S.I. No. 424/2001 - Merchant Shipping (Load Line) Rules, 2001

Type Statutory Instrument
Publication 2001-09-13
Last updated 2010-12-17
State In force superseded text
Text As published
articles 31

This is the act as published. Later amendments are not folded into the text below: each one is a separate act in this repository and an entry in this law's history.

1 amending act · 2010-12-17, S.I. No. 595/2010 - Merchant Shipping (Fees) Regulations 2010

Reform history JSON API
  • (3)
  • (a) In the case of an enclosed superstructure of standard height, the effective length of a superstructure (E) shall be, subject to subparagraph (c) below, either -
  • (i) its length; or
  • (ii) if the superstructure is set in from the sides of the ship, its length modified in the ratio b/Bs, where -
  • (aa) “b” is the breadth of the superstructure at the middle of its length; and
  • (bb) “Bs” is the breadth of the ship at the middle of the length of the superstructure:

where the superstructure is only set in for part of its length, this modification shall be applied only to that part.

  • (b) In the case of an enclosed superstructure of less than standard height the effective length of a superstructure, subject to subparagraphs (a) above and (c) below, shall be its length reduced in the ratio of the actual height of the superstructure to its standard height.
  • (c) In the case of an enclosed superstructure consisting of a raised quarter deck the effective length of a superstructure shall, if the deck is fitted with an intact front bulkhead, be its length subject to a maximum of 0.6 of the ship's length and, if not so fitted, be determined by treating the raised quarter deck as a poop of less than standard height.
  • (d) A superstructure which is not an enclosed superstructure as defined in paragraph 1 of Schedule 2 shall have no effective length.

Standard height and effective length of trunks

10. (1) The standard height of a trunk shall be that applicable to a superstructure other than a raised quarter deck in paragraph 9(1).

  • (2) The effective length of a trunk shall be determined as follows -
  • (a) a trunk which is not an efficient trunk as described in subparagraph (b) below shall have no effective length;
  • (b) a trunk shall be treated as an efficient trunk provided -
  • (i) it is at least as strong as a superstructure;
  • (ii) the hatchways in way of the trunk are in the trunk deck, and the hatchway coamings and covers comply with the requirements of paragraphs 4 to 6 of Schedule 2, except that small access openings with watertight covers may be permitted in the freeboard deck;
  • (iii) the width of the trunk deck stringer provides a satisfactory gangway and sufficient lateral stiffness;
  • (iv) a permanent working platform fore and aft fitted with guard rails or guard wires complying with applicable requirements in paragraph 18(2)(a) of Schedule 2 is provided by the trunk deck, or by detached trunks connected to superstructures by efficient permanent gangways.
  • (v) ventilators are protected by the trunk, by watertight covers or by equivalent means;
  • (vi) open rails or wires are fitted on the weather parts of the freeboard deck in way of the trunk for at least half of their length;
  • (vii) the machinery casings are protected by the trunk, or by an enclosed superstructure of at east standard height, or by a deckhouse of the same height, strength and weathertightness equivalent to such an enclosed superstructure;
  • (vii) the breadth of the trunk is at least 60 per cent of the breadth of the ship;
  • (ix) where there is no superstructure the length of the trunk is at least 0.6(L).
  • (c) Except as otherwise provided in subparagraph (d) below, the effective length of an efficient trunk shall be its full length reduced in the ratio of its mean breadth to the breadth of the ship.
  • (d) If the actual height of an efficient trunk is less than the standard height, its effective length shall be the length calculated in accordance with subparagraph (c) above reduced in the ratio of the actual to the standard height of the trunk. In addition, if the ship is a Type “B” ship and the height of hatchway coamings on the trunk deck is less than that required by paragraph 5(1) or 6(1) of Schedule 2 a reduction from the actual height of the trunk shall be made of an amount corresponding to the difference between the actual height and the required height of the hatchway coamings.

Deduction for effective length of superstructures and trunks

11. (1) Where the sum of the effective lengths of superstructures and trunks of a ship is 1.0(L), the basic freeboard of the ship shall be reduced by -

350 millimetres if the ship is 24 metres in length (L);
860 millimetres if the ship is 85 metres in length (L);
1070 millimetres if the ship is 122 metres in length (L) or more;

and by amounts obtained by linear interpolation in the case of ships of intermediate length.

  • (2) Where the sum of the effective lengths of superstructures and trunks is less than 1.0 (L), the basic freeboard of a ship shall be reduced by a percentage of the figures in subparagraph (1) according to the total effective length of its superstructures and trunks as follows:
  • (a) In the case of a Type “A” ship, by a percentage given in Table 3. The percentage in the case of a ship having superstructures and trunks of an effective length intermediate to those specified in Table 3 is to be obtained by linear interpolation.
  • (b) (i) Subject to subparagraphs (ii), (iii) and (iv) below, in the case of a Type “B” ship, by a percentage given in Table 4. The percentage in the case of a ship having superstructures and trunks of an effective length intermediate to those specified in Table 4 is to be obtained by linear interpolation.
  • (ii) Where the effective length of a bridge covers less than 0.1 (L) before and 0.1(L) abaft amidships the percentages shall be obtained by linear interpolation between the lines 1 and II.
  • (iii) Where the effective length of a forecastle is more than 0.4 (L), the percentage shall be obtained from line II.
  • (iv) Where the effective length of a forecastle is less than 0.07 (L), the above percentages shall be reduced by -
5. (0.07) (L) - f)
0.07(L)

where “f” is the effective length of the forecastle.

TABLE 3

PERCENTAGE OF DEDUCTION FOR TYPE “A” SHIPS

Percentage of deduction for all types of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks
0 0.1(L) 0.2(L) 0.3(L) 0.4(L) 0.5(L) 0.6(L) 0.7(L) 0.8(L) 0.9(L) 1.0(L)
0 7 14 21 31 41 52 63 75.3 87.7 100

TABLE 4

PERCENTAGE OF DEDUCTION FOR TYPE “B” SHIPS

Ships with forecastle and without detached bridge Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks Total effective length of superstructure and trunks
Line 0 0.1(L) 0.2(L) 0.3(L) 0.4(L) 0.5(L) 0.6(L) 0.7(L) 0.8(L) 0.9(L) 1.0
1 0 5 10 15 23.5 32 46 63 75.3 87.7 100
Ships with forecastle and detached bridge 11 0 6.3 12.7 19 27.5 36 46 63 75.3 87.7 100

Measurement of Sheer

12. (1) The sheer shall be measured from the deck at side to a line of reference drawn parallel to the keel through the sheer line at amidships.

  • (2) In ships designed with a rake of keel, the sheer shall be measured in relation to a line of reference drawn parallel to the Summer load waterline.
  • (3) In flush deck ships and in ships with detached superstructures the sheer shall be measured at the freeboard deck.
  • (4) In ships with topsides of unusual form in which there is a step or break in the topsides, the sheer shall be considered in relation to the equivalent depth amidships.
  • (5) In ships with a superstructure of standard height which extends over the whole length of the freeboard deck, the sheer shall be measured at the superstructure deck. Where the height of the superstructure exceeds the standard height the least difference (Z) between the actual and standard heights shall be added to each end ordinate. Similarly, the intermediate ordinates at distances of 1/6(L) and 1/3(L) from each perpendicular shall be increased by 0.444 (Z) and 0.111 (Z) respectively.
  • (6) Where the deck of an enclosed superstructure has at least the same sheer as the exposed freeboard deck, the sheer of the enclosed portion of the freeboard deck shall not be taken into account.
  • (7) Where an enclosed poop or forecastle is either -
  • (a) of standard height with greater sheer than that of the freeboard deck; or
  • (b) is of more than standard height;

an addition to the sheer of the freeboard deck shall be made calculated in accordance with paragraph 14(4).

Standard sheer profile

13. The ordinates of the standard sheer profile are given in Table 5 -

TABLE 5

Station Ordinate Factor
(in millimetres)
After Half After perpendicular (A.P.) 25.0((L)/3+10) 1
1/6(L) from A.P. 11.1((L)/3+10) 3
1/3(L) from A.P. 2.8((L)/3+10) 3
Amidships 0 1
Forward Half Amidships 0 1
1/3(L) from F.P. 5.6((L)/3+10) 3
1/6(L) from F.P. 22.2((L)/3+10) 3
Forward perpendicular (F.P.) 50.0((L)/3+10) 1

Measurement of variation from standard sheer profile

14. (1) Where the sheer profile differs from the standard sheer profile, the four ordinates of each profile in the forward or after halves of the ship shall be multiplied by the appropriate factors given in paragraph 13. The difference between the sums of the respective products and those of the standard divided by 8 shall be the deficiency or excess of sheer in the forward or other half. The arithmetical mean of the excess or deficiency in the forward and after halves shall be the excess or deficiency of sheer.

  • (2) Where the after half of the sheer profile is greater than the standard sheer profile and the forward half is less than the standard sheer profile, no credit shall be allowed for the part in excess, and deficiency only shall be measured.
  • (3) Where the forward half of the sheer profile exceeds the standard sheer profile, and the after half of the sheer profile is not less than 75 per cent of the standard sheer profile, credit shall be allowed for the part in excess. Where the after half of the sheer profile is less than 50 per cent of the standard sheer profile, no credit shall be given for the excess of sheer forward. Where the sheer in the after half is between 50 per cent and 75 per cent of the standard sheer profile, intermediate allowances may be granted for excess sheer forward.
  • (4) Where sheer credit is given for a poop or forecastle the following formula shall be used -
y L'
S = 3 (L)

where -

S=sheer credit, to be deducted from the deficiency or added to the excess of sheer;

Y=difference between actual and standard height of superstructure at the end ordinate of sheer; and

L'=mean enclosed length of poop or forecastle up to a maximum length of 0.5 (L).

This formula provides a curve in the form of a parabola tangential to the actual sheer curve at the freeboard deck and interacting the end of ordinate at a point below the superstructure deck at a distance equal to the standard height of the poop or forecastle. The superstructure deck shall not be less than standard height above this curve at any point. This curve shall be used in determining the sheer profile for the forward and the after halves of the ship.

Correction for Variations from standard sheer profile

15. (1) The correction for sheer shall be the deficiency or excess of sheer determined in accordance with paragraph 14 multiplied by -

0.75 - S
2(L)
  • (2) In the case of a ship with sheer less than the standard sheer profile, the correction for deficiency of sheer determined in accordance with subparagraph (1) shall be added to the basic freeboard of the ship.
  • (3) Subject to subparagraph (4), in the case of a ship having an excess of sheer -
  • (a) if an enclosed superstructure covers 0.1(L) before and 0.1(L) abaft amidships, the correction for excess of sheer determined in accordance with subparagraph (1) shall be deducted from the basic freeboard of the ship;
  • (b) if no enclosed superstructure covers amidships, no deductions shall be made from the basic freeboard of the ship;
  • (c) if an enclosed superstructure covers less than 0.1 (L) before and 0.1(L) abaft amidships, the correction for excess of sheer determined in accordance with subparagraph (1) shall be modified in the ratio of the amount of 0.2 (L) amidship which is covered by the superstructure, 0.2(L).
  • (4) The maximum deduction for excess sheer shall be at the rate of 125 millimetres per 100 metres of length (L).

Correction for minimum bow height

16. (1) Except as otherwise provided in subparagraph (2) and (3), where the bow height determined in accordance with subparagraph (4) is less than the minimum bow height determined in accordance with subparagraph (5), the freeboard determined for the ship shall be increased by an amount equal to the difference between the bow height and the minimum bow height.

  • (2) Where an existing ship to which subparagraph (1) applies has been so constructed or modified as to comply with all the requirements of Schedule 2 applicable to a new ship of her type is to be assigned freeboards determined in accordance with this Schedule, and/or -
  • (a) the forecastle is less than 0.07(L);
  • (b) the sheer extends for less than 15 per cent of the ship's length (L) measured from the forward perpendicular.

The freeboard shall be increased by such amount as the Assigning Authority may determine in each particular case.

  • (3) In the case of a ship to which subparagraph (1) applies, being a ship which is constructed to meet exceptional operational requirements, the correction to be made in accordance with subparagraphs (1) and (2) may be reduced or waived if the Minister is satisfied that the safety of the ship will not be impaired in consequence of the worst sea and weather conditions likely to be encountered by the ship in service.
  • (4) The bow height of the a ship is the vertical distance at the forward perpendicular between the Summer load waterline at the designed trim and the top of the exposed deck at side.
  • (a) Where the bow height is obtained by including sheer, the sheer shall extend for no less than 15 per cent of length (L) measured from the forward perpendicular.
  • (b) Where the bow height is obtained by including the height of a superstructure, such superstructure shall -
  • (i) extend from the stem to a point not less than 0.07 of the ship's length (L) measured from the forward perpendicular
  • (ii) if length (L) is 100 metres or less, be an enclosed superstructure; and
  • (iii) if length (L) exceeds 100 metres in length, be fitted with satisfactory closing appliances.
  • (5) The minimum bow height in millimetres shall be -
56(L) (1 - (L) ) ( 1.36 )
( 500 ) ( Cb + 0.68 )

Where (L) is less than 250 metres, and

7000 ( 1.36 )
( Cb + 0.68 )

where (L) is 250 metres or more;

Cb shall not be taken as less than 0.68.

PART II - TIMBER FREEBOARDS

Summer Timber freeboard

17. The Summer Timber freeboard is the freeboard determined in accordance with the provisions of paragraphs 5(1), (2)(a), (9) and (10) and corrected in accordance with the provisions of paragraph 6 to 15, except that the percentage in Table 6 shall be substituted for those given in Table 4 of paragraph 11(2).

TABLE 6

PERCENTAGE OF DEDUCTION FOR TYPE “B” SHIPS

Percentage of deduction for all types of superstructure Total effective length of superstructure Total effective length of superstructure Total effective length of superstructure Total effective length of superstructure Total effective length of superstructure Total effective length of superstructure Total effective length of superstructure Total effective length of superstructure Total effective length of superstructure Total effective length of superstructure Total effective length of superstructure
0 0.1(L) 0.2(L) 0.3(L) 0.4(L) 0.5(L) 0.6(L) 0.7(L) 0.8(L) 0.9(L) 1.0(L)
20 31 42 53 64 70 76 82 88 94 100

Percentages at intermediate lengths superstructures shall be obtained by linear interpolation.

Other Timber freeboards

18. (1) The Winter Timber freeboard shall be obtained by adding to the Summer Timber freeboard one thirty-sixth (1/36th) of the Summer Timber draught.

  • (2) The Winter North Atlantic Timber freeboard shall be the same as the Winter North Atlantic freeboard assigned.
  • (3) The Tropical Timber freeboard shall be obtained by deducting from the Summer Timber freeboard one forty-eighth (1/48th) of the Summer Timber draught.
  • (4)
  • (a) The Fresh Water Timber freeboard shall, subject to subparagraph (b), be obtained by deducting from the Summer Timber freeboard the quantity -
▴ millimetres
4T

where -

▴is the displacement in salt water in tonnes at the waterline which will when load lines have been marked on the ship's side correspond to the Summer Timber load line; and

T represents tonnes per centimetre immersion in salt water at that waterline.

  • (b) Where the displacement at that waterline cannot be ascertained the deduction shall be one forty-eighth (1/48th) of the Summer Timber draught of the ship.

PART III - SAILING SHIPS AND OTHER SHIPS

Sailing ships and tugs

19. The freeboards to be assigned to sailing ships and tugs shall be freeboards determined in accordance with the provisions of Part I of this Schedule increased by such amount as the Minister may direct in each particular case.

Ships of wood and other ships

20. The freeboards to be assigned to ships of wood or of composite construction or of other materials, or to ships with constructional features such as to render freeboards calculated in accordance with Part I of this Schedule unreasonable or impracticable shall be determined by the Assigning Authority in each particular case.

Unmanned barges

21. The freeboards to be assigned to unmanned barges having on the freeboard deck only small access openings closed by watertight gasketed covers of steel shall be freeboards determined in accordance with the provisions of Part I of this Schedule omitting paragraphs 5 and 16. Such freeboards may be reduced by such amounts not exceeding 25 per cent as the Minister may direct in each particular case.

SCHEDULE 5

FREEBOARD TABLES

1. The following is the Freeboard Table referred to in paragraph 4 of Schedule 4:-

TABLE A

FREEBOARD TABLE TYPES “A” SHIPS

Length of ship Freeboard Length of ship Freeboard Length of ship Freeboard
(metres) (millimetres) (metres) (millimetres) (metres) (millimetres)
24 200 64 626 104 1196
25 208 65 639 105 1212
26 217 66 653 106 1228
27 225 67 666 107 1244
28 233 68 680 108 1260
29 242 69 693 109 1276
30 250 70 706 110 1293
31 258 71 720 111 1309
32 267 72 733 112 1326
33 275 73 746 113 1342
34 283 74 760 114 1359
35 292 75 773 115 1376
36 300 76 786 116 1392
37 308 77 800 117 1409
38 316 78 814 118 1426
39 325 79 828 119 1442
40 334 80 841 120 1459
41 344 81 855 121 1476
42 354 82 869 122 1494
43 364 83 883 123 1511
44 374 84 897 124 1528
45 385 85 911 125 1546
46 396 86 926 126 1563
47 408 87 940 127 1580
48 420 88 955 128 1598
49 432 89 969 129 1615
50 443 90 984 130 1632
51 455 91 999 131 1650
52 467 92 1014 132 1667
53 478 93 1029 133 1684
54 490 94 1044 134 1702
55 503 95 1059 135 1719
56 516 96 1074 136 1736
57 530 97 1089 137 1753
58 544 98 1105 138 1770
59 559 99 1120 139 1787
60 573 100 1135 140 1803
61 587 101 1151 141 1820
62 600 102 1166 142 1837
63 613 103 1181 143 1853
144 1870 197 2582 250 3012
145 1886 198 2592 251 3018
146 1903 199 2602 252 3024
147 1919 200 2612 253 3030
148 1935 201 2622 254 3036
149 1952 202 2632 255 3042
150 1968 203 2641 256 3048
151 1984 204 2650 257 3054
152 2000 205 2659 258 3060
153 2016 206 2669 259 3066
154 2032 207 2678 260 3072
155 2048 208 2687 261 3078
156 2064 209 2696 262 3084
157 2080 210 2705 263 3089
158 2096 211 2714 264 3095
159 2111 212 2723 265 3101
160 2126 213 2732 266 3106
161 2141 214 2741 267 3112
162 2155 215 2749 268 3117
163 2169 216 2758 269 3123
164 2184 217 2767 270 3128
165 2198 218 2775 271 3133
166 2212 219 2784 272 3138
167 2226 220 2792 273 3143
168 2240 221 2801 274 3148
169 2254 222 2809 275 3153
170 2268 223 2817 276 3158
171 2281 224 2825 277 3163
172 2294 225 2833 278 3167
173 2307 226 2841 279 3172
174 2320 227 2849 280 3176
175 2332 228 2857 281 3181
176 2345 229 2865 282 3185
177 2357 230 2872 183 3189
178 2369 231 2880 284 3194
179 2381 232 2888 285 3198
180 2393 233 2895 286 3202
181 2405 234 2903 287 3207
182 2416 235 2910 288 3211
183 2428 236 2918 289 3215
184 2440 237 2925 290 3220
185 2451 238 2932 291 3224
186 2463 239 2939 292 3228
187 2474 240 2946 293 3233
188 2486 241 2953 294 3237
189 2497 242 2959 295 3241
190 2508 243 2966 296 3246
191 2519 244 2973 297 3250
192 2530 245 2979 298 3254
193 2541 246 2986 299 3258
194 2552 247 2993 300 3262
195 2562 248 3000 301 3266
196 2572 249 3006 302 3270
303 3274 324 3342 345 3394
304 3278 325 3345 346 3396
305 3281 326 3347 347 3399
306 3285 327 3350 348 3401
307 3288 328 3353 349 3403
308 3292 329 3355 350 3406
309 3295 330 3358 351 3408
310 3298 331 3361 352 3410
311 3302 332 3363 353 3412
312 3305 333 3366 354 3414
313 3308 334 3368 355 3416
314 3312 335 3371 356 3418
315 3315 336 3373 357 3420
316 3318 337 3375 358 3422
317 3322 338 3378 359 3423
318 3325 339 3380 360 3425
319 3328 340 3382 361 3427
320 3331 341 3385 362 3428
321 3334 342 3387 363 3430
322 3337 343 3389 364 3432
323 3339 344 3392 365 3433

Freeboards at intermediate lengths of ship shall be obtained by linear interpolation.

Freeboards, in mm, at length of ship less than 24 metres shall be -

50 + [ 150 (L) ]
[ 24 ]

See also paragraph 3 of Schedule 4.

2. The following is the Freeboard Table B referred to in paragraph 5 of Schedule 4:-

TABLE B

FREEBOARD TABLE TYPES “B” SHIPS

Length of ship Freeboard Length of ship Freeboard Length of ship Freeboard
(metres) (millimetres) (metres) (millimetres) (metres) (millimetres)
24 200 72 754 120 1690
25 208 73 769 121 1709
26 217 74 784 122 1729
27 225 75 800 123 1750
28 233 76 816 124 1771
29 242 77 833 125 1793
30 250 78 850 126 1815
31 258 79 868 127 1837
32 267 80 887 128 1859
33 275 81 905 129 1880
34 283 82 923 130 1901
35 292 83 942 131 1921
36 300 84 960 132 1940
37 308 85 978 133 1959
38 316 86 996 134 1979
39 325 87 1015 135 2000
40 334 88 1034 136 2021
41 344 89 1054 137 2043
42 354 90 1075 138 2065
43 364 91 1096 139 2087
44 374 92 1116 140 2109
45 385 93 1135 141 2130
46 396 94 1154 142 2131
47 408 95 1172 143 2171
48 420 96 1190 144 2190
49 432 97 1209 145 2209
50 443 98 1229 146 2229
51 455 99 1250 147 2250
52 467 100 1271 148 2271
53 478 101 1293 149 2293
54 490 102 1315 150 2315
55 503 103 1337 151 2334
56 516 104 1359 152 2354
57 530 105 1380 153 2375
58 544 106 1401 154 2396
59 559 107 1421 155 2418
60 573 108 1440 156 2440
61 587 109 1459 157 2460
62 601 110 1479 158 2480
63 615 111 1500 159 2500
64 629 112 1521 160 2520
65 644 113 1543 161 2540
66 659 114 1565 162 2560
67 674 115 1587 163 2580
68 689 116 1609 164 2600
69 705 117 1630 165 2620
70 721 118 1651 166 2640
71 738 119 1671 167 2660
168 2680 221 3601 274 4327
169 2698 222 3615 275 4339
170 2716 223 3630 276 4350
171 2735 224 3645 277 4362
172 2754 225 3660 278 4373
173 2774 226 3675 279 4385
174 2795 227 3690 280 4397
175 2815 228 3705 281 4408
176 2835 229 3720 282 4420
177 2855 230 3735 283 4432
178 2875 231 3750 284 4443
179 2895 232 3765 285 4455
180 2915 233 3780 286 4467
181 2933 234 3795 287 4478
182 2952 235 3808 288 4490
183 2970 236 3821 289 4502
184 2988 237 3835 290 4513
185 3007 238 3849 291 4525
186 3025 239 3864 292 4537
187 3044 240 3880 293 4548
188 3062 241 3893 294 4560
189 3080 242 3906 295 4572
190 3098 243 3920 296 4583
191 3116 244 3934 297 4595
192 3134 245 3949 298 4607
193 3151 246 3965 299 4618
194 3167 247 3978 300 4630
195 3185 248 3992 301 4642
196 3202 249 4005 302 4654
197 3219 250 4018 303 4665
198 3235 251 4032 304 4676
199 3249 252 4045 305 4686
200 3264 253 4058 306 4695
201 3280 254 4072 307 4704
202 3296 255 4085 308 4714
203 3313 256 4098 309 4725
204 3330 257 4112 310 4736
205 3347 258 4125 311 4748
206 3363 259 4139 312 4757
207 3380 260 4152 313 4768
208 3397 261 4165 314 4779
209 3413 262 4177 315 4790
210 3430 263 4189 316 4801
211 3445 264 4201 317 4812
212 3460 265 4214 318 4823
213 3475 266 4227 319 4834
214 3490 267 4240 320 4844
215 3505 268 4252 321 4855
216 3520 269 4264 322 4866
217 3537 270 4276 323 4878
218 3554 271 4289 324 4890
219 3570 272 4302 325 4899
220 3586 273 4315 326 4909
327 4920 340 5055 353 5190
328 4931 341 5065 354 5200
329 4943 342 5075 355 5210
330 4955 343 5086 356 5220
331 4965 344 5087 357 5230
332 4975 345 5108 358 5240
333 4985 346 5119 359 5250
334 4995 347 5130 360 5260
335 5005 348 5140 361 5268
336 5015 349 5150 362 5276
337 5025 350 5160 363 5285
338 5035 351 5170 364 5294
339 5045 352 5180 365 5303

Freeboards at intermediate lengths of ship shall be obtained by linear interpolation.

Freeboards, in mm, at length of ship less than 24 metres shall be -

50 + [ 150 (L) ]
[ 24 ]

See also paragraph 3 and 17 of Schedule 4.

SCHEDULE 6

Rule 29

STABILITY

PART I - INFORMATION AS TO STABILITY

The information relating to the stability of a ship to be provided for the master shall include the particulars specified below.

1. The ship's name, official number, port of registry, gross and register tonnages, principal dimensions, displacement, deadweight and draught to the Summer Load Line.

2. A profile view and, if necessary, plan views of the ship drawn to scale showing all compartments, tanks, storerooms and crew and passenger accommodation spaces, with their position relative to mid ship.

3. (1) The capacity and the longitudinal and vertical centre of gravity of every compartment available for the carriage of cargo, fuel, stores, feedwater, domestic water or water ballast.

  • (2) In the case of vehicle ferry, the vertical centre of gravity of compartments designated for the carriage of vehicles shall be based on the estimated centres of gravity of the vehicles and not on the volumetric centres of the compartments.

4. (1) The estimated total weight and the longitudinal and vertical centre of gravity of each such total weight of -

  • (a) the passengers and their effects; and
  • (b) the crew and their effects.
  • (2) In estimating such centres of gravity, passengers and crew shall be assumed to be distributed about the ship in the spaces they will normally occupy, including the highest decks to which either or both have access.

5. (1) The estimated weight and the disposition and centre of gravity of the maximum amount of deck cargo which the ship may reasonably be expected to carry on an exposed deck.

  • (2) In the case of deck cargo, the arrival condition shall include the weight of water likely to be absorbed by the cargo. (For timber deck cargo the weight of water absorbed shall be taken as 15 per cent of the weight when loaded.)

6. A diagram or scale showing -

  • (a) the load line mark and load lines with particulars of the corresponding freeboards; and
  • (b) the displacement, tonnes per centimetre immersion, and deadweight corresponding to a range of mean draughts extending between the waterline representing the deepest load line and the waterline of the ship in light condition.

7. (1) A diagram or tabular statement showing the hydrostatic particulars of the ship, including the heights of the transverse metacentre and the values of the moment to change trim one centimetre. These particulars shall be provided for a range of mean draughts extending at least between the waterline representing the deepest load line and the waterline of the ship in light condition.

  • (2) Where a tabular statement is used to comply with subparagraph (1), the intervals between such draughts shall be sufficiently close to permit accurate interpolation.
  • (3) In the case of ships having raked keels, the same datum for the heights of centres of buoyancy and metacentres shall be used as for the centres of gravity referred to in paragraphs 3, 4 and 5.

8. The effect on stability of free surface in each tank in the ship in which liquids may be carried, including an example to show how the metacentric height is to be corrected.

9. (1) A diagram or table showing cross curves of stability, covering the range of draughts referred to in paragraph 7(1).

  • (2) The information shall indicate the height of the assumed axis from which the righting levers are measured and the trim which has been assumed.
  • (3) In the case of ships having raked keels, or where a datum other than the top of keel has been used, the position of the assumed axis shall be clearly defined.
  • (4) Subject to subparagraph (5), only enclosed superstructures and efficient trunks as defined in paragraph 10 of Schedule 4 shall be taken into account in deriving such curves.
  • (5) The following structures may be taken into account in deriving such curves if the Minister is satisfied that their location, integrity and means of closure will contribute to the ship's stability -
  • (a) superstructures located above the superstructure deck;
  • (b) deckhouses on or above the freeboard deck whether wholly or in part only;
  • (c) hatchway structures on or above the freeboard deck.
  • (6) Subject to the approval of the Minister in the case of a ship carrying timber deck cargo, the volume of the timber deck cargo, or a part thereof, may be taken into account in deriving a supplementary curve of stability appropriate to the ship when carrying such cargo.
  • (7) An example shall be included to show how a curve of righting levers (GZ) may be obtained from the cross curves of stability.
  • (8) In the case of a vehicle ferry or a similar ship having bow doors, ship-side doors or stern doors where the buoyancy of a superstructure is taken into account in the calculation of stability information, and the cross curves of stability are based upon the assumption that such doors are secured weathertight, there shall be a specific warning that such doors must be secured weathertight before the ship proceeds to sea.

10. (1) The diagram and statements referred to in subparagraph (2) shall be provided separately for each of the following conditions of the ship -

  • (a) light condition. If the ship has permanent ballast, such diagram and statements shall be provided for the ship in light condition both with and without such ballast;
  • (b) ballast condition both on departure and on arrival. It is to be assumed that on arrival oil fuel, fresh water, consumable stores and the like are reduced to 10 per cent of their capacity;
  • (c) condition on departure and on arrival when loaded to the Summer load line with cargo filling all spaces available for cargo. Cargo shall be taken to be homogeneous except where this is clearly inappropriate, for example, in cargo spaces which are intended to be used exclusively for the carriage of vehicles or of containers;
  • (d) service loaded conditions both on departure and on arrival.
  • (2)
  • (a) A profile diagram of the ship drawn to a suitable small scale showing the disposition of all components of the deadweight
  • (b) A statement showing the lightweight, the disposition and the total weights of all components of the deadweight, the displacement, the corresponding positions of the centres of gravity, the metacentre and also the metacentre height (GM).
  • (c) A diagram showing the curve of righting levers (GZ). Where credit is given for the buoyancy of a timber deck cargo the curve of righting levers (GZ) must be drawn both with and without this credit.
  • (d) A statement showing the elements of stability in the condition compared to the criteria laid down in Schedule 2 paragraph 2(2).
  • (3) The metacentric height (GM) and the curve of righting levers (GZ) shall be corrected for liquid free surface.
  • (4) Where there is a significant amount of trim in any of the conditions referred to in subparagraph (1) the metacentric height and the curve of righting levers (GZ) may be required to be determined from the trimmed waterline.
  • (5) If in the view of the Assigning Authority the stability characteristics in either or both of the conditions referred to in subparagraph (1)(c) are not satisfactory, such conditions shall be marked accordingly and an appropriate warning to the master shall be inserted.

11. A statement of instructions on appropriate procedures to maintain adequate stability in each case where special procedures are applied such as partial or complete filling of spaces designated for cargo, fuel, fresh water or other purposes.

12. The report on the inclining test and of the calculation derived from it to obtain information of the light condition of the ship.

PART II - INFORMATION IN RELATION TO WHICH THE MINISTER'S OR ASSIGNING AUTHORITY'S APPROVAL OF THE STABILITY INFORMATION IS REQUIRED

13. The ships referred to in rule 29(3), 4(a) and 5(a) of the Rules are as follows:

  • (a) an oil tanker over 100 metres in length;
  • (b) a bulk carrier, or an ore carrier, over 150 metres in length;
  • (c) a single deck bulk carrier over 100 metres in length;
  • (d) a single deck dry cargo ship over 100 metres in length;
  • (e) a purpose built container ship over 125 metres in length.

SCHEDULE 7

Rule 13

NOTICE OF LOAD LINE TO BE POSTED UP BEFORE SAILING

1. In this Schedule -

“freeboard” means the distance measured vertically downwards amid ships from the upper edge of the deck-line marked on the side of the ship to the surface of the water;

“mean freeboard” means the mean of the freeboards on each side of the ship;

“mean draught” means the mean of the draughts shown on the scales of measurement on the stem and on the stem post of the ship;

Notice to be posted up on board ship

2. Before a ship leaves any dock, wharf or harbour or other place for the purpose of proceeding to sea, a notice is to be posted up in some conspicuous place on board ship in the form and containing the particulars in this Notice.

3. Paragraph 2 does not apply to ships employed on a near-coastal voyage.

Availability of Standard Form

4. Copies of the “Draught of Water and Freeboard” Notice, an example of which is attached, are available from the Department of the Marine and Natural Resources.

DRAUGHT OF WATER AND FREEBOARD

NOTICE

SHIP ......................................... PORT OF REGISTRY ............................. GROSS TONNAGE ............................

  • (1) Summer freeboard ......................................... millimetres corresponding to a mean draught of ................. millimetres
  • (2) Winter freeboard ........................................... millimetres corresponding to a mean draught of ................. millimetres
  • (3) Tropical freeboard ......................................... millimetres corresponding to a mean draught of ................. millimetres
  • (4) Winter North Atlantic freeboard ..................... millimetres corresponding to a mean draught of ................. millimetres
  • (5) Allowance for fresh water for all freeboards other than Timber freeboards .................................................. millimetres
  • (6) Timber Summer freeboard ............................. millimetres corresponding to a mean draught of ................. millimetres
  • (7) Timber Winter freeboard ............................... millimetres corresponding to a mean draught of ................. millimetres
  • (8) Timber Tropical freeboard ............................. millimetres corresponding to a mean draught of ................. millimetres
  • (9) Timber Winter North Atlantic freeboard ......... millimetres corresponding to a mean draught of ................. millimetres
  • (10) Allowance for fresh water for Timber freeboards ............................................................ ......................... millimetres

Notes

1. The particulars to be given above of freeboards and allowances for fresh water to be taken from the load line certificate currently in force in respect of the ship.

2. All freeboards given on the load line certificate must be stated.

3. The mean draught to be given above is the mean of the draughts which would be shown on the scales of measurement on the stem and on the stem post of the ship if it were so loaded that the upper edge of the load line on each side of the ship appropriate to the particular freeboard were on the surface of the water.

4. Where the draught is shown on the scales of measurement on the stem and on the stem post of the ship in feet the mean draught must be given in millimetres.

PARTICULARS OF LOADING

1 2 3 4 5 6 7 8 9
ACTUAL DRAUGHT ACTUAL DRAUGHT ACTUAL DRAUGHT MEAN FREEBOARD MEAN FREEBOARD SIGNATURE OF MASTER AND AN OFFICER SIGNATURE OF MASTER AND AN OFFICER
DATE PLACE FORWARD AFT MEAN ACTUAL (See notes 1 & 2) CORRECTED (See note 3) MASTER AN OFFICER

Notes

1. The actual mean freeboard (Column 6) is the mean of the freeboards on each side of the ship at the time when the ship is loaded and ready to leave.

2. If the actual mean freeboard is less than the appropriate minimum saltwater freeboard as shown on the load line certificate these must be entered in Column 7 the corrected freeboard arrived at after making any allowances for density of water, rubbish to be discharged overboard and fuel, water and stores to be consumed on any stretch of river or inland water, being allowances duly entered in the ship's official log-book.

3. If the actual mean freeboard is greater than the appropriate salt water freeboard, Column 7 need not be filled in.

SCHEDULE 8

Rules 7, 10 and 11

IRISH LOAD LINE CERTIFICATES

Interpretation

1. In this Schedule -

“appropriate certificate” means -

  • (a) in the case of a Convention-size ship, an International Load Line Certificate (1966), and
  • (b) in the case of any other ship, an Irish Load Line Certificate.

Appropriate Certificates

2. (1) Subject to the provisions of rule 10, the Assigning Authority shall issue the appropriate certificate in respect of an Irish ship which has been surveyed and marked in accordance with these Rules.

  • (2) If the certificate is an International Load Line Certificate (1966) it shall be in the form prescribed by the 1966 Convention.
  • (3) If the certificate is an Irish Load Line Certificate it shall be in the form indicated below.
  • (4) Subject to any exemption conferred by or under the Principal Act or, these Rules, a ship shall not proceed, or attempt to proceed, to sea unless the appropriate certificate is in force in respect of that ship.

Exemption Certificates

3. (1) Where a ship is exempted under subsections (2) or (4) of Section 20 of the Principal Act an “International Load Line Exemption Certificate” in the form prescribed by Annex III of the 1988 Protocol shall be issued in respect of the ship by the Minister; and

  • (2) Where a ship is exempted under subsections (3) of such section an “Irish Load Line Exemption Certificate” in the form indicated below shall be issued in respect of the ship by the Minister which shall state the conditions with which the ship is to comply.
  • (3) Exempt in so far as the nature or terms of any such exemption require the contrary:
  • (a) the ship shall be assigned freeboards in accordance with rule 5
  • (b) shall be subject to surveys in accordance with rule 6; and
  • (c) rules 7 to 9 shall apply in relation to the certificate of exemption as they apply in relation to load line certificates,

subject to the substitution, for references in the said Rules to an Assigning Authority, of references to the Minister.

Non-Irish Ships

4. (1) The Minister may, at the request of a Government of a Convention country, survey a ship registered in that country and if satisfied that the requirements of the 1966 Convention are complied with and that a survey has been satisfactorily completed in accordance with these Rules, issue to the ship an International Load Line Certificate (1966) and, where appropriate, endorse such certificates in accordance with the requirements of the 1966 Convention. A certificate issued in accordance with such a request shall contain a statement that it has been so issued and shall have the same effect as if it was issued by that Government and not by the Minister.

  • (2) An Irish Load Line Certificate may be issued to a non-Irish ship which has been surveyed and marked in accordance with these Rules.
  • (3) Subject to paragraph (4), a certificate issued under paragraph (2) shall be subject to the same conditions and have the same effect as a similar certificate issued to an Irish ship.
  • (4) Any certificate issued under paragraph (2) in respect of a ship registered in a Convention country shall be valid only so long as the ship is not plying on international voyages, and shall be cancelled by the Minister if he has reason to believe that the ship is plying on international voyages.

IRISH LOAD LINE CERTIFICATE


Issued under the provisions of the Merchant Shipping (Load Line) Rules 2001 under the authority of the Government of Ireland by [Full official designation of the Assigning Authority]

PARTICULARS OF SHIP


Name of Ship


Distinctive Number or Letters


Length(L) as defined by rule 2 of the Merchant Shipping (Load Line) Rules 2001

Gross Tonnage


Freeboard assigned as: Type of ship

Freeboard from deck line Freeboard from deck line Load line
Tropical ____mm. (T) ____mm. above (S)
Summer ____mm. (S) Upper edge of line through centre of ring
Winter ____mm. (W) ____mm. below (S)
Winter North Atlantic ____mm. (WNA) ____ mm. below (S)

Note: Freeboards and Load Lines which are not applicable need not be entered on the certificate.

Allowance for Fresh Water for all freeboards: _______mm.

The upper edge of deck line from which these freeboards are measured is

Date of initial or periodical survey


THIS IS TO CERTIFY

That this ship has been surveyed and the freeboards and load lines shown above have been assigned in accordance with the Merchant Shipping (Load Line) Rules, 2001.

This certificate is valid until _________ subject to annual surveys in accordance with those Rules.

Issued at __________ on ________
Signed __________ Signature of authorised official issuing the certificate
Name __________

Name of Ship

CONDITIONS:

THIS IS TO CERTIFY

that at an annual survey required by the Merchant Shipping (Load Line) Rules, 2001, this ship was found to comply with the relevant provisions of those Rules.

Place _________ Date ________
________ Name _____________
Signature, Department of the Marine and Natural Resources
Place _________ Date ________
________ Name _____________
Signature, Department of the Marine and Natural Resources
Place _________ Date ________
________ Name _____________
Signature, Department of the Marine and Natural Resources
Place _________ Date ________
________ Name _____________
Signature, Department of the Marine and Natural Resources

Survey of this ship having been satisfactorily completed in accordance with the provisions of the Merchant Shipping (Load Line) Rules, 2001 this Certificate is extended until _______

Place _________ Date ________
________ Name _____________
Signature of authorised official conducting the survey

Notes

1. When a ship departs from a port situated on a river or inland water, deeper loading shall be permitted corresponding to the weight of fuel and all other materials required for consumption between the point of departure and the sea.

2. When a ship is in fresh water of unit density, the appropriate load line may be submerged by the amount of the fresh water allowances shown above. Where the density is other than unity, an allowance shall be made proportional to the difference between 1.025 and the actual density.

3. This certificate must be kept framed and posted up in some conspicuous place on board the ship, so long as it remains in force and the ship is in use.


IRISH LOAD LINE EXEMPTION CERTIFICATE


Issued under the provisions of the Merchant Shipping (Load Line) Rules 2001 under the authority of the Government of Ireland by [Full official designation of the Assigning Authority]

PARTICULARS OF SHIP


Name of Ship


Distinctive Number or Letters


THIS IS TO CERTIFY

That the above-mentioned ship is exempted pursuant to Section 20(3) of the Merchant Shipping (Load Line) Act, 1968 from the following provisions of that Act:-

Subject to the following provisions:-

Date of initial or renewal survey


This certificate is valid until ______ subject, where appropriate, to annual surveys in accordance with the Merchant Shipping (Load Line) Rules, 2001.

Issued at ____________ on _________
Signed ________ Name ________
The Department of the Marine and Natural Resources

Name of Ship

CONDITIONS (Continued) :

THIS IS TO CERTIFY

That this ship continues to comply with the conditions under which the exemption was granted.

Place _________ Date ________
________ Name _____________
Signature, Department of the Marine and Natural Resources
Place _________ Date ________
________ Name _____________
Signature, Department of the Marine and Natural Resources
Place _________ Date ________
________ Name _____________
Signature, Department of the Marine and Natural Resources
Place _________ Date ________
________ Name _____________
Signature, Department of the Marine and Natural Resources
--- ---
GIVEN under my Official Seal, this 13 September day of September, 2001
Frank Fahey
Minister for the Marine and Natural Resources

EXPLANATORY NOTE

(This note is not part of the Rules)

1.

These Rules replace the Load Line Rules of 1968.

2.

The Rules apply the provisions of the International Convention on Load Lines, 1966 as amended by the Protocol of 1988 thereto, to all Irish ships which go to sea, with certain exceptions. They also apply to all sea-going foreign ships within Irish waters.

3.

The Rules enable the Minister to authorise persons or organisations to act as Assigning Authorities for the purpose of the Rules.

This document does not substitute the official text published in the Irish Statute Book. We accept no responsibility for any inaccuracies arising from the transcription of the original into this format.

This text is published under Irish Statute Book's own terms of reuse, not a Legalize or public-domain licence. Irish Statute Book
CC-BY 4.0 (Oireachtas Open Data PSI Licence)
Contains Irish Public Sector Information licensed under the Oireachtas (Houses of the Oireachtas) Open Data PSI Licence / Creative Commons Attribution 4.0 International, sourced from https://www.irishstatutebook.ie.