S.I. No. 481/2001 - Safety, Health and Welfare At Work (Construction) Regulations, 2001

Type Statutory Instrument
Publication 2001-10-26
Last updated 2007-06-14
State Partially repealed superseded text
Text As published
articles 129

This is the act as published. Later amendments are not folded into the text below: each one is a separate act in this repository and an entry in this law's history.

5 amending acts · 2007-06-14, S.I. No. 299/2007 - Safety, Health and Welfare at Work (General Application) Regulations 2007

Reform history JSON API
ARRANGEMENT OF REGULATIONS
Regulation
Interpretation and General 1-2
Design and Management 3-8
General Duties of Contractors and Others Safety of Workplaces 9-14
Safety of Workplaces 15-20
Excavations, Shafts, Earthworks, Underground Works and Tunnels 21-26
Cofferdams and Caissons 27-30
Compressed Air 31-34
Explosives 35
Dangerous or Unhealthy Atmospheres 36-38
Work on or Adjacent to Water 39-40
Transport, Earthmoving and Materials Handling Machinery, and Locomotives 41-46
Demolition 47-50
Working at Heights 51-79
Lifting Appliances 80-104
Chains, Ropes and Lifting Gear 105-113
Special Provisions as to Hoists 114-118
Carriage of Persons and Secureness of Loads 119-123
Miscellaneous 124-128
Application of Regulations 129

SAFETY, HEALTH AND WELFARE AT WORK (CONSTRUCTION) REGULATIONS, 2001

INDEX

PART 1

Interpretation and General

1.

1.

Citation and Commencement

2.

2.

Interpretation

PART 2

Design and Management

3.

3.

General Duties of Client

4.

4.

Duties of Project Supervisor appointed for the design stage.

5.

5.

Duties of Designers.

6.

6.

Duties of Project Supervisor Appointed for the Construction Stage.

7.

7.

Site Safety Representative

8.

8.

Notification of Projects to the Authority

PART 3

General Duties of Contractors and Others

9.

9.

Duties of Contractors

10.

10.

Appointment of Safety Officers

11.

11.

Erection and Installation of Plant and Equipment

12.

12.

Information

13.

13.

Consultation

14.

14.

Duties of Employees and Other Persons at Work

PART 4

Safety of Workplaces

15.

15.

General.

16.

16.

Protection from falling material

17.

17.

Lighting of Work Places.

18.

18.

Projecting Nails and Loose Material.

19.

19.

Construction of Temporary Structures.

20.

20.

Avoidance of Danger from Collapse of Structure

PART 5

Excavations, Shafts, Earthworks, Underground Works and Tunnels

21.

21.

General

22.

22.

Inspection and Examination.

23.

23.

Supervision and Execution of Shorting and Other Work.

24.

24.

Excavations etc. Likely to Reduce Security of a Structure.

25.

25.

Fencing of Excavations, etc.

26.

26.

Safeguarding Edges of Excavations, etc.

PART 6

Cofferdams and Caissons

27.

27.

Construction and Maintenance.

28.

28.

Means of Egress in Case of Flooding.

29.

29.

Supervision of Work and Inspection of Material.

30.

30.

Inspections and Examinations.

PART 7

Compressed Air

31.

31.

Application of Part 7.

32.

32.

General.

33.

33.

Plant and Equipment.

34.

34.

Minimum Requirements.

PART 8

Explosives

35.

35.

Explosives.

PART 9

Dangerous or Unhealthy Atmospheres

36.

36.

Health Hazards.

37.

37.

Disposal of Waste.

38.

38.

Internal Combustion Engines or Dangerous Gas.

PART 10

Work on or Adjacent to Water

39.

39.

Transport by Water.

40.

40.

Prevention of Drowning.

PART 11

Transport, Earthmoving and Materials Handling Machinery, and Locomotives

41.

41.

General.

42.

42.

Rails and Rail Tracks.

43.

43.

Clearance.

44.

44.

Riding in Insecure Positions on Vehicles, etc.

45.

45.

Vehicles Near Edge of Excavations, etc.

46.

46.

Protection of Driver.

PART 12

Demolition

47.

47.

Application of Part 12.

48.

48.

General.

49.

49.

Fire and Flooding.

50.

50.

Precautions in Connection with Demolition.

PART 13

Working at Heights

51.

51.

Provision of Scaffolds, etc.

52.

52.

Supervision of Work and Inspection of Material.

53.

53.

Construction and Material.

54.

54.

Defective Material.

55.

55.

Maintenance of Scaffolds.

56.

56.

Partly Erected or Dismantled Scaffolds.

57.

57.

Standards or Uprights, Ledgers and Putlogs.

58.

58.

Stability of Scaffolds.

59.

59.

Slung Scaffolds.

60.

60.

Cantilever, Jib, Figure and Bracket Scaffolds.

61.

61.

Support for Scaffolds, etc.

62.

62.

Suspended Scaffolds (not power operated).

63.

63.

Boatswain's Chairs, Cages, Skip's etc. (Not power operated).

64.

64.

Trestle Scaffolds.

65.

65.

Inspection of Scaffolds, Boatswain's Chairs etc.

66.

66.

Scaffolds used by Employees of Different Contractors.

67.

67.

Construction of Working Platforms, Gangways, Runs and Stairs.

68.

68.

Decking of Working Platforms, Gangways and Runs.

69.

69.

Guard-rails and toe-boards at working platforms and workplaces.

70.

70.

Guard-rails, etc for Gangways, Runs and Stairs.

71.

71.

Platforms, Gangways, Runs and Stairs, etc. to Afford Safe Foothold.

72.

72.

Construction and maintenance of ladders and folding step-ladders.

73.

73.

Use of ladders and folding step-ladders.

74.

74.

Openings, Corners, Breaks, Edges and Open Joisting.

75.

75.

Exceptions from Regulation 74.

76.

76.

Sloping roofs.

77.

77.

Work on or Near Fragile Materials.

78.

78.

Loads on Scaffolds.

79.

79.

Prevention of Falls and Provision of Safety Nets and Harnesses.

PART 14

Lifting Appliances

80.

80.

Construction, Maintenance and Inspection.

81.

81.

Support, Anchoring, Fixing and Erecting.

82.

82.

Precautions where Lifting Appliance has Travelling or Slewing Motion.

83.

83.

Platforms for Crane Drivers and Signaller.

84.

84.

Cabins for Drivers.

85.

85.

Drums and Pulleys.

86.

86.

Brakes, Controls, Safety Devices, etc.

87.

87.

Safe Means of Access.

88.

88.

Poles or Beams Supporting Pulley Blocks or Gin Wheels.

89.

89.

Stability of Lifting Appliances.

90.

90.

Rail mounted cranes.

91.

91.

Mounting of cranes.

92.

92.

Cranes with Derricking Jibs.

93.

93.

Restriction of use of cranes.

94.

94.

Erection of Cranes under Supervision.

95.

95.

Competent Persons to Operate Lifting Appliances and Give Signals.

96.

96.

Signals.

97.

97.

Testing and examination of lifting appliances.

98.

98.

Marking of Safe Working Loads.

99.

99.

Indication of Safe Working Load on Jib Cranes.

100.

100.

Excavators used as Cranes.

101.

101.

Load not to Exceed Safe Working Load.

102.

102.

Precautions on Raising or Lowering Loads.

103.

103.

Scotch and Guy Derrick Cranes.

104.

104.

Cranes etc. in Factories and Other Premises.

PART 15

Chains, Ropes and Lifting Gear

105.

105.

Construction, testing, examination and safe working load.

106.

106.

Testing of Chains, Rings, etc. Altered or Repaired by Welding.

107.

107.

Hooks.

108.

108.

Slings.

109.

109.

Edges of Load not to come into Contact with Sling, etc.

110.

110.

Knotted Chains, etc.

111.

111.

Examination of Chains, Ropes and Lifting Gear.

112.

112.

Annealing of Chains and Lifting Gear.

113.

113.

Delivery of Loads with Lifting Gear Attached.

PART 16

Special Provisions as to Hoists

114.

114.

Safety of Hoistways, Platforms and Cages.

115.

115.

Operation of Hoist.

116.

116.

Winches.

117.

117.

Safe Working Load and Marking of Hoists.

118.

118.

Test and Examination of Hoists.

PART 17

Carriage of Persons and Secureness of Loads

119.

119.

Carrying Persons by Means of Lifting Appliances.

120.

120.

Hoists Carrying Persons.

121.

121.

Hoists Forming Part of the Permanent Equipment.

122.

122.

Secureness of Loads.

123.

123.

Mobile Elevating Work Platforms.

PART 18

Miscellaneous

124.

124.

Installations, Machinery, Equipment.

125.

125.

Wet Paint or Cement Wash on Ironwork or Steelwork.

126.

126.

Helmets or Crowns for Pile Driving.

127.

127.

Keeping of records.

128.

128.

Revocations.

PART 19

Application of Regulations

129.

129.

Application

SCHEDULES

First Schedule Particulars to be notified to the Authority before construction begins.
Second Schedule Non-exhaustive list of work involving particular risks to the safety and health of persons at work.
Third Schedule Requirements to be applied as regards the general principles of prevention.
Fourth Schedule Minimum health and safety requirements for construction sites.
Fifth Schedule Minimum requirements for on-site indoor workstations.
Sixth Schedule Minimum requirements for work in compressed air.
Seventh Schedule Minimum requirements for an excavator or loader used as a crane.
Eighth Schedule FÁS Safe Pass Programme
Ninth Schedule FÁS Construction Skills Certification.
Tenth Schedule Procedure for selection of Safety representatives.

I, TOM KITT, Minister of State at the Department of Enterprise, Trade and Employment, in exercise of the powers conferred on me by section 28 of the Safety, Health and Welfare at Work Act, 1989 (No. 7 of 1989), in relation to the matters set out in paragraphs 1 to 6, 8, 9, 11 to 15, 19 to 30, 32, 33, 35 and 36 of the Fourth Schedule of that Act, and the Labour (Transfer of Departmental Administration and Ministerial Functions) Order, 1993 ( S.I. No. 18 of 1993 ), and the Enterprise and Employment (Delegation of Ministerial Functions) (No. 2) Order, 1995 ( S.I. No. 43 of 1995 ) and after consultation with the National Authority for Occupational Safety and Health, and for the purpose of giving further effect to Council Directive 92/57/EEC1 , hereby make the following regulations:

PART 1 INTERPRETATION AND GENERAL

Citation and Commencement

1.

(1) These Regulations may be cited as the Safety, Health and Welfare at Work (Construction) Regulations, 2001.

  • (2) Except as specified in paragraph (3), these Regulations shall come into operation on the 1st day of January 2002.
  • (3)
  • (a) In the case of persons employed in construction work for the first time, the provisions of Regulations 6(5) and 9(3) shall apply from the 1st day of January 2002.
  • (b) Where construction work on a construction site commences on or after the 1st day of May 2002, Regulations 6(5) and 9(3) shall apply from that date for all workers employed in construction work on that site.
  • (c) In respect of “scaffolding - basic”, designated in paragraph 1 of the Ninth Schedule, Regulations 6(6) and 9(4) shall come into operation on the 1st day of January 2002.
  • (d) In respect of “scaffolding-advanced”, “tower crane operation”, “slinging/signalling” and “telescopic handler operation” designated in paragraph 1 of the Ninth Schedule, Regulations 6(6) and 9(4) shall come into operation on the 1st day of July 2002.
  • (e) In all other cases, Regulations 6(5), 6(6), 9(3) and 9(4) shall come into operation on the 1st day of June 2003.
2.

(1) In these Regulations, unless the context otherwise requires -

“the Act” means the Safety, Health and Welfare at Work Act, 1989 (No. 7 of 1989);

“approved programme,” means a programme with a syllabus and trainers approved by FAS or a course approved by a body in another jurisdiction recognised by FAS as equivalent;

“approved trainer” means a person or organisation approved by FAS for the purpose of delivering an approved programme;

“the Authority” means the National Authority for Occupational Safety and Health;

“construction site” means any site at which construction work in relation to a project is carried out;

“construction stage” means the period of time starting when preparation of the construction site begins, including the design of temporary works to facilitate the construction of the project, and ending when construction work on the project is completed;

“construction work” means the carrying out of any building, civil engineering or engineering construction work and includes any of the following -

  • (a) the construction, alteration, conversion, fitting out, commissioning, renovation, repair, upkeep, redecoration or other maintenance (including cleaning which involves the use of water or an abrasive at high pressure or the use of substances or preparations classified as corrosive or toxic for the purposes of Regulation 8 of the European Communities (Classification, Packaging, Labelling and Notification of Dangerous Substances) Regulations, 1994 and Regulation 5 of the European Communities (Classification, Packaging, Labelling and Notification of Dangerous Preparations) Regulations, 1995), decommissioning, demolition or dismantling of a structure,
  • (b) the preparation for an intended structure, including site clearance, exploration, investigation (but not site survey) and excavation, and laying or installing the foundations of an intended structure,
  • (c) the assembly of prefabricated elements to form a structure, or the disassembly of prefabricated elements which, immediately before such disassembly, formed a structure,
  • (d) the removal of a structure or part of a structure or of any product or waste resulting from demolition or dismantling of a structure or disassembly of prefabricated elements which, immediately before such disassembly, formed a structure,
  • (e) the installation, commissioning, maintenance, repair or removal of mechanical, electrical, gas, compressed air, hydraulic, telecommunication systems, computer systems, or similar services which are normally fixed within or to a structure, but does not include drilling and extraction in the extractive industries;

“client” means any person, engaged in trade, business or other undertaking, who commissions or procures the carrying out of a project or who undertakes a project directly for the purpose of such trade, business or undertaking

“contractor” means a contractor or an employer whose employees undertake, carry out or manage construction work, or any person who carries out or manages construction work for a fixed or other sum and who supplies the materials and labour (whether his own labour or that of another) to carry out such work or supplies the labour only;

“design” means the preparation of drawings, particulars, specifications, calculations, bills of quantities in so far as they contain specifications or other expressions of purpose, according to which a project, or any part or component of a project, is to be executed;

“design stage” means the period of time during which the design of a project is prepared but does not include the design of temporary works by the contractor to facilitate construction of the project;

“developed health and safety plan” means the health and safety plan developed in accordance with Regulation 6(1);

“FAS” means An Foras Aiseanna Saothair;

“hoist” means a lifting machine, whether worked by mechanical power or not, with a carriage, platform or cage, the movement of which is restricted by a guide or guides, but does not include a lifting appliance used for the movement of trucks or wagons on a line of rails;

“inspector” has the meaning assigned to it by the Act;

“ladder” does not include a folding step-ladder;

“lifting appliance” means any stationary or mobile appliance used for raising or lowering persons or loads, including:-

  • (a) a crane, crab, winch, pulley block, gin wheel, hoist, mobile elevating work platform, sheer legs, excavator, dragline, piling frame, aerial cableway, aerial ropeway or overhead runways,
  • (b) a vehicle which can be used to transport goods and which is fitted with forks or any other attachment for stacking, loading or unloading goods;

“lifting gear” means any gear or cable by means of which a load can be attached to a lifting appliance but which does not form an integral part of the appliance or load, and includes a chain sling, rope sling or similar gear and a ring, link, hook, plate, clamp, shackle, swivel or eye-bolt;

“locomotive” means any self-propelled wheeled vehicle used on a line of rails for the movement of trucks or wagons;

“man-lock” means any air lock or decompression chamber used for the compression or decompression of persons, but does not include an air lock which is only so used in emergency or a medical lock used solely for treatment purposes;

“mobile crane” means a crane capable of travelling under its own power, but does not include such a crane, which travels on a line of rails;

“the Principal Regulations” means the Safety, Health and Welfare at Work (General Application) Regulations, 1993 ( S.I. No. 44 of 1993 );

“project” means any development, which includes or is intended to include construction work;

“project supervisor,” means a competent person or organisation appointed under Regulation 3(1) and responsible for carrying out the appropriate duties specified in these Regulations;

“raising or lowering or as a means of suspension” in Regulation 105, 106, 107, 110 or 111 means raising or lowering or as a means of suspension either of a load on a lifting appliance or lifting gear or a scaffold but does not include the use of a rope or chain solely as a means of lashing or securing together two or more rigid members of a scaffold to form a frame or as a means of making a lapped joint or the use of a rope or chain solely for the movement of a load in a horizontal direction;

“safe working load” means either the relevant safe working load required to be specified in the latest certificate of test obtained for the purposes of Regulation 97, 105, 106, 118 or 123 or, where no such certificate is required, the relevant safe working load required to be marked or exhibited on the lifting appliance, lifting gear, chain, rope or other article of plant or equipment by Regulation 98 or 105;

“scaffold” means any temporary structure whether fixed, suspended or mobile, (and its supporting components) which is used for supporting workers and materials or to gain access to any such structure and includes any working platform, working stage, gangway, run, ladder or step-ladder (other than independent ladder or step-ladder which does not form part of such a structure) together with any guard-rail, toe-board or other safeguards and all fixings, but does not include a lifting appliance or a structure only used to support such an appliance or to support other plant or equipment;

“sloping roof” has the meaning assigned to it by Regulation 77 of these Regulations;

“slung scaffold” means a scaffold suspended by means of lifting gear, ropes or chains or rigid members and not provided with means of raising or lowering by a lifting appliance or similar device;

“structure” means -

  • (a) any building, railway line or siding, tramway line, dock, harbour, inland navigation, tunnel, bridge, viaduct, waterworks, reservoir, pipe-line (whatever it contains or is intended to contain) underground or overground cables, aqueduct, sewer, sewage works, gasholder, road, airfield, sea defence works, river works, drainage works, earthworks, lagoon, dam, wall, caisson, mast, tower, pylon, underground tank, earth retaining structure, or structure designed to preserve or alter any natural feature, and any other structure similar to the foregoing,
  • (b) any formwork, falsework, scaffold or other structure designed or used to provide support or means of access during construction work, or
  • (c) any fixed plant in respect of work which is installation, commissioning, de-commissioning or dismantling and where any such work involves a risk of falling more than 2.00 metres;

“suspended scaffold” means a scaffold (not being a slung scaffold) suspended by means of ropes or chains and capable of being raised or lowered but does not include a boatswain's chair or similar appliance;

“trestle scaffold” includes a scaffold in which the supports for the platforms are any of the following which are self-supporting, namely split heads, folding step-ladders, tripods or movable contrivances similar to any of the foregoing;

“plant or equipment” means any gear, machine, rig, apparatus or appliance, or any part of any plant or equipment;

“working platform” includes a working stage.

  • (2) In these Regulations a reference to a paragraph is to a paragraph in the Regulation in which the reference occurs, unless it is indicated that reference to some other Regulation is intended, and a reference to a Regulation or a Schedule is to a Regulation of, or a Schedule to, these Regulations, unless it is indicated that reference to some other Regulation or Schedule is intended.
  • (3) The provisions of Regulations 2, 4 and Part II of the Principal Regulations shall apply in full to the application of the provisions of these Regulations.

PART 2 DESIGN AND MANAGEMENT

General Duties of Client

3.

(1) It shall be the duty of every client to appoint, in respect of every project, a project supervisor for the design stage and a project supervisor for the construction stage.

  • (2) Nothing in paragraph (1) shall:
  • (a) prevent the client appointing himself or herself as project supervisor if competent to undertake the duties involved,
  • (b) prevent the client appointing one person as project supervisor for both the design and construction stages if that person is competent to undertake the duties involved.
  • (3) The appointments mentioned in paragraph (1) shall be made at the appropriate time and shall be terminated, changed or renewed as necessary.
  • (4) It shall be the duty of every client to keep available any safety file referred to in Regulation 6(2)(a) and any information delivered to the client in relation to the file for inspection by any person who may need information in the file for the purpose of compliance by that person with any duties imposed under the relevant statutory provisions.
  • (5) It shall be sufficient compliance with paragraph (5) by a client who disposes of his or her interest in the property involved in the project if he or she delivers the safety file for that property to the person who acquires such interest in that property and such person shall keep available such safety file in accordance with paragraph (4).
4.

(1) It shall be the duty of the project supervisor appointed for the design stage to -

  • (a) take account during the design of a project and when estimating the period of time required for completion of a project, and where appropriate for stages of a project, of the general principals of prevention specified in the First Schedule of the Principal Regulations and of any safety and health plan or safety file prepared in accordance with these Regulations, and to co-ordinate in these respects the activities of other persons engaged in work related to design of the project;
  • (b) subject to paragraph (2) prepare on a preliminary basis and for the purpose of providing information for the project supervisor appointed for the construction stage, the safety and health plan referred to in Regulation 6(1) specifying, in writing -
  • (i) a general description of the project and of the time within which it is intended that the project will be completed,
  • (ii) appropriate information on any other work activities taking place on the site, and
  • (iii) where appropriate work related to the project which will involve particular risks to the safety and health of persons at work as referred to in the Second Schedule,
  • (c) provide the project supervisor for the construction stage with any necessary information available to the project supervisor for the design stage which needs to be included in the safety file referred to in Regulation 6(2)(a).
  • (2) Where notification of the construction site is not required under Regulation 8, a safety and health plan shall be required only for such sites where the work concerned involves a particular risk, including any of those specified in the Second Schedule.
  • (3) The project supervisor for the design stage may appoint a competent person as health and safety co-ordinator for the design to undertake on behalf of the project supervisor the duties specified in paragraph (1).

Duties of Designers

5.

(1) In any case in which a person is engaged in work related to the design of a project, it shall be the duty of that person to take account of the general principles of prevention as specified in the First Schedule of the Principal Regulations and any relevant safety and health plan or safety file prepared in accordance with these Regulations.

  • (2) In any case in which a person is engaged in work related to the design of a project, save where such a person is appointed under Regulation 3(1) as project supervisor for the design stage, it shall be the duty of that person to -
  • (a) co-operate with the project supervisor appointed for the design stage or the project supervisor for the construction stage, as appropriate, to enable that project supervisor to comply with these Regulations,
  • (b) promptly provide the project supervisor appointed for the design stage or the project supervisor for the construction stage, as appropriate, with such information as is known to that person regarding particular risks to the safety and health of persons at work as referred to in the Second Schedule which may be associated with the project, and also with such information regarding the nature and scope of the project to the extent necessary to enable the project supervisor to comply with these Regulations, and
  • (c) take into account any directions from the project supervisor appointed for the design stage or the project supervisor appointed for the construction stage, as appropriate.

Duties of project supervisor for the construction stage.

6.

(1) It shall be the duty of the project supervisor appointed for the construction stage to develop before the commencement of the construction work the safety and health plan for the construction site prepared on a preliminary basis under Regulation 4(1)(b), and make adjustments to such plan where required to take account of the progress of the work and any changes which occur, and take account as regards such plan at all times during the construction stage of the requirements of section 12 of the Act and of other work activities taking place on the site, and include in such plan specific measures concerning work which falls within one or more of the categories of the Second Schedule.

  • (2) It shall be the duty of the project supervisor appointed for the construction stage where more than one contractor is engaged in the project to -
  • (a) prepare a safety file appropriate to the characteristics of the project containing relevant health and safety information to be taken into account during any subsequent construction work following completion of the project and make any adjustments to the safety file where required to take account of the progress of the work and any changes which have occurred and, on completion of the project, deliver the safety file to the client,
  • (b) co-ordinate the implementation of the general principles of prevention specified in the First Schedule of the Principal Regulations when -
  • (i) technical or organisational aspects are being decided,
  • (ii) estimating the period required for completing such work or work stages,
  • (c) co-ordinate the implementation of any relevant requirements of these Regulations in order that the contractors, as regards the general principles of prevention specified in the First Schedule of the Principal Regulations, apply in a consistent manner the requirements set out in the Third Schedule,
  • (d) follow the provisions of the safety and health plan where required,
  • (e) (i) organise co-operation between contractors (including successive contractors on the same site) and co-ordination of their activities in relation to a project with a view to protecting persons at work and preventing accidents and injury to health,
  • (ii) organise the implementation of Regulation 6 of the Principal Regulations, in particular in relation to the provision of information,
  • (iii) coordinate the implementation by contractors of Regulation 9(1)(e) and keep available for inspection a copy of any information provided to the project supervisor under that Regulation, and where the Authority requests information in relation to such a record, to comply with such a request as soon as possible,
  • (iv) provide access to appropriate information regarding safety, health and welfare required by paragraph (iii) to the site safety representative;
  • (f) co-ordinate arrangements for checking the implementation of safe working procedures,
  • (g) co-ordinate measures to permit authorised persons only on to the construction site.
  • (3) The project supervisor appointed for the construction stage may appoint a competent person as health and safety co-ordinator for the construction stage to undertake on behalf of the project supervisor the duties specified in paragraphs (1) and (2).
  • (4) It shall be the duty of the project supervisor appointed for the construction stage to co-ordinate arrangements which facilitate the provision and maintenance, in an appropriate condition, of site welfare facilities to all persons at work on the construction site, in accordance with the requirements of paragraphs 13 to 18 of the Fourth Schedule and the relevant requirements of the Fifth Schedule.
  • (5) It shall be the duty of the project supervisor for the construction stage to co-ordinate arrangements whereby persons at work on the construction site to whom the Eighth Schedule applies are in possession of a current registration card in the form specified in the Eighth Schedule.
  • (6) It shall be the duty of the project supervisor for the construction stage to co-ordinate arrangements whereby those persons who engage in any of the tasks specified in the Ninth Schedule are in possession of a current certificate or registration card in the form specified in the Ninth Schedule.
  • (6A) A person shall not -
  • (a) in applying for a registration card as specified in the Eighth or Ninth Schedule from FÁS or another competent authority, make a statement which he or she knows to be false,
  • (b) with intent to deceive, forge or alter a registration card, or
  • (c) with intent to deceive, make or possess any document closely resembling a registration card.
  • (7) It shall be the duty of the project supervisor for the construction stage to maintain and keep available for inspection a record of the names of persons at work at the construction site to whom paragraphs (5) and (6) apply as provided by each contractor under Regulation 9(5).

Site Safety Representative

7.

(1) (a) Without prejudice to the provisions of section 13 of the Act it shall be the duty of the project supervisor for the construction stage to -

  • (i) coordinate the development and application by contractors of arrangements, made in consultation with their employees, which will enable them and their employees to co-operate effectively in promoting and developing measures in relation to their health and safety on the construction site and in ascertaining the effectiveness of such measures,
  • (ii) facilitate, where more than 20 persons are normally employed at any one time on the site at any stage of the project, in cooperation with contractors and persons employed on the project, the appointment of a site safety representative from among the employees of the contractor or contractors undertaking the project in accordance with the procedure outlined in the Tenth Schedule.
  • (b) A site safety representative shall have the right of access to such information from the project supervisor for the construction stage regarding the safety, health and welfare of persons at work at the construction site including information referred to in 6(2)(e)(iv) and approved forms under these or the Principal Regulations.
  • (c) It shall be the duty of the project supervisor for the construction stage to take reasonable measures to inform the site safety representative when an inspector enters the construction site for the purpose of making a tour of inspection.
  • (2) A site safety representative may -
  • (a) make representations to the project supervisor for the construction stage and, as appropriate, any contractor involved in the project on any aspects of safety, health and welfare at the construction site,
  • (b) investigate accidents and dangerous occurrences provided that he or she shall not interfere with or obstruct the performance of any statutory obligation required to be performed by any person under any relevant statutory provisions,
  • (c) make oral or written representations to inspectors on matters of safety, health and welfare at work,
  • (d) receive relevant advice and information from inspectors on matters of safety, health and welfare at work,
  • (e) subject to prior notice to the project supervisor for the construction stage and the contractor employing the site safety representative and to agreement between the site safety representative, project supervisor for the construction stage and the contractor employing the site safety representative as to frequency, carry out inspections and in reaching such agreement, which shall not unreasonably be withheld by the employer, the parties shall consider the nature and extent of the hazards at the construction site in determining the frequency of inspections to be carried out by the site safety representative,
  • (f) subject to prior notice to the project supervisor for the construction stage and the contractor employing the site safety representative, in circumstances in which it is reasonable to assume that risk of personal injury exists, to investigate potential hazards and complaints made by any person at work at the construction site relating to safety, health and welfare at the construction site, or
  • (g) on a request being made in that behalf by him, accompany an inspector on any tour of inspection other than a tour of inspection made by the inspector for the purpose of investigating an accident.
  • (3) The project supervisor for the construction stage and, as appropriate, any contractor involved in the project shall take account of any representations made to him or her by a site safety representative on any matter affecting the safety, health and welfare at work of any person at work at the construction site.
  • (4) The contractor employing the site safety representative shall afford him or her such time off from his or her duties as may be reasonable having regard to all the circumstances without loss of remuneration, to enable him or her to -
  • (a) acquire the knowledge necessary to discharge his or her functions as a safety representative, and
  • (b) discharge his or her functions as a site safety representative under this Regulation.
  • (5) Arising from the discharge of his or her functions under this Regulation, a site safety representative shall not be placed at any disadvantage in relation to his or her employment.

Notification of Projects to the Authority

8.

(1) It shall be the duty of the project supervisor appointed for the construction stage to give notice to the Authority before work on a construction site begins, where work is planned to last longer than 30 working days or on which the volume of work is scheduled to exceed 500 person-days.

  • (2) A notice required by paragraph (1) shall be in writing and shall contain the particulars provided for in the First Schedule.
  • (3) The project supervisor appointed for the construction stage shall cause to be clearly displayed on the construction site and, if necessary, periodically cause to be updated the particulars required to be in any notice under this Regulation.

PART 3 GENERAL DUTIES OF CONTRACTORS AND OTHERS

Duties of Contractors

9.

(1) It shall be the duty of every contractor -

  • (a) to comply with the provisions of Parts 4 to 18 of these Regulations,
  • (b) to co-operate with the project supervisor appointed for the construction stage to enable such project supervisor to comply with the relevant statutory provisions,
  • (c) to provide promptly to the project supervisor appointed for the construction stage any information (including a copy of any relevant safety statement prepared under section 12 of the Act) which is likely to affect the health or safety of any person at work on the project or which might justify a review of the safety and health plan,
  • (d) to take into account any directions of the project supervisor appointed for the construction stage,
  • (e) to provide the project supervisor appointed for the construction stage with the information in relation to any death, injury, condition or dangerous occurrence which the contractor is required to notify or report under the Principal Regulations,
  • (f) to apply, where appropriate, the general principles of prevention specified in the First Schedule of the Principal Regulations in a consistent manner and in particular in relation to the matters specified in the Third Schedule in order to protect the health and safety of persons at work,
  • (g) to comply with the appropriate requirements of the Fourth and Fifth Schedules as regards any place of work under the contractor's control.
  • (2) It shall be the duty of every contractor to comply with those requirements of the Fourth and Fifth Schedules which apply whenever required by the features of the construction site, the activity, the circumstances or a hazard at the site.
  • (3) It shall be the duty of every contractor or other person to ensure that all persons under their direct control on a construction site to whom the Eighth Schedule refers have received the training specified in the Eighth Schedule and have been issued with a current registration card in the form specified in that Schedule.
  • (4) It shall be the duty of every contractor or other person to ensure that any person under their direct control on a construction site who engages in any of the tasks specified in the Ninth Schedule has received the training specified in that Schedule and has been issued with a current construction skills card in the form specified in that Schedule.
  • (5) It shall be the duty of every contractor or other person to ensure in respect of any person under their direct control on a construction site to whom Regulations 9(3) and 9(4) apply to furnish to the project supervisor appointed for the construction stage on the date upon which they first start work on that site written confirmation that the persons concerned are in possession of any registration cards required under Regulations 6(5) and 6(6) together with any other relevant certificates and documentation required under the Principal Regulations.

Appointment of Safety Officers

10.

(1) It shall be the duty of every contractor who normally has more than 20 persons under his direct control at any one time on a construction site or normally more than 30 persons under his direct control at any one time engaged in construction work, taking account of the provisions of Regulation 8 of the Principal Regulations, to appoint in writing one or more persons as a safety officer and the person so appointed shall be qualified by experience and training to undertake the following duties:

  • (a) to advise the contractor as to the observance of the requirements of the relevant statutory provisions;
  • (b) to exercise a general supervision of the observance of the aforesaid requirements and the promotion of the safe conduct of work generally.
  • (2) The duties assigned to any person appointed under paragraph (1) including any duties other than those mentioned in paragraph (1) shall not be such as to prevent that person from discharging with reasonable efficiency duties assigned under that paragraph.
  • (3) Nothing in these Regulations shall be construed as preventing the same person or persons being appointed under these Regulations for a group of sites or two or more contractors from jointly so appointing the same person or persons.

Erection and Installation of Plant or Equipment

11.

It shall be the duty of every contractor who -

  • (a) erects, installs, modifies, works or uses any plant or equipment to which any of the provisions of these Regulations applies to erect, install, modify, work or use any such plant or equipment in a manner which complies with those provisions, and
  • (b) erects or alters any scaffold to comply with the requirements of these Regulations having regard to the purpose or purposes for which the scaffold is designed at the time of erection or alteration.

Information

12.

It shall be the duty of every contractor in providing information to his employees or safety representative (or both), as required under Regulation 11 of the Principal Regulations, to ensure that such information includes information on the measures to be taken concerning their safety and health on the construction site and that such information is comprehensible to the employees concerned.

Consultation

13.

It shall be the duty of every contractor to ensure consultation with employees or their safety representative (or both) in relation to the requirements of these Regulations in accordance with the provisions of Regulation 12 of the Principal Regulations, taking account of the need, whenever necessary, for co-ordination between employees or the safety representatives of the different contractors on the construction site.

Duties of Employees and other Persons at Work

14.

Without prejudice to the provisions of Regulation 14 of the Principal Regulations, it shall be the duty of every person at work -

  • (a) to comply with these Regulations and to co-operate in carrying out these Regulations and if that person discovers any defect in the plant or equipment to which these Regulations apply and which might endanger safety, health and welfare, to report such defect without unreasonable delay to the employer, immediate supervisor or the contractor responsible for the plant or equipment,
  • (b) to make proper use of any safety helmet, harness or any other personal protective equipment provided for that person's health and safety,
  • (c) to accept reasonable offers of assessment and training specified in the Eighth and Ninth Schedules to these Regulations, without loss of remuneration, made by his employer, and
  • (d) when requested by their employer or the project supervisor appointed for the construction stage, to show relevant registration or construction skills cards referred to in Regulation 9(3) and Regulation 9(4).

PART 4 SAFETY OF WORKPLACES

General

15.

(1) All appropriate precautions shall be taken to ensure that all workplaces are safe and without risk of injury to the safety and health of persons at work.

  • (2) Safe means of access to and egress from all workplaces shall be provided and maintained, and indicated where appropriate.
  • (3) Appropriate precautions shall be taken to protect persons present at or in the vicinity of a construction site from risks, which may arise from such site.

Protection from falling material

16.

(1) (a) Adequate measures shall be taken to prevent persons at work from being struck by any falling material or article.

  • (b) Wherever technically feasible, persons shall be protected by collective methods against falling objects.
  • (c) Materials and equipment shall be laid out or stacked in such a way as to prevent their collapsing or overturning.
  • (d) Where necessary, there shall be covered passageways on the site or access to danger areas shall be prevented.
  • (2) Every person carrying out construction work shall be provided with a suitable safety helmet or other suitable head protection unless there is no foreseeable risk of injury to the head other than by falling.
  • (3) Every protective helmet provided pursuant to this Regulation shall be marked with a distinguishing mark which shall be used to identify it in relation to the person to whom it has been issued and the helmet shall not be issued to any other person unless and until it has been cleaned and disinfected.
  • (4)
  • (a) Scaffold materials, tools, other objects or material, including waste material, shall not be thrown, or shot down from a height where they are liable to cause injury, and where practicable shall be properly lowered.
  • (b) Where proper lowering is not practicable or where any part of a building or other structure is being demolished or removed adequate steps shall be taken to protect persons at work from falling or flying debris.

Lighting of Work Places

17.

Every place at which persons are at work and the approach thereto and, in particular, every such place where raising or lowering operations with the use of a lifting appliance are in progress and all openings dangerous to persons at work, shall be adequately and suitably lighted.

Projecting Nails and Loose Material

18.

No timber or material with projecting nails shall be used in any work to which these Regulations apply if such timber or material is a source of danger to persons at work nor shall such timber or materials be allowed to remain in any place where they are a source of danger to such persons.

Construction of Temporary Structures.

19.

Any temporary structure erected for the purpose of construction work not being a scaffold or other structure to which Regulation 81 applies, shall, having regard to the purpose for which it is used, be of good construction and adequate strength and stability and shall be of sound material, free from patent defect and properly maintained.

Avoidance of Danger from Collapse of Structure

20.

(1) Metal or concrete frameworks and their components, shutterings, prefabricated components or temporary support, and buttresses shall be erected and dismantled only under the supervision of a competent person.

  • (2) All practicable precautions shall be taken by the use of temporary guys, stays, supports and fixings or otherwise where necessary to prevent danger to any person at work through the collapse of any part of a building or other structure during any temporary state of weakness or instability of the building or structure or part thereof before the whole building or structure is completed.
  • (3) Any guys, stays, supports, fixings or other devices provided under paragraph (2) shall be designed, installed and maintained so as to safely withstand any strains and stresses which may be placed on them.
  • (4) Where any work is carried on which is likely to reduce the security or stability of any part of an existing building or structure or of a building or structure in course of construction, all practicable precautions shall be taken by shoring or otherwise to prevent danger to any person at work from the collapse of the building or structure or the fall of any part thereof.

PART 5 EXCAVATIONS, SHAFTS, EARTHWORKS, UNDERGROUND WORKS AND TUNNELS

General

21.

(1) Adequate precautions shall be taken in any excavation, shaft, earthwork, underground works or tunnel to -

  • (a) guard against danger to persons at work from a fall or dislodgement of earth, rock or other material by suitable shoring or otherwise,
  • (b) guard against dangers arising from the fall of persons at work, materials or objects or the inrush of water into the excavation, shaft, earthworks, underground works or tunnel,
  • (c) secure adequate ventilation at all workplaces so as to maintain an atmosphere fit for respiration and to limit any fumes, gases, vapours, dust or other impurities to levels which are not dangerous or injurious to health,
  • (d) enable persons at work to reach safety in the event of fire or an inrush of water or materials,
  • (e) avoid risk to persons at work arising from possible underground dangers such as underground cables or other distribution systems, the circulation of fluids or the presence of pockets of gas, by undertaking appropriate investigations to locate them before excavation begins,
  • (f) ensure that a safe means of access to and egress from each work place is provided.
  • (2) Paragraph (1)(a) shall not apply to any excavation, shaft or earthwork where, having regard to the nature and slope of the sides of the excavation, shaft or earthwork and other circumstances, a fall or dislodgement of earth or other material which would bury or trap a person from a height of more than 1.25 metres is not liable to occur.
  • (3) Where a person is engaged in shoring or other work which is being carried out for the purpose of compliance with paragraph (1) (a) appropriate precautions shall, as far as circumstances permit, be taken to ensure his safety.

Inspection and Examination

22.

(1) Subject to the provisions of paragraph (4), every part of any excavation, shaft, earthwork, underground works or tunnel where persons are at work shall be inspected by a competent person at least once on every day during which persons are at work therein; and the face of every tunnel and the working end of every trench more than 2.00 metres deep and the base and crown of every shaft shall be inspected by a competent person at the commencement of every shift.

  • (2) Subject to the provisions of paragraph (4), a person shall not be permitted to work in any excavation, shaft, earthwork, underground work or tunnel unless a thorough examination has been carried out by a competent person -
  • (a) of those parts thereof, and in particular any shoring or other support, in the region of the blast since explosives have been used in or near the excavation, shaft, earthwork, underground work or tunnel in a manner likely to have affected the strength or stability of that shoring or other support of any part thereof; and
  • (b) of those parts thereof in the region of any shoring or other support of any part thereof that has been substantially damaged and in the region of any unexpected fall of rock or earth or other material; and
  • (c) of every part thereof within the immediately preceding seven days.
  • (3) A report of the results of every examination required by paragraph (2), signed by the person carrying out the examination, shall be made on the day of the examination in the approved form.
  • (4) This Regulation shall not apply -
  • (a) to any excavation, shaft or earthwork where, having regard to the nature and slope of the sides of the excavation, shaft or earthwork and other circumstances, a fall or dislodgement of earth or other material which would bury or trap a person or which would strike a person from a height of more than 1.25 metres is not likely to occur, or
  • (b) in relation to persons carrying out inspections or examinations required by this regulation or engaged in shoring or other work for the purpose of making a place safe, if appropriate precautions are taken to ensure their safety as far as circumstances permit.

Supervision and Execution of Shoring and Other Work

23.

(1) No shoring or other support for any part of an excavation, shaft, earthwork, underground work or tunnel shall be erected or be substantially added to, altered or dismantled except under the direction of a competent person and so far as practicable by persons possessing adequate experience of such work and all material for any such work shall be inspected by a competent person on each occasion before being taken into use and material found defective in any respect shall not be used.

  • (2) Shoring or other support for any part of an excavation, shaft, earthwork, underground work or tunnel shall be of good construction, sound material, free from patent defect and of adequate strength for the purpose for which it is used and shall be properly maintained.
  • (3) All struts and braces in any excavation, shaft, earthwork, underground work or tunnel shall be properly and adequately secured so as to prevent their accidental displacement or fall.

Excavations etc. Likely to Reduce Security of a Structure

24.

No excavation, shaft, earthwork, underground work or tunnel which is likely to reduce, so as to endanger any employee or other person at work, the security or stability of any part of any structure, whether temporary or permanent, shall be commenced or continued unless adequate steps are taken both before and during the progress of the work, to prevent danger to any such person from collapse of the structure or the fall of any part thereof.

Fencing of Excavations, etc.

25.

(1) Every accessible part of an excavation, shaft, pit or opening in the ground near to which persons are working and into or down a side of which a person is liable to fall a distance of more than 2.00 metres shall be either provided with a suitable barrier placed as close as is practicable to the edge or securely covered.

  • (2) Paragraph (1) shall not apply to any part of an excavation, shaft, pit or opening while, and to the extent to which, the absence of such barrier and covering is necessary for the access of persons or for the movement of plant or equipment or materials or while, and to the extent to which, it has not up to then been practicable to erect such barrier or covering since the formation of that part of the excavation, shaft, pit or opening.

Safeguarding Edges of Excavations, etc.

26.

(1) Material shall not be placed or stacked near the edge of any excavation, shaft, pit or opening in the ground so as to endanger persons at work below.

  • (2) No load, vehicle, or plant or equipment shall be placed or moved near the edge of any excavation, shaft, pit or opening in the ground where it is likely to cause a collapse of the side of the excavation, shaft, pit or opening and thereby endanger any person at work, and if necessary appropriate barriers shall be provided.

PART 6 COFFERDAMS AND CAISSONS

Construction and Maintenance

27.

Every cofferdam or caisson and every part thereof shall be of good construction, of suitable and sound material, free from patent defect and of adequate strength and shall be properly maintained.

Means of Egress in Case of Flooding

28.

Every cofferdam or caisson shall be provided with adequate means for persons at work to reach places of safety in the event of an inrush of water or material.

Supervision of Work and Inspection of Material

29.

(1) No cofferdam or caisson or part thereof shall be constructed or be placed in position or be substantially added to or altered or be dismantled except under the immediate supervision of a competent person and so far as practicable by persons possessing adequate experience of such work.

  • (2) All material used for the construction or fixing of a cofferdam or caisson shall be inspected by a competent person on each occasion before taken into such use and material, which is unsuitable or defective in any respect, shall not be used.

Inspections and Examinations

30.

(1) Subject to paragraph (3), any cofferdam or caisson in which persons are at work shall -

  • (a) be inspected by a competent person at least once on every day during which persons are working therein, and
  • (b) be thoroughly examined by a competent person -
  • (i) in case explosives have been used in or near the cofferdam or caisson in a manner likely to have affected the strength or stability of the cofferdam or caisson or any part thereof, since the use of the explosives, and
  • (ii) in case the cofferdam or caisson has been substantially damaged, since it was so damaged, and
  • (iii) in any other case, at least once within the immediately preceding seven days.
  • (2) A report of the results of every examination made pursuant to this regulation signed by the person carrying out the examination shall be made on the day of the examination in the approved form.
  • (3) This Regulation shall not apply in relation to persons engaged in the construction, placing, repairing or alteration of the cofferdam or caisson or carrying out inspections or examinations required by this Regulation if appropriate precautions are taken to ensure their safety as far as circumstances permit.

PART 7 COMPRESSED AIR

Application of Part 7

31.

In this Part of these Regulations:-

“pressure” means pressure in kg/cm^2 above atmospheric pressure.

General

32.

Where persons are required to work in compressed air -

  • (a) appropriate precautions, arrangements and procedures shall be adapted, and
  • (b) the work shall be planned and undertaken only under the supervision of a competent person.

Plant and Equipment

33.

All plant and equipment, including man-lock and air supply plant, and all parts and fittings thereof provided for use in relation to work in compressed air shall be -

  • (a) of good design and construction,
  • (b) of sound material and adequate strength,
  • (c) free from patent defect,
  • (d) properly maintained and used, and
  • (e) suitable for the purpose used.

Minimum Requirements

34.

Work in compressed air shall be carried out in accordance with the minimum requirements specified in the Sixth Schedule.

PART 8

EXPLOSIVES

Explosives

35.

(1) Explosives for use in construction work, shall not be stored, transported, handled or used except by or under the immediate control of a competent person with an adequate knowledge of the dangers connected with their use.

  • (2) All work involving the handling and use of explosives shall be carried out by competent persons and shall be organised and performed so as to avoid risks to persons at work.
  • (3) Suitable measures shall be taken to ensure that when a charge is fired -
  • (a) persons at work are in places where, so far as can reasonably be anticipated, they will not be exposed to risk of injury from the explosion or from flying materials, and
  • (b) other persons are not exposed to risk of injury.
  • (4) This Regulation shall not be construed as being in substitution for, or otherwise affecting any provision of the Explosives Act, 1875 (1875 c.17), or any provision of any other enactment which amends the law relating to explosive substances.

PART 9 DANGEROUS OR UNHEALTHY ATMOSPHERES

Health Hazards

36.

(1) Where a person at work is liable to be exposed to any chemical, physical or biological hazard to such an extent as is liable to be dangerous to health, appropriate preventative measures shall be taken against such exposure.

  • (2) The preventative measures referred to in paragraph (1) above shall comprise -
  • (a) the replacement of a hazardous substance by a harmless or less hazardous substance wherever possible, or
  • (b) technical measures applied to the plant, machinery, equipment or process; or
  • (c) where it is not possible to comply with subparagraphs (a) or (b) above, other effective measures, including the use of personal protective equipment and protective clothing.

Disposal of Waste

37.

Waste shall not be destroyed or otherwise disposed of on a construction site in a manner, which is liable to be injurious to health.

Internal Combustion Engines or Dangerous Gas

38.

No stationary internal combustion engine shall be used in any enclosed or confined place unless specific provision is made for conducting the exhaust gases from the engine into the open air or the place is adequately ventilated so as to prevent danger to health from such exhaust gases.

PART 10 WORK ON OR ADJACENT TO WATER

Transport by Water

39.

When any person at work is conveyed to or from any place of work on water, proper measures shall be taken to provide for his safe transport and vessels used for this purpose shall be of suitable construction, properly maintained and in the charge of a competent person and not overcrowded or overloaded.

Prevention of Drowning

40.

(1) Where, on or adjacent to a construction site there is water into which a person is, in the course of his work, liable to fall with risk of drowning, suitable rescue equipment shall be provided and kept in an efficient state and ready for use and measures shall be taken to arrange for the prompt rescue of any such person who is in danger of drowning.

  • (2) Where there is special risk of such a fall from the edge of adjacent land or from a structure adjacent to or above the water, or from a floating stage, secure fencing shall be provided near the edge to prevent such a fall, but such fencing may be removed or remain unerected for the time and to the extent necessary for the access of persons or the movement of materials.

PART 11 TRANSPORT, EARTHMOVING AND MATERIALS-HANDLING MACHINERY, AND LOCOMOTIVES

General

41.

(1) All transport vehicles, earth-moving and materials-handling machinery and locomotives shall -

  • (a) be of good design and construction taking into account as far as possible ergonomic principles,
  • (b) be maintained in good working order,
  • (c) be properly used,
  • (d) not be operated otherwise than by a competent person who has attained the age of eighteen years but notwithstanding the foregoing operation shall be permissible for the purpose of training by a person who is under the direct supervision of a qualified person for the purpose of training,
  • (e) in circumstances where the operator's visibility is restricted, be fitted with an efficient warning device.
  • (2) On all construction sites on which transport vehicles, earth-moving or materials-handling machinery or locomotives are used -
  • (a) safe and suitable access ways shall be provided for them, and
  • (b) traffic shall be so organised and controlled as to secure their safe operation.

Rails and Rail Tracks

42.

(1) All rails on which any locomotive, truck or wagon moves shall -

  • (a) have an even running surface, be sufficiently and adequately supported and be of adequate section,
  • (b) be jointed by fishplates or double chairs,
  • (c) be securely fastened to sleepers or bearers,
  • (d) be supported on a surface sufficiently firm to prevent undue movement of the rails,
  • (e) be laid in straight lines or in curves of such radii that the locomotive, truck or wagon can be moved freely and without danger of derailment,
  • (f) be provided with an adequate stop or buffer on each rail at each end of the track.
  • (2) All rails and equipment referred to in this Regulation shall be properly maintained but paragraphs (1) (b) and (1) (c) shall not apply if other adequate steps are taken to ensure the proper junction of the rails, and to prevent any material variation in their gauge.

Clearance

43.

(1) In connection with the erection, installation, working or use of any line of rails on which any locomotive, truck or wagon moves, there shall be adequate clearance so that persons are not likely to be crushed or trapped by a locomotive, truck or wagon or any part of a load thereon.

  • (2) Where it is not practicable to provide clearance in accordance with paragraph (1), such suitable arrangements shall be provided as are necessary to ensure that persons at work are not exposed to unnecessary risks.

Riding in Insecure Positions on Vehicles, etc.

44.

No person at work shall ride or be required or permitted to ride on the buffer, running board or other insecure position -

  • (a) on any transport vehicle, earthmoving or materials handling machinery, or
  • (b) on any locomotive, truck or wagon,

and shall only ride on the part thereof provided for that purpose.

Vehicles Near Edge of Excavations, etc.

45.

Where any vehicle or machinery is used for tipping material into any excavation or shaft or over the edge of any embankment or earthwork or into water adequate measures shall be taken where necessary so as to prevent such vehicle or machinery from overturning or from overrunning the edge of such excavation, shaft, embankment, earthwork or water.

Protection of Driver

46.

Where appropriate, excavating machinery and materials handling machinery shall comply with the provisions of any relevant Directive of the European Communities which is applicable as regards the protection of the driver against being crushed if the machine overturns and against falling objects.

PART 12 DEMOLITION

Application of Part 12

47.

The requirements of this Part of these Regulations shall apply to the demolition of the whole or any substantial part of a building or other structure.

General

48.

When the demolition of any building or structure might present danger to persons at work and others -

  • (a) appropriate precautions, methods and procedures shall be adopted, including those for the disposal of waste or residues,
  • (b) the work shall be planned and undertaken only under the supervision of a competent person.

Fire and Flooding

49.

Before demolition is commenced and also during the progress of the work, appropriate steps shall be taken to prevent danger to persons at work -

  • (a) from risk of fire or explosion through leakage or accumulation of gas or vapour, and
  • (b) from risk of flooding.

Precautions in Connection with Demolition

50.

(1) No part of a building or other structure as regards which demolition is carried out shall be so overloaded with debris or materials as to render it unsafe to any person at work.

  • (2) The following operations shall be carried out only under the immediate supervision of a competent person or by persons trained and experienced in the kind of work and under the direction of a competent person -
  • (a) the actual demolition of a building or other structure or part thereof, except where there is no risk of a collapse of any part of the building or the structure in the course or as a result of the demolition which would endanger persons at work,
  • (b) the actual demolition of any part of a building or other structure where there is such a risk of collapse, whether of that or of any part of the building or structure, in the course or as a result of the said demolition,
  • (c) the cutting of reinforced or prestressed concrete, steelwork or ironwork forming part of the building or other structure which is being demolished.
  • (3) Before any steelwork or ironwork is cut or released, precautions shall be taken to avoid danger from any sudden twist, spring, or collapse.
  • (4) Where demolition is being carried out all appropriate precautions shall be taken to avoid danger from collapse of a building or other structure when any part of the framing is removed from a framed or partly framed building or other structure.
  • (5) Before demolition is commenced and also during the progress of the work precautions shall, where necessary, be taken by adequate shoring or otherwise to prevent the accidental collapse of any part of the relevant building or structure or of any adjoining building or structure, the collapse of which may endanger persons at work, but this requirement shall not apply in relation to any person actually engaged in erecting or placing shoring or other safeguards for the purpose of compliance with this requirement, if appropriate precautions are taken to ensure his safety as far as circumstances permit.
  • (6) Before demolition is commenced and also during the progress of the work all appropriate steps shall be taken to ensure that there is no danger to persons at work from electric cables, gas pipes, water mains, sewers or other underground watercourses.
  • (7) Appropriate steps shall be taken to suppress, either by water sprays or other means, any dust generated during the process of demolition.

PART 13 WORKING AT HEIGHTS

Provision of Scaffolds, etc.

51.

Where work cannot safely be done on or from the ground or from part of a building or other permanent structure, there shall be provided, placed and kept in position for use and properly maintained either scaffolds or, where appropriate, ladders or other means of support, all of which shall be sufficient and suitable for the purpose for which it is used.

Supervision of Work and Inspection of Material

52.

(1) No scaffold shall be erected or be substantially added to or altered or be dismantled except under the immediate supervision of a competent person and by persons trained and experienced in the kind of work.

  • (2) All material for any scaffold shall be inspected by a competent person on each occasion before being taken into use.

Construction and Material

53.

(1) Every scaffold and every part thereof shall be of good design and construction, of suitable and sound material and of adequate strength for the purpose for which it is used.

  • (2) Sufficient material shall be provided for and shall be used in the construction of scaffolds.

This document does not substitute the official text published in the Irish Statute Book. We accept no responsibility for any inaccuracies arising from the transcription of the original into this format.

This text is published under Irish Statute Book's own terms of reuse, not a Legalize or public-domain licence. Irish Statute Book
CC-BY 4.0 (Oireachtas Open Data PSI Licence)
Contains Irish Public Sector Information licensed under the Oireachtas (Houses of the Oireachtas) Open Data PSI Licence / Creative Commons Attribution 4.0 International, sourced from https://www.irishstatutebook.ie.