The M74 Motorway (Fullarton Road to the M8 West of Kingston Bridge) (Speed Limit) Regulations 2012
Made: 22nd November 2012
Laid before the Scottish Parliament: 23rd November 2012
Coming into force: 28th December 2012
In accordance with section 17(3A)[^f00002] of that Act they have consulted with such representative organisations as they think fit.
Citation and commencement
1
These Regulations may be cited as the M74 Motorway (Fullarton Road to the M8 West of Kingston Bridge) (Speed Limit) Regulations 2012 and come into force on 28thDecember 2012.
Interpretation
2
In these Regulations—
- “the M8” means the M8/A8 Edinburgh - Greenock Trunk Road;
- “the M74” means the M74/A74(M)/A74 Glasgow - Carlisle Trunk Road;
- “point 1” means a point 32 metres or thereby east of the point of intersection of the centre lines of the M74 and Carmyle Avenue;
- “point 2” means a point 710 metres or thereby southeast of the point of intersection of the centre lines of the M74 and Polmadie Road;
- “point 3” means a point 60 metres or thereby northeast of the point of intersection of the centre lines of Scotland Street and West Street,
and references to “the Schedule” are to the Schedule to these Regulations.
Speed limits
3
No person may drive a motor vehicle at a speed exceeding—
- (a) 60 miles per hour on those lengths of road described in Part 1 of the Schedule;
- (b) 50 miles per hour on those lengths of road described in Part 2 of the Schedule;
- (c) 30 miles per hour on those lengths of road described in Part 3 of the Schedule.
Exemptions
4
No speed limit imposed by these Regulations applies to vehicles falling within regulation 3(4) of the Road Traffic Exemptions (Special Forces) (Variation and Amendment) Regulations 2011[^f00003] when used in accordance with regulation 3(5) of those Regulations.
SCHEDULE
PART 1 — 60MPH SPEED LIMIT
1
That length of the carriageway of the M74 between point1 and point2, a distance of 4.9kilometres or thereby.
2
That length of the M74 being part of the eastbound on-slip road from Fullarton Road, from a point 26metres or thereby east of the east kerb line of the Fullarton Road roundabout (as measured along the northernmost kerb line of the on-slip road), eastwards to its junction with the main eastbound carriageway of the M74, a distance of 507metres or thereby.
3
That length of the M74 being part of the westbound on-slip road from Fullarton Road, from a point 34metres or thereby west of the west kerb line of the Fullarton Road roundabout (as measured along the southernmost kerb line of the on-slip road), westwards to its junction with the main westbound carriageway of the M74, a distance of 537metres or thereby.
4
That length of the M74 being part of the eastbound off-slip road to Fullarton Road, from its junction with the main eastbound carriageway of the M74, eastwards to a point 239metres or thereby from that junction (as measured along the northernmost kerb line of the off-slip road).
5
That length of the M74 being part of the westbound off-slip road to Fullarton Road, from its junction with the main westbound carriageway of the M74, westwards to a point 237metres or thereby from that junction (as measured along the southernmost kerb line of the off-slip road).
6
That length of the M74 being part of the eastbound on-slip road from Cambuslang Road, from a point 93metres or thereby east of the north east kerb line of Cambuslang Road (as measured along the northernmost kerb line of the on-slip road), eastwards to its junction with the main eastbound carriageway of the M74, a distance of 572metres or thereby.
7
That length of the M74 being part of the westbound on-slip road from Cambuslang Road, from a point 103metres or thereby west of the south west kerb line of Cambuslang Road (as measured along the southernmost kerb line of the on-slip road), westwards to its junction with the main westbound carriageway of the M74, a distance of 600metres or thereby.
8
That length of the M74 being part of the eastbound off-slip road to Cambuslang Road, from its junction with the main eastbound carriageway of the M74, eastwards to a point 270metres or thereby from that junction (as measured along the northernmost kerb line of the off-slip road).
9
That length of the M74 being part of the westbound off-slip road to Cambuslang Road, from its junction with the main westbound carriageway of the M74, westwards to a point 247metres or thereby from that junction (as measured along the southernmost kerb line of the off-slip road).
PART 2 — 50MPH SPEED LIMIT
10
That length of the M74 being part of the westbound off-slip road to Carnoustie Street, from its junction with the main westbound carriageway of the M74, westwards to a point 111metres or thereby from that junction (as measured along the northernmost kerb line of the off-slip road).
PART 3 — 30MPH SPEED LIMIT
11
That length of the M74 being part of the eastbound off-slip road to Polmadie Road, from a point 245metres or thereby from its junction with the main eastbound carriageway of the M74 (as measured along the northernmost kerb line of the off-slip road), eastwards to the west kerb line of Polmadie Road, a distance of 283metres or thereby.
12
That length of the M74 being part of the westbound off-slip road to Polmadie Road, from a point 263metres or thereby from its junction with the main westbound carriageway of the M74 (as measured along the southernmost kerb line of the off-slip road), westwards to the east kerb line of Polmadie Road, a distance of 236 metres or thereby.
13
That length of the M74 being part of the eastbound on-slip road from Dalintober Street, from a point 65 metres or thereby south of the intersection of the centre lines of Dalintober Street and Wallace Street to a point 166 metres or thereby southeast of that intersection, a distance of 101metres or thereby.
14
That length of the M74 being the eastbound off-slip road to Paisley Road, from a point 127metres or thereby from its junction with the eastbound carriageway of the M74 (as measured along the northernmost kerb line of the on-slip road), north eastwards to the south kerb line of Paisley Road, a distance of 349metres or thereby.
15
That length of the M74 being the westbound off-slip road to Carnoustie Street, from a point 111metres or thereby from the junction of the main westbound carriageway of the M74 (as measured along the northernmost kerb line of the on-slip road), westwards to the east kerb line of Carnoustie Street, a distance of 232metres or thereby.
Signed
KEITH BROWN — Authorised to sign by the Scottish Ministers — 22nd November 2012
Explanatory note
(This note is not part of the Regulations)
EXPLANATORY NOTE
These Regulations apply permanent speed limits to the M74 motorway between Fullarton Road, Glasgow and its connection to the M8 motorway west of the Kingston Bridge. Speed limits are applied to the main carriageway and slip roads.
Regulation 3 and Part 1 of the Schedule set the maximum speed limit for the driving of motor vehicles at 60 miles per hour on certain lengths of road.
Regulation 3 and Part 2 of the Schedule set the maximum speed limit for the driving of motor vehicles at 50 miles per hour on certain lengths of road.
Regulation 3 and Part 3 of the Schedule set the maximum speed limit for the driving of motor vehicles at 30 miles per hour on certain lengths of road.
Regulation 4 provides that the speed limits do not apply to vehicles used for naval, military or air force purposes while being driven in response, or for practice in responding, to a national security emergency by a member of the special forces who has been trained in driving at high speeds or for the purpose of such training.
The Regulations come into force on 28thDecember 2012. Prior to that date, temporary speed limits applied to the roads covered by these Regulations, by virtue of the M74 Motorway (Fullarton Road to the M8 Motorway West of Kingston Bridge) (Temporary Speed Restriction) Order 2011 (S.S.I. 2011/275).
Footnotes
[^f00001]: 1984 c.27. Section 17(2) was amended by the New Roads and Street Works Act 1991 (c.22), Schedule 8, paragraph 28; by the Road Traffic Act 1991 (c.40), Schedule 4, paragraph 25 and Schedule 8, paragraph 1; by the National Parks (Scotland) Act 2000 (asp 10), schedule 5, paragraph 11 and by the Scotland Act 2012 (c.11), section 21(3). Section 17(3ZA) was inserted by the Scotland Act 2012, section 21(4).
[^f00002]: Section 17(3A) was amended by the Scotland Act 2012, section 21(5).
[^f00003]: S.I. 2011/935.
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.