Electricity Act 1989

Type Public General Act
Publication 1989-07-27
Last updated 2026-07-30
State In force
Department Statute Law Database
PDF Download
articles 1
Reform history JSON API
  • (b) that it has been supplied by an electricity supplier to customers in Great Britain (or the part of Great Britain stated in the certificate).
  • (6) The matters within this subsection are—
  • (a) that two or more generating stations have, between them, generated from renewable sources the amount of electricity stated in the certificate,
  • (b) that none of them is a generating station mentioned in Article 54(1) of the Energy (Northern Ireland) Order 2003, and
  • (c) that the electricity has been supplied by a Northern Ireland supplier to customers in Northern Ireland.
  • (7) The matters within this subsection are—
  • (a) that the generating station, or, in the case of a certificate issued otherwise than to the operator of a generating station, a generating station specified in the certificate, has generated from renewable sources the amount of electricity stated in the certificate, and
  • (b) that the electricity has been used in a permitted way.
  • (8) The matters within this subsection are—
  • (a) that two or more generating stations have, between them, generated from renewable sources the amount of electricity stated in the certificate, and
  • (b) that the electricity has been used in a permitted way.
  • (9) For the purposes of subsections (7) and (8), electricity generated by a generating station, or generating stations, of any description is used in a permitted way if—
  • (a) it is used in one of the ways mentioned in subsection (10), and
  • (b) that way is specified in the order as a permitted way—
  • (i) in relation to all generating stations, or
  • (ii) in relation to generating stations of that description.
  • (10) Those ways are—
  • (a) being consumed by the operator of the generating station or generating stations by which it was generated;
  • (b) being supplied to customers in Great Britain through a private wire network;
  • (c) being provided to a distribution system or a transmission system in circumstances in which its supply to customers cannot be demonstrated;
  • (d) being used, as respects part, as mentioned in one of paragraph (a), (b) or (c) and as respects the remainder—
  • (i) as mentioned in one of the other paragraphs, or
  • (ii) as respects part, as mentioned in one of the other paragraphs and as respects the remainder as mentioned in the other;
  • (e) being used, as respects part, as mentioned in paragraph (a), (b), (c) or (d) and as respects the remainder by being supplied by an electricity supplier to customers in Great Britain or by a Northern Ireland supplier to customers in Northern Ireland, or both.
  • (11) For the purposes of subsection (10)(b) electricity is supplied through a private wire network if it is conveyed to premises by a system which is used for conveying electricity from a generating station in circumstances where—
  • (a) the operator of the generating station is exempt from section 4(1)(c) and does not hold a supply licence, and
  • (b) the electricity is supplied to one or more customers—
  • (i) by the operator directly, or
  • (ii) by a person to whom the operator supplies the electricity, being a person who is exempt from section 4(1)(c) and does not hold a supply licence.
  • (12) In this section “generating station”—
  • (a) in the case of an order made by the Scottish Ministers, means a generating station which is situated in Scotland;
  • (b) in the case of an order made by the Secretary of State, means a generating station which is not situated in Scotland.
  • (13) For this purpose “Scotland” is to be construed in accordance with section 32(3).

Section 32B: supplemental provision

32C
  • (1) A renewables obligation order may provide—
  • (a) that no renewables obligation certificates are to be issued in respect of electricity generated in specified cases or circumstances, or
  • (b) that renewables obligation certificates are to be issued in respect of a proportion only of the electricity generated in specified cases or circumstances.
  • (2) In particular, provision made by virtue of subsection (1) may specify—
  • (a) electricity generated using specified descriptions of renewable sources,
  • (b) electricity generated by specified descriptions of generating station, or
  • (c) electricity generated in specified ways.
  • (3) Provision made by virtue of subsection (1)(b) may include—
  • (a) provision about how the proportion is to be determined;
  • (b) provision about what, subject to such exceptions as may be specified, constitutes sufficient evidence of any matter required to be established for the purpose of determining that proportion;
  • (c) provision authorising the Authority, in specified circumstances, to require an operator of a generating station to arrange—
  • (i) for samples of any fuel used (or to be used) in the generating station, or of any gas or other substance produced as a result of the use of such fuel, to be taken by a person, and analysed in a manner, approved by the Authority, and
  • (ii) for the results of that analysis to be made available to the Authority.
  • (4) In the case of electricity generated by a generating station fuelled or driven—
  • (a) partly by renewable sources, and
  • (b) partly by fossil fuel (other than waste which constitutes a renewable source),

only the proportion attributable to the renewable sources is to be regarded as generated from such sources.

  • (5) A renewables obligation order may specify—
  • (a) how the proportion referred to in subsection (4) is to be determined, and
  • (b) the consequences for the issuing of renewables obligation certificates if a generating station of the type mentioned in that subsection uses more than a specified proportion of fossil fuel during a specified period.
  • (6) Those consequences may include the consequence that no certificates are to be issued in respect of any of the electricity generated by that generating station during that period.
  • (7) A renewables obligation order may specify circumstances in which the Authority may revoke a renewables obligation certificate before its production for the purposes of the renewables obligation.
  • (8) A renewables obligation order must—
  • (a) prohibit the issue of a renewables obligation certificate certifying matters within section 32B(4) or (6) where the Northern Ireland authority has notified the Authority that it is not satisfied that the electricity in question has been supplied to customers in Northern Ireland, and
  • (b) require the revocation of such a certificate if the Northern Ireland authority so notifies the Authority at a time between the issue of the certificate and its production for the purposes of the renewables obligation.
  • (9) References in section 32B and this section to the supply of electricity to customers in Northern Ireland are to be construed in accordance with the definition of “supply” in Article 3 of the Electricity (Northern Ireland) Order 1992.

Amounts of electricity specified in certificates

32D
  • (1) A renewables obligation order may specify the amount of electricity to be stated in each renewables obligation certificate, and different amounts may be specified in relation to different cases or circumstances.
  • (2) In particular, different amounts may be specified in relation to—
  • (a) electricity generated from different renewable sources;
  • (b) electricity generated by different descriptions of generating station;
  • (c) electricity generated in different ways.
  • (3) In this section “banding provision” means provision made in a renewables obligation order by virtue of subsection (1).
  • (4) Before making any banding provision, the relevant minister must have regard to the following matters—
  • (a) the costs (including capital costs) associated with generating electricity from each of the renewable sources or with transmitting or distributing electricity so generated;
  • (b) the income of operators of generating stations in respect of electricity generated from each of those sources or associated with the generation of such electricity;
  • (c) the effect of paragraph 19 of Schedule 6 to the Finance Act 2000 (c. 17) (supplies of electricity from renewable sources exempted from climate change levy) in relation to electricity generated from each of those sources;
  • (d) the desirability of securing the long term growth, and economic viability, of the industries associated with the generation of electricity from renewable sources;
  • (e) the likely effect of the proposed banding provision on the number of renewables obligation certificates issued by the Authority, and the impact this will have on the market for such certificates and on consumers;
  • (f) the potential contribution of electricity generated from each renewable source to the attainment of any target which relates to the generation of electricity or the production of energy and is imposed by, or results from or arises out of, an EU obligation.
  • (5) For the purposes of subsection (4)(a), the costs associated with generating electricity from a renewable source include any costs associated with the production or supply of heat produced in connection with that generation.
  • (6) For the purposes of subsection (4)(b), an operator's income associated with the generation of electricity from a renewable source includes any income connected with—
  • (a) the acquisition of the renewable source;
  • (b) the supply of heat produced in connection with the generation;
  • (c) the disposal of any by-product of the generation process.
  • (7) After the first order containing banding provision is made by the relevant minister, no subsequent order containing such provision may be made by that minister except following a review held by virtue of subsection (8).
  • (8) A renewables obligation order—
  • (a) may authorise the relevant minister to review the banding provision at such intervals as are specified in or determined in accordance with the order, and
  • (b) may authorise the relevant minister to review the whole or any part of the banding provision at any time when that minister is satisfied that one or more of the specified conditions is satisfied.

Section 32D: transitional provision and savings

32E
  • (1) This section applies where a renewables obligation order contains banding provision.
  • (2) The order may provide for the effect of any banding provision made in an earlier order, or of any provision of a pre-commencement order, to continue, in such circumstances as may be specified, in relation to—
  • (a) the electricity generated by generating stations of such a description as may be specified, or
  • (b) so much of that electricity as may be determined in accordance with the order.
  • (3) For the purposes of subsection (2) “pre-commencement order” means an order made under section 32 before the coming into force of this section.
  • (4) Subsection (6) applies to a generating station in respect of which a statutory grant has been awarded if—
  • (a) the generating station is of a specified description, or
  • (b) the circumstances of the case meet specified requirements.
  • (5) The requirements specified under subsection (4)(b) may relate to the time when the grant was awarded (whether a time before or after the coming into force of this section).
  • (6) A renewables obligation order which contains banding provision may provide for the operation of that provision in relation to electricity generated by a generating station to which this subsection applies to be conditional upon the operator of the station agreeing—
  • (a) if the grant or any part of it has been paid, to repay to the Secretary of State the whole or a specified part of the grant or part before the repayment date,
  • (b) to pay to the Secretary of State interest on an amount repayable under paragraph (a) for such period, and at such rate, as may be determined by the Secretary of State, and
  • (c) if the grant or any part of it has not yet been paid, to consent to the cancellation of the award of the grant or part.
  • (7) If the grant in respect of which an amount falls to be paid under paragraph (a) or (b) of subsection (6) was paid by the Scottish Ministers, the references in those paragraphs to the Secretary of State are to be read as references to those Ministers.
  • (8) For the purposes of subsection (6)—
  • (a) “the repayment date” means the date specified in or determined in accordance with the order, and
  • (b) the period for which interest is payable must not begin before the grant was paid or, if the repayment relates to an instalment of the grant, before the instalment was paid;

and, for the purposes of provision made under that subsection, a renewables obligation order may make provision about the cancellation of an award of a statutory grant or an instalment of such a grant.

  • (9) In this section “statutory grant” means—
  • (a) a grant awarded under section 5(1) of the Science and Technology Act 1965 (grants to carry on or support scientific research), or
  • (b) any other grant which is payable out of public funds and awarded under or by virtue of an Act.
  • (10) This section is without prejudice to section 32K(1)(b) (power for renewables obligation order to include transitional provision and savings).

Use of renewables obligation certificates issued in Northern Ireland

32F
  • (1) A renewables obligation order may provide that—
  • (a) in such cases as may be specified in the order, and
  • (b) subject to such conditions as may be so specified,

an electricity supplier may (to the extent provided for in accordance with the order) discharge its renewables obligation (or its obligation in relation to a particular period) by the production to the Authority of a Northern Ireland certificate.

  • (2) In this section “Northern Ireland certificate” means a certificate issued by the Northern Ireland authority in accordance with provision included, by virtue of Articles 54 to 54D of the Energy (Northern Ireland) Order 2003, in an order under Article 52 of that Order (renewables obligations for Northern Ireland suppliers).

Payment as alternative to complying with renewables obligation order

32G
  • (1) A renewables obligation order may provide—
  • (a) that an electricity supplier may (in whole or in part) discharge its renewables obligation by making a payment to the Authority before the last discharge day, and
  • (b) that an electricity supplier's renewables obligation that was not discharged in whole or in part before the last discharge day is to be treated as having been discharged to the extent specified in the order where the payment for which the order provides is made to the Authority before the end of the late payment period.
  • (2) The order may make provision—
  • (a) as to the sum which for the purposes of subsection (1) is to correspond to a renewables obligation certificate,
  • (b) for the sums that must be paid in order for an obligation to be treated as having been discharged to increase at a rate specified in the order for each day after the last discharge day;
  • (c) for different sums or rates falling within paragraph (a) or (b) in relation to different periods;
  • (d) for different such sums or rates in relation to electricity generated in different cases or circumstances specified in the order (including those of a kind referred to in section 32A(2)(c));
  • (e) for any such sum or rate to be adjusted from time to time for inflation by a method specified in the order.
  • (3) The method specified under subsection (2)(e) may, in particular, refer to a specified scale or index (as it may have effect from time to time) or to other specified data of any description.
  • (4) A renewables obligation order may provide that, where—
  • (a) a renewables obligation is one in relation to which provision made by virtue of subsection (1)(b) applies in the case of the electricity supplier who is subject to the obligation, and
  • (b) the period ending with such day (after the last discharge day) as may be specified in or determined under the order has not expired,

the taking of steps under section 27A in respect of a contravention by that supplier of that obligation is prohibited or otherwise restricted to the extent specified in the order.

  • (5) A renewables obligation order may provide that, in a case in which the amount received by the Authority, or by the Northern Ireland authority, by way of discharge payments for a period falls short of the amount due in respect of that period, every person who—
  • (a) was subject to a renewables obligation for the relevant period or for a subsequent period specified in or determined under the order, and
  • (b) is of a description so specified or determined,

must by the time and in the circumstances so specified or determined make a payment (or further payment) to the Authority of an amount calculated in the manner so specified or determined.

  • (6) A renewables obligation order may not by virtue of subsection (5) confer an entitlement on the Authority to receive a payment in respect of the shortfall for any period—
  • (a) in the case of a shortfall in the amount received by the Authority, if the receipt of the payment is to be while a prohibition or restriction by virtue of subsection (4) applies, in one or more cases, to the taking of steps in relation to contraventions of renewables obligations for that period, or
  • (b) in the case of a shortfall in the amount received by the Northern Ireland authority, if the receipt of the payment is to be while a prohibition or restriction by virtue of a corresponding provision having effect in Northern Ireland applies, in one or more cases, to the taking of steps in relation to contraventions of Northern Ireland obligations for that period.
  • (7) The provision that may be made by virtue of subsection (5) includes—
  • (a) provision for the making of adjustments and repayments at times after a requirement to make payments in respect of a shortfall for a period has already arisen, and
  • (b) provision that sections 25 to 28 are to apply in relation to a requirement imposed by virtue of that subsection on a person who is not a licence holder as if the person were a licence holder.
  • (8) References in this section to an electricity supplier's renewables obligation include references to its renewables obligation in relation to a particular period.
  • (9) For the purposes of this section, the amount received by the Authority by way of discharge payments for a period falls short of the amount due in respect of that period if, and to the extent that, the Authority would have received more by way of discharge payments if every renewables obligation for that period, so far as it was not otherwise discharged, had been discharged by payment.
  • (10) For the purposes of this section the amount received by the Northern Ireland authority by way of discharge payments for a period falls short of the amount due in respect of that period if, and to the extent that, that authority would have received more by way of discharge payments if every Northern Ireland obligation for that period, so far as not otherwise discharged, had been discharged by payment.
  • (11) In this section—
  • “discharge payment”, in relation to a period, means—a payment by virtue of subsection (1)(a) for discharging (in whole or in part) an electricity supplier's renewables obligation for that period,so much of a payment by virtue of subsection (1)(b) for securing that such an obligation is treated as discharged to any extent as does not exceed the payment that would have discharged that obligation to the same extent if it had been made before the last discharge day, orso much of any payment to the Northern Ireland authority as corresponds in relation to a Northern Ireland obligation for that period, to anything falling within paragraph (a) or (b) above;
  • “last discharge day” means the day specified as the day by which renewables obligation certificates must be produced for the purposes of section 32(6);
  • “late payment period” means such period beginning with the last discharge day as may be specified;
  • “Northern Ireland obligation” means a renewables obligation of a Northern Ireland supplier under Article 52 of the Energy (Northern Ireland) Order 2003;
  • “the relevant period”—in relation to a shortfall in amounts received by the Authority by way of discharge payments for a period, means that period, andin relation to a shortfall in amounts received by the Northern Ireland authority by way of discharge payments for a period, means any period that includes the whole or a part of that period.

Allocation of amounts to electricity suppliers

32H
  • (1) The amounts received by the Authority by virtue of section 32G must be paid by it to electricity suppliers in accordance with a system of allocation specified in a renewables obligation order.
  • (2) Subsection (1) does not apply to those amounts to the extent that they are used by the Authority under section 32I.
  • (3) The system of allocation specified in the order may provide for payments to specified categories of electricity supplier only.
  • (4) That system may also provide for the postponement of a requirement to make payments to electricity suppliers of amounts received by the Authority under section 32G(1)(b) if, at the time the payments would otherwise fall to be made, the aggregate of the amounts so received (and not used under section 32I or already paid under subsection (1)) is less than an amount specified in the order.
  • (5) The references in this section to electricity suppliers include references to Northern Ireland suppliers.

Costs of the Authority and the Northern Ireland authority

32I
  • (1) A renewables obligation order may provide for amounts received by the Authority by virtue of section 32G to be used by the Authority—
  • (a) to make payments into the Consolidated Fund in respect of costs (or a proportion of costs) which have been or are expected to be incurred by the Authority in connection with the performance of its functions conferred by or under sections 32 to 32M, or
  • (b) to make payments to the Northern Ireland authority in respect of costs (or a proportion of costs) which have been or are expected to be incurred by that authority in connection with the performance of its functions conferred by or under Articles 52 to 55F of the Energy (Northern Ireland) Order 2003.
  • (2) A renewables obligation order—
  • (a) may exclude amounts of a specified description from being used as mentioned in subsection (1);
  • (b) may prevent the Authority using amounts to make payments in respect of costs of a specified description.

Information

32J
  • (1) A renewables obligation order may provide for the Authority to require—
  • (a) an electricity supplier to provide the Authority with information, or with information of a particular kind, which in the Authority's opinion is relevant to the question whether the supplier is discharging, or has discharged, its renewables obligation;
  • (b) a person to provide the Authority with information, or with information of a particular kind, which in the Authority's opinion is relevant to the question whether a renewables obligation certificate is, or was or will in future be, required to be issued to the person.
  • (2) That information must be given to the Authority in whatever form it requires.
  • (3) A renewables obligation order may—
  • (a) require operators of generating stations generating electricity (wholly or partly) from biomass to give specified information, or information of a specified kind, to the Authority;
  • (b) specify what, for this purpose, constitutes “biomass”;
  • (c) require the information to be given in a specified form and within a specified period;
  • (d) authorise or require the Authority to postpone the issue of certificates under section 32B to the operator of a generating station who fails to comply with a requirement imposed by virtue of paragraph (a) or (c) until such time as the failure is remedied;
  • (e) authorise or require the Authority to refuse to issue certificates to such a person or to refuse to issue them unless the failure is remedied within a prescribed period.
  • (4) The Authority may publish information obtained by virtue of subsection (3).
  • (5) No person is required by virtue of this section to provide any information which the person could not be compelled to give in evidence in civil proceedings in the High Court or, in Scotland, the Court of Session.

Renewables obligation order: general provision

32K
  • (1) A renewables obligation order may—
  • (a) make further provision as to the functions of the Authority in relation to the matters dealt with by the order;
  • (b) make transitional provision and savings;
  • (c) provide for anything falling to be calculated or otherwise determined under the order to be calculated or determined by such persons, in accordance with such procedure and by reference to such matters and to the opinion of such persons, as may be specified in the order;
  • (d) make different provision for different cases or circumstances.
  • (2) Provision made by virtue of subsection (1)(b) may, in particular, include provision about the treatment of certificates issued under section 32B before the substitution of that section by section 37 of the Energy Act 2008 or certificates referred to in section 38(2)(b) of the Energy Act 2008 (Northern Ireland certificates issued under the Energy (Northern Ireland) Order 2003 before 1st April 2009).
  • (3) Provision made by virtue of subsection (1)(d) may, in particular, make—
  • (a) different provision in relation to different suppliers;
  • (b) different provision in relation to generating stations of different descriptions;
  • (c) different provision in relation to different localities.
  • (4) In subsection (3) “supplier” means an electricity supplier or a Northern Ireland supplier.

Renewables obligation orders: procedure

32L
  • (1) Before making a renewables obligation order, the relevant minister must consult—
  • (a) the Authority,
  • (b) Citizens Advice,
  • (ba) Consumer Scotland,
  • (c) the electricity suppliers to whom the proposed order would apply,
  • (d) such generators of electricity from renewable sources as the relevant minister considers appropriate, and
  • (e) such other persons, if any, as the relevant minister considers appropriate.
  • (2) A renewables obligation order is not to be made by the Secretary of State unless a draft of the instrument containing it has been laid before and approved by a resolution of each House of Parliament.
  • (3) A renewables obligation order is not to be made by the Scottish Ministers unless a draft of the instrument containing it has been laid before and approved by a resolution of the Scottish Parliament.

Renewables obligation closure order

32LA
  • (1) The Secretary of State may make a renewables obligation closure order.
  • (2) A renewables obligation closure order is an order which provides that no renewables obligation certificates are to be issued under a renewables obligation order in respect of electricity generated after a specified date.
  • (3) Provision made under subsection (2) may specify different dates in relation to different cases or circumstances.
  • (4) The cases or circumstances mentioned in subsection (2) may in particular be described by reference to—
  • (a) accreditation of a generating station, or
  • (b) the addition of generating capacity to a generating station.
  • (5) A renewables obligation closure order may include provision about—
  • (a) the meaning of “accreditation” and “generating capacity” in subsection (4);
  • (b) when generating capacity is to be treated as added to a generating station for the purposes of that subsection.
  • (6) References in this section to a renewables obligation order are references to any renewables obligation order made under section 32 (whenever made, and whether or not made by the Secretary of State).
  • (7) Power to make provision in a renewables obligation order (and any provision contained in such an order) is subject to provision contained in a renewables obligation closure order; but this section is not otherwise to be taken as affecting power to make provision in a renewables obligation order of the kind mentioned in subsection (2).
  • (8) Section 32K applies in relation to a renewables obligation closure order as it applies in relation to a renewables obligation order (and subsection (3) above is not to be taken as limiting the application of that section).

Renewables obligation closure orders: procedure

32LB
  • (1) Before making a renewables obligation closure order, the Secretary of State must consult—
  • (a) the Authority,
  • (b) the Council,
  • (c) such generators of electricity from renewable sources as the Secretary of State considers appropriate, and
  • (d) such other persons, if any, as the Secretary of State considers appropriate.
  • (2) The requirement to consult may be satisfied by consultation before, as well as consultation after, the passing of the Energy Act 2013.
  • (3) A renewables obligation closure order is not to be made unless a draft of the instrument containing it has been laid before and approved by a resolution of each House of Parliament.

Onshore wind generating stations: closure of renewables obligation

32LC
  • (1) No renewables obligation certificates are to be issued under a renewables obligation order in respect of electricity generated after the onshore wind closure date by an onshore wind generating station.
  • (2) Subsection (1) does not apply to electricity generated in the circumstances set out in any one or more of sections 32LD to 32LL.
  • (3) In this section and sections 32LD to 32LL—
  • “the onshore wind closure date” means the date on which the Energy Act 2016 is passed;
  • “onshore wind generating station” means a generating station that—generates electricity from wind, andis situated in England, Wales or Scotland, but not in waters in or adjacent to England, Wales or Scotland up to the seaward limits of the territorial sea.
  • (4) The reference in subsection (1) to a renewables obligation order is to any renewables obligation order made under section 32 (whenever made, and whether or not made by the Secretary of State).
  • (5) Power to make provision in a renewables obligation order or a renewables obligation closure order (and any provision contained in such an order) is subject to subsection (1) and sections 32LD to 32LL.
  • (6) This section is not otherwise to be taken as affecting power to make provision in a renewables obligation order or renewables obligation closure order.

Onshore wind generating stations accredited, or additional capacity added, on or before the onshore wind closure date

32LD

The circumstances set out in this section are where the electricity is—

  • (a) generated by an onshore wind generating station which was accredited on or before the onshore wind closure date, and
  • (b) generated using—
  • (i) the original capacity of the station, or
  • (ii) additional capacity which in the Authority's view first formed part of the station on or before the onshore wind closure date.

Onshore wind generating stations accredited, or additional capacity added, in the year after the onshore wind closure date: grid or radar delay condition met

32LE

The circumstances set out in this section are where the electricity is—

  • (a) generated using the original capacity of an onshore wind generating station—
  • (i) which was accredited during the period beginning immediately after the onshore wind closure date and ending with the first anniversary of the onshore wind closure date, and
  • (ii) in respect of which the grid or radar delay condition is met, or
  • (b) generated using additional capacity of an onshore wind generating station, where—
  • (i) the station was accredited on or before the onshore wind closure date,
  • (ii) in the Authority's view, the additional capacity first formed part of the station during the period beginning immediately after the onshore wind closure date and ending with the first anniversary of the onshore wind closure date, and
  • (iii) the grid or radar delay condition is met in respect of the additional capacity.

Onshore wind generating stations accredited, or additional capacity added, on or before 31 March 2017: approved development condition met

32LF

The circumstances set out in this section are where the electricity is—

  • (a) generated using the original capacity of an onshore wind generating station—
  • (i) which was accredited on or before 31 March 2017, and
  • (ii) in respect of which the approved development condition is met, or
  • (b) generated using additional capacity of an onshore wind generating station, where—
  • (i) the station was accredited on or before the onshore wind closure date,
  • (ii) in the Authority's view, the additional capacity first formed part of the station on or before 31 March 2017, and
  • (iii) the approved development condition is met in respect of the additional capacity.

Onshore wind generating stations accredited, or additional capacity added, between 1 April 2017 and 31 March 2018: grid or radar delay condition met

32LG

The circumstances set out in this section are where the electricity is—

  • (a) generated using the original capacity of an onshore wind generating station—
  • (i) which was accredited during the period beginning with 1 April 2017 and ending with 31 March 2018,
  • (ii) in respect of which the approved development condition is met, and
  • (iii) in respect of which the grid or radar delay condition is met, or
  • (b) generated using additional capacity of an onshore wind generating station, where—
  • (i) the station was accredited on or before the onshore wind closure date,
  • (ii) in the Authority's view, the additional capacity first formed part of the station during the period beginning with 1 April 2017 and ending with 31 March 2018,
  • (iii) the approved development condition is met in respect of the additional capacity, and
  • (iv) the grid or radar delay condition is met in respect of the additional capacity.

Onshore wind generating stations accredited, or additional capacity added, between 1 April 2017 and 31 January 2018: investment freezing condition met

32LH

The circumstances set out in this section are where the electricity is—

  • (a) generated using the original capacity of an onshore wind generating station—
  • (i) which was accredited during the period beginning with 1 April 2017 and ending with 31 January 2018, and
  • (ii) in respect of which both the approved development condition and the investment freezing condition are met, or
  • (b) generated using additional capacity of an onshore wind generating station, where—
  • (i) the station was accredited on or before the onshore wind closure date,
  • (ii) in the Authority's view, the additional capacity first formed part of the station during the period beginning with 1 April 2017 and ending with 31 January 2018, and
  • (iii) both the approved development condition and the investment freezing condition are met in respect of the additional capacity.

Onshore wind generating stations accredited, or additional capacity added, between 1 February 2018 and 31 January 2019: grid or radar delay condition met

32LI

The circumstances set out in this section are where the electricity is—

  • (a) generated using the original capacity of an onshore wind generating station—
  • (i) which was accredited during the period beginning with 1 February 2018 and ending with 31 January 2019,
  • (ii) in respect of which both the approved development condition and the investment freezing condition are met, and
  • (iii) in respect of which the grid or radar delay condition is met, or
  • (b) generated using additional capacity of an onshore wind generating station, where—
  • (i) the station was accredited on or before the onshore wind closure date,
  • (ii) in the Authority's view, the additional capacity first formed part of the station during the period beginning with 1 February 2018 and ending with 31 January 2019,
  • (iii) both the approved development condition and the investment freezing condition are met in respect of the additional capacity, and
  • (iv) the grid or radar delay condition is met in respect of the additional capacity.

The approved development condition

32LJ
  • (1) This section applies for the purposes of sections 32LF to 32LI.
  • (2) The approved development condition is met in respect of an onshore wind generating station if the documents specified in subsections (4), (5) and (6) were provided to the Authority with the application for accreditation of the station.
  • (3) The approved development condition is met in respect of additional capacity if the documents specified in subsections (4), (5) and (6) were provided to the Authority on or before the date on which the Authority made its decision that the additional capacity could form part of an onshore wind generating station.
  • (4) The documents specified in this subsection are—
  • (a) evidence that—
  • (i) planning permission for the station or additional capacity was granted on or before 18 June 2015, and
  • (ii) any conditions as to the time period within which the development to which the permission relates must be begun have not been breached,
  • (b) evidence that—
  • (i) planning permission for the station or additional capacity was refused on or before 18 June 2015, but granted after that date following an appeal or judicial review, and
  • (ii) any conditions as to the time period within which the development to which the permission relates must be begun have not been breached,
  • (c) evidence that—
  • (i) an application for 1990 Act permission or 1997 Act permission was made on or before 18 June 2015 for the station or additional capacity,
  • (ii) the period allowed under section 78(2) of the 1990 Act or (as the case may be) section 47(2) of the 1997 Act ended on or before 18 June 2015 without any of the things mentioned in section 78(2)(a) to (b) of the 1990 Act or section 47(2)(a) to (c) of the 1997 Act being done in respect of the application,
  • (iii) the application was not referred to the Secretary of State, Welsh Ministers or Scottish Ministers in accordance with directions given under section 77 of the 1990 Act or section 46 of the 1997 Act,
  • (iv) 1990 Act permission or 1997 Act permission was granted after 18 June 2015 following an appeal, and
  • (v) any conditions as to the time period within which the development to which the permission relates must be begun have not been breached, or
  • (d) a declaration by the operator of the station that, to the best of the operator's knowledge and belief, planning permission is not required for the station or additional capacity.
  • (5) The documents specified in this subsection are—
  • (a) a copy of an offer from a licensed network operator made on or before 18 June 2015 to carry out grid works in relation to the station or additional capacity, and evidence that the offer was accepted on or before that date (whether or not the acceptance was subject to any conditions or other terms), or
  • (b) a declaration by the operator of the station that, to the best of the operator's knowledge and belief, no grid works were required to be carried out by a licensed network operator in order to enable the station to be commissioned or the additional capacity to form part of the station.
  • (6) The documents specified in this subsection are a declaration by the operator of the station that, to the best of the operator's knowledge and belief, as at 18 June 2015 a relevant developer of the station or additional capacity (or a person connected, within the meaning of section 1122 of the Corporation Tax Act 2010, with a relevant developer of the station or additional capacity)—
  • (a) was an owner or lessee of the land on which the station or additional capacity is situated,
  • (b) had entered into an agreement to purchase or lease the land on which the station or additional capacity is situated,
  • (c) had an option to purchase or to lease the land on which the station or additional capacity is situated, or
  • (d) was a party to an exclusivity agreement in relation to the land on which the station or additional capacity is situated.
  • (7) In this section—
  • “the 1990 Act” means the Town and Country Planning Act 1990;
  • “1990 Act permission” means planning permission under the 1990 Act (except outline planning permission, within the meaning of section 92 of that Act);
  • “the 1997 Act” means the Town and Country Planning (Scotland) Act 1997;
  • “1997 Act permission” means planning permission under the 1997 Act (except planning permission in principle, within the meaning of section 59 of that Act);
  • “exclusivity agreement”, in relation to land, means an agreement by the owner or a lessee of the land not to permit any person (other than the persons identified in the agreement) to construct an onshore wind generating station on the land;
  • “planning permission” means—consent under section 36 of this Act,1990 Act permission,1997 Act permission, ordevelopment consent under the Planning Act 2008.

The investment freezing condition

32LK
  • (1) This section applies for the purposes of sections 32LH and 32LI.
  • (2) The investment freezing condition is met in respect of an onshore wind generating station if the documents specified in subsection (4) were provided to the Authority with the application for accreditation of the station.
  • (3) The investment freezing condition is met in respect of additional capacity if the documents specified in subsection (4) were provided to the Authority on or before the date on which the Authority made its decision that the additional capacity could form part of an onshore wind generating station.
  • (4) The documents specified in this subsection are—
  • (a) a declaration by the operator of the station that, to the best of the operator's knowledge and belief, as at the Royal Assent date—
  • (i) the relevant developer required funding from a recognised lender before the station could be commissioned or additional capacity could form part of the station,
  • (ii) a recognised lender was not prepared to provide that funding until enactment of the Energy Act 2016, because of uncertainty over whether the Act would be enacted or its wording if enacted, and
  • (iii) the station would have been commissioned, or the additional capacity would have formed part of the station, on or before 31 March 2017 if the funding had been provided before the Royal Assent date, and
  • (b) a letter or other document, dated on or before the date which is 28 days after the Royal Assent date, from a recognised lender confirming (whether or not the confirmation is subject to any conditions or other terms) that the lender was not prepared to provide funding in respect of the station or additional capacity until enactment of the Energy Act 2016, because of uncertainty over whether the Act would be enacted or its wording if enacted.
  • (5) In this section—
  • “recognised lender” means a provider of debt finance which has been issued with an investment grade credit rating by a registered credit rating agency;
  • “the Royal Assent date” means the date on which the Energy Act 2016 is passed.
  • (6) For the purposes of the definition of “recognised lender” in subsection (5)—
  • “investment grade credit rating” means a credit rating commonly understood by registered credit rating agencies to be investment grade;
  • “registered credit rating agency” means a credit rating agency registered in accordance with Regulation (EC) No 1060/2009 of the European Parliament and the Council of 16 September 2009 on credit rating agencies.

The grid or radar delay condition

32LL
  • (1) This section applies for the purposes of sections 32LE, 32LG and 32LI.
  • (2) The grid or radar delay condition is met in respect of an onshore wind generating station if, on or before the date on which the Authority made its decision to accredit the station, the documents specified in subsection (4), (5) or (6) were—
  • (a) submitted by the operator of the station, and
  • (b) received by the Authority.
  • (3) The grid or radar delay condition is met in respect of additional capacity if, on or before the date on which the Authority made its decision that the additional capacity could form part of an onshore wind generating station, the documents specified in subsection (4), (5) or (6) were—
  • (a) submitted by the operator of the station, and
  • (b) received by the Authority.
  • (4) The documents specified in this subsection are—
  • (a) evidence of an agreement with a network operator (“the relevant network operator”) to carry out grid works in relation to the station or additional capacity (“the relevant grid works”);
  • (b) a copy of a document written by, or on behalf of, the relevant network operator which estimated or set a date for completion of the relevant grid works (“the planned grid works completion date”) which was no later than the primary date;
  • (c) a letter from the relevant network operator confirming (whether or not such confirmation is subject to any conditions or other terms) that—
  • (i) the relevant grid works were completed after the planned grid works completion date, and
  • (ii) in the relevant network operator's opinion, the failure to complete the relevant grid works on or before the planned grid works completion date was not due to any breach by a generating station developer of any agreement with the relevant network operator; and
  • (d) a declaration by the operator of the station that, to the best of the operator's knowledge and belief, the station would have been commissioned, or the additional capacity would have formed part of the station, on or before the primary date if the relevant grid works had been completed on or before the planned grid works completion date.
  • (5) The documents specified in this subsection are—
  • (a) evidence of an agreement between a generating station developer and a person who is not a generating station developer (“the radar works agreement”) for the carrying out of radar works (“the relevant radar works”);
  • (b) a copy of a document written by, or on behalf of, a party to the radar works agreement (other than a generating station developer) which estimated or set a date for completion of the relevant radar works (“the planned radar works completion date”) which was no later than the primary date;
  • (c) a letter from a party to the radar works agreement (other than a generating station developer) confirming, whether or not such confirmation is subject to any conditions or other terms, that—
  • (i) the relevant radar works were completed after the planned radar works completion date, and
  • (ii) in that party's opinion, the failure to complete the relevant radar works on or before the planned radar works completion date was not due to any breach of the radar works agreement by a generating station developer; and
  • (d) a declaration by the operator of the station that, to the best of the operator's knowledge and belief, the station would have been commissioned, or the additional capacity would have formed part of the station, on or before the primary date if the relevant radar works had been completed on or before the planned radar works completion date.
  • (6) The documents specified in this subsection are—
  • (a) the documents specified in subsection (4)(a), (b) and (c);
  • (b) the documents specified in subsection (5)(a), (b) and (c); and
  • (c) a declaration by the operator of the station that, to the best of the operator's knowledge and belief, the station would have been commissioned, or the additional capacity would have formed part of the station, on or before the primary date if—
  • (i) the relevant grid works had been completed on or before the planned grid works completion date, and
  • (ii) the relevant radar works had been completed on or before the planned radar works completion date.
  • (7) In this section “the primary date” means—
  • (a) in a case within section 32LE(a)(i) or (b)(i) and (ii), the onshore wind closure date;
  • (b) in a case within section 32LG(a)(i) and (ii) or (b)(i) to (iii), 31 March 2017;
  • (c) in a case within section 32LI(a)(i) and (ii) or (b)(i) to (iii), 31 January 2018.

Use of Northern Ireland certificates: onshore wind power

32LM
  • (1) The Secretary of State may make regulations providing that an electricity supplier may not discharge its renewables obligation (or its obligation in relation to a particular period) by the production to the Authority of a relevant Northern Ireland certificate, except in the circumstances, and to the extent, specified in the regulations.
  • (2) A “relevant Northern Ireland certificate” is a Northern Ireland certificate issued in respect of electricity generated after the onshore wind closure date (or any later date specified in the regulations)—
  • (a) using the original capacity of a Northern Ireland onshore wind generating station accredited after the onshore wind closure date (or any later date so specified), or
  • (b) using additional capacity of a Northern Ireland onshore wind generating station, where in the Authority's view the additional capacity first formed part of the station after the onshore wind closure date (or any later date so specified).
  • (3) In this section—
  • “NIRO Order” means any order made under Articles 52 to 55F of the Energy (Northern Ireland) Order 2003;
  • “Northern Ireland certificate” means a renewables obligation certificate issued by the Northern Ireland authority under the Energy (Northern Ireland) Order 2003 and pursuant to a NIRO Order;
  • “Northern Ireland onshore wind generating station” means a generating station that—generates electricity from wind, andis situated in Northern Ireland, but not in waters in or adjacent to Northern Ireland up to the seaward limits of the territorial sea.
  • (4) Power to make provision in a renewables obligation order by virtue of section 32F (and any provision contained in such an order) is subject to provision contained in regulations under this section.
  • (5) This section is not otherwise to be taken as affecting power to make provision in a renewables obligation order.
  • (6) Regulations under this section may amend a renewables obligation order.
  • (7) Section 32K applies in relation to regulations under this section as it applies in relation to a renewables obligation order.

Interpretation of sections 32 to 32M

32M
  • (1) In this section and sections 32 to 32LM—
  • “accredited”, in relation to an onshore wind generating station, means accredited by the Authority as a generating station which is capable of generating electricity from renewable sources; and “accredit” and “accreditation” are to be construed accordingly;
  • “additional capacity”, in relation to an onshore wind generating station, means any generating capacity which does not form part of the original capacity of the station;
  • “banding provision” is to be construed in accordance with section 32D(3);
  • “bioliquid” has the meaning given by Article 2(h) of Directive 2009/28/EC of the European Parliament and of the Council on the promotion of the use of energy from renewable sources;
  • “commissioned”, in relation to an onshore wind generating station, means having completed such procedures and tests in relation to the station as constitute, at the time they are undertaken, the usual industry standards and practices for commissioning that type of generating station in order to demonstrate that it is capable of commercial operation
  • “fossil fuel” means—coal,lignite,natural gas (within the meaning of the Energy Act 1976),crude liquid petroleum,petroleum products (within the meaning of that Act), orany substance, other than bioliquid, produced directly or indirectly from a substance mentioned in paragraphs (a) to (e);
  • “generated” means generated at any place whether situated in the United Kingdom or elsewhere, and cognate expressions are to be construed accordingly;
  • “generating station developer”, in relation to an onshore wind generating station or additional capacity, means—the operator of the station, ora person who arranged for the construction of the station or additional capacity;
  • “grid works”, in relation to an onshore wind generating station, means—the construction of a connection between the station and a transmission or distribution system for the purpose of enabling electricity to be conveyed from the station to the system, orthe carrying out of modifications to a connection between the station and a transmission or distribution system for the purpose of enabling an increase in the amount of electricity that can be conveyed over that connection from the station to the system;
  • “licensed network operator” means a distribution licence holder or a transmission licence holder;
  • “network operator” means a distribution exemption holder, a distribution licence holder or a transmission licence holder;
  • “Northern Ireland authority” means the Northern Ireland Authority for Utility Regulation;
  • “Northern Ireland supplier” means an electricity supplier within the meaning of Part 7 of the Energy (Northern Ireland) Order 2003;
  • “the onshore wind closure date” has the meaning given by section 32LC(3);
  • “onshore wind generating station” has the meaning given by section 32LC(3);
  • “original capacity”, in relation to an onshore wind generating station, means the generating capacity of the station as accredited;
  • “radar works” means—the construction of a radar station,the installation of radar equipment,the carrying out of modifications to a radar station or radar equipment, orthe testing of a radar station or radar equipment;
  • “relevant developer”, in relation to an onshore wind generating station or additional capacity, means a person who—applied for planning permission for the station or additional capacity,arranged for grid works to be carried out in relation to the station or additional capacity,arranged for the construction of any part of the station or additional capacity,constructed any part of the station or additional capacity, oroperates, or proposes to operate, the station;
  • “the relevant minister” has the meaning given by section 32;
  • “the relevant part of Great Britain” means—in the case of a renewables obligation order made by the Secretary of State, England and Wales (including so much of the internal waters and territorial sea of the United Kingdom as are adjacent to England or Wales);in the case of a renewables obligation order made by the Scottish Ministers, Scotland (including so much of the internal waters and territorial sea of the United Kingdom as are adjacent to Scotland);
  • “the renewables obligation” is to be construed in accordance with section 32(4);
  • “renewables obligation certificate” is to be construed in accordance with section 32B;
  • “renewables obligation order” is to be construed in accordance with section 32;
  • “renewables obligation closure order” is to be construed in accordance with section 32LA;
  • “renewable sources” means sources of energy other than fossil fuel or nuclear fuel, but includes waste of which not more than a specified proportion is waste which is, or is derived from, fossil fuel;
  • “specified”, in relation to a renewables obligation order or a renewables obligation closure order, means specified in the order.
  • (2) For the purposes of the definition of “renewable sources”, a renewables obligation order may make provision—
  • (a) about what constitutes “waste”;
  • (b) about how the proportion of waste which is, or is derived from, fossil fuel is to be determined;
  • (c) about what, subject to such exceptions as may be specified, constitutes sufficient evidence of that proportion in any particular case;
  • (d) authorising the Authority, in specified circumstances, to require an operator of a generating station to arrange—
  • (i) for samples of any fuel used (or to be used) in the generating station, or of any gas or other substance produced as a result of the use of such fuel, to be taken by a person, and analysed in a manner, approved by the Authority, and
  • (ii) for the results of that analysis to be made available to the Authority.
  • (3) For the purposes of the definition of “the relevant part of Great Britain”, the territorial sea adjacent to England is the territorial sea adjacent to the United Kingdom, other than the territorial sea adjacent to Scotland, Wales or Northern Ireland.
  • (4) An Order in Council under section 126(2) of the Scotland Act 1998 (c. 46) (apportionment of sea areas) has effect for the purposes of this section and sections 32 to 32L if, or to the extent that, the Order is expressed to apply—
  • (a) by virtue of this subsection, for those purposes, or
  • (b) if no provision has been made by virtue of paragraph (a), for the general or residual purposes of that Act.
  • (5) An order or Order in Council made under or by virtue of section 158(3) or (4) of the Government of Wales Act 2006 (apportionment of sea areas) has effect for the purposes of this section if, or to the extent that, the order or Order in Council is expressed to apply—
  • (a) by virtue of this subsection, for those purposes, or
  • (b) if no provision has been made by virtue of paragraph (a), for the general or residual purposes of that Act.
  • (6) An Order in Council under section 98(8) of the Northern Ireland Act 1998 (c. 46) (apportionment of sea areas) has effect for the purposes of this section if, or to the extent that, the Order is expressed to apply—
  • (a) by virtue of this subsection, for those purposes, or
  • (b) if no provision has been made by virtue of paragraph (a), for the general or residual purposes of that Act.
  • (7) A renewables obligation order may make provision, for the purposes of sections 32 to 32LM, about the circumstances in which electricity is to be regarded as having been supplied—
  • (a) to customers in Great Britain;
  • (b) to customers in the relevant part of Great Britain;
  • (c) to customers in Northern Ireland.

The certificate purchase obligation

32N
  • (1) The Secretary of State may make a certificate purchase order.
  • (2) A certificate purchase order is an order which imposes the certificate purchase obligation on—
  • (a) the purchasing body of GB certificates;
  • (b) the purchasing body of NI certificates.
  • (3) The certificate purchase obligation is that—
  • (a) the purchasing body of GB certificates must pay the redemption value of a GB certificate to the person presenting it;
  • (b) the purchasing body of NI certificates must pay the redemption value of a NI certificate to the person presenting it.
  • (4) The purchasing body of GB certificates is—
  • (a) the Authority, or
  • (b) such other eligible person as may be designated by the order as the purchasing body of GB certificates.
  • (5) The purchasing body of NI certificates is—
  • (a) the Northern Ireland authority, or
  • (b) such other eligible person as may be designated by the order as the purchasing body of NI certificates.
  • (6) A person is an “eligible person” for the purposes of designation under subsection (4)(b) if the person is—
  • (a) a CFD counterparty at the time when the designation is made, or
  • (b) the Secretary of State.
  • (7) A person is an “eligible person” for the purposes of designation under subsection (5)(b) if the person is a CFD counterparty at the time when the designation is made.
  • (8) Subsection (3) is subject to sections 32O to 32Z2.

Further provision about the certificate purchase obligation

32O
  • (1) A certificate purchase order may make provision generally in relation to the certificate purchase obligation.
  • (2) A certificate purchase order may, in particular—
  • (a) specify the redemption value of certificates or provide for how the redemption value is to be calculated;
  • (b) provide for different redemption values for successive periods of time;
  • (c) authorise the adjustment of redemption values from time to time for inflation by a method specified in the order (including by reference to a specified scale or index, as it has effect from time to time, or to other specified data of any description);
  • (d) require the relevant purchasing body or the Secretary of State (if not the relevant purchasing body) to publish the redemption value of certificates by a specified deadline;
  • (e) provide for the manner in which a certificate is to be presented to the relevant purchasing body;
  • (f) provide for the certificate purchase obligation in relation to certificates issued in respect of electricity generated—
  • (i) using specified descriptions of renewable sources,
  • (ii) by specified descriptions of generating stations,
  • (iii) in specified ways, or
  • (iv) in other specified cases or circumstances,

to apply only up to a specified number of the certificates that are presented for payment in any specified period;

  • (g) provide that certificates in respect of electricity generated—
  • (i) using specified descriptions of renewable sources,
  • (ii) by specified descriptions of generating stations,
  • (iii) in specified ways, or
  • (iv) in other specified cases or circumstances,

are to be issued only up to such number of certificates in any specified period as may be specified or determined in accordance with the order;

  • (h) provide that the certificate purchase obligation is not to apply on presentation of a certificate unless—
  • (i) the certificate is presented by such a deadline as may be specified or determined in accordance with the order, and
  • (ii) any other specified conditions are met (whether in relation to the certificate, the person presenting it or other matters);
  • (i) provide for how the relevant purchasing body is to determine whether specified conditions are met;
  • (j) provide that the certificate purchase obligation in relation to a certificate is to be discharged by such a deadline as may be specified or determined in accordance with the order;
  • (k) authorise the relevant purchasing body to determine the manner in which payments under the certificate purchase obligation are to be made;
  • (l) authorise the relevant purchasing body to deduct from payments specified descriptions of fees or charges incurred in making the payments;
  • (m) provide for a certificate purchase levy (see section 32P);
  • (n) authorise the Secretary of State to make payments for the purpose of enabling the certificate purchase obligation to be discharged;
  • (o) impose such other obligations, or confer such other functions, on the relevant purchasing body as the Secretary of State considers appropriate.
  • (3) Once the redemption value in relation to a certificate is paid (less any deductions permitted under the order by virtue of subsection (2)(l)), the certificate purchase obligation in relation to that certificate is discharged (and the certificate is not to be presented for payment again).
  • (4) For the purposes of carrying out its functions under a certificate purchase order, the relevant purchasing body may—
  • (a) require a person presenting a certificate to provide such information or documentation as the body may reasonably need for such purposes, and
  • (b) determine the form in which, and the time by which, such information or documentation is to be supplied.
  • (5) The certificate purchase obligation does not apply in relation to a certificate unless the person presenting the certificate has complied with any requirements imposed under subsection (4).

Certificate purchase levy

32P
  • (1) A certificate purchase order may provide for a certificate purchase levy to be charged in connection with the provision of payments to the relevant purchasing body.
  • (2) A certificate purchase levy is a levy—
  • (a) charged in respect of supplies of electricity that have been, or are expected to be, made in each specified period, and
  • (b) payable in respect of each such period by persons who make, or are expected to make, the supplies.
  • (3) The order may (without limiting the generality of section 32Z(1)(d)) provide for different rates or different amounts of levy to be charged—
  • (a) in different cases or circumstances;
  • (b) in relation to different specified periods.
  • (4) The order may secure that the levy is not to be charged in respect of particular descriptions of supplies of electricity.
  • (5) The order may provide for amounts of the levy received in respect of any period to be applied for the purpose of discharging the certificate purchase obligation in another period.
  • (6) The order may, in particular, make provision about any of the following matters—
  • (a) what is a supply of electricity for the purposes of the levy;
  • (b) when a supply of electricity is, or is expected to be, made for those purposes;
  • (c) who makes, or is expected to make, a supply of electricity for those purposes;
  • (d) the rates or amounts of the levy, or how such rates or amounts are to be determined;
  • (e) payment of the levy, including deadlines for payment in respect of each period and interest in respect of late payment;
  • (f) administration of the levy;
  • (g) audit of information (whether by the administrator of the levy or a third party) including requirements for audits to be paid by the person whose information is subject to the audit;
  • (h) provision of information, including its provision to third parties in specified circumstances;
  • (i) enforcement of the levy;
  • (j) insolvency of persons liable to pay the levy;
  • (k) reviews and appeals;
  • (l) the functions of the administrator in connection with the levy.
  • (7) The administrator of the levy, in the case of persons who make, or are expected to make, supplies of electricity in Great Britain, is—
  • (a) the Authority, or
  • (b) such other eligible person as may be designated by the order as the administrator in the case of such persons.
  • (8) The administrator of the levy, in the case of persons who make, or are expected to make, supplies of electricity in Northern Ireland, is—
  • (a) the Northern Ireland authority, or
  • (b) such other eligible person as may be designated by the order as the administrator in the case of such persons.
  • (9) A person is an “eligible person” for the purposes of designation under subsection (7)(b) if the person is—
  • (a) a CFD counterparty at the time when the designation is made, or
  • (b) the Secretary of State.
  • (10) A person is an “eligible person” for the purposes of designation under subsection (8)(b) if the person is—
  • (a) a CFD counterparty at the time when the designation is made, or
  • (b) the Northern Ireland department.
  • (11) In a case where a person liable to pay the levy has made any overpayment or underpayment (whether arising because an estimate turns out to be wrong or otherwise), provision under subsection (6)(e) may require the amount of the overpayment or underpayment (including interest) to be set off against, or added to, any subsequent liability of the person to pay the levy.
  • (12) In a case where the amount received in respect of levy payments for a period falls short of the amount due for that period, provision under subsection (6)(e) or (j) may include a requirement on persons liable to pay the levy to make further payments, by the time and in the circumstances specified, of an amount calculated in the manner specified or determined in accordance with the order.
  • (13) Provision under subsection (6)(h) may provide for the administrator to determine the form in which any information that a person is required to give is to be given and the time by which it is to be given.
  • (14) Provision under subsection (6)(i) may—
  • (a) if the Authority is the administrator, apply sections 25 to 28 in relation to a requirement in respect of the levy imposed under the order on a person who is not a licence holder as if the person were a licence holder;
  • (b) in any other case, include provision for the imposition of penalties if a requirement in respect of the levy is breached (whether financial or not, but not including the creation of criminal offences).

Use of levy payments

32Q
  • (1) Amounts payable in respect of the certificate purchase levy are to be paid to the administrator of the levy.
  • (2) Amounts received by the administrator under subsection (1) must be paid to—
  • (a) the purchasing body of GB certificates, or
  • (b) the purchasing body of NI certificates,

in accordance with such provision as may be contained in the order.

  • (3) Amounts paid to a purchasing body under subsection (2) may be used by that body only for the purpose of discharging the certificate purchase obligation.
  • (4) The order may contain further provision about—
  • (a) the calculation of amounts received by the administrator that are to be paid to a relevant purchasing body;
  • (b) the time by which the administrator must make payments of such amounts to a relevant purchasing body;
  • (c) the manner in which any such payments are to be made;
  • (d) how amounts are to be dealt with for the purposes of subsection (2) where the administrator and a relevant purchasing body to whom they are to be paid are the same person.
  • (5) Subsections (2) to (4) are subject to subsections (6) to (10).
  • (6) The order may provide for amounts received by the administrator under subsection (1) to be used by the administrator to make payments—
  • (a) into the Consolidated Fund in respect of costs (or a proportion of costs) which have been or are expected to be incurred—
  • (i) by the Authority,
  • (ii) by the Secretary of State, or
  • (iii) by a relevant designated person,

in connection with the performance of functions conferred by or under sections 32N to 32Z2;

  • (b) into the Consolidated Fund of Northern Ireland in respect of costs (or a proportion of costs) which have been or are expected to be incurred—
  • (i) by the Northern Ireland authority, or
  • (ii) by the Northern Ireland department,

in connection with the performance of functions conferred by or under sections 32N to 32Z2.

  • (7) For the purposes of subsection (6)(a), “relevant designated person” means a person who is designated—
  • (a) as the purchasing body of GB certificates by virtue of being an eligible person within section 32N(6)(a) (CFD counterparty);

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.