STATUTORY INSTRUMENTS

S.I. No. 596 of 2006

Railway (Kildare Route Project) Order 2006

ARRANGEMENT OF ARTICLES

PART I PRELIMINARY PART I PRELIMINARY
Article. Article.
1. Citation
2. Interpretation
3. Incorporation of enactments
PART 2 WORKS AND RELATED PROVISIONS PART 2 WORKS AND RELATED PROVISIONS
4. Construction of Railway and Railway works
5. Discharge of water
6. Deviation
7. Closure of roads - permanent and temporary.
8 . Power to alter public roads
9. Construction of new roads
10. Tree lopping
PART 3 ACQUISITION AND POSSESSION OF LAND AND RIGHTS PART 3 ACQUISITION AND POSSESSION OF LAND AND RIGHTS
11. Power to acquire land
12. Power to temporarily possess and occupy land
13. Acquisition of easements and other rights over land
14. Extinguishment of rights, including rights of Way and temporary interference with rights
15. Period within which the Railway Undertaking may compulsorily acquire land and interests in land
PART 4 MISCELLANEOUS AND GENERAL PART 4 MISCELLANEOUS AND GENERAL
16. Interference with apparatus
17. Arbitration

SCHEDULE 1 The Railway and Railway Works authorised by this Order.

SCHEDULE 2 Land which may be acquired

SCHEDULE 3 Roads to be closed permanently.

SCHEDULE 4 Roads to be closed temporarily.

SCHEDULE 5 Roads to be altered.

SCHEDULE 6 New roads to be constructed

SCHEDULE 7 Land over which rights including rights of way and other rights and easements are to be acquired

SCHEDULE 8 Part 1. Public rights to be extinguished

Part 2. Private rights to be extinguished

SCHEDULE 9 Public and Private Rights of way to be temporarily interrupted

SCHEDULE 10 Land of which temporary possession is to be taken

SCHEDULE 11 Conditions attached to the Order

SCHEDULE 12 Agreements reached with the Railway Undertaking

I, Martin Cullen, Minister for Transport, in exercise of the powers conferred on me by section 43 of the Transport (Railway Infrastructure) Act 2001 (No. 55 of 2001) (as adapted by the Public Enterprise (Alteration of Name of Department and Title of Minister) Order 2002 ( S.I. No. 305 of 2002 )) having considered an application by Córas Iompair Éireann for a railway order to authorise railway works affecting the Dublin-Cork railway line between Inchicore Depot, Dublin, and Cherryville Junction, County Kildare, the draft order, the plans of the proposed railway works and the book of reference to those plans, and the Environmental Impact Statement that accompanied the said application, the Report of the Public Inquiry duly held and the recommendations contained therein, the submissions duly made to me under section 40 of the said Act and not withdrawn, and being of opinion that the said application should be granted, and being also of the opinion that the rights in over or under public roads specified in this Order with the consent of the Minister for the Environment, Heritage and Local Government are necessary for giving effect to this Order hereby order as follows:-

PART 1 PRELIMINARY

Citation

1.

This Order may be cited as the Transport (Railway Infrastructure) Act 2001 , (Kildare Route Project) Order 2006.

Interpretations

2.

In this Order -

“Act of 1961” means the Road Traffic Act 1961 (No. 24 of 1961);

“Act of 1993” means the Roads Act 1993 (No. 14 of 1993;

“Act of 1994” means the Road Traffic Act 1994 (No. 7 of 1994);

“Act of 2000” means the Planning and Development Act 2000 (No. 30 of 2000);

“Act of 2005” means the Railway Safety Act 2005 (No. 31 of 2005);

“apparatus” includes any sub-station, inspection chamber, junction box, booster station, pipe, sewer, drain, duct, tunnel, conduit, wire, cable, fibre, insulator, and such other thing as may be used by a utility for or in connection with the provision of a service to the public.

“construct” includes build, make, put together, erect, create, form, and assemble, and cognate works shall be construed accordingly.

“Deposited Plan” means the copy of the plan deposited together with this Order pursuant to section 46 of the Principal Act;

“execute” includes construct, maintain and improve;

“land” has the meaning assigned to it by the Act of 2000;

“local authority” has the meaning assigned to it by the Act of 1993;

“maintain” includes inspect, repair, adjust, alter, remove, reconstruct, renew and replace;

“mechanical power” includes electrical and any other motive power;

“Minister” means the Minister for Transport;

“planning authority” has the meaning assigned to it by the Act of 2000;

“Principal Act” means the Transport (Railway Infrastructure) Act 2001 (No.55 of 2001) as amended by the Railway Safety Act 2005 (No. 31 of 2005);

“public road” has the meaning assigned to it by the Act of 1993 and includes any road which becomes a public road during the currency of this Order;

“railway” means a railway or part of a railway for which railway works are authorised by this Order;

“Railway Undertaking” means Córas Iompair Éireann, or where the context so requires or admits, a person with whom Córas Iompair Éireann has made an arrangement under section 43 (6) of the Principal Act;

“Railway Order” means an order made under section 43 of the Principal Act;

“reconstruct” means wholly or partly rebuild, re-erect, re-create, reform, reassemble, repair, restore, replace or alter;

“road” has the interpretation assigned to it by the Act of 1993;

“road authority” has the meaning assigned to it by the Act of 1993;

“substratum of land” means any subsoil or anything beneath the surface of the land required for any purpose connected with this Order;

“Undertaker” means any person or body with power and authority in relation to apparatus to relocate or cause it to be relocated as provided for in Article 16;

“works” includes railway works as defined in the Principal Act and the doing, making laying down, placing, erection, maintenance, operation and use of anything deemed necessary or desirable for or in connection with the construction, operation, maintenance efficiency, safety and security of a railway and authorised expressly or by necessary implication by this Order.

Incorporation of enactments

3.

(1) The Regulation of Railways Acts 1840 to 1893 and any other Act relating to railways shall apply to the railway works authorised by this Order so far as they are applicable for the purposes of and are not inconsistent with or varied by the provisions of this Order, and the Principal Act together with the Order shall be deemed to be the Special Act for the purposes of those enactments.

Construction of Railway and Railway Works

4.

(1) Subject to the provisions of this Order, the Railway Undertaking may, on the lines, in the places, and according to the levels shown on the deposited map, execute and operate the railway and railway works specified in Schedule 1 and all other works of things necessary or ancillary thereto subject to the conditions (including the conditions set out in Schedule 11) and requirements specified in this Order.

Discharge of Water

5.

(1) The Railway Undertaking may alter the level or the course of, or make use of for the drainage of water, any surface watercourse or any sewer or drain and may construct provide and use any underground or overground tanks or pipes to assist in such drainage in connection with the construction maintenance or operation of the railway works and for that purpose may make any convenient connections with any such surface watercourse, sewer or drain, subject, however, to the following provisions:

(c ) should any dispute occur in relation to any of the provisions of this Article between the Railway Undertaking and the sanitary authority such dispute shall be referred to arbitration in accordance with the provisions of Article 17 of this order.

Deviation.

6.

(1) In executing any of the railway works authorised by this Order, the Railway Undertaking may deviate horizontally from the line delineated on the deposited plans provided that no such deviation shall extend to a greater distance than the limits of deviation delineated on the said plans.

Closure of roads (permanent and temporary).

7.

(1) The Railway Undertaking may, for the purpose of executing the railway works authorised by this Order or for any purpose incidental thereto, from time to time request a road authority by order to close permanently the roads specified in Schedule 3 to traffic and to close temporarily any one or more of the public roads specified in Schedule 4 to traffic and the following provisions shall apply in relation to such a request:

Power to alter public roads.

8.

(1) Subject to paragraph (2), the Railway Undertaking may, in accordance with the deposited plans, execute the following works in relation to the public roads specified in Schedule 5:

and in connection therewith, the Railway Undertaking may take such steps and do all things necessary or incidental thereto.

Construction of new roads.

9.

(1) The Railway Undertaking may, with the consent of the relevant road authority (which shall not be unreasonably withheld or delayed), construct the new roads specified in Schedule 6 either by way of alteration of, diversion from or in substitution for an existing public road or as an additional public road and in connection therewith the Railway Undertaking may execute such works, take such steps and do all things necessary or incidental thereto.

Tree lopping.

10.

(1) The Railway Undertaking may lop, remove or cut any tree, shrub or hedge that obstructs or interferes with any railway works authorised by this Order.

PART 3 ACQUISITION AND POSSESSION OF LAND AND RIGHTS

Power to acquire land

11.

(1) Subject to the Principal Act, the Railway Undertaking may acquire compulsorily all or such part of the land and any substratum of land shown on the deposited plan and described in Schedule 2 and the rights in under or over land described in Schedule 7 as the Railway Undertaking may require for the execution and operation of the railway and railway works authorised by this Order and any works necessary, incidental or ancillary thereto.

Power to temporarily possess and occupy land

12.

(1) Subject to the Principal Act, the Railway Undertaking may enter upon and take up and retain temporary possession and occupation of the land, or any part of the land, shown on the deposited plan and specified in Schedule 10.

and for those purposes may construct thereon, demolish or remove therefrom any structures cut and, if necessary, remove anything found or growing on such land or any part thereof and generally carry out any works, take any steps and do all things to, on, in, beneath, over and with such land as may be required to adapt them for or to facilitate the execution of those works.

Acquisition of easements and other rights over land.

13.

Subject to the Principal Act, the Railway Undertaking may acquire compulsorily such rights over all or part of the land described in Schedule 7 as may be required for the purposes of the Railway or the railway works authorised by this Order.

Extinguishment of rights, including rights of way and temporary interference with rights.

14.

(1) The Railway Undertaking may extinguish the public rights including the rights of way specified in Part 1 of Schedule 8.

Period within which the Railway Undertaking may compulsorily acquire land and interests in land.

15.

(1) The powers conferred by this Order to acquire compulsorily land or rights in relation to land and to enter upon and take up temporary possession of land shall cease at the end of the period of 7 years beginning on the day upon which this Order comes into force.

PART 4 MISCELLANEOUS AND GENERAL

Interference with apparatus

16.

(1) Wherever the Railway Undertaking is authorised to execute works by virtue of this Order, and any apparatus will or may be affected in consequence thereof, the following shall apply:

Arbitration.

17.

(1) Should any dispute arise between the Railway Undertaking and any other party in relation to the execution of railway works authorised by or the powers or provisions granted by or contained in this Order, the following shall apply:

SCHEDULE 1 Description of the Railway and Railway Works Authorised by this Order

This document does not substitute the official text published in the Irish Statute Book. We accept no responsibility for any inaccuracies arising from the transcription of the original into this format.

This text is published under Irish Statute Book's own terms of reuse, not a Legalize or public-domain licence. Irish Statute Book
CC-BY 4.0 (Oireachtas Open Data PSI Licence)
Contains Irish Public Sector Information licensed under the Oireachtas (Houses of the Oireachtas) Open Data PSI Licence / Creative Commons Attribution 4.0 International, sourced from https://www.irishstatutebook.ie.