S.I. No. 507/2024 - Planning and Development Act 2000 (Section 181(2)(a)) (No.4) Order 2024

Type Statutory Instrument
Publication 2024-10-08
Last updated 2024-10-17
State In force superseded text
Text As published
articles 3

This is the act as published. Later amendments are not folded into the text below: each one is a separate act in this repository and an entry in this law's history.

1 amending act · 2024-10-17, PLANNING AND DEVELOPMENT ACT 2024

Reform history JSON API

Notice of the making of this Statutory Instrument was published in

“Iris Oifigiúil” of 8th October, 2024.

WHEREAS I, RODERIC O’GORMAN, Minister for Children, Equality, Disability, Integration and Youth –

am satisfied that the carrying out of the development described in Part 1 of the Schedule to the following order proposed to be carried out by me or on my behalf is required by reason of an emergency, being the serious risk that persons, being applicants within the meaning of the European Communities (Receptions Conditions) Regulations 2018 (S.I. 230 of 2018), will be without accommodation,

NOW THEREFORE I, RODERIC O’GORMAN, Minister for Children, Equality, Disability, Integration and Youth, in exercise of the powers conferred on me by section 181 (2)(a) of the Planning and Development Act 2000 (No. 30 of 2000), hereby make the following order:

1.

1.

This Order may be cited as the Planning and Development Act 2000 (Section 181(2)(a)) (No.4) Order 2024.

2.

2.

The Planning and Development Act 2000 (No. 30 of 2000) (other than sections 50, 50A, 50B and 181 of that Act) shall not apply to the development described in Part 1 of the Schedule proposed to be carried out by me or on my behalf.

3.

3.

This Order shall cease to have effect on the date that is the fifth anniversary of the date on which this Order comes into operation.

Schedule

Part 1

Site: Lissywollen, (as identified on site maps at Part 2 of Schedule)

Address: Athlone, Co Westmeath

Description: Initial development of up to 150 high-performance tents and associated ancillary works, including amenity areas, groundworks, landscaping, 1.8m to 2.4m high security fencing, external lighting, CCTV surveillance system, pipework, storage facilities, and electrical distribution boxes for the purposes of accommodating applicants within the meaning of the European Communities (Receptions Conditions) Regulations 2018 (S.I. 230 of 2018), which will later be replaced with up to 250 accommodation modular units, to include:

1.

The development will provide accommodation for approximately 1000 applicants within the meaning of the European Communities (Receptions Conditions) Regulations 2018 (S.I. 230 of 2018) with tents which will then be replaced by modular units.

2.

Suitable groundworks will be completed for 150 high-performance tents. The development will involve extensive site preparation, ensuring that the ground is levelled and stable, with proper drainage systems in place.

3.

The provision of sanitary and shower facilities with ready access to hot and cold water. Prior to establishing mains sewage connection, waste tank storage and collection services will be utilised for servicing such facilities.

4.

Internal and external amenity areas are to be provided for recreation and leisure. These will have security fencing, adequate external lighting and protected by a certified external CCTV surveillance system.

5.

The provision of suitable and adequate pest and vermin proof refuse storage facilities.

6.

The installations for the supply of gas (LPG), oil and electricity including pipework, storage facilities and electrical distribution boxes including pipework, storage facilities and electrical distribution boxes and any necessary ancillary works required in relation to same.

7.

The site perimeter to be enclosed/secured with 1.8m to 2.4m high security fencing and the external general/amenity areas to be provided with adequate external lighting and protected by a certified external CCTV surveillance system.

8.

Access roads will be established for pedestrians and vehicles.

9.

The installation of distribution boxes to manage and distribute electricity from generators to the various units and facilities on-site, including any necessary ancillary works required in relation to the same.

10.

The project will also include further and other ancillary works necessary to support the above installations, ensuring comprehensive site readiness and functionality.

Part 2

GIVEN under my Official Seal,

1 October, 2024.

RODERIC O’GORMAN,

Minister for Children, Equality, Disability, Integration and Youth.

This document does not substitute the official text published in the Irish Statute Book. We accept no responsibility for any inaccuracies arising from the transcription of the original into this format.

This text is published under Irish Statute Book's own terms of reuse, not a Legalize or public-domain licence. Irish Statute Book
CC-BY 4.0 (Oireachtas Open Data PSI Licence)
Contains Irish Public Sector Information licensed under the Oireachtas (Houses of the Oireachtas) Open Data PSI Licence / Creative Commons Attribution 4.0 International, sourced from https://www.irishstatutebook.ie.