Directive 2008/57/EC of the European Parliament and of the Council of 17 June 2008 on the interoperability of the rail system within the Community (Recast) (Text with EEA relevance)
All applications for an authorisation to place in service shall be the subject of a decision by the competent national safety authority, pursuant to Articles 22 and 23 or Articles 24 and 25. The authorisation to place in service may stipulate conditions of use and other restrictions.
Any decision by a competent national safety authority refusing the placing in service of a vehicle shall be duly substantiated. The applicant may within a period of one month from receipt of the negative decision request that the competent national safety authority reviewed the decision for duly justified reasons. The national safety authority shall then have two months starting from receipt of the appeal to confirm or reverse its decision. If the negative decision is confirmed, the applicant may request that the appeal body designated by the competent Member State under Article 17(3) of Directive 2004/49/EC review the decision for duly justified reasons. Member States may designate the regulatory body set up in accordance with Article 30 of Directive 2001/14/EC for the purpose of this appeal procedure.
In the absence of a decision of the competent national safety authority as referred to in Articles 23(7) and 25(5) within the prescribed time limits, the placing in service of the vehicle in question shall be deemed to have been authorised after a period of three months starting at the end of these time limits. The authorisations granted pursuant to this paragraph are only valid on the network for which the competent national safety authority did not react within the prescribed limits.
A national safety authority which intends to revoke an authorisation to place in service granted by itself or an authorisation granted to the applicant pursuant to paragraph 8 shall use the procedure for revision of safety certificates referred to in Article 10(5) of Directive 2004/49/EC or, where applicable, the procedure for revision of safety authorisations referred to in Article 11(2) of that Directive.
In the case of an appeal procedure, the competent appeal body referred to in paragraph 7 may request from the Agency an opinion which, in that case, shall be issued within one month of the request being filed and notified to the applicant, to the competent appeal body and to the competent national safety authority which refuses to grant the authorisation.
In the case of vehicles running between a Member State and a third country, on a network whose track gauge is different from that of the main rail network within the Community and for which a derogation may be granted in accordance with Article 9(5) or which are subject to specific cases, the national rules referred to in Articles 22 and 24 may include international agreements in so far as they are compatible with Community legislation.
Authorisations for placing in service which have been granted before 19 July 2008, including authorisations delivered under international agreements, in particular RIC (Regolamento Internazionale Carrozze) and RIV (Regolamento Internazionale Veicoli), shall remain valid in accordance with the conditions under which the authorisations have been granted. This provision takes precedence over Articles 22 to 25.
Member States may grant authorisations to place in service a series of vehicles. To that end, the national safety authorities shall notify the applicant of the procedure to be followed.
Authorisations for placing in service granted in accordance with this Article shall be without prejudice to other conditions imposed on railway undertakings and infrastructure managers for operating such vehicles on the relevant network, pursuant to Articles 9, 10 and 11 of Directive 2004/49/EC.
Article 22
First authorisation for placing in service of TSI conform vehicles
This Article shall apply to vehicles which are in conformity with all the relevant TSIs which are in force at the moment of placing in service, provided that a significant part of the essential requirements is laid down in these TSIs and that the relevant TSI on rolling stock has entered into force and is applicable.
The first authorisation shall be granted by a national safety authority as follows:
- (a)where all the structural subsystems of a vehicle have been authorised in conformity with the provisions of Chapter IV, the authorisation shall be granted without further checks;
- (b)in the case of vehicles bearing all necessary ‘EC’ declarations of verification as provided for in Article 18, the criteria which a national safety authority may check with a view to granting an authorisation for placing in service may concern only: —technical compatibility between the vehicle's relevant subsystems and their safe integration in accordance with Article 15(1), —technical compatibility between the vehicle and the network concerned, —national rules applicable to the open points, —national rules applicable to the specific cases duly identified in the relevant TSIs.
Article 23
Additional authorisations for placing in service of TSI conform vehicles
Vehicles in complete conformity with TSIs covering all aspects of the relevant subsystems without specific cases and without open points strictly related to technical compatibility between vehicle and network, shall not be subject to any additional authorisation for placing in service as long as they run on TSI conform networks in the other Member States or under the conditions specified in the corresponding TSIs.
In the case of vehicles placed in service in accordance with Article 22 but not covered by paragraph 1, Member States shall decide if additional authorisations are necessary on their territory. In this case, paragraphs 3 to 7 shall apply.
The applicant shall submit to the national safety authority a file on the vehicle or type of vehicle and the intended use thereof on the network. The file shall contain the following information:
- (a)documentary evidence that the placing in service of the vehicle has been authorised in another Member State in accordance with Article 22;
- (b)a copy of the technical file as referred to in Annex VI. This shall include, in the case of vehicles equipped with data recorders, information on the data collection procedure, permitting read out and evaluation, as long as this information is not harmonised by the corresponding TSI;
- (c)records showing the vehicle's maintenance history and, where applicable, technical modifications undertaken after the authorisation;
- (d)evidence on technical and operational characteristics that shows that the vehicle is compatible with the infrastructures and fixed installations, including climate conditions, energy supply system, control-command and signalling system, track gauge and infrastructure gauges, maximum permitted axle load and other constraints of the network.
The criteria checked by a national safety authority may concern only:
- —technical compatibility between the vehicle and the network concerned, including the national rules applicable to the open points needed to ensure such compatibility,
- —the national rules applicable to the specific cases duly identified in the relevant TSIs.
The national safety authority may request additional information to be supplied, risk analyses to be carried out in accordance with Article 6(3)(a) of Directive 2004/49/EC or tests to be conducted on the network in order to verify the criteria referred to in paragraph 4. However, after the adoption of the reference document referred to in Article 27 of this Directive, the national safety authority may only carry out such verification on the basis of the national rules relating to Group B or C featuring in that document.
The national safety authority shall define, after consultation with the applicant, the scope and content of the additional information, the risk analyses and the tests requested. The infrastructure manager, in consultation with the applicant, shall make every effort to ensure that any tests take place within three months of the applicant's request. Where appropriate, the national safety authority shall take measures to ensure that the tests take place.
All applications for an authorisation to place in service submitted in accordance with this Article shall be the subject of a decision by the national safety authority, to be taken as soon as possible and not later than:
- (a)two months after submission of the file referred to in paragraph 3;
- (b)where applicable, one month after provision of any additional information requested by the national safety authority;
- (c)where applicable, one month after provision of the results of any tests requested by the national safety authority.
Article 24
First authorisation for placing in service of non-TSI conform vehicles
This Article shall apply to vehicles which are not in conformity with all the relevant TSIs in force at the moment of placing in service, including vehicles subject to derogations, or where a significant part of the essential requirements is not laid down in one or more TSIs.
The first authorisation shall be granted by a national safety authority as follows:
- —for the technical aspects covered by a TSI, if any, the ‘EC’ verification procedure shall apply,
- —for the other technical aspects, national rules as notified under Article 17(3) of this Directive and under Article 8 of Directive 2004/49/EC shall apply.
This first authorisation shall be valid only on the network of the Member State granting it.
Article 25
Additional authorisations for placing in service of non-TSI conform vehicles
In the case of vehicles that have been authorised to be placed in service in one Member State in accordance with Article 21(12) or Article 24, other Member States may decide in accordance with this Article whether additional authorisations to place in service are necessary on their territory.
The applicant shall submit to the national safety authority a technical file on the vehicle or type of vehicle, together with details of planned use on the network. The file shall contain the following information:
- (a)documentary evidence that the placing in service of the vehicle has been authorised in another Member State together with documentation on the procedure followed in order to show that the vehicle complied with the safety requirements in force, including, where applicable, information on derogations enjoyed or granted in accordance with Article 9;
- (b)the technical data, the maintenance programme and the operational characteristics. This shall include, in the case of vehicles equipped with data recorders, information on the data collection procedure, permitting read out and evaluation as provided for in Article 20(2)(c) of Directive 2004/49/EC;
- (c)records showing the vehicle's history of operation, maintenance and, where applicable, technical modifications undertaken after the authorisation;
- (d)evidence on technical and operational characteristics that shows that the vehicle is compatible with the infrastructures and fixed installations, including climate conditions, energy supply system, control-command and signalling system, track gauge and infrastructure gauges, maximum permitted axle load and other constraints of the network.
The information referred to in paragraph 2(a) and (b) may not be called into question by the national safety authority, save where the latter is able to demonstrate without prejudice to Article 16 the existence of a substantial safety risk. After the adoption of the reference document referred to in Article 27, the national safety authority may not invoke in this regard any Group A rule listed in that document.
The national safety authority may request additional information to be supplied, risk analyses to be carried out in accordance with Article 6(3)(a) of Directive 2004/49/EC or tests to be conducted on the network in order to verify that the information referred to in paragraph 2(c) and (d) of this Article complies with the national rules in force as notified to the Commission pursuant to Article 8 of Directive 2004/49/EC or to Article 17 of this Directive. However, after the adoption of the reference document referred to in Article 27 of this Directive, the national safety authority may only carry out such verification on the basis of the national rules relating to Group B or C listed in that document.
The national safety authority shall define, after consultation with the applicant, the scope and content of the additional information, the risk analyses or the tests requested. The infrastructure manager, in consultation with the applicant, shall make every effort to ensure that any tests take place within three months of the applicant's request. Where appropriate, the national safety authority shall take measures to ensure that the tests take place.
All applications for an authorisation to place in service submitted in accordance with this Article shall be the subject of a decision by the national safety authority, to be taken as soon as possible and not later than:
- (a)four months after submission of the technical file referred to in paragraph 2;
- (b)where applicable, two months after provision of the additional information or risk analyses requested by the national safety authority pursuant to paragraph 4;
- (c)where applicable, two months after provision of the results of the tests requested by the national safety authority pursuant to paragraph 4.
Article 26
Authorisation for types of vehicles
Member States may grant authorisations for types of vehicles.
However, if Member States authorise a vehicle, they shall at the same time authorise the type of vehicle.
A vehicle which conforms to a type already authorised in a Member State shall be authorised by that Member State on the basis of a declaration of conformity to this type submitted by the applicant without further checks. However, where the relevant provisions in TSIs and national rules on the basis of which a type of vehicle was authorised have changed, Member States shall decide if authorisations of type already granted remain valid or need to be renewed. The criteria which a national safety authority checks in the case of a renewed authorisation of type may only concern the changed rules. The renewal of the type authorisation does not affect authorisations of vehicles already granted on the basis of previously authorised types.
The model of declaration of conformity to type shall be adopted by the Commission by 19 July 2009 on the basis of a draft prepared by the Agency and in accordance with the regulatory procedure referred to in Article 29(3).
The declaration of conformity to type shall be established in accordance with:
- (a)for TSI conform vehicles, the verification procedures of the relevant TSIs;
- (b)for non-TSI conform vehicles, the verification procedures as defined in modules D or E of Decision 93/465/EEC. Where appropriate, the Commission may adopt an ad hoc verification procedure in accordance with the regulatory procedure referred to in Article 29(3).
The applicant may request a type authorisation in several Member States at the same time. In this case, national safety authorities shall cooperate with a view to simplifying the procedure and minimising administrative efforts.
Type authorisations shall be registered in the European register of authorised types of vehicles referred to in Article 34. This register shall specify the Member State or Member States in which a type of vehicle is authorised.
Article 27
Classification of national rules
In order to facilitate the procedure for authorising the placing in service of vehicles referred to in Article 25, national rules shall be classified pursuant to Annex VII.
Without prejudice to Article 30(3), the Agency shall, by 19 January 2009, review the parameters set out in section 1 of Annex VII and make the recommendations it considers appropriate to the Commission.
The Agency shall draw up a recommendation for a reference document cross-referencing all the national rules applied by the Member States for placing vehicles in service. The national safety authorities shall cooperate with the Agency in this task.
The Commission shall adopt the reference document, as well as any decision to update it, on the basis of the Agency's recommendation and in accordance with the regulatory procedure referred to in Article 29(3).
CHAPTER VI NOTIFIED BODIES
Article 28
Notified bodies
Member States shall notify to the Commission and the other Member States the bodies responsible for carrying out the procedure for the assessment of conformity or suitability for use referred to in Article 13 and the verification procedure referred to in Article 18, indicating each body's area of responsibility, and the identification numbers obtained in advance from the Commission. The Commission shall publish in the Official Journal of the European Union the list of bodies, their identification numbers and areas of responsibility, and shall keep this list updated.
Member States shall apply the criteria provided for in Annex VIII for the assessment of the bodies to be notified. Bodies meeting the assessment criteria provided for in the relevant European standards shall be deemed to meet those criteria.
A Member State shall withdraw approval from a body which no longer meets the criteria referred to in Annex VIII. It shall forthwith inform the Commission and the other Member States thereof.
Should a Member State or the Commission consider that a body notified by another Member State does not meet the criteria referred to in Annex VIII, the Commission shall consult the parties concerned. The Commission shall inform the latter Member State of any changes that are necessary for the notified body to retain the status conferred upon it.
The Commission shall set up a notified bodies coordination group (hereinafter referred to as the Coordination Group) which shall discuss any matter relating to the application of the procedures for assessing conformity or suitability for the use referred to in Article 13 and the verification procedure referred to in Article 18, or to application of the relevant TSIs. Member States' representatives may take part in the work of the Coordination Group as observers.
The Commission and the observers shall inform the committee referred to in Article 29 of the work carried out in the framework of the Coordination Group. The Commission, when appropriate, will propose the measures needed to remedy the problems. Where necessary, coordination of the notified bodies shall be implemented in accordance with Article 30(4).
The first of the reports referred to in Article 39 shall also assess the implementation of the criteria specified in Annex VIII, and, if necessary, propose appropriate measures.
CHAPTER VII COMMITTEE AND WORK PROGRAMME
Article 29
Committee procedure
The Commission shall be assisted by the committee established by Article 21 of Directive 96/48/EC (hereinafter referred to as the Committee).
Where reference is made to this paragraph, Articles 3 and 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof.
Where reference is made to this paragraph, Articles 5 and 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof.
The period laid down in Article 5(6) of Decision 1999/468/EC shall be set at three months.
Where reference is made to this paragraph, Article 5a(1) to (4) and Article 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof.
Where reference is made to this paragraph, Article 5a(1), (2), (4) and (6) and Article 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof.
Article 30
Complementary tasks
The Commission may submit to the Committee any matter relating to the implementation of this Directive. If necessary, the Commission shall adopt an implementing recommendation in accordance with the advisory procedure referred to in Article 29(2).
The Committee may discuss any matter relating to the interoperability of the rail system, including questions relating to interoperability between the rail system within the Community and the rail system of third countries.
Measures designed to amend non-essential elements of this Directive and relating to the adaptation of Annexes II to IX shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 29(4).
Should it prove necessary, the Committee may set up working parties to assist it in carrying out its tasks, in particular with a view to coordinating the notified bodies.
Article 31
Work programme
The Commission shall draw up a work programme taking account of the extension of the scope provided for in Article 8, the amendment of the TSIs provided for in Article 6(1) and the other obligations imposed on it by this Directive. The Commission shall keep the Committee fully informed on and involved in the drawing up and updating of the programme.
The work programme shall consist of the following stages:
- (a)development on the basis of a draft prepared by the Agency of a model of the Community rail system, based on the list of subsystems (Annex II), to guarantee consistency between TSIs; this model must include in particular the various constituents of the system and their interfaces and act as a reference framework for defining the areas of use of each TSI;
- (b)development of a model structure for developing TSIs;
- (c)development of a method of cost-benefit analysis of the solutions set out in the TSIs;
- (d)adoption of the mandates needed to draw up the TSIs;
- (e)identification of the basic parameters for each TSI;
- (f)approval of draft standardisation programmes;
- (g)management of the transition period between the date of entry into force of Directive 2004/50/EC and publication of the TSIs, including the adoption of the reference system referred to in Article 36.
CHAPTER VIII REGISTERS OF NETWORK AND VEHICLES
Article 32
Vehicle numbering system
Any vehicle placed in service in the Community rail system shall carry a European vehicle number (EVN) assigned when the first authorisation for placing in service is granted.
The applicant for the first authorisation shall be responsible for marking the vehicle in question with the EVN assigned to it.
The EVN shall be specified in the TSI on operation and traffic management.
A vehicle shall be assigned an EVN only once, unless otherwise specified in the TSI on operation and traffic management.
Notwithstanding paragraph 1, in the case of vehicles operated or intended to be operated from or to third countries the track gauge of which is different from that of the main rail network within the Community, Member States may accept vehicles clearly identified according to a different coding system.
Article 33
National vehicle registers
Each Member State shall keep a register of the vehicles authorised in its territory. This register shall meet the following criteria:
- (a)it shall comply with the common specifications referred to in paragraph 2;
- (b)it shall be kept updated by a body independent of any railway undertaking;
- (c)it shall be accessible to the safety authorities and investigating bodies designated in Articles 16 and 21 of Directive 2004/49/EC; it shall also be made accessible, in response to any legitimate request, to the regulatory bodies designated in Article 30 of Directive 2001/14/EC, and to the Agency, the railway undertaking and the infrastructure managers, as well as those persons or organisations registering vehicles or identified in the register.
Common specifications for the register shall be adopted in accordance with the regulatory procedure referred to in Article 29(3) and on the basis of draft specifications prepared by the Agency. Those draft specifications shall include content, data format, functional and technical architecture, operating mode, including arrangements for the exchange of data, and rules for data input and consultation. For each vehicle, the register shall contain at least the following information:
- (a)the EVN;
- (b)references to the ‘EC’ declaration of verification and the issuing body;
- (c)references to the European register of authorised types of vehicles referred to in Article 34;
- (d)identification of the owner of the vehicle and the keeper;
- (e)restrictions on how the vehicle may be used;
- (f)the entity in charge of maintenance.
The registration holder shall immediately declare any modification to the data entered in the national vehicle register, the destruction of a vehicle or its decision to no longer register a vehicle, to the authority of any Member State where the vehicle has been authorised.
As long as Member States' national vehicle registers are not linked, each Member State shall update its register with the modifications made by another Member State in its own register, as regards the data with which it is concerned.
In the case of vehicles placed in service for the first time in a third country and authorised in a Member State for placing in service on its territory, that Member State shall ensure that the data listed in paragraph 2(d) to (f) can be retrieved through the national vehicle register. Data referred to in paragraph 2(f) may be substituted by safety critical data relating to the maintenance schedule.
Article 34
European register of authorised types of vehicles
The Agency shall set up and keep a register of types of vehicles authorised by the Member States for placing in service on the Community rail network. This register shall meet the following criteria:
- (a)it shall be public and electronically accessible;
- (b)it shall comply with the common specifications referred to in paragraph 4;
- (c)it shall be linked with all national vehicle registers.
This register shall include the following details for each type of vehicle:
- (a)the technical characteristics of the type of vehicle, as defined in the relevant TSIs;
- (b)the manufacturer's name;
- (c)the dates, references and Member States granting the successive authorisations for this type of vehicle, including any restrictions or withdrawals.
When an authorisation of type is granted, modified, suspended or withdrawn in a Member State, the national safety authority of this Member State shall inform the Agency, so that the latter may update the register.
Common specifications for the register shall be adopted in accordance with the regulatory procedure referred to in Article 29(3) and on the basis of draft specifications prepared by the Agency. Those draft specifications shall include content, data format, functional and technical architecture, operating mode and rules for data input and consultation.
Article 35
Register of infrastructure
Each Member State shall ensure that a register of infrastructure is published and updated on the basis of the revision cycle referred to in paragraph 2. This register shall indicate the main features of each subsystem or part subsystem involved (e.g. the basic parameters) and their correlation with the features laid down under the applicable TSIs. To that end, each TSI shall indicate precisely what information must be included in the register of infrastructure.
The Agency shall prepare draft specifications on this register regarding its presentation and format, its revision cycle and instructions for use, taking into account an appropriate transition period for infrastructures placed in service before the entry into force of this Directive. The Commission shall adopt the specifications in accordance with the regulatory procedure referred to in Article 29(3).
CHAPTER IX TRANSITIONAL PROVISIONS
Article 36
Draft reference systems
The Agency shall develop, in accordance with Articles 3 and 12 of Regulation (EC) No 881/2004 and on the basis of the information notified by the Member States under Article 17(3) of this Directive, technical documents from the profession and the texts of the relevant international agreements, a draft reference system of technical rules ensuring the current degree of interoperability of the networks and vehicles that will be brought within the scope of this Directive, as defined in Article 1 of this Directive. If necessary, the Commission shall adopt the reference system in accordance with the regulatory procedure referred to in Article 29(3) of this Directive.
Following adoption of this reference system, Member States shall inform the Commission of their intention to adopt any national provision or of the development of any project in their territory which diverges from the reference system.
CHAPTER X FINAL PROVISIONS
Article 37
Motivation
Any decision taken pursuant to this Directive concerning the assessment of conformity or suitability for use of interoperability constituents, the checking of subsystems constituting the rail system or any decision taken pursuant to Articles 7, 12, 14 and 19 shall set out in detail the reasons on which it is based. It shall be notified as soon as possible to the party concerned, together with an indication of the remedies available under the law in force in the Member State concerned and of the time limits allowed for the exercise of such remedies.
Article 38
Transposition
Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with Article 1, Article 2, Article 4(2), Article 5(2), (5), (6) and (8), Article 6(1), (2), (3), (9) and (10), Articles 7, 8, and 9, Article 11(4) and (5), Article 12, Article 13(5), Articles 15, 16 and 17, Article 18(1), (2), (4) and (5), Article 19(3), Articles 20 to 27, Article 28(4) and (6), Articles 32 to 35 and Annexes I to IX not later than 19 July 2010. They shall forthwith communicate to the Commission the text of those measures.
When Member States adopt those measures, they shall contain a reference to this Directive or shall be accompanied by such reference at the time of their official publication. The methods of making such reference shall be laid down by the Member States. Member States shall communicate to the Commission the text of the main provisions of national law which they adopt in the field covered by this Directive.
The obligation to transpose and implement Chapters IV, V, VII and VIII of this Directive shall not apply to the Republic of Cyprus and the Republic of Malta for as long as no railway system is established within their territory.
However, as soon as a public or private entity submits an official application to build a railway line in view of its operation by one or more railway undertakings, the Member States concerned shall put in place legislation to implement the Chapters referred to in the first subparagraph within one year from the receipt of the application.
Article 39
Reports and information
Every three years and for the first time 19 July 2011, the Commission shall report to the European Parliament and the Council on the progress made towards achieving interoperability of the rail system. That report shall also include an analysis of the cases set out in Article 9.
The Commission shall, by 19 July 2013, publish a report including an analysis of the application of Chapter V and of the improvements in the cross-acceptance of vehicles in the Community in terms of length and costs of the procedures for applicants. Where appropriate, the report shall also assess the impact of various options for further simplifying procedures relating to the authorisation of vehicles. In this case, several options concerning cooperation between national safety authorities and the Agency shall be analysed.
The Agency shall develop and regularly update a tool capable of providing, at the request of a Member State or the Commission, a chart of the interoperability level of the rail system. That tool shall use the information included in the registers provided for in Articles 33, 34 and 35.
Article 40
Repeal
Directives 96/48/EC and 2001/16/EC shall be repealed with effect from 19 July 2010, without prejudice to the obligations of the Member States concerning the time limits for transposition into national law and application of those Directives.
References to the repealed Directives shall be construed as references to this Directive and shall be read in accordance with the correlation table set out in Annex XI.
Article 14 of Directive 2004/49/EC shall be repealed with effect from 19 July 2008.
Article 41
Entry into force
This Directive shall enter into force on the day following its publication in the Official Journal of the European Union.
Article 42
Addressees
This Directive is addressed to the Member States.
ANNEX I
SCOPE
1. Trans-European conventional rail system
1.1. Network
The network of the trans-European conventional rail system will be that on the conventional lines of the trans-European transport network identified in Decision No 1692/96/EC.
For the purposes of this Directive, this network may be subdivided into the following categories:
- —lines intended for passenger services,
- —lines intended for mixed traffic (passengers and freight),
- —lines specially designed or upgraded for freight services,
- —passenger hubs,
- —freight hubs, including intermodal terminals,
- —lines connecting the abovementioned elements.
This network includes traffic management, tracking and navigation systems, technical installations for data processing and telecommunications intended for long-distance passenger services and freight services on the network in order to guarantee the safe and harmonious operation of the network and efficient traffic management.
1.2. Vehicles
The trans-European conventional rail system shall comprise all the vehicles likely to travel on all or part of the trans-European conventional rail network, including:
- —self-propelling thermal or electric trains,
- —thermal or electric traction units,
- —passenger carriages,
- —freight wagons, including vehicles designed to carry lorries.
Mobile railway infrastructure construction and maintenance equipment may be included.
Each of the above categories may be subdivided into:
- —vehicles for international use,
- —vehicles for national use.
2. Trans-European high-speed rail system
2.1. Network
The network of the trans-European high-speed rail system shall be that of the high-speed lines of the trans-European transport network identified in Decision No 1692/96/EC.
The high-speed lines shall comprise:
- —specially built high-speed lines equipped for speeds generally equal to or greater than 250 km/h,
- —specially upgraded high-speed lines equipped for speeds of the order of 200 km/h,
- —specially upgraded high-speed lines which have special features as a result of topographical, relief or town-planning constraints, on which the speed must be adapted to each case. This category also includes interconnecting lines between the high-speed and conventional networks, lines through stations, accesses to terminals, depots, etc. travelled at conventional speed by ‘high-speed’ rolling stock.
This network includes traffic management, tracking and navigation systems, technical installations for data processing and telecommunications intended for services on these lines in order to guarantee the safe and harmonious operation of the network and efficient traffic management.
2.2. Vehicles
The trans-European high-speed rail system shall comprise vehicles designed to operate:
- —either at speeds of at least 250 km/h on lines specially built for high speeds, while enabling operation at speeds exceeding 300 km/h in appropriate circumstances,
- —or at speeds of the order of 200 km/h on the lines of section 2.1, where compatible with the performance levels of these lines.
In addition, vehicles designed to operate with a maximum speed lower than 200 km/h which are likely to travel on all or part of the trans-European high-speed network, where compatible with the performance levels of this network, shall fulfil the requirements ensuring safe operation on this network. To this end, the TSIs for conventional vehicles shall also specify requirements for safe operation of conventional vehicles on high-speed networks.
3. Compatibility of the railway system
The quality of rail services in Europe depends, inter alia, on excellent compatibility between the characteristics of the network (in the broadest sense, i.e. the fixed parts of all the subsystems concerned) and those of the vehicles (including the onboard components of all the subsystems concerned). Performance levels, safety, quality of service and cost depend upon that compatibility.
4. Extension of the scope
4.1. Subcategories of network and vehicles
The scope of the TSIs shall be progressively extended to the whole rail system as referred to in Article 1(4). In order to deliver interoperability cost-effectively further subcategories of all categories of network and vehicles mentioned in this Annex will, where necessary, be developed. If necessary, the functional and technical specifications mentioned in Article 5(3) may vary according to the subcategory.
4.2. Cost safeguards
The cost-benefit analysis of the proposed measures will take into consideration, among others, the following:
- —cost of the proposed measure,
- —benefits to interoperability of an extension of the scope to particular subcategories of networks and vehicles,
- —reduction of capital costs and charges due to economies of scale and better utilisation of vehicles,
- —reduction of investment and maintenance/operating costs due to increased competition between manufacturers and maintenance companies,
- —environmental benefits, due to technical improvements of the rail system,
- —increase of safety in operation.
In addition, this assessment will indicate the likely impact for all the operators and economic agents involved.
ANNEX II
SUBSYSTEMS
1. List of subsystems
For the purposes of this Directive, the system constituting the rail system may be broken down into the following subsystems, either:
- (a)structural areas: —infrastructure, —energy, —trackside control-command and signalling, —on-board control-command and signalling, —rolling stock,
- (b)functional areas: —operation and traffic management, —maintenance, —telematics applications for passenger and freight services.
2. Description of the subsystems
For each subsystem or part of a subsystem, the list of constituents and aspects relating to interoperability is proposed by the Agency at the time of drawing up the relevant draft TSI. Without prejudging the choice of aspects and constituents relating to interoperability or the order in which they will be made subject to TSIs, the subsystems include the following:
2.1. Infrastructure
The track, points, engineering structures (bridges, tunnels, etc.), associated station infrastructure (platforms, zones of access, including the needs of persons with reduced mobility, etc.), safety and protective equipment.
2.2. Energy
The electrification system, including overhead lines and the trackside of the electricity consumption measuring system.
2.3. Trackside control-command and signalling
All the trackside equipment required to ensure safety and to command and control movements of trains authorised to travel on the network.
2.4. On-board control-command and signalling
All the on-board equipment required to ensure safety and to command and control movements of trains authorised to travel on the network.
2.5. Operation and traffic management
The procedures and related equipment enabling coherent operation of the various structural subsystems, during both normal and degraded operation, including in particular train composition and train driving, traffic planning and management.
The professional qualifications which may be required for carrying out cross-border services.
2.6. Telematics applications
In accordance with Annex I, this subsystem comprises two elements:
- (a)applications for passenger services, including systems which provide passengers with information before and during the journey, reservation and payment systems, luggage management and management of connections between trains and with other modes of transport;
- (b)applications for freight services, including information systems (realtime monitoring of freight and trains), marshalling and allocation systems, reservation, payment and invoicing systems, management of connections with other modes of transport and production of electronic accompanying documents.
2.7. Rolling stock
Structure, command and control system for all train equipment, electric current collection devices, traction and energy conversion units, on-board equipment for electricity consumption measuring, braking, coupling and running gear (bogies, axles, etc.) and suspension, doors, man/machine interfaces (driver, on-board staff and passengers, including the needs of persons with reduced mobility), passive or active safety devices and requisites for the health of passengers and on-board staff.
2.8. Maintenance
The procedures, associated equipment, logistics centres for maintenance work and reserves providing the mandatory corrective and preventive maintenance to ensure the interoperability of the rail system and guarantee the performance required.
ANNEX III
ESSENTIAL REQUIREMENTS
1. General requirements
1.1. Safety
- 1.1.1.The design, construction or assembly, maintenance and monitoring of safety-critical components, and more particularly of the components involved in train movements must be such as to guarantee safety at the level corresponding to the aims laid down for the network, including those for specific degraded situations.
- 1.1.2.The parameters involved in the wheel/rail contact must meet the stability requirements needed in order to guarantee safe movement at the maximum authorised speed. The parameters of brake equipment must guarantee that it is possible to stop within a given brake distance at the maximum authorised speed.
- 1.1.3.The components used must withstand any normal or exceptional stresses that have been specified during their period in service. The safety repercussions of any accidental failures must be limited by appropriate means.
- 1.1.4.The design of fixed installations and rolling stock and the choice of the materials used must be aimed at limiting the generation, propagation and effects of fire and smoke in the event of a fire.
- 1.1.5.Any devices intended to be handled by users must be so designed as not to impair the safe operation of the devices or the health and safety of users if used in a foreseeable manner, albeit not in accordance with the posted instructions.
1.2. Reliability and availability
The monitoring and maintenance of fixed or movable components that are involved in train movements must be organised, carried out and quantified in such a manner as to maintain their operation under the intended conditions.
1.3. Health
- 1.3.1.Materials likely, by virtue of the way they are used, to constitute a health hazard to those having access to them must not be used in trains and railway infrastructures.
- 1.3.2.Those materials must be selected, deployed and used in such a way as to restrict the emission of harmful and dangerous fumes or gases, particularly in the event of fire.
1.4. Environmental protection
- 1.4.1.The environmental impact of establishment and operation of the rail system must be assessed and taken into account at the design stage of the system in accordance with the Community provisions in force.
- 1.4.2.The materials used in the trains and infrastructures must prevent the emission of fumes or gases which are harmful and dangerous to the environment, particularly in the event of fire.
- 1.4.3.The rolling stock and energy-supply systems must be designed and manufactured in such a way as to be electromagnetically compatible with the installations, equipment and public or private networks with which they might interfere.
- 1.4.4.The design and operation of the rail system must not lead to an inadmissible level of noise generated by it: —in areas close to railway infrastructure, as defined in Article 3 of Directive 2012/34/EU, and —in the driver’s cab.
- 1.4.5.Operation of the rail system must not give rise to an inadmissible level of ground vibrations for the activities and areas close to the infrastructure and in a normal state of maintenance.
1.5. Technical compatibility
The technical characteristics of the infrastructure and fixed installations must be compatible with each other and with those of the trains to be used on the rail system.
If compliance with these characteristics proves difficult on certain sections of the network, temporary solutions, which ensure compatibility in the future, may be implemented.
1.6. Accessibility
- 1.6.1.The ‘infrastructure’ and ‘rolling stock’ subsystems must be accessible to persons with disabilities and persons with reduced mobility in order to ensure access on an equal basis with others by way of the prevention or removal of barriers, and by way of other appropriate measures. This shall include the design, construction, renewal, upgrade, maintenance and operation of the relevant parts of the subsystems to which the public has access.
- 1.6.2.The ‘operations’ and ‘telematics applications for passengers’ subsystems must provide for the necessary functionality required to facilitate access to persons with disabilities and persons with reduced mobility on an equal basis with others by way of the prevention or removal of barriers, and by way of other appropriate measures.
2. Requirements specific to each subsystem
2.1. Infrastructure
- 2.1.1.Safety Appropriate steps must be taken to prevent access to or undesirable intrusions into installations. Steps must be taken to limit the dangers to which persons are exposed, particularly when trains pass through stations. Infrastructure to which the public has access must be designed and made in such a way as to limit any human safety hazards (stability, fire, access, evacuation, platforms, etc.). Appropriate provisions must be laid down to take account of the particular safety conditions in very long tunnels and viaducts.
2.1.2. Accessibility
- 2.1.2.1.Infrastructure subsystems to which the public has access must be accessible to persons with disabilities and persons with reduced mobility in accordance with 1.6.
2.2. Energy
- 2.2.1.Safety Operation of the energy-supply systems must not impair the safety either of trains or of persons (users, operating staff, trackside dwellers and third parties).
- 2.2.2.Environmental protection The functioning of the electrical or thermal energy-supply systems must not interfere with the environment beyond the specified limits.
- 2.2.3.Technical compatibility The electricity/thermal energy supply systems used must: —enable trains to achieve the specified performance levels, —in the case of electricity energy supply systems, be compatible with the collection devices fitted to the trains.
2.3. Control-command and signalling
- 2.3.1.Safety The control-command and signalling installations and procedures used must enable trains to travel with a level of safety which corresponds to the objectives set for the network. The control-command and signalling systems should continue to provide for safe passage of trains permitted to run under degraded conditions.
- 2.3.2.Technical compatibility All new infrastructure and all new rolling stock manufactured or developed after adoption of compatible control-command and signalling systems must be tailored to the use of those systems. The control-command and signalling equipment installed in the train drivers' cabs must permit normal operation, under the specified conditions, throughout the rail system.
2.4. Rolling stock
- 2.4.1.Safety The rolling-stock structures and those of the links between vehicles must be designed in such a way as to protect the passenger and driving compartments in the event of collision or derailment. The electrical equipment must not impair the safety and functioning of the control-command and signalling installations. The braking techniques and the stresses exerted must be compatible with the design of the tracks, engineering structures and signalling systems. Steps must be taken to prevent access to electrically-live constituents in order not to endanger the safety of persons. In the event of danger devices must enable passengers to inform the driver and accompanying staff to contact him. The access doors must incorporate an opening and closing system which guarantees passenger safety. Emergency exits must be provided and indicated. Appropriate provisions must be laid down to take account of the particular safety conditions in very long tunnels. An emergency lighting system having a sufficient intensity and duration is an absolute requirement on board trains. Trains must be equipped with a public address system which provides a means of communication to the public from on-board staff.
- 2.4.2.Reliability and availability The design of the vital equipment and the running, traction and braking equipment and also the control and command system must, in a specific degraded situation, be such as to enable the train to continue without adverse consequences for the equipment remaining in service.
- 2.4.3.Technical compatibility The electrical equipment must be compatible with the operation of the control-command and signalling installations. In the case of electric traction, the characteristics of the current-collection devices must be such as to enable trains to travel under the energy-supply systems for the rail system. The characteristics of the rolling stock must be such as to allow it to travel on any line on which it is expected to operate, taking account of relevant climatic conditions.
- 2.4.4.Controls Trains must be equipped with a recording device. The data collected by this device and the processing of the information must be harmonised.
2.4.5. Accessibility
- 2.4.5.1.Rolling stock subsystems to which the public has access must be accessible to persons with disabilities and persons with reduced mobility in accordance with 1.6.
2.5. Maintenance
- 2.5.1.Health and safety The technical installations and the procedures used in the centres must ensure the safe operation of the subsystem and not constitute a danger to health and safety.
- 2.5.2.Environmental protection The technical installations and the procedures used in the maintenance centres must not exceed the permissible levels of nuisance with regard to the surrounding environment.
- 2.5.3.Technical compatibility The maintenance installations for rolling stock must be such as to enable safety, health and comfort operations to be carried out on all stock for which they have been designed.
2.6. Operation and traffic management
- 2.6.1.Safety Alignment of the network operating rules and the qualifications of drivers and on-board staff and of the staff in the control centres must be such as to ensure safe operation, bearing in mind the different requirements of cross-border and domestic services. The maintenance operations and intervals, the training and qualifications of the maintenance and control centre staff and the quality assurance system set up by the operators concerned in the control and maintenance centres must be such as to ensure a high level of safety.
- 2.6.2.Reliability and availability The maintenance operations and periods, the training and qualifications of the maintenance and control centre staff and the quality assurance system set up by the operators concerned in the control and maintenance centres must be such as to ensure a high level of system reliability and availability.
- 2.6.3.Technical compatibility Alignment of the network operating rules and the qualifications of drivers, on-board staff and traffic managers must be such as to ensure operating efficiency on the rail system, bearing in mind the different requirements of cross-border and domestic services.
2.6.4. Accessibility
- 2.6.4.1.Appropriate steps must be taken to ensure that operating rules provide for the necessary functionality required to ensure accessibility for persons with disabilities and persons with reduced mobility.
2.7. Telematics applications for freight and passengers
- 2.7.1.Technical compatibility The essential requirements for telematics applications guarantee a minimum quality of service for passengers and carriers of goods, particularly in terms of technical compatibility. Steps must be taken to ensure: —that the databases, software and data communication protocols are developed in a manner allowing maximum data interchange between different applications and operators, excluding confidential commercial data, —easy access to the information for users.
- 2.7.2.Reliability and availability The methods of use, management, updating and maintenance of these databases, software and data communication protocols must guarantee the efficiency of these systems and the quality of the service.
- 2.7.3.Health The interfaces between these systems and users must comply with the minimum rules on ergonomics and health protection.
- 2.7.4.Safety Suitable levels of integrity and dependability must be provided for the storage or transmission of safety-related information.
2.7.5. Accessibility
- 2.7.5.1.Appropriate steps must be taken to ensure that telematics applications for passengers subsystems provide for the necessary functionality required to ensure accessibility for persons with disabilities and persons with reduced mobility.
ANNEX IV
‘EC’ DECLARATION OF CONFORMITY AND SUITABILITY FOR USE OF INTEROPERABILITY CONSTITUENTS
1. Interoperability constituents
The ‘EC’ declaration applies to the interoperability constituents involved in the interoperability of the rail system, as referred to in Article 3. These interoperability constituents may be:
1.1. Multiple-use constituents
These are constituents that are not specific to the railway system and which may be used as such in other areas.
1.2. Multiple-use constituents having specific characteristics
These are constituents which are not, as such, specific to the railway system, but which must display specific performance levels when used for railway purposes.
1.3. Specific constituents
These are constituents that are specific to railway applications.
2. Scope
The ‘EC’ declaration covers:
- —either the assessment by a notified body or bodies of the intrinsic conformity of an interoperability constituent, considered in isolation, to the technical specifications to be met,
- —or the assessment/judgement by a notified body or bodies of the suitability for use of an interoperability constituent, considered within its railway environment and, in particular in cases where the interfaces are involved, in relation to the technical specifications, particularly those of a functional nature, which are to be checked.
The assessment procedures implemented by the notified bodies at the design and production stages will draw upon the modules defined in Decision 93/465/EEC, in accordance with the conditions referred to in the TSIs.
3. Contents of the ‘EC’ declaration
The ‘EC’ declaration of conformity or of suitability for use and the accompanying documents must be dated and signed.
That declaration must be written in the same language as the instructions and must contain the following:
- —the Directive references,
- —name and address of the manufacturer or its authorised representative established within the Community (give trade name and full address; in the case of the authorised representative, also give the trade name of the manufacturer),
- —description of interoperability constituent (make, type, etc.),
- —description of the procedure followed in order to declare conformity or suitability for use (Article 13),
- —all the relevant descriptions met by the interoperability constituent and, in particular, its conditions of use,
- —name and address of the notified body or bodies involved in the procedure followed in respect of conformity or suitability for use and date of examination certificate together with, where appropriate, the duration and conditions of validity of the certificate,
- —where appropriate, reference to the European specifications,
- —identification of the signatory empowered to enter into commitments on behalf of the manufacturer or of the manufacturer's authorised representative established within the Community.
ANNEX V
‘EC’ DECLARATION OF VERIFICATION OF SUBSYSTEMS
1. ‘EC’ DECLARATION OF VERIFICATION OF SUBSYSTEMS
The ‘EC’ declaration of verification of a subsystem is a declaration established by the ‘applicant’ within the meaning of Article 18 in which he declares on his sole responsibility that the subsystem concerned, which has been subject to the relevant verifications procedures, satisfies the requirements of the relevant Union legislation, including any relevant national rules.
The ‘EC’ declaration of verification and the accompanying documents must be dated and signed.
The ‘EC’ declaration of verification must be based on the information resulting from the ‘EC’ verification procedure for subsystems set out in Annex VI. It must be written in the same language as the technical file accompanying the ‘EC’ declaration of verification and must contain at least the following:
- (a)the reference to this Directive, TSIs and applicable national rules,
- (b)the reference to the TSI(s) or their parts to which conformity has not been examined during EC verification procedure and to the national rules which have been applied in case of a derogation, partial application of TSIs for upgrade or renewal, transitional period in a TSI or specific case,
- (c)name and address of the ‘applicant’ within the meaning of Article 18 (specifying the trade name and full address; in the case of the authorised representative, specifying also the trade name of the contracting entity or the manufacturer),
- (d)a brief description of the subsystem,
- (e)name(s) and address(es) and the identification number(s) of the notified body(ies) which conducted the ‘EC’ verification(s) referred to in Article 18,
- (f)name(s) and address(es) and the identification number(s) of the notified body(ies) which conducted the assessment of conformity with other regulations deriving from the Treaty,
- (g)name(s) and address(es) of the designated body(ies) which conducted the verification(s) of conformity with national rules referred to in Article 17(3),
- (h)name and address of the assessment body(ies) which established the safety assessment reports related to the use of the CSM on risk assessment where required by this Directive,
- (i)the references of the documents contained in the technical file accompanying the ‘EC’ declaration of verification,
- (j)all the relevant temporary or final provisions to be complied with by the subsystems and in particular, where appropriate, any operating restrictions or conditions,
- (k)the identity of the signatory (i.e. the physical person or persons authorised to sign the declaration)
Where reference is made in Annex VI to the ‘intermediate statement of verification’ (ISV), the provisions of this Section shall apply to that declaration.
2. ‘EC’ DECLARATION OF VERIFICATION OF SUBSYSTEMS IN THE CASE OF MODIFICATIONS
In a case of a modification, which is not a substitution in the framework of maintenance, of a subsystem covered by an ‘EC’ declaration of verification, without prejudice to Article 20, the following provisions apply.
- 2.1. If the entity introducing the modification demonstrates that the modification does not affect the basic design characteristics of the subsystem which are relevant for the compliance with the requirements concerning the basic parameters:
- (a)the entity introducing the modification shall update the references of the documents contained in the technical file accompanying the ‘EC’ declaration of verification;
- (b)no new ‘EC’ declaration of verification needs to be established.
- 2.2. If the entity introducing the modification demonstrates that the modification affects the basic design characteristics of the subsystem which are relevant for the compliance with the requirements concerning some basic parameters:
- (a)the entity introducing the modification shall establish a complementary ‘EC’ declaration of verification with reference to the basic parameters concerned;
- (b)the complementary ‘EC’ declaration of verification shall be accompanied by a list of documents of the original technical file accompanying the original ‘EC’ declaration of verification that are no more valid;
- (c)the technical file accompanying the ‘EC’ declaration of verification shall include a demonstration that the impact of modifications is limited to the basic parameters referred to in point (a);
- (d)provisions of Section 1 of this Annex shall apply mutatis mutandis to this complementary ‘EC’ declaration of verification;
- (e)the original ‘EC’ declaration of verification shall be considered valid for the basic parameters not concerned by the modification.
3. ‘EC’ DECLARATION OF VERIFICATION OF SUBSYSTEMS IN THE CASE OF ADDITIONAL VERIFICATIONS
An ‘EC’ declaration of verification of a subsystem may be complemented in the case of additional verifications carried out, in particular when such additional verifications are necessary for an additional authorisation for placing in service. In this case the scope of the complementary declaration shall be limited to the scope of the additional verifications.
ANNEX VI
‘EC’ VERIFICATION PROCEDURE FOR SUBSYSTEMS
1. GENERAL PRINCIPLES
‘“EC” verification’ means a procedure carried out by the applicant within the meaning of Article 18 to demonstrate that the requirements of the relevant Union legislation including any relevant national rules relating to a subsystem have been fulfilled and the subsystem may be authorised to be placed in service.
2. CERTIFICATE OF VERIFICATION ISSUED BY A NOTIFIED BODY
2.1. Introduction
For the purpose of this Directive, the verification by reference to TSIs is the procedure whereby a notified body checks and certifies that the subsystem complies with the relevant technical specifications for interoperability (TSI).
This is without prejudice of the obligations of the contracting entity or manufacturer (i.e. the applicant in the meaning of Article 18) to comply with the other applicable legislation deriving from the Treaty, including any verifications by the assessment bodies required by the other legislation.
2.2. Intermediate statement of verification (ISV)
2.2.1. Principles
At the request of the contracting entity or manufacturer (i.e. the applicant in the meaning of Article 18), the verifications may be done for parts of a subsystem or may be limited to certain stages of the verification procedure. In these cases, the results of verification may be documented in an ‘intermediate statement of verification’ (ISV) issued by the notified body chosen by the contracting entity or manufacturer (i.e. the applicant in the meaning of Article 18).
The ISV must provide reference to the TSIs with which the conformity has been assessed.
2.2.2. Parts of the subsystem
The applicant within the meaning of Article 18 may apply for an ISV for any part into which he decides to split the subsystem. Each part shall be checked at each stage as set out in point 2.2.3.
2.2.3. Stages of the verification procedure
The subsystem, or certain parts of the subsystem, shall be checked at each of the following stages:
- (a)overall design,
- (b)production: construction, including, in particular, civil-engineering activities, manufacturing, constituent assembly and overall adjustment,
- (c)final testing.
The applicant (within the meaning of Article 18) may apply for an ISV for the design stage (including the type tests) and for the production stage for the whole subsystem or for any part into which the applicant decided to split it (see paragraph 2.2.2).
2.3. Certificate of verification
- 2.3.1. The notified bodies responsible for the verification assesses the design, production and final testing of the subsystem and draw up the certificate of verification intended for the contracting entity or manufacturer (i.e. the applicant in the meaning of Article 18), who in turn draws up the ‘EC’ declaration of verification. The certificate of verification must provide reference to the TSIs with which the conformity has been assessed.
Where a subsystem has not been assessed for its conformity with all relevant TSI(s) (e.g. in the case of a derogation, partial application of TSIs for upgrade or renewal, transitional period in a TSI or specific case), the certificate of verification shall give the precise reference to the TSI(s) or their parts whose conformity has not been examined by the notified body during the verification procedure.
- 2.3.2. Where ISV have been issued, the notified body responsible for the verification of the subsystem takes these ISV into account, and, before issuing its certificate of verification:
- (a)verifies that the ISV cover correctly the relevant requirements of the TSI(s),
- (b)checks all aspects that are not covered by the ISV, and
- (c)checks the final testing of the subsystem as a whole.
- 2.3.3. In the case of a modification to a subsystem already covered by a certificate of verification, the notified body shall perform only those examinations and tests that are relevant and necessary, i.e. assessment shall relate only to the parts of the subsystem that are changed and their interfaces to the unchanged parts of the subsystem.
- 2.3.4. Each notified body involved in the verification of a subsystem shall draw up a technical file in accordance with Article 18(3) covering the scope of its activities.
2.4. Technical file accompanying the EC declaration of verification
The technical file accompanying the EC declaration of verification shall be assembled by the applicant (in the meaning of Article 18) and must contain the following:
- (a)technical characteristics linked to the design including general and detailed drawings with respect to execution, electrical and hydraulic diagrams, control-circuit diagrams, description of data-processing and automatic systems to the level of detail sufficient for documenting the verification of conformity carried out, documentation on operation and maintenance, etc., relevant for the subsystem concerned;
- (b)a list of interoperability constituents, referred to in Article 5(3)(d), incorporated into the subsystem;
- (c)the technical files referred to in Article 18(3), compiled by each of the notified bodies involved in the verification of the sub-system, which shall include: —copies of the ‘EC’ declarations of conformity and, where applicable, ‘EC’ declarations of suitability for use established for interoperability constituents referred to in Article 5(3)(d) and accompanied, where appropriate, by the corresponding calculation notes and a copy of the records of the tests and examinations carried out by the notified bodies on the basis of the common technical specifications, —where available, the ISV that accompany the certificate of verification, including the result of verification by the notified body of the ISV validity, —the certificate of verification, accompanied by corresponding calculation notes and signed by the notified body responsible for the verification, stating that the subsystem complies with the requirements of the relevant TSI(s) and mentioning any reservations recorded during performance of the activities and not withdrawn; the certificate of verification should also be accompanied by the inspection and audit reports drawn up by the same body in connection with its task, as specified in points 2.5.2 and 2.5.3;
- (d)certificates of verification issued in accordance with other legislation deriving from the Treaty;
- (e)when verification of safe integration is required pursuant to Article 15, the relevant technical file shall include the assessors' report(s) on the common safety methods (CSM) on risk assessment referred to in Article 6(3) of Directive 2004/49/EC.
2.5. Surveillance by notified bodies
- 2.5.1. The notified body responsible for checking production must have permanent access to building sites, production workshops, storage areas and, where appropriate, prefabrication or testing facilities and, more generally, to all premises which it considers necessary for its task. The notified body must receive from the contracting entity or manufacturers (i.e. the applicant in the meaning of Article 18) all the documents needed for that purpose and, in particular, the implementation plans and technical documentation concerning the subsystem.
- 2.5.2. The notified body responsible for checking implementation must periodically carry out audits in order to confirm compliance with the relevant TSI(s). It must provide those responsible for implementation with an audit report. Its presence may be required at certain stages of the building operations.
- 2.5.3. In addition, the notified body may pay unexpected visits to the worksite or to the production workshops. At the time of such visits the notified body may conduct complete or partial audits. It must provide those responsible for implementation with an inspection report and, if appropriate, an audit report.
Reading this document does not replace reading the official text published in the Official Journal of the European Union. We assume no responsibility for any inaccuracies arising from the conversion of the original to this format.
This text is published under EUR-Lex's own terms of reuse, not a Legalize or public-domain licence.
EUR-Lex
Creative Commons Attribution 4.0 International (CC BY 4.0)
© European Union, https://eur-lex.europa.eu — Source: EUR-Lex (Publications Office of the European Union). Reused under the Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Only EU legislation published in the printed Official Journal of the European Union is deemed authentic; consolidated texts are reproduced here for documentation purposes and have been reformatted to Markdown.