Article 26

Cross-border participation in capacity mechanisms
1.

Capacity mechanisms other than strategic reserves and where technically feasible, strategic reserves shall be open to direct cross-border participation of capacity providers located in another Member State, subject to the conditions laid down in this Article.

2.

Member States shall ensure that foreign capacity capable of providing equivalent technical performance to domestic capacities has the opportunity to participate in the same competitive process as domestic capacity. In the case of capacity mechanisms in operation on 4 July 2019, Member States may allow interconnectors to participate directly in the same competitive process as foreign capacity for a maximum of four years from 4 July 2019 or two years after the date of approval of the methodologies referred to in paragraph 11, whichever is earlier.

Member States may require foreign capacity to be located in a Member State that has a direct network connection with the Member State applying the mechanism.

3.

Member States shall not prevent capacity which is located in their territory from participating in capacity mechanisms of other Member States.

4.

Cross-border participation in capacity mechanisms shall not change, alter or otherwise affect cross-zonal schedules or physical flows between Member States. Those schedules and flows shall be determined solely by the outcome of capacity allocation pursuant to Article 16.

5.

Capacity providers shall be able to participate in more than one capacity mechanism.

Where capacity providers participate in more than one capacity mechanism for the same delivery period, they shall participate up to the expected availability of interconnection and the likely concurrence of system stress between the system where the mechanism is applied and the system in which the foreign capacity is located, in accordance with the methodology referred to in point (a) of paragraph 11.

6.

Capacity providers shall be required to make non-availability payments where their capacity is not available.

Where capacity providers participate in more than one capacity mechanism for the same delivery period, they shall be required to make multiple non-availability payments where they are unable to fulfil multiple commitments.

7.

For the purposes of providing a recommendation to transmission system operators, regional coordination centres established pursuant to Article 35 shall calculate on an annual basis the maximum entry capacity available for the participation of foreign capacity. That calculation shall take into account the expected availability of interconnection and the likely concurrence of system stress in the system where the mechanism is applied and the system in which the foreign capacity is located. Such a calculation shall be required for each bidding zone border.

Transmission system operators shall set the maximum entry capacity available for the participation of foreign capacity based on the recommendation of the regional coordination centre on an annual basis.

8.

Member States shall ensure that the entry capacity referred to in paragraph 7 is allocated to eligible capacity providers in a transparent, non-discriminatory and market-based manner.

9.

Where capacity mechanisms allow for cross-border participation in two neighbouring Member States, any revenues arising through the allocation referred to in paragraph 8 shall accrue to the transmission system operators concerned and shall be shared between them in accordance with the methodology referred in point (b) of paragraph 11 of this Article or in accordance with a common methodology approved by both relevant regulatory authorities. If the neighbouring Member State does not apply a capacity mechanism or applies a capacity mechanism which is not open to cross-border participation, the share of revenues shall be approved by the competent national authority of the Member State in which the capacity mechanism is implemented after having sought the opinion of the regulatory authorities of the neighbouring Member States. Transmission system operators shall use such revenues for the purposes set out in Article 19(2).

10.

The transmission system operator where the foreign capacity is located shall:

  • (a) establish whether interested capacity providers can provide the technical performance as required by the capacity mechanism in which the capacity provider intends to participate, and register that capacity provider as an eligible capacity provider in a registry set up for that purpose;
  • (b) carry out availability checks;
  • (c) notify the transmission system operator in the Member State applying the capacity mechanism of the information it acquires under points (a) and (b) of this subparagraph and the second subparagraph.

The relevant capacity provider shall notify the transmission system operator of its participation in a foreign capacity mechanism without delay.

11.

By 5 July 2020 the ENTSO for Electricity shall submit to ACER:

  • (a) a methodology for calculating the maximum entry capacity for cross-border participation as referred to in paragraph 7;
  • (b) a methodology for sharing the revenues referred to in paragraph 9;
  • (c) common rules for the carrying out of availability checks referred to in point (b) of paragraph 10;
  • (d) common rules for determining when a non-availability payment is due;
  • (e) terms of the operation of the registry as referred to in point (a) of paragraph 10;
  • (f) common rules for identifying capacity eligible to participate in the capacity mechanism as referred to in point (a) of paragraph 10.

The proposal shall be subject to prior consultation and approval by ACER in accordance with Article 27.

12.

The regulatory authorities concerned shall verify whether the capacities have been calculated in accordance with the methodology referred to in point (a) of paragraph 11.

13.

Regulatory authorities shall ensure that cross-border participation in capacity mechanisms is organised in an effective and non-discriminatory manner. They shall in particular provide for adequate administrative arrangements for the enforcement of non-availability payments across borders.

14.

The capacities allocated in accordance with paragraph 8 shall be transferable between eligible capacity providers. Eligible capacity providers shall notify the registry as referred to in point (a) of paragraph 10 of any such transfer.

15.

By 5 July 2021 the ENTSO for Electricity shall set up and operate the registry referred to in point (a) of paragraph 10. The registry shall be open to all eligible capacity providers, the systems implementing capacity mechanisms and their transmission system operators.

Article 27

Approval procedure
1.

Where reference is made to this Article, the procedure set out in paragraphs 2, 3 and 4 shall apply to the approval of proposals submitted by the ENTSO for Electricity.

2.

Before submitting a proposal, the ENTSO for Electricity shall carry out a consultation involving all relevant stakeholders, including regulatory authorities and other national authorities. It shall duly take the results of that consultation into consideration in its proposal.

3.

Within three months of the date of receipt of the proposal referred to in paragraph 1, ACER shall either approve or amend it. In the latter case, ACER shall consult the ENTSO for Electricity before approving the amended proposal. ACER shall publish the approved proposal on its website within three months of the date of receipt of the proposed documents.

4.

ACER may request changes to the approved proposal at any time. Within six months of the date of receipt of such a request, the ENTSO for Electricity shall submit a draft of the proposed changes to ACER. Within three months of the date of receipt of the draft, ACER shall amend or approve the changes and publish those changes on its website.

CHAPTER V TRANSMISSION SYSTEM OPERATION

Article 28

European network of transmission system operators for electricity
1.

Transmission system operators shall cooperate at Union level through the ENTSO for Electricity, in order to promote the completion and functioning of the internal market for electricity and cross-zonal trade and to ensure the optimal management, coordinated operation and sound technical evolution of the European electricity transmission network.

2.

In performing its functions under Union law, the ENTSO for Electricity shall act with a view to establishing a well-functioning and integrated internal market for electricity and shall contribute to the efficient and sustainable achievement of the objectives set out in the policy framework for climate and energy covering the period from 2020 to 2030, in particular by contributing to the efficient integration of electricity generated from renewable energy sources and to increases in energy efficiency while maintaining system security. The ENTSO for Electricity shall be equipped with adequate human and financial resources to carry out its duties.

Article 29

The ENTSO for Electricity
1.

The transmission system operators for electricity shall submit to the Commission and to ACER any draft amendments to the statutes, list of members or rules of procedure of the ENTSO for Electricity.

2.

Within two months of receipt of the draft amendments to the statutes, list of members or rules of procedure, ACER, after consulting the organisations representing all stakeholders, in particular the system users, including customers, shall provide an opinion to the Commission on these draft amendments to the statutes, list of members or rules of procedure.

3.

The Commission shall deliver an opinion on the draft amendments to the statutes, list of members or rules of procedures taking into account ACER's opinion as provided for in paragraph 2 and within three months of receipt of ACER's opinion.

4.

Within three months of receipt of the Commission's favourable opinion, the transmission system operators shall adopt and publish the amended statutes or rules of procedure.

5.

The documents referred to in paragraph 1 shall be submitted to the Commission and to ACER where there are changes thereto or upon the reasoned request of either of them. The Commission and ACER shall deliver an opinion in accordance with paragraphs 2, 3 and 4.

Article 30

Tasks of the ENTSO for Electricity
1.

The ENTSO for Electricity shall:

  • (a) develop network codes in the areas set out in Article 59(1) and (2) with a view to achieving the objectives set out in Article 28;
  • (b) adopt and publish a non-binding Union-wide ten-year network development plan, (‘Union-wide network development plan’), biennially;
  • (c) prepare and adopt proposals related to the European resource adequacy assessment pursuant to Article 23 and proposals for the technical specifications for cross-border participation in capacity mechanisms pursuant to Article 26(11);
  • (d) adopt recommendations relating to the coordination of technical cooperation between Union and third-country transmission system operators;
  • (e) adopt a framework for the cooperation and coordination between regional coordination centres;
  • (f) adopt a proposal defining the system operation region in accordance with Article 36;
  • (g) cooperate with distribution system operators and the EU DSO entity;
  • (h) promote the digitalisation of transmission networks including deployment of smart grids, efficient real time data acquisition and intelligent metering systems;
  • (i) adopt common network operation tools to ensure coordination of network operation in normal and emergency conditions, including a common incident classification scale, and research plans, including the deployment of those plans through an efficient research programme. Those tools shall specify inter alia:
  • (i) the information, including appropriate day-ahead, intraday and real-time information, useful for improving operational coordination, as well as the optimal frequency for the collection and sharing of such information;
  • (ii) the technological platform for the exchange of information in real time and where appropriate, the technological platforms for the collection, processing and transmission of the other information referred to in point (i), as well as for the implementation of the procedures capable of increasing operational coordination between transmission system operators with a view to such coordination becoming Union-wide;
  • (iii) how transmission system operators make available the operational information to other transmission system operators or any entity duly mandated to support them to achieve operational coordination, and to ACER; and
  • (iv) that transmission system operators designate a contact point in charge of answering inquiries from other transmission system operators or from any entity duly mandated as referred to in point (iii), or from ACER concerning such information;
  • (j) adopt an annual work programme;
  • (k) contribute to the establishment of interoperability requirements and non-discriminatory and transparent procedures for accessing data as provided for in Article 24 of Directive (EU) 2019/944;
  • (l) adopt an annual report;
  • (m) carry out and adopt seasonal adequacy assessments pursuant to Article 9(2) of Regulation (EU) 2019/941;
  • (n) promote cyber security and data protection in cooperation with relevant authorities and regulated entities;
  • (o) take into account the development of demand response in fulfilling its tasks.
2.

The ENTSO for Electricity shall report to ACER on shortcomings identified regarding the establishment and performance of regional coordination centres.

3.

The ENTSO for Electricity shall publish the minutes of its assembly meetings, board meetings and committee meetings and provide the public with regular information on its decision-making and activities.

4.

The annual work programme referred to in point (j) of paragraph 1 shall contain a list and description of the network codes to be prepared, a plan on coordination of operation of the network, and research and development activities, to be realised in that year, and an indicative calendar.

5.

The ENTSO for Electricity shall provide ACER with the information that ACER requires to fulfil its tasks pursuant to Article 32(1). In order to enable the ENTSO for Electricity to meet that requirement, transmission system operators shall provide the ENTSO for Electricity with the requisite information.

6.

Upon request of the Commission, the ENTSO for Electricity shall give its views to the Commission on the adoption of the guidelines as laid down in Article 61.

Article 31

Consultations
1.

While preparing the proposals pursuant to the tasks referred to in Article 30(1), the ENTSO for Electricity shall conduct an extensive consultation process. The consultation process shall be structured in a way to enable the accommodation of stakeholder comments before the final adoption of the proposal and in an open and transparent manner, involving all relevant stakeholders, and, in particular, the organisations representing such stakeholders, in accordance with the rules of procedure referred to in Article 29. That consultation shall also involve regulatory authorities and other national authorities, supply and generation undertakings, system users including customers, distribution system operators, including relevant industry associations, technical bodies and stakeholder platforms. It shall aim at identifying the views and proposals of all relevant parties during the decision-making process.

2.

All documents and minutes of meetings related to the consultations referred to in paragraph 1 shall be made public.

3.

Before adopting the proposals referred to in Article 30(1) the ENTSO for Electricity shall indicate how the observations received during the consultation have been taken into consideration. It shall provide reasons where observations have not been taken into account.

Article 32

Monitoring by ACER
1.

ACER shall monitor the execution of the tasks of the ENTSO for Electricity referred to in Article 30(1), (2) and (3) and report its findings to the Commission.

ACER shall monitor the implementation by the ENTSO for Electricity of network codes developed under Article 59. Where the ENTSO for Electricity has failed to implement such network codes, ACER shall request the ENTSO for Electricity to provide a duly reasoned explanation as to why it has failed to do so. ACER shall inform the Commission of that explanation and provide its opinion thereon.

ACER shall monitor and analyse the implementation of the network codes and the guidelines adopted by the Commission as laid down in Article 58(1), and their effect on the harmonisation of applicable rules aimed at facilitating market integration as well as on non-discrimination, effective competition and the efficient functioning of the market, and report to the Commission.

2.

The ENTSO for Electricity shall submit the draft Union-wide network development plan, the draft annual work programme, including the information regarding the consultation process, and the other documents referred to in Article 30(1) to ACER for its opinion.

Where it considers that the draft annual work programme or the draft Union-wide network development plan submitted by the ENTSO for Electricity does not contribute to non-discrimination, effective competition, the efficient functioning of the market or a sufficient level of cross-border interconnection open to third-party access, ACER shall provide a duly reasoned opinion as well as recommendations to the ENTSO for Electricity and to the Commission within two months of the submission.

Article 33

Costs

The costs related to the activities of the ENTSO for Electricity referred to in Articles 28 to 32 and 58 to 61 of this Regulation, and in Article 11 of Regulation (EU) No 347/2013 of the European Parliament and of the Council ([^E0014]) shall be borne by the transmission system operators and shall be taken into account in the calculation of tariffs. Regulatory authorities shall approve those costs only if they are reasonable and appropriate.

Article 34

Regional cooperation of transmission system operators
1.

Transmission system operators shall establish regional cooperation within the ENTSO for Electricity to contribute to the activities referred to in Article 30(1), (2) and (3). In particular, they shall publish a regional investment plan biennially, and may take investment decisions based on that regional investment plan. The ENTSO for Electricity shall promote cooperation between transmission system operators at regional level ensuring interoperability, communication and monitoring of regional performance in those areas which have not yet been harmonised at Union level.

2.

Transmission system operators shall promote operational arrangements in order to ensure the optimum management of the network and shall promote the development of energy exchanges, the coordinated allocation of cross-border capacity through non-discriminatory market-based solutions, paying due attention to the specific merits of implicit auctions for short-term allocations, and the integration of balancing and reserve power mechanisms.

3.

For the purposes of achieving the goals set in paragraphs 1 and 2, the geographical area covered by each regional cooperation structure may be established by the Commission, taking into account existing regional cooperation structures. Each Member State may promote cooperation in more than one geographical area.

The Commission is empowered to adopt delegated acts in accordance with Article 68, supplementing this Regulation, establishing the geographical area covered by each regional cooperation structure. For that purpose, the Commission shall consult the regulatory authorities, ACER and the ENTSO for Electricity.

The delegated acts referred to in this paragraph shall be without prejudice to Article 36.

Article 35

Establishment and mission of regional coordination centres
1.

By 5 July 2020, all transmission system operators of a system operation region shall submit a proposal for the establishment of regional coordination centres to the regulatory authorities concerned in accordance with the criteria set out in this Chapter.

The regulatory authorities of the system operation region shall review and approve the proposal.

The proposal shall at least include the following elements:

  • (a) the Member State of the prospective seat of the regional coordination centres and the participating transmission system operators;
  • (b) the organisational, financial and operational arrangements necessary to ensure the efficient, secure and reliable operation of the interconnected transmission system;
  • (c) an implementation plan for the entry into operation of the regional coordination centres;
  • (d) the statutes and rules of procedure of the regional coordination centres;
  • (e) a description of cooperative processes in accordance with Article 38;
  • (f) a description of the arrangements concerning the liability of the regional coordination centres in accordance with Article 47;
  • (g) where two regional coordination centres are maintained on a rotational basis in accordance with Article 36(2), a description of the arrangements to provide clear responsibilities to those regional coordination centres and procedures on the execution of their tasks.
2.

Following approval by regulatory authorities of the proposal in paragraph 1, the regional coordination centres shall replace the regional security coordinators established pursuant to the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009 and shall enter into operation by 1 July 2022.

3.

Regional coordination centres shall have a legal form referred to in Annex II to Directive (EU) 2017/1132 of the European Parliament and of the Council ([^E0015]).

4.

In performing their tasks under Union law, regional coordination centres shall act independently of individual national interests and independently of the interests of transmission system operators.

5.

Regional coordination centres shall complement the role of transmission system operators by performing the tasks of regional relevance assigned to them in accordance with Article 37. Transmission system operators shall be responsible for managing electricity flows and ensuring a secure, reliable and efficient electricity system in accordance with point (d) of Article 40(1) of Directive (EU) 2019/944.

Article 36

Geographical scope of regional coordination centres
1.

By 5 January 2020 the ENTSO for Electricity shall submit to ACER a proposal specifying which transmission system operators, bidding zones, bidding zone borders, capacity calculation regions and outage coordination regions are covered by each of the system operation regions. The proposal shall take into account the grid topology, including the degree of interconnection and of interdependency of the electricity system in terms of flows and the size of the region which shall cover at least one capacity calculation region.

2.

The transmission system operators of a system operation region shall participate in the regional coordination centre established in that region. In exceptional circumstances, where the control area of a transmission system operator is part of various synchronous areas, the transmission system operator may participate in two regional coordination centres. For the bidding zone borders adjacent to system operation regions, the proposal in paragraph 1 shall specify how the coordination between regional coordination centres for those borders is to take place. For the Continental Europe synchronous area, where the activities of two regional coordination centres may overlap in a system operation region, the transmission system operators of that system operation region shall decide to either designate a single regional coordination centre in that region or that the two regional coordination centres carry out some or all of the tasks of regional relevance in the entire system operation region on a rotational basis while other tasks are carried out by a single designated regional coordination centre.

3.

Within three months of receipt of the proposal in paragraph 1, ACER shall either approve the proposal defining the system operation regions or propose amendments. In the latter case, ACER shall consult the ENTSO for Electricity before adopting the amendments. The adopted proposal shall be published on ACER's website.

4.

The relevant transmission system operators may submit a proposal to ACER for the amendment of system operation regions defined pursuant to paragraph 1. The process set out in paragraph 3 shall apply.

Article 37

Tasks of regional coordination centres
1.

Each regional coordination centre shall carry out at least all the following tasks of regional relevance in the entire system operation region where it is established:

  • (a) carrying out the coordinated capacity calculation in accordance with the methodologies developed pursuant to the forward capacity allocation guideline established by Regulation (EU) 2016/1719, the capacity allocation and congestion management guideline established by Regulation (EU) 2015/1222 and the electricity balancing guideline established by Regulation (EU) 2017/2195;
  • (b) carrying out the coordinated security analysis in accordance with the methodologies developed pursuant to the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009;
  • (c) creating common grid models in accordance with the methodologies and procedures developed pursuant to the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009;
  • (d) supporting the consistency assessment of transmission system operators' defence plans and restoration plans in accordance with the procedure set out in the emergency and restoration network code adopted on the basis of Article 6(11) of Regulation (EC) No 714/2009;
  • (e) carrying out regional week ahead to at least day-ahead system adequacy forecasts and preparation of risk reducing actions in accordance with the methodology set out in Article 8 of Regulation (EU) 2019/941 and the procedures set out in the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009;
  • (f) carrying out regional outage planning coordination in accordance with the procedures and methodologies set out in the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009;
  • (g) training and certification of staff working for regional coordination centres;
  • (h) supporting the coordination and optimisation of regional restoration as requested by transmission system operators;
  • (i) carrying out post-operation and post-disturbances analysis and reporting;
  • (j) regional sizing of reserve capacity;
  • (k) facilitating the regional procurement of balancing capacity;
  • (l) supporting transmission system operators, at their request, in the optimisation of inter-transmission system operators settlements;
  • (m) carrying out tasks related to the identification of regional electricity crisis scenarios if and to the extent they are delegated to the regional coordination centres pursuant to Article 6(1) of Regulation (EU) 2019/941;
  • (n) carrying out tasks related to the seasonal adequacy assessments if and to the extent that they are delegated to the regional coordination centres pursuant to Article 9(2) of Regulation (EU) 2019/941;
  • (o) calculating the value for the maximum entry capacity available for the participation of foreign capacity in capacity mechanisms for the purposes of issuing a recommendation pursuant to Article 26(7);
  • (p) carrying out tasks related to supporting transmission system operators in the identification of needs for new transmission capacity, for upgrade of existing transmission capacity or their alternatives, to be submitted to the regional groups established pursuant to Regulation (EU) No 347/2013 and included in the ten-year network development plan referred to in Article 51 of Directive (EU) 2019/944.

The tasks referred to in the first subparagraph are set out in more detail in Annex I.

2.

On the basis of a proposal by the Commission or a Member State, the Committee established by Article 68 of Directive (EU) 2019/944 shall issue an opinion on the assignment of new advisory tasks to regional coordination centres. Where that Committee issues a favourable opinion on the assignment of new advisory tasks, the regional coordination centres shall carry out those tasks on the basis of a proposal developed by the ENTSO for Electricity and approved by ACER in accordance with the procedure set out in Article 27.

3.

Transmission system operators shall provide their regional coordination centres with the information necessary to carry out its tasks.

4.

Regional coordination centres shall provide transmission system operators of the system operation region with all information necessary to implement the coordinated actions and recommendations issued by regional coordination centres.

5.

For the tasks set out in this Article and not already covered by the relevant network codes or guidelines, the ENTSO for Electricity shall develop a proposal in accordance with the procedure set out in Article 27. Regional coordination centres shall carry out those tasks on the basis of the proposal following its approval by ACER.

Article 38

Cooperation within and between regional coordination centres

The day-to-day coordination within and between regional coordination centres shall be managed through cooperative processes among the transmission system operators of the region, including arrangements for coordination between regional coordination centres where relevant. The cooperative process shall be based on:

  • (a) working arrangements to address planning and operational aspects relevant to the tasks referred to in Article 37;
  • (b) a procedure for sharing analysis and consulting on regional coordination centres' proposals with the transmission system operators in the system operation region and relevant stakeholders and with other regional coordination centres, in an efficient and inclusive manner, in the exercise of the operational duties and tasks, in accordance with Article 40;
  • (c) a procedure for the adoption of coordinated actions and recommendations in accordance with Article 42.

Article 39

Working arrangements
1.

Regional coordination centres shall develop working arrangements that are efficient, inclusive, transparent and facilitate consensus, in order to address planning and operational aspects related to the tasks to be carried out, taking into account, in particular, the specificities and requirements of those tasks as specified in Annex I. Regional coordination centres shall also develop a process for the revision of those working arrangements.

2.

Regional coordination centres shall ensure that the working arrangements referred to in paragraph 1 contain rules for the notification of parties concerned.

Article 40

Consultation procedure
1.

Regional coordination centres shall develop a procedure to organise, in the exercise of their daily operational duties and tasks, the appropriate and regular consultation of transmission system operators in the system operation region, other regional coordination centres and of relevant stakeholders. In order to ensure that regulatory issues can be addressed, regulatory authorities shall be involved when required.

2.

Regional coordination centres shall consult the Member States in the system operation region and, where there is a regional forum, their regional forums on matters of political relevance excluding the day-to-day activities of regional coordination centres and the implementation of their tasks. Regional coordination centres shall take due account of the recommendations of the Member States and where applicable, of their regional forums.

Article 41

Transparency
1.

Regional coordination centres shall develop a process for stakeholder involvement and shall organise regular meetings with stakeholders to discuss matters relating to the efficient, secure and reliable operation of the interconnected system and to identify shortcomings and propose improvements.

2.

The ENTSO for Electricity and regional coordination centres shall operate in full transparency towards stakeholders and the general public. They shall publish all relevant documentation on their respective websites.

Article 42

Adoption and review of coordinated actions and recommendations
1.

The transmission system operators in a system operation region shall develop a procedure for the adoption and revision of coordinated actions and recommendations issued by regional coordination centres in accordance with the criteria set out in paragraphs 2, 3, and 4.

2.

Regional coordination centres shall issue coordinated actions to the transmission system operators in respect of the tasks referred to in points (a) and (b) of Article 37(1). Transmission system operators shall implement the coordinated actions except where the implementation of the coordinated actions would result in a violation of the operational security limits defined by each transmission system operator in accordance with the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009.

Where a transmission system operator decides not to implement a coordinated action for the reasons set out in this paragraph, it shall transparently report the detailed reasons to the regional coordination centre and the transmission system operators of the system operation region without undue delay. In such cases, the regional coordination centre shall assess the impact of that decision on the other transmission system operators of the system operation region and may propose a different set of coordinated actions subject to the procedure set out in paragraph 1.

3.

Regional coordination centres shall issue recommendations to the transmission system operators in relation to the tasks listed in points (c) to (p) of Article 37(1) or assigned in accordance with Article 37(2).

Where a transmission system operator decides to deviate from a recommendation as referred to in paragraph 1, it shall submit a justification for its decision to regional coordination centres and to the other transmission system operators of the system operation region without undue delay.

4.

The review of coordinated actions or a recommendation shall be triggered at the request of one or more of the transmission system operators of the system operation region. Following the review of the coordinated action or recommendation, regional coordination centres shall confirm or modify the measure.

5.

Where a coordinated action is subject to review in accordance with paragraph 4 of this Article, the request for review shall not suspend the coordinated action except where the implementation of the coordinated action would result in a violation of the operational security limits defined by each individual transmission system operator in accordance with the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009.

6.

Upon the proposal of a Member State or the Commission and following consultation with the Committee established by Article 68 of Directive (EU) 2019/944, the Member States in a system operation region may jointly decide to grant the competence to issue coordinated actions to their regional coordination centre for one or more of the tasks provided for in points (c) to (p) of Article 37(1) of this Regulation.

Article 43

Management board of regional coordination centres
1.

In order to adopt measures related to their governance and to monitor their performance, the regional coordination centres shall establish a management board.

2.

The management board shall be composed of members representing all the transmission system operators that participate in the relevant regional coordination centre.

3.

The management board shall be responsible for:

  • (a) drafting and endorsing the statutes and rules of procedure of regional coordination centres;
  • (b) deciding upon and implementing the organisational structure;
  • (c) preparing and endorsing the annual budget;
  • (d) developing and endorsing the cooperative processes in accordance with Article 38.
4.

The competences of the management board shall exclude those that are related to the day-to-day activities of regional coordination centres and the performance of its tasks.

Article 44

Organisational structure
1.

The transmission system operators of a system operation region shall establish the organisational structure of regional coordination centres that supports the safety of their tasks.

Their organisational structure shall specify:

  • (a) the powers, duties and responsibilities of the personnel;
  • (b) the relationship and reporting lines between different parts and processes of the organisation.
2.

Regional coordination centres may establish regional desks to address sub-regional specificities or establish back-up regional coordination centres for the efficient and reliable exercise of their tasks where proven to be strictly necessary.

Article 45

Equipment and staff

Regional coordination centres shall be equipped with all human, technical, physical and financial resources necessary for fulfilling their obligations under this Regulation and carrying out their tasks independently and impartially.

Article 46

Monitoring and reporting
1.

Regional coordination centres shall establish a process for the continuous monitoring of at least:

  • (a) their operational performance;
  • (b) the coordinated actions and recommendations issued, the extent to which the coordinated actions and recommendations have been implemented by the transmission system operators and the outcome achieved;
  • (c) the effectiveness and efficiency of each of the tasks for which they are responsible and, where applicable, the rotation of those tasks.
2.

Regional coordination centres shall account for their costs in a transparent manner and report them to ACER and to the regulatory authorities in the system operation region.

3.

Regional coordination centres shall submit an annual report on the outcome of the monitoring provided for in paragraph 1 and information on their performance to the ENTSO for Electricity, ACER, the regulatory authorities in the system operation region and the Electricity Coordination Group.

4.

Regional coordination centres shall report any shortcomings that they identify in the monitoring process under paragraph 1 to the ENTSO for Electricity, the regulatory authorities in the system operation region, ACER and the other competent authorities of Member States responsible for the prevention and management of crisis situations. On the basis of that report, the relevant regulatory authorities of the system operation region may propose measures to address the shortcomings to the regional coordination centres.

5.

Without prejudice to the need to protect security and the confidentiality of commercially sensitive information, regional coordination centres shall make public the reports referred to in paragraphs 3 and 4.

Article 47

Liability

In proposals for the establishment of regional coordination centres in accordance with Article 35, the transmission system operators in the system operation region shall include the necessary steps to cover liability related to the execution of regional coordination centres' tasks. The method employed to provide the cover shall take into account the legal status of regional coordination centres and the level of commercial insurance cover available.

Article 48

Ten-year network development plan
1.

The Union-wide network development plan referred to under Article 30(1), point (b), shall include the modelling of the integrated network, including scenario development and an assessment of the resilience of the system. Relevant input parameters for the modelling such as assumptions on fuel and carbon prices or installation of renewables shall be fully consistent with the European resource adequacy assessment developed pursuant to Article 23.

The Union-wide network development plan shall, in particular:

  • (a) build on national investment plans, taking into account regional investment plans as referred to in Article 34(1) of this Regulation, and, if appropriate, Union aspects of network planning as set out in Regulation (EU) No 347/2013; it shall be subject to a cost-benefit analysis using the methodology established as set out in Article 11 of that Regulation;
  • (b) regarding cross-border interconnections, also build on the reasonable needs of different system users and integrate long-term commitments from investors referred to in Articles 44 and 51 of Directive (EU) 2019/944; and
  • (c) identify investment gaps, in particular with respect to cross-border capacities.

In regard to point (c) of the first subparagraph, a review of barriers to the increase of cross-border capacity of the network arising from different approval procedures or practices may be annexed to the Union–wide network development plan.

2.

ACER shall provide an opinion on the national ten-year network development plans to assess their consistency with the Union–wide network development plan. If ACER identifies inconsistencies between a national ten-year network development plan and the Union–wide network development plan, it shall recommend amending the national ten-year network development plan or the Union–wide network development plan as appropriate. If such a national ten-year network development plan is developed in accordance with Article 51 of Directive (EU) 2019/944, ACER shall recommend that the regulatory authority amend the national ten-year network development plan in accordance with Article 51(7) of that Directive and inform the Commission thereof.

Article 49

Inter-transmission system operator compensation mechanism
1.

Transmission system operators shall receive compensation for costs incurred as a result of hosting cross-border flows of electricity on their networks.

2.

The compensation referred to in paragraph 1 shall be paid by the operators of national transmission systems from which cross-border flows originate and the systems where those flows end.

3.

Compensation payments shall be made on a regular basis with regard to a given period in the past. Ex-post adjustments of compensation paid shall be made where necessary, to reflect costs actually incurred.

The first period for which compensation payments are to be made shall be determined in the guidelines referred to in Article 61.

4.

The Commission shall adopt delegated acts in accordance with Article 68, supplementing this Regulation, establishing the amounts of compensation payments payable.

5.

The magnitude of cross-border flows hosted and the magnitude of cross-border flows designated as originating or ending in national transmission systems shall be determined on the basis of the physical flows of electricity actually measured during a given period.

6.

The costs incurred as a result of hosting cross-border flows shall be established on the basis of the forward-looking long-run average incremental costs, taking into account losses, investment in new infrastructure, and an appropriate proportion of the cost of existing infrastructure, in so far as such infrastructure is used for the transmission of cross-border flows, in particular taking into account the need to guarantee security of supply. When establishing the costs incurred, recognised standard-costing methodologies shall be used. Benefits that a network incurs as a result of hosting cross-border flows shall be taken into account to reduce the compensation received.

7.

For the purpose of the inter-transmission system operator compensation mechanism only, where transmission networks of two or more Member States form part, in whole or in part, of a single control block, the control block as a whole shall be considered as forming part of the transmission network of one of the Member States concerned, in order to avoid flows within control blocks being considered as cross-border flows under point (b) of Article 2(2) and giving rise to compensation payments under paragraph 1 of this Article. The regulatory authorities of the Member States concerned may decide which of the Member States concerned shall be that of which the control block as a whole is to be considered to form part.

Article 50

Provision of information
1.

Transmission system operators shall put in place coordination and information exchange mechanisms to ensure the security of the networks in the context of congestion management.

2.

The safety, operational and planning standards used by transmission system operators shall be made public. The information published shall include a general scheme for the calculation of the total transfer capacity and the transmission reliability margin based upon the electrical and physical features of the network. Such schemes shall be subject to approval by the regulatory authorities.

3.

Transmission system operators shall publish estimates of available transfer capacity for each day, indicating any available transfer capacity already reserved. Those publications shall be made at specified intervals before the day of transport and shall include, in any event, week-ahead and month-ahead estimates, as well as a quantitative indication of the expected reliability of the available capacity.

4.

Transmission system operators shall publish relevant data on aggregated forecast and actual demand, on availability and actual use of generation and load assets, on availability and use of the networks and interconnections, on balancing power and reserve capacity and on the availability of flexibility. For the availability and actual use of small generation and load assets, aggregated estimate data may be used.

4a. Transmission system operators shall publish in a transparent manner clear information on the capacity available for new connections in their areas of operation with high spatial granularity, respecting public security and data confidentiality, including the capacity under connection request and the possibility of flexible connection in congested areas. The publication shall include information on the criteria for the calculation of the available capacity for new connections. Transmission system operators shall update that information on a regular basis, at least every month.

Transmission system operators shall provide in a transparent manner clear information to system users about the status and treatment of their connection requests including, where relevant, information related to flexible connection agreements. They shall provide such information within three months of the submission of the request. Where the requested connection is neither granted nor permanently rejected, transmission system operators shall update that information on a regular basis, at least quarterly.

5.

The market participants concerned shall provide the transmission system operators with the relevant data.

6.

Generation undertakings which own or operate generation assets, where at least one generation asset has an installed capacity of at least 250 MW, or which have a portfolio comprising at least 400 MW of generation assets, shall keep at the disposal of the regulatory authority, the national competition authority and the Commission, for five years all hourly data per plant that is necessary to verify all operational dispatching decisions and the bidding behaviour at power exchanges, interconnection auctions, reserve markets and over-the-counter-markets. The per-plant and per hour information to be stored shall include, but shall not be limited to, data on available generation capacity and committed reserves, including allocation of those committed reserves on a per-plant level, at the times the bidding is carried out and when production takes place.

7.

Transmission system operators shall exchange regularly a set of sufficiently accurate network and load flow data in order to enable load flow calculations for each transmission system operator in its relevant area. The same set of data shall be made available to the regulatory authorities, and to the Commission and Member States upon request. The regulatory authorities, Member States and the Commission shall treat that set of data confidentially, and shall ensure that confidential treatment is also given by any consultant carrying out analytical work on their request, on the basis of those data.

Article 51

Certification of transmission system operators
1.

The Commission shall examine any notification of a decision on the certification of a transmission system operator as laid down in Article 52(6) of Directive (EU) 2019/944 as soon as it is received. Within two months of receipt of such notification, the Commission shall deliver its opinion to the relevant regulatory authority as to its compatibility with Article 43 and either Article 52(2) or Article 53 of Directive (EU) 2019/944.

When preparing the opinion referred to in the first subparagraph, the Commission may request ACER to provide its opinion on the regulatory authority's decision. In such a case, the two-month period referred to in the first subparagraph shall be extended by two further months.

In the absence of an opinion by the Commission within the periods referred to in the first and second subparagraphs, the Commission shall be considered not to raise objections to the regulatory authority's decision.

2.

Within two months of receipt of an opinion of the Commission, the regulatory authority shall adopt its final decision regarding the certification of the transmission system operator, taking the utmost account of that opinion. The regulatory authority's decision and the Commission's opinion shall be published together.

3.

At any time during the procedure, regulatory authorities or the Commission may request from a transmission system operator or an undertaking performing any of the functions of generation or supply any information relevant to the fulfilment of their tasks under this Article.

4.

Regulatory authorities and the Commission shall protect the confidentiality of commercially sensitive information.

5.

Where the Commission has received notification of the certification of a transmission system operator under Article 43(9) of Directive (EU) 2019/944, the Commission shall take a decision relating to certification. The regulatory authority shall comply with the Commission decision.

CHAPTER VI DISTRIBUTION SYSTEM OPERATION

Article 52

European entity for distribution system operators
1.

Distribution system operators shall cooperate at Union level through the EU DSO entity, in order to promote the completion and functioning of the internal market for electricity, and to promote optimal management and a coordinated operation of distribution and transmission systems. Distribution system operators who wish to participate in the EU DSO entity shall have the right to become registered members of the entity.

Registered members may participate in the EU DSO entity directly or be represented by a national association designated by the Member State or by a Union-level association.

2.

Distribution system operators are entitled to associate themselves through the establishment of the EU DSO entity. The EU DSO entity shall carry out its tasks and procedures in accordance with Article 55. As an expert entity working for the common Union interest, the EU DSO entity shall neither represent particular interests nor seek to influence the decision-making process to promote specific interests.

3.

Members of the EU DSO entity shall be subject to registration and to the payment of a fair and proportionate membership fee that reflects the number of customers connected to the distribution system operator concerned.

Article 53

Establishment of the EU DSO entity
1.

The EU DSO entity shall consist of, at least, a general assembly, a board of directors, a strategic advisor group, expert groups and a secretary-general.

2.

By 5 July 2020, the distribution system operators shall submit to the Commission and to ACER, the draft statutes, in accordance with Article 54, including a code of conduct, a list of registered members, the draft rules of procedure, including the rules of procedures on the consultation with the ENTSO for Electricity and other stakeholders and the financing rules, of the EU DSO entity to be established.

The draft rules of procedure of the EU DSO entity shall ensure balanced representation of all participating distribution system operators.

3.

Within two months of receipt of the draft statutes, the list of members and the draft rules of procedure, ACER shall provide the Commission with its opinion, after consulting the organisations representing all stakeholders, in particular distribution system users.

4.

Within three months of receipt of ACER's opinion, the Commission shall deliver an opinion on the draft statutes, the list of members and the draft rules of procedure, taking into account ACER's opinion as provided for in paragraph 3.

5.

Within three months of receipt of the Commission's positive opinion, the distribution system operators shall establish the EU DSO entity and shall adopt and publish its statutes and rules of procedure.

6.

The documents referred to in paragraph 2 shall be submitted to the Commission and to ACER where there are changes thereto or upon the reasoned request of either of them. The Commission and ACER shall deliver an opinion in line with the process set out in paragraphs 2, 3 and 4.

7.

The costs related to the activities of the EU DSO entity shall be borne by the distribution system operators that are registered members and shall be taken into account in the calculation of tariffs. Regulatory authorities shall only approve costs that are reasonable and proportionate.

Article 54

Principal rules and procedures for the EU DSO entity
1.

The statutes of the EU DSO entity adopted in accordance with Article 53 shall safeguard the following principles:

  • (a) participation in the work of the EU DSO entity is limited to registered members with the possibility of delegation within the membership;
  • (b) strategic decisions regarding the activities of the EU DSO entity as well as policy guidelines for the board of directors are adopted by the general assembly;
  • (c) decisions of the general assembly are adopted according with the following rules:
  • (i) each member disposes of a number of votes proportional to the number of that member's customers;
  • (ii) 65 % of the votes attributed to the members are cast; and
  • (iii) the decision is adopted by a majority of 55 % of the members;
  • (d) decisions of the general assembly are rejected according with the following rules:
  • (i) each member disposes of a number of votes proportional to the number of that member's customers;
  • (ii) 35 % of the votes attributed to the members are cast; and
  • (iii) the decision is rejected by at least 25 % of the members;
  • (e) the board of directors is elected by the general assembly for a mandate of a maximum of four years;
  • (f) the board of directors nominates the President and the three Vice-Presidents from among the members of the board;
  • (g) cooperation between transmission system operators and distribution system operators pursuant to Articles 56 and 57 is led by the board of directors;
  • (h) decisions of the board of directors are adopted by an absolute majority;
  • (i) on the basis of a proposal by the board of directors, the secretary general is appointed by the general assembly from among its members for a mandate of four years, renewable once;
  • (j) on the basis of a proposal by the board of directors, Expert Groups are appointed by the general assembly and do not exceed 30 members, with the possibility of one-third of the members coming from outside the membership of EU DSO; in addition, one ‘country’ expert group shall be established and shall consist of one representative of distribution system operators from each Member State.
2.

Procedures adopted by the EU DSO entity shall safeguard the fair and proportionate treatment of its members and shall reflect the diverse geographical and economic structure of its membership. In particular, the procedures shall provide that:

  • (a) the board of directors is composed of the President of the Board and 27 members' representatives, of which:
  • (i) nine are representatives of members with more than 1 million grid users;
  • (ii) nine are representatives of members with more than 100 000 and less than 1 million grid users; and
  • (iii) nine are representatives of members with less than 100 000 grid users;
  • (b) representatives of existing DSO associations are permitted to participate as observers at the meetings of the board of directors;
  • (c) the board of directors are not permitted to consist of more than three representatives of members who are based in the same Member State or in the same industrial group;
  • (d) each Vice-President of the Board is nominated among representatives of members in each category described in point (a);
  • (e) representatives of members who are based in one Member State or the same industrial group do not constitute the majority of the participants in the Expert Group;
  • (f) the board of directors establishes a Strategic Advisory group that provides its opinion to the board of directors and the Expert Groups and consists of representatives of the European DSO associations and representatives of those Member States which are not represented in the board of directors.

Article 55

Tasks of the EU DSO entity
1.

The tasks of the EU DSO entity shall be the following:

  • (a) promoting operation and planning of distribution networks in coordination with the operation and planning of transmission networks;
  • (b) facilitating the integration of renewable energy resources, distributed generation and other resources embedded in the distribution network such as energy storage;
  • (c) facilitating demand side flexibility and response and distribution grid users' access to markets;
  • (d) contributing to the digitalisation of distribution systems including deployment of smart grids and intelligent metering systems;
  • (e) supporting the development of data management, cyber security and data protection in cooperation with relevant authorities and regulated entities;
  • (f) participating in the development of network codes which are relevant to the operation and planning of distribution grids and the coordinated operation of the transmission networks and distribution networks pursuant to Article 59.
2.

In addition the EU DSO entity shall:

  • (a) cooperate with the ENTSO for Electricity on the monitoring of implementation of the network codes and guidelines adopted pursuant to this Regulation which are relevant to the operation and planning of distribution grids and the coordinated operation of the transmission networks and distribution networks;
  • (b) cooperate with the ENTSO for Electricity and adopt best practices on the coordinated operation and planning of transmission and distribution systems including issues such as exchange of data between operators and coordination of distributed energy resources;
  • (c) work on identifying best practices on the areas identified in paragraph 1 and for the introduction of energy efficiency improvements in the distribution network;
  • (d) adopt an annual work programme and an annual report;
  • (e) operate in accordance with competition law and ensure neutrality.

Article 56

Consultations in the network code development process
1.

While participating in the development of new network codes pursuant to Article 59, the EU DSO entity shall conduct an extensive consultation process, at an early stage and in an open and transparent manner, involving all relevant stakeholders, and, in particular, organisations representing such stakeholders, in accordance with the rules of procedure on consultation referred to in Article 53. That consultation shall also involve regulatory authorities and other national authorities, supply and generation undertakings, system users including customers, technical bodies and stakeholder platforms. It shall aim at identifying the views and proposals of all relevant parties during the decision-making process.

2.

All documents and minutes of meetings related to the consultations referred to in paragraph 1 shall be made public.

3.

The EU DSO entity shall take into consideration the views provided during the consultations. Before adopting proposals for the network codes referred to in Article 59 the EU DSO entity shall indicate how it has taken the observations received during the consultation into consideration. It shall provide reasons where it has not taken such observations into account.

Article 57

Cooperation between distribution system operators and transmission system operators
1.

Distribution system operators and transmission system operators shall cooperate with each other in planning and operating their networks. In particular, distribution system operators and transmission system operators shall exchange all necessary information and data regarding, the performance of generation assets and demand side response, the daily operation of their networks and the long-term planning of network investments, with the view to ensure the cost-efficient, secure and reliable development and operation of their networks.

2.

Distribution system operators and transmission system operators shall cooperate with each other in order to achieve coordinated access to resources such as distributed generation, energy storage or demand response that may support particular needs of both the distribution system operators and the transmission system operators.

3.

Distribution system operators and transmission system operators shall cooperate with each other in publishing, in a consistent manner, consistent information on the capacity available for new connections in their respective areas of operation that provides sufficient granular visibility to developers of new energy projects and other potential network users.

CHAPTER VII NETWORK CODES AND GUIDELINES

Article 58

Adoption of network codes and guidelines
1.

The Commission may, subject to the empowerments in Articles 59, 60 and 61, adopt implementing or delegated acts. Such acts may either be adopted as network codes on the basis of text proposals developed by the ENTSO for Electricity, or, where so provided for in the priority list pursuant to Article 59(3), by the EU DSO entity, where relevant in cooperation with the ENTSO for Electricity, and ACER pursuant to the procedure in Article 59, or as guidelines pursuant to the procedure in Article 61.

2.

The network codes and guidelines shall:

  • (a) ensure that they provide the minimum degree of harmonisation required to achieve the aims of this Regulation;
  • (b) take into account regional specificities, where appropriate;
  • (c) not go beyond what is necessary for the purposes of point (a); and
  • (d) be without prejudice to the Member States' right to establish national network codes which do not affect cross-zonal trade.

Article 59

Establishment of network codes
1.

The Commission is empowered to adopt implementing acts in order to ensure uniform conditions for the implementation of this Regulation by establishing network codes in the following areas:

  • (a) network security and reliability rules including rules for technical transmission reserve capacity for operational network security as well as interoperability rules implementing Articles 34 to 47 and Article 57 of this Regulation and Article 40 of Directive (EU) 2019/944, including rules on system states, remedial actions and operational security limits, voltage control and reactive power management, short-circuit current management, power flow management, contingency analysis and handling, protection equipment and schemes, data exchange, compliance, training, operational planning and security analysis, regional operational security coordination, outage coordination, availability plans of relevant assets, adequacy analysis, ancillary services, scheduling, and operational planning data environments;
  • (b) capacity-allocation and congestion- management rules pursuant to Articles 7 to 10, 13 to 17, 19 and 35 to 37 of this Regulation and Article 6 of Directive (EU) 2019/944, including rules on day-ahead, intraday and forward capacity calculation methodologies and processes, grid models, bidding zone configuration, redispatching and countertrading, trading algorithms, single day-ahead and intraday coupling, different governance options, the firmness of allocated cross-zonal capacity, congestion income distribution, the details and specific features of the tools referred to in Article 9(3) of this Regulation by reference to the elements specified in paragraphs (4) and (5) thereof, the allocation and facilitation of trading of financial long-term transmission rights by the single allocation platform as well as the frequency, maturity and specific nature of such long-term transmission rights, cross-zonal transmission risk hedging, nomination procedures, and capacity allocation and congestion management cost recovery, and methodology for compensating offshore renewable electricity plant operators for capacity reductions;
  • (c) rules implementing Articles 5, 6 and 17 in relation to trading related to technical and operational provision of network access services and system balancing, including rules on network-related reserve power, including functions and responsibilities, platforms for the exchange of balancing energy, gate closure times, requirements for standard and specific balancing products, procurement of balancing services, allocation of cross-zonal capacity for the exchange of balancing services or sharing of reserves, settlement of balancing energy, settlement of exchanges of energy between system operators, imbalance settlement and settlement of balancing capacity, load frequency control, frequency quality defining and target parameters, frequency containment reserves, frequency restoration reserves, replacement reserves, exchange and sharing of reserves, cross-border activation processes of reserves, time-control processes and transparency of information;
  • (d) rules implementing Articles 36, 40 and 54 of Directive (EU) 2019/944 in relation to non-discriminatory, transparent provision of non-frequency ancillary services,, including rules on steady state voltage control, inertia, fast reactive current injection, inertia for grid stability, short circuit current, black-start capability and island operation capability;
  • (e) rules implementing Article 57 of this Regulation and Articles 17, 31, 32, 36, 40 and 54 of Directive (EU) 2019/944 in relation to demand response, including rules on aggregation, energy storage, and demand curtailment rules.

Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 67(2).

2.

The Commission is empowered to adopt delegated acts in accordance with Article 68 supplementing this Regulation with regard to the establishment of network codes in the following areas:

  • (a) network connection rules including rules on the connection of transmission-connected demand facilities, transmission-connected distribution facilities and distribution systems, connection of demand units used to provide demand response, requirements for grid connection of generators and other system users, requirements for high-voltage direct current grid connection, requirements for direct current-connected power park modules and remote-end high-voltage direct current converter stations, and operational notification procedures for grid connection;
  • (b) data exchange, settlement and transparency rules, including in particular rules on transfer capacities for relevant time horizons, estimates and actual values on the allocation and use of transfer capacities, forecast and actual demand of facilities and aggregation thereof including unavailability of facilities, forecast and actual generation of generation units and aggregation thereof including unavailability of units, availability and use of networks, congestion management measures and balancing market data. Rules should include ways in which the information is published, the timing of publication, the entities responsible for handling;
  • (c) third-party access rules;
  • (d) operational emergency and restauration procedures in an emergency including system defence plans, restoration plans, market interactions, information exchange and communication and tools and facilities;
  • (e) sector-specific rules for cyber security aspects of cross-border electricity flows, including rules on common minimum requirements, planning, monitoring, reporting and crisis management.
3.

The Commission shall, after consulting ACER, the ENTSO for Electricity, the EU DSO entity and the other relevant stakeholders, establish a priority list every three years, identifying the areas set out in paragraphs 1 and 2 to be included in the development of network codes.

If the subject matter of the network code is directly related to the operation of the distribution system and not primarily relevant to the transmission system, the Commission may require the EU DSO entity, in cooperation with the ENTSO for Electricity, to convene a drafting committee and submit a proposal for a network code to ACER.

Reading this document does not replace reading the official text published in the Official Journal of the European Union. We assume no responsibility for any inaccuracies arising from the conversion of the original to this format.

This text is published under EUR-Lex's own terms of reuse, not a Legalize or public-domain licence. EUR-Lex
Creative Commons Attribution 4.0 International (CC BY 4.0)
© European Union, https://eur-lex.europa.eu — Source: EUR-Lex (Publications Office of the European Union). Reused under the Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Only EU legislation published in the printed Official Journal of the European Union is deemed authentic; consolidated texts are reproduced here for documentation purposes and have been reformatted to Markdown.