Regulation (EC) No 1905/2006 of the European Parliament and of the Council of 18 December 2006 establishing a financing instrument for development cooperation
The measurement of the allocation criteria shall be based on representative data preceding 2011 and covering a period not longer than five years. The indicative country allocations will take account in the same way of the three criteria across all eligible beneficiary countries.
On the basis of the application of the criteria referred to above, the Commission will inform the European Parliament and Council about the intended use of the indicative financial allocation referred to in Annex IV before the adoption of the multiannual support strategies mentioned in paragraph 3 of this Article. That information will set out, for each eligible ACP banana-supplying country, the indicative amount available.
The Commission shall adopt multiannual support strategies by analogy to Article 19, and in accordance with Article 21. It shall ensure that such strategies complement the geographic strategy papers of the countries concerned, and the temporary nature of the banana accompanying measures.
The multiannual support strategies for banana accompanying measures shall include:
- (a)an updated environmental profile paying due attention to the country’s banana sector, inter alia, focusing on pesticides;
- (b)information on the achievements of past banana support programmes;
- (c)indicators to assess progress in relation to disbursement conditions, when budget support will be chosen as the form of financing;
- (d)the expected results of the assistance;
- (e)a time schedule of support activities and of expected disbursements;
- (f)the ways in which progress will be achieved and monitored in meeting internationally agreed ILO core labour standards and appropriate occupational safety and health conventions as well as relevant internationally agreed core environmental standards.
In the framework of the multiannual financial framework for 2007-2013, established by Interinstitutional Agreement of 17 May 2006 between the European Parliament, the Council and the Commission in budgetary discipline and sound financial management ([^E0016]), the BAM programme and the progress made by the countries concerned shall be the subject of an assessment, which shall include recommendations on any measures to be taken and the nature thereof.
TITLE III PROGRAMMING AND ALLOCATION OF FUNDS
Article 18
General framework for programming and allocating funds
In the case of geographic programmes, the Commission shall draw up a strategy paper and a multiannual indicative programme for each partner country or region, as provided for in Article 19, and adopt an annual action programme for each partner country or region, as provided for in Article 22.
In the case of thematic programmes, the Commission shall draw up thematic strategy papers as provided for in Article 20, and adopt action programmes as provided for in Article 22.
In exceptional circumstances, Community support may also take the form of special measures not covered in strategy papers or multiannual indicative programmes, as provided for in Article 23.
The Commission shall determine the multiannual indicative allocations within each geographic programme using standard, objective and transparent resource allocation criteria, based on the needs and performance of the partner country or region concerned and bearing in mind the particular difficulties faced by countries or regions in crisis, conflict or disaster prone, alongside the specificity of the different programmes.
The needs criteria include population, income per capita and the extent of poverty, income distribution and the level of social development. The performance criteria include political, economic and social progress, progress in good governance and the effective use of aid, and in particular the way a country uses scarce resources for development, beginning with its own resources.
The Commission may include a specific financial allocation for the purpose of strengthening cooperation between the EU's outermost regions and neighbouring partner countries and regions.
Article 19
Geographic strategy papers and multiannual indicative programmes
The preparation and implementation of strategy papers shall apply principles of aid effectiveness: national ownership, partnership, coordination, harmonisation, alignment to recipient country or regional systems and results orientation as laid down in Article 3(5) to (8).
Strategy papers shall cover no more than the period of validity of this Regulation and aim to provide a coherent framework for cooperation between the Community and the partner country or region concerned, consistent with the overall purpose and scope, objectives, principles and policy prescriptions of, and Annex IV to, this Regulation. Multiannual indicative programmes shall be based on strategy papers.
Strategy papers shall be reviewed at mid-term, or ad hoc if necessary, in accordance where appropriate with the principles and procedures laid down in the Partnership and Cooperation Agreements concluded with the partner countries and regions.
Strategy papers shall, in principle, be based on a dialogue with the partner country or region which involves civil society and regional and local authorities, so as to ensure that the country or region concerned takes sufficient ownership of the process and to encourage support for national development strategies, particularly those for reducing poverty.
Multiannual indicative programmes shall be drawn up on the basis of the strategy papers for each partner country or region. They shall be the subject of an agreement with the country or region where possible.
Multiannual indicative programmes shall set out the priority areas selected for Community financing, the specific objectives, the expected results and the performance indicators.
The programmes shall also set out the indicative financial allocation, both overall and per priority area; this may be given in the form of a range, where appropriate. These allocations shall be consistent with the indicative allocations set out in Annex IV.
The programmes shall be adjusted where necessary, taking into account any mid-term or ad hoc reviews of strategy papers.
A multiannual indicative allocation may be increased or decreased as a result of reviews, particularly in the light of special needs such as those of a post-crisis situation, or where performance has been exceptional or unsatisfactory.
In circumstances such as crises, post conflict situations or threats to democracy, the rule of law, human rights or fundamental freedoms, a special emergency procedure may be used to conduct an ad hoc review of the country's or region's cooperation strategy. Such reviews may propose a country or region strategy to make the transition to long-term cooperation and development.
In accordance with Article 2(6), the strategy shall ensure that measures taken under this Regulation are consistent with, and avoid duplication with, measures eligible for funding under other Community instruments, in particular Regulation (EC) No 1717/2006 and Regulation (EC) No 1257/96. Where partner countries or groups of partner countries are directly involved in, or affected by, a crisis or post-crisis situation, multiannual indicative programmes shall place special emphasis on stepping up coordination between relief, rehabilitation and development to help them make the transition from an emergency situation to the development phase; programmes for countries and regions regularly subject to natural disasters shall provide for disaster preparedness and prevention and the management of the consequences of such disasters.
To foster regional cooperation, the Commission may decide when adopting annual action programmes of the type referred to in Article 22, or the special measures referred to in Article 23 for cooperation measures under this Chapter, that projects or programmes of a regional or cross-border nature carried out with countries listed in Annex V are eligible, in accordance with the first subparagraph of Article 2(4). Provisions may be made for this in the strategy papers and multiannual indicative programmes, referred to in this Article, and in Article 20.
The Commission and the Member States shall consult each other, as well as other donors and development actors including representatives of civil society and regional and local authorities, at an early stage of the programming process in order to promote complementarity among their cooperation activities.
Article 20
Strategy papers for thematic programmes
Thematic strategy papers shall cover no more than the period of validity of this Regulation. They shall set out the Community's strategy for the theme concerned, the Community's priorities, the international situation and the activities of the main partners. They shall be consistent with the overall purpose and scope, objectives, principles and policy prescriptions of, and Annex IV to, this Regulation.
Thematic strategy papers shall set out the priority areas selected for financing by the Community, the specific objectives, the expected results and the performance indicators.
The thematic strategy papers shall also give the indicative financial allocation, both overall and per priority area; this may be given in the form of a range, where appropriate.
Strategy papers shall be reviewed at mid-term, or ad hoc if necessary.
The Commission and the Member States shall consult each other, as well as other donors and development actors including representatives of civil society and local authorities, at an early stage of the programming process in order to promote complementarity among their cooperation activities.
Resources and intervention priorities shall be laid down for participation in global initiatives.
Article 21
Adoption of strategy papers and multiannual indicative programmes
Strategy papers and multiannual indicative programmes referred to in Articles 19 and 20, and any reviews thereof referred to in Article 19(2) and Article 20(1), as well as accompanying measures referred to in Articles 17 and 17a respectively, shall be adopted by the Commission in accordance with the procedure referred to in Article 35(2).
TITLE IV IMPLEMENTATION
Article 22
Adoption of annual action programmes
The Commission shall adopt annual action programmes based on the strategy papers and multiannual indicative programmes referred to in Articles 19 and 20.
Exceptionally, for instance where an action programme has not yet been adopted, the Commission may, on the basis of the strategy papers and multiannual indicative programmes referred to in Articles 19 and 20, adopt measures not provided for in an annual action programme under the same rules and procedures as for action programmes.
Annual action programmes shall specify the objectives pursued, the fields of intervention, the expected results, the management procedures and total amount of financing planned. They shall contain a description of the operations to be financed, an indication of the amounts allocated for each operation and an indicative implementation timetable. Objectives shall be measurable and have time bound benchmarks.
The annual action programmes shall be adopted by the Commission in accordance with the procedure referred to in Article 35(2).
Appropriate environmental screening shall be undertaken at project level including environmental impact assessment (EIA) for environmentally sensitive projects, in particular for major new infrastructure. Where relevant, strategic environmental assessments (SEA) shall be used in the implementation of sectoral programmes. The involvement of interested stakeholders in environmental assessments and public access to the results shall be ensured.
Article 23
Adoption of special measures not provided for in the strategy papers or multiannual indicative programmes
In the event of unforeseen and duly justified needs or circumstances related to natural disasters, civil strife or crises, and which cannot be funded under Regulation (EC) No 1717/2006 or Regulation (EC) No 1257/96, the Commission shall adopt special measures not provided for in the strategy papers or multiannual indicative programmes (hereinafter referred to as ‘special measures’).
Special measures may also be used to fund measures to ease the transition from emergency aid to long-term development operations, including those to better prepare people to deal with recurring crises.
Special measures shall specify the objectives pursued, the intervention areas, the expected results, the management procedures and the total amount of financing. They shall contain a description of the operations to be financed, an indication of the amounts allocated for each operation and the indicative timetable for their implementation. They shall include a definition of the type of performance indicators that will have to be monitored when implementing the special measures.
Where the cost of such measures exceeds EUR 10 million, the Commission shall adopt them under the management procedure referred to in Article 35(2). For special measures below EUR 10 million, the Commission shall send the measures to the Member States and the European Parliament for information within one month of adopting its decision.
The procedure referred to in Article 35(2) need not be used for amendments to special measures, such as those making technical adjustments, extending the implementation period, reassigning funds within the forecast budget, or increasing or reducing the size of the budget by less than 20 % of the initial budget, provided these amendments do not affect the initial objectives set out in the Commission decision. Any such technical adjustments shall be communicated within one month to the European Parliament and to the Member States.
Article 24
Eligibility
Without prejudice to Article 31, the following, inter alia, shall be eligible for funding under this Regulation for the purposes of implementing the annual action programmes referred to in Article 22 or the special measures referred to in Article 23:
- (a)partner countries and regions, and their institutions;
- (b)decentralised bodies in the partner countries, such as municipalities, provinces, departments and regions;
- (c)joint bodies set up by the partner countries and regions with the Community;
- (d)international organisations, including regional organisations, UN bodies, departments and missions, international and regional financial institutions and development banks, in so far as they contribute to the objectives of this Regulation;
- (e)Community institutions and bodies, but only for the purposes of implementing the support measures referred to in Article 26;
- (f)EU agencies;
- (g)the following entities and bodies of the Member States, partner countries and regions and any other third country complying with the rules on access to the Community's external assistance set out in Article 31, insofar as they help to achieve the objectives of this Regulation: (i)public or para-Statal bodies, local authorities and consortia or representative associations thereof; (ii)companies, firms and other private organisations and businesses; (iii)financial institutions that grant, promote and finance private investment in partner countries and regions; (iv)non-State actors as defined in paragraph 2; (v)natural persons.
The non-State, non-profit making actors eligible for financial support under this Regulation operating on an independent and accountable basis include: non governmental organisations, organisations representing indigenous peoples, organisations representing national and/or ethnic minorities, local traders' associations and citizens' groups, cooperatives, trade unions, organisations representing economic and social interests, organisations fighting corruption and fraud and promoting good governance, civil rights organisations and organisations combating discrimination, local organisations (including networks) involved in decentralised regional cooperation and integration, consumer organisations, women's and youth organisations, teaching, cultural, research and scientific organisations, universities, churches and religious associations and communities, the media and any non governmental associations and independent foundations, including independent political foundations, likely to contribute to the implementation of the objectives of this Regulation.
Article 25
Types of financing
Community financing may take the following forms:
- (a)projects and programmes;
- (b)budget support if the partner country's management of public spending is sufficiently transparent, reliable and effective, and where it has put in place properly formulated sectoral or macroeconomic policies positively assessed by its principal donors; including, where relevant, the international financial institutions. The Commission shall consistently use an approach based on results and performance indicators and shall clearly define and monitor its conditionality and support efforts of partner countries to develop parliamentary control and audit capacities and to increase transparency and public access to information. Disbursement of budgetary support shall be conditional on satisfactory progress towards achieving the objectives in terms of impact and results;
- (c)sectoral support;
- (d)in exceptional cases, sectoral and general import programmes, which may take the form of: (i)sectoral import programmes in kind; (ii)sectoral import programmes providing foreign exchange to finance imports for the sector in question; or (iii)general import programmes providing foreign exchange to finance general imports of a wide range of products;
- (e)funds made available to the EIB or other financial intermediaries on the basis of Commission programmes for the purpose of providing loans (in particular to support investment in and development of the private sector), risk capital (in the form of subordinated or conditional loans) or other temporary minority holdings in business capital, and contributions to guarantee funds in accordance with Article 32, to the extent that the financial risk of the Community is limited to these funds;
- (f)interest-rate subsidies, especially for environment related loans;
- (g)debt-relief, under internationally agreed debt relief programmes;
- (h)grants to finance projects submitted by entities of the type listed in Article 24(1)(b), (c), (d), (f) and (g)(i) to (v);
- (i)grants to finance the operating costs of entities of the type listed in Article 24(1)(b), (c), (d), (f) and (g)(i), (iii) and (iv);
- (j)funding for twinning programmes between public institutions, local authorities, national public bodies or private-law entities entrusted with public service tasks of a Member State and those of a partner country or region;
- (k)contributions to international funds, such as those managed by international or regional organisations;
- (l)contributions to national funds set up by partner countries and regions to attract joint financing from a number of donors, or contributions to funds set up by one or more donors for the purpose of the joint implementation of projects;
- (m)capital investments in international financial institutions and regional development banks;
- (n)human and material resources required for effective administration and supervision of projects and programmes by partner countries and regions.
Union assistance shall not in principle be used for paying taxes, duties or charges in beneficiary countries.
Article 26
Support measures
Community financing may cover expenditure associated with the preparation, follow up, monitoring, audit and evaluation activities directly necessary for the implementation of this Regulation and the achievement of its objectives, e.g. studies, meetings, information, awareness-raising, training and publication activities, expenditure associated with computer networks for the exchange of information, and any other administrative or technical assistance expenditure necessary for the management of the programme. It shall also cover expenditure at Commission delegations on the administrative support needed to manage operations financed under this Regulation.
These support measures are not necessarily covered by multiannual indicative programmes and may therefore be financed outside the scope of strategy papers and multiannual indicative programmes. However, they may also be financed under multiannual indicative programmes.
The Commission shall adopt support measures not covered by the multiannual indicative programmes in accordance with Article 23(3) and (4).
Article 27
Co-financing
Measures shall be eligible for co-financing from the following, inter alia:
- (a)Member States and their regional and local authorities, and in particular their public and para-Statal agencies;
- (b)other donor countries, and in particular their public and para-Statal agencies;
- (c)international organisations, including regional organisations, and in particular international and regional financial institutions;
- (d)companies, firms, other private organisations and businesses, and other non-State actors;
- (e)partner countries and regions in receipt of funding.
In the case of parallel co-financing, the project or programme is split into a number of clearly identifiable components, which are each financed by the different partners providing co-financing in such a way that the end-use of the financing can always be identified.
In the case of joint co-financing, the total cost of a project or programme is shared between the partners providing the co-financing and the resources are pooled in such a way that it is no longer possible to identify the source of financing for any given activity undertaken as part of the project or programme.
In the case of joint co-financing, the Commission may receive and manage funds on behalf of the bodies referred to in paragraph 1(a), (b) and (c) for the purpose of implementing joint measures. Such funds shall be treated as assigned revenue, in accordance with Article 18 of Regulation (EC, Euratom) No 1605/2002.
Article 28
Management procedures
The measures financed under this Regulation shall be implemented in accordance with Regulation (EC, Euratom) No 1605/2002 and any revision thereof.
In the event of co-financing and in other duly justified cases, the Commission may entrust tasks of public authority, and in particular budget implementation tasks, to the bodies referred to in Article 54(2)(c) of Regulation (EC, Euratom) No 1605/2002.
In the case of decentralised management, the Commission may decide to use the procurement or grant procedures of the beneficiary partner country or region after verifying that they respect the relevant criteria of Regulation (EC, Euratom) No 1605/2002, provided that:
- —the procedures of the beneficiary partner country or region satisfy the principles of transparency, proportionality, equal treatment and non-discrimination and prevent any conflict of interests,
- —the beneficiary partner country or region undertakes to check regularly that the operations financed by the General Budget of the European Union have been properly implemented, to take appropriate measures to prevent irregularities and fraud, and, if necessary, to take legal action to recover unduly paid funds.
Article 29
Budget commitments
Budget commitments shall be made on the basis of decisions taken by the Commission in accordance with Articles 17a(3), 22(1), 23(1) and 26(1).
Community financing may take one of the following legal forms, inter alia:
- —financing agreements,
- —grant agreements,
- —procurement contracts,
- —employment contracts.
Article 30
Protecting the Community's financial interests
Any agreements resulting from this Regulation shall contain provisions ensuring the protection of the Community's financial interests, in particular with respect to irregularities, fraud, corruption and any other illegal activity, in accordance with Council Regulation (EC, Euratom) No 2988/95 of 18 December 1995 on the protection of the European Communities' financial interests ([^E0017]), Council Regulation (Euratom, EC) No 2185/96 of 11 November 1996 concerning on-the-spot checks and inspections carried out by the Commission in order to protect the European Communities' financial interests against fraud and other irregularities ([^E0018]) and Regulation (EC) No 1073/1999 of the European Parliament and of the Council of 25 May 1999 concerning investigations conducted by the European Antifraud Office (OLAF) ([^E0019]).
Agreements shall expressly entitle the Commission and the Court of Auditors to perform audits, including document audits or on the spot audits of any contractor or subcontractor who has received Community funds. They shall also expressly authorise the Commission to carry out on-the-spot checks and inspections as provided for in Regulation (Euratom, EC) No 2185/96.
All contracts resulting from the implementation of assistance shall ensure the rights of the Commission and the Court of Auditors under paragraph 2 during and after the performance of the contracts.
Article 31
Public procurement procedures, grant award procedures, rules of origin
Participation in the award of procurement or grant contracts financed under this Regulation shall be open to all natural persons who are nationals of, or legal persons who are established in, a Member State of the Community, in an official candidate country as recognised by the European Community or in a Member State of the European Economic Area.
Participation in the award of procurement or grant contracts financed under a geographic programme as defined in Articles 5 to 10 shall be open to all natural persons who are nationals of, or legal persons who are established in, any developing country eligible by virtue of Annex I.
Participation in the award of procurement or grant contracts financed under a thematic programme as defined in Articles 11 to 16, and the programmes set out in Articles 17 and 17a, shall be open to all natural persons who are nationals of, or legal persons who are established in, a developing country, as specified by the OECD/DAC and in Annex II, in addition to natural or legal persons eligible by virtue of the thematic programme or the programmes set out in Articles 17 and 17a. The Commission shall publish and update Annex II in accordance with regular reviews of the list of aid recipients of the OECD/DAC, and inform the Council thereof.
Participation in the award of procurement or grant contracts financed under this Regulation shall also be open to all natural persons who are nationals of or legal persons who are established in any country other than those referred in paragraph 1, where reciprocal access to their external assistance has been established.
Reciprocal access shall be granted whenever a country grants eligibility on equal terms to the Member States and to the recipient country concerned.
Reciprocal access shall be established by means of a specific decision concerning a given country or a given regional group of countries. Such a decision shall be adopted in accordance with the procedure referred to in Article 35(2) and shall be in force for a minimum period of one year.
The granting of reciprocal access shall be based on a comparison between the Community and other donors and shall proceed at sectoral level, as defined by the OECD/DAC categories, or at country level, whether it be a donor or a recipient country. The decision to grant such reciprocity to a donor country shall be based on the transparency, consistency and proportionality of the aid provided by that donor, including its qualitative and quantitative nature. The recipient countries shall be consulted as part of the procedure described in this paragraph.
Reciprocal access in the least developed countries as defined by the OECD/DAC shall be automatically granted to OECD/DAC members.
Participation in the award of procurement or grant contracts financed under a Community instrument shall be open to international organisations.
The above is without prejudice to the participation of categories of eligible organisations by nature or by localisation in regard to the objectives of the action to carry out.
Experts may be of any nationality, without prejudice to the qualitative and financial requirements set out in the Community's procurement rules.
All supplies and materials purchased under a contract financed under this Regulation shall originate from the Community or from an eligible country as defined in paragraph 1 and 2. The term ‘origin’ for the purpose of this Regulation is defined in the relevant Community legislation on rules of origin for customs purposes.
The Commission may, in duly substantiated cases, authorise the participation of natural and legal persons from countries having traditional economic, trade or geographical links with neighbouring countries or other third countries, and the use of supplies and materials of different origin.
The Commission may, in duly substantiated exceptional cases, authorise the participation of natural persons who are nationals of or legal persons who are established in other countries than those referred to in paragraph 1 and 2, or the purchase of supplies and materials of different origins from that set out in paragraph 6.
Derogations may be justified on the basis of the unavailability of products and services in the markets of the countries concerned, for reasons of extreme urgency, or if the eligibility rules would make the realisation of a project, a programme or an action impossible or exceedingly difficult.
Whenever Community funding covers an operation implemented through an international organisation, participation in the appropriate contractual procedures shall be open to all natural or legal persons who are eligible pursuant to paragraph 1 and 2 as well as to all natural or legal persons who are eligible pursuant to the rules of that organisation, care being taken to ensure that equal treatment is afforded to all donors. The same rules shall apply in respect of supplies, materials and experts.
Whenever Community funding covers an operation co-financed with a third country, subject to reciprocity as defined in paragraph 2, or with a regional organisation, or with a Member State, participation in the appropriate contractual procedures shall be open to all natural or legal persons who are eligible pursuant to paragraph 1, 2 and 3 as well as to all natural or legal persons who are eligible under the rules of such third country, regional organisation or Member State. The same rules shall apply in respect of supplies, materials and experts.
For the purposes of aid channelled directly through non-State actors under the thematic programme defined in Article 14, the provisions of paragraph 1 shall not apply to the eligibility criteria established for the selection of grant beneficiaries.
Beneficiaries of these grants shall abide by the rules established in this Article where the implementation of aid requires the award of procurement contracts.
In order to accelerate the eradication of poverty through the promotion of local capacities, markets and purchases, special consideration shall be given to local and regional procurement in partner countries.
Tenderers who have been awarded contracts shall respect internationally agreed core labour standards, e.g. the ILO core labour standards, conventions on freedom of association and collective bargaining, elimination of forced and compulsory labour, elimination of discrimination in respect of employment and occupation, and the abolition of child labour.
Access by developing countries to Community assistance shall be rendered possible by all such technical assistance as is deemed appropriate.
Article 32
Funds made available to the European Investment Bank or other financial intermediaries
The funds referred to in Article 25(1)(e) shall be managed by the EIB, other financial intermediaries or any other bank or organisation with the capacity to manage such funds.
The Commission shall adopt implementing provisions for paragraph 1 on a case-by-case basis to cover risk sharing, the remuneration of the intermediary responsible for implementation, the use and recovery of profits on funds, and the closure of the operation.
Article 33
Evaluation
The Commission shall regularly monitor and review its programmes, and evaluate the results of the implementation of geographical and thematic policies and programmes, and of sectoral policies and the effectiveness of programming, where appropriate by means of independent external evaluations, in order to ascertain whether the objectives have been met and enable it to formulate recommendations with a view to improving future operations. Proposals by the European Parliament or the Council for independent external evaluations will be taken into due account. Particular attention shall be given to social sectors and to progress made towards achieving the MDGs.
The Commission shall send its evaluation reports to the European Parliament and to the Committee referred to in Article 35 for information. Member States may request to discuss specific evaluations in the Committee referred to in Article 35(3). The results shall feed back into programme design and resource allocation.
The Commission shall associate all relevant stakeholders, including non-State actors and local authorities, in the evaluation phase of the Community assistance provided under this Regulation.
TITLE V FINAL PROVISIONS
Article 34
Annual report
The Commission shall examine the progress made in implementing the measures taken under this Regulation and shall submit to the European Parliament and the Council an annual report on the implementation and the results and, as far as possible, on the main outcomes and impacts of the assistance. This report shall also be submitted to the European Economic and Social Committee and to the Committee of the Regions.
The annual report shall contain information relating to the previous year on the measures financed, the results of monitoring and evaluation exercises, the involvement of the relevant partners, and the implementation of budget commitments and payments, broken down by country, region and cooperation sector. It shall assess the results of the assistance, using as far as possible, specific and measurable indicators of its role in meeting the objectives of this Regulation. Particular attention shall be given to social sectors and to progress made towards achieving the MDGs.
Article 35
Committee
The Commission shall be assisted by a committee.
Where reference is made to this paragraph, Articles 4 and 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof. The period laid down in Article 4(3) of the Decision shall be set at 30 days.
Where reference is made to this paragraph, Articles 3 and 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof.
The committee shall adopt its rules of procedure.
An observer from the EIB shall take part in the committee's proceedings, with regard to questions concerning the Bank.
Article 36
Participation by a third country not eligible under this Regulation
Without prejudice to Article 3(5), to ensure the coherence and effectiveness of Community assistance, the Commission may decide when adopting action programmes referred to in Article 22 or the special measures referred to in Article 23 that countries, territories and regions eligible for Community assistance under Regulation (EC) No 1085/2006 or Regulation (EC) No 1638/2006 and the EDF are eligible for measures under this Regulation where the geographic or thematic project or programme to be implemented is of a global, regional or cross border nature. Provision may be made for this method of financing in the strategy papers and multiannual indicative programmes referred to in Articles 19 and 20. The provisions of Article 10 concerning eligibility and the provisions of Article 31 concerning participation in public procurement and grant award procedures and rules of origin shall be adapted to allow the countries, territories and regions concerned to take part.
Article 37
Suspension of assistance
Without prejudice to the provisions on suspension of aid in partnership and cooperation agreements with partner countries and regions, where a partner country fails to observe the principles referred to in Article 3(1), and where consultations with the partner country do not lead to a solution acceptable to both parties, or if consultations are refused or in cases of special urgency, the Council, acting by a qualified majority on a proposal from the Commission, may take appropriate measures in respect of any assistance granted to the partner country under this Regulation. Such measures may include full or partial suspension of assistance.
Article 38
Financial provisions
The financial reference amount for the implementation of this Regulation over the period 2007-2013 is EUR 17 087 million.
The indicative amounts allocated to each programme referred to in Articles 5 to 10, 11 to 16 and 17 to 17a are laid down in Annex IV. These amounts are established for the period 2007-2013.
Annual appropriations shall be authorised by the budgetary authority within the limits of the multiannual financial framework.
An indicative amount of EUR 465 million has been included in the total amount for thematic programmes to finance activities that benefit the ENPI countries.
Article 39
Repeals
The following Regulations are hereby repealed:
- (a)Regulation (EC) No 2110/2005 of the European Parliament and of the Council of 14 December 2005 on access to Community external assistance ([^E0020]);
- (b)Regulation (EC) No 806/2004 of the European Parliament and of the Council of 21 April 2004 on promoting gender equality in development cooperation ([^E0021]);
- (c)Regulation (EC) No 491/2004 of the European Parliament and of the Council of 10 March 2004 establishing a programme for financial and technical assistance to third countries in the areas of migration and asylum (AENEAS) ([^E0022]);
- (d)Regulation (EC) No 1568/2003 of the European Parliament and of the Council of 15 July 2003 on aid to fight poverty diseases (HIV/AIDS, tuberculosis and malaria) in developing countries ([^E0023]);
- (e)Regulation (EC) No 1567/2003 of the European Parliament and of the Council of 15 July 2003 on aid for policies and actions on reproductive and sexual health and rights in developing countries ([^E0024]);
- (f)Regulation (EC) No 2130/2001 of the European Parliament and of the Council of 29 October 2001 on operations to aid uprooted people in Asia and Latin American developing countries ([^E0025]);
- (g)Regulation (EC) No 2494/2000 of the European Parliament and of the Council of 7 November 2000 on measures to promote the conservation and sustainable management of tropical forests and other forests in developing countries ([^E0026]);
- (h)Regulation (EC) No 2493/2000 of the European Parliament and of the Council of 7 November 2000 on measures to promote the full integration of the environmental dimension in the development process of developing countries ([^E0027]);
- (i)Regulation (EC) No 1726/2000 of the European Parliament and of the Council of 29 June 2000 on development cooperation with South Africa ([^E0028]);
- (j)Council Regulation (EC) No 1659/98 of 17 July 1998 on decentralised cooperation ([^E0029]);
- (k)Council Regulation (EC) No 1658/98 of 17 July 1998 on co-financing operations with European non-governmental organisations (NGOs) in fields of interest to the developing countries ([^E0030]);
- (l)Council Regulation (EC) No 1292/96 of 27 June 1996 on food-aid policy and food-aid management and special operations in support of food security ([^E0031]);
- (m)Council Regulation (EEC) No 443/92 of 25 February 1992 on financial and technical assistance to, and economic cooperation with, the developing countries in Asia and Latin America ([^E0032]) (ALA).
The repealed Regulations shall continue to apply for legal acts and commitments of pre 2007 budget years. Any reference to the repealed Regulations shall be deemed to be a reference to this Regulation.
Article 40
Review
Not later than 31 December 2010, the Commission shall submit to the European Parliament and the Council a report evaluating the implementation of this Regulation in the first three years with, if appropriate, a legislative proposal introducing the necessary modifications, including the indicative financial allocations set out in Annex IV.
Article 41
Entry into force
This Regulation shall enter into force on the day following that of its publication in the Official Journal of the European Union.
It shall apply from 1 January 2007 to 31 December 2013.
This Regulation shall be binding in its entirety and directly applicable in all Member States.
ANNEX I
COUNTRIES ELIGIBLE UNDER ARTICLE 1(1)
Latin America
- 1.Argentina
- 2.Bolivia
- 3.Brazil
- 4.Chile
- 5.Colombia
- 6.Costa Rica
- 7.Cuba
- 8.Ecuador
- 9.El Salvador
- 10.Guatemala
- 11.Honduras
- 12.Mexico
- 13.Nicaragua
- 14.Panama
- 15.Paraguay
- 16.Peru
- 17.Uruguay
- 18.Venezuela
Asia
- 19.Afghanistan
- 20.Bangladesh
- 21.Bhutan
- 22.Cambodia
- 23.China
- 24.India
- 25.Indonesia
- 26.Democratic People’s Republic of Korea
- 27.Laos
- 28.Malaysia
- 29.Maldives
- 30.Mongolia
- 31.Myanmar
- 32.Nepal
- 33.Pakistan
- 34.Philippines
- 35.Sri Lanka
- 36.Thailand
- 37.Vietnam
Central Asia
- 38.Kazakhstan
- 39.Kyrgyz Republic
- 40.Tajikistan
- 41.Turkmenistan
- 42.Uzbekistan
Middle East
- 43.Iran
- 44.Iraq
- 45.Yemen
Southern Africa
- 46.South Africa
ANNEX II
OECD/DAC LIST OF ODA RECIPIENTS
Effective for reporting on 2011, 2012 and 2013 flows
| Least Developed Countries | Other Low Income Countries (per capita GNI < USD 1 005 in 2010) | Lower Middle Income Countries and Territories (per capita GNI USD 1 006 - USD 3 975 in 2010) | Upper Middle Income Countries and Territories (per capita GNI USD 3 976 - USD 12 275 in 2007) |
|---|---|---|---|
| Afghanistan | Kenya | Armenia | Albania |
| Angola | Korea, Democratic People’s Republic of | Belize | Algeria |
| Bangladesh | Kyrgyz Rep. | Bolivia | [^E0033] Anguilla |
| Benin | South Sudan | Cameroon | Antigua and Barbuda |
| Bhutan | Tajikistan | Cape Verde | Argentina |
| Burkina Faso | Zimbabwe | Congo, Rep. | Azerbaijan |
| Burundi | Côte d’Ivoire | Belarus | |
| Cambodia | Egypt | Bosnia and Herzegovina | |
| Central African Rep. | El Salvador | Botswana | |
| Chad | Fiji | Brazil | |
| Comoros | Georgia | Chile | |
| Congo, Dem. Rep. | Ghana | China | |
| Djibouti | Guatemala | Colombia | |
| Equatorial Guinea | Guyana | Cook Islands | |
| Eritrea | Honduras | Costa Rica | |
| Ethiopia | India | Cuba | |
| Gambia | Indonesia | Dominica | |
| Guinea | Iraq | Dominican Republic | |
| Guinea-Bissau | Kosovo [^E0034] | Ecuador | |
| Haiti | Marshall Islands | Former Yugoslav Republic of Macedonia | |
| Kiribati | Micronesia, Federated States | Gabon | |
| Laos | Moldova | Grenada | |
| Lesotho | Mongolia | Iran | |
| Liberia | Morocco | Jamaica | |
| Madagascar | Nicaragua | Jordan | |
| Malawi | Nigeria | Kazakhstan | |
| Mali | Pakistan | Lebanon | |
| Mauritania | Papua New Guinea | Libya | |
| Mozambique | Paraguay | Malaysia | |
| Myanmar | Philippines | Maldives | |
| Nepal | Sri Lanka | Mauritius | |
| Niger | Swaziland | Mexico | |
| Rwanda | Syria | Montenegro | |
| Samoa | [^E0033] Tokelau | [^E0033] Montserrat | |
| São Tomé and Príncipe | Tonga | Namibia | |
| Senegal | Turkmenistan | Nauru | |
| Sierra Leone | Ukraine | Niue | |
| Solomon Islands | Uzbekistan | Palau | |
| Somalia | Vietnam | Panama | |
| Sudan | West Bank and Gaza Strip | Peru | |
| Tanzania | Serbia | ||
| Timor-Leste | Seychelles | ||
| Togo | South Africa | ||
| Tuvalu | [^E0033] St. Helena | ||
| Uganda | St. Kitts-Nevis | ||
| Vanuatu | St. Lucia | ||
| Yemen | St. Vincent and Grenadines | ||
| Zambia | Suriname | ||
| Thailand | |||
| Tunisia | |||
| Turkey | |||
| Uruguay | |||
| Venezuela | |||
| [^E0033] Wallis and Futuna |
[^E0034]: (2)This is without prejudice to the status of Kosovo under international law.
ANNEX III
ACP SUGAR PROTOCOL COUNTRIES
- 1.Barbados
- 2.Belize
- 3.Guyana
- 4.Jamaica
- 5.Saint Kitts and Nevis
- 6.Trinidad and Tobago
- 7.Fiji
- 8.Republic of the Congo
- 9.Côte d'Ivoire
- 10.Kenya
- 11.Madagascar
- 12.Malawi
- 13.Mauritius
- 14.Mozambique
- 15.Swaziland
- 16.Tanzania
- 17.Zambia
- 18.Zimbabwe
ANNEX IIIa
MAIN ACP BANANA-SUPPLYING COUNTRIES
- 1.Belize
- 2.Cameroon
- 3.Côte d’Ivoire
- 4.Dominica
- 5.Dominican Republic
- 6.Ghana
- 7.Jamaica
- 8.Saint Lucia
- 9.Saint Vincent and the Grenadines
- 10.Suriname
ANNEX IV
INDICATIVE FINANCIAL ALLOCATIONS FOR THE PERIOD 2007-2013
| (EUR million) | (EUR million) |
| Total | 17 087 |
| Geographic programmes: | 10 057 |
| Latin America | 2 690 |
| Asia | 5 187 |
| Central Asia | 719 |
| Middle East | 481 |
| South Africa | 980 |
| Thematic programmes: | 5 596 |
| Investing in people | 1 060 |
| Environment and sustainable management of natural resources | 804 |
| Non-State actors and local authorities in development | 1 639 |
| Food security | 1 709 |
| Migration and asylum | 384 |
| ACP Sugar Protocol countries | 1 244 |
| Main ACP banana-supplying countries | 190 |
ANNEX V
NON-DEVELOPING COUNTRIES AND TERRITORIES
- 1.Australia
- 2.Bahrain
- 3.Brunei
- 4.Canada
- 5.Chinese Taipei
- 6.Hong Kong
- 7.Japan
- 8.Korea
- 9.Macao
- 10.New Zealand
- 11.Kuwait
- 12.Qatar
- 13.Singapore
- 14.United Arab Emirates
- 15.United States of America
[^E0001]: Opinion of the European Parliament of 18 May 2006 (not yet published in the Official Journal), Council Common Position of 23 October 2006 (not yet published in the Official Journal) and Position of the European Parliament of 12 December 2006 (not yet published in the Official Journal).
[^E0002]: OJ L 210, 31.7.2006, p. 82.
[^E0003]: OJ L 310, 9.11.2006, p. 1.
[^E0004]: OJ L 405, 30.12.2006, p. 40.
[^E0005]: OJ L 327, 24.11.2006, p. 1.
[^E0006]: This Regulation will be adopted at a later date.
[^E0007]: OJ L 386, 29.12.2006, p. 1.
[^E0008]: OJ L 163, 2.7.1996, p. 1. Regulation as amended by Regulation (EC) No 1882/2003 of the European Parliament and of the Council (OJ L 284, 31.10.2003, p. 1).
[^E0009]: OJ C 46, 24.2.2006, p. 1.
[^E0010]: OJ L 314, 30.11.2001, p. 1.
[^E0011]: OJ L 50, 21.2.2006, p. 1.
[^E0012]: OJ L 248, 16.9.2002, p. 1.
[^E0013]: OJ C 139, 14.6.2006, p. 1.
[^E0014]: OJ L 184, 17.7.1999, p. 23. Decision as amended by Decision 2006/512/EC (OJ L 200, 22.7.2006, p. 11).
[^E0015]: Agreement on Trade, Development and Cooperation between the European Community and its Member States, of the one part, and the Republic of South Africa, of the other part (OJ L 311, 4.12.1999, p. 3.)
[^E0016]: OJ C 139, 14.6.2006, p. 1.
[^E0017]: OJ L 312, 23.12.1995, p. 1.
[^E0018]: OJ L 292, 15.11.1996, p. 2.
[^E0019]: OJ L 136, 31.5.1999, p. 1.
[^E0020]: OJ L 344, 27.12.2005, p. 1.
[^E0021]: OJ L 143, 30.4.2004, p. 40.
[^E0022]: OJ L 80, 18.3.2004, p. 1.
[^E0023]: OJ L 224, 6.9.2003, p. 7. Regulation as amended by Regulation (EC) No 2110/2005.
[^E0024]: OJ L 224, 6.9.2003, p. 1. Regulation as amended by Regulation (EC) No 2110/2005.
[^E0025]: OJ L 287, 31.10.2001, p. 3. Regulation as last amended by Regulation (EC) No 2110/2005.
[^E0026]: OJ L 288, 15.11.2000, p. 6. Regulation as amended by Regulation (EC) No 2110/2005.
[^E0027]: OJ L 288, 15.11.2000, p. 1. Regulation as amended by Regulation (EC) No 2110/2005.
[^E0028]: OJ L 198, 4.8.2000, p. 1. Regulation as last amended by Regulation (EC) No 2110/2005
[^E0029]: OJ L 213, 30.7.1998, p. 6. Regulation as last amended by Regulation (EC) No 625/2004 of the European Parliament and of the Council (OJ L 99, 3.4.2004, p. 1).
[^E0030]: OJ L 213, 30.7.1998, p. 1. Regulation as last amended by Regulation (EC) No 2110/2005.
[^E0031]: OJ L 166, 5.7.1996, p. 1. Regulation as amended by Regulation (EC) No 1726/2001 of the European Parliament and of the Council (OJ L 234, 1.9.2001, p. 10).
[^E0032]: OJ L 52, 27.2.1992, p. 1. Regulation as last amended by Regulation (EC) No 2112/2005 (OJ L 344, 27.12.2005, p. 23).
Reading this document does not replace reading the official text published in the Official Journal of the European Union. We assume no responsibility for any inaccuracies arising from the conversion of the original to this format.
This text is published under EUR-Lex's own terms of reuse, not a Legalize or public-domain licence.
EUR-Lex
Creative Commons Attribution 4.0 International (CC BY 4.0)
© European Union, https://eur-lex.europa.eu — Source: EUR-Lex (Publications Office of the European Union). Reused under the Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Only EU legislation published in the printed Official Journal of the European Union is deemed authentic; consolidated texts are reproduced here for documentation purposes and have been reformatted to Markdown.