S.I. No. 217/2002 - Electricity Regulation Act 1999 (Public Service Obligations) Order 2002

Type Statutory Instrument
Publication 2002-05-23
Last updated 2026-01-16
State In force superseded text
Text As published
articles 1

This is the act as published. Later amendments are not folded into the text below: each one is a separate act in this repository and an entry in this law's history.

27 amending acts · 2026-01-16, S.I. No. 689/2025 - Electricity Regulation Act 1999 (Public Service Obligations) (Amendme…

Reform history JSON API

TABLE OF CONTENTS

1. Citation 2
2. Interpretation 2
3. Direction to the Commission for Energy Regulation 4
4. Period of public service obligations 4
5. Public service obligation for Peat 5
6. Public service obligation for Renewable, Sustainable or Alternative forms of energy 7
7. Public service obligation Levy 7
8. Calculation of PSO Levy amount - constituent elements 7
9. Estimation of PSO Levy 9
10. Certification of PSO Levy 12
11. Duty of suppliers to invoice and collect PSO Levy 13
12. Duty of suppliers to account to distribution system operator for PSO Levy 13
13. Duty of suppliers to account to transmission system operator for PSO Levy 13
14. Duty of distribution system operator to account to transmission system operator for PSO levy 13
15. Duty of transmission system operator to account to Board for PSO Levy 14
16. Duty of final customers to pay PSO Levy 14
17. Duty of distribution system operator and transmission system operator to inform Commission as to the level of PSO Levy amounts received 14
18. Recovery of PSO Levy amounts due 14
19. CER supervision 15
20. Provision of information 17
21. Transmission system operator duty of priority dispatch of generating stations 17
SCHEDULE 1
Part 1. Edenderry Power Ltd. peat powered generating station referred to in Article 5 18
Part 2. ESB's peat powered generating stations referred to in Article 5 18
Part 3. Renewable, Sustainable or Alternative Energy contracts referred to in Article 6 19
SCHEDULE 2
PSO Levy: invoicing and collection terms 21

S.I. No. 217 of 2002

ELECTRICITY REGULATION ACT 1999

(PUBLIC SERVICE OBLIGATIONS) ORDER 2002

I, Mary O'Rourke, Minister for Public Enterprise, in exercise of the powers conferred on me by section 39 of the Electricity Regulation Act 1999 (No. 23 of 1999) (as amended by the European Communities (Internal Market in Electricity) Regulations 2000 ( S.I. No. 445 of 2000 ) and the Sustainable Energy Act 2002 (No. 2 of 2002)), in consideration of general social, economic and environmental factors and following consultation with the Minister for the Environment and Local Government, and having, in accordance with section 39 (10) of the Electricity Regulation Act 1999 , given a draft of this Order to the Electricity Supply Board, being the person upon whom the obligations are to be imposed, hereby order as follows:

Citation

1.

1.

This Order may be cited as the Electricity Regulation Act 1999 (Public Service Obligations) Order 2002.

Interpretation

2.(1) In this Order-

“Act” means the Electricity Regulation Act 1999 , as amended;

“category” means a category of electricity account holders referred to in section 39 (5A) and specified in Schedule 2 of the Act;

“Commission” means the Commission for Energy Regulation (CER) established by the Act;

“distribution system operator” means the holder of a licence granted under Section 14(1)(g) of the Act to discharge the functions of the distribution system operator;

“EU Commission” means the Commission of the European Communities;

“levy period” means a period of 12 calendar months commencing on 1 January in each period;

“Notification” means the correspondence referred to at paragraphs 1 to 4 of EU Commission C(2001)3265 fin dated 30.10.2001 and at paragraphs 1 and 2 of EU Commission C(2002)5fin dated 15.01.2002 relating to a notification to the EU Commission (Reference Nos. N6/A/2001 and N826/2001 - Ireland) pursuant to Articles 16 and 86 of the Treaty;

“PPA” means a power purchase agreement between the Board and a third party power producer;

“public service obligations levy” means the levy referred to in Article 7 of this Order;

“supplier” means the holder of a licence granted under Section 14, subsection (1) (a) (b), (c) and (d), and subsection (2) of the Act and the Board, and the holder of a permit under Section 37 of the Principal Act, in respect of the supply of electricity to final customers;

“transmission system operator” means the holder of a licence under Section 14(1)(e of the Act of 1999 to discharge the functions of the transmission system operator or the Board in its capacity as ESB National Grid, as appropriate.

(4)In respect of the first levy period, a reference in Article 8 (1) to administrative expenses of suppliers, the distribution system operator or the transmission system operator in the period concerned shall be construed as including administrative expenses which were incurred prior to the first levy period which relate to the introduction and implementation of the PSO Levy.

Direction to the Commission for Energy Regulation

3.

The Commission for Energy Regulation is directed to impose on the Board public service obligations in the terms set out in this Order.

Period of public service obligations

4.(1) The period of the public service obligations shall -

and subject to the provisions of paragraph (2) and Articles 5 and 6, shall continue until 31 December 2019.

Public service obligation for Peat

5.

(1) There shall be imposed by the Commission on the Board a requirement to take such steps and make such arrangements as are necessary-

provided that the amount of peat used in any calendar year to generate that electricity shall not exceed 15 per cent of the overall primary energy necessary to produce the electricity consumed in the State in that year.

Public service obligation for Renewable, Sustainable or Alternative forms of energy

6.

(1) There shall be imposed by the Commission on the Board a requirement that the Board take such steps and make such arrangements as may be necessary to have available to it and purchase electricity generated pursuant to the contracts listed in Part 3 of Schedule 1 for the respective terms of those contracts.

Public service obligations Levy

7.(1) There shall be a levy in respect of the matters provided for in this Order, which shall be known as the public service obligations levy and is in this Order referred to as the “PSO Levy” which levy shall be estimated, calculated, adjusted, collected, monitored certified, accounted for and paid in accordance with the provisions of this Order.

Calculation of PSO Levy amount - constituent elements

8.

(1) The amount of the PSO Levy in respect of a particular levy period shall be the aggregate of

Estimation of PSO Levy

9.

(1) (a) The Commission shall apportion the amount of PSO Levy payable in each levy period in respect of each category of electricity accounts in the State in accordance with the terms of section 39 and Schedule 2 of the Act, and

shall provide the Commission with an estimate of the amount of the administrative expenses that each such person estimates it will incur in the forthcoming levy period in complying with its duties under this Order together with such further information as the Commission may specify.

Certification of PSO Levy

10.

(1) Within 120 days of the end of each levy period-

together in each case with a separate auditors' certificate, detailing the actual amounts of the costs and expenses referred to in subparagraphs (a) and (b), as appropriate, and certifying that the costs and expenses in question have been incurred and the amounts recorded have been properly extracted from the books and records of the company.

Duty of suppliers to invoice and collect PSO Levy

11.

It shall be the duty of suppliers who make a supply of electricity to a final customer to invoice the PSO Levy to each such customer on the basis notified to them by the Commission (as referred to in Article 9(3)(e)) in respect of each electricity account held by such final customer, and collect from them, the amount of the PSO Levy payable in respect of each such account in accordance with the provisions of Schedule 2 to this Order.

Duty of suppliers to account to distribution system operator for PSO Levy

12.

It shall be the duty of each supplier to whom Article 11 applies, in respect of final customers who are connected to the distribution system, to account for and pay to the distribution system operator all amounts invoiced by such supplier in respect of the PSO Levy, in accordance with the provisions of Schedule 2 to this Order.

Duty of suppliers to account to transmission system operator for PSO Levy

13.

It shall be the duty of each supplier to whom the duty to collect the PSO Levy in Article 11 applies, in respect of final customers who are connected to the transmission system, to account for and pay to the transmission system operator all amounts invoiced by such supplier in respect of the PSO Levy, in accordance with the provisions of Schedule 2 to this Order.

Duty of distribution system operator to account to transmission system operator for PSO Levy

14.

It shall be the duty of the distribution system operator

Duty of transmission system operator to account to the Board for PSO Levy

15.

It shall be the duty of the transmission system operator

Duty of final customers to pay PSO Levy

16.

It shall be the duty of each final customer, which duty is owed to the electricity supplier which invoices such customer, to pay to that supplier the amount of the PSO Levy properly invoiced to such customer in accordance with this Order.

Duty of distribution system operator and transmission system operator to inform Commission as to level of PSO Levy amounts received

17.

It shall be the duty of the distribution system operator and transmission system operator to inform the Commission if the level of payments received by them in respect of the PSO Levy is materially different from that anticipated by the Commission as being payable in respect of a particular levy period and advised by the Commission to them and of the measures being taken to recover amounts due.

Recovery of PSO Levy amounts due

18.

A supplier, the distribution system operator and the transmission system operator may recover as a simple contract debt in any court of competent jurisdiction, any amount due and owing in respect of the PSO Levy, from each person who has, by virtue of this Order a duty to pay the PSO Levy to such supplier, the distribution system operator or the transmission system operator, as the case may be.

CER supervision

19.(1) Each person, other than a final customer, who has any duties imposed on him or her pursuant to this Order shall submit a document to the Commission for approval in such form as may be required by the Commission from time to time specifying the procedures which he or she will adopt in order to comply with those duties and, when approved by the Commission, shall comply with those procedures.

Provision of information

20.

It shall be the duty of each person who has duties pursuant to this Order to provide such information and documents to the Commission as it may require from time to time for the purpose of ensuring that each such person complies with his or her duties under this Order, including without limitation, information and evidence regarding amounts invoiced, received, accounted for and paid by him or her pursuant to his or her duties under this Order and the administrative expenses incurred by him or her, as appropriate in relation to the performance of his or her duties under this Order.

Transmission system operator duty of priority dispatch of generating stations

21.

The Commission shall direct that the transmission system operator, where applicable give priority of dispatch to generating stations, the output of which is the subject of this Order.

SCHEDULE 1

PART 1 Peat

(1) (2) (3) (4)
Name of Generator PPA Signing Date PPA Termination Date Project Size (kW)
Edenderry Power Limited 19/03/98 21/12/15 117,570

PART 2 Peat

1. Peat powered generating stations as specified at paragraph 4.16 of the Notification to the EU Commission:

Unit in Power Plant Projected Closure Date
Ferbane 2000
Shannonbridge U1 2003
Shannonbridge U2 2004
Shannonbridge U3 2004
Rhode U3 2003
Cahirciveen 2003
Lanesboro U2 2004
Lanesboro U3 2004
Bellacorick U1 2004
Bellacorick U2 2004

2. New 150MW peat power generating station to be constructed at Shannonbridge County Offaly.

3. New 100MW peat power generating station to be constructed at Lanesboro, County Longford.

PART 3 Renewable, Sustainable or Alternative Energy

(1) (2) (3) (4) (5)
PPA No. Type PPA Signing Date PPA Termination Date Name
WIND
AER3/WE/167 AER3 18/06/99 01/11/14 Gaelforce Energy Ltd.
AER3/WE/086 AER3 23/03/00 31/12/14 Largan Hill Windfarm Ltd.
AER3/WE/067 AER3 20/01/00 31/12/14 MHB Windfarms Ltd.
AER3/WE/156 AER3 20/01/00 31/12/14 MHB Windfarms Ltd.
AER3/WE/002 AER3 24/11/99 31/12/14 Tursillagh Windfarms Ltd.
AER3/WE/173 AER3 18/12/00 31/12/14 Waterfern Ltd.
AER94/TAD/WF/01 AER1 30/09/96 31/12/10 AWC Ltd.
AER94/WF/04 AER1 11/07/97 31/12/10 Baylsham Ltd.
AER94/WF/03 AER1 27/06/97 31/12/10 Cark Ltd.
AER94/WF/02 AER1 15/11/96 31/12/10 CRE Energy Ltd.
AER94/WF/06 AER1 23/03/98 31/12/10 Crockahenny Windfarm Ltd.
AER94/WF/04a AER1 01/02/99 31/12/10 E-Co Wind Power Ltd.
AER94/WF/05 AER1 20/05/97 31/12/10 Havasu Ltd.
Therm00/WF/01 THERMIE 28/03/00 14/06/08 First Electric Ltd.
Therm97/WF/03 THERMIE 29/05/98 31/12/10 Fuinneamh Gaoithe Teo
Therm96/WF/02 THERMIE 07/02/97 31/12/10 Gineadoiri Gaoithe Teo
Therm96/WF/01 THERMIE 05/11/97 31/12/10 Kilronan Windfarm Ltd.
Therm96/WF/03 THERMIE 21/11/97 31/12/10 Saporito Wind Ltd.
Therm98/WF/04 THERMIE 18/08/99 31/12/14 Western Power Ltd.
PPA Valoren 15/01/92 18/10/12 Renewable Energy Ireland Ltd.
preAER94/WF/01 PRE AER 30/09/98 31/12/03 Comharchumman Chleire Teo
HYDRO
AER3/HY/009 AER3 15/11/00 31/12/14 Hibernian Hydro Ltd.
AER3/HY/010 AER3 15/11/00 31/12/14 Hibernian Hydro Ltd.
AER3/HY/013 AER3 15/11/00 31/12/14 Hibernian Hydro Ltd.
AER3/HY/014 AER3 15/11/00 31/12/14 Hibernian Hydro Ltd.
AER94/TAD/HY/04 AER1 15/09/95 30/09/10 Cahir Mills Enterprises Ltd.
AER94/TAD/HY/03 AER1 08/11/95 31/12/10 Langan Springvale Ltd.
AER94/TAD/HY/06 AER1 30/04/97 31/12/10 Nadirkmore Energy Ltd.
AER94/TAD/HY/01 AER1 16/06/98 31/12/10 Sandview Ltd.
AER94/TAD/HY/02 AER1 28/11/96 31/12/10 Saporito Ltd.
Therm00/HYD/02 THERMIE 15/11/00 31/12/14 Hibernian Hydro Ltd.
preAER94/HYD/03 PRE AER 30/09/98 31/12/10 Bandon Charitable Resources Ltd.
preAER94/HYD/06 PRE AER 28/08/98 31/12/10 Baydeen Ltd.
preAER94/HYD/05 PRE AER 17/09/98 31/12/10 Celbridge Community Centre Ltd.
preAER94/HYD/27 PRE AER 17/09/98 31/12/03 Coola Mills Enterprises Ltd.
preAER94/HYD/08 PRE AER 17/09/98 31/12/10 Edergole Energy Ltd.
preAER94/HYD/09 PRE AER 17/09/98 31/12/10 Glenlough Generations Ltd.
preAER94/HYD/19 PRE AER 16/12/98 31/12/10 Mrs. Hannah Weir
preAER94/HYD/12 PRE AER 17/09/98 31/12/10 Mr. Michael Dwan
preAER94/HYD/13 PRE AER 17/09/98 31/12/10 Millstream Power Ltd.
preAER94/HYD/14 PRE AER 17/09/98 31/12/10 Munslow Ltd.
preAER94/HYD/15 PRE AER 17/09/98 31/12/10 Murphy Power Ltd.
preAER94/HYD/17 PRE AER 19/11/98 31/12/10 Mr. Nicholas de C. Grubb
preAER94/HYD/16 PRE AER 17/09/98 31/12/10 Nicholas Mosse Pottery Ltd.
preAER94/HYD/16a PRE AER 17/09/98 31/12/10 Nicholas Mosse Pottery Ltd.
preAER94/HYD/18 PRE AER 17/09/98 31/12/10 Owenbeg Natural Power Co Ltd.
preAER94/HYD/04 PRE AER 03/09/99 31/12/10 Paulson Investments Ltd
preAER94/HYD/20 PRE AER 30/09/98 31/12/10 Rockygrange Hydro Ltd.
preAER94/HYD/23 PRE AER 17/09/98 31/12/10 Stewart Hydro Ltd.
preAER94/HYD/21 PRE AER 17/09/98 31/12/10 Strongstream Electric Ltd.
preAER94/HYD/24 PRE AER 17/09/98 31/12/10 Trewell Ltd.
preAER94/HYD/25 PRE AER 17/09/98 31/12/10 Wilmoor Holdings Ltd.
Fixed Price PRE AER_FP 31/12/14 Aerobord Ltd.
Fixed Price PRE AER_FP 31/12/14 Mr. Benedict Behal
Fixed Price PRE AER_FP 31/12/14 Mr. Dominic Behal
Fixed Price PRE AER_FP 31/12/14 Mr. Hugh Kirk
Fixed Price PRE AER_FP 31/12/14 Inch Hydro Ltd.
Fixed Price PRE AER_FP 31/12/14 International Trailers Ltd.
LANDFILL GAS
AER3/BM/007 AER3 10/07/98 31/12/13 Irish Power Systems Ltd.
AER94/LFG/01 AER1 23/08/95 30/11/10 Irish Power Systems Ltd.
AER94/LFG/02 AER1 23/08/95 31/12/10 Irish Power Systems Ltd.
AER94/LFG/03 AER1 23/08/95 31/12/10 Irish Power Systems Ltd.
AER94/LFG/04 AER1 23/08/95 31/12/10 Irish Power Systems Ltd.
AER94/LFG/05 AER1 23/08/95 31/12/10 Irish Power Systems Ltd.
CHP
AER4/CHP/05 AER4 17/11/99 31/12/10 CoGen Ltd.
AER4/CHP/07 AER4 17/11/99 31/12/10 CoGen Ltd.
AER4/CHP/08 AER4 23/12/99 31/12/14 Golden Vale Food Products Ltd.
AER4/CHP/14 AER4 09/10/98 30/09/13 Guinness Ireland Group Ltd.
AER94/CHP/01 AER1 17/02/96 31/12/10 Electrical Power Distribution Ltd.
AER94/CHP/02 AER1 01/12/97 31/12/07 Guinness Ireland Group Ltd.
AER94/TAD/CHP/02 AER1 22/01/98 31/12/10 Southern Health Board
AER94/TAD/CHP/01 AER1 17/08/95 31/12/10 Transpower Ltd.
preAER94/CHP/01 PRE AER 17/09/98 31/12/08 C.H.P. Ltd.
preAER94/CHP/04 PRE AER 30/09/98 31/12/10 FMC International AG

SCHEDULE 2 PSO LEVY: INVOICING AND COLLECTION TERMS

1.

Each supplier shall invoice the PSO Levy to each final customer to whom they make a supply of electricity in respect of each electricity account held by such final customer with that supplier on the basis of the determination made by the Commission and notified to the supplier pursuant to Article 9(3)(e).

2.

Each supplier shall ensure that the PSO Levy is invoiced to every final customer-

as charges for electricity supply are invoiced, with due regard to a supplier's billing cycles, but in any event no less frequently than once every three months.

3.

The amount of the PSO Levy payable in respect of an electricity account by a final customer in a levy period shall be apportioned by the supplier equally, as far as is practicable, between the invoices to be issued by the supplier in the course of a levy period but in any event so as to ensure that the full amount of the PSO Levy payable by such final customer in respect of a levy period shall be so invoiced within 3 months of the end of that levy period and that the final customer is invoiced no less frequently than once every three months.

4.

Where a final customer changes its supplier, the full monthly PSO Levy amount for such final customer will be invoiced by the supplier with which that final customer is registered as the holder of an electricity account at the end of the month for which the monthly PSO Levy is due, whether or not the final customer concerned was a customer of the said supplier for a full calendar month and each such invoice shall charge the relevant final customer for the PSO Levy amount due in respect of such final customer since its last PSO Levy invoice.

5.

Every invoice in respect of the PSO Levy shall identify the amount of the PSO Levy being invoiced, separately from every other item being invoiced, and shall refer to the amount as “Public Service Obligations Levy”.

6.

Every invoice in respect of the PSO Levy shall include the following description of the PSO Levy:

“PUBLIC SERVICE OBLIGATIONS LEVY

This public service obligations levy relates to the purchase by ESB of the output of certain peat generated electricity, in the interests of security of supply, and the output of certain generating stations using renewable sustainable or alternative forms of energy, in the interests of environmental protection, in accordance with a Public Service Obligations Order made by the Minister for Public Enterprise.”.

7.

For the period of 6 months immediately following 1 January 2003, in lieu of the description of the PSO Levy specified in paragraph 6, the Board shall include on every invoice in respect of the PSO Levy the following description of the PSO Levy:

“PUBLIC SERVICE OBLIGATIONS LEVY

This public service obligations levy relates to the purchase by ESB of the output of certain peat generated electricity, in the interests of security of supply, and the output of certain generating stations using renewable sustainable or alternative forms of energy, in the interests of environmental protection, in accordance with a Public Service Obligations Order made by the Minister for Public Enterprise. The cost of purchase by ESB of these sources of electricity was included in electricity bills issued by the Board prior to the introduction of the PSO Levy and therefore, an appropriate adjustment has been made to this invoice to separately identify the PSO Levy, on a basis approved by the Commission for Energy Regulation.”.

8.

For the period of 6 months immediately following 1 January 2003, in lieu of the description of the PSO Levy specified in paragraph 6, suppliers to eligible customers using Virtual Independent Power Producer sourced electricity shall include on every invoice in respect of the PSO Levy the following description of the PSO Levy:

“PUBLIC SERVICE OBLIGATIONS LEVY

This public service obligations levy relates to the purchase by ESB of the output of certain peat generated electricity, in the interests of security of supply, and the output of certain generating stations using renewable sustainable or alternative forms of energy, in the interests of environmental protection, in accordance with a Public Service Obligations Order made by the Minister for Public Enterprise. The cost of purchase by [name of independent supplier] of these sources of electricity was included in electricity bills issued by [name of independent supplier] prior to the introduction of the PSO Levy and therefore, an appropriate adjustment has been made to this invoice to separately identify the PSO Levy, on a basis approved by the Commission for Energy Regulation.”.

9.

Each supplier shall account for and pay to the distribution system operator all amounts invoiced in respect of the PSO Levy to final customers connected to the distribution system but after having deducted the expenses referred to at paragraph 13, and the amount collected from final customers shall be paid to the distribution system operator no less frequently than within 2 months of invoicing the final customer concerned, on dates to be determined by the Commission.

10.

Each supplier shall account for and pay to the transmission system operator all amounts invoiced in respect of the PSO Levy to final customers connected to the transmission system but after having deducted the expenses referred to at paragraph 13, and the amount collected from final customers shall be paid to the transmission system operator no less frequently than within 2 months of invoicing the final customer concerned, on dates to be determined by the Commission.

11.

The distribution system operator shall account for and pay to the transmission system operator all amounts received by it from suppliers pursuant to paragraph 9, but after having deducted the expenses referred to at paragraph 14, and the amount collected shall be paid to the transmission system operator within one month of receipt of such monies on dates to be determined by the Commission.

12.

The transmission system operator shall account for and pay to the Board all amounts received by it from suppliers and the distribution system operator pursuant to paragraphs 10 and 11, but after having deducted the expenses referred to at paragraph 15, and the amount collected shall be paid to the Board within one month of receipt of monies from the distribution system operator and suppliers, on dates to be determined by the Commission.

13.

Each supplier shall be entitled to deduct from the amounts to be paid to the distribution system operator and the transmission system operator, as the case may be, pursuant to paragraphs 9 and 10 an amount equal to the administrative expenses estimated or determined by the Commission as incurred in complying with its duties as a collector and the amount so deducted shall form part of the calculation of the PSO Levy specified in Article 8 (1).

14.

The distribution system operator shall be entitled to deduct from the amounts to be paid to the transmission system operator pursuant to paragraph 11 an amount equal to the administrative expenses estimated or determined by the Commission as incurred in complying with its duties as a collector, and the amounts so deducted shall form part of the calculation of the PSO Levy specified in Article 8 (1).

15.

The transmission system operator shall be entitled to deduct from the amounts to be paid to the Board pursuant to paragraph 12 an amount equal to its administrative expenses estimated or determined by the Commission as incurred in complying with its duties as a collector, and the amounts so deducted shall form part of the calculation of the PSO Levy specified in Article 8 (1).

16.

Where a supplier has paid to the distribution system operator or the transmission system operator, as the case may be, an amount in respect of the PSO Levy invoiced to a final customer and the supplier has not received payment of that amount or a part of that amount, then where the supplier satisfies the Commission that all necessary steps have been taken to recover such amount and that the amount is nonetheless irrecoverable or unlikely to ever be recovered by the supplier the Commission shall issue a certificate to that effect and the supplier shall thereupon be entitled to treat the amount concerned as an administrative expense referred to in Article 9.

17.

Where a supplier, the distribution system operator or the transmission system operator has instituted legal proceedings to recover monies which it is entitled to recover and which include the PSO Levy and

then the legal costs (assessed on a solicitor and client basis) incurred by the person instituting those proceedings shall be treated as an administrative expense of that person in the same proportion that the PSO Levy bears to the sum recovered or adjudged to be due to the extent that the legal costs are not otherwise recovered.

18.

Where the amount of an invoice relating to the supply of electricity is partly paid by a final customer the PSO Levy shall be treated as partly paid in the same proportion as the payment bears to the total amount of the invoice (excluding Value Added Tax).

Given under my Official Seal, 23 May 2002.
[image omitted]
MARY O'ROURKE Minister for Public Enterprise.

EXPLANATORY NOTE

(This note is not part of the Instrument and does not purport to be a legal interpretation).

The Electricity Regulation Act 1999 (Public Service Obligations) Order 2002 (PSO Order provides for the imposition on ESB of public service obligations which will require ESB to purchase, up until 31 December 2019, the output of certain peat and renewable, sustainable or alternative electricity generating stations, in the interests of security of supply and environmental protection respectively.

The PSO Order provides for the introduction of a PSO levy mechanism to compensate ESB for the additional costs incurred in complying with these public service obligations. The Order allocates the PSO levy among final customers of electricity on the basis of the maximum import capacity of 3 separate categories of electricity accounts. The PSO Order specifies the role of the CER and the collection and other duties of suppliers, the distribution system operator and the transmission system operator.

This document does not substitute the official text published in the Irish Statute Book. We accept no responsibility for any inaccuracies arising from the transcription of the original into this format.

This text is published under Irish Statute Book's own terms of reuse, not a Legalize or public-domain licence. Irish Statute Book
CC-BY 4.0 (Oireachtas Open Data PSI Licence)
Contains Irish Public Sector Information licensed under the Oireachtas (Houses of the Oireachtas) Open Data PSI Licence / Creative Commons Attribution 4.0 International, sourced from https://www.irishstatutebook.ie.