Commission Delegated Regulation (EU) 2021/2139 of 4 June 2021 supplementing Regulation (EU) 2020/852 of the European Parliament and of the Council by establishing the technical screening criteria for determining the conditions under which an economic activity qualifies as contributing substantially to climate change mitigation or climate change adaptation and for determining whether that economic activity causes no significant harm to any of the other environmental objectives (Text with EEA relevance)
| Substantial contribution to climate change mitigation | Substantial contribution to climate change mitigation |
| The life-cycle GHG emissions from the combined generation of heat/cool and power [^E0204] from geothermal energy are lower than 100 g CO2e per 1 kWh of energy output from the combined generation. Life-cycle GHG emissions are calculated based on project-specific data, where available, using Commission Recommendation 2013/179/EU or, alternatively, using ISO 14067:2018 or ISO 14064-1:2018. Quantified life-cycle GHG emissions are verified by an independent third party. | The life-cycle GHG emissions from the combined generation of heat/cool and power [^E0204] from geothermal energy are lower than 100 g CO2e per 1 kWh of energy output from the combined generation. Life-cycle GHG emissions are calculated based on project-specific data, where available, using Commission Recommendation 2013/179/EU or, alternatively, using ISO 14067:2018 or ISO 14064-1:2018. Quantified life-cycle GHG emissions are verified by an independent third party. |
| Do no significant harm (‘DNSH’) | Do no significant harm (‘DNSH’) |
| (2) Climate change adaptation | The activity complies with the criteria set out in Appendix A to this Annex. |
| (3) Sustainable use and protection of water and marine resources | The activity complies with the criteria set out in Appendix B to this Annex. |
| (4) Transition to a circular economy | N/A |
| (5) Pollution prevention and control | For the operation of high-enthalpy geothermal energy systems, adequate abatement systems are in place to reduce emission levels in order not to hamper the achievement of air quality limit values set out in Directives 2004/107/EC and 2008/50/EC. |
| (6) Protection and restoration of biodiversity and ecosystems | The activity complies with the criteria set out in Appendix D to this Annex. |
Cogeneration is defined in Article 2 point 30 of Directive 2012/27/EU.
4.19. Cogeneration of heat/cool and power from renewable non-fossil gaseous and liquid fuels
Description of the activity
Construction and operation of combined heat/cool and power generation facilities using gaseous and liquid fuels of renewable origin. This activity does not include cogeneration of heat/cool and power from the exclusive use of biogas and bio-liquid fuels (see Section 4.20 of this Annex)
The economic activities in this category could be associated with several NACE codes, in particular D35.11 and D35.30 in accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006.
Technical screening criteria
| Substantial contribution to climate change mitigation | Substantial contribution to climate change mitigation |
| 1. The life-cycle GHG emissions from the co-generation of heat/cool and power [^E0205] from renewable gaseous and liquid fuels are lower than 100 g CO2e per 1 kWh of energy output from the co-generation. Life-cycle GHG emissions are calculated based on project-specific data, where available, using Recommendation 2013/179/EU or, alternatively, using ISO 14067:2018 [^E0206] or ISO 14064-1:2018 [^E0207]. Quantified life-cycle GHG emissions are verified by an independent third party. 2. Where facilities incorporate any form of abatement (including carbon capture or use of decarbonised fuels) that abatement activity complies with the relevant Sections of this Annex, where applicable. Where the CO2 that would otherwise be emitted from the cogeneration process is captured for the purpose of underground storage, the CO2 is transported and stored underground, in accordance with the technical screening criteria set out in Sections 5.11 and 5.12 of this Annex. 3. The activity meets either of the following criteria: (a) at construction, measurement equipment for monitoring of physical emissions, such as methane leakage is installed or a leak detection and repair program is introduced; (b) at operation, physical measurement of methane emissions are reported and leak is eliminated. 4. Where the activity blends renewable gaseous or liquid fuels with biogas or bioliquids, the agricultural biomass used for the production of the biogas or bioliquids complies with the criteria laid down in Article 29, paragraphs 2 to 5, of Directive (EU) 2018/2001 while forest biomass complies with the criteria laid down in Article 29, paragraphs 6 and 7, of that Directive. | 1. The life-cycle GHG emissions from the co-generation of heat/cool and power [^E0205] from renewable gaseous and liquid fuels are lower than 100 g CO2e per 1 kWh of energy output from the co-generation. Life-cycle GHG emissions are calculated based on project-specific data, where available, using Recommendation 2013/179/EU or, alternatively, using ISO 14067:2018 [^E0206] or ISO 14064-1:2018 [^E0207]. Quantified life-cycle GHG emissions are verified by an independent third party. 2. Where facilities incorporate any form of abatement (including carbon capture or use of decarbonised fuels) that abatement activity complies with the relevant Sections of this Annex, where applicable. Where the CO2 that would otherwise be emitted from the cogeneration process is captured for the purpose of underground storage, the CO2 is transported and stored underground, in accordance with the technical screening criteria set out in Sections 5.11 and 5.12 of this Annex. 3. The activity meets either of the following criteria: (a) at construction, measurement equipment for monitoring of physical emissions, such as methane leakage is installed or a leak detection and repair program is introduced; (b) at operation, physical measurement of methane emissions are reported and leak is eliminated. 4. Where the activity blends renewable gaseous or liquid fuels with biogas or bioliquids, the agricultural biomass used for the production of the biogas or bioliquids complies with the criteria laid down in Article 29, paragraphs 2 to 5, of Directive (EU) 2018/2001 while forest biomass complies with the criteria laid down in Article 29, paragraphs 6 and 7, of that Directive. |
| Do no significant harm (‘DNSH’) | Do no significant harm (‘DNSH’) |
| (2) Climate change adaptation | The activity complies with the criteria set out in Appendix A to this Annex. |
| (3) Sustainable use and protection of water and marine resources | The activity complies with the criteria set out in Appendix B to this Annex. |
| (4) Transition to a circular economy | N/A |
| (5) Pollution prevention and control | Emissions are within or lower than the emission levels associated with the best available techniques (BAT-AEL) ranges set out in the latest relevant best available techniques (BAT) conclusions, including the best available techniques (BAT) conclusions for large combustion plants [^E0208]. No significant cross-media effects occur. For combustion plants with thermal input greater than 1 MW but below the thresholds for the BAT conclusions for large combustion plants to apply, emissions are below the emission limit values set out in Annex II, part 2, to Directive (EU) 2015/2193. |
| (6) Protection and restoration of biodiversity and ecosystems | The activity complies with the criteria set out in Appendix D to this Annex. |
Cogeneration is defined in Article 2 point 30 of Directive 2012/27/EU.
ISO standard 14067:2018, Greenhouse gases — Carbon footprint of products — Requirements and guidelines for quantification (version of 4.6.2021: https://www.iso.org/standard/71206.html).
ISO standard 14064-1:2018, Greenhouse gases — Part 1: Specification with guidance at the organization level for quantification and reporting of greenhouse gas emissions and removals (version of 4.6.2021: https://www.iso.org/standard/66453.html).
[^E0208]: (4)
Implementing Decision (EU) 2017/1442.
4.20. Cogeneration of heat/cool and power from bioenergy
Description of the activity
Construction and operation of installations used for cogeneration of heat/cool and power exclusively from biomass, biogas or bioliquids, and excluding cogeneration from blending of renewable fuels with biogas or bioliquids (see Section 4.19 of this Annex).
The economic activities in this category could be associated with several NACE codes, in particular D35.11 and D35.30 in accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006.
Technical screening criteria
| Substantial contribution to climate change mitigation | Substantial contribution to climate change mitigation |
| 1. Agricultural biomass used in the activity complies with the criteria laid down in Article 29, paragraphs 2 to 5, of Directive (EU) 2018/2001. Forest biomass used in the activity complies with the criteria laid down in Article 29, paragraphs 6 and 7 of that Directive. 2. The greenhouse gas emission savings from the use of biomass in cogeneration installations are at least 80 % in relation to the GHG emission saving methodology and fossil fuel comparator set out in Annex VI to Directive (EU) 2018/2001. 3. Where the cogeneration installations rely on anaerobic digestion of organic material, the production of the digestate meets the criteria in Sections 5.6 and criteria 1 and 2 of Section 5.7 of this Annex, as applicable. 4. Points 1 and 2 do not apply to cogeneration installations with a total rated thermal input below 2 MW and using gaseous biomass fuels. | 1. Agricultural biomass used in the activity complies with the criteria laid down in Article 29, paragraphs 2 to 5, of Directive (EU) 2018/2001. Forest biomass used in the activity complies with the criteria laid down in Article 29, paragraphs 6 and 7 of that Directive. 2. The greenhouse gas emission savings from the use of biomass in cogeneration installations are at least 80 % in relation to the GHG emission saving methodology and fossil fuel comparator set out in Annex VI to Directive (EU) 2018/2001. 3. Where the cogeneration installations rely on anaerobic digestion of organic material, the production of the digestate meets the criteria in Sections 5.6 and criteria 1 and 2 of Section 5.7 of this Annex, as applicable. 4. Points 1 and 2 do not apply to cogeneration installations with a total rated thermal input below 2 MW and using gaseous biomass fuels. |
| Do no significant harm (‘DNSH’) | Do no significant harm (‘DNSH’) |
| (2) Climate change adaptation | The activity complies with the criteria set out in Appendix A to this Annex. |
| (3) Sustainable use and protection of water and marine resources | The activity complies with the criteria set out in Appendix B to this Annex. |
| (4) Transition to a circular economy | N/A |
| (5) Pollution prevention and control | For installations falling within the scope of Directive 2010/75/EU, emissions are within or lower than the emission levels associated with the best available techniques (BAT-AEL) ranges set out in the latest relevant best available techniques (BAT) conclusions, including the best available techniques (BAT) conclusions for large combustion plants [^E0209], ensuring at the same time that no significant cross-media effects occur. For combustion plants with thermal input greater than 1 MW but below the thresholds for the BAT conclusions for large combustion plants to apply, emissions are below the emission limit values set out in Annex II, part 2, to Directive (EU) 2015/2193. For plants in zones or parts of zones not complying with the air quality limit values laid down in Directive 2008/50/EC, results of the information exchange [^E0210], which are published by the Commission in accordance with Article 6, paragraphs 9 and 10, of Directive (EU) 2015/2193 are taken into account. In case of anaerobic digestion of organic material, where the produced digestate is used as fertiliser or soil improver, either directly or after composting or any other treatment, it meets the requirements for fertilising materials set out in Component Material Categories (CMC) 4 and 5 in Annex II to Regulation (EU) 2019/1009 or national rules on fertilisers or soil improvers for agricultural use. For anaerobic digestion plants treating over 100 tonnes per day, emissions to air and water are within or lower than the emission levels associated with the best available techniques (BAT-AEL) ranges set for anaerobic treatment of waste in the latest relevant best available techniques (BAT) conclusions, including the best available techniques (BAT) conclusions for waste treatment [^E0211]. No significant cross-media effects occur. |
| (6) Protection and restoration of biodiversity and ecosystems | The activity complies with the criteria set out in Appendix D to this Annex. |
[^E0209]: (1)
Implementing Decision (EU) 2017/1442.
[^E0210]: (2)
The final technology report resulting from the exchange of information with Member States, the industries concerned and non-governmental organisations contains technical information on best available technologies used in medium combustion plants to reduce their environmental impacts, and on the emission levels achievable with best available and emerging technologies and the related costs (version of 4.6.2021: https://circabc.europa.eu/ui/group/06f33a94-9829-4eee-b187-21bb783a0fbf/library/9a99a632-9ba8-4cc0-9679-08d929afda59/details).
Implementing Decision (EU) 2018/1147.
4.21. Production of heat/cool from solar thermal heating
Description of the activity
Construction and operation of facilities producing heat/cool from solar thermal heating technology.
Where an economic activity is an integral element of the ‘Installation, maintenance and repair of renewable energy technologies’ as referred to in Section 7.6 of this Annex, the technical screening criteria specified in Section 7.6 apply.
The economic activities in this category could be associated with NACE code D35.30 in accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006.
Technical screening criteria
| Substantial contribution to climate change mitigation | Substantial contribution to climate change mitigation |
| The activity produces heat/cool using solar thermal heating. | The activity produces heat/cool using solar thermal heating. |
| Do no significant harm (‘DNSH’) | Do no significant harm (‘DNSH’) |
| (2) Climate change adaptation | The activity complies with the criteria set out in Appendix A to this Annex. |
| (3) Sustainable use and protection of water and marine resources | N/A |
| (4) Transition to a circular economy | The activity assesses availability of and, where feasible, uses equipment and components of high durability and recyclability and that are easy to dismantle and refurbish. |
| (5) Pollution prevention and control | N/A |
| (6) Protection and restoration of biodiversity and ecosystems | The activity complies with the criteria set out in Appendix D to this Annex. |
4.22. Production of heat/cool from geothermal energy
Description of the activity
Construction or operation of facilities that produce heat/cool from geothermal energy.
The economic activities in this category could be associated with NACE code D35.30 in accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006.
Technical screening criteria
| | |
| --- | --- | | Substantial contribution to climate change mitigation | Substantial contribution to climate change mitigation | | The life-cycle GHG emissions from the generation of heat/cool from geothermal energy are lower than 100 g CO2e/kWh. Life-cycle GHG emissions are calculated based on project-specific data, where available, using Commission Recommendation 2013/179/EU or, alternatively, using ISO 14067:2018 or ISO 14064-1:2018. Quantified life-cycle GHG emissions are verified by an independent third party. | The life-cycle GHG emissions from the generation of heat/cool from geothermal energy are lower than 100 g CO2e/kWh. Life-cycle GHG emissions are calculated based on project-specific data, where available, using Commission Recommendation 2013/179/EU or, alternatively, using ISO 14067:2018 or ISO 14064-1:2018. Quantified life-cycle GHG emissions are verified by an independent third party. | | Do no significant harm (‘DNSH’) | Do no significant harm (‘DNSH’) | | (2) Climate change adaptation | The activity complies with the criteria set out in Appendix A to this Annex. | | (3) Sustainable use and protection of water and marine resources | The activity complies with the criteria set out in Appendix B to this Annex. | | (4) Transition to a circular economy | N/A | | (5) Pollution prevention and control | For the operation of high-enthalpy geothermal energy systems, adequate abatement systems are in place to reduce emission levels in order not to hamper the achievement of air quality limit values set out in Directives 2004/107/EC and 2008/50/EC. | | (6) Protection and restoration of biodiversity and ecosystems | The activity complies with the criteria set out in Appendix D to this Annex. |
4.23. Production of heat/cool from renewable non-fossil gaseous and liquid fuels
Description of the activity
Construction and operation of heat generation facilities that produce heat/cool using gaseous and liquid fuels of renewable origin. This activity does not include production of heat/cool from the exclusive use of biogas and bio-liquid fuels (see Section 4.24 of this Annex).
The economic activities in this category could be associated with NACE code D35.30 in accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006.
Technical screening criteria
| Substantial contribution to climate change mitigation | Substantial contribution to climate change mitigation |
| 1. The life-cycle GHG emissions from the generation of heat/cool using renewable gaseous and liquid fuels are lower than 100 g CO2e/kWh. Life-cycle GHG emissions are calculated based on project-specific data, where available, using Recommendation 2013/179/EU or, alternatively, using ISO 14067:2018 [^E0212] or ISO 14064-1:2018 [^E0213]. Quantified life-cycle GHG emissions are verified by an independent third party. 2. Where facilities incorporate any form of abatement (including carbon capture or use of decarbonised fuels), that abatement activity complies with the relevant Sections of this Annex, where applicable. Where the CO2 that would otherwise be emitted from the electricity generation process is captured for the purpose of underground storage, the CO2 is transported and stored underground, in accordance with the technical screening criteria set out in Sections 5.11 and 5.12 of this Annex. 3. The activity meets either of the following criteria: (a) at construction, measurement equipment for monitoring physical emissions, such as methane leakage is installed or a leak detection and repair program is introduced; (b) at operation, physical measurement of methane emissions are reported and leak is eliminated. 4. Where the activity blends renewable gaseous or liquid fuels with biogas or bioliquids, the agricultural biomass used for the production of the biogas or bioliquids complies with the criteria laid down in Article 29, paragraphs 2 to 5, of Directive (EU) 2018/2001 while forest biomass complies with the criteria laid down in Article 29, paragraphs 6 and 7, of that Directive. | 1. The life-cycle GHG emissions from the generation of heat/cool using renewable gaseous and liquid fuels are lower than 100 g CO2e/kWh. Life-cycle GHG emissions are calculated based on project-specific data, where available, using Recommendation 2013/179/EU or, alternatively, using ISO 14067:2018 [^E0212] or ISO 14064-1:2018 [^E0213]. Quantified life-cycle GHG emissions are verified by an independent third party. 2. Where facilities incorporate any form of abatement (including carbon capture or use of decarbonised fuels), that abatement activity complies with the relevant Sections of this Annex, where applicable. Where the CO2 that would otherwise be emitted from the electricity generation process is captured for the purpose of underground storage, the CO2 is transported and stored underground, in accordance with the technical screening criteria set out in Sections 5.11 and 5.12 of this Annex. 3. The activity meets either of the following criteria: (a) at construction, measurement equipment for monitoring physical emissions, such as methane leakage is installed or a leak detection and repair program is introduced; (b) at operation, physical measurement of methane emissions are reported and leak is eliminated. 4. Where the activity blends renewable gaseous or liquid fuels with biogas or bioliquids, the agricultural biomass used for the production of the biogas or bioliquids complies with the criteria laid down in Article 29, paragraphs 2 to 5, of Directive (EU) 2018/2001 while forest biomass complies with the criteria laid down in Article 29, paragraphs 6 and 7, of that Directive. |
| Do no significant harm (‘DNSH’) | Do no significant harm (‘DNSH’) |
| (2) Climate change adaptation | The activity complies with the criteria set out in Appendix A to this Annex. |
| (3) Sustainable use and protection of water and marine resources | The activity complies with the criteria set out in Appendix B to this Annex. |
| (4) Transition to a circular economy | N/A |
| (5) Pollution prevention and control | Emissions are within or lower than the emission levels associated with the best available techniques (BAT-AEL) ranges set in the latest relevant best available techniques (BAT) conclusions, including the best available techniques (BAT) conclusions for large combustion plants [^E0214]. No significant cross-media effects occur. For combustion plants with thermal input greater than 1 MW but below the thresholds for the BAT conclusions for large combustion plants to apply, emissions are below the emission limit values set out in Annex II, part 2, to Directive (EU) 2015/2193. |
| (6) Protection and restoration of biodiversity and ecosystems | The activity complies with the criteria set out in Appendix D to this Annex. |
ISO standard 14067:2018, Greenhouse gases — Carbon footprint of products — Requirements and guidelines for quantification (version of 4.6.2021: https://www.iso.org/standard/71206.html).
ISO standard 14064-1:2018, Greenhouse gases — Part 1: Specification with guidance at the organization level for quantification and reporting of greenhouse gas emissions and removals (version of 4.6.2021: https://www.iso.org/standard/66453.html).
[^E0214]: (3)
Implementing Decision (EU) 2017/1442.
4.24. Production of heat/cool from bioenergy
Description of the activity
Construction and operation of facilities that produce heat/cool exclusively from biomass, biogas or bioliquids, and excluding production of heat/cool from blending of renewable fuels with biogas or bioliquids (see Section 4.23 of this Annex.
The economic activities in this category could be associated with NACE code D35.30 in accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006.
Technical screening criteria
| | |
| --- | --- | | Substantial contribution to climate change mitigation | Substantial contribution to climate change mitigation | | 1. Agricultural biomass used in the activity for the production of heat and cool complies with the criteria laid down in Article 29, paragraphs 2 to 5, of Directive (EU) 2018/2001. Forest biomass used in the activity complies with the criteria laid down in Article 29, paragraphs 6 and 7, of that Directive. 2. The greenhouse gas emission savings from the use of biomass are at least 80 % in relation to the GHG emission saving methodology and relative fossil fuel comparator set out in Annex VI to Directive (EU) 2018/2001. 3. Where the installations rely on anaerobic digestion of organic material, the production of the digestate meets the criteria in Sections 5.6 and criteria 1 and 2 of Section 5.7 of this Annex, as applicable. 4. Points 1 and 2 do not apply to heat generation installations with a total rated thermal input below 2 MW and using gaseous biomass fuels. | 1. Agricultural biomass used in the activity for the production of heat and cool complies with the criteria laid down in Article 29, paragraphs 2 to 5, of Directive (EU) 2018/2001. Forest biomass used in the activity complies with the criteria laid down in Article 29, paragraphs 6 and 7, of that Directive. 2. The greenhouse gas emission savings from the use of biomass are at least 80 % in relation to the GHG emission saving methodology and relative fossil fuel comparator set out in Annex VI to Directive (EU) 2018/2001. 3. Where the installations rely on anaerobic digestion of organic material, the production of the digestate meets the criteria in Sections 5.6 and criteria 1 and 2 of Section 5.7 of this Annex, as applicable. 4. Points 1 and 2 do not apply to heat generation installations with a total rated thermal input below 2 MW and using gaseous biomass fuels. | | Do no significant harm (‘DNSH’) | Do no significant harm (‘DNSH’) | | (2) Climate change adaptation | The activity complies with the criteria set out in Appendix A to this Annex. | | (3) Sustainable use and protection of water and marine resources | The activity complies with the criteria set out in Appendix B to this Annex. | | (4) Transition to a circular economy | N/A | | (5) Pollution prevention and control | For installations falling within the scope of Directive 2010/75/EU, emissions are within or lower than the emission levels associated with the best available techniques (BAT-AEL) ranges set out in the latest relevant best available techniques (BAT) conclusions, including the best available techniques (BAT) conclusions for large combustion plants [^E0215], ensuring at the same time that no significant cross-media effects occur. For combustion plants with thermal input greater than 1 MW but below the thresholds for the BAT conclusions for large combustion plants to apply, emissions are below the emission limit values set out in Annex II, part 2, to Directive (EU) 2015/2193. For plants in zones or parts of zones not complying with the air quality limit values laid down in Directive 2008/50/EC, results of the information exchange [^E0216], which are published by the Commission in accordance with Article 6, paragraphs 9 and 10 of Directive (EU) 2015/2193 are taken into account. For anaerobic digestion of organic material, where the produced digestate is used as fertiliser or soil improver, either directly or after composting or any other treatment, it meets the requirements for fertilising materials set out in Component Material Categories (CMC) 4 and 5 in Annex II to Regulation (EU) 2019/1009 or national rules on fertilisers or soil improvers for agricultural use. For anaerobic digestion plants treating over 100 tonnes per day, emissions to air and water are within or lower than the emission levels associated with the best available techniques (BAT-AEL) ranges set for anaerobic treatment of waste in the latest relevant best available techniques (BAT) conclusions, including the best available techniques (BAT) conclusions for waste treatment [^E0217]. No significant cross-media effects occur. | | (6) Protection and restoration of biodiversity and ecosystems | The activity complies with the criteria set out in Appendix D to this Annex. |
[^E0215]: (1)
Implementing Decision (EU) 2017/1442.
The final technology report resulting from the exchange of information with Member States, the industries concerned and non-governmental organisations contains technical information on best available technologies used in medium combustion plants to reduce their environmental impacts, and on the emission levels achievable with best available and emerging technologies and the related costs (version of 4.6.2021: https://circabc.europa.eu/ui/group/06f33a94-9829-4eee-b187-21bb783a0fbf/library/9a99a632-9ba8-4cc0-9679-08d929afda59/details).
Implementing Decision (EU) 2018/1147.
4.25. Production of heat/cool using waste heat
Description of the activity
Construction and operation of facilities that produce heat/cool using waste heat.
The economic activities in this category could be associated with NACE code D35.30 in accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006.
Technical screening criteria
| Substantial contribution to climate change mitigation | Substantial contribution to climate change mitigation |
| The activity produces heat/cool from waste heat. | The activity produces heat/cool from waste heat. |
| Do no significant harm (‘DNSH’) | Do no significant harm (‘DNSH’) |
| (2) Climate change adaptation | The activity complies with the criteria set out in Appendix A to this Annex. |
| (3) Sustainable use and protection of water and marine resources | N/A |
| (4) Transition to a circular economy | The activity assesses availability of and, where feasible, uses equipment and components of high durability and recyclability and that are easy to dismantle and refurbish. |
| (5) Pollution prevention and control | Pumps and the kind of equipment used, which is covered by Ecodesign and Energy labelling comply, where relevant, with the top class requirements of the energy label laid down in Regulation (EU) 2017/1369, and with implementing regulations under Directive 2009/125/EC and represent the best available technology. |
| (6) Protection and restoration of biodiversity and ecosystems | The activity complies with the criteria set out in Appendix D to this Annex. |
4.26. Pre-commercial stages of advanced technologies to produce energy from nuclear processes with minimal waste from the fuel cycle
Description of the activity
Research, development, demonstration and deployment of innovative electricity generation facilities, licenced by Member States’ competent authorities in accordance with applicable national law, that produce energy from nuclear processes with minimal waste from the fuel cycle.
The activity is classified under NACE code M72 and M72.1 in accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006.
An economic activity in this category is an activity as referred to in Article 10(2) of Regulation (EU) 2020/852 where it complies with all the technical screening criteria set out in this Section.
Technical screening criteria
| General criteria pertaining to substantial contribution to climate change mitigation and Do no significant harm (‘DNSH’) |
- 1.The project related to the economic activity (‘the project’) is located in a Member State which complies with all of the following:
- (a) the Member State has fully transposed Council Directive 2009/71/Euratom ([^E0218]) and Council Directive 2011/70/Euratom ([^E0219]);
- (b) the Member State complies with the Treaty establishing the European Atomic Energy Community (‘Euratom Treaty’) and with legislation adopted on its basis, in particular, Directive 2009/71/Euratom, Directive 2011/70/Euratom and Council Directive 2013/59/Euratom ([^E0220]), as well as applicable Union environmental law adopted under Article 192 TFEU, in particular Directive 2011/92/EU of the European Parliament and of the Council ([^E0221]) and Directive 2000/60/EC of the European Parliament and of the Council ([^E0222]);
- (c) the Member State has in place, as of the approval date of the project, a radioactive waste management fund and a nuclear decommissioning fund which can be combined;
- (d) the Member State has demonstrated that it will have resources available at the end of the estimated useful life of the nuclear power plant corresponding to the estimated cost of radioactive waste management and decommissioning in compliance with Commission Recommendation 2006/851/Euratom ([^E0223]);
- (e) the Member State has operational final disposal facilities for all very low-, low- and intermediate-level radioactive waste, notified to the Commission under Article 41 Euratom Treaty or Article 1(4) of Council Regulation (Euratom) No 2587/1999, and included in the national programme updated under Directive 2011/70/Euratom;
- (f) the Member State has a documented plan with detailed steps to have in operation, by 2050, a disposal facility for high-level radioactive waste describing all of the following:
- (i) concepts or plans and technical solutions for spent fuel and radioactive waste management from generation to disposal;
- (ii) concepts or plans for the post-closure period of a disposal facility’s lifetime, including the period during which appropriate controls are retained and the means to be employed to preserve knowledge of that facility in the longer term;
- (iii) the responsibilities for the plan implementation and the key performance indicators to monitor its progress;
- (iv) cost assessments and financing schemes.
- For the purposes of point (f), Member States may use plans drawn up as part of the national programme required by Articles 11 and 12 of Directive 2011/70/Euratom.
- 2.The project is part of a Union financed research programme or the project has been notified to the Commission in accordance with Article 41 of the Euratom Treaty or with Article 1(4) of Council Regulation (Euratom) No 2587/1999, where either of these provisions is applicable, the Commission has given its opinion on it in accordance with Article 43 of the Euratom Treaty, and all the issues raised in the opinion, with relevance for the application of Article 10(2) and Article 17 of Regulation (EU) 2020/852, and of the technical screening criteria laid down in this Section have been satisfactorily addressed.
- 3.The Member State concerned has committed to report to the Commission every five years for each project on all of the following:
- (a) the adequacy of the accumulated resources referred to in point 1(c);
- (b) actual progress in the implementation of the plan referred to in point 1(f).
- On the basis of the reports, the Commission shall review the adequacy of the accumulated resources of the radioactive waste management fund and the nuclear decommissioning fund referred to in point 1(c) and the progress in the implementation of the documented plan referred to in point 1(f) and it may address an opinion to the Member State concerned.
- 4.The activity complies with national legislation that transposes the legislation referred to in point 1(a) and (b), including as regards the evaluation, in particular through stress tests, of the resilience of the nuclear power plants located on the territory of the Union against extreme natural hazards, including earthquakes. Accordingly, the activity takes place on the territory of a Member State where the operator of a nuclear installation:
- (a) has submitted a demonstration of nuclear safety, whose scope and level of detail is commensurate with the potential magnitude and nature of the hazard relevant for the nuclear installation and its site (Article 6, point (b), of Directive 2009/71/Euratom);
- (b) has taken defence-in-depth measures to ensure, inter alia, that the impact of extreme external natural and unintended man-made hazards is minimised (Article 8b(1), point (a) of Directive 2009/71/Euratom);
- (c) has performed an appropriate site and installation-specific assessment when the operator concerned applies for a licence to construct or operate a nuclear power plant (Article 8c(a) of Directive 2009/71/Euratom).
- 5.The activity fulfils the requirements of Directive 2009/71/Euratom, supported by the latest international guidance from the International Atomic Energy Agency (‘IAEA’) and the Western European Nuclear Regulator’s Association (‘WENRA’), contributing to increasing the resilience and the ability of new and existing nuclear power plants to cope with extreme natural hazards, including floods and extreme weather conditions.
- 6.Radioactive waste as referred to in point 1(e) and (f), is disposed of in the Member State in which it was generated, unless there is an agreement between the Member State concerned and the Member State of destination, as established in Directive 2011/70/Euratom. In that case, the Member State of destination has radioactive waste management and disposal programmes and a suitable disposal facility in operation in compliance with the requirements of Directive 2011/70/Euratom.
| Additional criteria pertaining to substantial contribution to climate change mitigation | Additional criteria pertaining to substantial contribution to climate change mitigation |
| The activity aims at generating or generates electricity using nuclear energy. Life-cycle greenhouse gas (GHG) emissions from the generation of electricity from nuclear energy are below the threshold of 100 g CO2e/kWh. Life-cycle GHG emission savings are calculated using Commission Recommendation 2013/179/EU or, alternatively, using ISO 14067:2018 or ISO 14064-1:2018. Quantified life-cycle GHG emissions are verified by an independent third party. | The activity aims at generating or generates electricity using nuclear energy. Life-cycle greenhouse gas (GHG) emissions from the generation of electricity from nuclear energy are below the threshold of 100 g CO2e/kWh. Life-cycle GHG emission savings are calculated using Commission Recommendation 2013/179/EU or, alternatively, using ISO 14067:2018 or ISO 14064-1:2018. Quantified life-cycle GHG emissions are verified by an independent third party. |
| Additional criteria pertaining to Do no significant harm (‘DNSH’) | Additional criteria pertaining to Do no significant harm (‘DNSH’) |
| (2) Climate change adaptation | The activity complies with the criteria set out in Appendix A to this Annex. The activity complies with the requirements laid down in Article 6(b), 8b(1), point (a), and Article 8c(a) of Directive 2009/71/Euratom. The activity fulfils the requirements of Directive 2009/71/Euratom implemented in accordance with the international guidance of the IAEA and WENRA relating to extreme natural hazards, including floods and extreme weather conditions. |
| (3) Sustainable use and protection of water and marine resources | The activity complies with the criteria set out in Appendix B to this Annex. Environmental degradation risks related to preserving water quality and avoiding water stress are identified and addressed, in accordance with a water use and protection management plan, developed in consultation with stakeholders concerned. In order to limit thermal anomalies associated with the discharge of waste heat, operators of inland nuclear power plants utilising once-through wet cooling by taking water from a river or a lake control: (a) the maximum temperature of the recipient freshwater body after mixing, and (b) the maximum temperature difference between the discharged cooling water and the recipient freshwater body. The temperature control is implemented in accordance with the individual licence conditions for the specific operations, where applicable, or threshold values in line with Union law. The activity complies with the International Finance Corporation (IFC) standards. Nuclear activities are operated in compliance with the requirements of Directive 2000/60/EC and of Council Directive 2013/51/Euratom laying down requirements for the protection of the health of the general public with regard to radioactive substances in water intended for human consumption. |
| (4) Transition to a circular economy | A plan for the management of both non-radioactive and radioactive waste is in place and ensures maximal reuse or recycling of such waste at end of life in accordance with the waste hierarchy, including through contractual agreements with waste management partners, the reflection in financial projections or the official project documentation. During operation and decommissioning, the amount of radioactive waste is minimised and the amount of free-release materials is maximised in accordance with Directive 2011/70/Euratom, and in compliance with the radiation protection requirements laid down in Directive 2013/59/Euratom. A financing scheme is in place to ensure adequate funding for all decommissioning activities and for the management of spent fuel and radioactive waste, in compliance with Directive 2011/70/Euratom and Recommendation 2006/851/Euratom. An Environmental Impact Assessment is completed prior to the construction of a nuclear power plant, in accordance with Directive 2011/92/EU. The required mitigation and compensatory measures are implemented. The relevant elements in this Section are covered by Member States’ reports to the Commission in accordance with Article 14(1) of Directive 2011/70/Euratom. |
| (5) Pollution prevention and control | The activity complies with the criteria set out in Appendix C to this Annex. Non-radioactive emissions are within or lower than the emission levels associated with the best available techniques (BAT-AEL) ranges set out in the best available techniques (BAT) conclusions for large combustion plants. No significant cross-media effects occur. For nuclear power plants greater than 1 MW thermal input but below the thresholds for the BAT conclusions for large combustion plants to apply, emissions are below the emission limit values set out in Annex II, part 2, to Directive (EU) 2015/2193. Radioactive discharges to air, water bodies and ground (soil) comply with individual licence conditions for the specific operations, where applicable, or national threshold values in line with Directive 2013/51/Euratom [^E0224] and Directive 2013/59/Euratom. Spent fuel and radioactive waste is safely and responsibly managed in accordance with Directive 2011/70/Euratom and Directive 2013/59/Euratom. An adequate capacity of interim storage is available for the project, while national plans for disposal are in place to minimise the duration of interim storage, in compliance with the provision of Directive 2011/70/Euratom that considers radioactive waste storage, including long-term storage, as an interim solution, but not an alternative to disposal. |
| (6) Protection and restoration of biodiversity and ecosystems | The activity complies with the criteria set out in Appendix D to this Annex. An Environmental Impact Assessment is completed prior to the construction of a nuclear power plant, in accordance with Directive 2011/92/EU. The required mitigation and compensatory measures are implemented. For sites/operations located in or near biodiversity sensitive areas likely to have a significant effect on biodiversity sensitive areas (including the Natura 2000 network of protected areas, Unesco World Heritage sites and Key Biodiversity Areas, as well as other protected areas), an appropriate assessment, where applicable, has been conducted and based on its conclusions the necessary mitigation measures are implemented. The sites/operations shall not be detrimental to the conservation status of any of the habitats or species present in protected areas. |
Council Directive 2013/51/Euratom of 22 October 2013 laying down requirements for the protection of the health of the general public with regard to radioactive substances in water intended for human consumption (OJ L 296, 7.11.2013, p. 12).
4.27. Construction and safe operation of new nuclear power plants, for the generation of electricity or heat, including for hydrogen production, using best-available technologies
For the purposes of this Section, best-available technologies mean technologies that fully comply with the requirements of Directive 2009/71/Euratom and fully respect the most recent technical parameters of the IAEA standards and the WENRA Safety objectives and Reference Levels.
Description of the activity
Construction and safe operation of new nuclear installations for which the construction permit has been issued by 2045 by Member States’ competent authorities, in accordance with applicable national law, to produce electricity or process heat, including for the purposes of district heating or industrial processes such as hydrogen production (new nuclear installations), as well as their safety upgrades.
The activity is classified under NACE codes D35.11 and F42.22 in accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006.
An economic activity in this category is an activity as referred to in Article 10(2) of Regulation (EU) 2020/852 where it complies with all the technical screening criteria set out in this Section.
Technical screening criteria
| General criteria pertaining to substantial contribution to climate change mitigation and Do no significant harm (‘DNSH’) |
- 1.The project related to the economic activity (‘the project’) is located in a Member State which complies with all of the following:
- (a) the Member State has fully transposed Council Directive 2009/71/Euratom and Council Directive 2011/70/Euratom;
- (b) the Member State complies with the Euratom Treaty and with legislation adopted on its basis, in particular, Directive 2009/71/Euratom, Directive 2011/70/Euratom and Directive 2013/59/Euratom, as well as applicable Union environmental law adopted under Article 192 TFEU, in particular Directive 2011/92/EU and Directive 2000/60/EC;
- (c) the Member State has in place, as of the approval date of the project, a radioactive waste management fund and a nuclear decommissioning fund which can be combined;
- (d) the Member State has demonstrated that it will have resources available at the end of the estimated useful life of the nuclear power plant corresponding to the estimated cost of radioactive waste management and decommissioning in compliance with Recommendation 2006/851/Euratom;
- (e) the Member State has operational final disposal facilities for all very low-, low- and intermediate-level radioactive waste, notified to the Commission under Article 41 of the Euratom Treaty or under Article 1(4) of Council Regulation 2587/1999 and included in the national programme updated under Council Directive 2011/70/Euratom;
- (f) the Member State has a documented plan with detailed steps to have in operation, by 2050, a disposal facility for high-level radioactive waste describing all of the following:
- (i) concepts or plans and technical solutions for spent fuel and radioactive waste management from generation to disposal;
- (ii) concepts or plans for the post-closure period of a disposal facility’s lifetime, including the period during which appropriate controls are retained and the means to be employed to preserve knowledge of that facility in the longer term;
- (iii) the responsibilities for the plan implementation and the key performance indicators to monitor its progress;
- (iv) cost assessments and financing schemes.
- For the purposes of point (f), Member States may use the plans drawn up as part of the national programme required by Articles 11 and 12 of Directive 2011/70/Euratom.
- 2.The project fully applies the best-available technology and from 2025 accident-tolerant fuel. The technology is certified and approved by the national safety regulator.
- 3.The project has been notified to the Commission in accordance with Article 41 of the Euratom Treaty or with Article 1(4) of Council Regulation 2587/1999, where either of these provisions is applicable, the Commission has given its opinion on it in accordance with Article 43 of the Euratom Treaty, and all the issues raised in the opinion, with relevance for the application of Article 10(2) and Article 17 of Regulation (EU) 2020/852, and of the technical screening criteria laid down in this Section, have been satisfactorily addressed.
- 4.The Member State concerned has committed to report to the Commission every five years for each project on all of the following:
- (a) the adequacy of the accumulated resources referred to in point 1(c);
- (b) actual progress in the implementation of the plan referred to in point 1(f).
- On the basis of the reports, the Commission shall review the adequacy of the accumulated resources of the radioactive waste management fund and the nuclear decommissioning fund referred to in point 1(c) and the progress in the implementation of the documented plan referred to in point 1(f) and it may address an opinion to the Member State concerned.
- 5.The Commission shall review, as of 2025 and at least every 10 years, the technical parameters corresponding to the best-available technology on the basis of the assessment by the European Nuclear Safety Regulators’ Group (‘ENSREG’).
- 6.The activity complies with national legislation that transposes the legislation referred to in point 1(a) and (b), including as regards the evaluation, in particular through stress-tests, of the resilience of the nuclear power plants located on the territory of the Union against extreme natural hazards, including earthquakes. Accordingly, the activity takes place on the territory of a Member State where the operator of a nuclear installation:
- (a) has submitted a demonstration of nuclear safety, whose scope and level of detail is commensurate with the potential magnitude and nature of the hazard relevant for the nuclear installation and its site (Article 6, point (b), of Directive 2009/71/Euratom);
- (b) has taken defence-in-depth measures to ensure, inter alia, that the impact of extreme external natural and unintended man-made hazards is minimised (Article 8b(1), point (a), of Directive 2009/71/Euratom);
- (c) has performed an appropriate site and installation-specific assessment when the operator concerned applies for a licence to construct or operate a nuclear power plant (Article 8c(a) of Directive 2009/71/Euratom).
- 7.The activity fulfils the requirements of Directive 2009/71/Euratom, supported by the latest international guidance from the IAEA and WENRA, contributing to increasing the resilience and the ability of new and existing nuclear power plants to cope with extreme natural hazards, including floods and extreme weather conditions.
- 8.Radioactive waste as referred to in point 1(e) and (f) is disposed of in the Member State in which it was generated, unless there is an agreement between the Member State concerned and the Member State of destination, as established in Directive 2011/70/Euratom. In that case, the Member State of destination has radioactive waste management and disposal programmes and a suitable disposal facility in operation in compliance with the requirements of Directive 2011/70/Euratom.
| Additional criteria pertaining to substantial contribution to climate change mitigation | Additional criteria pertaining to substantial contribution to climate change mitigation |
| The activity generates electricity using nuclear energy. Life-cycle greenhouse gas (GHG) emissions from the generation of electricity from nuclear energy are below the threshold of 100 g CO2e/kWh. Life-cycle GHG emission savings are calculated using Recommendation 2013/179/EU or, alternatively, using ISO 14067:2018 or ISO 14064-1:2018. Quantified life-cycle GHG emissions are verified by an independent third party. | The activity generates electricity using nuclear energy. Life-cycle greenhouse gas (GHG) emissions from the generation of electricity from nuclear energy are below the threshold of 100 g CO2e/kWh. Life-cycle GHG emission savings are calculated using Recommendation 2013/179/EU or, alternatively, using ISO 14067:2018 or ISO 14064-1:2018. Quantified life-cycle GHG emissions are verified by an independent third party. |
| Additional criteria pertaining to Do no significant harm (‘DNSH’) | Additional criteria pertaining to Do no significant harm (‘DNSH’) |
| (2) Climate change adaptation | The activity complies with the criteria set out in Appendix A to this Annex. The activity complies with the requirements laid down in Article 6(b), Article 8b(1), point (a), and Article 8c(a) of Directive 2009/71/Euratom. The activity fulfils the requirements of Directive 2009/71/Euratom, implemented in accordance with the international guidance of the IAEA and WENRA relating to extreme natural hazards, including floods and extreme weather conditions. |
| (3) Sustainable use and protection of water and marine resources | The activity complies with the criteria set out in Appendix B to this Annex. Environmental degradation risks related to preserving water quality and avoiding water stress are identified and addressed, in accordance with a water use and protection management plan, developed in consultation with stakeholders concerned. In order to limit thermal anomalies associated with the discharge of waste heat, operators of inland nuclear power plants utilising once-through wet cooling by taking water from a river or a lake control: (a) the maximum temperature of the recipient freshwater body after mixing, and (b) the maximum temperature difference between the discharged cooling water and the recipient freshwater body. The temperature control is implemented in accordance with the individual licence conditions for the specific operations, where applicable, or threshold values in line with Union law. The activity complies with the International Finance Corporation (IFC) standards. Nuclear activities are operated in compliance with Directive 2000/60/EC regarding water bodies used for the abstraction of drinking water and Council Directive 2013/51/Euratom laying down requirements for the protection of the health of the general public with regard to radioactive substances in water intended for human consumption. |
| (4) Transition to a circular economy | A plan for the management of both non-radioactive and radioactive waste is in place and ensures maximal reuse or recycling of such waste at end of life in accordance with the waste hierarchy, including through contractual agreements with waste management partners, the reflection in financial projections or the official project documentation. During operation and decommissioning, the amount of radioactive waste is minimised and the amount of free-release materials is maximised in accordance with Directive 2011/70/Euratom, and in compliance with the radiation protection requirements laid down in Directive 2013/59/Euratom. A financing scheme is in place to ensure adequate funding for all decommissioning activities and for the management of spent fuel and radioactive waste, in compliance with Directive 2011/70/Euratom and Recommendation 2006/851/Euratom. An Environmental Impact Assessment is completed prior to the construction of a nuclear power plant, in accordance with Directive 2011/92/EU. The required mitigation and compensatory measures are implemented. The relevant elements in this Section are covered by Member States’ reports to the Commission in accordance with Article 14(1) of Directive 2011/70/Euratom. |
| (5) Pollution prevention and control | The activity complies with the criteria set out in Appendix C to this Annex. Non-radioactive emissions are within or lower than the emission levels associated with the best available techniques (BAT-AEL) ranges set out in the best available techniques (BAT) conclusions for large combustion plants. No significant cross-media effects occur. For nuclear power plants greater than 1 MW thermal input but below the thresholds for the BAT conclusions for large combustion plants to apply, emissions are below the emission limit values set out in Annex II, part 2, to Directive (EU) 2015/2193. Radioactive discharges to air, water bodies and ground (soil) comply with individual licence conditions for the specific operations, where applicable, or national threshold values in line with Directive 2013/51/Euratom and Directive 2013/59/Euratom. Spent fuel and radioactive waste is safely and responsibly managed in accordance with Directive 2011/70/Euratom and Directive 2013/59/Euratom. An adequate capacity of interim storage is available for the project, while national plans for disposal are in place to minimise the duration of interim storage, in compliance with Directive 2011/70/Euratom that considers radioactive waste storage, including long-term storage, as an interim solution, but not an alternative to disposal. |
| (6) Protection and restoration of biodiversity and ecosystems | The activity complies with the criteria set out in Appendix D to this Annex. An Environmental Impact Assessment is completed prior to the construction of a nuclear power plant, in accordance with Directive 2011/92/EU. The required mitigation and compensatory measures are implemented. For sites/operations located in or near biodiversity sensitive areas likely to have a significant effect on biodiversity sensitive areas (including the Natura 2000 network of protected areas, Unesco World Heritage sites and Key Biodiversity Areas, as well as other protected areas), an appropriate assessment, where applicable, has been conducted and based on its conclusions the necessary mitigation measures are implemented. The sites/operations shall not be detrimental to the conservation status of any of the habitats or species present in protected areas. |
4.28. Electricity generation from nuclear energy in existing installations
Description of the activity
Modification of existing nuclear installations for the purposes of extension, authorised by Member States’ competent authorities by 2040 in accordance with applicable national law, of the service time of safe operation of nuclear installations that produce electricity or heat from nuclear energy (‘nuclear power plants’).
The activity is classified under NACE codes D35.11 and F42.22 in accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006.
An economic activity in this category is an activity as referred to in Article 10(2) of Regulation (EU) 2020/852 where it complies with all the technical screening criteria set out in this Section.
Technical screening criteria
| General criteria pertaining to substantial contribution to climate change mitigation and Do no significant harm (‘DNSH’) |
- 1.The project related to the economic activity (‘the project’) is located in a Member State which complies with all of the following:
- (a) the Member State has fully transposed Council Directive 2009/71/Euratom and Council Directive 2011/70/Euratom;
- (b) the Member State complies with the Euratom Treaty and with legislation adopted on its basis, in particular, Directive 2009/71/Euratom, Directive 2011/70/Euratom and Directive 2013/59/Euratom, and with applicable Union environmental law adopted under Article 192 TFEU, in particular Directive 2011/92/EU and Directive 2000/60/EC;
- (c) the Member State has in place, as of the approval date of the project, a radioactive waste management fund and a nuclear decommissioning fund which can be combined;
- (d) the Member State has demonstrated that it will have resources available at the end of the estimated useful life of the nuclear power plant corresponding to the estimated cost of radioactive waste management and decommissioning in compliance with Recommendation 2006/851/Euratom;
- (e) the Member State has operational final disposal facilities for all very low-, low- and intermediate-level radioactive waste, notified to the Commission under Article 41 of the Euratom Treaty or under Article 1(4) of Council Regulation 2587/1999 and included in the national programme updated under Council Directive 2011/70/Euratom;
- (f) for projects authorised after 2025, the Member State has a documented plan with detailed steps to have in operation, by 2050, a disposal facility for high-level radioactive waste describing all of the following:
- (i) concepts or plans and technical solutions for spent fuel and radioactive waste management from generation to disposal;
- (ii) concepts or plans for the post-closure period of a disposal facility’s lifetime, including the period during which appropriate controls are retained and the means to be employed to preserve knowledge of that facility in the longer term;
- (iii) the responsibilities for the plan implementation and the key performance indicators to monitor its progress;
- (iv) cost assessments and financing schemes.
- For the purposes of point (f), Member States may use the plans drawn up as part of the national programme required by Articles 11 and 12 of Directive 2011/70/Euratom.
- 2.The upgraded project implements any reasonably practicable safety improvement and from 2025 makes use of accident-tolerant fuel. The technology is certified and approved by the national safety regulator.
- 3.The project has been notified to the Commission in accordance with Article 41 of the Euratom Treaty or with Article 1(4) of Council Regulation 2587/1999, where either of these provisions is applicable, the Commission has given its opinion on it in accordance with Article 43 of the Euratom Treaty, and all the issues raised in the opinion, with relevance for the application of Article 10(2) and Article 17 of Regulation (EU) 2020/852, and of the technical screening criteria laid down in this Section, have been satisfactorily addressed.
- 4.The Member State concerned has committed to report to the Commission every five years for each project on all of the following:
- (a) the adequacy of the accumulated resources referred to in point 1(c);
- (b) actual progress in the implementation of the plan referred to in point 1(f).
- On the basis of the reports, the Commission shall review the adequacy of the accumulated resources of the radioactive waste management fund and the nuclear decommissioning fund referred to in point 1(c) and the progress in the implementation of the documented plan referred to in point 1(f) and it may address an opinion to the Member State concerned.
- 5.The activity complies with national legislation that transposes the legislation referred to in point 1(a) and (b), including as regards the evaluation, in particular through stress-tests, of the resilience of the Union nuclear power plants against extreme natural hazards, including earthquakes. Accordingly, the activity takes place on the territory of a Member State where the operator of a nuclear installation:
- (a) has submitted a demonstration of nuclear safety, whose scope and level of detail is commensurate with the potential magnitude and nature of the hazard relevant for the nuclear installation and its site (Article 6, point (b), of Directive 2009/71/Euratom);
- (b) has taken defence-in-depth measures to ensure, inter alia, that the impact of extreme external natural and unintended man-made hazards is minimised (Article 8b(1), point (a), of Directive 2009/71/Euratom);
- (c) has performed an appropriate site and installation-specific assessment when the operator concerned applies for a licence to construct or operate a nuclear power plant (Article 8c(a) of Directive 2009/71/Euratom).
- 6.The activity fulfils the requirements of Directive 2009/71/Euratom, supported by the latest international guidance from the IAEA and WENRA, contributing to increasing the resilience and the ability of new and existing nuclear power plants to cope with extreme natural hazards, including floods and extreme weather conditions.
- 7.Radioactive waste referred to in point 1(e) and (f) is disposed of in the Member State in which it was generated, unless there is an agreement between the Member State concerned and the Member State of destination, as established in Directive 2011/70/Euratom. In that case, the Member State of destination has radioactive waste management and disposal programmes and a suitable disposal facility in operation in compliance with the requirements of Directive 2011/70/Euratom.
| | |
Reading this document does not replace reading the official text published in the Official Journal of the European Union. We assume no responsibility for any inaccuracies arising from the conversion of the original to this format.
This text is published under EUR-Lex's own terms of reuse, not a Legalize or public-domain licence.
EUR-Lex
Creative Commons Attribution 4.0 International (CC BY 4.0)
© European Union, https://eur-lex.europa.eu — Source: EUR-Lex (Publications Office of the European Union). Reused under the Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Only EU legislation published in the printed Official Journal of the European Union is deemed authentic; consolidated texts are reproduced here for documentation purposes and have been reformatted to Markdown.