Land Compensation Act 1973
Act applied (with modifications) (7.1.2015) by The Willington C Gas Pipeline Order 2014 (S.I. 2014/3328), Sch. 7 para. 2
Act applied (with modifications) (26.9.2018) by The Network Rail (Felixstowe Branch Line Improvements Level Crossings Closure) Order 2018 (S.I. 2018/937), Sch. 8 para. 3
Act applied (with modifications) (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 20(4), Sch. 8 para. 2 (with arts. 40, 41)
Act applied (with modifications) (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), art. 1, Sch. 7 para. 2 (with arts. 41, 42, Sch. 16)
S. 52(4ZA)(b)(iii) and word inserted (6.4.2018) by Neighbourhood Planning Act 2017 (c. 20), ss. 38(2)(b)(ii), 46(1); S.I. 2018/252, reg. 3 (with reg. 4)
Words in s. 33I(1) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 106 (with Sch. 5)
Act applied (with modifications) (11.7.2025) by The Oaklands Farm Solar Park Order 2025 (S.I. 2025/739), art. 1, Sch. 7 paras. 1, 2 (with Sch. 10)
Act applied (with modifications) (11.1.2006) by The Cambridgeshire Guided Busway Order 2005 (S.I. 2005/3523), Sch. 7 paras. 1, 2 (with art. 52)
Act applied (with modifications) (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 28, Sch. 7 para. 3 (with arts. 5, 36)
Words in s. 39(8)(c) substituted (1.12.2008) by Housing and Regeneration Act 2008 (c. 17), s. 325(1), Sch. 8 para. 17(3)(b); S.I. 2008/3068, art. 2(1)(w)(3) (with arts. 6-13)
Act applied (with modifications) (21.4.2015) by The Network Rail (Ordsall Chord) Order 2015 (S.I. 2015/780), Sch. 9 para. 2 (with art. 36(2))
Act modified (6.11.2012) by The Network Rail (North Doncaster Chord) Order 2012 (S.I. 2012/2635), Sch. 9 para. 2(1) (with art. 35(2))
S. 52ZE inserted (6.4.2018) by Housing and Planning Act 2016 (c. 22), ss. 198, 216(3); S.I. 2018/251, reg. 4(i) (with reg. 6)
Act modified (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), art. 1, Sch. 7 para. 2 (with art. 32, Sch. 10 paras. 26(2), 68)
Act modified (21.4.2014) by The Network Rail (Norton Bridge Area Improvements) Order 2014 (S.I. 2014/909), Sch. 8 para. 2 (with art. 34(2))
Words in s. 61(1) substituted (1.7.2013) by The Transfer of Tribunal Functions Order 2013 (S.I. 2013/1036), art. 1, Sch. 1 para. 202 (with Sch. 3)
Act applied (with modifications) (2.4.2004) by Docklands Light Railway (Woolwich Arsenal Extension) Order 2004 (S.I. 2004/757), Sch. 8 paras. 1, 2
S. 32(7C) inserted (W.) (1.12.2022) by The Renting Homes (Wales) Act 2016 (Consequential Amendments) Regulations 2022 (S.I. 2022/1166), regs. 1(1), 7(3)
Words in s. 13(1) omitted (E.) (1.10.2006) by virtue of Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), s. 16(2), Sch. 5 para. 18(1); 2006 No. 2, Instrument made by Archbishops
Act applied (with modifications) (28.1.2005) by East Midlands Parkway Station (Land Acquisition) Order 2005 (S.I. 2005/8), Sch. 1 para. 2
Act modified (4.3.2020) by The Midland Metro (Birmingham Eastside Extension) Order 2020 (S.I. 2020/141), , art. 1, Sch. 5 para. 3 (with arts. 47, 48, Sch. 10 para. 19)
Act applied (with modifications) (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), art. 1, Sch. 11 para. 3 (with art. 51)
S. 39(9)(b) inserted (1.12.2008) by Housing and Regeneration Act 2008 (c. 17), s. 325(1), Sch. 8 para. 17(4)(b); S.I. 2008/3068, art. 2(1)(w)(3) (with arts. 6-13)
Act applied (with modifications) (4.10.2024) by The National Grid (Bramford to Twinstead Reinforcement) Order 2024 (S.I. 2024/958), art. 1, Sch. 9 paras. 1, 2 (with art. 40, Sch. 14)
Act applied (with modifications) (3.8.2005) by The Greater Manchester (Leigh Busway) Order 2005 (S.I. 2005/1918), Sch. 7 para. 2
Words in s. 32(7B)(b) substituted (1.4.2010) by The Housing and Regeneration Act 2008 (Consequential Provisions) Order 2010 (S.I. 2010/866), art. 1(2), Sch. 2 para. 5 (with art. 6, Sch. 3)
Words in s. 52ZB(9)(c) substituted (6.4.2018) by Housing and Planning Act 2016 (c. 22), ss. 195(4)(b), 216(3); S.I. 2018/251, reg. 4(f) (with reg. 6)
Act applied (with modifications) (28.7.2025) by The Mona Offshore Wind Farm Order 2025 (S.I. 2025/870), art. 1, Sch. 9 paras. 1, 3 (with arts. 37, 38, Sch. 10)
Act modified (30.12.2015) by The Port Talbot Steelworks Generating Station Order 2015 (S.I. 2015/1984), Sch. 3 para. 2 (with art. 26, Sch. 3 para. 1)
Words in s. 54(1) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 109 (with Sch. 5)
Words in s. 56(3)(d) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 110 (with Sch. 5)
Act applied (with modifications) (11.1.2023) by The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022 (S.I. 2022/1406), art. 1, Sch. 10 paras. 1, 3 (with art. 34(2), Sch. 12 paras. 5, 47, 79)
Act applied (with modifications) (22.7.2008) by Crossrail Act 2008 (c. 18), Sch. 6 paras. 6(2), 7
Act modified (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), art. 1, Sch. 12 para. 3
Words in s. 52ZC(10)(c) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 108 (with Sch. 5)
Act modified (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), art. 1, Sch. 7 para. 3 (with art. 5, Sch. 27 para. 36)
Words in s. 54(6)(b) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 109 (with Sch. 5)
Act applied (with modifications) (25.3.2016) by The Thorpe Marsh Gas Pipeline Order 2016 (S.I. 2016/297), Sch. 6 para. 2 (with art. 39)
S. 52ZC(3B)(b)(iii) and word inserted (6.4.2018) by Neighbourhood Planning Act 2017 (c. 20), ss. 38(3)(b)(ii), 46(1); S.I. 2018/252, reg. 3 (with reg. 4)
S. 52(2)(2A) substituted for s. 52(2) (6.4.2018) by Housing and Planning Act 2016 (c. 22), ss. 194(2), 216(3); S.I. 2018/251, reg. 4(e) (with reg. 6)
Act applied (with modifications) (4.4.2025) by The North Lincolnshire Green Energy Park Order 2025 (S.I. 2025/362), art. 1, Sch. 11 paras. 1, 2 (with Sch. 14)
Act applied (with modifications) (29.8.2017) by The East Anglia THREE Offshore Wind Farm Order 2017 (S.I. 2017/826), Sch. 6 para. 2(1) (with arts. 36, 37, Sch. 8 para. 34)
Act modified (1.6.2016) by The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016 (S.I. 2016/547), Sch. 6 para. 2 (with arts. 4, 5(3))
S. 39(9)(a): words in s. 39(9) renumbered as s. 39(9)(a) (1.12.2008) by Housing and Regeneration Act 2008 (c. 17), s. 325(1), Sch. 8 para. 17(4)(a); S.I. 2008/3068, art. 2(1)(w)(3) (with arts. 6-13)
Words in s. 29A(2)(a) substituted (5.12.2005) by Civil Partnership Act 2004 (c. 33), s. 263(2), Sch. 9 para. 17(3); S.I. 2005/3175, art. 2(1), Sch. 1
Act applied (with modifications) (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), art. 1, Sch. 16 para. 2 (with arts. 62, 76, 87)
Act modified (7.5.2014) by The National Grid (North London Reinforcement Project) Order 2014 (S.I. 2014/1052), Sch. 10 para. 2
Act applied (with modifications) (25.11.2005) by Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), Sch. 7 paras. 1, 2 (with arts. 3(5), 15(3))
S. 33D(4)(b)(c) substituted (6.4.2006 for E., 16.6.2006 for W.) by Housing Act 2004 (c. 34), s. 270(4)(5)(f), Sch. 15 para. 4(2); S.I. 2006/1060, art. 2(1)(d) (with Sch.); S.I. 2006/1535, art. 2(b) (with Sch.)
Act modified (13.11.2012) by The Chiltern Railways (Bicester to Oxford Improvements) Order 2012 (S.I. 2012/2679), Sch. 10 para. 2 (with art. 42(2))
S. 52ZC(3A)(3B) inserted (6.4.2018) by Housing and Planning Act 2016 (c. 22), ss. 195(5)(a), 216(3); S.I. 2018/251, reg. 4(f) (with reg. 6)
Act applied (with modifications) (22.10.2025) by The A46 Newark Bypass Development Consent Order 2025 (S.I. 2025/1090), art. 1, Sch. 6 paras. 1, 3 (with arts. 4, 9, 51, Sch. 9)
Act modified (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), art. 1, Sch. 12 para. 3 (with Sch. 13 Pt. 1 para. 19)
Act modified (20.11.2013) by The M1 Junction 10a (Grade Separation) Order 2013 (S.I. 2013/2808), Sch. 9 para. 2
Act modified (4.5.2005) by The Telford Railfreight Terminal (Donnington) Order 2005 (S.I. 2005/1163), Sch. 6 para. 2
Words in s. 38(3)(a) inserted (1.4.2015) by The Care Act 2014 and Children and Families Act 2014 (Consequential Amendments) Order 2015 (S.I. 2015/914), art. 1(2), Sch. para. 24 (with arts. 1(3), 3)
Words in s. 87(1) repealed (31.10.2004) by Planning and Compulsory Purchase Act 2004 (c. 5), Sch. 7 para. 7(4), 9 (with s. 111, Sch. 7 para. 7(5)); S.I. 2004/2593, art. 2(d)(e)
S. 58(1) modified (12.1.2004) by The Alconbury Airfield (Rail Facilities and Connection to East Coast Main Line) Order 2003 (S.I. 2003/3364), art. 1, Sch. 4 para. 2(3)
Act applied (with modifications) (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), Sch. 5 para. 2 (with arts. 20(6), 30)
Words in s. 37(3A) substituted (6.4.2006 for E., 16.6.2006 for W.) by Housing Act 2004 (c. 34), s. 270(4)(5)(f), Sch. 15 para. 5(5); S.I. 2006/1060, art. 2(1)(d) (with Sch.); S.I. 2006/1535, art. 2(b) (with Sch.)
Act applied (with modifications) (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), art. 1, Sch. 7 para. 3 (with Sch. 8 Pt. 6 para. 19)
Act modified (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), Sch. 7 para. 2 (with Sch. 9 para. 144)
Act modified (28.6.2018) by The High Speed Rail (London West Midlands) (Greatmoor Railway Sidings Etc.) Order 2018 (S.I. 2018/693), Sch. 6 para. 3
Act applied (with modifications) (30.9.2025) by The M60/M62/M66 Simister Island Interchange Development Consent Order 2025 (S.I. 2025/1018), art. 1, Sch. 6 paras. 1, 3 (with arts. 5, 34, Sch. 9)
Act modified (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), Sch. 7 para. 2 (with arts. 40, 41, Sch. 9 Pt. 5 para. 18)
Act modified (6.11.2013) by The Transport for Greater Manchester (Light Rapid Transit System) (Second City Crossing) Order 2013 (S.I. 2013/2587), Sch. 5 para. 2 (with arts. 42, 43)
Act applied (with modifications) (16.4.2013) by The Network Rail (Pont Briwet) (Land Acquisition) Order 2013 (S.I. 2013/767), Sch. 1 para. 2(2) (with arts. 20, 21)
S. 52AZA inserted (6.4.2018) by Housing and Planning Act 2016 (c. 22), ss. 197(5), 216(3); S.I. 2018/251, reg. 4(h) (with reg. 6)
Word in s. 52(4)(b) omitted (6.4.2018) by virtue of Neighbourhood Planning Act 2017 (c. 20), ss. 38(2)(a)(i), 46(1); S.I. 2018/252, reg. 3 (with reg. 4)
Act applied (with modifications) (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), art. 1, Sch. 7 paras. 1, 3 (with art. 6, Sch. 10)
S. 52ZD inserted (6.4.2018) by Housing and Planning Act 2016 (c. 22), ss. 194(4), 216(3); S.I. 2018/251, reg. 4(e)
Words in s. 59(1)(b)(ii) substituted (1.7.2013) by The Transfer of Tribunal Functions Order 2013 (S.I. 2013/1036), art. 1, Sch. 1 para. 201(a) (with Sch. 3)
Act modified (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), art. 1, Sch. 6 para. 3 (with arts. 5, 44)
Words in s. 39(8)(a) substituted (1.12.2008) by Housing and Regeneration Act 2008 (c. 17), s. 325(1), Sch. 8 para. 17(3)(a); S.I. 2008/3068, art. 2(1)(w)(3) (with arts. 6-13)
Act applied (with modifications) (9.10.2024) by The M3 Junction 9 Development Consent Order 2024 (S.I. 2024/752), art. 1, Sch. 6 paras. 1, 3 (with art. 4, Sch. 10) (as amended by S.I. 2024/1020, Sch.) Act applied (with modifications) (25.10.2024) by The Associated British Ports (Immingham Eastern Ro-Ro Terminal) Development Consent Order 2024 (S.I. 2024/1014), art. 1, Sch. 5 paras. 1, 3 (with arts. 36, 40, Sch. 4)
Act modified (24.4.2025) by The London Luton Airport Expansion Development Consent Order 2025 (S.I. 2025/463), art. 1, Sch. 6 para. 2 (with Sch. 8 paras. 36(3), 87)
Act applied (with modifications) (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), art. 1, Sch. 6 paras. 1, 3 (with arts. 4, 52, Sch. 9 para. 82)
S. 52ZA(1) substituted (6.4.2018) by Housing and Planning Act 2016 (c. 22), ss. 195(3), 216(3); S.I. 2018/251, reg. 4(f) (with reg. 6)
S. 52A modified by 1961 c. 33, s. 5A(5)(6) (as inserted (31.10.2004) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 103(2); S.I. 2004/2593, art. 2(a))
Act applied (with modifications) (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), s. 64(1), Sch. 9 paras. 1, 2(10)
Act applied (with modifications) (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), Sch. 5 para. 2 (with arts. 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))
Words in s. 58(1) omitted (3.2.2017) by virtue of Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 17 para. 5(a); S.I. 2017/75, reg. 3(g) (with reg. 5)
S. 52(4)(b)(iii) and word inserted (6.4.2018) by Neighbourhood Planning Act 2017 (c. 20), ss. 38(2)(a)(ii), 46(1); S.I. 2018/252, reg. 3 (with reg. 4)
Act applied (with modifications) (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), art. 1, Sch. 6 paras. 1, 3 (with arts. 4, 45, Sch. 9 paras. 6, 46, 54(1))
Act applied (with modifications) (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), art. 1(2), Sch. 9 paras. 1, 3 (with arts. 21, 41, Sch. 10)
S. 28 modified (6.11.2012) by The Network Rail (North Doncaster Chord) Order 2012 (S.I. 2012/2635), arts. 1, 41(2) (with art. 35(2))
Act applied (with modification) (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), Sch. 7 para. 2
Act applied (with modifications) (31.5.2025) by The East Yorkshire Solar Farm Order 2025 (S.I. 2025/585), art. 1, Sch. 10 paras. 1, 2 (with art. 49, Sch. 14)
Act applied (with modifications) (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), Sch. 5 para. 2 (with arts. 51, 53)
Act applied (with modifications) (12.10.2018) by The Eggborough Gas Fired Generating Station Order 2018 (S.I. 2018/1020), Sch. 9 para. 2 (with arts. 6, 42)
Act applied (with modifications) (18.3.2017) by The North London Heat and Power Generating Station Order 2017 (S.I. 2017/215), Sch. 11 para. 2
Act modified (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), art. 1, Sch. 10 paras. 1, 2 (with art. 19)
S. 10 applied (1.4.2010) by The Conservation of Habitats and Species Regulations 2010 (S.I. 2010/490), regs. 1(2), 28(5) (with reg. 125)
S. 33H applied by 1968 c. 34, s. 12(4) (as inserted (31.10.2004) by Planning and Compulsory Purchase Act 2004 (c. 5), Sch. 7 para. 4 (with s. 111); S.I. 2004/2593, art. 2(d))
Words in s. 6(3) substituted (22.9.2017) by Neighbourhood Planning Act 2017 (c. 20), ss. 32(5)(b), 46(1); S.I. 2017/936, reg. 3(b) (with reg. 4)
Act applied (with modifications) (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), Sch. 6 para. 2 (with arts. 37, 38)
Act applied (with modifications) (23.9.2016) by The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016 (S.I. 2016/863), Sch. 6 para. 2
Words in s. 29A(1) substituted (5.12.2005) by Civil Partnership Act 2004 (c. 33), s. 263(2), Sch. 9 para. 17(2)(a); S.I. 2005/3175, art. 2(1), Sch. 1
Act modified (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), Sch. 6 para. 3 (with art. 32, Sch. 9 para. 36)
Act applied (with modifications) (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), art. 1, Sch. 8 para. 2 (with art. 7)
Act applied (with modifications) (13.6.2024) by The Network Rail (Cambridge Re-Signalling) Order 2024 (S.I. 2024/724), art. 1, Sch. 5 paras. 1, 3 (with art. 13)
Act applied (with modifications) (17.2.2025) by The Heckington Fen Solar Park Order 2025 (S.I. 2025/85), art. 1, Sch. 9 paras. 1, 2 (with art. 43, Sch. 13)
Act applied (with modifications) (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), Sch. 7 para. 2
Act modified (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), Sch. 7 para. 3
Act modified (28.11.2014) by The Walney Extension Offshore Wind Farm Order 2014 (S.I. 2014/2950), Sch. 7 para. 2 (with arts. 38, 39)
S. 52(11) omitted (6.4.2018) by virtue of Housing and Planning Act 2016 (c. 22), ss. 195(2)(c), 216(3); S.I. 2018/251, reg. 4(f) (with reg. 6)
Act applied (with modifications) (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), art. 1, Sch. 9 paras. 1, 2 (with art. 44, Sch. 12)
Words in s. 3(5) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 102 (with Sch. 5)
Act applied (with modifications) (2.8.2022) by The Network Rail (Oxford Station Phase 2 Improvements (Land Only)) Order 2022 (S.I. 2022/871), art. 1, Sch. 1 para. 3
Act modified (31.12.2020) by The Network Rail (Cambridgeshire Level Crossing Reduction) Order 2020 (S.I. 2020/1485), Sch. 14 para. 3
Act applied (with modifications) (28.4.2025) by The Rampion 2 Offshore Wind Farm Order 2025 (S.I. 2025/468), art. 1, Sch. 8 paras. 1, 2 (with arts. 47, 48, Sch. 10)
Act applied (with modifications) (6.8.2014) by The Rampion Offshore Wind Farm Order 2014 (S.I. 2014/1873), Sch. 8 para. 2 (with arts. 12, 13, Pt. 2 para. 6, 3 para. 5, 4 para. 4, 5 para. 4, Sch. 12 para. 19)
Act applied (with modifications) (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), art. 1, Sch. 7 para. 2 (with arts. 41, 42, Sch. 17 para. 66)
Act applied (with modifications) (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), art. 1, Sch. 9 paras. 1, 2 (with Sch. 11)
Act modified (13.12.2006) by The Network Rail (Thameslink 2000) Order 2006 (S.I. 2006/3117), Sch. 7 para. 2 (with arts. 34, 35(2))
Act modified (21.11.2013) by The Network Rail (Redditch Branch Enhancement) Order 2013 (S.I. 2013/2809), Sch. 7 para. 2 (with arts. 27(2), 39, Sch. 10 para. 4)
Act modified (24.8.2017) by The National Grid (Richborough Connection Project) Development Consent Order 2017 (S.I. 2017/817), Sch. 10 para. 2 (with art. 22)
Act modified (14.10.2008) by Felixstowe Branch Line and Ipswich Yard Improvement Order 2008 (S.I. 2008/2512), Sch. 6 para. 2 (with art. 36(3))
Act applied (with modifications) (27.2.2025) by The Associated British Ports (Immingham Green Energy Terminal) Order 2025 (S.I. 2025/165), art. 1, Sch. 11 paras. 1, 2 (with arts. 48, 59, Sch. 14)
Act applied (with modifications) (2.8.2022) by The Network Rail (Oxford Station Phase 2 Improvements (Land Only)) (No. 2) Order 2022 (S.I. 2022/872), art. 1(1), Sch. 1 paras. 1, 3
Act applied (with modifications) (11.2.2005) by Merseytram (Liverpool City Centre to Kirkby) Order 2005 (S.I. 2005/120), Sch. 7 para. 2 (with arts. 65, 66)
Words in s. 52ZC(4) omitted (6.4.2018) by virtue of Housing and Planning Act 2016 (c. 22), ss. 195(5)(b), 216(3); S.I. 2018/251, reg. 4(f) (with reg. 6)
Act modified (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), art. 1(2), Sch. 8 para. 2 (with arts. 40, 41)
Act applied (with modifications) (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), Sch. 9 para. 3 (with art. 31(2))
Act modified (9.6.2009) by Nottingham Express Transit System Order 2009 (S.I. 2009/1300), Sch. 7 para. 2 (with Sch. 13 para. 14(2), 14 para. 19)
S. 52(6) substituted (31.10.2004) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 104(2)(b); S.I. 2004/2593, art. 2(a)
S. 58(1) applied (with modifications) (8.10.2005) by Leicestershire County Council (Ashby de la Zouch Canal Extension) Order 2005 (S.I. 2005/2786), art. 1, Sch. 7 para. 2(3)
Word in s. 37(2)(c) substituted (6.4.2006 for E., 16.6.2006 for W.) by Housing Act 2004 (c. 34), s. 270(4)(5)(f), Sch. 15 para. 5(3); S.I. 2006/1060, art. 2(1)(d) (with Sch.); S.I. 2006/1535, art. 2(b) (with Sch.)
Act applied (with modifications) (2.2.2016) by The East Midlands Gateway Rail Freight Interchange and Highway Order 2016 (S.I. 2016/17), Sch. 14 para. 2
Act applied (with modifications) (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), art. 1, Sch. 6 paras. 1, 3 (with arts. 4, 50)
Act applied (with modifications) (14.8.2025) by The Byers Gill Solar Order 2025 (S.I. 2025/934), art. 1, Sch. 9 paras. 1, 2 (with art. 43, Sch. 11)
Act applied (with modifications) (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), art. 1, Sch. 10 paras. 1, 2 (with art. 45, Sch. 14)
S. 28 modified (26.9.2012) by The Network Rail (Ipswich Chord) Order 2012 (S.I. 2012/2284), arts. 1, 31(2) (with art. 26(2))
Act applied (with modifications) (18.2.2016) by The A19/A1058 Coast Road (Junction Improvement) Development Consent Order 2016 (S.I. 2016/73), Sch. 6 para. 2 (with art. 37)
Act modified (19.1.2021) by The Network Rail (Suffolk Level Crossing Reduction) Order 2020 (S.I. 2020/1663), Sch. 8 para. 3
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.