” before period at end.
Subsec. (a)(3). Pub. L. 117–81, § 2831, added par. (3).
Subsec. (c)(7), (8). Pub. L. 117–81, § 2832(b), added par. (7) and redesignated former par. (7) as (8).
Subsec. (f)(6). Pub. L. 117–81, § 2832(c), added par. (6).
2019—Subsec. (a)(1). Pub. L. 116–92, § 2801(a)(1)(A), inserted “military installation resilience,” after “master planning,”.
Subsec. (c). Pub. L. 116–92, § 2801(a)(1)(C), added subsec. (c). Former subsec. (c) redesignated (e).
Subsec. (d). Pub. L. 116–92, § 2801(a)(2), added subsec. (d). Former subsec. (d) redesignated (f).
Subsecs. (e), (f). Pub. L. 116–92, § 2801(a)(1)(B), redesignated subsecs. (c) and (d) as (e) and (f), respectively.
2018—Subsec. (a)(2)(E). Pub. L. 115–232, § 2805(d)(1), added subpar. (E).
Subsec. (d)(3). Pub. L. 115–232, § 2805(d)(2), added par. (3).
2013—Subsec. (a). Pub. L. 113–66, § 2811(1), designated existing provisions as par. (1) and added par. (2).
Subsec. (b). Pub. L. 113–66, § 2811(2), designated existing provisions as par. (1) and added par. (2).
Subsecs. (c), (d). Pub. L. 113–66, § 2811(3), (4), added subsec. (c) and redesignated former subsec. (c) as (d).
Statutory Notes and Related Subsidiaries
Interagency Regional Coordinator for Resilience Pilot Project
Pub. L. 117–263, div. B, title XXVIII, § 2872, Dec. 23, 2022, 136 Stat. 3014, provided that: “(a) Pilot Project.—The Secretary of Defense shall carry out a pilot program under which the Secretary shall establish within the Department of Defense four Interagency Regional Coordinators. Each Interagency Regional Coordinator shall be responsible for improving the resilience of a community that supports a military installation and serving as a model for enhancing community resilience before disaster strikes. “(b) Selection.—Each Interagency Regional Coordinator shall support military installations and surrounding communities within a geographic area, with at least one such Coordinator serving each of the East, West, and Gulf coasts. For purposes of the project, the Secretary shall select geographic areas—“(1) with significant sea level rise and recurrent flooding that prevents members of the Armed Forces from reaching their posts or jeopardizes military readiness; and “(2) where communities have collaborated on multi-jurisdictional climate adaptation planning efforts, including such collaboration with the Army Corps of Engineers Civil Works Department and through Joint Land Use Studies. “(c) Collaboration.—In carrying out the pilot project, the Secretary shall build on existing efforts through collaboration with State and local entities, including emergency management, transportation, planning, housing, community development, natural resource managers, and governing bodies and with the heads of appropriate Federal departments and agencies.”
Strategic Decisions Relating to Military Installations; Implications of Military Installation Resilience for Strategy; Plans and Planning Documents; Definitions
Pub. L. 117–81, div. A, title III, § 311(d)–(g), (j), Dec. 27, 2021, 135 Stat. 1626, 1627, provided that: “(d) Strategic Decisions Relating to Military Installations.—The Secretary of each military department, with respect to any installation under the jurisdiction of that Secretary, and the Secretary of Defense, with respect to any installation of the Department of Defense that is not under the jurisdiction of the Secretary of a military department, shall consider the strategic risks associated with military installation resilience. “(e) National Defense Strategy and National Military Strategy.—The Secretary of Defense, in coordination with the heads of such other Federal agencies as the Secretary determines appropriate, shall incorporate the security implications of military installation resilience into the National Defense Strategy and the National Military Strategy. “(f) National Security Planning Documents.—The Secretary of Defense and the Chairman of the Joint Chiefs of Staff shall consider the security implications associated with military installation resilience in developing the Defense Planning Guidance under section 113(g)(2) of title 10, United States Code, the Risk Assessment of the Chairman of the Joint Chiefs of Staff under section 153(b)(2) of such title, and other relevant strategy, planning, and programming documents and processes. “(g) Campaign Plans of Combatant Commands.—The Secretary of Defense shall ensure that the national security implications associated with military installation resilience are integrated into the campaign plans of the combatant commands. “(j) Definitions.—In this section [transferring section 118a of this title to section 118b of this title, amending sections 113, 153, and 2925 of this title, enacting provisions set out as notes under this section and section 2925 of this title, and amending provisions set out as a note under section 118b of this title]:“(1) The term ‘military installation resilience’ has the meaning given that term in section 101(e) of title 10, United States Code [now 10 U.S.C. 101(f)]. “(2) The term ‘National Defense Strategy’ means the national defense strategy under section 113(g)(1) of such title. “(3) The term ‘National Military Strategy’ means the national military strategy under section 153(b) of such title.”
Prompt Completion of Military Installation Resilience Component of Master Plans for At-Risk Major Military Installations
Pub. L. 117–81, div. B, title XXVIII, § 2833, Dec. 27, 2021, 135 Stat. 2199, provided that: “(a) Identification of At-Risk Installations.—Not later than 30 days after the date of the enactment of this Act [Dec. 27, 2021], each Secretary of a military department shall—“(1) identify at least two major military installations under the jurisdiction of that Secretary that the Secretary considers at risk from extreme weather events; and “(2) notify the Committees on Armed Services of the Senate and the House of Representatives of the major military installations identified under paragraph (1). “(b) Completion Deadline.—Not later than one year after the date of the enactment of this Act, each Secretary of a military department shall ensure that the military installation resilience component of the master plan for each major military installation identified by the Secretary under subsection (a) is completed. “(c) Briefings.—Not later than 60 days after completion of a master plan component as required by subsection (b) for a major military installation, the Secretary of the military department concerned shall brief the Committees on Armed Services of the Senate and the House of Representatives regarding the results of the master plan efforts for that major military installation. “(d) Definitions.—In this section:“(1) The term ‘major military installation’ has the meaning given that term in section 2864(f) [now 2864(e)] of title 10, United States Code. “(2) The term ‘master plan’ means the master plan required by section 2864(a) of title 10, United States Code, for a major military installation.”
Removal of Barriers That Discourage Investments To Increase Military Installation Resilience
Pub. L. 116–92, div. A, title III, § 327, Dec. 20, 2019, 133 Stat. 1311, provided that: “(a) In General.—The Secretary of Defense shall—“(1) identify and seek to remove barriers that discourage investments to increase military installation resilience; “(2) reform policies and programs that unintentionally increased the vulnerability of systems to related extreme weather events; and “(3) develop, and update at least once every four years, an adaptation plan to assess how climate impacts affected the ability of the Department of Defense to accomplish its mission, and the short-and long- term actions the Department can take to ensure military installation resilience. “(b) Military Installation Resilience.—In this section, the term ‘military installation resilience’ has the meaning given such term in section 101(e)(8) of title 10, United States Code [now 10 U.S.C. 101(f)(8)].”
Incorporation of Changing Environmental Condition Projections in Military Construction Designs and Modifications
This document does not substitute reading the official United States Code published by the Office of the Law Revision Counsel. We assume no responsibility for any inaccuracies resulting from the conversion to this format.