Compulsory Purchase Act 1965

Type Public General Act
Publication 1965-08-05
Last updated 2026-03-11
State In force
Department Statute Law Database
articles Not indexed
Reform history JSON API

[^key-4aa803b24c1c289149afc6dae3021659]: Act applied (with modifications) (21.4.2014) by The Network Rail (Norton Bridge Area Improvements) Order 2014 (S.I. 2014/909), arts. 1, 26(1), 28(10), 29(10), 30(10), Sch. 8 paras. 3-9 (with art. 34(2))

[^key-c20f2a511991319b18e7682678dd1d7e]: Act applied (with modifications) (7.5.2014) by The National Grid (North London Reinforcement Project) Order 2014 (S.I. 2014/1052), arts. 1, 31(10), 32(10), Sch. 10 paras. 3-9

[^key-90ca17498605c74f9e50018b900a6e01]: Act applied (with modifications) (7.7.2014) by The East Anglia ONE Offshore Wind Farm Order 2014 (S.I. 2014/1599), arts. 1, 17(4), 21(1), 23(10), 24(10), Sch. 7 paras. 3-9, Sch. 9 para. 4(1) (with arts. 17(3), 37, 38, Sch. 9 para. 19)

[^M_C_639fa1cb-9d62-4c09-bf1e-33312ef1ab16]: Act applied (with modifications) (29.7.2014) by The Felixstowe Branch Line (Land Acquisition) Order 2014 (S.I. 2014/1821), arts. 1, 4, 8(10), 9(10), 12, 14

[^key-1dd01d2be2590896f78948ac255354de]: Act applied (with modifications) (6.8.2014) by The Rampion Offshore Wind Farm Order 2014 (S.I. 2014/1873), arts. 1, 29(1), 31(10), 32(10), Sch. 8 paras. 3-9 (with arts. 12, 13, Pt. 2 para. 6, 3 para. 5, 4 para. 4, 5 para. 4, Sch. 12 para. 19)

[^M_C_725b004c-cd6c-40c8-9ded-466229eee0b6]: Act applied (with modifications) (19.8.2014) by The Network Rail (Huyton) Order 2014 (S.I. 2014/2027), arts. 1, 17(2), 21(10), 22(10), 25(1), Sch. 5 paras. 3-9 (with art. 31(2))

[^key-8093d77f908597d96b912335778bc1f7]: Act applied (with modifications) (18.9.2014) by The A556 (Knutsford to Bowdon Improvement) Development Consent Order 2014 (S.I. 2014/2269), arts. 1, 24, 26(10), Sch. 6 paras. 3-9

[^key-0cca964861f522613e2dc0814b96a24c]: Act applied (with modifications) (2.10.2014) by The Clocaenog Forest Wind Farm Order 2014 (S.I. 2014/2441), arts. 1, 21(a), 23(1), Sch. 7 paras. 3-9 (with art. 33)

[^M_C_2a1f2f90-aceb-4a1f-fec1-e466961a6876]: Act applied (2.10.2014) by The North Killingholme (Generating Station) Order 2014 (S.I. 2014/2434), arts. 1, 25(10), 26(10), Sch. 8 para. 4 (with art. 13, Sch. 8 paras. 4(3), 6, 9)

[^key-ecd720c863cdba422343467525121947]: Act applied (with modifications) (21.10.2014) by The Central Bedfordshire Council (Woodside Link Houghton Regis) Development Consent Order 2014 (S.I. 2014/2637), arts. 1, 25, 27(10), 28(10), Sch. 8 paras. 3-9

[^M_C_d6000140-0b98-483b-c533-d40166020e1c]: Act modified (29.10.2014) by The Able Marine Energy Park Development Consent Order 2014 (S.I. 2014/2935), arts. 38, 40(10), 41(10) (with arts. 30(4), 53)

[^key-6fcec44537de0c6287bc702884b4ac79]: Act modified (28.11.2014) by The Walney Extension Offshore Wind Farm Order 2014 (S.I. 2014/2950), arts. 1, 27(10), 28(10), Sch. 7 paras. 3-9 (with arts. 38, 39)

[^key-fed8e2999102f3a1bc92ff9f9cf9b9f9]: Act applied (with modifications) (31.12.2014) by The Hornsea One Offshore Wind Farm Order 2014 (S.I. 2014/3331), arts. 1, 23(11), 24(10), Sch. 6 paras. 1-7, Sch. 12 para. 14(1) (with arts. 37, 38)

[^key-4b175b3e9eb8d86eda59a2d58d565047]: Act applied (with modifications) (7.1.2015) by The Willington C Gas Pipeline Order 2014 (S.I. 2014/3328), arts. 1, 19(3)(b), 24(10), 25(10), Sch. 7 paras. 3, 4, Sch. 9 para. 4(1) (with Sch. 9 para. 15)

[^key-2abd7eec272c6807206e821034dfe1bb]: Act modified (2.2.2015) by The Northumberland County Council (A1 – South East Northumberland Link Road (Morpeth Northern Bypass)) Development Consent Order 2015 (S.I. 2015/23), arts. 1, 27(1), 29(10), 30(10), Sch. 11 paras. 3-9

[^key-1821d6ad849d4339cb548e48e3d8b2a4]: Act applied (with modifications) (25.2.2015) by The A160/A180 (Port of Immingham Improvement) Development Consent Order 2015 (S.I. 2015/129), arts. 1, 26, 28(10), 29(10), Sch. 6 paras. 3-9, Sch. 8 para. 26(1)

[^M_C_e37a2c05-3c79-44c2-8875-0c4c6c53641e]: Act applied (with modifications) (26.2.2015) by The Cornwall Council (A30 Temple to Higher Carblake Improvement) Order 2015 (S.I. 2015/147), arts. 1, 23(3), 26(1), 28(10), 29(10)

[^key-f9979bbe2d7c09ca92f92b1fd2fd23c3]: Act modified (11.3.2015) by The Dogger Bank Creyke Beck Offshore Wind Farm Order 2015 (S.I. 2015/318), arts. 1, 27(1), 29(10), 30(10), Sch. 6 para. 3, Sch. 12 para. 4 (with arts. 40, 41, Pt. 2 para. 4(2), (3), 19, 4 para. 3, 4, 16, Sch. 12 paras. 4, 9(2), 10)

[^key-e6b0201b7e1983a0872bdb19d53e1976]: Act applied (with modifications) (1.4.2015) by The Knottingley Power Plant Order 2015 (S.I. 2015/680), arts. 1, 20(1)(a), 21, 25, 27(10), 28(10), Sch. 6 paras. 3-9 (with Sch. 8 para. 10)

[^key-3d6989b2038fbdc34df3f718ab752257]: Act applied (with modifications) (21.4.2015) by The Network Rail (Ordsall Chord) Order 2015 (S.I. 2015/780), arts. 1, 22(2), 27(10), 28(10), Sch. 9 paras. 3-9 (with art. 36(2))

[^M_C_47ee07e4-6855-4d7e-d9b3-428caeff0a15]: Act applied (with modifications) (21.4.2015) by The Crossrail (Plumstead Sidings) Order 2015 (S.I. 2015/781), arts. 1, 9, 15(1), 16(a), Sch. 2 paras. 3-9

[^M_C_667a9fc8-1f51-42a2-d5b4-b59fd15dd12b]: Pt. 1 (ss. 1-32) applied in part (29.3.1993) by 1993 c. iv, ss. 4(1)(2), 29(2)(3), Sch. 4 (with ss. 36, 41(5), 44(1)) Pt. 1 (ss. 1-32) applied in part (10.11.1993) by Leasehold Reform, Housing and Urban Development Act 1993 (c. 28), s. 162(6); S.I. 1993/2762, art.3 Pt. 1 (ss. 1-32) applied in part (with modifications) (27.7.1993) by 1993 c. xv, ss. 5(1)(2), 27(4), Sch. 4 (with s. 44) Pt. 1 (ss. 1-32) applied in part (with modifications) (5.11.1993) by Cardiff Bay Barrage Act 1993 (c. 42), ss. 4(2)-(4), 6, Sch. 5 para. 6(2) (with ss. 2, 30(1), Sch. 2 para. 9) Pt. 1 (ss. 1-32) applied in part (with modifications) (26.5.1994) by 1994 c. vi, s. 3(1)(2) Pt. 1 (ss. 1-32) applied in part (with modifications) (21.7.1994) by Croydon Tramlink Act 1994 (c. xi), ss. 5(1)(2), 30(3)(4)(a), 31(1), 56(2)(3), Sch. 4 Pt. 1 (ss. 1-32) applied in part (with modifications) (21.7.1994) by Greater Nottingham Light Rapid Transit Act 1994 (c. xv), ss. 5(1)(2), 22(f), 28(3)(4), 44(8), Sch. 5 Pt. 1 (ss. 1-32) applied (1.1.1996) by Merchant Shipping Act 1995 (c. 21), ss. 197(6)(a), 316(2) (with s. 312(1)) Pt. 1 (ss. 1-32) applied in part (with modifications) (28.7.1998) by Tamar Bridge Act 1998 (c. iv), ss. 4(2)-(4), 5(2)-(4), 6(1), 13, Sch. Pt. 1 (ss. 1-32) applied (with modifications) (13.1.1999) by Tyne and Wear Passenger Transport (Sunderland) Order 1998 (S.I. 1998/3269), arts. 23(1)(2), 24, Sch. 7

[^key-0b99904014f576cf2ba1af0f0524195b]: S. 8(1) excluded (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), arts. 1, 27(1)

[^key-c63236420a1dc8e07964c8495a3ca287]: Act applied (with modifications) (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), Sch. 11 para. 3(1)

[^key-7d6e51833b2dcc530e50627aadc46531]: Pt. 1 applied (with modifications) (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), art. 1, Sch. 11 paras. 3(2), 4-9

[^key-73a99ac618ea77fb6f94f6557f114082]: S. 11(3) restricted (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), art. 1, Sch. 13 para. 4(1)

[^key-e2ee399864053bac8c831f6b95d640f9]: Pt. 1 excluded (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), arts. 1, 27(1)(a) (with arts. 51, 53)

[^key-eaa384c92d1ef376c0770faf40dd5315]: S. 8(1) excluded (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), arts. 1, 31(1) (with arts. 51, 53)

[^key-e6e6f74e47220f55dc634369e46eb883]: Act applied (with modifications) (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), Sch. 5 para. 3 (with arts. 51, 53)

[^key-ed005907fc2153523ab171459e4372a2]: S. 11(3) restricted (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), art. 1, Sch. 8 para. 3(2) (with arts. 51, 53)

[^key-08e0267d8d88d6d3f6bd187c2ecec5f3]: S. 7 applied (7.8.2015) by The Preesall Underground Gas Storage Facility Order 2015 (S.I. 2015/1561), arts. 1, 21(5)(a) (with art. 44)

[^key-d54da8b4c2ff4785d067a3ded6054b97]: S. 10 applied (7.8.2015) by The Preesall Underground Gas Storage Facility Order 2015 (S.I. 2015/1561), arts. 1, 21(5)(a) (with art. 44)

[^key-7563cf91b3df7b3f247662451e67fd45]: S. 8(1) excluded (7.8.2015) by The Preesall Underground Gas Storage Facility Order 2015 (S.I. 2015/1561), arts. 1, 28(1) (with arts. 19(3), 44)

[^key-c5844f187ce36cdf028237ae4d73aa8f]: Pt. 1 excluded (7.8.2015) by The Preesall Underground Gas Storage Facility Order 2015 (S.I. 2015/1561), arts. 1, 31(1)(a) (with art. 44)

[^key-b485c9c74b5c678162670697fa1c1375]: Pt. 1 excluded (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), arts. 1, 20(1)(a)

[^key-eb1e3e96ebb2cd9a319dc3a0d41a4f5b]: Act applied (with modifications) (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), Sch. 7 para. 3(1)

[^key-818b817d3e14fad5512e86c602601bbd]: Pt. 1 applied (with modifications) (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), art. 1, Sch. 7 para. 3(2)-9

[^key-62e7827c448d2278f47196d7a7fe4ef1]: S. 10(2) applied (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), arts. 1, 18(4) (with arts. 18(5), 30)

[^key-0fccacd839b4c213a117a67b88ddbf78]: Pt. 1 excluded (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), arts. 1, 19(1)(a) (with art. 30)

[^key-993c88d76e7533cfcdd80cd448d2881e]: S. 8(1) excluded (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), arts. 1, 24 (with art. 30)

[^key-b6b7bff0ab71d53422c2666caf8e493d]: Act applied (with modifications) (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), Sch. 5 para. 3(1) (with arts. 20(6), 30)

[^key-2e3d31d989db3dd40584998a7e38b903]: Pt. 1 applied (with modifications) (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), art. 1, Sch. 5 para. 3(2)-9 (with arts. 20(6), 30)

[^key-8e64f6393ce4e5acf93af465f6f2ccef]: Act modified (26.8.2015) by The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015 (S.I. 2015/1592), Sch. 6 para. 3 (with arts. 40, 41)

[^key-cac255c07a06cc2f7881f2dc732d30bb]: S. 11(3) restricted (26.8.2015) by The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015 (S.I. 2015/1592), art. 1, Sch. 12 para. 4 (with arts. 40, 41)

[^key-6a1edf1c667244e36b761e2ed5def493]: Pt. 1 applied (30.9.2015) by The Network Rail (Blackthorn and Piddington) (Land Acquisition) Order 2015 (S.I. 2015/1684), arts. 1, 4

[^key-98f24c0e3e9e3ec5b18615bee87441fe]: S. 8(1) excluded (30.9.2015) by The Network Rail (Blackthorn and Piddington) (Land Acquisition) Order 2015 (S.I. 2015/1684), arts. 1, 10(1)

[^key-c2a757e8c8c549aeab5770f4f2fd527f]: Pt. 1 excluded (30.9.2015) by The Network Rail (Blackthorn and Piddington) (Land Acquisition) Order 2015 (S.I. 2015/1684), arts. 1, 12(1)(a)

[^key-b14b6d5d148a9b802879f6aca5648e93]: Act modified (30.9.2015) by The Network Rail (Blackthorn and Piddington) (Land Acquisition) Order 2015 (S.I. 2015/1684), Sch. 1 para. 3(1)

[^key-ad6392480fa1f63de13b95d4640e27da]: Pt. 1 applied (with modifications) (30.9.2015) by The Network Rail (Blackthorn and Piddington) (Land Acquisition) Order 2015 (S.I. 2015/1684), art. 1, Sch. 1 paras. 3(2), 4-9

[^key-c2dd95327cb3afb9d584e99766c95375]: Pt. 1 applied (with modifications) (16.12.2015) by The Network Rail (Tinsley Chord) Order 2015 (S.I. 2015/1876), arts. 1, 14 (with art. 24(1)(a))

[^key-f20a286c3338cc5fa654678d6986affa]: S. 8(1) excluded (16.12.2015) by The Network Rail (Tinsley Chord) Order 2015 (S.I. 2015/1876), arts. 1, 22

[^key-acfbfc2da18d7e7c5dbd9f4f4c9e4928]: Act applied (with modifications) (16.12.2015) by The Network Rail (Tinsley Chord) Order 2015 (S.I. 2015/1876), Sch. 4 paras. 3-9

[^key-6182c179c249999e39cc52002b9b6b7d]: Act applied with modifications (30.12.2015) by The Port Talbot Steelworks Generating Station Order 2015 (S.I. 2015/1984), Sch. 3 paras. 3-9 (with art. 26)

[^key-86c76162bc060970e280fd8694b39e01]: Act applied (with modifications) (12.1.2016) by The London Underground (Bank Station Capacity Upgrade) Order 2015 (S.I. 2015/2044), Sch. 6 para. 3(1)

[^key-63fc3fbee90f9f0232f19ad6f9d81be5]: Pt. 1 applied (with modifications) (12.1.2016) by The London Underground (Bank Station Capacity Upgrade) Order 2015 (S.I. 2015/2044), arts. 1, 21, Sch. 6 paras. 3(2), 4-9

[^key-8df6c1539b27c18094423cfbd00a4622]: Act modified (2.2.2016) by The East Midlands Gateway Rail Freight Interchange and Highway Order 2016 (S.I. 2016/17), Sch. 14 paras. 3-9

[^key-de75d84ff7dae35f4f15d6dfec5852d5]: S. 8(1) excluded (9.2.2016) by The National Grid (Hinkley Point C Connection Project) Order 2016 (S.I. 2016/49), arts. 1, 27 (with art. 32)

[^key-5d0500a1e6040795c2231a4f05622214]: Act applied (with modifications) (9.2.2016) by The National Grid (Hinkley Point C Connection Project) Order 2016 (S.I. 2016/49), art. 22, Sch. 10 paras. 3-9 (with arts. 21(1), 32)

[^key-e064af0f3b6737d6527d3e5907544979]: S. 8(1) excluded (18.2.2016) by The A19/A1058 Coast Road (Junction Improvement) Development Consent Order 2016 (S.I. 2016/73), arts. 1, 25(1) (with art. 37)

[^key-dc913311d4defa8362cdda746a829f4d]: Act applied (with modifications) (18.2.2016) by The A19/A1058 Coast Road (Junction Improvement) Development Consent Order 2016 (S.I. 2016/73), Sch. 6 para. 3(1) (with art. 37)

[^key-bbd7c23e12171ff3370ca78affa2d539]: Pt. 1 applied (with modifications) (18.2.2016) by The A19/A1058 Coast Road (Junction Improvement) Development Consent Order 2016 (S.I. 2016/73), art. 1, Sch. 6 paras. 3(2), 4-9 (with art. 37)

[^key-5de1a7cd6572e22fc7bae6b95c3e991d]: S. 8(1) excluded (25.3.2016) by The Thorpe Marsh Gas Pipeline Order 2016 (S.I. 2016/297), arts. 1, 27 (with art. 39)

[^key-f9a2632445846c3b21130c0e0fb5e63e]: Act applied (with modifications) (25.3.2016) by The Thorpe Marsh Gas Pipeline Order 2016 (S.I. 2016/297), Sch. 6 para. 3(1) (with art. 39)

[^key-00bc23244b15d4b877cfc8dff44d4e0c]: Pt. 1 applied (with modifications) (25.3.2016) by The Thorpe Marsh Gas Pipeline Order 2016 (S.I. 2016/297), art. 1, Sch. 6 paras. 3(2), 4-9 (with art. 39)

[^key-8e4ca757ab504d4176a1ae2b268635a8]: Pt. 1 excluded (1.6.2016) by The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016 (S.I. 2016/547), arts. 1, 22(1)(a) (with arts. 4, 5(3))

[^key-017c4d66b15592071b4b7f7ee67753c6]: S. 8(1) excluded (1.6.2016) by The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016 (S.I. 2016/547), arts. 1, 28 (with arts. 4, 5(3))

[^key-5fbc02313f891b9c2e6868c28d757da1]: Act applied (with modifications) (1.6.2016) by The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016 (S.I. 2016/547), Sch. 6 para. 3(1) (with arts. 4, 5(3))

[^key-4a9c0ebb008be37e14986da90906d3c5]: Pt. 1 applied (with modifications) (1.6.2016) by The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016 (S.I. 2016/547), art. 1, Sch. 6 para. 3(2)-9 (with arts. 4, 5(3))

[^key-7fad5090717a21b765dbdc32656be1f5]: Pt. 1 applied (with modifications) (14.6.2016) by The Midland Metro (Birmingham City Centre Extension, etc.) (Land Acquisition and Variation) Order 2016 (S.I. 2016/545), arts. 1, 21, 28, 30 (with art. 39)

[^key-6c8f8aff14571c55ab8ef9b813376201]: Act modified (14.6.2016) by The Midland Metro (Birmingham City Centre Extension, etc.) (Land Acquisition and Variation) Order 2016 (S.I. 2016/545), Sch. 2 para. 3(1) (with art. 39)

[^key-30c393a5a557dd705f56b0ee0ad30b64]: Pt. 1 applied (with modifications) (14.6.2016) by The Midland Metro (Birmingham City Centre Extension, etc.) (Land Acquisition and Variation) Order 2016 (S.I. 2016/545), art. 1, Sch. 2 paras. 3(2), 4-9 (with art. 39)

[^key-f4bb05d2d9bef9cf7a434e1cdfb2ea25]: S. 7 applied (13.7.2016) by Housing and Planning Act 2016 (c. 22), ss. 204(2), 216(3); S.I. 2016/733, reg. 3(m)

[^key-0dcf74baeb27a134f25c7b1fb6b1be40]: Sch. 3 omitted (13.7.2016) by virtue of Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 16 para. 6; S.I. 2016/733, reg. 3(j)

[^key-d23b171221b748b2bc177c418e3c5a67]: S. 4A inserted (13.7.2016) by Housing and Planning Act 2016 (c. 22), ss. 202(1), 216(3); S.I. 2016/733, reg. 3(l) (with reg. 9)

[^key-246e172e22d846b7ac9396112ad29485]: Words in s. 11(3) substituted (13.7.2016) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 14 para. 6; S.I. 2016/733, reg. 3(h) (with reg. 6)

[^key-4d9be6b7f57f86cc6e3329d2be5ab927]: S. 11(2) omitted (13.7.2016) by virtue of Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 16 para. 3; S.I. 2016/733, reg. 3(j)

[^key-b12c54a1d77c2c3d3d76ef3ff931ab43]: Words in s. 12(6) omitted (13.7.2016) by virtue of Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 16 para. 4; S.I. 2016/733, reg. 3(j)

[^key-9dd4ee4319295141fbf481d2db14b4da]: Words in s. 37 substituted (13.7.2016) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 16 para. 5; S.I. 2016/733, reg. 3(j)

[^key-706bb5f28baeb34280d10ceda57b0cbf]: S. 4 substituted (13.7.2016) by Housing and Planning Act 2016 (c. 22), ss. 182(1), 216(3); S.I. 2016/733, reg. 3(i) (with reg. 7)

[^key-a82c6003ca0fd0d914399a0451bb405a]: Pt. 1 applied (with modifications) (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), arts. 1, 28 (with arts. 39, 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))

[^key-3ad07aded6dae077dc36e7d1f8964819]: S. 8(1) excluded (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), arts. 1, 37(1) (with arts. 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))

[^key-0e79656fab04ff33d6eda5469eab84b6]: Act applied (with modifications) (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), Sch. 5 para. 3(1) (with arts. 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))

[^key-e2043da36d95022be55a2f4839df849b]: Pt. 1 applied (with modifications) (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), art. 1, Sch. 5 para. 3(2)-9 (with arts. 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))

[^key-bd1a2eb865296ed7dea3299ec491f69c]: S. 10(2) applied (2.8.2016) by The Meaford Gas Fired Generating Station Order 2016 (S.I. 2016/779), arts. 1, 21(4)

[^key-4bfe15c0cd90e0b838c6dadb203ee136]: Act applied (with modifications) (2.8.2016) by The Meaford Gas Fired Generating Station Order 2016 (S.I. 2016/779), arts. 1, 8, 18(3), Sch. 3 para. 3(1)

[^key-7423744dc9c1191b471cb78a89a42d2e]: Pt. 1 applied (with modifications) (2.8.2016) by The Meaford Gas Fired Generating Station Order 2016 (S.I. 2016/779), arts. 1, 8, 18(3), Sch. 3 paras. 4-9

[^key-6ea904f269ee0ea62e9e6789a09cbe60]: S. 7 applied (10.8.2016) by The York Potash Harbour Facilities Order 2016 (S.I. 2016/772), arts. 1, 25(6)(a) (with arts. 35, 36)

[^key-0866e9f2336c7e614dff7f8336dbe63a]: Act applied (with modifications) (10.8.2016) by The York Potash Harbour Facilities Order 2016 (S.I. 2016/772), Sch. 3 para. 3(1) (with arts. 35, 36)

[^key-ac6cd30309c900df43606e63160c6935]: Pt. 1 applied (with modifications) (10.8.2016) by The York Potash Harbour Facilities Order 2016 (S.I. 2016/772), art. 1, Sch. 3 para. 3(2)-9 (with arts. 35, 36)

[^key-f8783c6923dd1dd0776c9a12cf154427]: S. 10(2) modified (19.8.2016) by The North Wales Wind Farms Connection Order 2016 (S.I. 2016/818), arts. 1, 20(4), (5) (with art. 35)

[^key-70a9225ad7052199c78329cd645d18c7]: Act applied (with modifications) (19.8.2016) by The North Wales Wind Farms Connection Order 2016 (S.I. 2016/818), Sch. 7 para. 3(1) (with art. 35)

[^key-8e1d1546508d1215d6724a6cb82c6d8c]: Pt. 1 applied (with modifications) (19.8.2016) by The North Wales Wind Farms Connection Order 2016 (S.I. 2016/818), art. 1, Sch. 7 para. 3(2)-9 (with art. 35)

[^key-8ab5714ecdfdaf07cfe283653c1c2a44]: S. 8(1) excluded (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), arts. 1(2), 24 (with arts. 37, 38)

[^key-4729758a82ce9fb12eff189e3b4a1ba4]: Act applied (with modifications) (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), Sch. 6 para. 3(1) (with arts. 37, 38)

[^key-4199160bf8334962e986ef0604b51a29]: Pt. 1 applied (with modifications) (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), art. 1(2), Sch. 6 para. 3(2)-9 (with arts. 37, 38)

[^key-d97ba4c68a1c317c2820d998830c377e]: S. 11(3) excluded (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), art. 1(2), Sch. 12 para. 4(1) (with arts. 37, 38)

[^key-bf6d3bbd0b6b36280e5822a8510230ad]: S. 7 applied (15.9.2016) by The River Humber Gas Pipeline Replacement Order 2016 (S.I. 2016/853), arts. 1, 25(4) (with art. 43)

[^key-a34ef4d75fa2b6102039597aa8d2276f]: S. 10 applied (15.9.2016) by The River Humber Gas Pipeline Replacement Order 2016 (S.I. 2016/853), arts. 1, 25(4) (with art. 43)

[^key-87acbe4151a9e8608bf6d0b309672e40]: S. 8(1) excluded (15.9.2016) by The River Humber Gas Pipeline Replacement Order 2016 (S.I. 2016/853), arts. 1, 32 (with art. 43)

[^key-850974f62886a31d7e62522c4b07b617]: Act applied (with modifications) (15.9.2016) by The River Humber Gas Pipeline Replacement Order 2016 (S.I. 2016/853), Sch. 11 para. 3(1) (with art. 43)

[^key-fe1f33a469d8a1f99037f118d91bbe08]: Pt. 1 applied (with modifications) (15.9.2016) by The River Humber Gas Pipeline Replacement Order 2016 (S.I. 2016/853), art. 1, Sch. 11 para. 3(2)-8 (with art. 43)

[^key-0043f137c6ab93e63d8354024bb0da4e]: S. 8(1) excluded (23.9.2016) by The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016 (S.I. 2016/863), arts. 1, 26

[^key-8c8f7830633a5d86b36bd1f4ec23e4f9]: Act applied (with modifications) (23.9.2016) by The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016 (S.I. 2016/863), Sch. 6 para. 3(1)

[^key-9fd1f3ed96d7fcf4d46fe8ce0fb97f4e]: Pt. 1 applied (with modifications) (23.9.2016) by The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016 (S.I. 2016/863), art. 1, Sch. 6 para. 3(2)-9

[^key-a65ffd79768abab3c824f8c557ecc6c9]: S. 11(3) excluded (23.9.2016) by The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016 (S.I. 2016/863), art. 1, Sch. 9 para. 23(1)

[^key-356b50d6d0e41f48f4178a3111d16544]: S. 8(1) excluded (27.9.2016) by The Triton Knoll Electrical System Order 2016 (S.I. 2016/880), arts. 1(2), 23(1) (with arts. 39, 40, Sch. 8 para. 19)

[^key-699c5d1cda9136997ca38b495cc8ce11]: Act applied (with modifications) (27.9.2016) by The Triton Knoll Electrical System Order 2016 (S.I. 2016/880), Sch. 6 para. 3(1) (with arts. 39, 40, Sch. 8 para. 19)

[^key-783d99a335cab69fb0332d98f4bd8c4e]: Pt. 1 applied (with modifications) (27.9.2016) by The Triton Knoll Electrical System Order 2016 (S.I. 2016/880), art. 1(2), Sch. 6 para. 3(2)-9 (with arts. 39, 40, Sch. 8 para. 19)

[^key-85f2cccab6e64a0542c59357c5a1eebe]: S. 11(3) excluded (27.9.2016) by The Triton Knoll Electrical System Order 2016 (S.I. 2016/880), art. 1(2), Sch. 8 para. 4(1)(k) (with arts. 39, 40, Sch. 8 para. 19)

[^key-f100c2e1e3c8c15ee18abe9d5c2dfd60]: S. 10(2) applied (28.10.2016) by The Brechfa Forest Wind Farm Connection Order 2016 (S.I. 2016/987), arts. 1, 20(4), (5) (with art. 37)

[^key-5f1a1fc1961206e708006dab2e657e84]: Act applied (with modifications) (28.10.2016) by The Brechfa Forest Wind Farm Connection Order 2016 (S.I. 2016/987), Sch. 4 paras. 3-9 (with art. 37)

[^key-ddc7221c5e6370537c7e0763c09c51aa]: Pt. 1 applied (with modifications) (24.11.2016) by The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016 (S.I. 2016/1035), arts. 1, 28 (with arts. 37, 43, 44)

[^key-999e0a2d3bd10ad76e3a77c9e2edd510]: Act applied (with modifications) (24.11.2016) by The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016 (S.I. 2016/1035), Sch. 5 para. 3(1) (with arts. 43, 44)

[^key-f036bb8e450ff80d5d1eb727c7d343e6]: Pt. 1 applied (with modifications) (24.11.2016) by The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016 (S.I. 2016/1035), art. 1, Sch. 5 paras. 3(2), 4-9 (with arts. 43, 44)

[^key-cefa1e5d61895bfec2c87189ea6a8ebb]: S. 8(1) modified by Local Government (Miscellaneous Provisions) Act 1976 (c. 57), Sch. 1 para. 7 (as substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 17 paras. 6, 7; S.I. 2017/75, reg. 3(g) (with reg. 5))

[^key-ae930edb41c1c7e40849a882b5596cf7]: S. 8(1) modified by Local Government, Planning and Land Act 1980 (c. 65), Sch. 28 para. 23(2) (as substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 17 paras. 6, 7; S.I. 2017/75, reg. 3(g) (with reg. 5))

[^key-2e4365da670d8f803deca790a3b070a3]: S. 8(1) modified by Highways Act 1980 (c. 66), Sch. 19 para. 7 (as substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 17 paras. 6, 7; S.I. 2017/75, reg. 3(g) (with reg. 5))

[^key-98b9385d8270718276262771c215199a]: S. 8(1) modified by Gas Act 1986 (c. 44), Sch. 3 para. 8 (as substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 17 paras. 6, 7; S.I. 2017/75, reg. 3(g) (with reg. 5))

[^key-b099c05e2d313ca86bb4390b0dd26939]: S. 8(1) modified by Housing Act 1988 (c. 50), Sch. 10 para. 22 (as substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 17 paras. 6, 7; S.I. 2017/75, reg. 3(g) (with reg. 5))

[^key-a767afa3e5dc4b69da006d6f86030f1e]: S. 8(1) modified by Electricity Act 1989 (c. 29), Sch. 3 para. 9 (as substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 17 paras. 6, 7; S.I. 2017/75, reg. 3(g) (with reg. 5))

[^key-b583e0d864b3de82d7d975acae0585c0]: S. 8(1) modified by Water Industry Act 1991 (c. 56), Sch. 9 para. 4 (as substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 17 paras. 6, 7; S.I. 2017/75, reg. 3(g) (with reg. 5))

[^key-91b85791a49e94c3d0435fb4f109a198]: S. 8(1) modified by Water Resources Act 1991 (c. 57), Sch. 18 para. 4 (as substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 17 paras. 6, 7; S.I. 2017/75, reg. 3(g) (with reg. 5))

[^key-40f797a2076343fe97e11a1370b8a379]: S. 8(1) modified by Coal Industry Act 1994 (c. 21), Sch. 1B para. 4 (as substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 17 paras. 6, 7; S.I. 2017/75, reg. 3(g) (with reg. 5))

[^key-fed15b791c424ff84a2a2364b885af1f]: S. 8(1) modified by Postal Services Act 2000 (c. 26), Sch. 5 para. 8 (as substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 17 paras. 6, 7; S.I. 2017/75, reg. 3(g) (with reg. 5))

[^key-edb3c11b2c238842155239c3a2ca66cd]: S. 8(1) modified by Housing and Regeneration Act 2008 (c. 17), Sch. 2 para. 11 (as substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 17 paras. 6, 7; S.I. 2017/75, reg. 3(g) (with reg. 5))

[^key-41f2cfbce2176a4cbed497d32731d613]: Act applied (with modifications) by Compulsory Purchase (Vesting Declarations) Act 1981 (c. 66), s. 7(1) (as substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 18 para. 3; S.I. 2017/75, reg. 3(k) (with reg. 5))

[^key-e7d735e032646a3cbb736814db8708e9]: S. 11A inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), ss. 186(3), 216(3); S.I. 2017/75, reg. 3(e) (with reg. 5)

[^key-b500416cf2d651325347896c1782f4c4]: S. 11B inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), ss. 187(3), 216(3); S.I. 2017/75, reg. 3(e) (with reg. 5)

[^key-9598a9b010e400ccf70f36cb86a4252e]: Sch. 2A inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 17 para. 3; S.I. 2017/75, reg. 3(g) (with reg. 5)

[^key-5e6608fe826bba7bdde561f5d9e834c9]: S. 11(1A)(1B) inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), ss. 186(2)(b), 216(3); S.I. 2017/75, reg. 3(e) (with reg. 5)

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.