S.I. No. 788/2007 - Sea Pollution (Prevention of Oil Pollution) Regulations 2007

Type Statutory Instrument
Publication 2007-12-07
Last updated 2018-07-06
State In force superseded text
Text As published
articles 40

This is the act as published. Later amendments are not folded into the text below: each one is a separate act in this repository and an entry in this law's history.

8 amending acts · 2018-07-06, S.I. No. 236/2018 - Sea Pollution (Prevention of Oil Pollution) (Amendment) Regulations 2018

Reform history JSON API

ARRANGEMENT OF REGULATIONS

PART 1 General

1.

1.

Citation and commencement

2.

2.

Interpretation

3.

3.

Application

4.

4.

Exemptions and waivers

5.

5.

Equivalents and measurements

PART 2 Surveys and certification

6.

6.

Surveys

7.

7.

Issue or endorsement of IOPP Certificate

8.

8.

Issue or endorsement of IOPP Certificate by another Government

9.

9.

Form of IOPP Certificate

10.

10.

Duration and validity of IOPP Certificate

11.

11.

Port State Control on operational requirements

PART 3 Requirements for machinery spaces of all ships

Chapter 1 Construction

12.

12.

Tanks for oil residues (sludge)

13.

13.

Oil fuel tank protection

14.

14.

Standard discharge connection

Chapter 2 Equipment

15.

15.

Oil filtering equipment

Chapter 3 Control of operational discharge of oil

16.

16.

Control of discharge of oil (Part 3)

17.

17.

Segregation of oil and water ballast and carriage of oil in forepeak tanks

18.

18.

Oil Record Book, Part I — Machinery space operations

PART 4 Requirements for the cargo area of oil tankers

Chapter 1 Construction

19.

19.

Segregated ballast tanks

20.

20.

Double hull and double bottom requirements for oil tankers delivered on or after 6 July 1996

21.

21.

Double hull and double bottom requirements for oil tankers delivered before 6 July 1996

22.

22.

Pump-room bottom protection

23.

23.

Accidental oil outflow performance

24.

24.

Damage assumptions

25.

25.

Hypothetical outflow of oil

26.

26.

Limitation of size and arrangement of cargo tanks

27.

27.

Intact stability

28.

28.

Subdivision and stability

29.

29.

Slop tanks

30.

30.

Pumping, piping and discharge arrangement

Chapter 2 Equipment

31.

31.

Oil discharge monitoring and control system

32.

32.

Oil/water interface detector

33.

33.

Crude oil washing requirements

Chapter 3 Control of operational discharge of oil in cargo area of oil tankers

34.

34.

Control of discharge of oil (Part 4)

35.

35.

Crude oil washing operations

36.

36.

Oil Record Book, Part II — Cargo/ballast operations

PART 5 Prevention of pollution arising from an oil pollution incident

37.

37.

Shipboard oil pollution emergency plan

PART 6 Reception facilities

38.

38.

Reception facilities.

PART 7 Special requirements for fixed or floating platforms

39.

39.

Special requirements for drilling rigs and other platforms

PART 8 Revocations

40.

40.

Revocations

SCHEDULE 1 List of oils

SCHEDULE 2 Form of International Oil Pollution Prevention Certificate (IOPP Certificate)

SCHEDULE 3 Form of Oil Record Book.

SCHEDULE 4 Figures referred to in Regulations 13 and 20

S.I. No. 788 of 2007

SEA POLLUTION (PREVENTION OF OIL POLLUTION) REGULATIONS 2007

Notice of the making of this Statutory Instrument was published in

“Iris Oifigiúil” of 7th December, 2007.

I, NOEL DEMPSEY, Minister for Transport, in exercise of the powers conferred on me by sections 10 , 11 , 12 , 14 , 15 and 17 of the Sea Pollution Act 1991 (No. 27 of 1991) and the Maritime Transport, Safety and Security (Transfer of Departmental Administration and Ministerial Functions) Order 2005 ( S.I. No. 842 of 2005 ), and for the purpose of giving full effect to Regulation (EC) No. 417 of 2002 of the European Parliament and of the Council of 18 February 2002 1 , and giving effect to Annex I of the MARPOL Convention, hereby make the following regulations:

PART 1 General

Citation

1.

(1) These Regulations may be cited as the Sea Pollution (Prevention of Oil Pollution) Regulations 2007.

  • (2) These Regulations come into operation on the day after they are made.

Interpretation

2.

(1) In these Regulations:

“Act” means the Sea Pollution Act 1991 (No. 27 of 1991);

“amidships” is at the middle of the length (L);

“anniversary date” means the day and the month of each year which will correspond to the date of expiry of the International Oil Pollution Prevention Certificate;

“B” means breadth as defined by this Regulation;

“breadth”, subject to Regulation 13, means the maximum breadth of the ship, in metres, measured amidships to the moulded line of the frame in a ship with a metal shell and to the outer surface of the hull in a ship with a shell of any other material;

“centre tank” means any tank inboard of a longitudinal bulkhead;

“chemical tanker” means a ship constructed or adapted primarily to carry a cargo of noxious liquid substances in bulk;

“clean ballast”, subject to paragraph (2), means the ballast in a tank which since oil was last carried in it, has been cleaned in a manner so that effluent from it, if it were discharged from a ship which is stationary into clean calm water on a clear day, would not produce visible traces of oil on the surface of the water or on adjoining shorelines or cause a sludge or emulsion to be deposited beneath the surface of the water or upon adjoining shorelines;

“combination carrier” means a ship designed to carry either oil or solid cargoes in bulk;

“constructed” means a ship the keel of which is laid or which is at a similar stage of construction;

“crude oil” means any liquid hydrocarbon mixture occurring naturally in the earth whether or not treated to render it suitable for transportation and includes—

  • (a) crude oil from which certain distillate fractions may have been removed, and
  • (b) crude oil to which certain distillate fractions may have been added;

“crude oil tanker” means an oil tanker engaged in the trade of carrying crude oil;

“deadweight” means the difference in metric tonnes between the displacement of a ship in water of a specific gravity of 1.025 at the load waterline corresponding to the assigned summer freeboard and the lightweight of the ship;

“DW” means deadweight as defined by this Regulation;

“en route” means that the ship is under way at sea on a course, or courses, which will, so far as practicable for navigational purposes, cause any discharge to be spread over as great an area of the sea as is reasonably practicable;

“forward and after perpendiculars” shall be read in accordance with Regulation 5(4);

“gas carrier” means a cargo ship constructed or adapted and used for the carriage in bulk of any liquefied gas;

“instantaneous rate of discharge of oil content” means the rate of discharge of oil in litres per hour at any instant divided by the speed of the ship in knots at the same instant;

“IOPP Certificate” means an International Oil Pollution Prevention Certificate;

“International Bulk Chemical Code” means the International Code for the Construction and Equipment of Ships Carrying Dangerous Chemicals in bulk adopted by the Marine Environment Protection Committee of the Organization by resolution MEPC 19(22), as amended by resolution MEPC 40(29) on 16 March, 1990 and as may be amended by the Organization;

“L” means length as defined by this Regulation;

“length”, subject to Regulations 5 and 13, means 96 per cent of the total length on a waterline at 85 per cent of the least moulded depth measured from the top of the keel, or, if it is greater, the length from the foreside of the stem to the axis of the rudder stock on that waterline;

“lightweight” means the displacement of a ship in metric tonnes without cargo, fuel, lubricating oil, ballast water, fresh water and feed water in tanks, consumable stores, and passengers and crew and their effects;

“major conversion” means, subject to Regulation 3(7), a conversion of a ship—

  • (a) which substantially alters the dimensions or carrying capacity of the ship,
  • (b) which changes the type of the ship,
  • (c) the intent of which, in the opinion of the Minister, is, substantially, to prolong its life, or
  • (d) which otherwise so alters the ship that it would become subject to the relevant provisions of the MARPOL Convention not previously applicable to it;

“Marine Notice” means a Notice described as such, issued by the Minister and which may be amended or replaced from time to time;

“MARPOL Convention” means the International Convention for the Prevention of Pollution from Ships, 1973, as amended by the Protocols of 1978 and 1997;

“Minister” means the Minister for Transport;

“nearest land”, in the context of “from the nearest land”, means from the baseline from which the territorial sea of the territory in question is established in accordance with the Convention on the Territorial Sea and the Contiguous Zone 1958 except that, for the purposes of the MARPOL Convention “from the nearest land” off the north-eastern coast of Australia shall mean from a line drawn from a point on the coast of Australia in—

latitude 11°00 S, longitude 142°08 E to a point in latitude 10°35 S, longitude 141°55 E,

thence to a point latitude 10°00 S, longitude 142°00 E,

thence to a point latitude 9°10 S, longitude 143°52 E,

thence to a point latitude 9°00 S, longitude 144°30 E,

thence to a point latitude 10°41 S, longitude 145°00 E,

thence to a point latitude 13°00 S, longitude 145°00 E,

thence to a point latitude 15°00 S, longitude 146°00 E,

thence to a point latitude 17°30 S, longitude 147°00 E,

thence to a point latitude 21°00 S, longitude 152°55 E,

thence to a point latitude 24°30 S, longitude 154°00 E,

thence to a point on the coast of Australia in latitude 24°42 S, longitude 153°15 E;

“oil” means petroleum in any form including crude oil, fuel oil, sludge, oil refuse and refined products (other than those petrochemicals which are subject to the provisions of Annex II of the MARPOL Convention) and, without limiting the generality of the foregoing, includes the substances listed in Schedule 1;

“oil fuel” means any oil used as fuel in connection with the propulsion and auxiliary machinery of the ship in which such oil is carried;

“oil record book” means a book used to record the operations specified in Regulations 18 and 36 in the form specified in Schedule 3;

“oil tanker” means a ship constructed or adapted primarily to carry oil in bulk in its cargo spaces and includes combination carriers and any “chemical tanker” or gas carrier when it is carrying a cargo or part cargo of oil in bulk;

“oil tanker delivered on or before 1 June 1982” means an oil tanker—

  • (a) for which the building contract is placed on or before 1 June 1979,
  • (b) in the absence of a building contract, the keel of which is laid or which is at a similar stage of construction on or before 1 January 1980,
  • (c) the delivery of which is on or before 1 June 1982, or
  • (d) which has undergone a major conversion—
  • (i) for which the contract is placed on or before 1 June 1979,
  • (ii) in the absence of a contract, the construction work of which is begun on or before 1 January 1980, or
  • (iii) which is completed on or before 1 June 1982;

“oil tanker delivered after 1 June 1982” means an oil tanker—

  • (a) for which the building contract is placed after 1 June 1979,
  • (b) in the absence of a building contract, the keel of which is laid or which is at a similar stage of construction after 1 January 1980,
  • (c) the delivery of which is after 1 June 1982, or
  • (d) which has undergone a major conversion—
  • (i) for which the contract is placed after 1 June 1979,
  • (ii) in the absence of a contract, the construction work of which is begun after 1 January 1980, or
  • (iii) which is completed after 1 June 1982;

“oil tanker delivered before 6 July 1996” means an oil tanker—

  • (a) for which the building contract is placed before 6 July 1993,
  • (b) in the absence of a building contract, the keel of which is laid or which is at a similar stage of construction before 6 January 1994,
  • (c) the delivery of which is before 6 July 1996, or
  • (d) which has undergone a major conversion—
  • (i) for which the contract is placed before 6 July 1993,
  • (ii) in the absence of a contract, the construction work of which is begun before 6 January 1994, or
  • (iii) which is completed before 6 July 1996;

“oil tanker delivered on or after 6 July 1996” means an oil tanker—

  • (a) for which the building contract is placed on or after 6 July 1993,
  • (b) in the absence of a building contract, the keel of which is laid or which is at a similar stage of construction on or after 6 January 1994,
  • (c) the delivery of which is on or after 6 July 1996, or
  • (d) which has undergone a major conversion—
  • (i) for which the contract is placed on or after 6 July 1993,
  • (ii) in the absence of a contract, the construction work of which is begun on or after 6 January 1994, or
  • (iii) which is completed on or after 6 July 1996;

“oil tanker delivered on or after 1 February 2002” means an oil tanker—

  • (a) for which the building contract is placed on or after 1 February 1999,
  • (b) in the absence of a building contract, the keel of which is laid or which is at a similar stage of construction on or after 1 August 1999,
  • (c) the delivery of which is on or after 1 February 2002, or
  • (d) which has undergone a major conversion—
  • (i) for which the contract is placed on or after 1 February 1999,
  • (ii) in the absence of a contract, the construction work of which is begun on or after 1 August 1999, or
  • (iii) which is completed on or after 1 February 2002;

“oil tanker delivered on or after 1 January 2010” means an oil tanker—

  • (a) for which the building contract is placed on or after 1 January 2007,
  • (b) in the absence of a building contract, the keel of which is laid or which is at a similar stage of construction on or after 1 July 2007,
  • (c) the delivery of which is on or after 1 January 2010, or
  • (d) which has undergone a major conversion—
  • (i) for which the contract is placed on or after 1 January 2007,
  • (ii) in the absence of a contract, the construction work of which is begun on or after 1 July 2007, or
  • (iii) which is completed on or after 1 January 2010;

“oily mixture” means a mixture with any oil content;

“Organization” means the International Maritime Organization;

“parts per million” means parts of oil per million parts of water by volume;

“Party” means a state which has ratified the MARPOL Convention;

“permeability” of a space means the ratio of the volume within that space which is assumed to be occupied by water to the total volume of that space;

“product carrier” means an oil tanker engaged in the trade of carrying oil other than crude oil;

“qualified person” means a surveyor of ships or a recognised organisation;

“recognised organisation” means an organisation recognised by the Commission of the European Communities under Article 4 of Council Directive 94/57/EC 2 , as amended, and by the Minister under European Communities (Ship Inspection and Survey Organisations) Regulation, 2003 ( S.I. No. 301 of 2003 );

“segregated ballast” means the ballast water introduced into a tank which is completely separated from the cargo oil and oil fuel system and which is permanently allocated to the carriage of ballast or to the carriage of ballast or cargoes other than oil or noxious liquid substances;

“ship delivered on or before 31 December 1979” means a ship—

  • (a) for which the building contract is placed on or before 31 December 1975,
  • (b) in the absence of a building contract, the keel of which is laid or which is at a similar stage of construction on or before 30 June 1976,
  • (c) the delivery of which is on or before 31 December 1979, or
  • (d) which has undergone a major conversion—
  • (i) for which the contract is placed on or before 31 December 1975,
  • (ii) in the absence of a contract, the construction work of which is begun on or before 30 June 1976, or
  • (iii) which is completed on or before 31 December 1979;

“ship delivered after 31 December 1979” means a ship—

  • (a) for which the building contract is placed after 31 December 1975,
  • (b) in the absence of a building contract, the keel of which is laid or which is at a similar stage of construction after 30 June 1976,
  • (c) the delivery of which is after 31 December 1979, or
  • (d) which has undergone a major conversion—
  • (i) for which the contract is placed after 31 December 1975,
  • (ii) in the absence of a contract, the construction work of which is begun after 30 June 1976, or
  • (iii) which is completed after 31 December 1979;

“ship delivered on or after 1 August 2010” means a ship—

  • (a) for which the building contract is placed on or after 1 August 2007,
  • (b) in the absence of a building contract, the keels of which are laid or which are at a similar stage of construction on or after 1 February 2008,
  • (c) the delivery of which is on or after 1 August 2010, or
  • (d) which has undergone a major conversion—
  • (i) for which the contract is placed after 1 August 2007,
  • (ii) in the absence of a contract, the construction work of which is begun after 1 February 2008, or
  • (iii) which is completed after 1 August 2010;

“slop tank” means a tank specifically designated for the collection of tank drainings, tank washings and other oily mixtures;

“special area” means a sea area where for recognised technical reasons in relation to its oceanographical and ecological condition and to the particular character of its traffic the adoption of special mandatory methods for the prevention of sea pollution by oil is required and are defined as follows:

  • (a) “Mediterranean Sea area” means the Mediterranean Sea proper including the gulfs and seas therein with the boundary between the Mediterranean and the Black Sea constituted by the 41°N parallel and bounded to the west by the Straits of Gibraltar at the meridian of 5°36 W;
  • (b) “Baltic Sea area” means the Baltic Sea proper with the Gulf of Bothnia, the Gulf of Finland and the entrance to the Baltic Sea bounded by the parallel of the Skaw in the Skagerrak at 57°44.8N;
  • (c) “Black Sea area” means the Black Sea proper with the boundary between the Mediterranean and the Black Sea constituted by the parallel 41° N;
  • (d) “Red Sea area” means the Red Sea proper including the Gulfs of Suez and Aqaba bounded at the south by the rhumb line between Ras si Ane (12°28.5 N, 43°19.6 E) and Husn Murad (12°40.4 N, 43°30.2 E);
  • (e) “Gulfs area” means the sea area located north-west of the rhumb line between Ras al Hadd (22°30 N, 59°48 E) and Ras Al Fasteh (25°04 N, 61°25 E);
  • (f) “Gulf of Aden area” means that part of the Gulf of Aden between the Red Sea and the Arabian Sea bounded to the west by the rhumb line between Ras si Ane (12°28.5 N, 43°19.6 E) and Husn Murad (12°40.4 N, 43°30.2 E) and to the east by the rhumb line between Ras Asir (11°50 N, 51°16.9 E) and Ras Fartak (15°35 N, 52°13.8 E);
  • (g) “Antarctic area” means the sea area south of latitude 60°S;
  • (h) “North-West European waters” means the area bounded by lines joining at the following points:
  • (i) 48°27 N on the French coast;
  • (ii) 48°27 N; 6°25W;
  • (iii) 49°52 N; 7°44 W;
  • (iv) 50°30 N; 12° W;
  • (v) 56°30 N; 12° W;
  • (vi) 62° N; 3° W;
  • (vii) 62° N on the Norwegian coast;
  • (viii) 57°44.8 N on the Danish and Swedish coasts;

and includes the North Sea and its approaches, the Irish Sea and its approaches, the Celtic Sea, the English Channel and its approaches and part of the North-East Atlantic immediately to the west of Ireland;

  • (i) “Oman area of the Arabian Sea” means the sea area enclosed by the following coordinates:
  • (i) 22°30 N; 59°48 E;
  • (ii) 23°47.27 N; 60°35.73 E;
  • (iii) 22°40.62 N; 62°25.29 E;
  • (iv) 21°47.40 N; 63°22.22 E;
  • (v) 20°30.37 N; 62°52.41 E;
  • (vi) 19°45.90 N; 62°25.97 E;
  • (vii) 18°49.92 N; 62°02.94 E;
  • (viii) 17°44.36 N; 61°05.53 E;
  • (ix) 16°43.71 N; 60°25.62 E;
  • (x) 16°03.90 N; 59°32.24 E;
  • (xi) 15°15.20 N; 58°58.52 E;
  • (xii) 14°36.93 N; 58°10.23 E;
  • (xiii) 14°18.93 N; 57°27.03 E;
  • (xiv) 14°11.53 N; 56°53.75 E;
  • (xv) 13°53.80 N; 56°19.24 E;
  • (xvi) 13°45.86 N; 55°54.53 E;
  • (xvii) 14°27.38 N; 54°51.42 E;
  • (xviii) 14°40.10 N; 54°27.35E;
  • (xix) 14°46.21 N; 54°08.56 E;
  • (xx) 15°20.74 N; 53°38.33 E;
  • (xxi) 15°48.69 N; 53°32.07 E;
  • (xxii) 16°23.02 N; 53°14.82 E;
  • (xxiii) 16°39.06 N; 53°06.52 E.

“surveyor” means a surveyor of ships or other competent person appointed under section 20 of the Act for the purposes of section 17 of the Act;

“tank” means an enclosed space which is formed by the permanent structure of a ship and which is designed for the carriage of liquid in bulk;

“volumes” and “areas” in a ship shall be calculated in all cases to moulded lines;

“wing tank” means any tank adjacent to the side shell plating.

  • (2) If ballast is discharged through an approved oil discharge monitoring and control system, evidence based on such a system to the effect that the oil content of the effluent did not exceed 15 parts per million shall be determinative that the ballast was clean, notwithstanding the presence of visible traces.
  • (3) Any reference in these Regulations to standards and guidelines developed by the Organization, shall include a reference to any document amending those standards and guidelines which is considered by the Minister to be relevant from time to time and is specified in a Marine Notice.
  • (4) A reference in a form set out in Schedule 2 or 3 to a regulation is to a regulation of the MARPOL Convention.

Application

3.

(1) Unless expressly provided otherwise, these Regulations apply to all ships.

  • (2) In ships, other than oil tankers, fitted with cargo spaces which are constructed and utilised to carry oil in bulk of an aggregate capacity of 200 cubic metres or more, the requirements of Regulations 17, 26(4), 29, 30, 31, 32, 34 and 36 for oil tankers shall also apply to the construction and operation of these spaces, except that where such aggregate capacity is less than 1,000 cubic metres the requirements of Regulation 34(6) may apply in lieu of Regulation 29, 31 and 32.
  • (3) Where a cargo subject to the provisions of Annex II of the MARPOL Convention is carried in a cargo space of an oil tanker, the appropriate requirements of Annex II of the MARPOL Convention shall also apply.
  • (4) The requirements of Regulations 29, 31 and 32 shall not apply to oil tankers carrying asphalt or other products subject to the provisions of these Regulations, which through their physical properties inhibit effective product/water separation and monitoring, for which the control of discharge under Regulation 34 shall be effected by the retention of residues on board with discharge of all contaminated washings to reception facilities.
  • (5) Subject to paragraph (6) of this Regulation, paragraphs (6), (7) and (8) of Regulation 19 do not apply to an oil tanker delivered on or before 1 June 1982 that is solely engaged in specific trades between—
  • (a) ports or terminals within the State or a Party, or
  • (b) ports or terminals of Parties, where—
  • (i) the voyage is entirely within a Special Area, or
  • (ii) the voyage is entirely within other limits designated by the Organization.
  • (6) Paragraph (5) applies only when the ports or terminals where cargo is loaded on such voyages are provided with reception facilities adequate for the reception and treatment of all the ballast and tank washing water from oil tankers using them and all the following conditions are complied with:
  • (a) subject to the exceptions provided for in section 11 of the Act, all ballast water, including clean ballast water, and tank washing residues are retained on board and transferred to the reception facilities and the appropriate entry in the Oil Record Book Part II referred to in Regulation 36 is endorsed by the competent Port State authority;
  • (b) agreement has been reached between the State and the Governments of the Port States to which subparagraph (a) or (b) of paragraph (5) relates, concerning the use of an oil tanker delivered on or before 1 June 1982 for a specific trade;
  • (c) the adequacy of the reception facilities (in accordance with any Regulations relating to reception facilities) at the ports or terminals referred to in paragraph (5), have been approved by the State and the Governments of the Parties within which such ports or terminals are situated;
  • (d) the IOPP Certificate is endorsed to the effect that the oil tanker is solely engaged in such specific trade.
  • (7) Notwithstanding the definition of “major conversion”—
  • (a) conversion of an oil tanker of 20,000 tonnes deadweight and above delivered on or before 1 June 1982 to meet the requirements of Regulation 19 shall not be deemed to constitute a major conversion for the purposes of these Regulations,
  • (b) conversion of an oil tanker delivered before 6 July 1996 to meet the requirements of Regulation 20 or 21 shall not be deemed to constitute a major conversion for the purpose of these Regulations.

Exemptions and waivers

4.

(1) Any ship, including a hydrofoil, air-cushion vehicle, near-surface craft and submarine craft, whose constructional features are such as to render the application of any of the provisions of Parts 3 and 4 relating to construction and equipment unreasonable or impracticable, may be exempted by the Minister from such provisions, but only if the construction and equipment of that ship provides equivalent protection against pollution by oil, having regard to the service for which it is intended.

  • (2) Particulars of any exemption granted by the Minister under paragraph (1) shall be indicated in the Certificate referred to in Regulation 7.
  • (3) The Minister may waive the requirements of Regulations 29, 31 and 32, for any oil tanker which engages exclusively on voyages both of 72 hours or less in duration and within 50 miles from the nearest land, but only if the oil tanker is engaged exclusively in trades between ports or terminals within the State. Any such waiver shall be subject to the requirement that the oil tanker shall retain on board all oily mixtures for subsequent discharge to reception facilities and to the determination by the Minister that facilities available to receive such oily mixtures are adequate.
  • (4) The Minister may waive compliance with the requirements of Regulations 31 and 32 for oil tankers other than those referred to in paragraph (3) in cases where—
  • (a) the tanker is an oil tanker delivered on or before 1 June 1982 of 40,000 tonnes deadweight or above, as referred to in Regulation 3(5), engaged in specific trades, and the conditions specified in Regulation 3(6) are complied with, or
  • (b) the tanker is engaged exclusively in one or more of the following categories of voyages:
  • (i) voyages within special areas;
  • (ii) voyages within 50 miles from the nearest land outside special areas where the tanker is engaged in—
  • (I) trades between ports or terminals of the State, or
  • (II) restricted voyages as determined by the Minister and of 72 hours or less in duration;

but only if the following conditions are complied with in every relevant case:

  • (A) all oily mixtures are retained on board for subsequent discharge to reception facilities;
  • (B) for voyages specified in subparagraph (II), the Minister has determined that adequate reception facilities are available to receive such oily mixtures in those oil loading ports or terminals the tanker calls at;
  • (C) the IOPP Certificate, when required, is endorsed to the effect that the ship is exclusively engaged in one or more or the categories of voyages specified in subparagraphs (i) and (ii)(II); and
  • (D) the quantity, time, and port of the discharge are recorded in the Oil Record Book.

Equivalents and measurements

5.

(1) A fitting, material, appliance or apparatus may be fitted in a ship as an alternative to that required by these Regulations if a qualified person is satisfied that such fitting, material, appliance or apparatus is at least as effective as that required by these Regulations, but shall not permit the substitution of operational methods to control the discharge of oil as being equivalent to those design and construction features which are prescribed by these Regulations.

  • (2) For the purposes of these Regulations, the length of ships shall be measured in metres.
  • (3) For the purposes these Regulations, in ships designed with a rake of keel, the waterline on which length is measured shall be parallel to the designed waterline.
  • (4) For the purposes of these Regulations, forward and after perpendiculars shall be taken at the forward and after ends of the length (L). The forward perpendicular shall coincide with the foreside of the stem on the waterline on which the length is measured.

PART 2 Surveys and certification

Surveys

6.

(1) Every oil tanker registered in the State of 150 gross tonnage and above, and every other ship registered in the State of 400 gross tonnage and above shall be subject to the following surveys:

  • (a) an initial survey made—
  • (i) before the ship is put into service, or
  • (ii) before the IOPP Certificate required under Regulation 7 is issued for the first time, which shall include a complete survey of its structure, equipment, systems, fittings, arrangements and material in so far as the ship is covered by these Regulations;

and this survey shall be such as to ensure that the structure, equipment, systems, fittings, arrangements and material fully comply with the applicable requirements of these Regulations;

  • (b) a renewal survey made at intervals specified by the Minister, but not exceeding 5 years, except where paragraph (2)(ii), (5), (6) or (7) of Regulation 10 is applicable; this survey shall be such as to ensure that the structure, equipment, systems, fittings, arrangements and material fully comply with applicable requirements of these Regulations;
  • (c) an intermediate survey made—
  • (i) within 3 months before or after the second anniversary date, or
  • (ii) within 3 months before or after the third anniversary date,

of the IOPP Certificate which shall take the place of one of the annual surveys specified in subparagraph (d); this survey shall be such as to ensure that the equipment and associated pump and piping systems, including oil discharge monitoring and control systems, crude oil washing systems, oily-water separating equipment and oil filtering systems, fully comply with the applicable requirements of these Regulations and are in good working order and be endorsed by the surveyor on the IOPP Certificate issued under Regulation 7 or 8;

  • (d) an annual survey made within 3 months before or after each anniversary date of the IOPP Certificate, including a general inspection of the structure, equipment, systems, fittings, arrangements and material referred to in subparagraph (a) to ensure that they have been maintained in accordance with paragraphs (4) and (5) and that they remain satisfactory for the service for which the ship is intended; each such survey shall be endorsed by the surveyor on the IOPP Certificate issued under Regulation 7 or 8;
  • (e) an additional survey either general or partial, according to the circumstances, shall be carried out after a repair resulting from investigations prescribed in paragraph (6), or whenever any important repairs or renewals are made; such a survey shall be made so as to ensure that the necessary repairs or renewals have been effectively made, that the material and workmanship of such repairs or renewals are in all respects satisfactory and that the ship complies in all respects with the requirements of these Regulations.
  • (2) Ships that are not subject to paragraph (1) shall comply with such measures as may be determined by the Minister in order to ensure that the applicable provisions of these Regulations are complied with.
  • (3)
  • (a) Surveys of ships as regards the enforcement of the provisions of these Regulations shall be carried out by a qualified person.
  • (b) The Minister in nominating a qualified person to conduct surveys for the purpose of paragraph (3)(a) shall, as a minimum, empower any qualified person to—
  • (i) require repairs to a ship, and
  • (ii) carry out surveys, if requested by the appropriate authorities of a port State.
  • (c) Where the qualified person is a recognised organisation, any function under these Regulations (including the carrying out of a survey) may be performed only in respect of a ship flying the flag of the State.
  • (d) (i) Where a qualified person determines that the condition of the ship or its equipment does not correspond substantially with the particulars of the Certificate or is such that the ship is not fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment, he or she shall immediately ensure that corrective action is taken and in due course notify the Minister.
  • (ii) If such corrective action is not taken, the Minister shall be notified immediately and the Certificate shall be withdrawn by the Minister.
  • (iii) If the ship is in a port of another Party, the appropriate authorities of that Party shall also be notified immediately.
  • (4) The condition of the ship and its equipment shall be maintained to conform with the provisions of these Regulations so as to ensure that the ship in all respects will remain fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment.
  • (5) After any survey of the ship under paragraph (1) has been completed, no change shall be made in the structure, equipment, systems, fittings, arrangements or material covered by the survey, without the sanction of the Minister, except the direct replacement of such equipment and fittings.
  • (6) Whenever an accident occurs to a ship or a defect is discovered which substantially affects the integrity of the ship or the efficiency or completeness of its equipment covered by these Regulations, the master or owner of the ship shall report at the earliest opportunity to the Minister and qualified person responsible for issuing the relevant Certificate, who shall cause investigations to be initiated to determine whether a survey under this Regulation is necessary. If the ship is in a port of another Party the master or owner shall also report immediately to the appropriate authorities of the port State, and the Minister and qualified person concerned shall ascertain that such report has been made.
  • (7) The Minister shall, upon receipt of an application for survey and on payment of such fee (if any) as may be prescribed by him or her under section 17 of the Act, cause the ship to be surveyed by a surveyor of ships.

Issue or endorsement of IOPP Certificate

7.

(1) On receipt of a declaration of survey carried out in accordance with Regulation 6 and on payment of such fee (if any) as may be prescribed, a person authorised by the Minister shall issue an IOPP Certificate to any oil tanker of 150 gross tonnage and above and any other ships of 400 gross tonnage and above which are engaged in voyages to ports or offshore terminals under the jurisdiction of other Parties.

  • (2) Such certificate may alternatively be issued or endorsed, as appropriate, by a recognised organisation authorised by the Minister for this purpose.
  • (3) The owner of a ship specified in paragraph (1) shall ensure that the ship does not proceed to sea unless the IOPP Certificate is in force in relation to it.

Issue or endorsement of IOPP Certificate by another Government

8.

(1) A ship which is entitled to fly the flag of the State may, at the request of the Minister, be surveyed in accordance with the corresponding provisions provided for or laid down by or on behalf of the Government of another Party, and on compliance with the corresponding provisions, be issued with an IOPP Certificate, or where appropriate, have the IOPP Certificate on the ship endorsed.

  • (2) A ship which is entitled to fly the flag of another Party may be surveyed by a surveyor of ships, at the request of the Government of that Party, and, if satisfied that the provisions of these Regulations are complied with, shall cause an IOPP Certificate to be issued to the ship and, where appropriate, endorse or authorise the endorsement of that Certificate on the ship in accordance with these Regulations.

Form of IOPP Certificate

9.

The IOPP Certificate shall be in the form set out in Appendix II to Annex I of the MARPOL Convention, the text of which is, for convenience of reference, set out in Schedule 2.

Duration and validity of IOPP Certificate

10.

(1) An IOPP Certificate shall remain in force for such period, not exceeding 5 years, as a qualified person may determine and specify in the Certificate.

  • (2)
  • (a) Notwithstanding paragraph (1), when the renewal survey is completed within 3 months before the expiry date of the existing IOPP Certificate, the new IOPP Certificate shall be valid from the date of completion of the renewal survey to a date not exceeding 5 years from the date of expiry of the existing IOPP Certificate.
  • (b) When the renewal survey is completed after the expiry date of the existing IOPP Certificate, the new IOPP Certificate shall be valid from the date of completion of the renewal survey to a date not exceeding 5 years from the date of expiry of the existing IOPP Certificate.
  • (c) When the renewal survey is completed more than 3 months before the expiry date of the existing IOPP Certificate, the new IOPP Certificate shall be valid from the date of completion of the renewal survey to a date not exceeding 5 years from the date of completion of the renewal survey.
  • (3) If an IOPP Certificate is issued for a period of less than 5 years, a qualified person may extend the validity of the Certificate beyond the expiry date to the maximum period specified in paragraph (1), provided that the surveys referred to in subparagraphs (d) and (e) of Regulation 6(1) are carried out as appropriate.
  • (4) If a renewal survey has been completed and a new IOPP Certificate cannot be issued or placed on board the ship before the expiry date of the existing IOPP Certificate, a qualified person may endorse that Certificate and such a Certificate shall be accepted as valid for a further period which shall not exceed 5 months from the expiry date.
  • (5) If a ship at the time when an IOPP Certificate expires is not in a port in which it is to be surveyed, the Minister may extend the period of validity of the Certificate but such extension shall be granted only for the purpose of allowing the ship to complete its voyage to the port in which it is to be surveyed, and then only in cases where it appears proper and reasonable to do so. An IOPP Certificate shall not be extended for a period longer than 3 months, and a ship to which an extension is granted shall not, on its arrival in the port in which it is to be surveyed, be entitled by virtue of such extension to leave that port without having a new IOPP Certificate. When the renewal survey is completed, the new IOPP Certificate shall be valid to a date not exceeding 5 years from the date of expiry of the existing IOPP Certificate before the extension was granted.
  • (6) An IOPP Certificate issued to a ship engaged on short voyages which has not been extended under the foregoing provisions of this Regulation may be extended by the Minister for a period of up to one month from the date of expiry stated on it. When the renewal survey is completed, the new Certificate shall be valid to a date not exceeding 5 years from the date of expiry of the existing Certificate before the extension was granted.
  • (7) In such special circumstances as the Minister may determine, a new IOPP Certificate need not be dated from the date of expiry of the existing IOPP Certificate as required by paragraph (2)(b), (5) or (6). In these special circumstances, the new IOPP Certificate shall be valid to a date not exceeding 5 years from the date of completion of the renewal survey.
  • (8) If an annual or intermediate survey is completed before the period specified in Regulation 6, then:
  • (a) the anniversary date shown on the IOPP Certificate shall be amended by endorsement to a date which shall not be more than 3 months later than the date on which the survey was completed;
  • (b) the subsequent annual or intermediate survey required by Regulation 6(1) shall be completed at the intervals prescribed by that Regulation using the new anniversary date;
  • (c) the expiry date may remain unchanged provided one or more annual or intermediate surveys, as appropriate, are carried out so that the maximum intervals between the surveys prescribed by Regulation 6(1) are not exceeded.
  • (9) An IOPP Certificate issued under Regulation 7 or 8 shall cease to be valid in any of the following cases:
  • (a) if the relevant surveys are not completed within the periods specified under Regulation 6(1);
  • (b) if the Certificate is not endorsed in accordance with subparagraphs (d) or (e) of Regulation 6(1);
  • (c) if the ship transfers to the flag of another state.

Port State Control on operational requirements

11.

(1) A ship that is registered in a Party may, when it is in a port within the jurisdiction of the State, be inspected by an officer of the Minister duly authorised by him or her to carry out such inspections if the officer has clear grounds for believing that the master or crew are not familiar with shipboard procedures under these Regulations relating to the prevention of pollution by oil.

  • (2) If, consequent on an inspection of a ship by an officer pursuant to his or her powers under paragraph (1), the officer confirms that the master or crew are not familiar with the procedures referred to in that paragraph, the Minister shall take such steps (which he or she is hereby empowered to take) as will ensure that the ship shall not sail from the port until such time as the master or crew or, as the case may be, both the master and crew have become familiar with those procedures.
  • (3) So much of the procedures specified in Article 5 of the MARPOL Convention as are appropriate shall apply, with any necessary modifications, for the purposes of this Regulation.
  • (4) Nothing in this Regulation shall operate to derogate from the powers and duties of the Minister or any other person under the Act or any Regulations made thereunder.

PART 3 Requirements for machinery spaces of all ships

Chapter 1 Construction

Tanks for oil residues (sludge)

12.

(1) Every ship of 400 gross tonnage and above shall be provided with a tank or tanks of adequate capacity, having regard to the type of machinery and length of voyage, to receive the oily residue (sludges) which cannot be dealt with otherwise in accordance with the requirements of these Regulations such as those resulting from the purification of fuel and lubricating oils and oil leakages in the machinery spaces.

  • (2) Piping to and from sludge tanks shall have no direct connection overboard, other than the standard discharge connection referred to in Regulation 13.
  • (3) In ships delivered after 31 December 1979, such tanks shall be designed and constructed so as to facilitate their cleaning and the discharge of residues to reception facilities. Ships delivered on or before 31 December 1979 shall comply with this requirement as far as is reasonable and practicable.

Oil fuel tank protection

13.

(1) This regulation shall apply to all ships with an aggregate oil fuel capacity of 600 m3 and above which are delivered on or after 1 August 2010, as defined in Regulation 2(1).

  • (2) The application of this Regulation in determining the location of tanks used to carry oil fuel is, where applicable, subject to compliance with Regulation 20.
  • (3) In this Regulation—

“breadth” and “B” mean the maximum breadth of the ship, in metres, measured amidships to the moulded line of the frame in a ship with a metal shell and to the outer surface of the hull in a ship with a shell of any other material;

“breadth” and “BB” mean the greatest moulded breadth of the ship, in metres, at or below the waterline (dB);

“breadth” and “BS” mean the greatest moulded breadth of the ship, in metres, at or below the deepest load line draught (dS);

“C” is the ship’s total volume of oil fuel, including that of the small oil fuel tanks, in m3, at 98 per cent tank filling;

“depth” and “DS” mean the moulded depth, in metres, measured at mid-length to the upper deck at side;

“length” and “L” mean 96 per cent of the total length on a waterline at 85 per cent of the least moulded depth measured from the top of the keel, or the length from the foreside of the stem to the axis of the rudder stock on that waterline, if that be greater. In ships designed with a rake of keel the waterline on which this length is measured shall be parallel to the designed waterline. The length (L) shall be measured in metres;

“light ship draught” is the moulded draught amidships corresponding to the lightweight;

“load line draught” and “ds” mean the vertical distance, in metres, from the moulded baseline at mid-length to the waterline corresponding to the summer freeboard draught to be assigned to the ship;

“oil fuel” means any oil used as fuel oil in connection with the propulsion and auxiliary machinery of the ship in which such oil is carried;

“oil fuel capacity” means the volume of a tank in m3, at 98 per cent filling;

“Oil fuel tank” means a tank in which oil fuel is carried, but excludes those tanks which would not contain oil fuel in normal operation, such as overflow tanks;

“partial load line draught” and “dP” mean the light ship draught, measured in metres, plus 60 per cent of the difference between the light ship draught and the load line draught dS;

“small oil fuel tank” is an oil fuel tank with a maximum individual capacity not greater than 30m3;

“upper deck” means the highest deck to which the watertight transverse bulkheads except aft peak bulkheads extend;

“waterline” and “dB” mean the vertical distance, measured in metres, from the moulded baseline at mid-length to the waterline corresponding to 30 per cent of the depth DS.

  • (4) This Regulation applies to all oil fuel tanks except small oil fuel tanks, but only if the aggregate capacity of such excluded tanks is not greater than 600m3.
  • (5) Individual oil fuel tanks shall not have a capacity of over 2,500m3.
  • (6) For ships, other than self-elevating drilling units, having an aggregate oil fuel capacity of 600m3 and above, oil fuel tanks shall be located above the moulded line of the bottom shell plating nowhere less than the distance h as specified below:

h = B/20m or,

h = 2.0m,

whichever is the lesser. The minimum value of h = 0.76m

In the turn of the bilge area and at locations without a clearly defined turn of the bilge, the oil fuel tank boundary line shall run parallel to the line of the midship flat bottom as shown in Figure 1, which is set out in Schedule 4.

  • (7) For ships having an aggregate oil fuel capacity of 600m3 or more but less than 5,000m3, oil fuel tanks shall be located inboard of the moulded line of the side shell plating, nowhere less than the distance w which, as shown in Figure 2 (set out in Schedule 4), is measured at any cross-section at right angles to the side shell, as specified below:

w = 0.4 + 2.4 C/20,000m

The minimum value of w = 1.0m, however for individual tanks with an oil fuel capacity of less than 500m3 the minimum value is 0.76m.

  • (8) For ships having an aggregate oil fuel capacity of 5,000m3 and over, oil fuel tanks shall be located inboard of the moulded line of the side shell plating, nowhere less than the distance w which, as shown in Figure 2 (set out in Schedule 4), is measured at any cross-section at right angles to the side shell, as specified below:

w = 0.5 + C/20,000m or

w = 2.0m,

whichever is the lesser. The minimum value of w = 1.0m

  • (9) Lines of oil fuel piping located at a distance from the ship’s bottom of less than h, as defined in paragraph (6), or from the ship’s side less than w, as defined in paragraphs (7) and (8) shall be fitted with valves or similar closing devices within or immediately adjacent to the oil fuel tank. These valves shall be capable of being brought into operation from a readily accessible enclosed space the location of which is accessible from the navigation bridge or propulsion machinery control position without traversing exposed freeboard or superstructure decks. The valves shall close in case of remote control system failure (fail in a closed position) and shall be kept closed at sea at any time when the tank contains oil fuel except that they may be opened during oil fuel transfer operations.
  • (10) Suction wells in oil fuel tanks may protrude into the double bottom below the boundary line defined by the distance h provided that such wells are as small as practicable and the distance between the well bottom and the bottom shell plating is not less than 0.5 h.
  • (11) Alternatively to paragraph (6) and either paragraph (7) or (8), ships shall comply with the accidental oil fuel outflow performance standard specified below:
  • (a) The level of protection against oil fuel pollution in the event of collision or grounding shall be assessed on the basis of the mean oil outflow parameter as follows:

OM < 0.0157 - 1.14E-6.C 600 m3 ≤ C < 5,000m3

OM < 0.010 C ≥ 5,000m3

where OM = mean oil outflow parameter;

C = total oil fuel volume.

  • (b) The following general assumption shall apply when calculating the mean oil outflow parameter:
  • (i) the ship shall be assumed loaded to the partial load line draught dp without trim or heel;
  • (ii) all oil fuel tanks shall be assumed loaded to 98 per cent of their volumetric capacity;
  • (iii) the nominal density of the oil fuel (n ) shall generally be taken as 1,000 kg/m3. If the density of the oil fuel is specifically restricted to a lesser value, the lesser value may be applied; and
  • (iv) for the purpose of these outflow calculations, the permeability of each oil fuel tank shall be taken as 0.99, unless proven otherwise.
  • (c) The following assumptions shall be used when combining the oil outflow parameters:
  • (i) the mean oil outflow shall be calculated independently for side damage and for bottom damage and then combined into a non-dimensional oil outflow parameter OM, as follows:

OM = (0.4 OMS + 0.6 OMB) / C

where:

OMS = mean outflow for side damage, in m3

OMB = mean outflow for bottom damage, in m3

C = total oil fuel volume;

  • (ii) for bottom damage, independent calculations for mean outflow shall be done for 0m and 2.5m tide conditions, and then combined as follows:

O MB = 0. 7 OMB(0) + 0.3 OMB(2.5)

where:

OMB(0) = mean outflow for 0m tide condition, and

OMB(2.5) = mean outflow for minus 2.5m tide condition, in m3.

  • (d) The mean outflow for side damage OMS shall be calculated as follows:

where:

i = represents each oil fuel tank under consideration;

n = total number of oil fuel tanks;

PS(i) = the probability of penetrating oil fuel tank i from side damage, calculated in accordance with paragraph (11)(f);

OS(i) = the outflow, in m3, from side damage to oil fuel tank i, which is assumed equal to the total volume in oil fuel tank i at 98 per cent filling.

  • (e) The mean outflow for bottom damage shall be calculated for each tidal condition as follows:
  • (i) [image omitted]

where:

i = represents each oil fuel tank under consideration;

n = total number of oil fuel tanks;

PB(i) = the probability of penetrating oil fuel tank i from bottom damage, calculated in accordance with paragraph (11)(g);

OB(i) = the outflow from oil fuel tank i, in m3, calculated in accordance with paragraph (11)(e)(iii); and

CDB(i) = factor to account for oil capture as defined in paragraph (11)(e)(iv).

  • (ii) [image omitted]

where:

i, n, PB(i), and CDB(i) = as defined in subparagraph (i) above

OB(i) = the outflow from oil fuel tank i, in m3, after tidal change.

  • (iii) the oil outflow OB(i) for each oil fuel tank shall be calculated based on pressure balance principles, in accordance with the following assumptions:
  • (I) the ship shall be assumed stranded with zero trim and heel, with the stranded draught prior to tidal change equal to the partial load line draught dp;
  • (II) the oil fuel level after damage shall be calculated as follows:

hF = {(dp + tC - Zl)(ρS)} / ρn

where:

hF = the height of the oil fuel surface above Zl, in metres;

tC = the tidal change, in m. Reductions in tide shall be expressed as negative values;

Zl = the height of the lowest point in the oil fuel tank above the baseline, in metres;

ρS = density of seawater, to be taken as 1,025 kg/m3; and

ρn = nominal density of the oil fuel, as defined in paragraph (11)(b)(iii);

  • (III) the oil outflow OB(i) for any tank bounding the bottom shell plating shall be taken not less than the following formula, but no more than the tank capacity (see Figure 3, which is set out in Schedule 4):

OB(i) = HWA

where:

HW = 1.0 m, when YB = 0

HW = BB/50 but not greater than 0.4m, when YB is greater than BB/5 or 11.5m, whichever is less

“HW” is to be measured upwards from the midship flat bottom line. In the turn of the bilge area and at locations without a clearly defined turn of the bilge, HW is to be measured from a line parallel to the midship flat bottom, as shown for distance “h” in Figure 1, which is set out in Schedule 4;

for YB values outboard BB/5 or 11.5m, whichever is less, HW is to be linearly interpolated;

YB = the minimum value of YB over the length of the oil fuel tank, where at any given location, YB is the transverse distance between the side shell at waterline dB and the tank at or below waterline dB;

A = the maximum horizontal projected area of the oil fuel tank up to the level of HW from the bottom of the tank;

  • (IV) in the case of bottom damage, a portion from the outflow from an oil fuel tank may be captured by non-oil compartments. This effect is approximated by application of the factor CDB(i) for each tank, which shall be taken as follows:

CDB(i) = 0.6 for oil fuel tanks bounded from below by non-oil compartments;

CDB(i) = 1 otherwise.

  • (f) The probability PS of breaching a compartment from side damage shall be calculated as follows:
  • (i) PS = PSL . PSV . PST

where:

PSL = (1 – PSf – PSa) = probability the damage will extend into the longitudinal zone bounded by Xa and Xf;

PSV = (1 – PSu – PSl) = probability the damage will extend into the vertical zone bounded by Zl and Zu; and

PST = (1 – PSy) = probability the damage will extend transversely beyond the boundary defined by y;

  • (ii) PSa, PSf, PSu and PSl shall be determined by linear interpolation from the table of probabilities for side damage provided in paragraph (11)(f)(iii), and PSy shall be calculated from the formulas provided in paragraph (11)(f)(iii) where:

PSa = the probability the damage will lie entirely aft of location Xa /L;

PSf = the probability the damage will lie entirely forward of location Xf /L;

PSl = the probability the damage will lie entirely below the tank;

PSu = the probability the damage will lie entirely above the tank; and

PSy = the probability the damage will lie entirely outboard of the tank;

Compartment boundaries Xa, Xf, Zl, Zu and y shall be developed as follows:

Xa = the longitudinal distance from the aft terminal of L to the aft most point on the compartment being considered, in metres;

Xf = the longitudinal distance from the aft terminal of L to the foremost point on the compartment being considered, in metres;

Zl = the vertical distance from the moulded baseline to the lowest point on the compartment being considered, in metres. Where Zl is greater than DS, Zl shall be taken as DS;

Zu = the vertical distance from the moulded baseline to the highest point on the compartment being considered, in metres. Where Zu is greater than DS, Zu shall be taken as DS; and

y = the minimum horizontal distance measured at right angles to the centreline between the compartment under consideration and the side shell, in metres;

In way of the turn of the bilge, y need not be considered below a distance h above baseline, where h is lesser of B/10, 3 metres or the top of the tank.

  • (iii) Table of probabilities for side damage

PSy shall be calculated as follows:

PSy = (24.96 –199.6 y/ BS)(y/BS) for y/BS ≤ 0.05

PSy = 0.749 + {5 – 44.4 (y/BS – 0.05)} (y/BS – 0.05) for 0.05 < y/BS < 0.1

PSy = 0.888 + 0.56 (y/BS – 0.1) for y/BS ≥ 0.1

PSy shall not be taken greater than 1.

  • (g) The probability PB of breaching a compartment from bottom damage shall be calculated as follows:
  • (i) PB = PBL. PBT. PBV

where:

PBL = (1 – PBf – PBa) = probability the damage will extend into the longitudinal zone bounded by Xa and Xf;

PBT = (1 – PBp – PBs) = probability the damage will extend into the transverse zone bounded by Yp and Ys; and

PBV = (1 – PBz) = probability the damage will extend vertically above the boundary defined by z;

  • (ii) PBa, PBf, PBp, and PBs shall be determined by linear interpolation from the table of probabilities for bottom damage provided in paragraph (11)(g)(iii), and PBz shall be calculated from the formulas provided in paragraph (11)(g)(iii)

where:

PBa = the probability the damage will lie entirely aft of location Xa /L;

PBf = the probability the damage will lie entirely forward of location Xf /L;

PBp = the probability the damage will lie entirely to port of the tank;

PBs = the probability the damage will lie entirely to starboard of the tank; and

PBz = the probability the damage will lie entirely below the tank;

Compartment boundaries Xa, Xf, Yp, Ys and z shall be developed as follows:

Xa and Xf are as defined in paragraph (11)(f)(ii);

Yp = the transverse distance from the port-most point on the compartment located at or below the waterline dB, to a vertical plane located BB /2 to starboard of the ship’s centreline;

Ys = the transverse distance from the starboard-most point on the compartment located at or below the waterline dB, to a vertical plane located BB /2 to starboard of the ship’s centreline; and

z = the minimum value of z over the length of the compartment, where, at any given longitudinal location, z is the vertical distance from the lower point of the bottom shell at that longitudinal location to the lower point of the compartment at that longitudinal location;

  • (iii) Table of probabilities for bottom damage

PBz shall be calculated as follows:

PBz = (14.5 — 67 z/DS)(z/DS) for z/DS ≤ 0.1

PBz = 0.78 + 1.1 {(z/DS — 0.1)} for z/DS > 0.1

PBz shall not be taken greater than 1.

  • (h) For the purpose of maintenance and inspection, any oil fuel tanks that do not border the outer shell plating shall be located no closer to the bottom shell plating than the minimum value of h in paragraph (6) and no closer to the side shell plating than the applicable minimum value of w in paragraph (7) or (8).
  • (12) In approving the design and construction of ships to be built in accordance with this Regulation, a qualified person shall have due regard to the general safety aspects, including the need for maintenance and inspection of wing and double bottom tanks or spaces.

Standard discharge connection

14.

To enable pipes of reception facilities to be connected with the ship’s discharge pipeline for residues from machinery bilges and from sludge tanks, both lines shall be fitted with a standard discharge connection in accordance with the following table:

STANDARD DIMENSIONS OF FLANGES FOR DISCHARGE CONNECTIONS

Description Dimension
Outside diameter 215mm
Inner diameter According to pipe outside diameter
Bolt circle diameter 183mm
Slots in flange 6 holes 22mm in diameter equidistantly placed on a bolt circle of the above diameter, slotted to the flange periphery. The slot width to be 22mm
Flange thickness 20mm
Bolts and nuts:Quantity, diameter 6, each of 20mm in diameter and of suitable length

The flange is designed to accept pipes up to a maximum internal diameter of 125mm and shall be of steel or other equivalent material having a flat face. This flange, together with a gasket of oil-proof material, shall be suitable for a service pressure of 6 kPa.

Chapter 2 Equipment

Oil filtering equipment

15.

(1) Except as specified in paragraph (3), any ship of 400 gross tonnage and above but less than 10,000 gross tonnage shall be fitted with oil filtering equipment complying with paragraph (6). Any such ship which may discharge into the sea ballast water retained in fuel oil tanks in accordance with Regulation 17(2) shall comply with paragraph (2).

  • (2) Except as specified in paragraph (3), any ship of 10,000 gross tonnage and above, shall be fitted with oil filtering equipment complying with paragraph (7).
  • (3) Ships, such as hotel ships, storage vessels, and similar ships, which are stationary except for non-cargo-carrying relocation voyages need not be provided with oil filtering equipment. Such ships shall be provided with a holding tank having a volume adequate, to the satisfaction of the Minister, for the total retention on board of the oily bilge water. All oily bilge water shall be retained on board for subsequent discharge to reception facilities.
  • (4) Ships of less than 400 gross tonnage shall be equipped, as far as practicable, to retain on board oil or oily mixtures or discharge them in accordance with the requirements of Regulation 16(6).
  • (5) The Minister may waive the requirements of paragraphs (1) and (2) for:
  • (a) any ship engaged exclusively on voyages within special areas, or
  • (b) any ship certified under the International Code of Safety for High-Speed Craft (or otherwise within the scope of this Code with regard to size and design) engaged on a scheduled service with a turn-around time not exceeding 24 hours and covering also non-passenger/cargo-carrying relocation voyages for these ships,
  • (c) with regard to the provision of subparagraphs (a) and (b), that all of the following conditions are complied with:
  • (i) the ship is fitted with a holding tank having a volume adequate, to the satisfaction of the Minister, for the total retention on board of the oily bilge water;
  • (ii) all oily bilge water is retained on board for subsequent discharge to reception facilities;
  • (iii) the Minister has determined that adequate reception facilities are available to receive such oily bilge water in a sufficient number of ports or terminals the ship calls at;
  • (iv) the IOPP Certificate, when required, is endorsed to the effect that the ship is exclusively engaged on the voyages within special areas; and
  • (v) the quantity, time, and port of the discharge are recorded in the Oil Record Book Part I.
  • (6) Oil filtering equipment referred to in paragraph (1) shall be of a design approved by the Minister and shall be such as will ensure that any oily mixture discharged into the sea after passing through the system has an oil content not exceeding 15 parts per million. In considering the design of such equipment, the Minister shall have regard to the specification recommended by the Organization.
  • (7) Oil filtering equipment referred to in paragraph (2) is of a design approved by the Minister and is such as will ensure that any oily mixture discharged into the sea after passing through the system or systems has an oil content not exceeding 15 parts per million and that it is provided with alarm arrangements to indicate when this level cannot be maintained and that the system is also provided with arrangements such as will ensure that any discharge of oily mixtures is automatically stopped when the oil content of the effluent exceeds 15 parts per million. In considering the design of such equipment and arrangements, the Minister shall have regard to the specification recommended by the Organization.

Chapter 3 Control of operational discharge of oil

Control of discharge of oil (Part 3)

16.

(1) Subject to the provisions of section 11 of the Act and paragraphs (2), (3) and (6), any discharge into the sea of oil or oily mixtures from ships to which these Regulations apply is hereby prohibited.

  • (2) Any discharge into the sea outside special areas, of oil or oily mixtures from a ship of 400 gross tonnage and above shall be prohibited except when all the following conditions are satisfied:
  • (a) the ship is proceeding en route;
  • (b) the oily mixture is processed through an oil filtering equipment meeting the requirements of Regulation 15;
  • (c) the oil content of the effluent without dilution does not exceed 15 parts per million;
  • (d) the oily mixture does not originate from cargo pump room bilges on oil tankers; and
  • (e) the oily mixture, in case of oil tankers, is not mixed with oil cargo residues.
  • (3) Any discharge into the sea in special areas, of oil or oily mixtures from ships of 400 gross tonnage and above shall be prohibited except when all of the following conditions are satisfied:
  • (a) the ship is proceeding en route;
  • (b) the oily mixture is processed through an oil filtering equipment meeting the requirements of Regulation 15(7);
  • (c) the oil content of the effluent without dilution does not exceed 15 parts per million;
  • (d) the oily mixture does not originate from cargo pump room bilges on oil tankers; and
  • (e) the oily mixture, in case of oil tankers, is not mixed with oil cargo residues.
  • (4) In respect of the special area that is the Antarctic area, any discharge into the sea of oil or oily mixtures from any ship shall be prohibited.
  • (5) Nothing in this Regulation shall prohibit a ship on a voyage only part of which is in a special area from discharging outside a special area in accordance with paragraph (2).
  • (6) In the case of a ship of less than 400 gross tonnage, in all areas except the Antarctic area, oil and all oily mixtures shall either be retained on board for subsequent discharge to reception facilities or discharged into the sea in accordance with the following provisions:
  • (a) the ship is proceeding en route;
  • (b) the ship has in operation equipment of a design approved by the Minister that ensures that the oil content of the effluent without dilution does not exceed 15 parts per million;
  • (c) the oily mixture does not originate from cargo pump room bilges on oil tankers; and
  • (d) the oily mixture, in case of oil tankers, is not mixed with oil cargo residues.
  • (7) The following requirements apply generally:
  • (a) a discharge into the sea shall not contain chemicals or other substances in quantities or concentrations which are hazardous to the marine environment or chemicals or other substances introduced for the purpose of circumventing the conditions of discharge specified in this Regulation;
  • (b) the oil residues which cannot be discharged into the sea in compliance with this Regulation shall be retained on board or discharged to reception facilities.

Segregation of oil and water ballast and carriage of oil in forepeak tanks

17.

(1) Except as provided in paragraph (2), in ships delivered after 31 December 1979, of 4,000 gross tonnage and above other than oil tankers, and in oil tankers delivered after 31 December 1979, of 150 gross tonnage and above, ballast water is not carried in any oil fuel tank.

  • (2) Where the need to carry large quantities of oil fuel render it necessary to carry ballast water which is not a clean ballast in any oil fuel tank, such ballast water is discharged to reception facilities or into the sea in compliance with Regulation 16 using the equipment specified in Regulation 15(2) and an entry shall be made in the Oil Record Book to this effect.
  • (3) In a ship of 400 gross tonnage and above, for which the building contract is placed after 1 January, 1982 or, in the absence of a building contract, the keel of which is laid or which is at a similar stage of construction after 1 July, 1982, oil is not carried in a forepeak tank or a tank forward of the collision bulkhead.
  • (4) All ships to which paragraphs (1) and (3) do not apply shall comply with those paragraphs as far as is reasonable and practicable to do so.

Oil Record Book Part I — Machinery space operations

18.

(1) Every oil tanker of 150 gross tonnage and above and every ship of 400 gross tonnage and above other than an oil tanker shall be provided with a book to be known as the Oil Record Book Part I. The Oil Record Book Part 1, whether as a part of the ship’s official log book or otherwise, shall be in the form specified in Schedule 3.

  • (2) The Oil Record Book Part 1 shall be completed on each occasion, on a tank-to-tank basis if appropriate, whenever any of the following operations take place in the ship:
  • (a) ballasting or cleaning of oil fuel tanks;
  • (b) discharge of dirty ballast or cleaning water from oil fuel tanks;
  • (c) collection and disposal of oily residues (sludge and other oil residues);
  • (d) discharge overboard or disposal otherwise of bilge water which has accumulated in machinery spaces;
  • (e) bunkering of fuel or bulk lubricating oil.
  • (3) In the event of such discharge of oil or oily mixture as is referred to in section 11 of the Act or in the event of accidental or other exceptional discharge of oil not excepted by that section, a statement shall be made in the Oil Record Book Part I of the circumstances of, and the reasons for, the discharge.
  • (4) Each operation specified in paragraph (2) shall be fully recorded without delay in the Oil Record Book Part I, so that all the entries in the book appropriate to that operation are completed. Each completed operation shall be signed by the officer or officers in charge of the operations concerned and each completed page shall be signed by the master of the ship.
  • (5) Any failure of the oil filtering equipment shall be recorded in the Oil Record Book Part I.

This document does not substitute the official text published in the Irish Statute Book. We accept no responsibility for any inaccuracies arising from the transcription of the original into this format.

This text is published under Irish Statute Book's own terms of reuse, not a Legalize or public-domain licence. Irish Statute Book
CC-BY 4.0 (Oireachtas Open Data PSI Licence)
Contains Irish Public Sector Information licensed under the Oireachtas (Houses of the Oireachtas) Open Data PSI Licence / Creative Commons Attribution 4.0 International, sourced from https://www.irishstatutebook.ie.