Commission Implementing Regulation (EU) 2021/2017 of 13 September 2021 amending Implementing Regulation (EU) 2016/2070 as regards benchmark portfolios, reporting templates and reporting instructions to be applied in the Union for the reporting referred to in Article 78(2) of Directive 2013/36/EU of the European Parliament and of the Council (Text with EEA relevance)

Type Implementing Regulation
Publication 2021-11-26
State In force
Text As published
Department European Commission, FISMA
Source EUR-Lex
articles 2

This is the act as published. Later amendments are not folded into the text below: each one is a separate act in this repository and an entry in this law's history.

Reform history JSON API
TEMPLATE RELATED INSTRUCTIONS 2833
--- --- ---
C 106.00 – Initial Market Valuation and exclusion justification 2833
--- --- ---
C 107.01 – VaR & sVaR Non-CTP. Details 2834
--- --- ---
C 107.02 – VaR, sVaR and PV - Non-CTP. Base Currency Results 2836
--- --- ---
C 108.00 – Profit & Loss Time Series 2837
--- --- ---
C 109.01 – IRC. Details of the Model 2838
--- --- ---
C 109.02 – IRC. Details by Portfolio 2839
--- --- ---
C 109.03 – IRC. Amount by Portfolio/Date 2840
--- --- ---
C 110.01 – CT. Details of the Model. 2840
--- --- ---
C 110.02 – CT. Details by Portfolio. 2841
--- --- ---
C 110.03 – CT. APR by Portfolio/Date 2842

C 106.00 – Initial Market Valuation and exclusion justification

Column Label Legal reference Instructions
0010 Instrument number Section 2 of Annex V The instrument number taken from Annex V shall be reported.
0020 Instrument modelled for VaR and sVaR (TRUE/FALSE) Either TRUE or FALSE shall be reported.
0030 Instrument modelled for IRC (TRUE/FALSE) Either TRUE or FALSE shall be reported.
0040 Instrument modelled for correlation trading (TRUE/FALSE) Either TRUE or FALSE shall be reported.
0050 Rationale for exclusion Article 3 (2) of Commission Implementing Regulation (EU) 2016/2070 One of the following shall be reported: (a) Model not authorised by regulator; (b) Instrument or underlying not authorised internally; (c) Underlying or modelling feature not contemplated internally; (d) Other rationale for exclusion. Please, explain that rationale in column 0060.
0060 Free text box An institution may provide any additional information in this column.
0070 Initial market valuation (“IMV”) The mark-to-market value of each instrument on the reference date at 5:30 pm CET (as referred to in Annex V, Section 1, point (b). The cell shall be left blank where the institution does not wish to provide an IMV for a certain portfolio (i.e. zero values shall be reported only where the result of the calculation is zero).

C 107.01 - VaR & sVaR Non-CTP. Details.

Row Label Legal reference Instructions
0010 - 0060 VaR VaR VaR
0010 Methodology One of the following shall be reported in column 0010: (a) Historical simulation; (b) Monte Carlo simulation; (c) Parametric methodology; (d) Combination / other methodology (please specify). The institution shall use column 0020 to clarify the answer given in column 0010. Where option (d) was selected in column 0010, the institution shall provide details in column 0020.
0020 Computation of 10-day horizon Article 365(1) of Regulation (EU) No 575/2013 One of the following shall be reported in column 0010: (a) 1 day re-scaled to 10 days; (b) 10 days with overlapping periods; (c) 10 days other methodology. The institution shall use column 0020 to clarify the answer given in column 0010.
0030 Length of observation period Article 365(1) point (d) of Regulation (EU) No 575/2013 One of the following shall be reported in column 0010: (a) Up to 1 year; (b) More than 1 and up to 2 years; (c) More than 2 and up to 3 years; (d) More than 3 years. The institution shall use column 0020 to clarify the answer given in column 0010.
0040 Data Weighting Article 365(1) point (d) of Regulation (EU) No 575/2013 One of the following shall be reported in column 0010: (a) Unweighted (VaR data weighting); (b) Weighted (VaR data weighting); (c) Higher of weighted and unweighted (VaR data weighting) in points (a) and (b). The institution shall use column 0020 to clarify the answer given in column 0010.
0050 Backtesting add-on Article 366(2) of Regulation (EU) No 575/2013 Backtesting add-on means the addend between 0 and 1 in accordance with Table 1 of Article 366 (2) of Regulation (EU) No 575/2013 The institution shall use column 0020 to clarify the answer given in column 0010.
0060 VaR Regulatory add-on Article 366(2) of Regulation (EU) No 575/2013 (“at least 3”) VaR Regulatory add-on means the extra charge imposed by the competent authority with respect to the multiplication factor for VaR (at least 3) in accordance with Article 366 (2) of Regulation (EU) No 575/2013. The VaR Regulatory add-on is the sum of the backtesting add-on and of the qualitative add-on, where applicable, in excess to 3. The institution shall use column 0020 to clarify the answer given in column 0010.
0070-0100 SVaR (i.e. Stressed VaR) SVaR (i.e. Stressed VaR) SVaR (i.e. Stressed VaR)
0070 Methodology One of the following shall be reported in column 0010: (a) Historical simulation; (b) Monte Carlo simulation; (c) Parametric methodology; (d) Combination / other methodology (please specify). The institution shall use column 0020 to clarify the answer given in column 0010. In case option (d) was selected in column 0010, the institution shall provide details in column 0020.
0080 Computation of 10 day Horizon Article 365(1) of Regulation (EU) No 575/2013 One of the following shall be reported in column 0010: (a) 1 day re-scaled to 10 days; (b) 10 days with overlapping periods; (c) 10 days other methodology. The institution shall use column 0020 to clarify the answer given in column 0010.
0090 SVaR Regulatory add-on Article 366(2) of Regulation (EU) No 575/2013 Regulatory add-on means the extra charge imposed by the competent authority with respect to the multiplication factor for sVaR (at least 3) in accordance with Article 366 (2) of Regulation (EU) No 575/2013. The regulatory add-on is the sum of 3, backtesting add-on and qualitative add-on (if applicable). The institution shall use column 0020 to clarify the answer given in column 0010.
0100 SVaR period Article 365(2) of Regulation (EU) No 575/2013 One of the following shall be reported in column 0010: (a) Daily computation of the stressed VaR calibrated to one continuous 12-month period starting from the date specified in column 0020; (b) Weekly computation of the stressed VaR calibrated to one continuous 12-month period starting from the date specified in column 0020; (c) Daily computation of the stressed VaR calibrated to different continuous 12-month periods during the stressed VaR reporting dates given in column 0010 of C107.02 starting from the dates specified in column 0020; (d) Weekly computation of the stressed VaR calibrated to different continuous 12-month periods during the stressed VaR reporting dates given in column 0010 of C107.02 starting from the dates specified in column 0020; (e) Maximum of daily computation of the stressed VaR calibrated to more than one single 12-month period; (f) Maximum of weekly computation of the stressed VaR calibrated to more than one single 12-month period; (g) Other choices for the stressed VaR calibration (please specify). The institution shall use column 0020 to provide the starting date in the format of “dd/mm/yyyy” in case of options (a) or (b) given in column 0010 and the starting dates in the format “dd/mm/yyyy” used for each stressed VaR computation in case of options (c) or (d) given in column 0010. The institution shall also use column 0020 to clarify the 12-month period used for each stressed VaR computation in case of options (e), (f) and (g) given in column 0010.

C 107.02 - VaR, sVaR and PV - Non-CTP. Base Currency Results.

Instructions concerning sheets (z-axis)

Label Legal reference Instructions
Portfolio Sections 3 and 4 of Annex V to this Implementing Regulation The portfolio (both individual and aggregated) number taken from Annex V shall be reported.
Column Label Legal reference
--- --- ---
0010 Date
0020 VaR Article 365 of Regulation (EU) No 575/2013
0030 sVaR Article 365 of Regulation (EU) No 575/2013
0040 PV

C 108.00 - Profit & Loss Time Series

Template C 108.00 (“Profit & Loss Time Series”) shall be completed only by institutions that calculate VaR using historical simulation.

Instructions concerning sheets (z-axis)

Label Legal reference Instructions
Portfolio Sections 3 and 4 of Annex V to this Implementing Regulation The portfolio number (both individual and aggregated) taken from Annex V to this Implementing Regulation shall be reported.
Column Label Legal reference
--- --- ---
0010 Date Article 365(1) point (d) of Regulation (EU) No 575/2013
0020 Daily P&L

C 109.01 – IRC. Details of the Model

Row Label Legal reference Instructions
0010 Number of modelling factors EBA/GL/2012/3 The number of modelling factors at the overall IRC model level shall be reported. The answer shall be one of the following: (a) 1 modelling factor; (b) 2 modelling factors; (c) More than 2 modelling factors. The institution shall use column 0020 to clarify the answer given in column 0010.
0020 Source of LGDs EBA/GL/2012/3 The source of LGDs at the overall IRC Model level shall be reported. The answer shall be one of the following: (a) Market convention; (b) LGD used in IRB; (c) Other source of LGD (please specify). The institution shall use column 0020 to clarify the answer given in column 0010. In case option (c) was selected in column 0010, the institution shall provide details in this column.

C 109.02 – IRC. Details by Portfolio

Instructions concerning sheets (z-axis)

Label Legal reference Instructions
Portfolio Sections 3 and 4 of Annex V to this Implementing Regulation The portfolio number (both individual and aggregated) taken from Annex V to this Implementing Regulation, only for those portfolios where IRC is requested, shall be reported.
Row Label Legal reference
--- --- ---
0010 Liquidity Horizon Article 374(5) of Regulation (EU) No 575/2013
0020 Source of PDs
0030 Source of transition matrices

C 109.03 – IRC. Amount by Portfolio/Date.

Instructions concerning sheets (z-axis)

Label Legal reference Instructions
Portfolio Sections 3 and 4 of Annex V to this Implementing Regulation The portfolio (both individual and aggregated) number taken from Annex V to this Implementing Regulation, only for those portfolios where IRC is requested, shall be reported.
Column Label Legal reference
--- --- ---
0010 Date
0020 IRC Articles 372 to 376 of Regulation (EU) No 575/2013

C 110.01 – CT. Details of the Model.

Row Label Legal reference Instructions
0010 Number of modelling factors Article 377 of Regulation (EU) No 575/2013 The number of modelling factors at the overall correlation trading model level shall be reported. The answer shall be one of the following: (a) 1 modelling factor; (b) 2 modelling factors; (c) More than 2 modelling factors. The institution shall use column 0020 where it wants to clarify the answer given in column 0010.
0020 Source of LGDs Article 377 of Regulation (EU) No 575/2013 The source of LGDs at the overall correlation trading model level shall be reported. The answer shall be one of the following: (a) Market convention; (b) LGD used in IRB; (c) Other sources of LGD (please specify). The institution shall use column 0020 to clarify the answer given in column 0010. In case option (c) was selected in column 0010, the institution shall provide details in this column.

C 110.02 – CT. Details by Portfolio.

Instructions concerning sheets (z-axis)

Label Legal reference Instructions
Portfolio Sections 3 and 4 of Annex V to this Implementing Regulation The portfolio (both individual and aggregated) number taken from Annex V to this Regulation, only for those portfolios where APR is requested, shall be reported.
Row Label Legal reference
--- --- ---
0010 Liquidity horizon Article 377(2) of Regulation (EU) No 575/2013
0020 Source of PDs Article 377 of Regulation (EU) No 575/2013
0030 Source of transition matrices Article 377 of Regulation (EU) No 575/2013

C 110.03 – CT. APR by Portfolio/Date

Instructions concerning sheets (z-axis)

Label Legal reference Instructions
Portfolio Section 3 and 4 of Annex V to this Implementing Regulation The portfolio (both individual and aggregated) number taken from Annex V to this Implementing Regulation, only for those portfolios where APR is requested, shall be reported
Column Label Legal reference
--- --- ---
0010 Date Article 377 of Regulation (EU) No 575/2013
0060 APR Article 377 of Regulation (EU) No 575/2013

ANNEX VII

‘ANNEX VII

Results Supervisory Benchmarking portfolios. MARKET RISK

RESULTS BENCHMARKING PORTFOLIOS. MARKET RISK RESULTS BENCHMARKING PORTFOLIOS. MARKET RISK RESULTS BENCHMARKING PORTFOLIOS. MARKET RISK RESULTS BENCHMARKING PORTFOLIOS. MARKET RISK
Template number Template code Name of the template / group of templates Short name
INITIAL MARKET VALUATION
106 C 106.00 INITIAL MARKET VALUATION IMV
VaR, sVaR and PV
107.1 C 107.01 DETAILS VaR&SVaR 1
107.2 C 107.02 BASE CURRENCY RESULTS VaR&SVaR 2
PROFIT & LOSS TIME SERIES
108 C 108.00 PROFIT & LOSS TIME SERIES P&L
INCREMENTAL RISK CHARGE
109.1 C 109.01 IRC. DETAILS OF THE MODEL IRC 1
109.2 C 109.02 IRC. DETAILS BY PORTFOLIO IRC 2
109.3 C 109.03 IRC. AMOUNT BY PORTFOLIO/DATE IRC 3
CORRELATION TRADING
110.1 C 110.01 CT. DETAILS OF THE MODEL CT 1
110.2 C 110.02 CT. DETAILS BY PORTFOLIO CT 2
110.3 C 110.03 CT. AMOUNT BY PORTFOLIO/DATE CT 3
C 106.00 - INITIAL MARKET VALUATION AND EXCLUSION JUSTIFICATION
Instrument number Instrument Modelled for Var + SVaR (YES/NO) Instrument Modelled for IRC (YES/NO) Instrument Modelled for Correlation Trading (YES/NO) Rationale for Exclusion Free text box Initial Market Valuation
0010 0020 0030 0040 0050 0060 0070
C 107.01 - VaR, sVaR and PV. DETAILS
Option Free text box
0010 0020
VaR VaR VaR VaR
0010 Methodology
0020 Computation of 10-day horizon
0030 Length of observation period
0040 Data Weighting
0050 Backtesting add-on
0060 Regulatory add-on
SVaR SVaR SVaR SVaR
0070 Methodology
0080 Computation of 10-day horizon
0090 SVaR regulatory add-on
0100 SVaR period
C 107.02 - VaR and SVaR NON-CTP. BASE CURRENCY RESULTS
Portfolio
Date VaR sVaR PV
0010 0020 0030 0040
C 108.00- PROFIT & LOSS TIME SERIES
Portfolio
Date Daily P&L
0010 0020
C 109.01 - IRC. DETAILS OF THE MODEL
Option Free text box
Row Item 0010 0020
0010 Number of modelling factors
0020 Source of LGDs
C 109.02 - IRC. DETAILS BY PORTFOLIO
Portfolio
Option Free text box
Row Item 0010 0020
0010 Liquidity Horizon
0020 Source of PDs
0030 Source of transition matrices
C 109.03 - IRC. AMOUNT BY PORTFOLIO/DATE
Portfolio
Date IRC
0010 0020
C 110.01 - CT. DETAILS OF THE MODEL
Option Free text box
Row Item 0010 0020
0010 Number of modelling factors
0020 Source of LGDs
C 110.02 - CT. DETAILS BY PORTFOLIO
Portfolio
Option Free text box
Row Item 0010 0020
0010 Liquidity Horizon
0020 Source of PDs
0030 Source of transition matrices
C 110.03 - CT. APR BY PORTFOLIO/DATE
Portfolio
Date APR
0010 0060’

ANNEX VIII

‘ANNEX VIII

Results Supervisory Benchmarking portfolios

Template number Template code Name of the template /group of templates
111.00 C 111.00 Details on exposures in Low Default Portfolios by counterparty
112.00 C 112.00 Details on exposures in Low Default Portfolios by counterparty by economic scenario
113.00 C 113.00 Details on exposures in Low Default Portfolios by counterparty by facility
114.00 C 114.00 Details on macroeconomic scenarios per country

C 111.00 - Details on exposures in Low Default Portfolios by counterparty

Counterparty Code Number of facilities GDP Area Code Exposure value - IFRS 9 PD - 12 months - IFRS 9 PD - IRB without conservative adjustment LGD - IFRS 9 ECL amount - 12 months IFRS 9 Expected Loss - IRB
0010 0020 0030 0040 0100 0110 0200 0400 0410

C 112.00 - Details on exposures in Low Default Portfolios by counterparty by economic scenario

Counterparty Code Economic scenario ID PD - 0 - 12 months PD - 0 - 24 months PD - 0 - 36 months PD - 0 - 48 months PD - 0 - 60 months PD - 0 - 72 months PD - 0 - 84 months PD - 0 - 96 months PD - 0 - 108 months PD - 0 - 120 months
0010 0020 0100 0110 0120 0130 0140 0150 0160 0170 0180 0190

C 113.00 - Details on exposures in Low Default Portfolios by counterparty by facility

Counterparty Code facility ID Exposure value Impairment status Annualised originated PD Annualised PD at reporting date Quantitative Stage 2 trigger (in annualised PD) Low Credit Risk Exemption threshold (if applicable) Qualitative Stage 2 Trigger set
0010 0020 0100 0200 0300 0400 0500 0550 0600

C 114.00 - Details on macroeconomic scenarios per country

GDP Area Code Economic scenario ID GDP growth 0 - 12 months GDP growth 12 - 24 months GDP growth 24 - 36 months GDP growth 36 - 48 months GDP growth 48 - 60 months GDP growth 60 - 72 months GDP growth 72 - 84 months GDP growth 84 - 96 months GDP growth 96 - 108 months GDP growth 108 - 120 months Weight of the economic scenario
0010 0020 0100 0110 0120 0130 0140 0150 0160 0170 0180 0190 0200’

ANNEX IX

‘ANNEX IX

IFRS 9 TEMPLATE REPORTING INSTRUCTIONS

PART I: GENERAL INSTRUCTIONS 2851
--- --- ---
PART II: TEMPLATE-RELATED INSTRUCTIONS 2852
--- --- ---
C 111.00 – Details on exposures in Low Default Portfolios by counterparty 2852
--- --- ---
C 112.00 – Details on exposures in Low Default Portfolios by counterparty by economic scenario 2854
--- --- ---
C 113.00 – Details on exposures in Low Default Portfolios by counterparty by facility 2856
--- --- ---
C 114.00 – Details on macroeconomic scenarios per country 2860

PART I: GENERAL INSTRUCTIONS

1. Information shall be submitted only for those counterparties and portfolios where an actual exposure exists at the reference date in the form of either an Original Exposure or an Exposure after credit risk mitigation, including exposures in stage 3 and counterparties for which the temporary or permanent partial use of the Standardised Approach has been permitted by the respective competent authority in accordance with Article 148 or 150 of Regulation (EU) No 575/2013. Information for counterparties and portfolios for which no exposure exists at the reference date shall not be submitted. Only the following exposures should be reported: those exposures which are subject to the impairment requirements under IFRS 9.5.5.1, excluding purchased or originated credit-impaired financial assets as defined in Appendix A to IFRS 9 as set out in the Annex to Commission Regulation (EC) No 1126/2008 (“Annex relating to IFRS 9”) shall be included.
--- --- ---
2. Information not required or not applicable shall not be submitted; the relevant cells shall either be left blank or the indication “NULL” shall be inserted. This shall also apply to weighted average quantities that cannot be calculated. Zero values shall be reported only where the intention is to report a quantity of zero. The cells shall not be left blank nor the indication “NULL” shall be inserted to report quantities that are zero.
--- --- ---
3. Monetary amounts shall be reported in the same way as they are reported for calculating own funds requirements at a specific reference date in accordance with Commission Implementing Regulation (EU) No 680/2014 9.
--- --- ---
4. All the templates included in this Annex shall be filled only for the subset of counterparties with the counterparty ID in the following format: ID _*CT. Specialised lending exposures as defined in Article 147(8) of Regulation (EU) No 575/2013 shall be excluded.
--- --- ---
5. The PDs shall be expressed as a value between 0 and 1, and shall be expressed with a minimum precision equivalent to four decimals.
--- --- ---
6. Where the facility expires within the year considered for a specific data point, the parameter estimates and the ECL amount to be reported for this facility shall be related to a default event over a 12 months’ period. By way of derogation from this rule, for the purpose of template C 112.00, where the facility expires before the year considered for a specific data point, the facility’s PD shall not be included in the exposure weighted average PD.
--- --- ---
7. In relation to guaranteed exposures, the PD parameter to be reported shall be the one of the original obligor, regardless of whether, for regulatory purposes, the CRM technique is applied via a substitution of the risk parameters of the obligor by the risk parameters of the protection provider. However, the effect of the guarantee shall be taken into consideration in the LGD and in the ECL estimate, in line with the approach used for accounting purposes. Under no circumstances should the PD parameters of a protection provider be reported as the risk parameters of the original obligor.

C 111.00 – Details on exposures in Low Default Portfolios by counterparty

Column Label Legal reference Instructions
0010 Counterparty Code The instructions provided in Annex IV to this Implementing Regulation for column 0010 of C 101 shall apply.
0020 Number of facilities The number of facilities of the counterparty.
0030 GDP Area Code The code of the geographical area of the counterparty associated with the estimations of columns 0100 to 0190 of this Annex to this Implementing Regulation for column 0010 of C 114.00. Where the GDP is estimated for the counterparty on a single country basis, the country code shall have the same format as the one used in column 0080 of template C 101 of Annex I to this Implementing Regulation. Where the GDP is estimated for an area with several countries, one of the following codes shall be used: — “WR”: where GDP estimates can be considered as global estimates; — “EZ”: where the GDP estimates can be considered as estimates related to the European Union composition at the reference date; — “EA”: where the GDP estimates can be considered as estimates related to the Euro Area composition at the reference date.
0040 Exposure value - IFRS 9 The sum of exposure values to the counterparty over all facilities at the reporting date, as considered for the application of impairment requirements under IFRS 9. This shall include both on- and off-balance sheet exposures in the scope of the impairment requirements of IFRS 9, as well as off-balance sheet exposures after the application of the conversion factors used for accounting purposes. For both stage 1 and stage 2 facilities, the exposure value for each facility shall be the one associated with default events over the 12 months’ period following the reporting date.
0100 PD - 12 months IFRS 9 The PD calculated at the counterparty level at the reporting date, representing the probability of a default event within 12 months following the reporting date, as considered in the application of the impairment requirements under IFRS 9. This shall be the PD used to compute the 12 month expected credit loss (ECL amount – 12 months IFRS 9), and associated with the economic scenario 0 in template C 112.00. Where the institution applies different PDs for different exposures to the same counterparty, the weighted average PD at the reporting date shall be reported. The weight used for each facility shall be the exposure value as defined in column 0040 of this template. Where the PD values associated with the economic scenario 0 of the template C 112.00 are not populated, this data point shall not be populated, either.
0110 PD - IRB without conservative adjustments Article 160 of Regulation (EU) 575/2013 Section 4.4.3. of EBA Guidelines on PD estimation, LGD estimation and the treatment of defaulted exposures The PD estimated under Article 160 of the CRR, free from any Margin of Conservatism, regulatory floors, supervisory add-ons and any other conservative measures, and adjustments, except those that are retained for the purpose of IFRS 9. Where an institution is not able to isolate the conservative adjustments embedded in its PD estimates, this data point shall either be left blank or the indication “NULL” shall be inserted. This data point shall be submitted only for those exposures for which an internal model has been approved and is used in the calculation of risk weighted exposure amounts (RWEA). For all other cases, this field shall be left blank or the indication “NULL” shall be inserted.
0200 LGD - IFRS 9 Paragraph 5 (l) in Part 1 of Annex V to Regulation (EU) No 680/2014 The weighted average LGD of the counterparty applied by the institution to the exposures of each counterparty, at the reporting date, as considered in the impairment requirements under IFRS 9 and used to compute the final expected credit loss. The weight used to compute the LGD weighted average shall be the multiplication of the following two values: (a) the PD assigned to the facility at the reporting date, representing the probability of a default event within 12 months following the reporting date, as defined in column 0100 of this template; (b) the exposure value of the facility associated with default events over the 12 months’ period following the reporting date, as defined in column 0040 of this template. For both stage 1 and stage 2 facilities, the LGD for each facility shall be the one associated with default events over the 12 months’ period following the reporting date.
0400 ECL amount – 12 months IFRS 9 Appendix A to IFRS 9 as set out in the Annex to Commission Regulation (EC) No 1126/2008 The sum of the expected credit losses to the counterparty over all facilities for the exposures, at the reporting date, as considered for the application of impairment requirements under IFRS 9. For both stage 1 and stage 2 facilities, the ECL amount for each facility shall be the one associated with default events over the 12 months’ period following the reporting date.
0410 Expected Loss - IRB Column 0280 of template 8.1 of Annex I to Implementing Regulation (EU) No 680/2014 The expected loss amount calculated using IRB parameters. This data point shall be submitted only for those exposures for which an internal model has been approved and is used in the calculation of RWEA. For all other cases, this field shall be left blank or the indication “NULL” shall be inserted.

C 112.00 – Details on exposures in Low Default Portfolios by counterparty by economic scenario

The PD values reported in columns 0100, 0110, 0120, 0130, 0140, 0150, 0160, 0170, 0180 and 0190 shall not incorporate any effect of prepayment. Where the PD model cannot provide PD values beyond the maturity of the facility, these fields shall be left blank or the indication “NULL” shall be inserted.

Where the ECL amount is calculated as a probability weighted ECL of each economic scenario, the following considerations apply:

  • — Where the IFRS 9 model related to the obligor uses five economic scenarios, the PD values associated with each of the scenario shall be reported for the columns 0100 to 0190. The PD values associated with the economic scenario 0 shall be the weighted average of the PDs reported for the economic scenario 1 to 5, using the weights reported in the column 0200 in the template 114.00 of Annex VIII.
  • — Where the IFRS 9 model related to the obligor uses a lower number of economic scenarios than five, the data points related to the missing economic scenarios shall be left blank.
  • — Where more than one, but less than 5 economic scenarios are used, the PD values associated with the economic scenario 0 shall be the weighted average of the PDs reported for the economic scenario 1 to 5, using the weights reported in the data point 200 in the template C 114.00 of Annex VIII and 0 for the unused scenarios.
  • — Where the IFRS 9 model related to the obligor uses a higher number of economic scenarios than five, including when performing Monte Carlo simulation, institutions shall report the economic scenario 0 and they shall also map the economic scenarios into the 5 predefined buckets. Where there is no mapping of an institution’s internal scenarios and the five prescribed scenarios, only scenario 0 shall be reported.

Where only a single scenario is used, without any adjustment neither at the PD level nor at the ECL level that takes into account the non-linearity effects the PD values for this economic scenario shall be reported under both economic scenarios 0 and 1.

Where the estimation is based on a baseline scenario that is forward-looking, and an adjustment is applied to consider the non-linearity effect, the institution shall report in the template the cumulative PD value of the baseline scenario in scenario 1, and the PD used for the purpose of the Significant Increase in Credit Risk (SICR) assessment in scenario 0.

Column Label Legal reference Instructions
0010 Counterparty Code The counterparty code assigned in column 0010 of template C 101 of Annex I to the counterparty included in the low default portfolio (“LDP”) samples portfolios shall be reported. Columns 0010 and 0020 shall be a composite row identifier and together shall be unique for each row in the table.
0020 Economic scenario ID The economic scenario used by the institution to calculate the IFRS 9 PD. The scenario ID shall be expressed as a value between 0 and 5. With the exception of specific cases described before, all the 6 economic scenarios shall be populated. The economic scenario 1 shall be the baseline scenario. The economic scenarios 2 to 5 shall be ranked according to their severity, from the most favourable (number 2) to the most severe (number 5).
0100 PD - 0 - 12 months The cumulative PD assigned to the counterparty representing the probability of a default event within the 12 months after the reporting date, under the economic scenario considered.
0110 PD - 0 - 24 months The cumulative PD assigned to the counterparty representing the probability of a default event within the 24 months after the reporting date, under the economic scenario considered.
0120 PD - 0 - 36 months The cumulative PD assigned to the counterparty representing the probability of a default event within the 36 months after the reporting date, under the economic scenario considered.
0130 PD - 0 - 48 months The cumulative PD assigned to the counterparty representing the probability of a default event within the 48 months after the reporting date, under the economic scenario considered.
0140 PD - 0 - 60 months The cumulative PD assigned to the counterparty representing the probability of a default event within the 60 months after the reporting date, under the economic scenario considered.
0150 PD - 0 - 72 months The cumulative PD assigned to the counterparty representing the probability of a default event within the 72 months after the reporting date, under the economic scenario considered.
0160 PD - 0 - 84 months The cumulative PD assigned to the counterparty representing the probability of a default event within the 84 months after the reporting date, under the economic scenario considered.
0170 PD - 0 - 96 months The cumulative PD assigned to the counterparty representing the probability of a default event within the 96 months after the reporting date, under the economic scenario considered.
0180 PD - 0 - 108 months The cumulative PD assigned to the counterparty representing the probability of a default event within the 108 months after the reporting date, under the economic scenario considered.
0190 PD - 0 - 120 months The cumulative PD assigned to the counterparty representing the probability of a default event within the 120 months after the reporting date, under the economic scenario considered.

C 113.00 – Details on exposures in Low Default Portfolios by counterparty by facility

Column Label Legal reference Instructions
0010 Counterparty Code The instructions provided in this Annex to this Implementing Regulation for column 0010 of C 112.00 shall apply.
0020 Facility ID The facility ID assigned by the institution to the facility of the counterparty shall be used in a consistent way across time. Where the institution has more than five facilities toward a given counterparty, it shall report only the five facilities with the highest exposure amount.
0100 Exposure value – IFRS 9 The exposure value to the facility of the counterparty at the reporting date, as considered for the application of impairment requirements under IFRS 9. This shall include both, on- and off-balance sheet exposures in the scope of the impairment requirements of IFRS 9. For both stage 1 and stage 2 facilities, the exposure value for each facility shall be the one associated with default events over the 12 months’ period following the reporting date.
0200 Impairment Status Paragraph 5 (l) in Part 1 of Annex V to Regulation (EU) No 680/2014 The stage assigned to the facility to each counterparty at the reporting date shall be reported as follows: — instruments without significant increase in credit risk: stage 1; — instruments with significant increase in credit risk stage 2; — credit impaired instruments: stage 3.
0300 Annualised originated PD IFRS 9.5.5.9 IFRS 9.B5.5.11 IFRS 9.B5.5.13 IFRS 9.B5.5.43 The annualised lifetime PD representing the probability of default assigned to the facility, evaluated at the origination date, used for the assessment of the significant increase in credit risk, calculated in accordance with the following formula: Image omitted; see official source where — M is the residual number of years of the maturity of the facility at the reporting date; — lifetime PD is the lifetime PD representing the probability of default assigned to the facility, for the residual number of years at the reporting date, evaluated at the origination date, used for the assessment of the significant increase in credit risk Where the 12-month PD is used as a proxy for the assessment of the significant increase in credit risk, the 12-month PD evaluated at the origination date shall be reported.
0400 Annualised PD at reporting date IFRS 9.5.5.9 IFRS 9.B5.5.13 IFRS 9.B5.5.14 The annualised lifetime PD representing the probability of default assigned to the facility, evaluated at the reporting date, used for the assessment of the significant increase in credit risk, calculated in accordance with the following formula: Image omitted; see official source where: — M is the residual number of years of the maturity of the facility at the reporting date; — lifetime PD is the lifetime PD representing the probability of default assigned to the facility, for the residual number of years at the reporting date, evaluated at the reporting date, used for the assessment of the significant increase in credit risk. Where the 12-month PD is used as a proxy for the assessment of the significant increase in credit risk, the 12-month PD evaluated at the reporting date shall be reported.
0500 Quantitative Stage 2 trigger (in annualised PD) IFRS 9.5.5.9 The annualised lifetime PD level which constitutes a significant increase in credit risk and triggers a transfer to stage 2 for the considered facility of the counterparty, calculated in accordance with the following formula: Image omitted; see official source where: M is the residual number of years of the maturity of the facility at the reporting date; lifetime PD is the lifetime PD level which constitutes a significant increase in credit risk and triggers a transfer to stage 2 for the considered facility of the counterparty, for the residual number of years of the maturity of the exposure at the reporting date. Where both a relative and an absolute threshold are used for the assessment of a significant increase in credit risk, the threshold that first triggers a transfer to stage 2 for the considered facility shall be reported. Where a ratings-based approach is used for the assessment of a significant increase in credit risk, the annualised lifetime PDs corresponding to the number of notch downgrades required for a stage transfer shall be reported. Where the 12-month PD is used as a proxy for the assessment of the significant increase in credit risk, the 12-month PD trigger level which constitutes a significant increase in credit risk shall be reported.
0550 Low Credit Risk exemption threshold (if applicable) IFRS 9.5.5.10 IFRS 9.B5.5.22 – B5.5.24 The annualised lifetime PD level, below which the financial instrument is considered to have a low risk of default, calculated in accordance with the following formula: Image omitted; see official source where: M is the residual number of years of the maturity of the exposure at the reporting date; lifetime PD is the lifetime PD level below which the financial instrument is considered to have a low risk of default at the reporting date. Where the facility is not subject to the Low Credit Risk exemption, this data point shall be left blank or with the indication “NULL” shall be inserted. Where the 12-month PD is used as a proxy for the low credit risk assessment, the 12-month PD below which the financial instrument is considered to have a low risk of default shall be reported.
0600 Qualitative Stage 2 Trigger set IFRS 9.B5.5.17 IFRS 9.B5.5.19 – B5.5.21 Where the facility is in stage 1 or in stage 3, this field shall be left bank or the indication “NULL” shall be inserted. Where the facility is in stage 2, the type of qualitative indicator that triggered first the stage transfer shall be reported as one of the following: a) “no qualitative indicator” (but the facility is in stage 2 due to a quantitative trigger); b) “30 days past due”; c) “watch list”; d) “forbearance”; e) “other qualitative trigger or identification of first trigger not possible”.

C 114.00 – Details on macroeconomic scenarios per country

The estimated yearly GDP growth of the countries reported in columns 0100, 0110, 0120, 0130, 0140, 0150, 0160, 0170, 0180 and 0190 shall be expressed in decimals with a minimum precision equivalent to four decimals. Where the annual GDP growth is estimated for aggregated geographical zones different from the ones referred to in column 0010, this estimation shall be reported for each of the countries belonging to the relevant geographical zone.

In the case the institutions are not using a discrete number of macro-economic scenarios (for instance, because they are using Monte Carlo simulation for the PD), the template C 114.00 should not be populated.

Column Label Legal reference Instructions
0010 GDP Area Code The list of areas identified in column 0030 of template C 111.00 of Annex VIII. Columns 0010 and 0020 are a composite row identifier and together shall be unique for each row in the table.
0020 Economic scenario ID IFRS 9.5.5.17(a) IFRS 9.5.5.18 IFRS 9.B5.5.41 IFRS 9.B5.5.42 The instructions provided in this Annex to this Implementing Regulation for column 0020 of C 112.00 shall apply for scenario 1 to 5. However, in case the IFRS 9 model related to the GDP area code uses an average macro-economic scenario, with no individual macro-economic scenario available, the scenario 1 to 5 should not be populated. Instead, the average macro-economic scenario should be reported under the economic scenario 0, and no data should be reported for the economic scenarios 1 to 5
0100 GDP growth - 0 - 12 months The estimated yearly GDP growth within the next 12 months after the reporting date of the country reported in column 0010 under the economic scenario reported in column 0020 shall be reported.
0110 GDP growth - 12 - 24 months The estimated yearly GDP growth within the next 12 months starting 12 months after the reporting period of the country reported in column 0010 under the economic scenario reported in column 0020 shall be reported.
0120 GDP growth - 24 - 36 months The estimated yearly GDP growth within the next 12 months starting 24 months after the reporting period of the country reported in column 0010 under the economic scenario reported in column 0020 shall be reported.
0130 GDP growth - 36 - 48 months The estimated yearly GDP growth within the next 12 months starting 36 months after the reporting period of the country reported in column 0010 under the economic scenario reported in column 0020 shall be reported.
0140 GDP growth - 48 - 60 months The estimated yearly GDP growth within the next 12 months starting 48 months after the reporting period of the country reported in column 0010 under the economic scenario reported in column 0020 shall be reported.
0150 GDP growth - 60 - 72 months The estimated yearly GDP growth within the next 12 months starting 60 months after the reporting period of the country reported in column 0010 under the economic scenario reported in column 0020 shall be reported.
0160 GDP growth - 72 - 84 months The estimated yearly GDP growth within the next 12 months starting 72 months after the reporting period of the country reported in column 0010 under the economic scenario reported in column 0020 shall be reported.
0170 GDP growth - 84 - 96 months The estimated yearly GDP growth within the next 12 months starting 84 months after the reporting period of the country reported in column 0010 under the economic scenario reported in column 0020 shall be reported.
0180 GDP growth - 96 - 108 months The estimated yearly GDP growth within the next 12 months starting 96 months after the reporting period of the country reported in column 0010 under the economic scenario reported in column 0020 shall be reported.
0190 GDP growth - 108 - 120 months The estimated yearly GDP growth within the next 12 months starting 108 months after the reporting period of the country reported in column 0010 under the economic scenario reported in column 0020 shall be reported.
0200 Weight of the economic scenario IFRS 9.5.5.17(a) IFRS 9.5.5.18 IFRS 9.B5.5.41 IFRS 9.B5.5.42 The weight assigned to the economic scenario shall be reported. The weight shall be expressed as a value between 0 and 1.’
9

Commission Implementing Regulation (EU) No 680/2014 of 16 April 2014 laying down implementing technical standards with regard to supervisory reporting of institutions according to Regulation (EU) No 575/2013 of the European Parliament and of the Council (OJ L 191, 28.6.2014, p. 1).

Reading this document does not replace reading the official text published in the Official Journal of the European Union. We assume no responsibility for any inaccuracies arising from the conversion of the original to this format.

This text is published under EUR-Lex's own terms of reuse, not a Legalize or public-domain licence. EUR-Lex
Creative Commons Attribution 4.0 International (CC BY 4.0)
© European Union, https://eur-lex.europa.eu — Source: EUR-Lex (Publications Office of the European Union). Reused under the Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Only EU legislation published in the printed Official Journal of the European Union is deemed authentic; consolidated texts are reproduced here for documentation purposes and have been reformatted to Markdown.