Regulation (EU, Euratom) 2018/1046 of the European Parliament and of the Council of 18 July 2018 on the financial rules applicable to the general budget of the Union, amending Regulations (EU) No 1296/2013, (EU) No 1301/2013, (EU) No 1303/2013, (EU) No 1304/2013, (EU) No 1309/2013, (EU) No 1316/2013, (EU) No 223/2014, (EU) No 283/2014, and Decision No 541/2014/EU and repealing Regulation (EU, Euratom) No 966/2012
REGULATION (EU, Euratom) 2018/1046 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
of 18 July 2018
on the financial rules applicable to the general budget of the Union, amending Regulations (EU) No 1296/2013, (EU) No 1301/2013, (EU) No 1303/2013, (EU) No 1304/2013, (EU) No 1309/2013, (EU) No 1316/2013, (EU) No 223/2014, (EU) No 283/2014, and Decision No 541/2014/EU and repealing Regulation (EU, Euratom) No 966/2012
PART ONE
FINANCIAL REGULATION
TITLE I SUBJECT MATTER, DEFINITIONS AND GENERAL PRINCIPLES
Article 1
Subject matter
This Regulation lays down the rules for the establishment and the implementation of the general budget of the European Union and of the European Atomic Energy Community (‘the budget’) and the presentation and auditing of their accounts.
Article 2
Definitions
For the purposes of this Regulation, the following definitions apply:
- (1) ‘applicant’ means a natural person or an entity with or without legal personality who has submitted an application in a grant award procedure or in a contest for prizes;
- (2) ‘application document’ means a tender, a request to participate, a grant application or an application in a contest for prizes;
- (3) ‘award procedure’ means a procurement procedure, a grant award procedure, a contest for prizes, or a procedure for the selection of experts or persons or entities implementing the budget pursuant to point (c) of the first subparagraph of Article 62(1);
- (4) ‘basic act’ means a legal act, other than a recommendation or an opinion, which provides a legal basis for an action and for the implementation of the corresponding expenditure entered in the budget or of the budgetary guarantee or financial assistance backed by the budget, and which may take any of the following forms:
- (a) in implementation of the Treaty on the Functioning of the European Union (TFEU) and the Treaty establishing the European Atomic Energy Community (the Euratom Treaty), the form of a regulation, a directive or a decision within the meaning of Article 288 TFEU; or
- (b) in implementation of Title V of the Treaty on European Union (TEU), one of the forms specified in Articles 28(1) and 31(2), Article 33, and Articles 42(4) and 43(2) TEU;
- (5) ‘beneficiary’ means a natural person or an entity with or without legal personality with whom a grant agreement has been signed;
- (6) ‘blending facility or platform’ means a cooperation framework established between the Commission and development or other public finance institutions with a view to combining non-repayable forms of support and/or financial instruments and/or budgetary guarantees from the budget and repayable forms of support from development or other public finance institutions, as well as from private-sector finance institutions and private-sector investors;
- (7) ‘budget implementation’ means the carrying out of activities relating to the management, monitoring, control and auditing of budget appropriations in accordance with the methods provided for in Article 62;
- (8) ‘budgetary commitment’ means the operation by which the authorising officer responsible reserves the budget appropriations necessary to cover subsequent payments to honour legal commitments;
- (9) ‘budgetary guarantee’ means a legal commitment of the Union to support a programme of actions by taking on the budget a financial obligation that can be called upon should a specified event materialise during the implementation of the programme, and that remains valid for the duration of the maturity of the commitments made under the supported programme;
- (10) ‘building contract’ means a contract covering the purchase, exchange, long lease, usufruct, leasing, rental or hire purchase, with or without option to buy, of land, buildings or other immovable property. It covers both existing buildings and buildings before completion provided that the candidate has obtained a valid building permit for it. It does not cover buildings designed in accordance with the specifications of the contracting authority that are covered by works contracts;
- (11) ‘candidate’ means an economic operator that has sought an invitation or has been invited to take part in a restricted procedure, a competitive procedure with negotiation, a competitive dialogue, an innovation partnership, a design contest or a negotiated procedure;
- (12) ‘central purchasing body’ means a contracting authority providing centralised purchasing activities and, where applicable, ancillary purchasing activities;
- (13) ‘check’ means the verification of a specific aspect of a revenue or expenditure operation;
- (14) ‘concession contract’ means a contract for pecuniary interest concluded in writing between one or more economic operators and one or more contracting authorities within the meaning of Articles 174 and 178, in order to entrust the execution of works or the provision and management of services to an economic operator (the ‘concession’), and where:
- (a) the remuneration consists either solely in the right to exploit the works or services or in that right together with payment;
- (b) the award of the concession contract involves the transfer to the concessionaire of an operating risk in exploiting those works or services encompassing demand risk or supply risk, or both. The concessionaire shall be deemed to assume an operating risk where, under normal operating conditions, there is no guarantee of recouping the investments made or the costs incurred in operating the works or the services concerned;
- (15) ‘contingent liability’ means a potential financial obligation that could be incurred depending on the outcome of a future event;
- (16) ‘contract’ means a public contract or a concession contract;
- (17) ‘contractor’ means an economic operator with whom a public contract has been signed;
- (18) ‘contribution agreement’ means an agreement concluded with persons or entities implementing Union funds pursuant to points (c)(ii) to (viii) of the first subparagraph of Article 62(1);
- (19) ‘control’ means any measure taken to provide reasonable assurance regarding the effectiveness, efficiency and economy of operations, the reliability of reporting, the safeguarding of assets and information, the prevention and detection and correction of fraud and irregularities and their follow-up, and the adequate management of the risks relating to the legality and regularity of the underlying transactions, taking into account the multiannual character of programmes as well as the nature of the payments concerned. Controls may involve various checks, as well as the implementation of any policies and procedures to achieve the objectives referred to in the first sentence;
- (20) ‘counterpart’ means the party that is granted a budgetary guarantee;
- (21) ‘crisis’ means:
- (a) a situation of immediate or imminent danger threatening to escalate into an armed conflict or to destabilise a country or its neighbourhood;
- (b) a situation caused by natural disasters, man-made crisis such as wars and other conflicts or extraordinary circumstances having comparable effects related, inter alia, to climate change, environmental degradation, privation of access to energy and natural resources or extreme poverty;
- (22) ‘decommitment’ means an operation whereby the authorising officer responsible cancels wholly or partly the reservation of appropriations previously made by means of a budgetary commitment;
- (23) ‘dynamic purchasing system’ means a completely electronic process for making commonly used purchases of items generally available on the market;
- (24) ‘economic operator’ means any natural or legal person, including a public entity, or a group of such persons, who offers to supply products, execute works or provide services or supply immovable property;
- (25) ‘equity investment’ means the provision of capital to a company, invested directly or indirectly in return for total or partial ownership of that company and where the equity investor may assume some management control of the company and may share the company’s profits;
- (26) ‘European office’ means an administrative structure set up by the Commission, or by the Commission with one or more other Union institutions, to perform specific cross-cutting tasks;
- (27) ‘final administrative decision’ means a decision of an administrative authority having final and binding effect in accordance with the applicable law;
- (28) ‘financial asset’ means any asset in the form of cash, an equity instrument of a publicly or privately held entity or a contractual right to receive cash or another financial asset from such entity;
- (29) ‘financial instrument’ means a Union measure of financial support provided from the budget to address one or more specific policy objectives of the Union which may take the form of equity or quasi-equity investments, loans or guarantees, or other risk-sharing instruments, and which may, where appropriate, be combined with other forms of financial support or with funds under shared management or funds of the European Development Fund (EDF);
- (30) ‘financial liability’ means a contractual obligation to deliver cash or another financial asset to another entity;
- (31) ‘framework contract’ means a public contract concluded between one or more economic operators and one or more contracting authorities, the purpose of which is to establish the terms governing specific contracts under it to be awarded during a given period, in particular with regard to price and, where appropriate, the quantity envisaged;
- (32) ‘global provisioning’ means the total amount of resources deemed necessary over the entire lifetime of a budgetary guarantee as a result of applying the provisioning rate referred to in Article 211(1) to the amount of the budgetary guarantee authorised by the basic act referred to in point (b) of Article 210(1);
- (33) ‘grant’ means a financial contribution by way of donation. Where such a contribution is provided under direct management, it shall be governed by Title VIII;
- (34) ‘guarantee’ means a written commitment to assume responsibility for all or part of a third party’s debt or obligation or for the successful performance by that third party of its obligations if an event occurs which triggers such guarantee, such as a loan default;
- (35) ‘guarantee on demand’ means a guarantee that must be honoured by the guarantor upon the counterpart’s demand, notwithstanding any deficiencies in the enforceability of the underlying obligation;
- (36) ‘in-kind contribution’ means non-financial resources made available free of charge by third parties to a beneficiary;
- (37) ‘legal commitment’ means an act whereby the authorising officer responsible enters into or establishes an obligation which results in subsequent payment or payments and the recognition of expenditure charged to the budget, and which includes specific agreements and contracts concluded under financial framework partnership agreements and framework contracts;
- (38) ‘leverage effect’ means the amount of reimbursable financing provided to eligible final recipients divided by the amount of the Union contribution;
- (39) ‘liquidity risk’ means the risk that a financial asset held in the common provisioning fund might not be sold during a certain period of time without incurring a significant loss;
- (40) ‘loan’ means an agreement which obliges the lender to make available to the borrower an agreed amount of money for an agreed period and under which the borrower is obliged to repay that amount within the agreed period;
- (41) ‘low value grant’ means a grant lower than or equal to EUR 60 000 ;
- (42) ‘Member State organisation’ means an entity established in a Member State as a public law body, or as a body governed by private law entrusted with a public service mission and provided with adequate financial guarantees from the Member State;
- (43) ‘method of implementation’ means any of the methods of budget implementation referred to in Article 62, that is direct management, indirect management and shared management;
- (44) ‘multi-donor action’ means any action where Union funds are pooled with at least one other donor;
- (45) ‘multiplier effect’ means the investment by eligible final recipients divided by the amount of the Union contribution;
- (46) ‘output’ means the deliverables generated by the action determined in accordance with sector-specific rules;
- (47) ‘participant’ means a candidate or tenderer in a procurement procedure, an applicant in a grant award procedure, an expert in a procedure for selection of experts, an applicant in a contest for prizes or a person or entity participating in a procedure for implementing Union funds pursuant to point (c) of the first subparagraph of Article 62(1);
- (48) ‘prize’ means a financial contribution given as a reward following a contest. Where such a contribution is provided under direct management, it shall be governed by Title IX;
- (49) ‘procurement’ means the acquisition by means of a contract of works, supplies or services and the acquisition or rental of land, buildings or other immovable property, by one or more contracting authorities from economic operators chosen by those contracting authorities;
- (50) ‘procurement document’ means any document produced or referred to by the contracting authority to describe or determine elements of the procurement procedure, including:
- (a) the publicity measures set out in Article 163;
- (b) the invitation to tender;
- (c) the tender specifications, including the technical specifications and the relevant criteria, or the descriptive documents in the case of a competitive dialogue;
- (d) the draft contract;
- (51) ‘public contract’ means a contract for pecuniary interest concluded in writing between one or more economic operators and one or more contracting authorities within the meaning of Articles 174 and 178, in order to obtain, against payment of a price paid in whole or in part from the budget, the supply of movable or immovable assets, the execution of works or the provision of services, comprising:
- (a) building contracts;
- (b) supply contracts;
- (c) works contracts;
- (d) service contracts;
- (52) ‘quasi-equity investment’ means a type of financing that ranks between equity and debt, having a higher risk than senior debt and a lower risk than common equity and which can be structured as debt, typically unsecured and subordinated and in some cases convertible into equity, or into preferred equity;
- (53) ‘recipient’ means a beneficiary, a contractor, a remunerated external expert or a person or entity receiving prizes or funds under a financial instrument or implementing Union funds pursuant to point (c) of the first subparagraph of Article 62(1);
- (54) ‘repurchase agreement’ means the sale of securities for cash with an agreement to repurchase them on a specified future date, or on demand;
- (55) ‘research and technological development appropriation’ means an appropriation entered either in one of the titles of the budget relating to the policy areas linked to ‘Indirect research’ or ‘Direct research’ or in a chapter relating to research activities in another title;
- (56) ‘result’ means the effects of the implementation of an action determined in accordance with sector-specific rules;
- (57) ‘risk-sharing instrument’ means a financial instrument which allows for the sharing of a defined risk between two or more entities, where appropriate in exchange for an agreed remuneration;
- (58) ‘service contract’ means a contract covering all intellectual and non-intellectual services other than those covered by supply contracts, works contracts and building contracts;
- (59) ‘sound financial management’ means implementation of the budget in accordance with the principles of economy, efficiency and effectiveness;
- (60) ‘Staff Regulations’ means the Staff Regulations of Officials of the European Union and the Conditions of Employment of Other Servants of the European Union laid down in Regulation (EEC, Euratom, ECSC) No 259/68;
- (61) ‘subcontractor’ means an economic operator that is proposed by a candidate or tenderer or contractor to perform part of a contract or by a beneficiary to perform part of the tasks co-financed by a grant;
- (62) ‘subscription’ means sums paid to bodies of which the Union is member, in accordance with the budgetary decisions and the conditions of payment established by the body concerned;
- (63) ‘supply contract’ means a contract covering the purchase, leasing, rental or hire purchase, with or without option to buy, of products, and which may include, as an incidental matter, siting and installation operations;
- (64) ‘technical assistance’ means, without prejudice to sector-specific rules, support and capacity-building activities necessary for the implementation of a programme or an action, in particular preparatory, management, monitoring, evaluation, audit and control activities;
- (65) ‘tenderer’ means an economic operator that has submitted a tender;
- (66) ‘Union’ means the European Union, the European Atomic Energy Community, or both, as the context may require;
- (67) ‘Union institution’ means the European Parliament, the European Council, the Council, the Commission, the Court of Justice of the European Union, the Court of Auditors, the European Economic and Social Committee, the Committee of the Regions, the European Ombudsman, the European Data Protection Supervisor or the European External Action Service (the ‘EEAS’); the European Central Bank shall not be considered to be a Union institution;
- (68) ‘vendor’ means an economic operator registered in a list of vendors to be invited to submit requests to participate in or submit tenders;
- (69) ‘volunteer’ means a person working on a non-compulsory basis for an organisation without being paid;
- (70) ‘work’ means the outcome of building or civil engineering works taken as a whole that is sufficient in itself to fulfil an economic or technical function;
- (71) ‘works contract’ means a contract covering either:
- (a) the execution or both the execution and design of a work;
- (b) the execution or both the execution and design of a work related to one of the activities referred to in Annex II to Directive 2014/24/EU; or
- (c) the realisation, by whatever means, of a work corresponding to the requirements specified by the contracting authority exercising a decisive influence on the type or design of the work.
Article 3
Compliance of secondary legislation with this Regulation
Provisions concerning the implementation of the revenue and expenditure of the budget, and contained in a basic act, shall comply with the budgetary principles set out in Title II.
Without prejudice to paragraph 1, any proposal or amendment to a proposal submitted to the legislative authority containing derogations from the provisions of this Regulation other than those set out in Title II, or from delegated acts adopted pursuant to this Regulation, shall clearly indicate such derogations and shall state the specific reasons justifying them in the recitals and in the explanatory memorandum of such proposals or amendments.
Article 4
Periods, dates and time limits
Unless otherwise provided in this Regulation, Council Regulation (EEC, Euratom) No 1182/71 ([^E0001]) shall apply to the deadlines set out in this Regulation.
Article 5
Protection of personal data
This Regulation is without prejudice to Regulations (EC) No 45/2001 and (EU) No 2016/679.
TITLE II BUDGET AND BUDGETARY PRINCIPLES
Article 6
Respect for budgetary principles
The budget shall be established and implemented in accordance with the principles of unity, budgetary accuracy, annuality, equilibrium, unit of account, universality, specification, sound financial management and transparency as set out in this Regulation.
CHAPTER 1 Principles of unity and of budgetary accuracy
Article 7
Scope of the budget
For each financial year, the budget shall forecast and authorise all revenue and expenditure considered necessary for the Union. It shall comprise:
- (a) the revenue and expenditure of the Union, including administrative expenditure resulting from the implementation of the provisions of the TEU relating to the common foreign and security policy (CFSP), and operational expenditure occasioned by implementation of those provisions where it is charged to the budget;
- (b) the revenue and expenditure of the European Atomic Energy Community.
The budget shall contain differentiated appropriations, which consist of commitment appropriations and payment appropriations, and non-differentiated appropriations.
The appropriations authorised for the financial year shall consist of:
- (a) appropriations provided in the budget, including by amending budgets;
- (b) appropriations carried over from preceding financial years;
- (c) appropriations made available again in accordance with Article 15;
- (d) appropriations arising from pre-financing payments which have been repaid in accordance with point (b) of Article 12(4);
- (e) appropriations provided following the receipt of revenue assigned during the financial year or carried over from preceding financial years.
Commitment appropriations shall cover the total cost of the legal commitments entered into during the financial year, subject to Article 114(2).
Payment appropriations shall cover payments made to honour the legal commitments entered into in the financial year or preceding financial years.
Paragraphs 2 and 3 of this Article shall not prevent appropriations being committed globally or budgetary commitments being made in annual instalments as respectively provided for in point (b) of the first subparagraph of Article 112(1) and in Article 112(2).
Article 8
Specific rules on the principles of unity and budgetary accuracy
All revenue and expenditure shall be booked to a budget line.
Without prejudice to authorised expenditure arising from contingent liabilities as provided for in Article 210(2), no expenditure may be committed or authorised in excess of the authorised appropriations.
An appropriation shall be entered in the budget only if it is for an item of expenditure considered necessary.
Interest generated by pre-financing payments made from the budget shall not be due to the Union except as otherwise provided in the contribution agreements or the financing agreements concerned.
CHAPTER 2 Principle of annuality
Article 9
Definition
The appropriations entered in the budget shall be authorised for a financial year which shall run from 1 January to 31 December.
Article 10
Budgetary accounting for revenue and appropriations
The revenue of a financial year shall be entered in the accounts for that year on the basis of the amounts collected during it. However, the own resources for the month of January of the following financial year may be made available in advance pursuant to Regulation (EU, Euratom) No 609/2014.
The entries in respect of the Value Added Tax (VAT) and Gross National Income-based own resources may be adjusted in accordance with Regulation (EU, Euratom) No 609/2014.
Commitments shall be entered in the accounts for a financial year on the basis of the legal commitments entered into up to 31 December of that year. However, the global budgetary commitments referred to in Article 112(4) shall be entered in the accounts for a financial year on the basis of the budgetary commitments up to 31 December of that year.
Payments shall be entered in the accounts for a financial year on the basis of the payments made by the accounting officer by 31 December of that year.
By way of derogation from paragraphs 3 and 4:
- (a) the expenditure of the European Agricultural Guarantee Fund (EAGF) shall be entered in the accounts for a financial year on the basis of the repayments made by the Commission to Member States by 31 December of that year, provided that the payment order has reached the accounting officer by 31 January of the following financial year;
- (b) expenditure implemented under shared management with the exception of the EAGF shall be entered in the accounts for a financial year on the basis of the reimbursements made by the Commission to Member States by 31 December of that year, including the expenditure charged by 31 January of the following financial year as laid down in Articles 30 and 31.
Article 11
Commitment of appropriations
The appropriations entered in the budget may be committed with effect from 1 January, once the budget has been definitively adopted.
As of 15 October of the financial year, the following expenditure may be committed in advance against the appropriations provided for the following financial year:
- (a) routine administrative expenditure, provided that such expenditure has been approved in the last budget duly adopted, and only up to a maximum of one quarter of the total corresponding appropriations decided upon by the European Parliament and by the Council for the current financial year;
- (b) routine management expenditure for the EAGF, provided that the basis for such expenditure is laid down in an existing basic act, and only up to a maximum of three quarters of the total corresponding appropriations decided upon by the European Parliament and by the Council for the current financial year.
Article 12
Cancellation and carry-over of appropriations
Appropriations which have not been used by the end of the financial year for which they were entered shall be cancelled, unless they are carried over in accordance with paragraphs 2 to 8.
The following appropriations may be carried over by a decision taken pursuant to paragraph 3, but only to the following financial year:
- (a) commitment appropriations and non-differentiated appropriations, for which most of the preparatory stages of the commitment procedure have been completed by 31 December of the financial year. Such appropriations may be committed up to 31 March of the following financial year, with the exception of non-differentiated appropriations related to building projects which may be committed up to 31 December of the following financial year;
- (b) appropriations which are necessary when the legislative authority has adopted a basic act in the final quarter of the financial year and the Commission has been unable to commit the appropriations provided for that purpose by 31 December of that year. Such appropriations may be committed up to 31 December of the following financial year;
- (c) payment appropriations which are needed to cover existing commitments or commitments linked to commitment appropriations carried over, where the payment appropriations provided for in the relevant budget lines for the following financial year are insufficient;
- (d) non-committed appropriations relating to the actions referred to in Article 4(1) of Regulation (EU) No 1306/2013 of the European Parliament and of the Council ([^E0002]).
With regard to point (c) of the first subparagraph, the Union institution concerned shall first use the appropriations authorised for the current financial year and shall not use the appropriations carried over until the former are exhausted.
Carry-overs of non-committed appropriations as referred to in point (d) of the first subparagraph of this paragraph shall not exceed, within a limit of 2 % of the initial appropriations voted by the European Parliament and by the Council, the amount of the adjustment of direct payments applied in accordance with Article 26 of Regulation (EU) No 1306/2013 during the preceding financial year. Appropriations which are carried over shall be returned to the budget lines which cover the actions referred to in point (b) of Article 4(1) of Regulation (EU) No 1306/2013.
The Union institution concerned shall take its decision on carry-overs as referred to in paragraph 2 by 15 February of the following financial year. It shall inform the European Parliament and the Council by 15 March of that year of the carry-over decision it has taken. It shall also state, for each budget line, how the criteria in points (a), (b) and (c) of the first subparagraph of paragraph 2 have been applied to each carry-over.
Appropriations shall be automatically carried over in respect of:
- (a) commitment appropriations for the Emergency Aid Reserve and for the European Union Solidarity Fund. Such appropriations may be carried over only to the following financial year and may be committed up to 31 December of that year;
- (b) appropriations corresponding to internal assigned revenue. Such appropriations may be carried over only to the following financial year and may be committed up to 31 December of that year, with the exception of the internal assigned revenue from lettings and the sale of buildings and land which may be carried over until it is fully used. Commitment appropriations, as referred to in Regulation (EU) No 1303/2013 and in Regulation (EU) No 514/2014 of the European Parliament and of the Council ([^E0003]), which are available on 31 December arising from repayments of pre-financing payments may be carried over until the closure of the programme and used when necessary, provided that other commitment appropriations are no longer available;
- (c) appropriations corresponding to external assigned revenue. Such appropriations shall be fully used by the time all the operations relating to the programme or action to which they are assigned have been carried out or they may be carried over and used for the succeeding programme or action. This shall not apply to the revenue referred to in point (iii) of Article 21(2)(g) for which appropriations not committed within five years shall be cancelled;
- (d) payment appropriations related to the EAGF resulting from suspensions in accordance with Article 41 of Regulation (EU) No 1306/2013.
The treatment of external assigned revenue as referred to in point (c) of paragraph 4 of this Article resulting from the participation of European Free Trade Association (EFTA) States in certain Union programmes in accordance with point (e) of Article 21(2) shall be in line with Protocol No 32 annexed to the Agreement on the European Economic Area (EEA Agreement).
In addition to the information provided for in paragraph 3, the Union institution concerned shall submit to the European Parliament and to the Council information on appropriations which were automatically carried over, including the amounts involved and the provision of this Article under which the appropriations were carried over.
Non-differentiated appropriations legally committed at the end of the financial year shall be paid until the end of the following financial year.
Without prejudice to paragraph 4, appropriations placed in reserve and appropriations for staff expenditure shall not be carried over. For the purposes of this Article, staff expenditure comprises remuneration and allowances for members and for staff of Union institutions who are subject to the Staff Regulations.
Article 13
Detailed provisions on cancellation and carry-over of appropriations
The commitment appropriations and the non-differentiated appropriations referred to in point (a) of the first subparagraph of Article 12(2) may be carried over only if the commitments could not be made before 31 December of the financial year for reasons not attributable to the authorising officer and if the preparatory stages are sufficiently advanced to make it reasonable to expect that the commitment will be made by 31 March of the following financial year, or, in relation to building projects, by 31 December of the following financial year.
The preparatory stages referred to in point (a) of the first subparagraph of Article 12(2), which shall be completed by 31 December of the financial year in order to allow a carry-over to the following financial year, are in particular:
- (a) for individual budgetary commitments within the meaning of point (a) of the first subparagraph of Article 112(1), the completion of the selection of potential contractors, beneficiaries, prize winners or delegates;
- (b) for global budgetary commitments within the meaning of point (b) of the first subparagraph of Article 112(1), the adoption of a financing decision or the closing of the consultation of the departments concerned within each Union institution on the adoption of the financing decision.
Appropriations carried over in accordance with point (a) of the first subparagraph of Article 12(2) which have not been committed by 31 March of the following financial year, or by 31 December of the following financial year for amounts relating to building projects, shall be automatically cancelled.
The Commission shall inform the European Parliament and the Council of the appropriations cancelled in accordance with the first subparagraph within one month following the cancellation.
Article 14
Decommitments
Where budgetary commitments are decommitted in any financial year after the year in which they were made as a result of the total or partial non-implementation of the actions for which they were earmarked, the appropriations corresponding to such decommitments shall be cancelled, unless otherwise provided in Regulations (EU) No 1303/2013 and (EU) No 514/2014 and without prejudice to Article 15 of this Regulation.
Commitment appropriations referred to in Regulations (EU) No 1303/2013 and (EU) No 514/2014 shall be decommitted automatically in accordance with those Regulations.
This Article does not apply to external assigned revenue referred to in Article 21(2).
Article 15
Making appropriations corresponding to decommitments available again
The appropriations corresponding to decommitments referred to in Regulations (EU) No 1303/2013, (EU) No 223/2014 and (EU) No 514/2014 may be made available again in the event of a manifest error attributable solely to the Commission.
To that end, the Commission shall examine decommitments made during the preceding financial year and shall decide, by 15 February of the current financial year, on the basis of requirements, whether it is necessary to make the corresponding appropriations available again.
In addition to the case referred to in paragraph 1 of this Article, the appropriations corresponding to decommitments shall be made available again in the event of:
- (a) the decommitment from a programme under the arrangements for the implementation of the performance reserve established in Article 20 of Regulation (EU) No 1303/2013;
- (b) the decommitment from a programme dedicated to a specific financial instrument in favour of small and medium-sized enterprises (SMEs) following the discontinuance of the participation of a Member State in the financial instrument, as referred to in the seventh subparagraph of Article 39(2) of Regulation (EU) No 1303/2013.
Commitment appropriations corresponding to the amount of decommitments made as a result of total or partial non-implementation of corresponding research projects may also be made available again to the benefit of the research programme the projects belong to or its successor in the context of the budgetary procedure.
Article 16
Rules applicable in the event of late adoption of the budget
If the budget has not been definitively adopted at the beginning of the financial year, the procedure set out in the first paragraph of Article 315 TFEU (the provisional twelfths regime) shall apply. Commitments and payments may be made within the limits laid down in paragraph 2 of this Article.
Commitments may be made per chapter up to a maximum of one quarter of the total appropriations authorised in the relevant chapter of the budget for the preceding financial year plus one twelfth for each month which has elapsed.
The limit of the appropriations provided for in the draft budget shall not be exceeded.
Payments may be made monthly per chapter up to a maximum of one twelfth of the appropriations authorised in the relevant chapter of the budget for the preceding financial year. That sum shall not, however, exceed one twelfth of the appropriations provided for in the same chapter of the draft budget.
The appropriations authorised in the relevant chapter of the budget for the preceding financial year, as referred to in paragraphs 1 and 2, shall be understood as referring to the appropriations voted in the budget, including by amending budgets, and after adjustment for the transfers made during that financial year.
If the continuity of Union action and management needs so require, the Council, acting by qualified majority on a proposal from the Commission, may authorise expenditure in excess of one provisional twelfth but not exceeding a total of four provisional twelfths, except in duly justified cases, both for commitments and for payments over and above those automatically made available in accordance with paragraphs 1 and 2. The Council shall without delay forward its decision on authorisation to the European Parliament.
The decision referred to in the first subparagraph shall enter into force 30 days after its adoption unless the European Parliament takes any of the following actions:
- (a) acting by a majority of its component members, decides to reduce the expenditure before the expiry of the 30 days, in which case the Commission shall submit a new proposal;
- (b) informs the Council and the Commission that it does not wish to reduce the expenditure, in which case the decision shall enter into force before the expiry of the 30 days.
The additional twelfths shall be authorised in full and shall not be divisible.
If, for a given chapter, the authorisation of four provisional twelfths granted in accordance with paragraph 4 is not sufficient to cover the expenditure necessary to avoid a break in continuity of Union action in the area covered by the chapter in question, authorisation may exceptionally be given to exceed the amount of the appropriations entered in the corresponding chapter of the budget for the preceding financial year. The European Parliament and the Council shall act in accordance with the procedures provided for in paragraph 4. However, the overall total of the appropriations available in the budget of the preceding financial year or in the draft budget, as proposed, shall in no circumstances be exceeded.
CHAPTER 3 Principle of equilibrium
Article 17
Definition and scope
Revenue and payment appropriations shall be in balance.
The Union and the Union bodies referred to in Articles 70 and 71 shall not raise loans within the framework of the budget.
Article 18
Balance from financial year
The balance from each financial year shall be entered in the budget for the following financial year as revenue in the event of a surplus or as a payment appropriation in the event of a deficit.
The estimates of the revenue or payment appropriations referred to in paragraph 1 of this Article shall be entered in the budget during the budgetary procedure and in a letter of amendment submitted pursuant to Article 42 of this Regulation. The estimates shall be drawn up in accordance with Article 1 of Council Regulation (EU, Euratom) No 608/2014 ([^E0004]).
After the presentation of the provisional accounts for each financial year, any discrepancy between those accounts and the estimates shall be entered in the budget for the following financial year through an amending budget devoted solely to that discrepancy. In such a case, the Commission shall submit the draft amending budget simultaneously to the European Parliament and to the Council within 15 days of submission of the provisional accounts.
CHAPTER 4 Principle of unit of account
Article 19
Use of euro
The multiannual financial framework and the budget shall be drawn up and implemented in euro and the accounts shall be presented in euro. However, for the cash-flow purposes referred to in Article 77, the accounting officer and, in the case of imprest accounts, the imprest administrators, and, for the needs of the administrative management of the Commission and the EEAS, the authorising officer responsible, shall be authorised to carry out operations in other currencies.
Without prejudice to specific provisions laid down in sector-specific rules, or in specific contracts, grant agreements, contribution agreements and financing agreements, conversion by the authorising officer responsible shall be made using the daily euro exchange rate published in the C series of the Official Journal of the European Union of the day on which the payment order or recovery order is drawn up by the authorising department.
If no such daily rate is published, the authorising officer responsible shall use the one referred to in paragraph 3.
For the purposes of the accounts provided for in Articles 82, 83 and 84, conversion between the euro and another currency shall be made using the monthly accounting exchange rate of the euro. That accounting exchange rate shall be established by the accounting officer of the Commission by means of any source of information regarded as reliable, on the basis of the exchange rate on the penultimate working day of the month preceding that for which the rate is established.
Currency conversion operations shall be carried out in such a way as to avoid having a significant impact on the level of the Union co-financing or a detrimental impact on the budget. Where appropriate, the rate of conversion between the euro and other currencies may be calculated using the average of the daily exchange rate in a given period.
CHAPTER 5 Principle of universality
Article 20
Scope
Without prejudice to Article 21, total revenue shall cover total payment appropriations. Without prejudice to Article 27, all revenue and expenditure shall be entered in the budget in full without any adjustment against each other.
Article 21
Assigned revenue
External assigned revenue and internal assigned revenue shall be used to finance specific items of expenditure.
The following shall constitute external assigned revenue:
- (a) specific additional financial contributions from Member States to the following types of actions and programmes:
- (i) certain supplementary research and technological development programmes;
- (ii) certain external aid actions or programmes financed by the Union and managed by the Commission;
- (b) appropriations relating to the revenue generated by the Research Fund for Coal and Steel established by Protocol No 37 on the financial consequences of the expiry of the ECSC Treaty and on the Research Fund for Coal and Steel, annexed to the TEU and to the TFEU.
- (c) the interest on deposits and the fines provided for in Council Regulation (EC) No 1467/97 ([^E0005]);
- (d) revenue earmarked for a specific purpose, such as income from foundations, subsidies, gifts and bequests, including the earmarked revenue specific to each Union institution;
- (e) financial contributions to Union activities from third countries or from bodies other than those set up under the TFEU or the Euratom Treaty;
- (f) internal assigned revenue referred to in paragraph 3, to the extent that it is ancillary to external assigned revenue referred to in this paragraph;
- (g) revenue from the activities of a competitive nature conducted by the Joint Research Centre (JRC) which consist of any of the following:
- (i) grant and procurement procedures in which the JRC participates;
- (ii) activities of the JRC on behalf of third parties;
- (iii) activities undertaken under an administrative agreement with other Union institutions or other Commission departments, in accordance with Article 59, for the provision of technical-scientific services.
The following shall constitute internal assigned revenue:
- (a) revenue from third parties in respect of goods, services or work supplied at their request;
- (b) revenue arising from the repayment, in accordance with Article 101, of amounts wrongly paid;
- (c) proceeds from the supply of goods, services and works to other departments within an Union institution, or to other Union institutions or bodies, including refunds by other Union institutions or bodies of mission allowances paid on their behalf;
- (d) insurance payments received;
- (e) revenue from lettings and from the sale of buildings and land;
- (f) repayments to financial instruments or budgetary guarantees pursuant to the second subparagraph of Article 209(3);
- (g) revenue arising from subsequent reimbursement of taxes pursuant to point (b) of the first subparagraph of Article 27(3).
Assigned revenue shall be carried over and transferred in accordance with points (b) and (c) of Article 12(4) and with Article 32.
A basic act may assign the revenue for which it provides to specific items of expenditure. Unless otherwise specified in the basic act, such revenue shall constitute internal assigned revenue.
The budget shall include lines to accommodate external assigned revenue and internal assigned revenue and shall, wherever possible, indicate the amount.
Article 22
Structure to accommodate assigned revenue and provision of corresponding appropriations
Without prejudice to point (c) of the first subparagraph of paragraph 2 of this Article and to Article 24, the structure to accommodate assigned revenue in the budget shall comprise:
- (a) in the statement of revenue of each Union institution’s section, a budget line to receive the revenue;
- (b) in the statement of expenditure, the remarks, including general remarks, showing which budget lines may receive the appropriations corresponding to the assigned revenue which are made available.
In the case referred to in point (a) of the first subparagraph, a token entry pro memoria shall be made and the estimated revenue shall be shown for information in the remarks.
The appropriations corresponding to assigned revenue shall be made available automatically, both as commitment appropriations and as payment appropriations, when the revenue has been received by the Union institution, save in any of the following cases:
- (a) in the case provided for in point (a) of Article 21(2) for financial contributions from Member States and where the contribution agreement is expressed in euro, commitment appropriations may be made available upon signature of the contribution agreement by the Member State;
- (b) in the cases provided for in point (b) of Article 21(2) and in points (i) and (iii) of Article 21(2)(g), the commitment appropriations shall be made available as soon as the amount receivable has been estimated;
- (c) in the case provided for in point (c) of Article 21(2), the entry of the amounts in the statement of revenue shall give rise to the provision, in the statement of expenditure, of commitment and payment appropriations.
Appropriations referred to in point (c) of the first subparagraph of this paragraph shall be implemented in accordance with Article 20.
The estimates of amounts receivable referred to in points (b) and (g) of Article 21(2) shall be sent to the accounting officer for registration.
Article 23
Contributions from Member States to research programmes
The contributions from Member States to the financing of certain supplementary research programmes, provided for in Article 5 of Regulation (EU, Euratom) No 609/2014, shall be paid as follows:
- (a) seven twelfths of the sum entered in the budget shall be paid by 31 January of the current financial year;
- (b) the remaining five twelfths shall be paid by 15 July of the current financial year.
Where the budget has not been definitively adopted before the start of a financial year, the contributions provided for in paragraph 1 shall be based on the sum entered in the budget for the preceding financial year.
Any contribution or additional payment owed by Member States to the budget shall be entered in the Commission’s account or accounts within thirty calendar days of the call for funds.
Payments made shall be entered in the account provided for in Regulation (EU, Euratom) No 609/2014 and shall be subject to the conditions laid down by that Regulation.
Article 24
Assigned revenue resulting from the participation of EFTA States in certain Union programmes
The budget structure to accommodate the revenue from the participation of EFTA States in certain Union programmes shall be as follows:
- (a) in the statement of revenue, a budget line with a token entry pro memoria shall be entered to accommodate the full amount of each EFTA State’s contribution for the financial year;
- (b) in the statement of expenditure, an annex, forming an integral part of the budget, shall set out all the budget lines covering the Union activities in which EFTA States participate, and shall include information on the estimated amount of the participation of each EFTA State.
Under Article 82 of the EEA Agreement, the amounts of the annual participation of EFTA States, as confirmed to the Commission by the Joint Committee of the European Economic Area in accordance with Article 1(5) of Protocol No 32 annexed to the EEA Agreement, shall give rise to the provision, at the start of the financial year, of the full amounts of the corresponding commitment appropriations and payment appropriations.
The use of the revenue arising from the financial contribution of EFTA States shall be monitored separately.
Article 25
Donations
Union institutions may accept any donation made to the Union, such as income from foundations, subsidies, gifts and bequests.
Acceptance of a donation of a value of EUR 50 000 or more which involves a financial charge, including follow-up costs, exceeding 10 % of the value of the donation made, shall be subject to the authorisation of the European Parliament and of the Council. The European Parliament and the Council shall act on the matter within two months of receiving a request for such an authorisation from the Union institutions concerned. If no objection is made within that period, the Union institutions concerned shall take a final decision regarding the acceptance of the donation. The Union institutions concerned shall in their request to the European Parliament and to the Council explain the financial charges entailed by the acceptance of donations made to the Union.
Article 26
Corporate sponsorship
‘Corporate sponsorship’ means an agreement by which a legal person supports in-kind an event or an activity for promotional or corporate social responsibility purposes.
On the basis of specific internal rules, which shall be published on their respective websites, Union institutions and bodies may exceptionally accept corporate sponsorship provided that:
- (a) there is due regard to the principles of non-discrimination, proportionality, equal treatment and transparency at all stages of the procedure for accepting corporate sponsorship;
- (b) it contributes to the positive image of the Union and is directly linked to the core objective of an event or of an activity;
- (c) it does neither generate conflict of interests nor concern exclusively social events;
- (d) the event or activity is not exclusively financed through corporate sponsorship;
- (e) the service in return for the corporate sponsorship is limited to the public visibility of the trademark or name of the sponsor;
- (f) the sponsor is not, at the time of the sponsorship procedure, in one of the situations referred to in Articles 136(1) and 141(1) and is not registered as excluded in the database referred to in Article 142(1).
Where the value of the corporate sponsorship exceeds EUR 5 000 , the sponsor shall be listed in a public register that includes information on the type of event or activity being sponsored.
Article 27
Rules on deductions and exchange rate adjustments
The following deductions may be made from payment requests which shall then be passed for payment of the net amount:
- (a) penalties imposed on parties to contracts or beneficiaries;
- (b) discounts, refunds and rebates on individual invoices and cost statements;
- (c) interest generated by pre-financing payments;
- (d) adjustments for amounts unduly paid.
The adjustments referred to in point (d) of the first subparagraph may be made, by means of direct deduction, against a new interim payment or payment of a balance to the same payee under the chapter, article and financial year in respect of which the excess payment was made.
Union accounting rules shall apply to the deductions referred to in points (c) and (d) of the first subparagraph.
The cost of products or services, provided to the Union, incorporating taxes refunded by Member States pursuant to Protocol No 7 on the privileges and immunities of the European Union, annexed to the TEU and to the TFEU, shall be charged to the budget for the ex-tax amount.
The cost of products or services, provided to the Union, incorporating taxes refunded by third countries on the basis of relevant agreements, may be charged to the budget for any of the following amounts:
- (a) the ex-tax amount;
- (b) the tax-inclusive amount.
In the case referred to in point (b) of the first subparagraph, subsequently reimbursed taxes shall be treated as internal assigned revenue.
Adjustments may be made in respect of exchange differences occurring in budget implementation. The final gain or loss shall be included in the balance for the financial year.
CHAPTER 6 Principle of specification
Article 28
General provisions
Appropriations shall be earmarked for specific purposes by title and chapter. The chapters shall be further subdivided into articles and items.
The Commission and the other Union institutions may transfer appropriations within the budget subject to the specific conditions laid down in Articles 29 to 32.
Appropriations may only be transferred to budget lines for which the budget has authorised appropriations or which carry a token entry pro memoria.
The limits referred to in Articles 29, 30 and 31 shall be calculated at the time the request for transfer is made and with reference to the appropriations provided in the budget, including amending budgets.
The amount to be taken into consideration for the purposes of calculating the limits referred to in Articles 29, 30 and 31 shall be the sum of the transfers to be made on the budget line from which transfers are being made, after adjustment for earlier transfers made. The amount corresponding to the transfers which are carried out autonomously by the Commission, or by any other Union institution concerned without a decision of the European Parliament and of the Council, shall not be taken into consideration.
Proposals for transfers and all information for the European Parliament and for the Council concerning transfers made under Articles 29, 30 and 31 shall be accompanied by appropriate and detailed supporting documents showing the most recent information available for the implementation of appropriations and estimates of requirements up to the end of the financial year, both for the budget lines to which the appropriations are to be transferred and for those from which they are to be taken.
Article 29
Transfers by Union institutions other than the Commission
Any Union institution other than the Commission may, within its own section of the budget, transfer appropriations:
- (a) from one title to another up to a maximum of 10 % of the appropriations for the financial year shown on the budget line from which the transfer is made;
- (b) from one chapter to another without limit.
Without prejudice to paragraph 4 of this Article, three weeks before making a transfer, as referred to in paragraph 1, the Union institution shall inform the European Parliament and the Council of its intention to do so. In the event that duly justified objections are raised within that period by either the European Parliament or the Council, the procedure laid down in Article 31 shall apply.
Any Union institution other than the Commission may propose to the European Parliament and to the Council, within its own section of the budget, transfers from one title to another exceeding the limit referred to in point (a) of paragraph 1 of this Article. Those transfers shall be subject to the procedure laid down in Article 31.
Any Union institution other than the Commission may, within its own section of the budget, make transfers within articles without informing the European Parliament and the Council beforehand.
Article 30
Transfers by the Commission
The Commission may, within its own section of the budget, autonomously:
- (a) transfer appropriations within each chapter;
- (b) with regard to expenditure on staff and administration which is common to several titles, transfer appropriations from one title to another up to a maximum of 10 % of the appropriations for the financial year shown on the budget line from which the transfer is made, and up to a maximum of 30 % of the appropriations for the financial year shown on the budget line to which the transfer is made;
- (c) with regard to operational expenditure, transfer appropriations between chapters within the same title up to a maximum of 10 % of the appropriations for the financial year shown on the budget line from which the transfer is made;
- (d) with regard to research and technological development appropriations implemented by the JRC, within the title of the budget relating to the ‘Direct research’ policy area, transfer appropriations between chapters of up to a maximum of 15 % of the appropriations on the budget line from which the transfer is made;
- (e) with regard to research and technological development, transfer operational appropriations from one title to another, provided that the appropriations are used for the same purpose;
- (f) with regard to operational expenditure of the funds implemented under shared management, with the exception of the EAGF, transfer appropriations from one title to another, provided that the appropriations concerned are for the same objective within the meaning of the Regulation establishing the fund concerned or constitute technical assistance expenditure;
- (g) transfer appropriations from the budgetary item of a budgetary guarantee to the budgetary item of another budgetary guarantee, in the exceptional cases when the provisioned resources in the common provisioning fund of the latter are insufficient to pay a guarantee call and subject to the subsequent restoring of the amount transferred in accordance with the procedure set out in Article 212(4).
The expenditure referred to in point (b) of the first subparagraph of this paragraph shall cover, for each policy area, the items referred to in Article 47(4).
Where the Commission transfers EAGF appropriations pursuant to the first subparagraph after 31 December, it shall take its decision by 31 January of the following financial year. The Commission shall inform the European Parliament and the Council within two weeks after its decision on those transfers.
Three weeks before making the transfers referred to in point (b) of the first subparagraph of this paragraph, the Commission shall inform the European Parliament and the Council of its intention to do so. In the event that duly justified objections are raised within that period by the European Parliament or by the Council, the procedure laid down in Article 31 shall apply.
By way of derogation from the fourth subparagraph, the Commission may, during the last two months of the financial year, autonomously transfer appropriations concerning expenditure on staff, external personnel and other agents from one title to another within the total limit of 5 % of the appropriations for that year. The Commission shall inform the European Parliament and the Council within two weeks after its decision on those transfers.
The Commission may, within its own section of the budget, decide on the following transfers of appropriations from one title to another, provided it immediately informs the European Parliament and the Council of its decision:
- (a) transfer of appropriations from the ‘provisions’ title referred to in Article 49 of this Regulation, where the only condition for lifting the reserve is the adoption of a basic act pursuant to Article 294 TFEU;
- (b) in duly justified exceptional cases such as international humanitarian disasters and crises occurring after 1 December of the financial year, transfer of unused appropriations for that year still available in the titles falling under the heading of the multiannual financial framework dedicated to Union external action to the titles concerning crisis management aid and humanitarian aid operations.
Article 31
Transfer proposals submitted to the European Parliament and to the Council by Union institutions
Each Union institution shall submit its transfer proposals simultaneously to the European Parliament and to the Council.
The Commission may submit proposals for transfers of payment appropriations to the funds implemented under shared management with the exception of the EAGF to the European Parliament and to the Council by 10 January of the following financial year. The transfer of the payment appropriations may be made from any budgetary item. In such cases, the six-week period referred to in paragraph 4 shall be reduced to three weeks.
If the transfer is not approved or only partially approved by the European Parliament and by the Council, the corresponding part of the expenditure referred to in point (b) of Article 10(5) shall be charged to the payment appropriations of the following financial year.
The European Parliament and the Council shall take decisions on transfers of appropriations in accordance with paragraphs 4 to 8.
Except in urgent circumstances, the European Parliament and the Council, the latter acting by qualified majority, shall deliberate upon each transfer proposal within six weeks of its receipt by both institutions. In urgent circumstances, the European Parliament and the Council shall deliberate within three weeks of receipt of the proposal.
Where the Commission intends to transfer EAGF appropriations in accordance with this Article, it shall submit transfer proposals to the European Parliament and to the Council by 10 January of the following financial year. In such cases, the six-week period referred to in paragraph 4 shall be reduced to three weeks.
A transfer proposal shall be approved or considered to be approved, if, within the six-week period, any of the following occurs:
- (a) the European Parliament and the Council approve it;
- (b) either the European Parliament or the Council approves it and the other institution refrains from acting;
- (c) neither the European Parliament nor the Council takes a decision to amend or refuse the transfer proposal.
Unless either the European Parliament or the Council requests otherwise, the six-week period referred to in paragraph 4 shall be reduced to three weeks in the following cases:
- (a) the transfer represents less than 10 % of the appropriations of the budget line from which the transfer is made and does not exceed EUR 5 000 000 ;
- (b) the transfer concerns only payment appropriations and the overall amount of the transfer does not exceed EUR 100 000 000 .
If either the European Parliament or the Council has amended the amount of the transfer while the other institution has approved it or refrains from acting, or if the European Parliament and the Council have both amended the amount of the transfer, the lesser of the two amounts shall be deemed approved, unless the Union institution concerned withdraws its transfer proposal.
Article 32
Transfers subject to special provisions
Appropriations corresponding to assigned revenue may be transferred only if such revenue is used for the purpose for which it is assigned.
Decisions on transfers to allow the use of the Emergency Aid Reserve shall be taken by the European Parliament and by the Council on a proposal from the Commission.
For the purposes of this paragraph, the procedure set out in Article 31(3) and (4) shall apply. If the European Parliament and the Council do not agree to the Commission proposal and cannot reach a common position on the use of the Emergency Aid Reserve, they shall refrain from acting on that proposal.
Proposals for transfers from the Emergency Aid Reserve shall be accompanied by appropriate and detailed supporting documents demonstrating:
- (a) the most recent information available for the implementation of appropriations and the estimate of requirements up to the end of the financial year for the budget line to which the transfer is to be made;
- (b) an analysis of the possibilities of reallocating appropriations.
CHAPTER 7 Principle of sound financial management and performance
Article 33
Performance and principles of economy, efficiency and effectiveness
Appropriations shall be used in accordance with the principle of sound financial management, and thus be implemented respecting the following principles:
- (a) the principle of economy which requires that the resources used by the Union institution concerned in the pursuit of its activities shall be made available in due time, in appropriate quantity and quality, and at the best price;
- (b) the principle of efficiency which concerns the best relationship between the resources employed, the activities undertaken and the achievement of objectives;
- (c) the principle of effectiveness which concerns the extent to which the objectives pursued are achieved through the activities undertaken.
In line with the principle of sound financial management, the use of appropriations shall focus on performance and for that purpose:
- (a) objectives for programmes and activities shall be established ex ante;
- (b) progress in the achievement of objectives shall be monitored with performance indicators;
- (c) progress in, and problems with, the achievement of objectives shall be reported to the European Parliament and to the Council in accordance with point (h) of the first subparagraph of Article 41(3) and with point (e) of Article 247(1).
Specific, measurable, attainable, relevant and time-bound objectives as referred to in paragraphs 1 and 2 and relevant, accepted, credible, easy and robust indicators shall be defined where relevant.
Article 34
Evaluations
Programmes and activities which entail significant spending shall be subject to ex ante and retrospective evaluations, which shall be proportionate to the objectives and expenditure.
Ex ante evaluations supporting the preparation of programmes and activities shall be based on evidence on the performance of related programmes or activities and shall identify and analyse the issues to be addressed, the added value of Union involvement, objectives, expected effects of different options and monitoring and evaluation arrangements.
For major programmes or activities that are expected to have significant economic, environmental or social impacts, the ex ante evaluation may take the form of an impact assessment that, in addition to meeting the requirements set out in the first subparagraph, analyses the various options concerning the methods of implementation.
Retrospective evaluations shall assess the performance of the programme or activity, including aspects such as effectiveness, efficiency, coherence, relevance and EU added value. Retrospective evaluations shall be based on the information generated by the monitoring arrangements and indicators established for the action concerned. They shall be undertaken at least once during the term of every multiannual financial framework and where possible in sufficient time for the findings to be taken into account in ex ante evaluations or impact assessments which support the preparation of related programmes and activities.
Article 35
Compulsory financial statement
Any proposal or initiative submitted to the legislative authority by the Commission, the High Representative of the Union for Foreign Affairs and Security Policy (the ‘High Representative’) or by a Member State, which may have an impact on the budget, including changes in the number of posts, shall be accompanied by a financial statement showing the estimates in terms of payment and commitment appropriations, by an assessment of the different financing options available, and by an ex ante evaluation or impact assessment as provided for in Article 34.
Any amendment to a proposal or initiative submitted to the legislative authority which may have an appreciable impact on the budget, including changes in the number of posts, shall be accompanied by a financial statement prepared by the Union institution proposing the amendment.
The financial statement shall contain the financial and economic data necessary for the assessment by the legislative authority of the need for Union action. It shall provide appropriate information as regards coherence with other activities of the Union and any possible synergy.
In the case of multiannual operations, the financial statement shall contain the foreseeable schedule of annual requirements in terms of commitment and payment appropriations and posts, including for external personnel, and an evaluation of their medium-term and, where possible, long-term financial impact.
During the budgetary procedure, the Commission shall provide the necessary information for a comparison between changes in the appropriations required and the initial forecasts made in the financial statement in the light of the progress of deliberations on the proposal or initiative submitted to the legislative authority.
Reading this document does not replace reading the official text published in the Official Journal of the European Union. We assume no responsibility for any inaccuracies arising from the conversion of the original to this format.
This text is published under EUR-Lex's own terms of reuse, not a Legalize or public-domain licence.
EUR-Lex
Creative Commons Attribution 4.0 International (CC BY 4.0)
© European Union, https://eur-lex.europa.eu — Source: EUR-Lex (Publications Office of the European Union). Reused under the Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Only EU legislation published in the printed Official Journal of the European Union is deemed authentic; consolidated texts are reproduced here for documentation purposes and have been reformatted to Markdown.