Part I — The Channel Tunnel Rail Link

Works

Construction and maintenance of scheduled works

1

Further and supplementary provisions

2

Schedule 2 to this Act (which contains further and supplementary provisions about works) shall have effect.

Highways

3

Schedule 3 to this Act (which makes provision in relation to highways in connection with the works authorised by this Part of this Act) shall have effect.

Land

Acquisition within limits shown on deposited plans

4

Acquisition outside limits shown on deposited plans

5

Temporary possession and use

6

Schedule 5 to this Act (which contains provisions about temporary possession and use of land for the purposes of this Part of this Act) shall have effect.

Extinguishment of private rights of way

7

in which case it is the time of entry under that provision.

Extinguishment of rights of statutory undertakers etc

8

Planning and heritage

Planning: general

9

Permitted development: time limits

10

that the development must be begun not later than the end of 10 years beginning with the day on which this Act is passed.

Fees for planning applications

11

Heritage

12

Schedule 7 to this Act (which makes provision for the disapplication or modification, in relation to authorised works, of controls relating to listed buildings, buildings in conservation areas and ancient monuments etc.) shall have effect.

Heritage: rights of entry

13

Schedule 8 to this Act (which makes provision about rights of entry for the Historic Buildings and Monuments Commission for England and the Royal Commission on the Historical Monuments of England) shall have effect.

Operation

Operation and use of authorised works

14

Bye-laws

15

For the purposes of section 129 of the Railways Act 1993 (power of independent railway operator to make bye-laws), the nominated undertaker shall be treated as an independent railway operator.

Application of railway legislation

Licensing

16

Access agreements

17

Closures

18

The following provisions of the Railways Act 1993—

Railway administration orders

19

(which give the Strategic Rail Authority a role in relation to a protected railway company which is the holder of a passenger licence) a rail link service operator which is the holder of a passenger licence shall be treated as if it were not the holder of such a licence.

(c) that an agreement between the Secretary of State and a relevant rail link undertaker has terminated.

, and

rail link” has the same meaning as in the Channel Tunnel Rail Link Act 1996; “relevant rail link undertaker” means a person who, under section 34 of that Act, is the nominated undertaker for any purpose of section 1(1) or 14(1)(a) of that Act, so far as relating to the rail link.

(2A) Subsection (2) shall only apply if the proposals have been approved by the Secretary of State and, where he approves them with modifications, shall apply as if the proposals prepared for the purposes of section 23 were the proposals as so modified.

Other legislation

20

Schedule 9 to this Act (which makes provision with respect to the incorporation of the Railways Clauses Acts and the application of miscellaneous other enactments relating to railways) shall have effect.

Functions of the Rail Regulator

Duties as to exercise of regulatory functions

21

the Office of Rail Regulation shall also be under a duty to have regard to the financial position of the rail link undertaker.

references to the Office of Rail Regulation’s regulatory functions are to the functions assigned or transferred to it under or by virtue of Part I of the Railways Act 1993 other than any functions assigned to it by virtue of section 67(3) of that Act (“Competition Act functions”).

Restriction of functions in relation to competition etc

22

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Competition

Restrictive trade practices

23

Monopoly situations

24

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Anti-competitive practices

25

Sections 23 to 25: supplementary provisions

26

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Trees

Power to deal with trees on neighbouring land

27

the nominated undertaker may itself cause the tree to which the notice relates to be removed, topped or lopped as mentioned in subsection (1) above.

the county court shall, on application made by a person who has suffered loss or damage in consequence of the removal, topping or lopping of the tree concerned or who has incurred expenses in complying with the notice, order the nominated undertaker to pay that person such compensation in respect of the loss, damage or expenses as it thinks fit.

Disapplication of controls

28

shall not apply to any tree works which are authorised for the purposes of this section.

Noise

Control of construction sites: appeals

29

(7A) If within seven days of the giving of notice of appeal under subsection (7) of this section the appellant and the local authority so agree, the appeal shall, instead of being determined by the Secretary of State, be referred to arbitration.

Proceedings in respect of statutory nuisance: defence

30

shall not apply where the consent relates to the use of premises by the nominated undertaker for the purposes of or in connection with the exercise of the powers conferred by this Part of this Act with respect to works.

Financial matters

Expenditure in connection with securing construction of works

31

Reserved capacity on the rail link: expenditure

32

Undertakings with respect to financial assistance etc

33

shall be effective notwithstanding that it fetters his discretion.

Miscellaneous and general

Holder of functions of nominated undertaker

34

Transfer of functions relating to works

35

of a power or duty transferred under subsection (1) above or this subsection.

Compensation for injurious affection

36

Section 10(1) of the Compulsory Purchase Act 1965 (compensation for injurious affection) shall have effect, in relation to land injuriously affected by the execution of works under this Part of this Act, with the substitution for “acquiring authority have” of “ nominated undertaker has ”.

Duty to co-operate

37

it may by notice in writing require the operator of the asset to enter into an agreement with it about how the matter is to be dealt with.

it may by notice in writing require the nominated undertaker to enter into an agreement with it about how the matter is to be dealt with.

Disapplication and modification of miscellaneous controls

38

Schedule 10 to this Act (which makes provision for the disapplication and modification of miscellaneous statutory and other controls in relation to things done under this Part of this Act and otherwise for the purposes of this Part of this Act) shall have effect.

Burial grounds

39

and the other requirements of that Schedule, so far as relating to the nominated undertaker, have been complied with.

and references to a monument to any person are to a monument commemorating that person, whether or not also commemorating any other person.

Application of landlord and tenant law

40

Variation of development agreement: disapplication of s.2 of Law of Property (Miscellaneous Provisions) Act 1989

41

Related works: application of section 9 of the Transport and Works Act 1992

42

Arbitration

43

Part II — The A2 and M2 Improvement Works

Authorised works

44

for the purposes of or in connection with the construction of any of the A2 and M2 improvement works.

Acquisition of land

45

Blight: compensation for pre-enactment acquisition

46

this Act shall be deemed, for the purpose of applying section 6 of the Land Compensation Act 1961 (disregard of actual or prospective development in certain cases) to the assessment of compensation for the acquisition of the interest, to have been passed before the date on which the notice to treat is deemed to have been served.

Part III — Miscellaneous and General

Time limit for powers of compulsory acquisition

47

Power to acquire land by reference to combined effect of works

48

if the interest of the vendor is a qualifying interest.

Noise insulation regulations: procedure

49

Section 20 of the Land Compensation Act 1973 (sound-proofing of buildings affected by public works) shall have effect, in relation to regulations under that section which relate only to noise caused or expected to be caused by the construction or use of works authorised by this Act, with the substitution for subsection (9) of—

(9) An instrument containing regulations under this section shall be subject to annulment in pursuance of a resolution of either House of Parliament.

Overhead lines

50

is installed above land within the limits of deviation for the scheduled works or within the limits of land to be acquired or used.

Replacement concrete batching facilities at St. Pancras

51

Protection of interests

52

Correction of deposited plans

53

Service of documents

54

and for the purposes of this subsection the principal office of a company registered outside the United Kingdom or of a partnership carrying on business outside the United Kingdom is its principal office within the United Kingdom.

Financial provision

55

There shall be paid out of money provided by Parliament any expenditure of the Secretary of State under this Act.

Interpretation

56

Short title

57

This Act may be cited as the Channel Tunnel Rail Link Act 1996.

SCHEDULE 1

Description of works

1

The works which the nominated undertaker is authorised by section 1 above to construct and maintain are the following—

Interpretation

2

In paragraph 1 above—

SCHEDULE 2

Subsidiary works

1

Highway accesses

2

Without prejudice to paragraph 1(1)(b) above, the nominated undertaker may, for the purposes of or in connection with the works authorised by this Part of this Act—

in the locations shown on the deposited plans.

Overhead line diversions

3
(1) (2) (3)
Area Overhead line to be taken down New overhead line to be provided
GREATER LONDON GREATER LONDON GREATER LONDON
London Borough of Barking and Dagenham Barking corridor 275kV overhead electric cable (ZBA) between points EC106, EC107 and EC108 New overhead electric cable to be provided on land within the relevant limits between points EC106, EC109 and EC108 or thereabouts.
London Borough of Barking and Dagenham and London Borough of Havering Barking corridor 275kV overhead electric cable (ZBA) between points EC87, EC88, EC89, EC1, EC2, EC3, EC4, EC5, EC6, EC7, EC8, EC9, EC10, EC11 and EC12 New overhead electric cable to be provided on land within the relevant limits between points EC87, EC90, EC91, EC13, EC92, EC93, EC94, EC95, EC18, EC19, EC20, EC21, EC22 and EC12 or thereabouts.
London Borough of Havering Havering overhead electric cable (ZBA) between points EC23, EC24 and EC25 New overhead electric cable to be provided on land within the relevant limits between points EC23, EC26 and EC25 or thereabouts.
COUNTY OF ESSEX COUNTY OF ESSEX COUNTY OF ESSEX
Borough of Thurrock Purfleet Road 400kV overhead electric cable (ZR) between points EC103, EC27, EC28, EC29 and EC30 New overhead electric cable to be provided on land within the points EC103, EC27, EC28, EC29 and EC30 relevant limits between points EC103, EC104, EC28, EC105 and EC30 or thereabouts.
Aveley 275kV overhead electric cable (ZBA) between points EC96, EC97, EC98 and EC99 New overhead electric cable to be provided on land within the relevant limits between points EC96, EC100, EC101, EC102 and EC99 or thereabouts.
COUNTY OF KENT COUNTY OF KENT COUNTY OF KENT
Borough of Dartford, Parish of Swanscombe and Greenhithe Dartford 132kV overhead electric cable (south) (PK) between points EC48, EC49 and EC50 New overhead electric cable to be provided on land within the relevant limits between points EC48, EC51, EC52 and EC50 or thereabouts.
Borough of Dartford, Parish of Swanscombe and Greenhithe and Borough of Gravesham, Town of Gravesend Dartford 132kV overhead electric cable (north) (PJ) between points EC40, EC41, EC42, EC43 and EC44 New overhead electric cable to be provided on land within the relevant limits between points EC40, EC45, EC42, EC46, EC47 and EC44 or thereabouts.
Borough of Dartford, Parish of Southfleet and Borough of Gravesham, Town of Gravesend Dartford 400kV overhead electric cable (4TP) between points EC53, EC54, EC55 and EC56 New overhead electric cable to be provided on land within the relevant limits between points EC53, EC57, EC58 and EC56 or thereabouts.
Borough of Gravesham, Town of Gravesend and Borough of Dartford, Parish of Swanscombe and Greenhithe Gravesend 400kV overhead electric cable (ZR) between points EC33, EC34, EC35 and EC36 New overhead electric cable to be provided on land within the relevant limits between points EC33, EC37, EC38, EC39 and EC36 or thereabouts.
Borough of Gravesham, Town of Gravesend Pepper Hill 400kV overhead electric cable (YN) between points EC59, EC60, EC61 and EC62 New overhead electric cable to be provided on land within the relevant limits between points EC59, EC63, EC64, EC65 and EC62 or thereabouts.
Borough of Gravesham, Parish of Shorne Singlewell 400kV overhead electric cable (4YN) between points EC66, EC67 and EC68 New overhead electric cable to be provided on land within the relevant limits between points EC66, EC69 and EC68 or thereabouts.
Borough of Maidstone, Parish of Boxley Pilgrims Way 400kV overhead electric cable (TP) between points EC70, EC71 and EC72 New overhead electric cable to be provided on land within the relevant limits between points EC70, EC73, EC74 and EC72 or thereabouts.
Boxley 132kV overhead electric cable (PN) between points EC75, EC76, EC77 and EC78 New overhead electric cable to be provided on land within the relevant limits between points EC75, EC76, EC79 and EC78 or thereabouts.
Borough of Ashford, Parish of Aldington Sellindge 400kV overhead electric cable (VO) between points EC80 and EC81 New overhead electric cable to be provided on land within the relevant limits between points EC80, EC82 and EC81 or thereabouts.
District of Shepway, Parish of Sellindge Sellindge East 132kV overhead electric cable (PV) between points EC83, EC84 and EC85 New overhead electric cable to be provided on land within the relevant limits between points EC83, EC86 and EC85 or thereabouts.

Mitigation and protection works

4

The nominated undertaker may within the limits of deviation for the scheduled works or within the limits of land to be acquired or used—

Euston Road and York Way improvement works

5

and works ancillary to any such works.

Underpinning of buildings

6
7
8

Discharge of water

9

Entry for preparatory purposes

10

Temporary interference with waterways

11

SCHEDULE 3

Stopping up: non-level crossings

1
2
3

Stopping up: level crossings

4
(1) (2) (3)
Area Name of highway at crossing Extent of closure and nature of work
GREATER LONDON GREATER LONDON GREATER LONDON
London Borough of Barking and Dagenham Chequers Lane Chequers Lane to be stopped up between points H1 and H2. Footbridge to be provided to carry a new footpath between points H3, H4, H5 and H6.
London Borough of Havering Manor Way Manor Way to be stopped up between points A1 and A2. Footbridge to be provided to carry a new footpath between points A1, A3, A4, A5, A6 and A2.
Ferry Lane Ferry Lane to be stopped up between points F1 and F2. Footbridge to be provided to carry a new footpath between points F3, F4, F5, F6, F7 and F2.
COUNTY OF ESSEX COUNTY OF ESSEX COUNTY OF ESSEX
Borough of Thurrock A1090 (Tank Hill Road) A1090 (Tank Hill Road) to be stopped up between points J1 and J7.
COUNTY OF KENT COUNTY OF KENT COUNTY OF KENT
Borough of Ashford, Town of Ashford Aylesford Place Aylesford Place to be stopped up between points H1 and H2.

Permanent obstruction

5

Temporary interference

6

any highway or part of a highway, and

Street works

7
8

Construction

9

the construction or alteration shall be completed to the reasonable satisfaction of the highway authority.

it shall be deemed to have issued such a certificate at the end of that period.

10

and the highway is one for which a local highway authority is the highway authority.

Maintenance

11

and after the end of that period shall be maintained by and at the expense of the highway authority.

any railway of the nominated undertaker.

12

Notwithstanding anything in section 46 of the Railways Clauses Consolidation Act 1845, as incorporated with this Act, the nominated undertaker shall not be liable to maintain the surface of any highway under or over which the scheduled works shall be constructed, or the immediate approaches to any such highway.

Bridges carrying highways

13

Each of sections 116 and 117 of the Transport Act 1968 (duties as respects bridges carrying highways over railways) shall apply as if the nominated undertaker were one of the boards mentioned in that section.

Agreements with highway authorities etc.

14

Use of subsoil

15

The nominated undertaker may enter upon, take and use for the purposes of the works authorised by this Part of this Act so much of the subsoil of any highway within the limits of deviation for the scheduled works or within the limits of land to be acquired or used as shall be required for the purpose of the construction or maintenance of those works, without being required to acquire that subsoil or any interest therein.

SCHEDULE 4

Part I — Purposes for which Certain Land may be Acquired or Used

Part II — Application of Legislation Relating to Compulsory Purchase

Lands Clauses Consolidation Act 1845

1

The Lands Clauses Consolidation Act 1845 shall not apply to the acquisition of land under section 4(1) above.

Compulsory Purchase Act 1965

2

Part I of the Compulsory Purchase Act 1965, so far as not inconsistent with this Part of this Act, shall apply to an acquisition of land under section 4(1) above as it applies to a compulsory purchase to which Schedule 1 to the Acquisition of Land Act 1981 applies and as if this Act were a compulsory purchase order under that Act.

3

Compulsory Purchase (Vesting Declarations) Act 1981

4

The Compulsory Purchase (Vesting Declarations) Act 1981 shall apply as if this Act were a compulsory purchase order.

5

(1) Before making a declaration under section 4 below with respect to any land which is subject to a compulsory purchase order the acquiring authority shall include the particulars specified in subsection (3) below in a notice which is— (a) given to every person with a relevant interest in the land with respect to which the declaration is to be made (other than a mortgagee who is not in possession), and (b) published in the London Gazette.

(7) For the purposes of this section, a person has a relevant interest in land if— (a) he is for the time being entitled to dispose of the fee simple of the land, whether in possession or reversion, or (b) he holds, or is entitled to the rents and profits of, the land under a lease or agreement, the unexpired term of which exceeds one month.

Part III — Supplementary Provisions

Acquisition of subsoil

6
Area No. on deposited plans
GREATER LONDON GREATER LONDON
London Borough of Islington 307 to 318, 320 to 330, 332, 335, 338 to 739, 798, 799 and 803 to 1042
London Borough of Hackney 1 to 183, 185 to 211 and 213 to 772
London Borough of Newham 16 to 518, 522 to 540, 542 to 549, 551 to 1207, 1209 to 1223, 1235, 1236, 1238, 1240 to 1243 and 1246 to 1252
London Borough of Redbridge 8 to 14
London Borough of Barking and Dagenham 227 to 765, 767, 769 to 786, 794 and 796
COUNTY OF ESSEX COUNTY OF ESSEX
Borough of Thurrock 99 and 103
COUNTY OF KENT COUNTY OF KENT
Borough of Tonbridge and Malling, Parish of Aylesford 51 to 140 and 144 to 183
Borough of Tonbridge and Malling, Parish of Burham 1 to 9
Area No. on deposited plans
GREATER LONDON GREATER LONDON
London Borough of Camden 178
London Borough of Islington 740 to 771
COUNTY OF KENT COUNTY OF KENT
Borough of Ashford, Parish of Mersham 39

Acquisition of existing tunnels

7

In the case of land specified in the following table (existing railway tunnels), the power conferred by section 4(1) above shall only be exercisable in relation to so much of the land as is comprised in an existing railway tunnel.

Acquisition of new rights

8
9

(7) In assessing the compensation to be paid by the acquiring authority under this Act regard shall be had not only to the extent (if any) to which the value of the land over which the right is purchased is depreciated by the acquisition of the right but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of his, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.

(1) This subsection applies where— (a) a notice to treat in respect of a right over land consisting of a house, building or manufactory or of a park or garden belonging to a house (“the relevant land”) has been served on a person under section 5 of this Act, (b) in consequence of the service of the notice, a question of disputed compensation in respect of the purchase of the right would, apart from this section, fall to be determined by the Lands Tribunal, and (c) before the Lands Tribunal have determined that question, the person on whom the notice has been served satisfies them that the relevant conditions are met. (1A) The relevant conditions are— (a) that he has an interest which he is able and willing to sell in the whole of the relevant land; (b) where the relevant land consists of a house, building or manufactory, that it cannot be made subject to the right without material detriment to it; and (c) where the relevant land consists of a park or garden belonging to a house, that it cannot be made subject to the right without seriously affecting the amenity or convenience of the house. (1B) Where subsection (1) above applies— (a) the compulsory purchase order shall, in relation to the person on whom the notice to treat has been served— (i) cease to authorise the purchase of the right to which the notice relates, and (ii) be deemed to authorise the purchase of that person’s interest in the whole of the relevant land including, where the land consists of a park or garden belonging to a house, the house, and (b) the notice to treat shall be deemed to have been served in respect of that interest on such date as the Lands Tribunal direct. (1C) Any question as to the extent of the land in which the compulsory purchase order is deemed to authorise the purchase of an interest by virtue of subsection (1B)(a)(ii) of this section shall be determined by the Lands Tribunal. (1D) Where the Lands Tribunal determine that the person on whom a notice to treat has been served has satisfied them as mentioned in subsection (1)(c) of this section, the acquiring authority may withdraw the notice at any time within the period of six weeks beginning with the date of the determination. (1E) Subsection (1D) of this section is without prejudice to any other power of the acquiring authority to withdraw the notice to treat.

shall be so modified as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be purchased compulsorily is vested absolutely in the acquiring authority.

(44) (1) Where a right over land is purchased from any person for the purpose of works which are to be situated partly on that land and partly elsewhere, compensation for injurious affection of land retained by that person shall be assessed by reference to the whole of the works and not only the part situated on the land over which the right is exercisable. (2) In this section “compensation for injurious affection” means compensation for injurious affection under section 7 or 20 of the Compulsory Purchase Act 1965 as applied by paragraph 8(2) of Schedule 4 to the Channel Tunnel Rail Link Act 1996.

(58) In determining under section 8(1)(c) of the Compulsory Purchase Act 1965 as applied by paragraph 8(2) of Schedule 4 to the Channel Tunnel Rail Link Act 1996 whether— (a) a right over part of a house, building or manufactory can be taken without material detriment to the house, building or manufactory, or (b) a right over part of a park or garden belonging to a house can be taken without seriously affecting the amenity or convenience of the house, the Lands Tribunal shall take into account not only the effect of the right on the whole of the house, building or manufactory or of the house and the park or garden but also the use to be made of the rights proposed to be acquired and, in a case where the right is proposed to be acquired for works or other purposes extending to other land, the effect of the whole of the works and the use to be made of the other land.

10

Acquisition of part only of certain properties

11

the following provisions of this paragraph, with paragraph 12 below, shall apply instead of section 8(1) of the Compulsory Purchase Act 1965.

the owner shall be required to sell the land subject to the notice to treat.

then, except where sub-paragraph (10) below applies, the notice to treat shall be deemed to be a notice to treat in addition for the land to which the material detriment is confined.

the notice to treat shall be deemed to be a notice to treat in addition for the remainder of the land subject to the counter-notice.

12

Minerals

13

Power to require acquisition where time limit extended

14

the relevant powers of compulsory acquisition shall cease to be exercisable in respect of that person’s interest in any of the land specified in the notice under sub-paragraph (2) above.

the relevant powers of compulsory acquisition shall cease to be exercisable in respect of that person’s interest in the remainder of that land.

references to the relevant powers of compulsory acquisition are to—

15

Compensation

16

Section 4 of the Acquisition of Land Act 1981 (assessment of compensation in relation to a compulsory purchase where unnecessary things done with a view to obtaining compensation) shall have effect in relation to a compulsory purchase under this Part of this Act as if it were a compulsory purchase for the purposes of that Act.

SCHEDULE 5

Occupation and use for construction of works

1
(1) (2) (3) (4)
Works Area Number of land shown on deposited plans Purpose for which temporary possession may be taken
GREATER LONDON GREATER LONDON GREATER LONDON GREATER LONDON
1A, 1B, 1C, 1D, 1F and 5D(1) London Borough of Camden 79 The provision of access for construction purposes.
1A, 1B, 1C, 1D and 1F 87 The provision of a working site and access for construction purposes.
1A, 1AA, 1B, 1BB, 1C, 1CC, 1D, 1DD, 1EE, 1K, 3, 3B, 3C and 5A 182 and 189 to 192 The provision of access for construction purposes.
1HH, 3B and 3C 203 and 204 The provision of access for construction purposes.
1JJ, 2AA and 2BB London Borough of Islington 782 and 1050 The provision of access for construction purposes.
1AA, 1BB and 3E 787 and 788 The provision of access for construction purposes.
6 London Borough of Hackney 778 and 779 The provision of barge moorings and barge loading facilities.
6 780 The provision of barge loading facilities, spoil handling plant and machinery, a temporary shaft to Work No. 6, a working site and access for construction purposes.
6 781 and 782 The provision of access for construction purposes.
22 London Borough of Newham 1237 and 1239 The provision of a working site.
6, 6A, 6B, 6C, 6D, 6G, 6H, 6J and 7 1253 and 1254 The provision of barge moorings and barge loading facilities, spoil handling plant and machinery, a conveyor, a working site and access for construction purposes.
6, 6A, 6B, 6C, 6D, 6G, 6H, 6J and 7 1255 to 1260 The provision of spoil handling plant and machinery, a conveyor and access for construction purposes.
6, 6A, 6B, 6C, 6D, 6G, 6H, 6J and 7 1261 The provision of spoil handling plant and machinery and a conveyor.
6, 6A, 6B, 6C, 6D, 6G, 6H, 6J and 7 1262 and 1263 The provision of access for construction purposes.
6, 6A, 6B, 6C, 6D, 6G, 6H, 6J and 7 1269 The provision of a working site and access for construction purposes.
6D and 6E London Borough of Waltham Forest 6 The provision of access for construction purposes.
6D and 6E 10 The provision of access for construction of drainage works.
8Q London Borough of Barking and Dagenham 205 The provision of access for construction purposes.
8H, 8P(3) and 8P(4) 195, 201 and 202 The provision of access for construction purposes.
8L and 8R 215 and 226 The provision of accesses for construction purposes.
8, 8G, 8J and 8R 217 to 219 The provision of access for construction purposes.
22, 22A, 22B, 22C, 22E, 22F, 22G, 22J and 8U(13) 829 and 830 The provision of a conveyor, spoil handling plant and machinery, and access for construction purposes.
22, 22A, 22B, 22C, 22E, 22F, 22G, 22J and 8U(13) 839 The use of a jetty and provision of moorings in the River Thames.
8, 8G, 8J and 8R London Borough of Havering 1 to 4 The provision of access for construction purposes.
8 and 8S 25 to 30 and 45 The provision of a working site and access for construction purposes.
8 and 8U(7) 55 and 56 The provision of access for construction purposes.
COUNTY OF ESSEX COUNTY OF ESSEX COUNTY OF ESSEX COUNTY OF ESSEX
9 Borough of Thurrock 52 and 56 to 67 The provision of access for construction purposes.
9, 9C, 9D, 9F(1) and 10 81, 83, 84, 89, 93, 94, 96 and 98 The provision of a working site and access for construction purposes.
COUNTY OF KENT COUNTY OF KENT COUNTY OF KENT COUNTY OF KENT
10, 10A, 10B, 10C and 10J Borough of Dartford, Parish of Swanscombe and Greenhithe 13 and 14 The provision of access for construction purposes.
10B, 10D, 10F(1) and 10R(2) 21 to 23 The provision of access for construction purposes.
10, 10T(1), 10T(3), 10T(8), 10R, 10P, 10Q and 11 to 11F Borough of Dartford, Parish of Southfleet 12 and 13 The provision of access for construction purposes.
10T(6), 10T(7) and 10T(8) 26 The provision of access for construction purposes.
11 53 The provision of a working site.
10J and 10J(2) Borough of Gravesham, Town of Gravesend 2 to 4 The provision of access for construction purposes.
10, 10B, 10C, 10D, 10E and 10F(1) 12 to 14 The provision of access for construction purposes.
10R(2) 42 The provision of access for construction purposes.
10B, 10C and 10N 70 The provision of access for construction purposes.
12, 12F and 12H Borough of Gravesham, Parish of Cobham 28 The provision of a working site and temporary road diversion.
20A and 20B Borough of Gravesham, Parish of Higham 9 and 10 The provision of access to a railhead to be used for construction purposes.
20A and 20B Borough of Gravesham, Parish of Shorne 18 The provision of access to a railhead to be used for construction purposes.
13, 13B City of Rochester Upon Medway, Town of Rochester 27 to 29 The provision of a working site and access to the River Medway for construction purposes.
13C and 13D 65, 68, 69 and 71 The provision of access for construction purposes.
13C and 13D Borough of Tonbridge and Malling, Parish of Wouldham 1 and 2 The provision of access for construction purposes.
13 Borough of Tonbridge and Malling, Parish of Aylesford 1, 4, 29 and 41 The provision of a working site and access for construction purposes.
13 Borough of Maidstone, Parish of Boxley 88 The provision of access for construction purposes.
13 and 13J Borough of Maidstone, Parish of Detling 1 The provision of a working site and access for construction purposes.
14 and 14A Borough of Maidstone, Parish of Thurnham 5 The provision of a working site and access for construction purposes.
14 Borough of Maidstone, Parish of Leeds 1 The provision of access for construction purposes.
15 Borough of Ashford, Parish of Hothfield 6 The provision of access for construction purposes.
16, 16A, 16B and 16F 15 The provision of a working site and access for construction purposes.
16, 16A and 16B Borough of Ashford, Town of Ashford 16 The provision of a working site.
16C and 16H 34 to 37 and 48 The provision of a working site and access for construction purposes.
16 and 16H 59 to 73 and 76 The provision of a working site and access for construction purposes.
16 and 16K 78 The provision of a working site and access for construction purposes.
16A, 16B, 16C, 16K and 16L 46 and 78 to 80 The provision of a working site and access for construction purposes.
16, 16A, 16B, 16C, 16K and 16M 85, 86, 89, 94 and 95 The provision of a working site and access for construction purposes.
16, 16A, 16B 16C and 16D 110, 111, 117 and 122 The provision of a working site and access for construction purposes.
16, 16A, 16B, 16C, 16D and 16E 125 and 131 The provision of a working site and access for construction purposes.
17, 17B and 17C Borough of Ashford, Parish of Sevington 28 The provision of a working site.
17 and 17H Borough of Ashford, Parish of Smeeth 24 and 27 The provision of access for construction purposes.
17, 17J(1) and 17K 31 The provision of a working site and access for construction purposes.
17 and 17J(2) District of Shepway, Parish of Sellindge 44, 45 and 60 The provision of access for construction purposes.
17 District of Shepway, Parish of Stanford 7 and 17 to 19 The provision of access for construction purposes.
17 and 17Q District of Shepway, Parish of Saltwood 13 to 16 The provision of a working site and access for construction purposes.
17, 17Q and 17P District of Shepway, Parish of Postling 11 and 14 to 18 The provision of a working site and access for construction purposes.
18B, 18E, 18F and 18G District of Shepway, Parish of Newington 3 and 4 The provision of a working site and access for construction purposes.
18J 6 and 9 The provision of access for construction purposes.
18A, 18AA, 18B, 18F, 18G and 18K 14 to 16, 19 to 21, 32 and 37 The provision of a working site and access for construction purposes.
18A, 18AA, 18B and 18G 31 and 40 The provision of working sites and access for construction purposes.
18AA 62 The provision of access for construction purposes.
18E District of Shepway, Parish of Hythe 1 The provision of access for construction purposes.
18AA District of Shepway, Town of Folkestone 6 The provision of a working site and access for construction purposes.
13, 14, 15, 15A, 15B, 16, 16A, 16B, 16C, 16D, 16E, 17, 18A, 18AA, 18B, 18C, 18D, 18F, 18G and all railway works associated therewith District of Thanet, Parish of Minster 2 The provision of access to a railhead to be used for construction purposes.
13, 14, 15, 15A, 15B, 16, 16A, 16B, 16C, 16D, 16E, 17, 18A, 18AA, 18B, 18C, 18D, 18F, 18G and all railway works associated therewith District of Dover, Parish of Sandwich 1 The provision of access to a railhead to be used for construction purposes.
2
3

Occupation and use for maintenance of works

4

if such possession is reasonably required for the purpose of or in connection with maintaining the work or any ancillary works connected with it, and

Suspension of private rights of way

5

SCHEDULE 6

Part I — Qualifying Authorities

Specification

1

Transition

2

Part II — Development in Greater London

Introductory

3

This Part of this Schedule has effect in relation to development in Greater London.

Planning regimes

4

Conditions: non-qualifying authority

5

Conditions: qualifying authority

6
Operation or work Grounds
1.Construction works(a) The erection, construction, alteration or extension of any building (except for anything within (b) or (c) below or item 2 or 6) or road vehicle park.(b) The construction, alteration or extension of any terracing, cuttings, embankments or other earth works.(c) The erection, construction, alteration or extension of any fences, walls or other barriers (including bunds) for visual or noise screening or dust suppression. That the design or external appearance of the works ought to be modified—(a) to preserve the local environment or local amenity,(b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or(c) to preserve a site of archaeological or historic interest or nature conservation value,and is reasonably capable of being so modified.That the development ought to, and could reasonably, be carried out elsewhere within the limits of the land on which the works of which it forms part may be carried out under this Part of this Act.
2.Minor construction works The erection, construction, alteration or extension of any transformers, electronic communications masts or pedestrian accesses to the railway line. That the design or external appearance of the works ought to be modified to preserve the local environment or local amenity, and is reasonably capable of being so modified.
That the development ought to, and could reasonably, be carried out on land elsewhere within the relevant limits.
3.Fences and walls The erection, construction, alteration or extension of any fences or walls (except for anything within item 1(c) above). That the development ought to, and could reasonably, be carried out on land elsewhere within the relevant limits.
4.Highway access The formation, laying out or alteration of any means of access to a highway used, or proposed highway proposed to be used, by vehicular traffic. That the development ought to be modified to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and is reasonably capable of being so modified.
5.Gantries and overhead line supports The erection or construction of any gantries or overhead line supports for so much of any railway comprised in Work No. 1 as lies between the northern end of the roof over St. Pancras station, as it is at the time of erection or construction, and the northern abutment of the existing bridge over the Regent’s Canal. That the design or external appearance of the work ought to be modified to preserve the local environment or local amenity, and is reasonably capable of being so modified.
6.Artificial lighting The erection, construction or installation of lighting equipment. That the design of the equipment, with respect to the emission of light, ought to be modified to preserve the local environment or local amenity, and is reasonably capable of being so modified.
That the development ought to, and could reasonably, be carried out elsewhere within the limits of land on which the works of which it forms part may be carried out under this Part of this Act.
7.Waste and spoil disposal The disposal of waste or spoil. That—(a) the design or external appearance of disposal sites on land within the relevant limits,(b) the methods by which such sites are worked, or(c) the noise, dust, vibration or screening arrangements during the operation of such sites,ought to be modified and are reasonably capable of being modified.That—(a) to preserve the local environment or local amenity,(b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or(c) to preserve a site of archaeological or historic interest or nature conservation value,the development ought to be carried out on land elsewhere within the relevant limits, and is reasonably capable of being so carried out.
8.Borrow pits The excavation of bulk materials from borrow pits. That—(a) the design or external appearance of borrow pits on land within the relevant limits,(b) the methods by which such pits are worked, or(c) the noise, dust, vibration or screening arrangements during the operation of such pits,ought to be modified and are reasonably capable of being modified.That—(a) to preserve the local environment or local amenity,(b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or(c) to preserve a site of archaeological or historic interest or nature conservation value,the development ought to be carried out on land elsewhere within the relevant limits, and is reasonably capable of being so carried out.
7
Matters Grounds
1.Road transport Means and routes by which anything is to be transported on a highway by large goods vehicle to a working or storage site, a site where it will be re-used or a waste disposal site. That the arrangements ought to be modified—(a) to preserve the local environment, local amenity or a site of archaeological or historic interest or nature conservation value, or(b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area,and are reasonably capable of being so modified.
2.Handling of re-useable spoil and top soil Handling during removal, storage and re-use of any spoil or top soil removed during the course of carrying out the development. That the arrangements ought to be modified to ensure that the spoil or top soil remain in good condition and are reasonably capable of being so modified.
3.Storage sites Sites on land within the relevant limits at which—(a) minerals, aggregates or other construction materials required for the development, or(b) spoil or top soil,are to be stored until used or re-used in carrying out the development or disposed of as waste. That the arrangements ought to be modified—(a) to preserve the local environment, local amenity or a site of archaeological or historic interest or nature conservation value, or(b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area,and are reasonably capable of being so modified.
4.Construction camps Sites on land within the relevant limits which are to be used for the residential accommodation of persons engaged in carrying out the development. As item 3.
5.Screening Provision where necessary on land within the relevant limits of any screening for working sites on such land required for the purpose of carrying out the development. As item 3.
6.Hours of working The hours and days of the week during which work on the development on land within the relevant limits is to be carried out. That the arrangements ought to be modified to preserve the local environment or local amenity, and are reasonably capable of being so modified.
7.Artificial lighting The use of artificial lighting on land within the relevant limits for the purpose of carrying out the development. As item 6.
8.Suppression of noise, dust and vibration The suppression of noise, dust and vibration caused by construction operations carried on on land within the relevant limits for the purpose of carrying out the development. As item 6.
9.Mud on highway Measures to be taken on land within the relevant limits to prevent mud being carried onto any public highway as a result of carrying on the development. That the arrangements ought to be modified—(a) to preserve the local environment or local amenity, or(b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area,and are reasonably capable of being so modified.
10.Highway access The formation, laying out or alteration of any means of access to any highway used, or proposed highway proposed to be used, on a temporary basis by vehicular traffic to serve a construction site or camp. That the arrangements ought to be modified to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and are reasonably capable of being so modified.
8

it shall not be begun unless the local planning authority has, at the request of the nominated undertaker, approved a scheme for the restoration of the land on which the development is to be carried out.

9

and that the scheme is reasonably capable of being so modified.

10

—Where the local planning authority approves a scheme for the purposes of paragraph 9(3)(b) above, the nominated undertaker shall be required—

Conditions: general

11

Part III — Development in Essex or Kent

Introductory

12

This Part of this Schedule has effect in relation to development in Essex or Kent.

Planning regimes: district councils

13

District conditions: non-qualifying authority

14

District conditions: qualifying authority

15
Operation or work Grounds
1.Construction works(a) The erection, construction, alteration or extension of any building (except for anything within (b) or (c) below or item 2 or 6) or road vehicle park.(b) The construction, alteration or extension of any terracing, cuttings, embankments or other earth works.(c) The erection, construction, alteration or extension of any fences, walls or other barriers (including bunds) for visual or noise screening or dust suppression. That the design or external appearance of the works ought to be modified—(a) to preserve the local environment or local amenity,(b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or(c) to preserve a site of archaeological or historic interest or nature conservation value,and is reasonably capable of being so modified.That the development ought to, and could reasonably, be carried out elsewhere within the limits of the land on which the works of which it forms part may be carried out under this Part of this Act.
2.Minor construction works The erection, construction, alteration or extension of any transformers, electronic communications masts or pedestrian accesses to the railway line. That the design or external appearance of the works ought to be modified to preserve the local environment or local amenity, and is reasonably capable of being so modified.
That the development ought to, and could reasonably, be carried out on land elsewhere within the relevant limits.
3.Fences and walls The erection, construction, alteration or extension of any fences or walls (except for anything within item 1(c) above). That the development ought to, and could reasonably, be carried out on land elsewhere within the relevant limits.
4.Highway access The formation, laying out or alteration of any means of access to a highway used, or proposed highway proposed to be used, by vehicular traffic. That the development ought to be modified to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and is reasonably capable of being so modified.
5.Gantries and overhead line supports The erection or construction of any gantries or overhead line supports for so much of the railway comprised in Work No. 13 as lies between 1,000 and 2,400 metres from its western end. That the design or external appearance of the work ought to be modified to preserve the local environment or local amenity, and is reasonably capable of being so modified.
6.Artificial lighting The erection, construction or installation of lighting equipment. That the design of the equipment, with respect to the emission of light, ought to be modified to preserve the local environment or local amenity, and is reasonably capable of being so modified.
That the development ought to, and could reasonably be, carried out elsewhere within the limits of land on which the works of which it forms part may be carried out under this Part of this Act.
16
Matters Grounds
1.Handling of re-useable spoil and top soil Handling during removal, storage and re-use of any spoil or top soil removed during the course of carrying out the development. That the arrangements ought to be modified to ensure that the spoil or top soil remains in good condition and are reasonably capable of being so modified.
2.Storage sites Sites on land within the relevant limits at which—(a) minerals, aggregates or other construction materials required for the development, or(b) spoil or top soil,are to be stored until used or re-used in carrying out the development or disposed of as waste. That the arrangements ought to be modified—(a) to preserve the local environment, local amenity or a site of archaeological or historic interest or nature conservation value, or(b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area,and are reasonably capable of being so modified.
3.Construction camps Sites on land within the relevant limits which are to be used for the residential accommodation of persons engaged in carrying out the development. As item 2.
4.Screening Provision where necessary on land within the relevant limits of any screening for working sites on such land required for the purpose of carrying out the development. As item 2.
5.Hours of working The hours and days of the week during which work on the development on land within the relevant limits is to be carried out. That the arrangements ought to be modified to preserve the local environment or local amenity, and are reasonably capable of being so modified.
6.Artificial lighting The use of artificial lighting on land within the relevant limits for the purpose of carrying out the development. As item 5.
7.Suppression of noise, dust and vibration The suppression of noise, dust and vibration caused by construction operations carried on on land within the relevant limits for the purpose of carrying out the development. As item 5.
8.Mud on highway Measures to be taken on land within the relevant limits to prevent mud being carried onto any public highway as a result of carrying on the development. That the arrangements ought to be modified—(a) to preserve the local environment or local amenity, or(b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area,and are reasonably capable of being so modified.
9.Highway access The formation, laying out or alteration of any means of access to any highway used, or proposed highway proposed to be used, on a temporary basis by vehicular traffic to serve a construction site or camp. That the arrangements ought to be modified to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and are reasonably capable of being so modified.
17

and that the scheme is reasonably capable of being so modified.

18

Where the district planning authority approves a scheme for the purposes of paragraph 17(3)(b) above, the nominated undertaker shall be required—

District conditions: general

19

Planning regimes: county councils

20

County conditions: non-qualifying authority

21

County conditions: qualifying authority

22
Operation or work Grounds
1.Highway access The formation, laying out or alteration of any means of access to a highway used, or proposed highway proposed to be used, by vehicular traffic. That the development ought to be modified to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and is reasonably capable of being so modified.
2.Waste and spoil disposal The disposal of waste or spoil. That—(a) the design or external appearance of disposal sites on land within the relevant limits,(b) the methods by which such sites are worked, or(c) the noise, dust, vibration or screening arrangements during the operation of such sites, ought to be modified and are reasonably capable of being modified.That—(a) to preserve the local environment or local amenity,(b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or(c) to preserve a site of archaeological or historic interest or nature conservation value,the development ought to be carried out on land elsewhere within the relevant limits, and is reasonably capable of being so carried out.
3.Borrow pits The excavation of bulk materials from borrow pits. That—(a) the design or external appearance of borrow pits on land within the relevant limits,(b) the methods by which such pits are worked, or(c) the noise, dust, vibration or screening arrangements during the operation of such pits,ought to be modified and are reasonably capable of being modified.That—(a) to preserve the local environment or local amenity,(b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or(c) to preserve a site of archaeological or historic interest or nature conservation value,the development ought to be carried out on land elsewhere within the relevant limits, and is reasonably capable of being so carried out.

Note: In the case of items 2 and 3, the second of the grounds specified does not apply in relation to development which—

23
Matters Grounds
1.Handling of re-usable spoil and top soil Handling during removal, storage, and re-use of any spoil or top soil removed during the course of carrying out the development. That the arrangements ought to be modified to ensure that the spoil or top soil remains in good condition and are reasonably capable of being so modified.
2. Storage sites Sites on land within the relevant limits at which—(a) minerals, aggregates or other construction materials required for the development, or(b) spoil or top soil, are to be stored until used or re-used in carrying out the development or disposed of as waste. That the arrangements ought to be modified—(a) to preserve the local environment, local amenity or a site of archaeological or historic interest or nature conservation value, or(b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area,and are reasonably capable of being so modified.
3.Construction camps Sites on land within the relevant limits which are to be used for the residential accommodation of persons engaged in carrying out the development. As item 2.
4.Screening Provision where necessary on land within the relevant limits of any screening for working sites on such land required for the purpose of carrying out the development. As item 2.
5.Hours of working The hours and days of the week during which work on the development on land within the relevant limits is to be carried out. That the arrangements ought to be modified to preserve the local environment or local amenity, and are reasonably capable of being so modified.
6.Artificial lighting The use of artificial lighting on land within the relevant limits for the purpose of carrying out the development. As item 5.
7.Suppression of noise, dust and vibration The suppression of noise, dust and vibration caused by construction operations carried on on land within the relevant limits for the purpose of carrying out the development. As item 5.
8.Mud on highway Measures to be taken on land within the relevant limits to prevent mud being carried onto any public highway as a result of carrying on the development. That the arrangements ought to be modified—(a) to preserve the local environment or local amenity, or(b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area,and are reasonably capable of being so modified.
9.Highway access The formation, laying out or alteration of any means of access to any highway used, or proposed highway proposed to be used, on a temporary basis by vehicular traffic to serve a working site or camp. That the arrangements ought to be modified to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and are reasonably capable of being so modified.
24

it shall not be begun unless the county planning authority has, at the request of the nominated undertaker, approved a scheme for the restoration of the land on which the development is to be carried out.

25

and are reasonably capable of being so modified.

Part IV — Supplementary

Programming of requests for planning approvals

26

A planning authority shall not be required to entertain a request for approval under Part II or III of this Schedule unless—

Consultation

27

it shall, within 5 days of receiving the request, invite the appropriate body or bodies to make representations.

Matter Body
Nature conservation. Natural England.
Conservation of the natural beauty or amenity of the countryside. The Nature conservation or conservation of the natural beauty or amenity of the countryside .
Sites of archaeological or historic interest. The Historic Buildings and Monuments Commission for England.
28

it shall, within 5 days of receiving the request, invite the Environment Agency to make representations.

29

Intervention by Secretary of State

30
31

Appeals

32

this paragraph shall apply as if the authority had refused the request and notified the undertaker of its decision on the last day of the appropriate period.

33

No appeal under section 78 of the Town and Country Planning Act 1990 (right to appeal against planning decisions and failure to take such decisions) may be made against a decision, or failure to notify a decision, in relation to which a right of appeal arises under paragraph 32 above.

34
35

The decision of the person appointed under paragraph 34 above, or, as the case may be, of the Secretary of State, on an appeal under paragraph 32 above shall be final.

36
37

Interpretation

38

SCHEDULE 7

Listed buildings and conservation areas

1

section 74 of the Planning (Listed Buildings and Conservation Areas) Act 1990 (control of demolition in conservation areas) shall not apply to the demolition of it in exercise of the powers conferred by this Part of this Act.

2
3

Section 59 of the Planning (Listed Buildings and Conservation Areas) Act 1990 (acts causing or likely to result in damage to listed buildings) shall not apply to anything done in exercise of the powers conferred by this Part of this Act with respect to works.

Ancient monuments etc.

4
5

SCHEDULE 8

Historic Buildings and Monuments Commission for England

1

Royal Commission on the Historical Monuments of England

2
3

Interpretation

4

In this Schedule—

SCHEDULE 9

Part I — Railways Clauses Acts

Railways Clauses Consolidation Act 1845 (c. 20)

1

Railways Clauses Act 1863 (c. 92)

2

Part II — Other Legislation

Highway (Railway Crossings) Act 1839 (c. 45)

3

The Highway (Railway Crossings) Act 1839 shall not apply to a railway authorised by this Act.

Railway Regulation Act 1842 (c. 55)

4

Section 9 of the Railway Regulation Act 1842 shall not apply to a railway authorised by this Act.

Regulation of Railways Act 1871 (c. 78)

5

In section 2 of the Regulation of Railways Act 1871, in the definition of the term “railway”, the reference to any special Act of Parliament shall be construed as including this Act.

Railway Companies (Accounts and Returns) Act 1911 (c. 34)

6

For the purposes of the Railway Companies (Accounts and Returns) Act 1911, a person shall not be a railway company by virtue of working a railway authorised by this Act.

British Transport Commission Act 1949 (c. xxix)

7

Miscellaneous

8

the enactments specified in column (1) of the following table (which create the offences broadly described in column (2) of the table) shall each have effect as if the maximum fine which may be imposed on summary conviction of any offence specified in the enactment were, instead of that specified in column (3) of the table, a fine not exceeding the level specified in column (4) of the table.

(1) (2) (3) (4)
Enactment Description of offence Maximum otherwise applicable (level on standard scale) Maximum fine (level on standard scale)
Section 16 of the Railway Regulation Act 1840. Obstruction of officers of railway company or trespass upon railway. Level 1 Level 3
Section 17 of the Railway Regulation Act 1842. Misconduct of persons employed on railways. Level 1 Level 3
Section 22 of the Regulation of Railways Act 1868. Provision and improper use of means of communication. Level 1 Level 2
The Regulation of Railways Act 1889— The Regulation of Railways Act 1889— The Regulation of Railways Act 1889— The Regulation of Railways Act 1889—
section 5(1). Failure to produce ticket, to pay fare or to give name and address. Level 1 Level 2
section 5(3). Travel with intent to avoid payment of fare. Level 2 Level 3

SCHEDULE 10

Ecclesiastical law

1

Overground wires

2

Nothing in the London Overground Wires &c. Act 1933, or in any byelaw made under that Act, shall extend or apply to any wire or part of a wire erected or placed, proposed to be erected or placed, or for the time being maintained, by the nominated undertaker in exercise of the powers conferred by this Part of this Act.

London Building Acts (Amendment) Act 1939

3

shall not apply to anything held by the Secretary of State or the nominated undertaker and used, or intended for use, by the nominated undertaker for the purposes of its undertaking under this Part of this Act.

Coast works

4

The following provisions of the Coast Protection Act 1949, namely—

shall not apply in relation to anything done within the limits of deviation for the scheduled works in exercise of the powers conferred by this Part of this Act in relation to those works, or any work in connection with them.

Highways etc.

5

(which control obstructions of the highway in connection with works related to buildings) shall not apply to anything erected, placed or retained in, upon or over a highway for the purposes of or in connection with the exercise of any of the powers conferred by this Part of this Act with respect to works.

Sites of special scientific interest

6

Section 28I of the Wildlife and Countryside Act 1981 (statutory undertakers: duty in relation to authorising operations) shall not apply to any operation carried out for the purposes of or in connection with the exercise of any of the powers conferred by this Part of this Act with respect to works, and neither shall the following—

Building regulations

7

Deposits in the sea

8

London lorries: general

9

London lorries: emergency permits

10
11

(a) in relation to any goods vehicle being driven by any person in a restricted street during the prescribed hours in respect of which an application under paragraph 10 of Schedule 10 to the Channel Tunnel Rail Link Act 1996 has been granted, or is treated as granted, provided that any conditions subject to which the application is granted, or treated as granted, are complied with; or

.

Works under streets in Greater London

12

The following provisions of the Greater London Council (General Powers) Act 1986, namely—

shall not apply to anything done in exercise of the powers conferred by this Part of this Act with respect to works.

Communication with public sewers in London

13

Section 106(8) of the Water Industry Act 1991 (which qualifies the general right to communicate with the public sewers of a sewerage undertaker) shall not apply where the proposed communication involves a drain or sewer serving the rail link.

SCHEDULE 11

Notice of removal

1

a notice complying with sub-paragraph (2) below.

Removal of remains

2
3

Removal of monuments

4
5

Records

6

and

Supplementary

7

SCHEDULE 12

Part I — The Authorised Works

Description of works

1

The works which the Secretary of State is authorised by section 44 of this Act to construct are the following—

Interpretation of Part I

2

In paragraph 1 above—

Part II — Interference with Highways and Means of Access

Stopping up of highways

3

Stopping up of private access to premises

4

and

Temporary interference with highways

5

Part III — Miscellaneous

Status of new highways

6
7

On the date on which this Act is passed—

shall become trunk roads as if they had become so by virtue of an order under section 10(2) of the Highways Act 1980 specifying that date as the date on which they were to become trunk roads.

8

Status of operations and works

9

The construction by the Secretary of State of a highway in pursuance of this Part of this Act shall be treated as the construction of a highway authorised by, and in pursuance of—

10

shall be treated as authorised by an order made by the Secretary of State under section 18 of the Highways Act 1980 in relation to the roads which become special roads by virtue of paragraph 6 above, and, in the case of operations and works falling within paragraph (c) above, as so authorised by virtue of section 125 of that Act.

Treatment of provisions of this Schedule for Highways Act purposes

11

Regulation of traffic on new roads

12

SCHEDULE 13

SCHEDULE 14

Scope of Schedule

1

This Schedule applies to any electric line to which section 37(1) of the Electricity Act 1989 would apply, but for section 50(1) above.

Consent requirement

2

Applications for consent

3
4

An application for consent under this Schedule shall be supplemented, if the appropriate Ministers so direct in writing, by such additional information as may be specified in the direction.

Publicity

5

Consultation

6
7

they shall, within 14 days of receiving the application, also invite the appropriate body or bodies to make representations.

Matter Body
Nature conservation. Natural England.
Conservation of the natural beauty or amenity of the countryside. The Nature conservation or conservation of the natural beauty or amenity of the countryside.
Sites of archaeological or historic interest. The Historic Buildings and Monuments Commission for England.

Grant of consent

8
9

A consent under this Schedule may include such conditions (including conditions as to the ownership and operation of the electric line to which it relates) as appear to the appropriate Ministers to be appropriate.

Variation and revocation of consent

10

Duration of consent

11

Subject to paragraph 10 above, a consent under this Schedule shall continue in force for such period as may be specified in or determined by or under the consent.

Anticipatory applications

12

shall have effect as if this Schedule had been in force at all material times.

Interpretation

13

In this Schedule, references to the appropriate Ministers are to the Secretary of State for Trade and Industry and the Secretary of State for Transport acting jointly.

SCHEDULE 15

Part I — Protection for Highways and Traffic

1
2

Wherever in this Part of this Schedule provision is made with respect to the approval or consent of the highway authority, that approval or consent shall be in writing and subject to such reasonable terms and conditions as the highway authority may require, but shall not be unreasonably withheld.

3
4

Before carrying out any work for the construction or maintenance of any part of the works authorised by Part I of this Act which will involve interference with a highway, or the traffic in any highway, or before temporarily stopping up any highway, the nominated undertaker shall consult the highway authority—

so as to reduce so far as reasonably practicable inconvenience to the public and to ensure the safety of the public.

5

The nominated undertaker shall not, without the consent of the highway authority, construct any part of the works authorised by Part I of this Act under and within 8 metres of the surface of any highway which comprises a carriageway except in accordance with plans submitted to, and approved by, the highway authority and if within 28 days after such plans have been submitted the highway authority has not approved or disapproved them, it shall be deemed to have approved the plans as submitted.

6

In the construction of any part of the said works under a highway no part thereof shall, except with the consent of the highway authority, be so constructed as to interfere with the provision of proper means of drainage of the surface of the highway or be nearer than two metres to the surface of the highway.

7
8

The nominated undertaker shall secure that so much of the works authorised by Part I of this Act as is constructed under any highway shall be so designed, constructed and maintained as to carry the appropriate loading recommended for highway bridges by the Secretary of State at the time of construction of the works, and the nominated undertaker shall indemnify the highway authority against, and make good to the highway authority, the expenses which the highway authority may reasonably incur in the maintenance or repair of any highway, or any tunnels, sewers, drains or apparatus therein, by reason of non-compliance with the provisions of this paragraph.

9

Any officer of the highway authority duly appointed for the purpose may at all reasonable times, on giving to the nominated undertaker such notice as may in the circumstances be reasonable, enter upon and inspect any part of the works authorised by Part I of this Act which—

during the carrying out of the work, and the nominated undertaker shall give to such officer all reasonable facilities for such inspection and, if he shall be of opinion that the construction of the work is attended with danger to any highway or to any property of the highway authority on or under any highway, the nominated undertaker shall adopt such measures and precautions as may be reasonably practicable for the purpose of preventing any damage or injury to the highway.

10
11

The nominated undertaker shall not remove any soil or material from any highway except so much as must be excavated in the carrying out of the works authorised by Part I of this Act.

12
13
14

The nominated undertaker shall, if reasonably so required by the highway authority, provide and maintain to the reasonable satisfaction of the highway authority, during such time as the nominated undertaker may occupy any part of a highway for the purpose of the construction of any part of the works authorised by Part I of this Act, temporary bridges and temporary ramps for vehicular or pedestrian traffic over any part of the works or in such other position as may be necessary to prevent undue interference with the flow of traffic in the highway.

15
16

If any damage to any highway or any property of the highway authority on or under any highway is caused by, or results from, the construction of any work authorised by Part I of this Act or any act or omission of the nominated undertaker, its contractors, agents or employees whilst engaged upon such work, the nominated undertaker may, in the case of damage to a highway, make good such damage to the reasonable satisfaction of the highway authority and, where the nominated undertaker does not make good, or in the case of damage to property of the highway authority, the nominated undertaker shall make compensation to the highway authority.

17

The fact that any act or thing may have been done in accordance with plans approved by the highway authority shall not (if it was not attributable to the act, neglect or default of the highway authority or of any person in its employ or its contractors or agents) exonerate the nominated undertaker from any liability, or affect any claim for damages, under this Part of this Schedule or otherwise.

18

Any dispute arising between the nominated undertaker and the highway authority under this Part of this Schedule shall, if the parties agree, be referred to arbitration, but shall otherwise be determined by the Secretary of State.

Part II — Protection for Electricity, Gas, Water and Sewerage Undertakers

1

(not being, except in paragraph 17 below, apparatus in respect of which the relations between the nominated undertaker and the undertakers are regulated by the provisions of Part III of the New Roads and Street Works Act 1991) and includes any structure for the lodging therein of apparatus or for giving access to apparatus;

2

that apparatus may be removed (or required by the nominated undertaker to be removed) under this Part of this Schedule before any necessary alternative apparatus has been constructed or is in operation to the reasonable satisfaction of the undertakers.

3
4

The nominated undertaker shall give the undertakers not less than 28 days’ written preliminary notice of the nominated undertaker’s intention to give notice under paragraph 6(1)(a) below in respect of apparatus in any land.

5
6
7
8

The undertakers shall, after the manner of construction and the line and situation of any necessary alternative apparatus have been agreed or determined as aforesaid, and after the grant to or obtaining by the undertakers of any such facilities and rights as are referred to in paragraph 6 above, proceed with all reasonable despatch to construct and bring into operation the alternative apparatus and to remove any apparatus required by the nominated undertaker to be removed under the provisions of this Part of this Schedule and, in default, the nominated undertaker may remove that apparatus.

9
10
11
12

If in consequence of the exercise of the powers of Part I of this Act the access to any apparatus is materially obstructed the nominated undertaker shall, so far as reasonably practicable, provide alternative means of access to such apparatus which is no less convenient than the access enjoyed by the undertakers prior to the obstruction.

13

Where, in consequence of Part I of this Act, any part of any highway in which any apparatus is situate ceases to be part of a highway, the undertakers may exercise the same rights of access to such apparatus as they enjoyed immediately before the passing of Part I of this Act, but nothing in this paragraph shall affect any right of the nominated undertaker or of the undertakers to require removal of that apparatus under this Part of this Schedule or the power of the nominated undertaker to construct works in accordance with paragraph 11 above.

14

and the placing of apparatus of that type or capacity or of those dimensions, or the placing of apparatus at that depth, as the case may be, is not agreed by the nominated undertaker or, in default of agreement, is not determined by arbitration to be necessary, then, if it involves cost in the construction of works under paragraph 6 above exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the undertakers by virtue of sub-paragraph (1) above shall be reduced by the amount of that excess.

15

by reason or in consequence of any such damage or interruption.

16

The nominated undertaker shall, so far as is reasonably practicable, so exercise its powers under paragraphs 6 and 7 of Schedule 2 to this Act as not to obstruct or render less convenient the access to any apparatus.

17

Notwithstanding the temporary stopping up or diversion of any highway under paragraph 6 of Schedule 3 to this Act, the undertakers may do all such works and things in any such highway as may be reasonably necessary to enable them to inspect, repair, maintain, renew, remove or use any apparatus which at the time of the stopping up or diversion was in that highway.

18

Part III — Protection of Land Drainage, Flood Defence, Water Resources and Fisheries

1
2
3

The requirements which the Agency may make under paragraph 2 above include conditions requiring the nominated undertaker at its own expense to construct such protective works (including any new works as well as alterations to existing works) as are reasonably necessary—

during the construction of the specified work.

4
5
6
7

damage to a fishery is caused, or the Agency has reason to expect that such damage may be caused, the Agency may serve notice on the nominated undertaker requiring it to take such steps as may be reasonably practicable to make good the damage or, as the case may be, to protect the fishery against such damage.

8

which is caused by, or results from, the construction of any specified work or any act or omission of the nominated undertaker, its contractors, agents or employees whilst engaged upon the work.

9

Nothing in paragraph 8 above shall require the nominated undertaker to indemnify the Agency in respect of any claim, demand, proceedings or damages which the Agency could reasonably make, take against or recover from any other person.

10

The fact that any work or thing has been executed or done in accordance with a plan approved or deemed to be approved by the Agency, or to its satisfaction, or in accordance with any directions or award of an arbitrator, shall not relieve the nominated undertaker from any liability under the provisions of this Part of this Schedule.

11

For the purposes of section 5 of the Metropolis Management (Thames River Prevention of Floods) Amendment Act 1879 and Chapter II of Part II of the Water Resources Act 1991 (abstraction and impounding of water) and section 109 of that Act (as to structures in, over or under watercourses) as applying to the construction of any specified work, any consent or approval given or deemed to be given by the Agency under this Part of this Schedule with respect to such construction shall be deemed also to constitute an impounding licence under that Chapter or, as the case may be, a consent or approval under those sections, and the nominated undertaker shall not be obliged to serve any notice which would otherwise be required by section 30 of the said Act of 1991 (which relates to the construction of boreholes and similar works in respect of which a licence is not required).

12

Part IV — Protection of Telecommunications Operators

1
2
3

The temporary stopping up or diversion of any highway under paragraph 6 of Schedule 3 to this Act shall not affect any right of an operator under paragraph 9 of the electronic communications code in respect of any apparatus which at the time of the stopping up or diversion is in the highway.

4

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the nominated undertaker, or, in default of agreement, is not determined by arbitration to be necessary in consequence of the construction of the authorised works in order to ensure the continued efficient operation of the electronic communications code network of the operator then, if it involves cost in the execution of the relocation works exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this paragraph would be payable to the operator by virtue of sub-paragraph (4) above shall be reduced by the amount of that excess.

5
6

Any dispute arising under this Part of this Schedule shall be determined by an arbitrator who shall be appointed by agreement between the parties or, in default of such agreement, shall be the Secretary of State.

Part V — Protection of Port of Sheerness Limited

1
2
3

The nominated undertaker shall carry out all operations for the construction of any tidal works with all reasonable despatch to the reasonable satisfaction of the port authority (and shall promptly remove all temporary works as soon as the same are no longer required) so that river traffic shall not suffer more interference than is reasonably practicable and the port authority shall be entitled by its officer at all reasonable times, on giving such notice as may be reasonable in the circumstances, to inspect such operations.

4
5

If any pile, stump or other obstruction to navigation becomes exposed in the course of constructing any tidal work (other than a pile, stump or other obstruction on the site of any permanent work), the nominated undertaker shall, as soon as reasonably practicable after the receipt of notice in writing from the port authority requiring such action, remove it from the river or, if it is not reasonably practicable to remove it, cut it off at such level below the bed of the river (not being more than two metres below bed level in the main navigation channel or one metre below bed level elsewhere in the river) as the port authority may reasonably direct and in the absence of such action within a reasonable period of time the port authority may carry out the removal and recover its reasonable expenses in so doing from the nominated undertaker.

6

the nominated undertaker shall pay the costs reasonably so incurred by the port authority.

7

The nominated undertaker shall, at or near every tidal work, exhibit such lights, lay down such buoys and take such other steps for preventing danger to navigation as the port authority may from time to time reasonably require.

8

the port authority may include the non-tidal work, or any part of it, in any notice under this paragraph.

9
10

On the completion of the construction of the viaduct over the river comprised in Work No. 13 the nominated undertaker shall supply to the port authority a plan and sections and cross-sections on an appropriate scale showing the situation and level of the viaduct over the river.

11

The nominated undertaker shall not, except for the purpose of constructing a tidal work or any connected works, remove any gravel, soil or other materials from the bed, shores or banks of the river without the previous consent of the port authority signified in writing under the hand of its secretary (such consent not to be unreasonably withheld), but nothing in this paragraph shall prevent the use by the nominated undertaker of any gravel, soil or other material so removed for the purposes of the construction of other tidal works or any connected works.

12
13

Nothing in paragraph 12 above shall impose any liability on the nominated undertaker with respect to any damage to the extent that it is attributable to the act, neglect or default of the port authority, its officers, servants, contractors or agents, but the fact that any work or thing has been executed or done in accordance with a plan approved or deemed to be approved by the port authority, or to its satisfaction, or in accordance with any directions or award of an arbitrator, shall not (in the absence of negligence on the part of the port authority, its officers, servants, contractors or agents) relieve the nominated undertaker from any liability under the provisions of this Part of this Schedule.

14

Any dispute arising between the nominated undertaker and the port authority under this Part of this Schedule shall, if the parties agree, be determined by arbitration, but shall otherwise be determined by the Secretary of State.

Part VI — Protection of British Waterways Board

1
2

The Secretary of State shall not under the powers of section 4 above acquire compulsorily any land of the Board or any easement or other right over such land in the London Boroughs of Camden, Islington, Hackney or Newham other than such land, or easements or other rights thereover, as is reasonably necessary for, or in connection with, the construction, maintenance or operation of works authorised by Part I of this Act.

3
4
5

In constructing the bridge, or bridges, forming parts of Works Nos. 1AA, 1BB, 1CC, 1DD, 1EE, 3B and 3C over the canal, the nominated undertaker shall ensure that the soffit of any bridge at its lowest point is at a level of not less than 26.28 metres above Ordnance Datum Newlyn.

6
7

In its application to the discharge of water into the canal, paragraph 9(5) of Schedule 2 to this Act shall have effect subject to the terms of any conditions attached to the consent under paragraph 6(2) above and, where such discharge includes a deposit to which consent has been given under paragraph 6(1) above, to any conditions attached to that consent.

8
9
10

Nothing in paragraph 9 above shall impose any liability on the nominated undertaker with respect to any damage to the extent that it is attributable to the act, neglect or default of the Board, its officers, servants, contractors or agents but the fact that any work or thing has been executed or done in accordance with a plan approved or deemed to be approved by the Board, or to its satisfaction, or in accordance with any directions or award of an arbitrator, shall not (in the absence of negligence on the part of the Board, its officers, servants, contractors or agents) relieve the nominated undertaker from any liability under the provisions of this Part of this Schedule.

11

Part VII — Protection of Port of London Authority

1
2
3

The nominated undertaker shall carry out all operations for the construction of any specified work with all reasonable despatch to the reasonable satisfaction of the Port Authority so that river traffic and the exercise of the Port Authority’s statutory functions shall not suffer more interference than is reasonably practicable and the Port Authority shall be entitled by its officer at all reasonable times, on giving such notice as may be reasonable in the circumstances, to inspect such operations other than any operation relating to Work No. 10.

4
5

If any pile, stump or other obstruction to navigation becomes exposed in the course of constructing any specified work (other than a pile, stump or other obstruction on the site of any permanent work), the nominated undertaker shall, as soon as reasonably practicable after the receipt of notice in writing from the Port Authority requiring such action, remove it from the river or, if it is not reasonably practicable to remove it, cut it off at such level below the bed of the river (not being more than two metres below the bed of the river) as the Port Authority may reasonably direct.

6

If—

the nominated undertaker shall pay the costs reasonably so incurred by the Port Authority.

7

The nominated undertaker shall, at or near every specified work, and any other work of which the nominated undertaker is in possession in exercise of any of the powers of Part I of this Act, being in either case a work which is below the level of mean high water springs, exhibit such lights, lay down such buoys and take such other steps for preventing danger to navigation as the Port Authority may from time to time reasonably require.

8

the Port Authority may include the non-tidal work, or any part of it, in any notice under this paragraph.

9

Paragraph 9(4) of Schedule 2 to this Act shall apply to any discharge of water under paragraph 9(1) of that Schedule in connection with the construction or maintenance of a specified work notwithstanding that the part of the river affected by the discharge is not a main river.

10

Any dispute arising between the nominated undertaker and the Port Authority under this Part of this Schedule shall, if the parties agree, be determined by arbitration but shall otherwise be determined by the Secretary of State.

Further and supplementary provisions.

Permitted development: time limits.

Heritage.

Duties as to exercise of regulatory functions.

Expenditure in connection with securing construction of works.

Disapplication and modification of miscellaneous controls.

Arbitration.

42A

Blight: compensation for pre-enactment acquisition.

Work No

Railways between St. Pancras and Highbury Corner and related works comprising the following railways, including a station terminus at St Pancras for international and domestic services and the provision of facilities in connection therewith—

Work No

A railway (741 metres in length) commencing in the intended St. Pancras Station, passing north-westwards over the new road (Work No. 5D), then northwards over the realigned Camley Street (Work No. 5A) and terminating at a point 33 metres south of the southern abutment of the existing bridge over the Regent’s Canal, including bridges over Works Nos. 5A and 5D;

Work No

A railway (2,189 metres in length) commencing by a junction with the railway (Work No. 1A) at its termination, passing northwards over the Regent’s Canal and the railway (Work No. 2) in tunnel, then passing north-eastwards over the diverted York Way (Work No. 5Q), the railways (Works Nos. 2AA and 2BB) in tunnel and the East Coast Main Line to a tunnel portal 65 metres to the east of that railway, then passing in tunnel over the Piccadilly Line then beneath Caledonian Road, Westbourne Road and Liverpool Road and terminating at Highbury Corner beneath the junction of that road with Highbury Place, including bridges over the Regent’s Canal, Work No. 5Q and the East Coast Main Line;

Work No

A railway (737 metres in length) commencing in the intended St. Pancras Station, passing north-westwards over the new road (Work No. 5D), then northwards over the realigned Camley Street (Work No. 5A) and terminating at a point 30 metres south of the southern abutment of the existing bridge over the Regent’s Canal, including bridges over Works Nos. 5A and 5D;

Work No

A railway (2,182 metres in length) commencing by a junction with the railway (Work No. 1B) at its termination, passing northwards over the Regent’s Canal and the railway (Work No. 2) in tunnel, then passing north-eastwards in tunnel beneath the railway (Work No. 1CC) for a distance of 150 metres, then over the diverted York Way (Work No. 5Q), the railways (Works Nos. 2AA and 2BB) in tunnel and the East Coast Main Line to a tunnel portal 65 metres to the east of that railway, then passing in tunnel over the Piccadilly Line then beneath Caledonian Road, Westbourne Road and Liverpool Road and terminating at Highbury Corner beneath the junction of that road with Highbury Place, including bridges over the Regent’s Canal, Work No. 5Q and the East Coast Main Line;

Work No

A railway (533 metres in length) commencing in the intended St. Pancras Station at a point 15 metres north-west of the existing junction of Clarence Passage with Pancras Road, passing north-westwards on the eastern side of the existing Midland Main Line, over the new road (Work No. 5D) and the realigned Camley Street (Work No. 5A), and terminating at a point 25 metres south of the southern abutment of the existing bridge over the Regent’s Canal, including bridges over Works Nos. 5A and 5D;

Work No

A railway (650 metres in length) commencing by a junction with the railway (Work No. 1C) at its termination, passing northwards over the Regent’s Canal, then passing north-eastwards over the railways (Works Nos. 1BB and 1DD) in tunnel, then over the diverted York Way (Work No. 5Q) and terminating by a junction with the railway (Work No. 1AA) at a point 100 metres north-east of the existing York Way bridge, including bridges over the Regent’s Canal and Work No. 5Q;

Work No

A railway (534 metres in length) commencing in the intended St. Pancras Station at a point 15 metres north-west of the existing junction of Clarence Passage with Pancras Road, passing north-westwards on the eastern side of the existing Midland Main Line, over the new road (Work No. 5D) and the realigned Camley Street (Work No. 5A), and terminating at a point 30 metres south of the southern abutment of the existing bridge over the Regent’s Canal, including bridges over Works Nos. 5A and 5D;

Work No

A railway (680 metres in length) commencing by a junction with the railway (Work No. 1D) at its termination, passing northwards over the railway (Work No. 2) in tunnel and the Regent’s Canal, then passing north-eastwards in tunnel beneath the railway (Work No. 1CC) for a distance of 150 metres, then over the diverted York Way (Work No. 5Q) and the railways (Works Nos. 2AA and 2BB) in tunnel, and terminating by a junction with the railway (Work No. 1BB) at a point 125 metres north-east of the existing York Way bridge, including bridges over the Regent’s Canal and Work No. 5Q;

Work No

A railway (767 metres in length) commencing by a junction with the railway (Work No. 1AA) at a point on the existing bridge over the Regent’s Canal, passing northwards over the Midland City Line (Thameslink) in tunnel, then north-westwards and westwards, then on viaduct over the Midland City Line (Thameslink), the diverted Midland Main Line (Work No. 3B) and the railways (Works Nos. 1HH and 3C) and terminating by a junction with the North London Line at a point 15 metres east of the bridge carrying that railway over St Pancras Way, including the said viaduct;

Work No

A railway (394 metres in length) commencing by a junction with the railway (Work No. 1EE) at a point 95 metres north of the northern abutment of the existing bridge over the Regent’s Canal, passing northwards and north-eastwards under the railway (Work No. 1GG) and terminating by a junction with the realigned North London Incline Railway (Work No. 1JJ) at a point 30 metres west of the bridge carrying York Way over that railway;

Work No

A railway (696 metres in length) commencing by a junction with the railway (Work No. 1EE) at a point 40 metres east of the bridge carrying the North London Line over St. Pancras Way, passing eastwards on viaduct over the diverted Midland Main Line (Work No. 3B), the railways (Works Nos. 1HH and 3C) and the Midland City Line (Thameslink), then continuing on viaduct, passing south-eastwards over the new road (Work No. 5EE) and the railway (Work No. 1FF) and terminating by a junction with the railway (Work No. 1AA) at a point 40 metres west of the bridge carrying York Way over the North London Incline Railway, including the said viaduct;

Work No

A railway (610 metres in length) commencing by a junction with the railway (Work No. 1EE) at a point 55 metres north of the northern abutment of the existing bridge over the Regent’s Canal, passing northwards over the Midland City Line (Thameslink) in tunnel, then under the railways (Works Nos. 1EE, 1GG and 1JJ) and the existing bridge carrying the North London Line over the Midland Main Line and terminating by a junction with that railway at a point beneath the southern parapet of the bridge carrying Agar Grove over that railway;

Work No

A railway (955 metres in length), forming a realignment of the North London Incline Railway, commencing by a junction with the North London Line at a point 130 metres east of the bridge carrying that railway over St. Pancras Way, passing eastwards then south-eastwards, then on viaduct over the diverted Midland Main Line (Work No. 3B), the railways (Works Nos. 1HH and 3C), the Midland City Line (Thameslink) and the new road (Work No. 5EE), then over the diverted York Way (Work No. 5Q), then passing northwards under the North London Line on viaduct and terminating by a junction with the Great Northern Suburban Line at the southern portal of the western bore of the Copenhagen Tunnel, including the said viaduct and a bridge over Work No. 5Q;

Work No

A railway (103 metres in length), forming a cross-over between the diverted Midland Main Line (Work No. 3B) and the railway (Work No. 1A), commencing by a junction with Work No. 3B at its commencement and terminating by a junction with Work No. 1A at its termination;

Work No

A railway (876 metres in length), including a station tunnel on the Midland City Line (Thameslink) beneath St. Pancras Station, commencing by a junction with that railway in tunnel at a point beneath Midland Road 145 metres north-east of the existing junction of that road with Euston Road, passing in tunnel north-westwards and northwards beneath the Regent’s Canal and terminating by a junction with that railway in tunnel at a point beneath the existing Midland Main Line 55 metres north of the northern abutment of the bridge carrying that last-mentioned railway over that canal;

Work No

A railway (325 metres in length) commencing by a junction with the railway (Work No. 2) in tunnel at a point beneath the existing Midland Main Line 250 metres south of the southern abutment of the bridge carrying that railway over Camley Street, passing in tunnel northwards on the western side of Work No. 2 beneath the railways (Works Nos. 1A and 1B) and the realigned Camley Street (Work No. 5A) and terminating in tunnel at a point beneath the railway (Work No. 1D) 90 metres south of the southern abutment of the existing bridge over the Regent’s Canal;

Work No

A railway (883 metres in length) commencing by a junction with the railway (Work No. 2A) at its termination, passing in tunnel north-eastwards beneath the railways (Works Nos. 1C and 2), St. Pancras Basin, the Regent’s Canal and the diverted York Way (Work No. 5Q), then passing north-eastwards and northwards under the railways (Works Nos. 1AA, 1BB and 1DD) to a tunnel portal at a point 40 metres south of the southern side of the viaduct carrying the North London Line over the East Coast Main Line, then continuing under the North London Line on viaduct and terminating by a junction with the Great Northern Suburban Line at the southern portal of the western bore of the Copenhagen Tunnel on that railway;

Work No

A railway (255 metres in length) commencing by a junction with the railway (Work No. 2) in tunnel at the said point beneath the existing Midland Main Line 250 metres south of the southern abutment of the bridge carrying that railway over Camley Street, passing in tunnel northwards on the eastern side of Work No. 2 beneath the railways (Works Nos. 1A, 1B, 1C and 1D) and terminating in tunnel at a point beneath the realigned Camley Street (Work No. 5A) 150 metres south-east of the southern abutment of the existing bridge over the Regent’s Canal;

Work No

A railway (928 metres in length) commencing by a junction with the railway (Work No. 2B) at its termination, passing in tunnel north-eastwards beneath St. Pancras Basin, the Regent’s Canal and the diverted York Way (Work No. 5Q), then passing north-eastwards and northwards under the railways (Works Nos. 1AA, 1BB and 1DD) to a tunnel portal at a point 35 metres south of the southern side of the viaduct carrying the North London Line over the East Coast Main Line, then continuing under the North London Line on viaduct and terminating by a junction with the Great Northern Suburban Line at the said southern portal of the western bore of the Copenhagen Tunnel on that railway;

Work No

A railway (80 metres in length), forming a cross-over between the northbound and southbound rails of the Great Northern Suburban Line in tunnel within the western bore of the Copenhagen Tunnel, commencing and terminating by junctions with that railway at points respectively 50 metres and 130 metres north of the southern portal of that tunnel;

Work No

A railway (240 metres in length), forming cross-overs between the northbound and southbound rails of the City Widened Lines (Thameslink) partly within the Clerkenwell No. 3 Tunnel, commencing by a junction with that railway in tunnel beneath the junction of Frederick Street with the Kings Cross Road, passing north-westwards beneath Acton Street, Swinton Street, Wicklow Street and Britannia Street and terminating by a junction with that railway at a point 10 metres south-east of the bridge carrying Leeke Street over that railway;

Work No

A railway (349 metres in length), forming a cross-over between the Midland City Line (Thameslink) and the Midland Main Line at Kentish Town, commencing by a junction with that first named railway at a point 20 metres south-east of the south-eastern side of the bridge carrying Islip Street over that railway, passing south-eastwards and terminating by a junction with that last named railway at a point 85 metres north-west of the north-western portal of the Camden Road Tunnel;

Work No

A railway (645 metres in length), forming a diversion of the Midland Main Line at St. Pancras Station, commencing at its terminus in that station, passing north-westwards on the western side of the existing railway, including a western extension of the station over Midland Road and Pancras Road, then northwards over the new road (Work No. 5D) and the realigned Camley Street (Work No. 5A) and terminating at a point on the northern side of Work No. 5A 140 metres south of the existing bridge over the Regent’s Canal, including bridges over Works Nos. 5A and 5D;

Work No

A railway (846 metres in length), forming a continuation of the diversion of the Midland Main Line at St. Pancras Station, commencing by a junction with the railway (Work No. 3) at its termination, passing northwards over the Regent’s Canal, under the railways (Works Nos. 1EE, 1GG and 1JJ) on viaduct and the existing bridge carrying the North London Line over the Midland Main Line and terminating by a junction with that railway beneath a point 30 metres north of the southern parapet of the bridge carrying Agar Grove over that railway, including a bridge over the Regent’s Canal;

Work No

A railway (876 metres in length), forming a siding on the western side of the diverted Midland Main Line (Works Nos. 3 and 3B) north of St. Pancras Station, commencing at a point 60 metres south of the bridge carrying that railway over the realigned Camley Street (Work No. 5A), passing northwards over Work No. 5A and the Regent’s Canal, under the railways (Works Nos. 1EE, 1GG and 1JJ) on viaduct and the existing bridge carrying the North London Line over the Midland Main Line and terminating by a junction with that railway beneath a point 15 metres south of the said southern parapet of the bridge carrying Agar Grove over that railway, including bridges over Work No. 5A and the Regent’s Canal;

Work No

A railway (71 metres in length), forming a cross-over between the northbound and southbound rails of the Midland Main Line, commencing by a junction with that railway at the northern portal of the Camden Road Tunnel on that railway, passing northwards and terminating by a junction with that railway at a point 70 metres north of its commencement;

Work No

A railway (829 metres in length), for construction purposes, commencing by a junction with the railway (Work No. 1HH) at a point 110 metres south-east of the southern side of the bridge carrying the North London Line over the Midland Main Line, passing south-eastwards, then eastwards and north-eastwards under the diverted York Way (Work No. 5Q), then passing northwards and terminating by a junction with the Great Northern Suburban Line at a point 65 metres south of the southern side of the viaduct carrying the North London Line over that railway;

Work No

Ticket halls and subways, including alteration of existing ticket halls and subways, of the London Underground Railways comprising—

Work No

A passenger subway commencing on the eastern side of the intended St. Pancras Station beneath a point 22 metres north of the existing junction of Clarence Passage with Pancras Road, passing south-eastwards to a ticket hall beneath the northern side of the forecourt of the Great Northern Hotel and terminating by a junction with the passenger subways (Works Nos. 4AA and 4F) beneath a point 26 metres north of the north-eastern corner of the Great Northern Hotel, including the said ticket hall;

Work No

A passenger subway commencing by a junction with the passenger subway (Work No. 4A) at its termination and the passenger subway (Work No. 4F) at its commencement, passing eastwards to junctions with the passenger subway (Work No. 4MM) then continuing south-eastwards to a junction with the passenger subway (Work No. 4D), continuing eastwards and terminating by a junction with the existing passenger subway beneath a point 14 metres west of the junction of Caledonian Road with Pentonville Road;

Work No

A ticket hall in the German Gym off Pancras Road and a passenger subway commencing on the south-western side of that building at a point 40 metres west of the existing junction of Wellers Court with Cheney Road, passing south-eastwards, then south-westwards and terminating by a junction with the subway (Work No. 4A) beneath a point 23 metres east of the junction of Wellers Court with Pancras Road;

Work No

A passenger subway, forming a cross-passage between northbound and southbound station tunnels of the Victoria Line, commencing beneath a point 29 metres north-west of the junction of Caledonian Road with Pentonville Road; and terminating beneath a point 45 metres north-west of that road junction;

Work No

A passenger subway, including a lift shaft, commencing by a junction with the cross-passage (Work No. 4C) beneath a point 35 metres north-west of the junction of Caledonian Road with Pentonville Road, passing south-westwards to a junction with the passenger subway (Work No. 4A) at its termination and terminating by a junction with the cross-passage (Work No. 4E) beneath a point 55 metres west of that road junction;

Work No

A passenger subway, forming a cross-passage between northbound and southbound station tunnels of the Victoria Line, commencing and terminating beneath points 95 metres and 80 metres respectively south-east of the junction of Caledonia Street with York Way;

Work No

A passenger subway commencing by a junction with the passenger subway (Work No. 4A) at its termination and the passenger subway (Work No. 4AA) at its commencement beneath a point 26 metres north of the north-eastern corner of the Great Northern Hotel, passing south-westwards and terminating by a junction with the passenger subway (Work No. 4G) beneath a point in Pancras Road 40 metres south-west of the south-western corner of that building;

Work No

A passenger subway, including a lift shaft, commencing by a junction with the cross-passage (Work No. 4Q), passing eastwards to junctions with the cross-passage (Work No. 4R) and with the passenger subway (Work No. 4F) at its termination, and terminating by a junction with the existing cross-passage between northbound and southbound station tunnels of the Northern Line beneath a point 60 metres north-east of the existing junction of Pancras Road with Euston Road;

Work No

A passenger subway commencing in the ticket hall (part of Work No. 4A) beneath a point 48 metres north of the north-eastern corner of the Great Northern Hotel, passing south-eastwards and terminating by a junction with the existing passenger subway beneath a point 40 metres south-east of that corner of that building;

Work No

A passenger subway commencing in the existing ticket hall beneath the station concourse of King’s Cross Station beneath a point 40 metres north of the junction of Pancras Road with Euston Road and terminating in St. Pancras Station beneath a point 60 metres north-west of that road junction;

Work No

A ticket hall beneath the forecourt of St. Pancras Station off Euston Road and a passenger subway commencing in that ticket hall beneath a point 100 metres west of the junction of Pancras Road with Euston Road, passing south-eastwards then north-eastwards and terminating by a junction with the Circle and Metropolitan Line Station concourse beneath a point 95 metres south-west of that road junction;

Work No

A passenger subway commencing in St. Pancras Station at a point 75 metres west of the junction of Pancras Road with Euston Road, passing south-eastwards beneath Euston Road and terminating in the footway on the southern side of Euston Road at a point 75 metres south-west of that road junction, including a junction with the new ticket hall (part of Work No. 4K) and a permanent opening in Euston Road at that termination;

Work No

A passenger subway, including a lift shaft, commencing by a junction with the existing Piccadilly Line Station concourse beneath a point 56 metres north-west of the junction of York Way with Euston Road, passing northwards to junctions with the passenger subway (Work No. 4AA) and the cross passage (Work No. 4N) then continuing south-eastwards and terminating by a junction with the passenger subway (Work No. 4AA) beneath a point 45 metres north-east of that road junction;

Work No

A passenger subway, forming a cross-passage between westbound and eastbound station tunnels of the Piccadilly Line, commencing beneath a point 35 metres west of the junction of Caledonia Street with York Way and terminating beneath a point 46 metres west of that road junction;

Work No

A passenger subway, including a lift shaft, commencing in the ticket hall (part of Work No. 4A) beneath a point 17 metres east of the north-eastern corner of the Great Northern Hotel, passing south-eastwards, then south-westwards and south-eastwards and terminating beneath that building at a point 11 metres north-west of the south-eastern corner of that hotel;

Work No

A passenger subway, forming a cross-passage between southbound and northbound station tunnels of the Northern Line, commencing beneath a point 70 metres south of the existing junction of Cheney Road with Pancras Road and terminating beneath a point 82 metres south of that road junction;

Work No

A passenger subway, forming a cross-passage between southbound and northbound station tunnels of the Northern Line, commencing beneath a point 72 metres south of the existing junction of Cheney Road with Pancras Road and terminating beneath a point 84 metres south of that road junction;

Work No

A passenger subway, including a lift shaft, commencing in the existing passenger subway beneath a point 33 metres north of the junction of Belgrove Street with Euston Road and terminating at the Circle and Metropolitan Line Station concourse beneath a point 20 metres north of that road junction;

Work No

Roadworks and sewer diversions associated with Works Nos. 1 to 4 comprising—

Work No

Realignment of Camley Street commencing at a point in that road 50 metres south of its junction with Granary Street, passing south-eastwards then eastwards under the railways (Works Nos. 1A to 1D and 3), then south-eastwards and terminating by a junction with Camley Street (Work No. 5C) at a point on the western side of that road 44 metres north-west of its existing junction with Goods Way;

Work No

A road commencing in Pancras Road at a point 20 metres south-east of the entrance from that road to St. Pancras Old Church, passing south-eastwards then southwards to a junction with Brill Place and terminating in Midland Road at its existing junction with Euston Road, including access to a service area in St. Pancras Station;

Work No

A road commencing by a junction with Camley Street (Work No. 5A) at a point 45 metres north-west of its existing junction with Goods Way, passing south-eastwards to a point 5 metres east of the existing junction of Wellers Court with Cheney Road, then south-westwards to a point 55 metres south of the existing junction of Wellers Court with Pancras Road, then passing south-eastwards along the line of that road and terminating in that road at its existing junction with Euston Road, including access to a service area in St. Pancras Station and a parcels depot;

Work No

A road commencing by a junction with Work No. 5B at a point 175 metres south-east of its commencement, passing north-eastwards beneath the intended St. Pancras Station (Works Nos. 1A to 1D and 3), across Work No. 5C at a point 7 metres south of its commencement and terminating by a junction with Goods Way at a point 155 metres from the junction of that road with York Way;

Work No

A road, for construction purposes, commencing at a point 43 metres north-west of Battle Bridge Road at its termination west of Kings Cross Station, passing northwards, then north-westwards over Goods Way (Work No. 5D) at the termination of that work and over the Regent’s Canal, then south-westwards and terminating by a junction with Wharf Road at a point 45 metres west of the existing bridge between Wharf Road and Goods Way, including bridges over Goods Way and the Regent’s Canal;

Work No

Widening of Wharf Road on its northern side between a point 50 metres west of the western side of the existing bridge over the Regent’s Canal between Wharf Road and Goods Way and a point 15 metres east of the eastern side of that bridge;

Work No

A road commencing by a junction with the diverted York Way (Work No. 5Q) at a point 70 metres south of the bridge carrying the North London Line over that road, passing westwards then south-westwards and southwards under the realigned North London Incline Railway (Work No. 1JJ) and the railway (Work No. 1GG) and terminating at a point 150 metres south-east of the existing bridge carrying the North London Line over the Midland Main Line;

Work No

A road commencing by a junction with Pancras Road (Work No. 5C) at a point 75 metres from its termination, passing north-eastwards, then northwards and north-westwards and terminating by a junction with Work No. 5C at the south-eastern corner of the German Gym in Cheney Road as existing, including access to a parcels depot;

Work No

A road commencing by a junction with Work No. 5F at a point 65 metres from the commencement of that work, passing westwards and north-westwards along the frontage of the Great Northern Hotel, then continuing northwards and north-eastwards and terminating by a junction with Work No. 5F at a point 75 metres from the termination of that work;

Work No

Widening of Euston Road on its southern side between its junctions with Crestfield Street and Birkenhead Street;

Work No

Widening of Euston Road on its northern side between its junction with Euston Square and a point 45 metres north-east of that road junction;

Work No

A road, forming a diversion of York Way, commencing at a point in that road 80 metres north of the junction of Copenhagen Street with York Way, passing northwards then north-westwards over the railway (Work No. 3E) and the railways (Works Nos. 2AA and 2BB) in tunnel, then northwards under the railways (Works Nos. 1AA, 1BB, 1CC, 1DD and 1JJ) to a junction with the new road (Work No. 5EE), then continuing northwards under the North London Line and terminating at a point in York Way 10 metres north-west of the junction of Vale Royal with York Way;

Work No

A road, forming a diversion of Randell’s Road, commencing by a junction with the diverted York Way (Work No. 5Q) at a point 20 metres west of the existing junction of Randell’s Road with York Way, passing eastwards and terminating at a point in Randell’s Road 55 metres east of that existing road junction;

Work No

A sewer, forming a diversion of part of the Fleet Sewer, commencing by a junction with that sewer beneath a point in Pancras Road 35 metres south-east of the junction of Chenies Place with that street, passing along the line of Work No. 5B to its junction with Brill Place, then passing eastwards beneath the intended St. Pancras Station, then southwards on the eastern side of that station and terminating beneath a point in Pancras Road 5 metres north of the existing junction of Wellers Court with that road, including a weir chamber at its junction with the Fleet Storm Relief Sewer;

Work No

A sewer, forming a diversion of the Midland Road sewer, commencing by a junction with that sewer beneath a point in Midland Road 140 metres north of its existing junction with Euston Road, passing north-westwards then northwards beneath land adjoining Midland Road and terminating by a junction with Work No. 5J beneath a point on the north-western side of Brill Place at its existing junction with Midland Road;

Work No

A sewer, forming a diversion of part of the Camden Sewer, commencing by a junction with that sewer beneath a point 10 metres north of the bridge carrying the North London Line over the diverted York Way (Work No. 5Q), passing southwards, south-eastwards, then southwards and south-westwards and terminating by a junction with that sewer beneath a point 110 metres west of the Maiden Lane Bridge carrying York Way over the Regent’s Canal;

Work No

A sewer, forming a diversion of the Camley Street Sewer, commencing by a junction with that sewer beneath a point in that street (Work No. 5A) 93 metres from the termination of that work, passing southwards along the line of that work and Work No. 5C to a point 15 metres south of Battle Bridge Road, then passing south-eastwards and terminating by a junction with the sewer (Work No. 5J) at a point on the northern side of Stanley Passage 35 metres north-east of its existing junction with Pancras Road;

Work No

A sewer, forming a diversion of the Goods Way Sewer, commencing by a junction with the sewer (Work No. 5N) at a point 105 metres south of the commencement of that work, passing eastwards on the line of the new road (Work No. 5D) and terminating by a junction with the Goods Way sewer beneath a point in Goods Way 180 metres west of its junction with York Way;

Work No

A sewer, forming a diversion of part of the St. Pancras Sewer, commencing by a junction with that sewer beneath a point 38 metres north-west of the junction of Pancras Road with Euston Road, passing northwards, then westwards, north-westwards, then north-eastwards and terminating by a junction with the Fleet Sewer beneath a point 10 metres south-west of the south-eastern gable of the Great Northern Hotel;

Work No

A railway (7,229 metres in length) commencing by a junction with the railways (Works Nos. 1AA and 1BB) at their termination, passing eastwards in tunnel beneath the North London Line, or land adjoining on the northern or southern side thereof, beneath Highbury Corner, Highbury Grove, Wallace Road, Mildmay Park, King Henry’s Walk, Kingsland High Street, Dalston Lane, the Liverpool Street and Cambridge Railway, Mare Street, Barnabas Road, Kenworthy Road, the East Cross Route on the northern side of the North London Line, Eastway, the River Lea Navigation, Waterden Road and the River Lea, including ventilation shafts on lands off Corsica Street and Graham Road, then in retained cutting from chainage 6,147 metres for a distance of 1,067 metres, partly in tunnel beneath the railways (Works Nos. 6B and 6C) and the access roads (Works Nos. 6H and 6J), in land west of the High Meads Loop Railway, in the International Freight Terminal and the site of the former Chobham Farm Container Depot at Stratford, and terminating beneath a point on the western side of Angel Lane 60 metres north of the northern abutment of the bridge carrying that road over the Great Eastern Railway, including facilities for a railway crossover and junction at the International Freight Terminal and Depot at Stratford;

Work No

A railway (1,368 metres in length) commencing by a junction with the railway (Work No. 6) at the commencement of the retained cutting forming part of that work, passing eastwards between the eastbound and westbound lines of that railway to a point 210 metres west of the eastern face of the tunnel beneath the railway (Work No. 6C), then passing north-eastwards over the eastbound line of Work No. 6 and northwards in tunnel beneath the Old Yard Sidings (Work No. 6C) and the Lea Valley Line, then continuing north-westwards on the eastern side of that railway and terminating at a point under the bridge carrying Temple Mill Lane over that railway;

Work No

A railway (426 metres in length), for construction purposes, commencing by a junction with the North London Line at a point 10 metres north-west of the junction of that railway with the Channelsea Curve at Stratford Station, passing northwards, on the eastern side of the High Meads Curve, then north-eastwards over the railways (Works Nos. 6 and 6A) in tunnel and terminating by a junction with the High Meads Sidings at a point 30 metres north-east of the termination of the said tunnel over Works Nos. 6 and 6A;

Work No

A railway (836 metres in length) for construction purposes, commencing by a junction with the Lea Valley Line at a point 120 metres north-east of the junction of that railway with the Great Eastern Railway at Stratford Station, passing northwards and north-eastwards through the Old Yard Sidings and terminating by a junction with the Lea Valley Line at a point 130 metres south of the bridge carrying Temple Mill Lane over that railway;

Work No

A railway (1,032 metres in length) commencing in the existing Traction Maintenance Depot at a point 25 metres south-west of the south-western corner of the diesel repair shed in that depot, passing north-eastwards and northwards, then north-westwards on the western side of the Lea Valley Line to a junction with that railway 60 metres south of the bridge carrying Temple Mill Lane over that railway, passing under that bridge, then continuing on the eastern side of the Lea Valley Line and terminating by a junction with the railway (Work No. 6E) at a point 390 metres north of that bridge;

Work No

A railway (2,720 metres in length) commencing by a junction with the railway (Work No. 6A) at its termination, passing north-westwards and westwards through the former Temple Mills Marshalling Yard under Ruckholt Road and terminating at a point on the northern side of the Lea Valley Line 15 metres south-east of the eastern side of the bridge carrying Lea Bridge Road over that railway;

Work No

A railway (410 metres in length), for construction purposes, commencing by a junction with the Lea Valley Line at a point 345 metres south-east of the bridge carrying Lea Bridge Road over that railway, passing eastwards and terminating by a junction with the railway (Work No. 6E) at chainage 1,922 metres;

Work No

A railway (509 metres in length) commencing by a junction with the railway (Work No. 6E) at a point 30 metres south-east of the bridge carrying Ruckholt Road over the Lea Valley Line, passing westwards under that bridge then south-westwards and terminating by a junction with that railway at a point 459 metres north-west of that bridge;

Work No

A cut, forming a diversion of the Channelsea River at its confluence with the River Lea, commencing in the Channelsea River at a point 26 metres south of the former sluice on that river at Bully Fen, passing south-westwards and terminating at the confluence of those rivers;

Work No

An access road commencing by a junction with the access road to the International Freight Terminal on the eastern side of the Container Terminal, passing south-westwards, over Works Nos. 6 and 6A in tunnel, and southwards through the International Freight Terminal, then south-eastwards, eastwards and north-eastwards on the northern side of the North London Line, then continuing northwards, then eastwards and terminating by a junction with the access road to the Channelsea site, north of Stratford Station;

Work No

An access road commencing at a point in the existing Traction Maintenance Depot on the western side of the diesel repair shed in that depot, passing south-westwards, then westwards on the northern side of the retained cutting forming part of Work No. 6, then south-westwards over that railway and Work No. 6A in tunnel, then southwards and south-westwards and terminating by a junction with Work No. 6H in the International Freight Terminal;

Work No

A railway (4,560 metres in length) commencing by a junction with the railway (Work No. 6) at its termination, passing eastwards in tunnel beneath Angel Lane, The Grove, Atherton Road, Woodgrange Road, Romford Road, Woodgrange Park Cemetery and Browning Road, including a ventilation shaft on land off Woodgrange Road and terminating beneath a point 60 metres east of the junction of Reesland Close with Barrington Road;

Work No

A railway (6,700 metres in length) commencing by a junction with the railway (Work No. 7) at its termination, passing eastwards in tunnel beneath the North Circular Road and the River Roding, then south-eastwards beneath Barking Station, Station Parade, Ripple Road and Alfred’s Way, then eastwards beneath Renwick Road and the Ripple Lane Freightliner Terminal to a portal at a point 462 metres south-east of the junction of Morrison Road with Julia Gardens, then continuing eastwards under the railway (Work No. 22A) and the new road (Work No. 22H(1)), across Chequers Lane (to be stopped up) and under Kent Avenue and terminating at a point 85 metres east of the bridge carrying Kent Avenue over the Tilbury Loop Railway, including ventilation shafts on lands off Barrington Road and Alfred’s Way and a footbridge over the railway at Chequers Lane;

Work No

A railway (2,201 metres in length), forming a diversion of the Tilbury Loop Railway westbound line, commencing by a junction with that railway at a point 253 metres east of the junction of Stebbing Way with Wivenhoe Road, passing eastwards under Renwick Road, then south-eastwards and eastwards over the railway in tunnel (Work No. 22), under the new road (Work No. 22H(1)) and terminating by a junction with the Tilbury Loop Railway westbound line at a point 2 metres west of the western end of Dagenham Dock Station platforms;

Work No

A railway (2,252 metres in length), forming holding sidings, commencing by a junction with the railway (Work No. 22A) at a point 15 metres west of the bridge carrying Renwick Road over the Tilbury Loop Railway, passing south-eastwards and eastwards, under the new road (Work No. 22H(1)) and across Chequers Lane and terminating at a point 120 metres south-east of the eastern end of Dagenham Dock Station platforms, including a footbridge over the railway at Chequers Lane;

Work No

A railway (1,523 metres in length), for construction purposes, commencing by a junction with the Tilbury Loop Railway at a point 166 metres south-east of the bridge carrying Renwick Road over that railway, passing south-eastwards and eastwards, and terminating at a point 38 metres south-west of the point where the new road (Work No. 22H(1)) passes over the railway (Work No. 22B), including railway sidings;

Work No

A railway (280 metres in length) forming a connection between the Tilbury Loop Railway goods line and the railway (Work No. 22A), commencing by a junction with the said goods line at a point 468 metres south-east of the bridge carrying Renwick Road over that goods line, passing south-eastwards and terminating by a junction with Work No. 22A at a point 742 metres south-east of the said bridge;

Work No

A railway (1,095 metres in length) forming a connecting line between the railway (Work No. 22A) and the railway (Work No. 8E), commencing by a junction with Work No. 22A at a point 342 metres south of the junction of Morrison Road with Julia Gardens, passing eastwards under the new road (Work No. 22H(1)) and across Chequers Lane and terminating by a junction with Work No. 8E at a point 180 metres south-east of the eastern end of Dagenham Dock Station platforms, including a footbridge over the railway at Chequers Lane;

Work No

A railway (648 metres in length) forming a connecting line between the railway (Work No. 22A) and the railway (Work No. 22), commencing by a junction with Work No. 22A at a point 378 metres south-east of the junction of Morrison Road with Julia Gardens, passing eastwards under the new road (Work No. 22H(1)) and terminating by a junction with Work No. 22 at a point 150 metres west of the eastern end of Dagenham Dock Station platforms;

Work No

A railway (715 metres in length), for construction purposes, commencing by a junction with the railway (Work No. 22B) at a point 27 metres west of the point where the new road (Work No. 22H(1)) passes over Work No. 22B, passing eastwards then southwards, and terminating at a point 270 metres south-east of the eastern end of Dagenham Dock Station platforms, including railway sidings;

Work No

A jetty commencing on the northern bank of the River Thames at a point 190 metres north-west of The Gores outfall sluice, extending in a south-westerly direction into the said river for a distance of 230 metres and there terminating, including a jetty head with mooring dolphins and berthing facilities;

Work No

A railway (5,200 metres in length) commencing by a junction with the railway (Work No. 22) at its termination, passing eastwards under Thames Avenue (Work No. 8R), over the Beam River, and under the intended A13 link road (under construction), then continuing south-eastwards on viaduct over the new road (Work No. 8S) and Rainham Creek, and terminating beneath the intended A13 (under construction) at a point 20 metres south-west of the Tilbury Loop Railway;

Work No

A railway (906 metres in length), forming a connection between the railway (Work No. 22E) and the westbound line of the railway (Work No. 8), commencing by a junction with Work No. 22E at its termination, passing south-eastwards under Kent Avenue (Work No. 8Q) and terminating by a junction with the railway (Work No. 8) at a point 30 metres west of the intended Thames Avenue bridge (Work No. 8R);

Work No

A railway (1,330 metres in length), forming a connection between the Tilbury Loop Railway and the eastbound line of the railway (Work No. 8), commencing by a junction with the Tilbury Loop Railway 10 metres east of the eastern end of Dagenham Dock Station, passing eastwards on the southern side of that line under Kent Avenue (Work No. 8Q) and Thames Avenue (Work No. 8R), over the Beam River and terminating by a junction with Work No. 8 at a point 215 metres east of the intended Thames Avenue bridge (Work No. 8R), including a bridge over the Beam River;

Work No

A railway (279 metres in length), connecting the goods line (Work No. 22B) with a private siding west of Kent Avenue, commencing by a junction with Work No. 22B at its termination, passing south-eastwards and southwards, under the intended A13 and terminating by a junction with the said siding at a point 55 metres south of the footpath crossing that siding east of Breach Lane;

Work No

A railway (1,452 metres in length), connecting the goods line (Work No. 22B) with private sidings east of Kent Avenue, commencing by a junction with Work No. 22B at its termination, passing eastwards under Kent Avenue (Work No. 8Q) and Thames Avenue (Work No. 8R), over the Beam River and terminating at a point 33 metres west of the bridge carrying the intended A13 link road (under construction) over the Tilbury Loop Railway and the railway (Work No. 8), including a bridge over the Beam River and railway sidings;

Work No

A railway (496 metres in length) commencing by a junction with a private siding on the eastern side of Kent Avenue at a point 10 metres south of the southern end of the viaduct carrying that road and railway across Dagenham Breach, passing northwards on that existing viaduct, under the intended A13, then eastwards and terminating by a junction with the railway (Work No. 8J) at a point 300 metres east of the intended Kent Avenue bridge (Work No. 8Q);

Work No

A railway (301 metres in length) commencing by a junction with the railway (Work No. 8J) at a point 245 metres west of the intended Thames Avenue bridge (Work No. 8R), passing eastwards then southwards and terminating by a junction with a private siding at a point 30 metres north of Lake Road on the western side of Thames Avenue;

Work No

A road commencing by a junction with Ripple Road at a point on its southern side 23 metres east of the junction of Pooles Lane with that road, passing southwards on the eastern side of Pooles Lane, then south-eastwards and southwards on the line of Choats Manor Way, over a private siding, the diverted Tilbury Loop Railway (Work No. 22A) and the railways (Works Nos. 22, 22B, 22E, 22F and 22G), and terminating at a point 100 metres south-west of the junction of Choats Road with Hindmans Way, including a bridge over the said railways;

Work No

A road commencing at a point 25 metres west of Pooles Lane at the southern end of that road, passing eastwards and north-eastwards and terminating by a junction with the new road ( Work No. 22H(1)) at a point 240 metres from its commencement;

Work No

A road commencing by a junction with Choats Road at a point 240 metres west of its junction with Hindmans Way, passing eastwards along the line of Choats Road and Hindmans Way to a point 80 metres west of the junction of Hindmans Way with Chequers Lane, then turning southwards and terminating by a junction with Chequers Lane at a point 120 metres south of that last-mentioned road junction;

Work No

A road commencing by a junction with the new road (Work No. 8P(3)) at a point 100 metres from its termination, passing north-eastwards and terminating by a junction with Chequers Lane at a point 60 metres north of its junction with Hindmans Way;

Work No

Realignment of Kent Avenue, including a bridge over a private siding, the Tilbury Loop Railway and the railways (Works Nos. 8, 8E, 8G and 8J), commencing in that road at a point 205 metres south of its junction with New Road, Hornchurch, passing southwards over the said railways and terminating in Kent Avenue at a point 10 metres north of the northern end of the viaduct carrying that road over Dagenham Breach;

Work No

Realignment of Thames Avenue, including a bridge over the Tilbury Loop Railway, the railways (Works Nos. 8, 8G and 8J) and private sidings, commencing in that road at a point 25 metres south of its junction with New Road, Hornchurch, passing southwards over those railways and terminating in Thames Avenue at the junction of Lake Road with that road;

Work No

A road commencing by a junction with Bridge Road at the roundabout on that road 200 metres south of its junction with New Road, Hornchurch, passing westwards over Rainham Creek, then south-westwards under the Tilbury Loop Railway and the railway (Work No. 8), then passing southwards over Rainham Creek at a point 140 metres downstream from the bridge carrying the Tilbury Loop Railway over that river, then south-eastwards and terminating by a junction with Ferry Lane at the southernmost junction of Lamson Road with that road;

Work No

A road, forming an access to the Riverside Sewage Treatment works at Rainham off the new road (Work No. 8S), commencing in the said Treatment Works at Creekside Cottages, passing south-eastwards and eastwards and terminating by a junction with Work No. 8S at a point 70 metres south-west of the intended viaduct carrying the railway (Work No. 8) over that new road;

Work No

A cut, forming a diversion of the Ship and Shovel Relief Channel, commencing by a junction with that watercourse at a point 148 metres from its confluence with The Gores, passing eastwards, then south-eastwards and terminating in The Gores at that confluence;

Work No

A cut, forming a diversion of The Gores, commencing at the confluence of the Ship and Shovel Relief Channel (Work No. 8U(4)) with that stream, passing eastwards then northwards under the railways (Works Nos. 22, 22A, 22B, 22E, 22F and 22G), and terminating by a junction with The Gores at a point 70 metres east of the northern end of its existing culvert under the Tilbury Loop Railway;

Work No

A cut, forming a diversion of Pooles Sewer, commencing by a junction with that watercourse 85 metres south of the southern side of the existing Manor Way level crossing on the Tilbury Loop Railway, passing eastwards and south-eastwards, then northwards under the railway (Work No. 8) and terminating by a junction with that watercourse at the southern end of its culvert under the Tilbury Loop Railway;

Work No

A cut, forming a diversion of the Ferry Lane Sewer, commencing by a junction with that watercourse at the northern end of its culvert under the Tilbury Loop Railway west of Rainham Station, passing southwards under that railway and the railway (Work No. 8), then eastwards and southwards and terminating in that watercourse on the western side of Ferry Lane at a point 48 metres south of the existing Ferry Lane level crossing on the Tilbury Loop Railway;

Work No

A cut, forming a diversion of the Rainham Cross Sewer, commencing at a point on the southern side of the Tilbury Loop Railway 375 metres east of the eastern end of Rainham Station, passing eastwards for a distance of 95 metres and there terminating by a junction with that watercourse;

Work No

A cut, forming an improvement of the Rainham Main Sewer, commencing in that watercourse at a point 15 metres north of the northern end of its existing culvert under the Tilbury Loop Railway, passing under that railway and the railway (Work No. 8) and terminating in that watercourse at a point 52 metres south of the southern end of that existing culvert;

Work No

A cut, forming a diversion of the Wennington Main Sewer, commencing by a junction with the cut (Work No. 8U(9)) at a point 10 metres north of its termination, passing south-eastwards on the southern side of the existing watercourse and terminating by a junction with that watercourse at a point 100 metres south of the southern end of a branch of that watercourse south of Manstead Gardens;

Work No

A cut, forming an improvement of the Common Watercourse (Southall Sewers), commencing in that watercourse at a point 10 metres north-east of the northern end of its existing culvert under the Tilbury Loop Railway, passing south-westwards under that railway and the railway (Work No. 8) and terminating in that watercourse at a point 47 metres south-west of the southern end of that existing culvert;

Work No

A cut, forming a diversion of Wennington Branch Sewer, commencing in that watercourse at a point 10 metres north-east of the northern end of its existing culvert under the Tilbury Loop Railway, passing under that railway and the railway (Work No. 8) and terminating in that watercourse at a point 40 metres south-west of the southern end of that existing culvert;

Work No

A railway (3,835 metres in length) commencing by a junction with the railway (Work No. 8) at its termination, passing south-eastwards on the southern side of the realigned Tilbury Loop Railway (Work No. 23A) then on viaduct over that railway, then over the diverted Aveley Sewer (Work No. 23D) and under the new road (Work No. 23B(1)), then continuing over Mar Dyke and under the new road (Work No. 23C(2)), passing on the southern side of the Purfleet Bypass and terminating at a point 250 metres east of the junction of London Road, Purfleet with the Purfleet Bypass, including the said viaduct and a bridge over Mar Dyke;

Work No

A railway (1,185 metres in length), being a realignment of the Tilbury Loop Railway, commencing by a junction with that railway at a point 230 metres south-east of the Wennington Branch Sewer where that sewer passes in culvert under that railway, passing south-eastwards in tunnel under the railway (Work No. 23) and terminating by a junction with the Tilbury Loop Railway at a point 240 metres south-west of the point where Tank Hill Road is crossed on the level by the Tilbury Loop Railway;

Work No

A road, forming a diversion of Tank Hill Road (A1090), commencing by a junction with Arterial Road, Purfleet (A13) at a point 165 metres north of its junction with Tank Hill Road, passing south-westwards then southwards over the diverted Aveley Sewer (Work No. 23D), the railway (Work No. 23), the Tilbury Loop Railway and Mar Dyke and terminating in that road at a point 15 metres north of the junction of Marlow Avenue with Tank Hill Road, including bridges over Works Nos. 23 and 23D, the Tilbury Loop Railway and Mar Dyke;

Work No

A road, forming an access road into the Purfleet Industrial Estate, commencing by a junction with the new road (Work No. 23B(1)) at a point 130 metres west of the junction of Tank Hill Road with Arterial Road, Purfleet (A13), passing westwards then northwards and terminating at a point in the said estate 155 metres north-west of its commencement;

Work No

A road, forming an access road, commencing by a junction with the new road (Work No. 23B(1)) at a point 110 metres south-west of the point where Tank Hill Road is crossed on the level by the Tilbury Loop Railway, passing eastwards and terminating at a point 105 metres south of that level crossing;

Work No

Diversion of Arterial Road, Purfleet, and Purfleet Bypass and diversion of Tank Lane and Botany Way, comprising—

Work No

Diversion of the A13 (Arterial Road, Purfleet) commencing in that road at a point 360 metres west of its existing junction with Purfleet Bypass, passing eastwards by way of the northern junction roundabout forming part of Work No. 23C(2), and terminating in the A13 at a point 235 metres east of the said existing road junction;

Work No

A road, including junction roundabouts at its commencement and termination, commencing by a junction with the diverted Arterial Road, Purfleet (Work No. 23C(1)) at a point 48 metres north-east of the existing junction of Arterial Road with Purfleet Bypass, passing south-westwards over the railway (Work No. 23) and terminating by a junction with the diverted Tank Lane (Works Nos. 23C(4) and 23C(5)) at a point 150 metres west of the existing junction of Tank Lane with Botany Way, including a bridge over Work No. 23;

Work No

Diversion of Purfleet Bypass at its junction with the A13 commencing by a junction with that road at the northern junction roundabout forming part of Work No. 23C(2), passing southwards and south-eastwards and terminating in Purfleet Bypass at a point 160 metres north-west of its junction with North Road;

Work No

Diversion of Tank Lane commencing at a point 165 metres north of the bridge carrying Tank Lane over the Tilbury Loop Railway, passing southwards then eastwards along the northern side of Tank Lane, then south-eastwards along the line of that road and terminating at the southern junction roundabout forming part of Work No. 23C(2), at a point 150 metres west of the existing junction of Tank Lane with Botany Way;

Work No

Diversion of Tank Lane and Botany Way, commencing at the southern junction roundabout forming part of Work No. 23C(2) at a point 150 metres north-west of its existing junction with Botany Way, passing eastwards then southwards on the line of Botany Way and terminating by a junction with that road at a point 115 metres south-west of its existing junction with Purfleet Bypass;

Work No

A cut, forming a diversion of the Aveley Sewer, commencing in that watercourse at a point 25 metres south-west of the southern end of its existing culvert under the Tilbury Loop Railway, passing in a north-easterly direction under the railways (Works Nos. 23 and 23A) and the new road (Work No. 23B(1)), then passing northwards and terminating at a point in a new balancing pond 95 metres north-west of the junction of Tank Hill Road with Arterial Road, Purfleet;

Work No

A railway (1,537 metres in length) commencing by a junction with the railway (Work No. 23) at its termination, passing south-eastwards on viaduct over the A1090 (London Road, Purfleet), the Tilbury Loop Railway and the northbound Dartford Tunnel Approach Road (Canterbury Way), under a span of the southbound approach to the Queen Elizabeth II Bridge, and over Oliver Close (North) (Work No. 9B) in the West Thurrock Industrial Estate to a point 90 metres west of the existing southernmost junction of Oliver Close with Oliver Road, then under Oliver Road (Work No. 9C) and terminating at a point 160 metres south-east of that existing road junction, including the said viaducts and a bridge over Work No. 9A(1);

Work No

Diversion of Oliver Close (North) commencing in that road at a point 25 metres south of the westernmost corner of that road, passing northwards for a distance of 60 metres from that commencement under the railway (Work No. 9), then turning eastwards and terminating by a junction with Oliver Close (North) at a point 160 metres west of its junction with Oliver Road;

Work No

Diversion of Oliver Road, including a bridge over the railway (Work No. 9), commencing in that road at the existing junction of that road with Oliver Close (North), passing southwards over Work No. 9 on the eastern side of the existing road, and terminating by a junction with Oliver Road at a point 130 metres south of its existing junction with Burnley Road;

Work No

Realignment of Burnley Road and Watson Close commencing by a junction with Oliver Road (Work No. 9C) at the existing road junction, passing eastwards along the line of, and then to the south of, Burnley Road, then turning northwards and terminating in Watson Close at a point 60 metres north of its existing junction with Burnley Road;

Work No

A railway (835 metres in length) commencing by a junction with the railway (Work No. 9F(2)) at a point 275 metres from its commencement, passing westwards, south-westwards, southwards and south-eastwards and terminating at a point on the western side of Watson Close (Work No. 9D) at a point 45 metres north of the existing junction of that road with Burnley Road;

Work No

A deviation railway (849 metres in length), commencing by a junction with the Tilbury Loop Railway at a point 325 metres east of the bridge carrying the southbound approach to the Queen Elizabeth II Bridge over that railway, passing eastwards on the southern side of that railway and terminating at the eastern end of the existing sidings;

Work No

A railway (9,161 metres in length) commencing by a junction with the railway (Work No. 9) at its termination, passing south-eastwards to a point 249 metres from that commencement, then passing in tunnel beneath Burnley Road and Watson Close (Work No. 9D), then beneath the River Thames and Bell Wharf, Swanscombe, with shafts at Burnley Road, West Thurrock Power Station, Bell Wharf and Swanscombe Marsh, continuing in tunnel south-eastwards to a point 120 metres north-west of the existing junction of Green Manor Way with Lower Road, then passing south-eastwards and southwards, under Galley Hill Road (Work No. 10K), then in tunnel for a distance of 58 metres beneath the North Kent Railway, continuing under the railway (Work No. 10C) and the new road (Work No. 10S(1)), then on viaduct over the River Ebbsfleet, then in tunnel for a distance of 310 metres beneath the course of the former Gravesend West Branch Railway and the A2 (Watling Street) at a point 50 metres west of the southern abutment of the bridge carrying the B262 (Hall Road) over that road, then passing in tunnel for distances of 35 metres and 25 metres respectively beneath the B262 and the slip road to that road and Station Road on the southern side of the A2, then continuing south-eastwards on the southern side of the A2, then in tunnel for a distance of 80 metres beneath the railway (Work No. 11A) and on viaduct over the A227 (Wrotham Road) and terminating at a point 180 metres east of that road 340 metres south of the southern side of the bridge carrying the A2 over that road, including the said viaducts over the River Ebbsfleet and Wrotham Road;

Work No

A railway (1,732 metres in length), partly for construction purposes, commencing at the seaward end of the existing Swanscombe Jetty, passing south-eastwards from that jetty and terminating by a junction with the railway (Work No. 10B) at a point 40 metres south-east of the intended bridge (Work No. 10K) carrying Galley Hill Road over that railway;

Work No

A railway (2,281 metres in length) commencing by a junction with the railway (Work No. 10) at a point 113 metres north-west of the intended bridge (Work No. 10K) carrying Galley Hill Road over that railway, passing south-eastwards on the eastern side of that railway under that road, and in tunnel for a distance of 71 metres beneath the North Kent Railway, then passing eastwards over a private road between the Northfleet Cement Works and Springhead Road, then in tunnel for a distance of 60 metres beneath the North Kent Railway at a point 30 metres south-east of the eastern abutment of the bridge carrying that railway over the mineral railway at the entrance to Church Path Pit, then south-eastwards on the northern side of the North Kent Railway, under Springhead Road (Work No. 10N) and terminating by a junction with that railway at a point 110 metres east of the intended bridge forming part of Work No. 10N, including a bridge over the said private road;

Work No

A railway (2,324 metres in length) commencing by a junction with the railway (Work No. 10) at a point 140 metres north-west of the intended bridge (Work No. 10K) carrying Galley Hill Road over that railway, passing south-eastwards on the western side of that railway under that road and in tunnel for a distance of 54 metres beneath the North Kent Railway, then eastwards, over the railways (Works Nos. 10, 10D and 10E) and over the said private road between the Northfleet Cement Works and Springhead Road, then south-eastwards on viaduct across the northern bay of the Blue Lake south of the North Kent Railway and under Springhead Road (Work No. 10N) and terminating by a junction with that railway at a point 95 metres east of the intended bridge forming part of Work No. 10N, including the said viaduct and bridges over Works Nos. 10, 10D and 10E and the said private road;

Work No

A railway (1,523 metres in length) commencing by a junction with the railway (Work No. 10B) at a point 45 metres north-west of the northern portal of the intended tunnel by which that railway passes beneath the North Kent Railway, passing south-eastwards on the western side of Work No. 10B beneath the North Kent Railway in that tunnel, then continuing southwards on the eastern side of the railway (Work No. 10), under the railway (Work No. 10C) and the new road (Work No. 10S(1)) and terminating by a junction with Work No. 10 at a point 10 metres south of the commencement of the intended viaduct carrying that railway over the River Ebbsfleet;

Work No

A railway (1,445 metres in length) commencing by a junction with the railway (Work No. 10C) 7 metres north-west of the southern portal of the intended tunnel by which that railway passes beneath the North Kent Railway, passing south-eastwards on the eastern side of Work No. 10C, then under that railway and continuing on the western side of the railway (Work No. 10), under the new road (Work No. 10S(1)) and terminating by a junction with Work No. 10 at a point 5 metres north of the commencement of the said intended viaduct carrying that railway over the River Ebbsfleet;

Work No

A railway (532 metres in length) commencing by a junction with the railway (Work No. 10B) at a point 140 metres west of the bridge carrying the North Kent Railway over the mineral railway at the entrance to the Church Path Pit, passing eastwards under that bridge and terminating in that pit at a point 378 metres east of that railway bridge;

Work No

A railway (200 metres in length) commencing by a junction with the North Kent Railway at a point 230 metres north-west of the western end of the westbound platform of Northfleet Station passing eastwards and terminating by a junction with the sidings of the mineral railway on the southern side of the North Kent Railway at the western end of those sidings;

Work No

Improvement of Manor Way (West) commencing at the junction of that road with the A226 (London Road), passing north-eastwards and eastwards along the line of Manor Way (West) and terminating at a point 20 metres east of the junction of that road with Pilgrims Road;

Work No

A road commencing by a junction with Manor Way (West) (Work No. 10G) at the termination of that work, passing eastwards, then south-eastwards and terminating at the existing roundabout at the west end of the central access road in the Northfleet Industrial Estate;

Work No

A road, forming a diversion of Lower Road and Green Manor Way, commencing by a junction with Manor Way (West) (Work No. 10G) at its termination, passing northwards on the line of the footpath DS2 to a point 280 metres north of its existing junction with Lower Road, then turning eastwards and south-eastwards on the eastern side of the railway (Work No. 10) to a point on the northern side of Lower Road 330 metres east of its existing junction with Green Manor Way, then passing north-eastwards and eastwards on the line of Lower Road and terminating by a junction with Lower Road at a point 60 metres north of its junction with Stonebridge Road and Galley Hill Road;

Work No

A road commencing by a junction with Green Manor Way at a point 310 metres north of its existing junction with Lower Road, passing southwards then south-westwards and terminating by a junction with the new road (Work No. 10J) at a point 85 metres from that commencement;

Work No

A road commencing by a junction with Manor Way (East) at a point 110 metres north of its existing junction with Lower Road, passing southwards and terminating by a junction with the new road (Work No. 10J) at a point 105 metres from that commencement;

Work No

Realignment of Galley Hill Road, including a bridge over the railways (Works Nos. 10, 10A, 10B and 10C), commencing in that road at a point 270 metres east of its junction with London Road, Swanscombe, and terminating in Galley Hill Road at a point 310 metres west of its junction with Stonebridge Road;

Work No

Realignment of Springhead Road, including a bridge over the railways (Works Nos. 10B and 10C) and the North Kent Railway, commencing in that road at a point 40 metres north of the northern abutment of the existing bridge carrying that road over the North Kent Railway and terminating in that road at a point 110 metres south of the southern abutment of that existing bridge;

Work No

Diversion of Downs Road commencing in that road at a point 310 metres south-east of its junction with the Hog Lane subway under the A2 (Watling Street), passing south-eastwards and eastwards then southwards over the railways (Works Nos. 10, 11A and 11B) and terminating in Downs Road at a point 330 metres south of the existing junction with that road of the road to Northfleet Green, including bridges over Works Nos. 10, 11A and 11B;

Work No

Diversion of the road from Downs Road to Northfleet Green commencing in that road at a point 20 metres east of the access from that road to Hazells, passing south-eastwards and terminating by a junction with Downs Road (Work No. 10P) at a point 210 metres north of the termination of that work;

Work No

A road, for construction purposes, including a bridge over the A2, commencing in the course of the former Gravesend West Branch Railway at a point 35 metres north-east of the northern side of that road, passing south-westwards over that road and terminating in the disused railway at a point 50 metres south-west of the southern side of that road;

Work No

A cut, forming a diversion of the Swanscombe Main Drain south of the sewage disposal works on Swanscombe Marshes, commencing in that drain at a point 60 metres north of the junction of Pilgrims Road with Manor Way (West), passing northwards, then in culvert north-westwards under the new road (Work No. 10J), then northwards and terminating in that drain at the south-western corner of the said sewage works;

Work No

A drainage pumping main commencing at a point 300 metres south-west of the western end of the platform of Northfleet Station, passing north-eastwards, under the railway (Work No. 10F(1)) and the North Kent Railway, then continuing north-eastwards and eastwards in Stonebridge Road and Grove Road between its junctions with Stonebridge Road and College Road, then eastwards in the Creek to a point 40 metres east of the junction of that road with College Road, then passing north-eastwards and terminating at a point at low water on the south bank of the River Thames 15 metres east of Robins Creek;

Work No

A road commencing by a junction with the access road between the Northfleet Cement Works and Springhead Road at a point 75 metres south of the southern end of the bridge carrying that road over the River Ebbsfleet, passing southwards over that river, over the railways (Works Nos. 10, 10D and 10E), then south-westwards and terminating by a junction with the new road (Work No. 10S(2)) at a point 140 metres north of the junction with the existing Southfleet Road of the access road to the Northfleet West Grid Substation, including roundabouts at that commencement and termination and bridges over the river and Works Nos. 10, 10D and 10E;

Work No

A road commencing at a point adjoining Southfleet Road 310 metres north of the existing junction with that road of the said road access to the Northfleet West Grid Substation, passing southwards to a point 120 metres south of that existing road junction then passing south-eastwards and terminating at a point 60 metres east of Southfleet Road, 220 metres north of the existing junction with the A2 of the road access from that road to the Northfleet West Grid Substation, including a roundabout at that termination;

Work No

A road commencing by a junction with the new road (Work No. 10S(2)) at its termination, passing eastwards, then south-eastwards to a junction with Work No. 10T(4) at its termination, then eastwards over the railway (Work No. 10) in tunnel and terminating in the existing eastbound exit slip road of the A2 at Pepper Hill at a point 80 metres north-west of the junction of that slip road with Hall Road;

Work No

A road commencing by a junction with the road (Work No. 10T(1)) at a point 85 metres north-west of the access to the Springhead Nursery from the existing access road on the northern side of the A2, passing south-eastwards on the southern side of Work No. 10T(1), over the railway (Work No. 10) in tunnel, and terminating in the eastbound carriageway of the A2 at a point 250 metres south-east of the bridge carrying Hall Road over the A2;

Work No

A road, forming an exit slip road from the eastbound carriageway of the A2, commencing in that carriageway at a point 325 metres east of the footbridge over the A2 between Blue House and Swanscombe Park, passing eastwards over the new roads (Works Nos. 10T(6) and 10T(8)) and terminating by a junction with the road (Work No. 10T(1)) at a point 260 metres from its commencement;

Work No

A road, forming an entry slip road to the westbound carriageway of the A2, commencing by a junction with the new road (Work No. 10S(2)) at its termination, passing southwards under the A2 then south-westwards, westwards and north-westwards to a point 300 metres west of the bridge carrying the A2 over the B259 (Park Corner Road) continuing westwards and terminating in the westbound carriageway of the A2 at a point 130 metres east of the said footbridge over the A2;

Work No

A road commencing by a junction with the slip road (Work No. 10T(6)) at a point 325 metres north of the junction of Park Corner Road with the road leading to North End Farm, passing southwards and terminating by a junction with Park Corner Road at a point 150 metres from that commencement;

Work No

A station access road, forming an exit slip road from the westbound carriageway of the A2, commencing by a junction with the new road (Work No. 10S(2)) at its termination, passing southwards under the A2 on the western side of the slip road (Work No. 10T(6)) to a point on the western side of the B259 (Park Corner Road) 160 metres south of the southern end of the bridge carrying the A2 over that road, then turning south-westwards, north-westwards, northwards and north-eastwards, passing over the road and the slip road (Work No. 10T(6)) on the southern side of the A2, continuing eastwards and terminating in the westbound carriageway of the A2 at a point 190 metres north-west of the bridge carrying Hall Road over the A2;

Work No

A railway (4,402 metres in length) commencing by a junction with the London and Chatham Railway at a point 130 metres east of the eastern abutment of the bridge carrying that railway over Pinden Road, passing eastwards, then north-eastwards on the course of the former Gravesend West Branch Railway, over the B260 (Main Road, Longfield), under Whitehill Road (Work No. 11C), the B255 (Hook Green Road) (Work No. 11D) and the B259 (Dale Road) (Work No. 11E), then eastwards under New Barn Road (Work No. 11F), and terminating at a point 60 metres east of the intended bridge forming part of that work, including a bridge over the B260;

Work No

A railway (1,366 metres in length) commencing by a junction with the railway (Work No. 11) at its termination, passing eastwards over the railway (Work No. 10) in tunnel, then south-eastwards on the northern side of that railway under Downs Road (Work No. 10P) and terminating by a junction with that railway at a point 290 metres south-east of the intended bridge forming part of that work;

Work No

A railway (1,354 metres in length) commencing by a junction with the railway (Work No. 11) at its termination, passing south-eastwards on the southern side of the railway (Work No. 10) under Downs Road (Work No. 10P) and terminating by a junction with the railway at a point 275 metres south-east of the intended bridge forming part of that work;

Work No

Realignment of Whitehill Road, including a bridge over the railway (Work No. 11), commencing in Whitehill Road at a point 375 metres south of the southern abutment of the existing bridge carrying that road over the disused railway and terminating in that road at its junction with Hook Green Road;

Work No

Realignment of the B255 (Hook Green Road), including a bridge over the railway (Work No. 11), commencing in that road at a point 50 metres south-east of its junction with Whitehill Road and terminating in the B255 at a point 190 metres east of the eastern abutment of the existing bridge over the disused railway;

Work No

Realignment of the B259 (Dale Road), including a bridge over the railway (Work No. 11), commencing in that road at a point 60 metres south of the southern abutment of the existing bridge over that disused railway and terminating in that road at a point 70 metres south of its junction with the B262 (Station Road);

Work No

Realignment of New Barn Road, including a bridge over the railway (Work No. 11), commencing in that road at a point 25 metres south of the centre of the roundabout at the junction of that road with the B262 (Station Road) and terminating in New Barn Road at a point 370 metres south-west of that commencement;

Work No

A railway (7,700 metres in length) commencing by a junction with the railway (Work No. 10) at its termination, passing eastwards on the southern side of the A2 (Watling Street), under Henhurst Road (Work No. 12D), Scotland Lane (Work No. 12E), Watling Street (B395) (Work No. 12F) and Halfpence Lane (C492) (Work No. 32C), then in tunnel for a distance of 75 metres beneath Work No. 32B and an adjoining area, under Brewers Road (Work No. 12H), over the access road (Work No. 12K) and under the access road (Work No. 12L), then passing south-eastwards on the western side of the M2, under a land bridge in Temple Wood, and terminating at a point 435 metres north-west of the southern end of the subway by which the footpath RS203 passes under the M2 as existing, including a bridge over Work No. 12K;

Work No

A railway (2,520 metres in length) on the northern side of the railway (Work No. 12) commencing by a junction with that railway at a point 50 metres east of its commencement, passing eastwards under Henhurst Road (Work No. 12D) and terminating by a junction with Work No. 12 at a point 515 metres east of the intended bridge carrying that road over that railway;

Work No

A railway (2,520 metres in length) on the southern side of the railway (Work No. 12) commencing by a junction with that railway at the said point 50 metres east of its commencement, passing eastwards under Henhurst Road (Work No. 12D) and terminating by a junction with Work No. 12 at the said point 515 metres east of the intended bridge carrying that road over that railway;

Work No

Diversion of Church Road commencing in that road at a point 170 metres north of the entrance from that road to St Margaret’s Church, Ifield Court, passing north-eastwards then south-eastwards and terminating by a junction with Henhurst Road (Work No. 12D) at a point 100 metres south of the southern abutment of the intended bridge carrying that road over the railways (Works Nos. 12, 12A and 12B);

Work No

Diversion of Henhurst Road, including a bridge over the railways (Works Nos. 12, 12A and 12B), commencing in that road at a point 40 metres south of its junction with the exit slip road from the westbound carriageway of the A2 and terminating in Henhurst Road at a point 60 metres north of the access from that road to Henhurst Cottage;

Work No

Diversion of Scotland Lane (Byway NS 195), including a bridge over the railway (Work No. 12), commencing in Scotland Lane at a point 210 metres south of its existing junction with Watling Street (B395), passing north-eastwards then eastwards to a junction with the existing access to The Mount, then passing northwards over the railway and terminating by a junction with the new road (Work No. 12F) at a point 15 metres from the commencement of that work;

Work No

A road, forming a diversion of Watling Street (B395), including a bridge over the railway (Work No. 12), commencing in that road at a point 130 metres south-east of the southern abutment of the bridge carrying that road over the A2, passing eastwards on the northern side of that road, then southwards over the railway and terminating by a junction with Halfpence Lane (C492) (Work No. 32C) at a point 80 metres north of its existing junction with Brewers Road;

Work No

Diversion of Brewers Road, including bridges over the railway (Work No. 12) and the A2, commencing in Brewers Road at its junction with Halfpence Lane (C492) passing eastwards, then north-eastwards over that railway and terminating in Brewers Road at a point 160 metres north-east of its junction with the slip roads to and from the eastbound carriageway of the A2;

Work No

An access road commencing by a junction with Brewers Road (Work No. 12H) at a point 55 metres south-west of the termination of that work, passing south-eastwards, then eastwards along the northern side of the A2 and terminating within the curtilage of Park Pale;

Work No

An access road to the Rochester and Cobham Park Golf Course, including a bridge over the A2, commencing by a junction with the access road (Work No. 12J) on the northern side of the A2 at a point 250 metres west of Park Pale, passing northwards and eastwards then southwards over that road and the A2 (including Works Nos. 31A, 31B, 34A and 35A), then westwards and southwards under the railway (Work No. 12), and terminating in the golf course south of the railway;

Work No

Diversion of an access road to Knights Place, including a bridge over the railway (Work No. 12), commencing in the existing access road from the A2 at a point 170 metres south of that road, passing southwards over the railway and terminating in the existing access road at a point 110 metres north of the access from that road to Knights Cottage;

Work No

A railway (14,100 metres in length) commencing by a junction with the railway (Work No. 12) at its termination, passing south-eastwards, on the western side of the M2, over new roads (Works Nos. 36C, 36D and 36E) forming part of Junction 2 of the motorway, under the A228 (Rochester Road) (Work No. 36F), over the London and Chatham Railway, then on viaduct over the Strood and Maidstone Railway, the River Medway and Wouldham Road, then continuing south-eastwards on the western side of the M2 to a point at Nashenden Bottom, 120 metres north-west of the northern end of the go-kart racing track at Buckmore Park, south of Rochester Airport, then passing in tunnel (the North Downs Tunnel) for a distance of 3,190 metres beneath Blue Bell Hill and the North Downs, then passing south-eastwards under the Pilgrims Way (Work No. 13F), over Boarley Lane (Work No. 13G), then in tunnel for a distance of 330 metres beneath Boxley Road (Work No. 13H), continuing south-eastwards, under the A249 (Sittingbourne Road) (Work No. 13J), and Hockers Lane (Work No. 13K) and terminating at a point 270 metres east of the northern abutment of the bridge carrying Hockers Lane over the M20, including bridges over Works Nos. 36C, 36D and 36E, the London and Chatham Railway, the said viaduct, and a bridge over Work No. 13G;

Work No

Slip roads forming part of Junction 2 of the M2 pending widening of that motorway, being roads to be stopped up on the construction of the slip roads (Works Nos. 36A to 36D), comprising—

Work No

A road, forming an exit slip road from the existing eastbound carriageway of the M2, commencing in that carriageway at a point 75 metres south-east of the southern end of the subway by which the footpath RS 203 passes under the motorway, passing south-eastwards and terminating by a junction with the A228 (Rochester Road) (Work No. 13A(4)) at a point 70 metres east of the eastern abutment of the existing bridge carrying that road over the M2;

Work No

A road, forming an entry slip road to the existing westbound carriageway of the M2, commencing in that carriageway at a point 345 metres south-east of the southern end of the subway by which the footpath NS 183 passes under the M2, passing south-eastwards and terminating by a junction with Work No. 36C at a point 100 metres west of the southern end of the said subway for the footpath RS 203;

Work No

A road forming an exit slip road from the existing westbound carriageway of the M2, commencing in that carriageway at a point 25 metres south-east of the southern abutment of the bridge carrying the M2 over the London and Chatham Railway, passing north-westwards under the railway (Work No. 13) and terminating by a junction with the western junction roundabout (part of Work No. 36E);

Work No

A road, forming a diversion of the A228 (Rochester Road), commencing by a junction with the road (Work No. 36F) at a point 395 metres north-east of the commencement of that work, passing north-eastwards and eastwards and terminating by a junction with the A228 at a point 140 metres north-east of the junction with that road of the existing slip roads to the eastbound carriageway of the M2;

Work No

Diversion of Burham Road (D422) commencing by a junction with Wouldham Road at a point 30 metres south-west of the existing junction of those roads, passing south-eastwards and terminating by a junction with Burham Road 325 metres south of that road junction;

Work No

Diversion of bridleway MR11 (Stony Lane), including a bridge over the railway (Work No. 13), commencing in that bridleway at the northern end of the subway by which it passes under the M2, passing south-westwards under the M2, then north-westwards and south-westwards over the railway, then southwards and south-eastwards and terminating by a junction with Stony Lane at the north-eastern corner of Upper Nashenden Farm;

Work No

An access, for construction purposes, commencing by a junction with the existing westbound carriageway of the M2 at a point 160 metres north-west of the southern end of the existing subway by which Stony Lane passes under the motorway, passing north-westwards and westwards to the southern side of the railway (Work No. 13), passing south-eastwards on that side of the railway between chainages 4,000 and 4,190 metres, then passing eastwards, northwards and north-westwards and terminating by a junction with that carriageway of the motorway at a point 180 metres south-east of the bridge carrying Borstal Farm access over the M2;

Work No

Diversion of byway MR401, commencing by a junction with the byway at a point 160 metres south of its junction with Lower Warren Road, passing southwards over the railway (Work No. 13) in tunnel, then south-westwards and south-eastwards and terminating by a junction with byway MR401 at a point 225 metres south of that commencement;

Work No

Realignment of Pilgrims Way, including a bridge carrying that byway over the railway (Work No. 13), commencing in that byway at a point 85 metres east of the northern end of the subway by which the Pilgrims Way passes under the A229 (Chatham Road), passing eastwards then north-eastwards over the railway and terminating in that byway at a point 130 metres east of that commencement;

Work No

Diversion of Boarley Lane (D898) commencing in that road at a point 100 metres south of Boarley Cottage, passing southwards and south-eastwards under the railway (Work No. 13) and terminating in Boarley Lane at a point 50 metres north-east of the access to Boarley Oast;

Work No

Diversion of Boxley Road (C97) commencing in that road at its junction with Sandy Lane, passing north-westwards then north-eastwards over the railway (Work No. 13) in tunnel and terminating in that road at a point 50 metres north-east of the access to Street Farm, Boxley;

Work No

Realignment of the A249 (Sittingbourne Road), including a bridge over the railway (Work No. 13), commencing in that road at a point 80 metres north-east of the junction with that road of the side road to Detling and terminating in Sittingbourne Road at a point 110 metres north of the northern abutment of the eastern bridge of the roundabout through which that road passes over the M20;

Work No

Realignment of Hockers Lane, including a bridge over the railway (Work No. 13), commencing in that road at a point 230 metres north of the northern abutment of the bridge carrying that road over the M20 and terminating in Hockers Lane at a point on that bridge 260 metres south of that commencement;

Work No

A railway (13,904 metres in length) commencing by a junction with the railway (Work No. 13) at its termination, passing south-eastwards over Thurnham Lane (Work No. 14A), Water Lane (Work No. 14B) and Crismill Lane (Work No. 14C), then over the Maidstone and Ashford Railway at a point 85 metres east of the bridge carrying the M20 over that railway, continuing south-eastwards in tunnel for a distance of 240 metres beneath the B2163 (Eyhorne Street) (Work No. 14D), then passing over Snagbrook Stream, under Hospital Road (Work No. 14E), over the A20 (Ashford Road) (Work No. 14F) and under Fairbourne Lane (Work No. 14H), over Bell Farm access (Work No. 14J), then under Runham Lane (Work No. 14K), Sandway Road (Work No. 14L), Old Ham Lane (Work No. 14M), in tunnel for a distance of 170 metres beneath Headcorn Road (Work No. 14N), then continuing under Boughton Road (Work No. 14P), Lenham Heath Road (Work No. 14Q) and Bowley Lane (Work No. 14S), over the Great Stour River at a point 40 metres north of the bridge carrying the M20 over that river, under the access road west of Hook Street (Work No. 14U) and terminating at a point 85 metres south of the junction of Bull Hill with Lenham Heath Road, including bridges over Works Nos. 14A, 14B and 14C, the Maidstone and Ashford Railway, Snagbrook Stream, Works Nos. 14F and 14J and the Great Stour River;

Work No

Diversion of Thurnham Lane commencing in that road at a point 10 metres north of the access from that road to Gorewood Farm, passing south-westwards and southwards under the railway (Work No. 14) and terminating in Thurnham Lane at a point 10 metres north of the southern side of the bridge carrying the M20 over that road;

Work No

Diversion of Water Lane commencing in that road at a point 185 metres north of the northern side of the bridge carrying the M20 over that road, passing south-westwards and southwards under the railway (Work No. 14) and terminating in Water Lane at a point 5 metres north of the southern side of that bridge;

Work No

Diversion of bridleway KH134 (Crismill Lane) commencing in that bridleway at a point 30 metres south of the entrance to the Poer Meadow Shaw Pumping Station of the Mid-Kent Water Company, passing south-westwards, then south-eastwards and south-westwards under the railway (Work No. 14) and terminating in Crismill Lane at a point 5 metres north of the northern end of the subway by which that bridleway passes under the M20;

Work No

Realignment of the B2163 (Eyhorne Street) commencing at a point in that road 140 metres north-east of the northern abutment of the bridge carrying that road over the M20, passing south-westwards over the railway (Work No. 14) in tunnel and terminating at a point 75 metres south-west of that commencement;

Work No

Diversion of Hospital Road (D971), including a bridge over the railway (Work No. 14), commencing in that road at a point 180 metres north-east of the northern end of the subway by which that road passes under the M20, passing south-westwards, north-westwards, then south-westwards over the railway and south-eastwards and south-westwards and terminating in Hospital Road at a point 10 metres north-east of the southern end of that subway;

Work No

Diversion of the A20 (Ashford Road) commencing in that road at a point 20 metres east of the southern side of the bridge carrying the M20 over that road west of Holm Mill, passing eastwards under the railway (Work No. 14), then south-eastwards on the northern side of Work No. 14 and terminating in the A20 at a point 25 metres south-east of its junction with Holm Mill Lane;

Work No

Diversion of Greenway Court Road (D946) at its junction with the A20 (Ashford Road), commencing in Greenway Court Road at a point 110 metres north-east of its junction with Greenway Lane, passing south-westwards, then southwards on the eastern side of the existing road and terminating by a junction with the A20 (Work No. 14F) at a point 105 metres east of the intended bridge carrying the railway (Work No. 14) over that road;

Work No

Realignment of Fairbourne Lane, including a bridge over the railway (Work No. 14), commencing in that road at a point 50 metres south of its junction with the A20 (Ashford Road), passing southwards over the railway and terminating at a point 45 metres south of the northern end of the bridge carrying that road over the M20;

Work No

Diversion of the Bell Farm access from Sandway Road, Harrietsham, commencing by a junction with Sandway Road at a point 130 metres south-east of its junction with East Street, passing south-eastwards, then south-westwards and southwards under the railway (Work No. 14) and terminating in that access road at a point 35 metres south of the northern end of the subway by which it passes under the M20;

Work No

Realignment of Runham Lane, including a bridge over the railway (Work No. 14), commencing in that road at a point 60 metres south-west of its junction with Sandway Road, passing south-westwards over the railway and terminating in Runham Lane at a point 10 metres south-west of the north-eastern end of the bridge carrying that road over the M20;

Work No

Diversion of Sandway Road (C92), including a bridge over the railway (Work No. 14), commencing in that road at a point 180 metres south-east of its junction with Runham Lane, passing south-eastwards on the eastern side of Sandway Road, then southwards over the railway and terminating in that road at a point 190 metres north-west of its junction with Old Ham Lane;

Work No

Diversion of Old Ham Lane (D986), including a bridge over the railway (Work No. 14), commencing in that road at a point 360 metres north of its junction with Sandway Road and Lenham Heath Road, passing southwards over the railway and terminating in Old Ham Lane at that road junction;

Work No

Realignment of Headcorn Road commencing in that road at a point 220 metres north-east of its junction with Lenham Heath Road, passing south-westwards over the railway (Work No. 14) in tunnel and terminating in Headcorn Road at a point 130 metres north-east of that road junction;

Work No

Realignment of Boughton Road, including a bridge over the railway (Work No. 14) commencing in that road at a point 140 metres north of its junction with Lenham Heath Road, passing southwards over the railway and terminating in Boughton Road at a point 70 metres north of that road junction;

Work No

Diversion of Lenham Heath Road (C92) at Sandway, including a bridge over the railway (Work No. 14), commencing in that road at a point 225 metres south-east of its junction with Boughton Road, passing south-eastwards then north-eastwards over the railway, then south-eastwards and eastwards and terminating in Lenham Heath Road at a point 590 metres north-west of its existing junction with Bowley Lane;

Work No

Diversion of Lenham Heath Road (C92) at Chapel Mill commencing in that road at a point 260 metres north-west of its existing junction with Bowley Lane, passing south-eastwards over the Great Stour River and terminating in Lenham Heath Road at a point 310 metres south-east of that existing road junction, including a bridge over the Great Stour River;

Work No

Diversion of Bowley Lane at its junction with Lenham Heath Road, including bridges over the railway (Work No. 14) and the M20, commencing by a junction with Lenham Heath Road (Work No. 14R) at a point 225 metres south-east of the commencement of that work, passing southwards and south-westwards, over the railway and the motorway, and terminating in Bowley Lane at a point 165 metres south of the southern end of the existing bridge carrying that road over the M20;

Work No

An access road, for construction purposes, commencing by a junction with the eastbound carriageway of the M20 at a point 75 metres north-west of the western side of the existing bridge carrying Bowley Lane over the motorway, passing south-eastwards and eastwards to a point on the southern side of the railway (Work No. 14) 220 metres south-east of the intended bridge carrying that road over the railway, then passing southwards and south-eastwards and terminating by a junction with that carriageway of the M20 at a point 210 metres north-west of the western side of the bridge carrying Hubbard’s Farm access road over the motorway;

Work No

An access road on the line of Hubbard’s Farm access road west of Hook Street, including a bridge over the railway (Work No. 14), commencing by a junction with Lenham Heath Road at a point 75 metres west of its junction with Bull Hill, passing southwards over the railway and terminating in the existing access road at the southern end of the bridge carrying it over the M20;

Work No

An access road on the southern side of the railway (Work No. 14) commencing in the curtilage of Old Cottage, passing south-eastwards to a junction with the new road (Work No. 14U) at a point 120 metres south of its commencement, then continuing south-eastwards and terminating in the curtilage of Yew Tree Cottage off Hook Street (to be stopped up);

Work No

A railway (11,342 metres in length) commencing by a junction with the railway (Work No. 14) at its termination, passing south-eastwards under Egerton Road (Work No. 15C), Newlands Road (Work No. 15F) and Pluckley Road (Work No. 15G), passing eastwards in tunnel for a distance of 115 metres beneath Leacon Lane (Work No. 15J), and under the A20 (Maidstone Road) (Work No. 15K) then continuing south-eastwards over the M20 at a point 50 metres west of the bridge carrying the Maidstone and Ashford Railway over the motorway at Tutt Hill, passing under Westwell Lane (Work No. 15M) and over Station Road (Work No. 15N), under the A20 (Work No. 15P) and over Godinton Lane (Work No. 15Q) and terminating at a point in Rowcroft Barracks 530 metres north-west of the existing junction of Godinton Road with Chart Road, including bridges over the M20, Station Road and Godinton Lane;

Work No

A railway (2,576 metres in length) on the northern side of the railway (Work No. 15) commencing by a junction with that railway at a point 360 metres east of its commencement, passing eastwards under Egerton Road (Work No. 15C) and terminating by a junction with Work No. 15 at a point 125 metres north-west of the intended bridge carrying Newlands Road (Work No. 15F) over that railway;

Work No

A railway (2,576 metres in length) on the southern side of the railway (Work No. 15) commencing by a junction with that railway at the said point 360 metres east of its commencement, passing eastwards under Egerton Road (Work No. 15C) and terminating by a junction with Work No. 15 at the said point 125 metres north-west of the intended bridge carrying Newlands Road (Work No. 15F) over that railway;

Work No

Realignment of Egerton Road, including a bridge over the railways (Works Nos. 15, 15A and 15B), commencing in that road at a point 5 metres south-west of the southern end of the bridge carrying it over the M20, passing north-eastwards over those railways and terminating in Egerton Road at a point 130 metres north-east of its junction with Vicarage Lane;

Work No

Realignment of Vicarage Lane commencing in that road at a point 65 metres north of its junction with Egerton Road and terminating at that road junction;

Work No

Diversion of Hurst Lane (D1198) at its junction with Newlands Road commencing in Hurst Lane at a point 260 metres north-west of that existing road junction, passing eastwards and terminating by a junction with Newlands Road (Work No. 15F) at a point 75 metres north of the said existing road junction;

Work No

Realignment of Newlands Road (D1199), including a bridge over the railway (Work No. 15), commencing in that road at a point 15 metres north of the northern abutment of the bridge carrying that road over the M20, passing northwards over the railway, then north-eastwards and terminating in Newlands Road at a point 135 metres north-east of its junction with Hurst Lane;

Work No

Realignment of Pluckley Road (C493), including a bridge over the railway (Work No. 15), commencing in that road at a point 25 metres south-west of the southern end of the bridge carrying it over the M20, passing north-eastwards and northwards over the motorway and the railway and terminating in Pluckley Road at a point 65 metres north of its existing junction with Leacon Lane;

Work No

Diversion of Leacon Lane between Pluckley Road and Leacon Alders commencing by a junction with Pluckley Road at its existing junction with Leacon Lane, passing eastwards then south-eastwards under the railway (Work No. 15) and terminating in Leacon Lane at a point 195 metres west of the bridge carrying that road over the stream at Leacon Alders, including access to Oakover Nursery and Raywood Cottages and to the emergency access to the M20;

Work No

Realignment of Leacon Lane east of Leacon Alders commencing in that road at a point 240 metres east of its junction with Hurstford Lane, passing north-eastwards over the railway (Work No. 15) in tunnel, and terminating in Leacon Lane at a point 200 metres south-west of its junction with the A20 (Maidstone Road);

Work No

Diversion of the A20 (Maidstone Road), including a bridge over the railway (Work No. 15), commencing in that road at a point 25 metres north of its junction with Leacon Lane, passing south-eastwards over the railway on the western side of the existing road and terminating in the A20 at the north-western end of the bridge carrying that road over the M20, including access to Leda Cottages at a point 35 metres north-west of that termination;

Work No

A road for access to premises on the eastern side of the existing A20 commencing by a junction with the A20 (Work No. 15K) at a point on its eastern side 205 metres south-east of its commencement, passing eastwards, then south-eastwards and terminating by a junction with the remaining part of the existing road at a point 285 metres south-east of the commencement of Work No. 15K;

Work No

Diversion of Westwell Lane (D1227) commencing in that road at the southern end of the bridge carrying it over the M20, passing southwards on the eastern side of the existing road, then south-westwards over the Maidstone and Ashford Railway and the railway (Work No. 15), then passing south-eastwards and southwards and terminating in that road at a point 180 metres south of the southern abutment of the existing bridge carrying that road over the Maidstone and Ashford Railway, including a bridge over that railway and Work No. 15;

Work No

Realignment of Station Road, Westwell, commencing in that road at a point 15 metres south-west of the bridge carrying the Maidstone and Ashford Railway over that road, passing south-westwards under the railway (Work No. 15) and terminating in Station Road at a point 220 metres south-west of that commencement;

Work No

Diversion of the A20 (Maidstone Road), including a bridge over the railway (Work No. 15), commencing in that road at a point 405 metres north-west of the entrance to Yonsea Farm, passing eastwards on the northern side of the existing road, over the railway, then south-eastwards and terminating in that road at a point at Potters Corner 25 metres south-east of the junction with that road of Godinton Lane;

Work No

Diversion of Godinton Lane commencing in that road at a point 225 metres south-west of its junction with the A20, passing south-westwards on the western side of the existing road, under the railway (Work No. 15) and terminating in Godinton Lane at a point 10 metres north-east of the access to North Lodge;

Work No

A railway (4,535 metres in length) commencing by a junction with the railway (Work No. 15) at its termination, passing south-eastwards to a point 130 metres north-west of the existing junction of Godinton Road with Chart Road, then in tunnel for a distance of 565 metres beneath Chart Road (Work No. 16F) and Godinton Road (Works Nos. 16G and 16H), the railway (Work No. 16A) and the Maidstone and Ashford Railway (Work No. 16C), then under Beaver Road (Work No. 16N), over the Great Stour and the East Stour Rivers, the Ashford and Canterbury Railway and the railways (Works Nos. 16C and 16D), then over the railways (Works Nos. 16A and 16E), under Boys Hall Road (Work No. 16Q), and terminating at a point 225 metres west of the western side of the existing bridge carrying Bad Munstereifel Road over the Ashford and Folkestone Railway at Sevington, including bridges over Works Nos. 16A, 16C, 16D and 16E, the Great Stour and the East Stour Rivers, the Ashford and Canterbury Railway, and the Aylesford Stream (Work No. 16S);

Work No

A railway (4,555 metres in length) commencing by a junction with the railway (Work No. 16) at a point 5 metres south-east of the commencement of that work, passing south-eastwards on the northern side of that railway, in tunnel for a distance of 405 metres beneath Chart Road (Work No. 16F), then passing southwards over the railway (Work No. 16) in tunnel, then south-eastwards and eastwards under Beaver Road (Work No. 16N), on existing bridges over the Great Stour and the East Stour Rivers, under Work No. 16, and Boys Hall Road (Work No. 16Q) and terminating by a junction with Work No. 16 at its termination, including bridges over Work No. 16K and the Aylesford Stream (Work No. 16S);

Work No

A railway (4,550 metres in length) commencing by a junction with the railway (Work No. 16) at a point 5 metres south-east of the commencement of that work, passing south-eastwards on the southern side of that railway, in tunnel for a distance of 475 metres beneath Chart Road (Work No. 16F) and Godinton Road (Works Nos. 16G and 16H), passing south-eastwards and eastwards under Beaver Road (Work No. 16N), on existing bridges over the Great Stour and East Stour Rivers, under Boys Hall Road (Work No. 16Q) and terminating by a junction with Work No. 16 at its termination, including bridges over Work No. 16K and the Aylesford Stream (Work No. 16S);

Work No

A railway (2,228 metres in length) commencing by a junction with the Maidstone and Ashford Railway at a point 200 metres north-west of the bridge carrying the Godinton Road over that railway, passing south-eastwards over the railway (Work No. 16) in tunnel, under Beaver Road (Work No. 16N), on existing bridges over the Great Stour and East Stour Rivers and terminating by a junction with the Ashford and Canterbury Railway at a point 70 metres east of the intended bridge carrying Work No. 16 over that railway, including a bridge over Work No. 16K;

Work No

A railway (954 metres in length), forming sidings on the Ashford and Canterbury and Ashford and Folkestone Railways, commencing at a point 45 metres south-east of the eastern abutment of the bridge carrying that railway over the East Stour River, passing south-eastwards on the southern side of the railway (Work No. 16C) to a junction with the Ashford and Canterbury Railway, then passing eastwards under the railway (Work No. 16) then south-eastwards and terminating at a point 125 metres north-west of the junction of Bentley Road with Hunter Avenue and Aylesford Place, including railway sidings;

Work No

A railway (748 metres in length) commencing by a junction with the railway (Work No. 16A) at a point 140 metres north-west of the intended bridge carrying the railway (Work No. 16) over that railway, passing south-eastwards under Work No. 16, on the northern side of Work No. 16A and terminating at a point 92 metres south-east of the eastern side of the existing Aylesford Place level crossing (to be stopped up), including railway sidings;

Work No

Realignment of the A28 (Chart Road) commencing in that road at a point 45 metres east of the junction of Hilton Road with that road, passing eastwards over the railways (Works Nos. 16, 16A and 16B) in tunnel and terminating in that road at a point 3 metres west of the western side of the bridge carrying the Maidstone and Ashford Railway over that road;

Work No

Realignment of Godinton Road (B2074) and Carlton Road (E1467) commencing by a junction with Chart Road (Work No. 16F) at the existing junction of that road with Godinton Road, passing south-eastwards on the line of that road over the railway (Work No. 16B) in tunnel, then passing south-westwards on the line of Carlton Road and terminating in that road at a point 63 metres south-west of its junction with Godinton Road;

Work No

A road commencing by a junction with Godinton Road (Work No. 16G) at a point 80 metres south-east of its existing junction with Chart Road, passing north-eastwards over the railways (Works Nos 16, 16A and 16B) in tunnel, then south-eastwards over the Maidstone and Ashford Railway (Work No. 16C) and terminating in Godinton Road at a point 45 metres north-west of its junction with James Street, including a bridge over the Maidstone and Ashford Railway (Work No. 16C);

Work No

Realignment of Bridge Road commencing in that road at a point 45 metres south-west of its existing junction with Godinton Road, passing north-eastwards, and terminating by a junction with Work No. 16G at that road junction;

Work No

An access road and cycle track commencing in Gasworks Lane at a point 30 metres south of its junction with the A292 (Elwick Road), passing south-westwards for a distance of 108 metres, on the western side of Gasworks Lane (to be stopped up), over the railway (Work No. 16), then continuing as a cycle track south-westwards, then eastwards and westwards, under the railways (Works Nos. 16A, 16B and 16C) and the Tonbridge and Ashford Railway, and terminating in Gasworks Lane at a point 10 metres south of the southern end of the existing bridge carrying that last mentioned railway over that road, including a bridge over Work No. 16;

Work No

A road commencing by a junction with Leacon Road at its junction with Norfolk Drive, passing eastwards and terminating by a junction with Gasworks Lane at a point 120 metres south of the southern end of the bridge carrying the Tonbridge and Ashford Railway over that road;

Work No

A cycle track commencing by a junction with the footpath AU 37 at a point 32 metres south of its junction with the A292 (Elwick Road), passing south-westwards over the railways (Works Nos. 16, 16A, 16B and 16C), the Maidstone and Ashford and the Tonbridge and Ashford Railways, then passing westwards, then eastwards and terminating by a junction with the footpath at a point 5 metres south-west of the southern end of the footbridge carrying that footpath over the Tonbridge and Ashford Railway;

Work No

Diversion of the A2070 (Beaver Road) commencing in that road at its junction with the A292 (Elwick Road and Station Road), passing southwards over the railways (Works Nos. 16, 16A, 16B and 16C) and terminating in the A2070 at its junction with the Romney Marsh Road, including a bridge over the said railways and a junction roundabout at that termination;

Work No

A cycle track commencing at the southern end of Alsops Road, passing eastwards, then westwards and eastwards, then southwards over the railways (Works Nos. 16, 16A and 16B) and the Ashford and Folkestone Railway, then continuing westwards and eastwards and terminating by a junction with Crowbridge Road at a point 60 metres west of the junction of that road with Gladstone Road;

Work No

Diversion of Boys Hall Road and Canterbury Road (E1466), including a bridge over the Ashford and Folkestone Railway in place of the existing bridge over that railway and over the railways (Works Nos. 16, 16A and 16B) and the new road (Work No. 16RR), commencing in Boys Hall Road at a point 215 metres north-east of the existing junction of Crowbridge Road with that road, passing south-westwards over Works Nos. 16, 16A and 16B, the Ashford and Folkestone Railway and Work No. 16RR on the eastern side of the existing road and terminating in Canterbury Road at a point 150 metres south-west of that existing road junction;

Work No

A road, forming in part a realignment of Crowbridge Road (D4488), commencing in that road at a point 230 metres north-west of its existing junction with Canterbury Road, passing south-eastwards under Work No. 16QQ then passing southwards, south-westwards and south-eastwards and terminating at a roundabout in the northern corner of Orbital Park, Ashford, at a point 520 metres north-west of the junction of Bad Munstereifel Road (Work No. 17A) with the access road to Orbital Park, Ashford;

Work No

A road commencing by a junction with the new road (Work No. 16QQ) at a point 40 metres north-east of the junction of Mead Road with Canterbury Road, passing south-eastwards and terminating by a junction with Work No. 16RR at a point 120 metres south-east of that road junction;

Work No

A cut, forming a diversion of the Aylesford Stream, commencing in that stream at a point 185 metres upstream from the northern side of the bridge carrying the Ashford and Folkestone Railway over that stream, passing westwards under the railways (Works Nos. 16, 16A and 16B) and terminating in that stream at a point 5 metres north of the southern side of the said bridge;

Work No

A railway (1,201 metres in length), forming sidings, commencing by a junction with the Ashford to Canterbury Railway at a point 4 metres south of the southern side of the bridge carrying Hythe Road over that railway, passing southwards, westwards then north-westwards and terminating in the Ashford Goods Yard at a point 200 metres east of the south-western side of the bridge carrying the Ashford to Folkestone Railway over the East Stour river;

Work No

A railway (100 metres in length), forming a cross-over, commencing by a junction with the railway (Work No. 16E) at a point 60 metres west of the junction of Bentley Road with Hunter Avenue and Aylesford Place, passing south-eastwards and terminating by a junction with the railway (Work No. 16A) at a point 85 metres south of that road junction;

Work No

A railway (12,300 metres in length) commencing by a junction with the railway (Work No. 16) at its termination, passing south-eastwards on the northern side of the Ashford and Folkestone Railway, under Bad Munstereifel Road (Work No. 17A) and Highfield Lane (Work No. 17C), over Blind Lane (Work No. 17D), then in tunnel beneath Church Road, Mersham for a distance of 160 metres, then passing eastwards, under Station Road, Smeeth (Work No. 17H), over Church Lane, Sellindge, (Work No. 17K), then on the southern side of the Sellindge Converter Station, under Harringe Lane (Work No. 17L), over the A20 (Ashford Road) at Sellindge (Work No. 17M) and the East Stour River west of Stone Street, Westenhanger, under the B2068 Link Road (Work No. 17P) and the A20 (Ashford Road) (Work No. 17Q) to a point alongside the western portal of the tunnel on the Ashford and Folkestone Railway beneath the access to Sandling Park, then in tunnel for a distance of 90 metres beneath that access and terminating at a point 427 metres east of the eastern portal of that tunnel at the access to Sandling Park, including bridges over Works Nos. 17D, 17K and 17M;

Work No

Realignment of Bad Munstereifel Road, including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge over that railway, commencing in that road at a point 330 metres north-east of the north-eastern abutment of the said existing bridge passing south-westwards over the two railways and terminating in that road at a point 420 metres south-west of the south-western abutment of that existing bridge;

Work No

Diversion of Highfield Lane and Church Road north of the bridge carrying Highfield Lane over the Ashford and Folkestone Railway, commencing in Church Road at a point 260 metres south of its junction with Bad Munstereifel Road, passing southwards, then eastwards on the line of Church Road to its junction with Highfield Lane, then passing north-eastwards on the line of that road to a point 120 metres north-east of that road junction, then passing eastwards and terminating by a junction with Highfield Lane (Work No. 17C) at a point 120 metres south-west of the commencement of that work;

Work No

A new road, forming a diversion of Highfield Lane and Church Road, including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge carrying Highfield Lane over that railway, commencing by a junction with Highfield Lane at a point 260 metres north-east of its existing junction with Church Road, passing westwards, then south-westwards and southwards on the eastern side of the existing road, over the two railways, and terminating by a junction with Highfield Lane at a point 40 metres south of the access from that road to The Dean;

Work No

A road for access to premises on the eastern side of Highfield Lane south of the Ashford and Folkestone Railway, commencing by a junction with the new road (Work No. 17C) at a point 100 metres north of the termination of that work, passing eastwards and terminating by a junction with the remaining part of Highfield Lane at a point 80 metres north of the access to The Dean;

Work No

Realignment of Blind Lane commencing in that road at a point 180 metres north-east of the existing bridge carrying the Ashford and Tonbridge Railway over that road, passing under that railway and the railway (Work No. 17) and terminating in Blind Lane at a point 90 metres south-west of the said existing bridge;

Work No

A tunnel over the Ashford and Folkestone Railway coterminous with the tunnel forming part of the railway (Work No. 17), beneath Church Road, Mersham (Work No. 17F);

Work No

A road, forming a diversion of Church Road, Mersham, commencing in that road at a point 240 metres south-west of its junction with Bower Road, passing south-westwards and southwards on the eastern side of the existing road, over the railway (Work No. 17) in tunnel and the Ashford and Folkestone Railway in tunnel (Work No. 17E), and terminating in Church Road at a point 190 metres north of its junction with Jemmett Lane;

Work No

A road for access to premises on the western side of Church Road, Mersham, north of the Ashford and Folkestone Railway, commencing in the remaining part of Church Road at a point opposite Bridge Cottage and terminating by a junction with Church Road (Work No. 17F) at a point 180 metres south-west of its commencement;

Work No

Diversion of the B2069 (Station Road, Smeeth), including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge carrying that road over that railway, commencing in Station Road at a point 260 metres south-west of the access to Park Wood Cottage, passing northwards on the western side of the existing road over the two railways, and terminating in Station Road at a point 130 metres north of the northern abutment of that existing bridge;

Work No

A cut, forming a diversion of a tributary of the East Stour River west of Church Lane, Sellindge, commencing in that stream at a point 130 metres east of the northern end of the culvert by which it passes under the Ashford and Folkestone Railway, passing westwards, then southwards and terminating in that stream at a point 10 metres north of the northern end of that culvert;

Work No

A cut, forming a diversion of the East Stour River, commencing in that river at a point 60 metres south-west of the southern end of the culvert by which that river passes under the Ashford and Folkestone Railway 290 metres east of Grove Bridge, passing eastwards then southwards and terminating in that river at a point 80 metres south of the southern end of the culvert by which that river passes under that railway 750 metres east of Grove Bridge;

Work No

A cut, forming a diversion of the East Stour River at Westenhanger, commencing in that river at the northern end of the culvert by which that river passes under the Ashford and Folkestone Railway west of Stone Street, passing eastwards on the northern side of the railway (Work No. 17), and terminating in that river at a point 170 metres north-east of that commencement;

Work No

A diversion of Church Lane, Sellindge, commencing in that road at a point 20 metres north of the northern side of the existing bridge carrying the Ashford and Folkestone Railway over that road, passing south-eastwards under the railway (Work No. 17) and the Ashford and Folkestone Railway and terminating in Church Lane at a point 280 metres south of the southern side of that existing bridge;

Work No

A realignment of Harringe Lane, including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge carrying that road over that railway, commencing in that road at a point 50 metres north of the northern end of the bridge carrying that road over the M20, passing southwards over the motorway and over the two railways and terminating in Harringe Lane at a point 50 metres north of the bridge carrying that road over the East Stour River;

Work No

Realignment of the A20 (Ashford Road) at Sellindge commencing in that road at the southern side of the bridge carrying the M20 over that road, passing southwards on the line of the A20, under the railway (Work No. 17) and the Ashford and Folkestone Railway, and terminating in that road at a point 50 metres south of the southern side of the bridge carrying that last-mentioned railway over that road;

Work No

A road commencing by a junction with Stone Street at a point 80 metres west of the southern end of the bridge carrying the emergency services access road over the M20 at Stanford, passing south-eastwards then eastwards on the northern side of the railway (Work No. 17), then northwards, and terminating by a junction with the roundabout at Junction 11 of the M20 at a point 70 metres west of the junction with that roundabout of the westbound slip road of the B2068 Link Road;

Work No

Realignment of the B2068 Link Road, including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge carrying that road over that railway, commencing in that road at the existing junction of that road with the roundabout at Junction 11 of the M20, passing southwards over those two railways and terminating in that road at the existing roundabout at its junction with the A20 (Ashford Road);

Work No

Diversion of the A20 (Ashford Road) at Sandling, including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge carrying that road over that railway, commencing in that road at the existing roundabout at its junction with the B2068 Link Road, passing north-eastwards over those two railways and terminating in that road at a point 220 metres north-east of the northern abutment of that existing bridge;

Work No

A railway (3,476 metres in length) commencing by a junction with the railway (Work No. 17) at its termination, passing eastwards under Sandling Road (Work No. 18H) on the northern side of the Ashford and Folkestone Railway and the northern side of the Dollands Moor Freight Yard, then under the roundabout (part of Work No. 18J) and terminating at a point on the western side of the M20 at Newington 215 metres south-west of the junction of Newington Road with the A20;

Work No

A railway (1,700 metres in length) commencing by a junction with the railway (Work No. 18A) at its termination, passing eastwards over the M20 and the A20 and an access road within the Channel Tunnel Terminal and terminating by a junction with the Eurotunnel Railway at a point 1,430 metres east of the western end of the bridge carrying that railway over the A20, including bridges over the M20, the A20 and the said access road;

Work No

A railway (4,400 metres in length) commencing by a junction with the railway (Work No. 17) at its termination, passing eastwards on the northern side of the Ashford and Folkestone Railway, under Sandling Road (Work No. 18H), then over the Saltwood Tunnel on that railway, continuing on the southern side of that railway and the Dollands Moor Freight Yard, over the railway (Work No. 18E), under the B2065 (Hythe Road) (Work No. 18J), on existing bridges over the M20 and the A20 and terminating by a junction with the Eurotunnel Railway at a point 570 metres east of the eastern end of the bridge carrying that railway over the A20, including a bridge over Work No. 18E;

Work No

A railway (1,591 metres in length) commencing by a junction with the railway (Work No. 18B) at chainage 369 metres, passing eastwards on the southern side of the railway (Work No. 18A), then south-eastwards and terminating by a junction with the northern sidings of the Dollands Moor Freight Yard at a point 370 metres east of the eastern portal of the Saltwood Tunnel;

Work No

A railway (352 metres in length) commencing by a junction with the railway (Work No. 18A) at chainage 588 metres, passing eastwards and terminating by a junction with the railway (Work No. 18C) at chainage 571 metres;

Work No

A deviation railway (2,136 metres in length), forming a diversion of the Ashford and Folkestone Railway, commencing by a junction with that railway at the eastern portal of the Saltwood Tunnel, passing eastwards under the railway (Work No. 18B) and the B2065 (Hythe Road) (Work No. 18J) and terminating by a junction with the Ashford and Folkestone Railway at a point 470 metres west of the bridge carrying Cheriton High Street over that railway;

Work No

A railway (1,423 metres in length) commencing by a junction with the railway (Work No. 18E) at chainage 150 metres, passing eastwards under the B2065 (Hythe Road) (Work No. 18J), and terminating by a junction with the Eurotunnel Railway at a point 365 metres east of the existing bridge carrying that road over the Dollands Moor Freight Yard;

Work No

A railway (1,272 metres in length) commencing by a junction with the railway (Work No. 18E) at chainage 750 metres, passing eastwards under the B2065 (Hythe Road) (Work No. 18J) and terminating by a junction with the railway (Work No. 18B) at a point 90 metres east of the western end of the bridge carrying that railway over the M20;

Work No

Realignment of Sandling Road, including a bridge over the railways (Works Nos. 18A and 18B), commencing in that road at the bridge carrying that road over the Ashford and Folkestone Railway, passing north-westwards over those railways and terminating in Sandling Road at a point 140 metres south-east of the junction of that road with the A20 (Ashford Road), including a bridge over Works Nos. 18A and 18B;

Work No

Realignment of the B2065 (Hythe Road), including a roundabout at the junction of that road with the exit slip road from the Channel Tunnel Terminal (Work No. 18K) and bridges carrying that roundabout over the railway (Work No. 18A), commencing in the B2065 at a point 183 metres south of the centre of the roundabout at the Beechborough Cross Roads, passing southwards over Work No. 18A, then on viaduct over Dollands Moor Freight Yard and over the railways (Works Nos. 18B, 18E, 18F and 18G) and terminating in the B2065 at a point 215 metres north of its junction with the bridleway HE 260, including the said roundabout bridges and viaduct;

Work No

A road commencing by a junction with the north-eastern side of the roundabout (part of Work No. 18J), passing north-eastwards and eastwards and terminating by a junction with the exit slip road from the Channel Tunnel Terminal at a point 250 metres from the western end of the bridge carrying that road over the M20;

Work No

A railway (1,050 metres in length), forming a diversion of the northbound track of the West London Line between North Pole Junction and Kensington Olympia, commencing by a junction with that railway at a point 25 metres south-east of the bridge over that railway beneath Westway west of the junction of that road with West Cross Route, passing south-eastwards on the western side of that railway under the bridge carrying the Hammersmith and City Line of the London Underground over that railway and terminating by a junction with the West London Line at a point 170 metres north of the northern portal of the tunnel in which that railway passes beneath the junction of West Cross Route with Holland Park Avenue, Shepherds Bush Green and the Uxbridge Road;

Work No

A railway (715 metres in length), forming a siding of the West London Line, commencing by a junction with the railway (Work No. 19) at its commencement, passing south-eastwards on the eastern side of that railway, under the bridge carrying the Hammersmith and City Line of the London Underground over that railway and terminating at a point 258 metres south of the southern side of the said railway bridge;

Work No

A railway (1,111 metres in length), forming sidings of the Gravesend and Higham Railway at Hoo Junction, commencing by a junction with that railway on the eastern side of the Queens Farm Road level crossing on that railway, passing eastwards on the northern side of that railway, then north-eastwards on the southern side of the Grain Branch of that railway and terminating at a point 120 metres south of the south-western abutment of the bridge carrying that railway over the former Thames and Medway Canal;

Work No

A railway (827 metres in length), forming sidings of the Gravesend and Higham Railway at Hoo Junction, commencing by a junction with that railway on the eastern side of the Queens Farm Road level crossing on that railway, passing eastwards then south-eastwards on the southern side of that railway and terminating at the eastern end of the existing siding of that railway, including railway sidings;

Work No

A railway (1,139 metres in length), forming sidings at the Richborough Power Station at Stonelees, commencing by a junction with the Margate and Dover Railway at a point 530 metres north-west of the north-western abutment of the bridge carrying that railway over the River Stour, passing south-eastwards and terminating at a point 470 metres west of the north-western end of the culvert carrying the A256 (Ramsgate Road) over Minster Stream, including railway sidings.

The Table — Buildings Authorised to be Demolished

The Table — Buildings Authorised to be Extended and Altered

Ancient monuments etc.

Work No

Improvement of the A2 between its junction with Halfpence Lane (C492) and its junction with the M2 at Junction 1, comprising—

Work No

Improvement and realignment of the eastbound carriageway of the A2 commencing at a point 115 metres east of the bridge carrying Brewers Road over that road, passing eastwards and terminating at a point 100 metres west of the bridge carrying the westbound slip road of the A2 over the M2 at Junction 1;

Work No

Improvement and realignment of the westbound carriageway of the A2 commencing at a point 340 metres west of the said bridge carrying Brewers Road over that road, passing eastwards and terminating at a point 220 metres west of the bridge carrying the said westbound slip road over that road;

Work No

Improvement of the junction of Halfpence Lane (C492) and Brewers Road with the A2 at Cobham Junction, comprising—

Work No

A road, forming an entry slip road to the eastbound carriageway of the A2 (Work No. 31A), commencing by a junction with Brewers Road at a point 150 metres north-east of the north-eastern abutment of the bridge carrying that road over the A2, passing southwards and terminating by a junction with that carriageway at a point 410 metres east of that bridge;

Work No

A road, forming an exit slip road from the westbound carriageway of the A2 (Work No. 31B), commencing by a junction with the C492 at a point 150 metres south-west of the existing junction of Brewers Road with that road, passing northwards, then north-eastwards over the railway (Work No. 12) in tunnel, and terminating by a junction with that carriageway at a point 20 metres west of the said bridge over the A2, including a roundabout at the junction of the slip road with Brewers Road (Work No. 32C);

Work No

A road, forming an entry slip road to the westbound carriageway of the A2 from the C492 commencing at a point 30 metres south-east of that carriageway, passing southwards over the railway (Work No. 12), passing eastwards through the roundabout (part of Work No. 32B) along Brewers Road and terminating at a point 160 metres west of the said roundabout, including a bridge over Work No. 12;

Work No

Improvement of the M2 between Junction 1 and Junction 2, comprising—

Work No

Improvement and realignment of the M2 to form the eastbound carriageway of the motorway, commencing by a junction with Work No. 31A at its termination, passing south-eastwards under the A2 (Work No. 35A) at Junction 1 of the M2, over the existing subway by which footpath NS 183 passes under the M2, then over the road (Work No. 36E) and under Rochester Road (Work No. 36F) and the cycle track (Work No. 36G), over the London and Chatham Railway and terminating on the existing bridge carrying the M2 over that railway at a point 20 metres south-east of that railway, including a bridge over Work No. 36E;

Work No

A road, forming the westbound carriageway of the M2, commencing by a junction with Work No. 31B at its termination, passing south-eastwards under the A2 (Work No. 35A) at Junction 1 of the M2, over footpath NS 183, then over Work No. 36E and under Work No. 36F and Work No. 36G, over the London and Chatham railway and terminating at a point 180 metres south-east of that railway, including bridges over Work No. 36E and the said railway and extension of the subway for the footpath NS 183;

Work No

Improvement of Junction 1 of the M2 comprising—

Work No

A road, forming the exit slip road from the eastbound carriageway of the A2, commencing by a junction with that carriageway (Work No. 31A) at a point 210 metres west of the existing bridge carrying the footpath between Park Pale and the Rochester and Cobham Park Golf Course, passing eastwards and terminating in the A2 at a point 20 metres east of the junction of Crutches Lane with that road;

Work No

A road, forming the entry slip road to the eastbound carriageway of the M2, commencing at a point on the northern side of Old Watling Street 270 metres east of its junction with Bowesden Lane and terminating in the M2 (Work No. 33A) at a point 30 metres north-west of the bridge carrying the A2 (Work No. 35A) over the M2;

Work No

A road, forming the exit slip road from the westbound carriageway of the M2, commencing in the intended eastbound entry slip road to the Wainscott Northern Bypass at a point 435 metres east of the bridge carrying the said footpath between Park Pale and the Rochester and Cobham Park Golf Course over the M2 and terminating in the M2 (Work No.33B) at a point 190 metres from that commencement;

Work No

Roads between the junction of the A2 and Halfpence Lane (C492) and Junction 1 of the M2, comprising—

Work No

Diversion of the A2 at Junction 1 commencing in the westbound carriageway of the A2 (Work No. 31B) at a point 660 metres east of the existing bridge carrying Brewers Road over the A2, passing eastwards on the southern side of the A2, then north-eastwards over the M2 (Works Nos. 33A and 33B) on the northern side of the existing bridge carrying the westbound slip road from the A2 over the M2, continuing eastwards and terminating in the westbound carriageway of the A2 at a point 20 metres east of the junction of Crutches Lane with that road, including bridges over Works Nos. 33A and 33B;

Work No

A road, forming a diversion of the access road to the Colewood Reservoirs of Southern Water Services Limited, commencing by a junction with the new road (Work No. 35A) at a point 230 metres west of the junction of the existing access road with the A2, passing southwards then eastwards and terminating by a junction with the existing access on the northern side of those reservoirs;

Work No

Improvement of Junction 2 of the M2, comprising—

Work No

A road, forming the exit slip road from the eastbound carriageway of the M2 (Work No. 33A) at Junction 2, commencing by a junction with that carriageway at a point 550 metres north-west of the existing subway by which the footpath RS 203 passes under the M2, passing south-eastwards and terminating at the eastern junction roundabout (part of Work No. 36E);

Work No

A road, forming the entry slip road to the eastbound carriageway of the M2 (Work No. 33A) at Junction 2, commencing at the said eastern junction roundabout (part of Work No. 36E), passing southwards under Rochester Road (Work No. 36F) and the cycle track (Work No. 36G), over the London and Chatham Railway and terminating by a junction with Work No. 33A at its termination;

Work No

A road, forming the entry slip road on to the westbound carriageway of the M2 (Work No. 33B) at Junction 2, commencing by a junction with that carriageway at a point 590 metres north-west of the southern end of the said existing subway, passing south-eastwards under the railway (Work No. 13) and terminating at the western junction roundabout (part of Work No. 36E);

Work No

A road, forming the exit slip road from the westbound carriageway of the M2 (Work No. 33B) at Junction 2, commencing at the western junction roundabout (part of Work No. 36E), passing south-eastwards under the railway (Work No. 13), under Rochester Road (Work No. 36F) and the cycle track (Work No. 36G) and over the London and Chatham Railway and terminating by a junction with the westbound carriageway (Work No. 37B) at a point 160 metres south-east of that railway, including a bridge over the London and Chatham Railway;

Work No

A road, forming dual carriageways, commencing by junctions with Work No. 36A at its termination and Work No. 36B at its commencement at the eastern junction roundabout, the centre of which is at a point 180 metres south of the junction of Bootham Close with Rushdean Road, passing south-westwards under the M2 (Works Nos. 33A and 33B) and the railway (Work No. 13) to junctions with Work No. 36C at its termination and Work No. 36D at its commencement at the western junction roundabout, the centre of which is at a point 355 metres south-west of the junction of Bootham Close with Rushdean Road, then passing southwards and terminating by a junction with the A228 (Rochester Road) (Work No.38F) at a roundabout, the centre of which is at a point 190 metres north-east of the northern end of the existing bridge carrying the A228 over the London and Chatham Railway, including those roundabouts;

Work No

A road, being a diversion of the A228, commencing in that road at the northern end of the said bridge carrying that road over the London and Chatham Railway, passing north-eastwards over the cycle track (Work No. 36H) to the roundabout (part of Work No. 36E), then north-eastwards over the railway (Work No. 13) and the M2 (Works Nos. 36B, 33A, 33B and 36D), over the cycle track (Work No. 36J) and terminating in the A228 at a point 30 metres south-west of the junction of Roman Way with that road, including bridges over Works Nos. 13, 33A, 33B, 36B, 36D 36H and 36J;

Work No

A cycle track on the southern side of the A228 (Work No. 36F) commencing by a junction with that work at a point 45 metres north-east of its commencement, passing north-eastwards on the eastern side of Work No. 36F to a junction with the cycle track (Work No. 36H), then over Work No. 13, the M2 and Work No. 36J and terminating by a junction with the A228 at a point 370 metres south-west of the termination of Work No. 36F;

Work No

A cycle track commencing by a junction with the A228 (Work No. 36F) at a point 60 metres north-east of its commencement, passing northwards then eastwards and south-eastwards under the A228 and terminating by a junction with Work No. 36G at a point 90 metres north-east of the commencement of that work;

Work No

A cycle track commencing by a junction with the A228 (Work No. 36F) at a point 370 metres south-west of its termination, passing westwards then southwards under the A228 and terminating by a junction with the cycle track (Work No. 36K) at a point 180 metres north-east of the termination of that work;

Work No

Realignment and improvement of the cycle track between the A228 and the bridge carrying the M2 over the River Medway, commencing by a junction with the cycle track (Work No. 36G) at a point 45 metres south-west of its termination, passing southwards to a junction with the cycle track (Work No. 36J), then south-westwards and south-eastwards and terminating by a junction with the existing cycle track at a point 5 metres south-east of the western abutment of the bridge carrying the M2 over the London and Chatham Railway;

Work No

Improvement of the M2 between Junctions 2 and 3, comprising—

Work No

Improvement and realignment of the M2 to form the eastbound carriageway of the motorway, commencing by a junction with Work No. 33A at its termination, passing south-eastwards on the existing viaduct over the Strood and Maidstone Railway and the River Medway, then over Wouldham Road (Work No. 38B) and under Work No. 38F, then continuing south-eastwards to Junction 3 (Work No. 39), under the A229 (Work No. 40A) east of Buckmore Park, the new roundabout (Work No. 39E) and Robin Hood Lane (Work No. 41C) and over footpath MR 440 and terminating at a point 145 metres south-west of the junction of Woodbury Road with Walderslade Woods, including a bridge over Work No. 38B;

Work No

A road, forming the westbound carriageway of the M2, commencing by a junction with Work No. 33B at its termination, passing south-eastwards on viaduct over the Strood and Maidstone Railway and the River Medway, then over Work No. 38B and under Work No. 38F, then continuing south-eastwards to Junction 3 (Work No. 39), under Works Nos. 40A, 39E and 41C and over footpath MR 440 and terminating at a point 205 metres south of the junction of Woodbury Road with Walderslade Woods, including the said viaduct and a bridge over Work No. 38B and extension of the underpass for the said footpath;

Work No

Roads between Junctions 2 and 3 of the M2, comprising—

Work No

A road, for construction purposes, commencing at a point 300 metres north-west of the western abutment of the bridge carrying the M2 over Wouldham Road (Work No. 38B), passing south-eastwards on the northern side of Work No. 37A and terminating by a junction with Work No. 38B at a point 30 metres north-west of the M2 eastbound carriageway;

Work No

Realignment of Wouldham Road commencing in that road at a point 20 metres north-east of the northern side of the existing bridge carrying the M2 over that road, passing south-westwards under Works Nos. 37A and 37B and terminating in Wouldham Road at a point 35 metres north-east of the junction of Burham Road with that road;

Work No

A road, forming a diversion of Nashenden Farm Lane and the access to Waterworks Cottages, commencing by a junction with Wouldham Road (Work No. 38B) at a point 110 metres south-west of its commencement, passing south-eastwards on the southern side of the M2 to a junction with Nashenden Farm Lane at a point 65 metres north-east of the access to Nashenden Farm Cottages, continuing southwards and terminating at a point 20 metres south-east of the entrance to Waterworks Cottages;

Work No

A road, for construction purposes, forming a diversion of the access to Nashenden Farm and Borstal Court Farm, commencing in Burham Road (Work No. 13B) at a point 100 metres south-east of the commencement of that work, passing eastwards, then south-eastwards on the southern side of Work No. 38C and terminating by a junction with the new road (Work No. 38C) at a point 225 metres from the commencement of that work;

Work No

A road, forming a diversion of the access track from the Roman Burial grounds to Stony Lane, commencing at a point 30 metres north of the existing bridge carrying that track over the M2, passing south-eastwards and terminating by a junction with Stony Lane (Work No. 38F) at a point 325 metres from its commencement;

Work No

A road, forming a diversion of bridleway MR11 (Stony Lane) commencing in Maidstone Road at its junction with Stony Lane, passing south-westwards and north-westwards, then south-westwards over the M2 (Works Nos. 37A and 37B), then southwards and terminating by a junction with the new access road (Work No. 13C) at a point 340 metres north-west of the western end of the subway by which Stony Lane passes under the M2, including a bridge over Works Nos. 37A and 37B;

Work No

Improvements of the M2 at Junction 3, comprising—

Work No

Realignment of the exit slip road from the eastbound carriageway of the M2 (Work No. 37A), commencing by a junction with Work No. 37A at a point 185 metres south of the access from Rochester Road to the caravan site on the south side of Rochester Airport, passing south-eastwards under the A229 (Work No. 40A) and terminating at the north-eastern end of the roundabout (Work No. 39E);

Work No

Realignment of the entry slip road to the eastbound carriageway of the M2 (Work No. 37A), commencing at the north-eastern end of the roundabout (Work No. 39E), passing southwards under Robin Hood Lane (Work No. 41C), over footpath MR 440 and terminating by a junction with Work No.37A at a point 145 metres south-west of the junction of Woodbury Road with Walderslade Woods;

Work No

A road, forming the entry slip road to the westbound carriageway of the M2 (Work No. 37B), commencing by a junction with Work No. 37B at a point 230 metres south of the access from Rochester Road to the said caravan site, passing south-eastwards under the A229 (Work No. 40A) and terminating at the south-western end of the roundabout (Work No. 39E);

Work No

A road, forming the exit slip road from the westbound carriageway of the M2 (Work No. 37B), commencing at the south-western end of the roundabout (Work No. 39E), passing south-eastwards under Robin Hood Lane (Work No. 41C), over footpath MR 440 and terminating by a junction with Work No. 37B at a point 205 metres west of the junction of Woodbury Road with Walderslade Woods;

Work No

Improvement of the Taddington Wood Loop Junction, forming a new roundabout over the M2 (Works Nos. 37A and 37B) including two bridges over those works;

Work No

A road commencing at the north-eastern end of the roundabout (Work No. 39E), passing eastwards and terminating by a junction with Walderslade Woods (Work No. 39G) at the Walderslade Woods Roundabout, the centre of which is 160 metres south of the junction of Hurst Hill with Taddington Wood Lane, including the said Walderslade Woods Roundabout;

Work No

Realignment of Walderslade Woods, forming dual carriageways, commencing at a point 140 metres south-east of the junction of that road with Taddington Wood Lane, passing south-eastwards to the roundabout (part of Work No. 39F) then continuing south-eastwards and terminating in Walderslade Woods at a point 310 metres from that commencement;

Work No

A road, forming dual carriageways, commencing at the south-western end of the roundabout (Work No. 39E), passing westwards and north-westwards and terminating by a junction with the A229 at the roundabout (Work No. 40N);

Work No

Realignment of Maidstone Road to form a junction with the new road (Work No. 39H) at Blue Bell Hill, commencing in that road at a point 40 metres north-west of its existing junction with Victoria Close, passing south-eastwards, then southwards to the junction with Work No. 39H, then continuing southwards and south-westwards and terminating in Maidstone Road at a point 120 metres north of its junction with Robin Hood Lane;

Work No

Improvements of the A229 at Junction 3 of the M2, comprising—

Work No

Improvement and realignment of the A229 (Maidstone Road), forming dual carriageways, commencing at a point 345 metres north of the existing Bridgewood Roundabout at the junction of that road with Walderslade Woods and Rochester Road, passing southwards over the new roundabout at that road junction (Work No. 40F), the M2 (Works Nos. 37A, 37B, 39A and 39C), then under the roundabout (Work No. 40N) and terminating at a point 10 metres north of the bridge carrying Common Road over the A229, including bridges over Works Nos. 40F, 37A, 37B, 39A and 39C;

Work No

A road, forming the southbound exit slip road from the A229 (Work No. 40A), commencing by a junction with that road at a point 280 metres north of the existing Bridgewood Roundabout, passing southwards and terminating at the eastern end of the roundabout (Work No. 40F);

Work No

A road, forming the southbound entry slip road to the A229 (Work No. 40A), commencing at the eastern end of the roundabout (Work No. 40F), passing southwards and terminating by a junction with Work No. 40A at a point 145 metres south of the existing Bridgewood Roundabout;

Work No

A road, forming the northbound entry slip road to the A229 (Work No. 40A), commencing by a junction with that road at a point 280 metres north of the said existing Bridgewood Roundabout, passing southwards and terminating at the western end of the roundabout (Work No. 40F);

Work No

A road, forming the northbound exit slip road from the A229 (Work No. 40A), commencing at the western end of the roundabout (Work No. 40F), passing southwards and terminating by a junction with Work No. 40A at a point 145 metres south of the existing Bridgewood Roundabout;

Work No

A roundabout (the Bridgewood Roundabout) at the junction of Walderslade Woods, Rochester Road and the A229;

Work No

Realignment of Rochester Road commencing in that road at a point 160 metres north-west of its junction with the A229 at the existing Bridgewood Roundabout, passing south-eastwards and terminating at the western end of the roundabout (Work No. 40F);

Work No

Improvement and realignment of Walderslade Woods forming dual carriageways, commencing at the eastern end of the roundabout (Work No. 40F), passing eastwards and terminating in Walderslade Woods at a point 100 metres east of that commencement;

Work No

A road, forming the southbound exit slip road from the A229 (Work No. 40A), commencing by a junction with that road at a point 270 metres north of the intended Lord Lees Roundabout (Work No. 40N), passing southwards and terminating at the eastern end of that roundabout;

Work No

A road, forming the southbound entry slip road to the A229 (Work No. 40A), commencing at the eastern end of the intended Lord Lees Roundabout (Work No. 40N), passing southwards and terminating by a junction with Work No. 40A at a point 80 metres north-west of the bridge carrying Common Road over the A229;

Work No

A road, forming the northbound entry slip road to the A229 (Work No. 40A), commencing by a junction with that road at a point 300 metres north of the intended Lord Lees Roundabout (Work No. 40N), passing southwards and terminating at the western end of that roundabout;

Work No

A road, forming the northbound exit slip road from the A229 (Work No. 40A), commencing at the western end of the Roundabout (Work No. 40N), passing southwards and terminating by a junction with Work No. 40A at a point 70 metres north-east of the bridge carrying Common Road over the A229;

Work No

A roundabout (Lord Lees Roundabout) over the A229 (Work No. 40A) at Blue Bell Hill, including two bridges over Work No. 40A;

Work No

A road, forming an access road to the Buckmore Park Activity Centre and an access way for cycles and pedestrians at Shall Hook Wood, commencing in the existing access road at a point 250 metres north of the centre of the existing Lord Lees Roundabout, passing southwards and south-westwards on the western side of the slip road (Work No. 40L) and terminating at the western end of the roundabout (Work No. 40N);

Work No

A road, forming an access road to the premises known as Nil Desperandum, commencing by a junction with the access road (Work No. 40P) at a point 40 metres west of the termination of that work, passing north-eastwards and terminating in the curtilage of those premises;

Work No

An access way to land on the northern side of the Common Road Sports Ground, commencing by a junction with the access way (Work No. 40S) at a point 90 metres north of the termination of that work, passing southwards on the western side of that work and Work No. 40M and terminating in the existing access way at a point 30 metres north of the said land;

Work No

A road, forming an access way for cycles and pedestrians, commencing by a junction with the access road (Work No. 40P) at a point 30 metres from the termination of that work, passing southwards and south-eastwards and terminating by a junction with the slip road (Work No. 40M) at a point 250 metres from the termination of that work;

Work No

Associated works connected with improvements at Junction 3 of the M2, comprising—

Work No

A road, forming a southern extension of Hallsfield Road, commencing at a point 30 metres east of the western end of that road east of Maidstone Road, passing westwards, then southwards and terminating at a point 260 metres south of that commencement;

Work No

Realignment of Hallsfield Road commencing at a point 30 metres west of the junction of that road with Sadlers Close and terminating in Hallsfield Road at a point 95 metres north-west of that road junction;

Work No

Realignment of Robin Hood Lane commencing at a point 60 metres west of the existing junction of that road with the access road to the Medway Crematorium, passing eastwards over the M2 (Works Nos. 37A and 37B) and terminating at a point 180 metres east of that commencement, including a bridge over Works Nos. 37A, 37B, 39B and 39D;

Work No

Diversion of the said access road to the Medway Crematorium, commencing by a junction with Robin Hood Lane (Work No. 41C) at a point 15 metres west of its existing junction with that road and terminating in that access road at a point 80 metres south of that commencement;

Work No

Improvement of the M2 between Junctions 3 and 4, comprising —

Work No

Improvement and realignment of the M2, to form the eastbound carriageway of that motorway, commencing by a junction with Work No. 37A at its termination, passing under the footpath KH 32 (Work No. 45), over Harp Farm Road (Work No. 43A), and under Lidsing Road and Forge Lane (Works Nos. 43C and 43E) and under Maidstone Road, then passing to Junction 4 (Work No. 44) and terminating at a point 190 metres east of the easternmost bridge at that Junction carrying the A278 (Hoath Way) over the M2, including a bridge over Harp Farm Road;

Work No

A road forming the westbound carriageway of the M2, being in part a new road and in part improvement and realignment of the existing westbound carriageway, commencing by a junction with Work No. 37B at its termination, passing over Work No. 43A, under Works Nos. 43C, 43E and 45 and under Maidstone Road, then passing to Junction 4 (Work No. 44) and terminating at a point 190 metres east of the said bridge over the M2, including a bridge over Harp Farm Road;

Work No

Roads between Junctions 3 and 4, comprising—

Work No

Realignment of Harp Farm Road, commencing at a point 65 metres south of the centre of the roundabout at its junction with Walderslade Woods, passing southwards under the M2 (Works Nos. 42A and 42B) and terminating at a point 50 metres south-west of its existing junction with Yelsted Lane;

Work No

A road, forming a diversion of Yelsted Lane, commencing by a junction with Harp Farm Road (Work No. 43A) at a point 10 metres south of its existing junction with that road, passing eastwards on the southern side of the M2 (Work No. 42B) and terminating in Yelsted Lane at a point 345 metres east of that commencement;

Work No

Realignment of Lidsing Road commencing at a point 260 metres south of the southern end of the existing bridge carrying that road over the M2, passing northwards over the M2 (Works Nos. 42A and 42B) and terminating at a point 70 metres south of the junction of that road with Westfield Sole Road and Blind Lane, including a new bridge over Works Nos. 42A and 42B;

Work No

Realignment of an existing track between Blind Lane and Forge Lane on the northern side of the M2 (Work No. 42A), commencing at a point 370 metres north-east of the junction of that track with Blind Lane, passing north-eastwards on the northern side of the existing track then northwards and terminating by a junction with Forge Lane (Work No. 43E) at a point 260 metres south-east of its junction with Chapel Lane;

Work No

Realignment of Forge Lane commencing at its junction with Chapel Lane, passing south-eastwards over the M2 (Works Nos. 42A and 42B) and terminating at a point 40 metres south-east of the junction of Forge Lane with Blind Lane on the southern side of the motorway, including a bridge over the M2;

Work No

Improvement of Junction 4 of the M2, comprising —

Work No

Realignment of the exit slip road from the eastbound carriageway of the M2 (Work No. 42A), commencing by a junction with Work No. 42A at a point 390 metres north-east of the existing bridge carrying Forge Lane over the M2, passing under Maidstone Road and terminating at the northern end of the roundabout over the M2 at Junction 4;

Work No

Realignment of the entry slip road to the westbound carriageway of the M2 (Work No. 42B) commencing by a junction with Work No. 42B at a point 155 metres north-east of the said bridge carrying Forge Lane over the M2, passing under Maidstone Road and terminating at the southern end of the roundabout over the M2 at Junction 4.

Work No

Realignment of footpath KH 32, commencing at a point 12 metres south of the southern end of the footbridge carrying footpath KH 32A over Walderslade Wood, passing southwards over the M2 (Works Nos. 42A and 42B) on the eastern side of the existing bridge carrying that footpath over the M2 and terminating at a point 30 metres south of the southern end of that existing bridge, including a bridge over Works Nos. 42A and 42B;

Work No

A cycle track commencing by a junction with the existing cycle track on the western side of the A229 (Maidstone Road) at a point 190 metres north of the centre of the Bridgewood Roundabout, passing westwards and terminating at a point on the eastern side of Rochester Road 200 metres west of the centre of that roundabout.

Editorial notes

[^c1251921]: Act: transfer of functions (26.1.1998) by S.I. 1997/2971, art. 3(3)(b)(4)(5)

[^c1251922]: Act: transfer of rights and obligations (19.2.1999) by S.I. 1999/391, art. 4(2)(4)(6)

[^c1251923]: Act: S.I. 2001/1451 to be construed as one with this Act (22.3.2001) by virtue of art. 15(2) of that S.I.

[^c1251924]: Act wholly in force; Act mainly in force at Royal Assent but see ss. 40, 41, 46 for retrospective in-force dates

[^c1251925]: Power conferred by s. 1 to ceased to have effect (19.2.1999) by S.I. 1999/537, art. 16

[^c1251926]: 1981 c. 67.

[^c1251927]: 1965 c. 56.

[^c1251929]: 1961 c. 33.

[^c1251930]: 1990 c. 8.

[^c1251931]: S. 8 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8 S. 8 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a) S. 8 applied (with modifications) (12.8.2002) by S.I. 2002/1943, art. 15(1)(a)

[^c1251932]: S. 9(1) excluded (17.2.1999) by S.I. 1999/107, reg. 3

[^c1251933]: S.I. 1995/418.

[^c1251934]: 1990 c. 8.

[^c1251936]: Words in s. s. 11(1) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 26(a)

[^c1251937]: Words in s. 11(3)(a) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 26(b)

[^c1251938]: 1990 c. 8.

[^c1251939]: Definition in s. 11(6) repealed (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 26(c)

[^c1251940]: S. 14 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)

[^c1251941]: 1993 c. 43.

[^c1251942]: S. 16 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)

[^c1251943]: 1993 c. 43.

[^c1251944]: S. 17 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)

[^c1251945]: 1993 c. 43.

[^c1251946]: S. 18 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)

[^c1251949]: S. 19 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)

[^c1251950]: Words in s. 19(2)(5)(6) substituted (1.2.2001 subject to transitional provision in Sch. 2 Pt. II of the commencing S.I.) by 2000 c. 38, s. 215, Sch. 16 para. 56; S.I. 2001/57, art. 3, Sch. 2 Pt. I

[^c1251955]: 1986 c. 45.

[^c1251956]: 1993 c. 43.

[^c1251958]: S. 21 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)

[^c1251959]: 1993 c. 43.

[^c1251960]: Words in s. 21(6) and subsection (7) inserted (1.3.2000) by 1998 c. 41, ss. 54, 66(5), Sch. 10 Pt. IV para. 16(2) (with s. 73); S.I. 2000/344, art. 2

[^c1251968]: S. 22 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)

[^c1251983]: S. 23 repealed (1.3.2000) by S.I. 2000/311, art. 31(2)

[^c1251992]: S. 25 repealed (1.3.2000) by S.I. 2000/311, art. 31(2)

[^c1252005]: S. 27 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8 S. 27 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)

[^c1252006]: S. 28 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8 S. 28 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)

[^c1252007]: 1990 c. 8.

[^c1252017]: S. 29 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8 S. 29 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(a), 4(1)

[^c1252018]: 1974 c. 40.

[^c1252019]: S. 29(4) transfer of functions (13.8.2001) by S.I. 2001/2568, art. 5

[^c1252020]: Words in s. 29(4) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(2)

[^c1252021]: Words in s. 29(4) substituted (25.11.2002) by S.I. 2002/2626, art. 20, Sch. 2 para. 21(2)

[^c1252023]: S. 30 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8 S. 30 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)

[^c1252024]: 1990 c. 43.

[^c1252025]: S. 34 applied (19.2.1999) by S.I. 1999/537, art. 15(2)

[^c1252026]: Power conferred by s. 34(1) and (5) exercised (19.2.1999) by S.I. 1999/391

[^c1252027]: 1993 c. 43.

[^c1252028]: 1965 c. 56.

[^c1252029]: S. 37 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)

[^c1252030]: S. 39 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)

[^c1252031]: S. 40 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)

[^c1252032]: 1989 c. 34.

[^c1252033]: 1992 c. 42.

[^c1252034]: S. 42A inserted (1.2.2001 Subject to transitional provision in Sch. 2 Pt. II of the commencing S.I.) by 2000 c. 38, s. 252, Sch. 27 para. 55; S.I. 2001/57, art. 3, Sch. 2 Pt. I

[^c1252035]: S. 43 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8 S. 43 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(a), 4(2) S. 43 applied (12.8.2002) by S.I. 2002/1943, art. 15(3)

[^c1252036]: Words in s. 43(2) repealed (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 28

[^c1252037]: 1980 c. 66.

[^c1252038]: 1984 c. 27.

[^c1252039]: 1965 c. 56.

[^c1252040]: 1981 c. 67.

[^c1252041]: 1981 c. 66.

[^c1252042]: 1845 c. 18.

[^c1252043]: 1990 c. 8.

[^c1252044]: 1961 c. 33.

[^c1252045]: 1965 c. 56.

[^c1252046]: 1981 c. 66.

[^c1252047]: 1980 c. 66.

[^c1252048]: 1973 c. 26.

[^c1252049]: 1990 c. 8.

[^c1252050]: 1973 c. 26.

[^c1252058]: S. 50 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)

[^c1252059]: 1989 c. 29.

[^c1252060]: Words in s. 50(5)(b) substituted (25.11.2002) by S.I. 2002/2626, art. 20, Sch. 2 para. 21(3)

[^c1252061]: 1990 c. 8.

[^c1252062]: 1965 c. 56.

[^c1252063]: S. 54 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8 S. 54 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a) S. 54 applied (12.8.2002) by S.I. 2002/1943, art. 15(4)

[^c1252064]: 1978 c. 30.

[^c1252065]: 1978 c. 30.

[^c1252066]: 1972 c. 70.

[^c1252067]: 1980 c. 66.

[^c1252068]: 1981 c. 67.

[^c1252069]: Sch. 2 para. 4 applied (with modification) (12.8.2002) by S.I. 2002/1943, art. 15(1)(b)

[^c1252070]: Sch. 2 para. 6 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(b), 5

[^c1252071]: 1981 c. 67.

[^c1252072]: Sch. 2 para. 7 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(b), 5

[^c1252073]: 1981 c. 67.

[^c1252074]: Sch. 2 para. 8 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(b), 5

[^c1252075]: 1961 c. 33.

[^c1252076]: 1845 c. 20.

[^c1252077]: 1965 c. 56.

[^c1252078]: Sch. 2 para. 9 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1) Sch. 3 paras. 1-8 Sch. 2 para. 9 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(b), 5 Sch. 2 para. 9 applied (with modification) (12.8.2002) by S.I. 2002/1943, art. 15(1)(b)

[^c1252079]: 1991 c. 57.

[^c1252080]: 1964 c. 40.

[^c1252081]: Sch. 2 para. 10 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8 Sch. 2 para. 10 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(b) Sch. 2 para. 10 applied (with modification) (12.8.2002) by S.I. 2002/1943, art. 15(1)(b)

[^c1252082]: 1961 c. 33.

[^c1252083]: Power conferred by Sch. 3 para. 1 ceased to have effect (19.2.1999) by S.I. 1999/537, art. 16

[^c1899186]: Sch. 3 para. 2 transfer of functions (13.8.2001) by S.I. 2001/2568, art. 5

[^c1899097]: Words in Sch. 3 para. 2(2) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(a)

[^c1899098]: Words in Sch. 3 para. 2(3) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(b)

[^c1899099]: Words in Sch. 3 para. 2(3) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(b)

[^c1899140]: Words in Sch. 3 para. 2(4) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(c)

[^c1899145]: Words in Sch. 3 para. 2(4) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(c)

[^c1899150]: Words in Sch. 3 para. 2(8) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(d)

[^c1899153]: Words in Sch. 3 para. 2(8) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(d)

[^c1899154]: Words in Sch. 3 para. 2(9) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(e)

[^c1899155]: Words in Sch. 3 para. 2(9) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(e)

[^c1899158]: Words in Sch. 3 para. 2(9) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(e)

[^c1899163]: Words in Sch. 3 para. 2(9) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(e)

[^c1899168]: 1985 c. 51.

[^c1899177]: Words in Sch. 3 para. 2(11) inserted (3.7.2000) by 1999 c. 29, s. 328(8), Sch. 29 Pt. I para. 61 (with Sch. 12 para. 9(1)); S.I. 2000/1094, art. 4(h)

[^c1899173]: 1988 c. 50.

[^c1899241]: Sch. 3 para. 2(12) inserted (13.8.2001) by S.I. 2001/2568, Sch. para. 15(4)(f)

[^c1899295]: Sch. 3 para. 3(1)(a)(2)(3) applied with modifications (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8

[^c1899296]: Sch. 3 para. 3(1)(a)(2)(3) applied with modifications (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8

[^c1899297]: Sch. 3 para. 3(1)(a)(2)(3) applied with modifications (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8

[^c1899298]: 1961 c. 33.

[^c1899299]: 1981 c. 67.

[^c1899304]: 1961 c. 33.

[^c1899305]: Sch. 3 para. 5 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8 Sch. 3 para. 5 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(c), 3(2)

[^c1899306]: Sch. 3 para. 6 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8 Sch. 3 para. 6 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(c), 3(3)

[^c1899307]: Sch. 3 para. 7 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8 Sch. 3 para. 7 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(c)

[^c1899308]: 1991 c. 22.

[^c1899329]: Sch. 3 para. 8 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8 Sch. 3 para. 8 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(c)

[^c1899330]: 1980 c. 66.

[^c1899331]: Sch. 3 para. 9 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8 Sch. 3 para. 9 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(c)

[^c1899332]: Sch. 3 para. 10 applied (with modifications) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8 Sch. 3 para. 10 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(c)

[^c1899333]: Sch. 3 para. 11 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8 Sch. 3 para. 11 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(c)

[^c1899334]: 1991 c. 22.

[^c1899335]: Sch. 3 para. 12 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8 Sch. 3 para. 12 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(c)

[^c1899336]: 1845 c. 20.

[^c1899337]: Sch. 3 para. 13 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8 Sch. 3 para. 13 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(c)

[^c1899338]: 1968 c. 73.

[^c1899339]: Sch. 3 para. 14 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8 Sch. 3 para. 14 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(c), 3(4)

[^c1252152]: 1845 c. 18.

[^c1252153]: 1965 c. 56.

[^c1252154]: 1981 c. 67.

[^c1252155]: 1981 c. 66.

[^c1252156]: 1981 c. 67.

[^c1252157]: 1965 c. 56.

[^c1252158]: 1965 c. 56.

[^c1252159]: 1965 c. 56.

[^c1252160]: 1973 c. 26.

[^c1252161]: 1965 c. 56.

[^c1252162]: Sch. 4 para. 11 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8 Sch. 4 para. 11 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(d), 3(5)

[^c1252163]: Sch. 4 para. 12 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8 Sch. 4 para. 12 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(d)

[^c1252164]: Sch. 4 para. 13 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8 Sch. 4 para. 13 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(d), 3(5)

[^c1252165]: 1981 c. 67.

[^c1252166]: 1965 c. 56.

[^c1252167]: 1981 c. 66.

[^c1252168]: Sch. 4 para. 16 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8 Sch. 4 para. 16 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(d)

[^c1252169]: 1981 c. 67.

[^c1252170]: 1961 c. 33.

[^c1252171]: 1965 c. 56.

[^c1252172]: Words in Sch. 5 para. 2(2) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 31(a)

[^c1252173]: Words in Sch. 5 para. 2(5) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 31(b)

[^c1252176]: Definition in Sch. 5 para. 2(8) repealed (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 31(c)

[^c1252177]: 1965 c. 56.

[^c1252178]: 1981 c. 66.

[^c1252179]: Sch. 5 para. 4 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8 Sch. 5 para. 4 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(e), 3(5)

[^c1252180]: 1961 c. 33.

[^c1252181]: 1965 c. 56.

[^c1252182]: Sch. 5 para. 5 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8 Sch. 5 para. 5 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(e)

[^c1252183]: 1988 c. 52.

[^c1252184]: 1993 c. 43.

[^c1252185]: Words in Sch. 6 para. 11(3) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(a)(i)

[^c1252186]: Words in Sch. 6 para. 11(4) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(a)(ii)-(iv)

[^c1252189]: 1993 c. 43.

[^c1252190]: Words in Sch. 6 para. 19(3) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(b)(i)

[^c1252191]: Words in Sch. 6 para. 19(4) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(b)(ii)-(iv)

[^c1252194]: 1988 c. 52.

[^c1252198]: Words in Sch. 6 para. 30 substitited (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(c)(i)

[^c1252199]: Words in Sch. 6 para. 30 substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(c)(ii)

[^c1252204]: Words in Sch. 6 para. 31(1) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(d)

[^c1252205]: Words in Sch. 6 para. 32(1)(2)(3)(b)(5)(7) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(e)(i)

[^c1252206]: Words in Sch. 6 para. 32(1) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(e)(ii)

[^c1252211]: 1990 c. 8.

[^c1252212]: Words in Sch. 6 para. 34(1)(2)(4)(6) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(f)(i)

[^c1252213]: Words in Sch. 6 para. 34(1) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(f)(ii)-(iv)

[^c1252220]: Words in Sch. 6 para. 34(6) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(f)(v)-(vii)

[^c1252223]: Words in Sch. 6 para. 35 substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(g)

[^c1252224]: Words in Sch. 6 para. 36(2)(4)(b) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(h)(i)

[^c1252225]: Words in Sch. 6 para. 36(2) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(h)(ii)

[^c1252227]: 1990 c. 8.

[^c1252228]: Sch. 6 para. 38(2)(a) repealed (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(j)

[^c1252811]: 1990 c. 9

[^c1252229]: 1990 c. 9.

[^c1252230]: 1990 c. 9.

[^c1252231]: 1990 c. 9.

[^c1252232]: 1979 c. 46.

[^c1252253]: 1983 c. 47.

[^c1252254]: 1983 c. 47.

[^c1252255]: Words in Sch. 7 para. 5(4) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 33(a)

[^c1252256]: Word in Sch. 7 para. 5(5) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 33(b)(i)

[^c1252257]: Words in Sch. 7 para. 5(5)(a) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 33(b)(ii)

[^c1252258]: Words in Sch. 7 para. 5(5)(a) substituted (22.8.1997) by S.I. 1997/1744, art. 2(2), Sch. paras. 6

[^c1252259]: Words in Sch. 7 para. 5(5)(a) substituted (25.11.2002) by S.I. 2002/2626, art. 20, Sch. 2 para. 21(5)

[^c1252260]: Words in Sch. 7 para. 5(5)(b) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 33(b)(iii)

[^c1252261]: 1990 c. 9.

[^c1252262]: 1990 c. 9.

[^c1252263]: 1979 c. 46.

[^c1252265]: Sch. 9 Pt. I para. 1 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8

[^c1252266]: 1991 c. 22.

[^c1252267]: Sch. 9 Pt. I para. 2 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8

[^c1252268]: Words in Sch. 9 para. 7(2)(3) substituted (1.2.2001 subject to transitional provision in Sch. 2 Pt. II of the commencing S.I.) 2000 c. 38, s. 252, Sch. 27 para. 56(1)(2); S.I. 2001/57, art. 3, Sch. 2 Pt. I

[^c1252270]: Sch. 9 para. 7(4) inserted (1.2.2001 subject to transitional provision in Sch. 2 Pt. II of the commencing S.I.) by 2000 c. 38, s. 252, Sch. 27 para. 56(1)(3); S.I. 2001/57, art. 3, Sch. 2 Pt. I

[^c1252271]: S.I. 1999/1998.

[^c1252272]: 1840 c. 97.

[^c1252273]: 1842 c. 55.

[^c1252274]: 1868 c. 119.

[^c1252275]: 1889 c. 57.

[^c1252276]: 1840 c. 97.

[^c1252277]: 1842 c. 55.

[^c1252278]: 1889 c. 57.

[^c1252264]: Sch. 9 (except paras. 1(3)(c), 8(2)(a)(b)) applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(f), 5

[^c1252280]: 1933 c. xliv.

[^c1252281]: 1939 c. xcvii.

[^c1252282]: 1949 c. 74.

[^c1252283]: Sch. 10 para. 5 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8

[^c1252284]: 1970 c. lxxvi.

[^c1252285]: 1980 c. 66.

[^c1252286]: 1986 c. iv.

[^c1252289]: Sch. 10 para. 6 substituted (30.1.2001) by 2000 c. 37, ss. 76(1), 103(2), Sch. 10 Pt. II para. 11

[^c1252290]: 1981 c. 69.

[^c1252287]: Sch. 10 para. 6 and cross-heading immediately preceding it substituted (30.1.2001) by 2000 c. 37, ss. 76(1), 103(2), Sch. 10 Pt. II para. 11

[^c1252291]: Sch. 10 para. 7 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8

[^c1252292]: 1984 c. 55.

[^c1252293]: 1985 c. 48.

[^c1252294]: 1971 c. 80.

[^c1252295]: 1986 c. iv.

[^c1252296]: 1991 c. 56.

[^c1252279]: Sch. 10 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(g), 3(6)(7), 4(3) Sch. 10 applied (with modification) (12.8.2002) by S.I. 2002/1943, art. 15(1)(c)

[^c1252298]: 1857 c. 81.

[^c1252299]: 1985 c. 6.

[^c1252300]: 1857 c. 81.

[^c1252301]: 1857 c. 81.

[^c1252297]: Sch. 11 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(h)

[^c1252302]: 1961 c. 33.

[^c1899611]: 1980 c. 66.

[^c1899612]: 1980 c. 66.

[^c1899613]: 1984 c. 27.

[^c1252307]: 1989 c. 29.

[^c1252311]: 1989 c. 29.

[^c1252312]: 1985 c. 6.

[^c1252315]: Words in Sch. 14 para. 13 substituted (25.11.2002) by S.I. 2002/2626, art. 20, Sch. 2 para. 21(6)

[^c1252306]: Sch. 14 (except paras. 8(2)(a), 12) applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(i)

[^c1252317]: 1991 c. 22.

[^c1252318]: 1991 c. 22.

[^c1252316]: Sch. 15 Pt. I (paras. 1-18) applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8 Sch. 15 Pt. I (paras. 1-18) applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(j), 3(8)

[^c1252320]: 1989 c. 29.

[^c1252321]: 1991 c. 56.

[^c1252322]: 1986 c. 44.

[^c1252323]: 1991 c. 56.

[^c1252331]: Words in Sch. 15 Pt. 2 para. 2(2) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 35(a)

[^c1252332]: Words in Sch. 15 Pt. 2 para. 2(3) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 35(b)

[^c1252333]: Sch. 15 Pt. 2 para. 2(4) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 35(c)

[^c1252334]: Words in Sch. 15 Pt. 2 para. 2(4)(a) substituted (25.11.2002) by S.I. 2002/2626, art. 20, Sch. 2 para. 21(7)

[^c1252319]: Sch. 15 Pt. II (paras. 1-18) applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8 Sch. 15 Pt. II (paras. 1-18) applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(j) Sch. 15 Pt. II applied (with modifications) (12.8.2002) by S.I. 2002/1943, art. 15(1)(d)

[^c1252336]: 1879 c. cxcviii.

[^c1252337]: 1991 c. 57.

[^c1252338]: Words in Sch. 15 Pt. III para. 12(1) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 36(a)

[^c1252339]: Sch. 15 Pt. III para. 12(2) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 36(b)

[^c1252335]: Sch. 15 Pt. III (ss. 1-12) applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8 Sch. 15 Pt. III (paras. 1-12) applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(j) Sch. 15 Pt. III applied (with modifications) (12.8.2002) by S.I. 2002/1943, art. 15(1)(d)

[^c1252342]: 1990 c. 8.

[^c1252343]: 1991 c. 22.

[^c1252344]: 1991 c. 22.

[^c1252345]: 1990 c. 8.

[^c1252346]: 1991 c. 22.

[^c1252340]: Sch. 15 Pt. IV (paras. 1-6) applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8 Sch. 15 Pt. IV (paras. 1-6) applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(j), 3(9) Sch. 15 Pt. IV applied (with modifications) (12.8.2002) by S.I. 2002/1943, art. 15(1)(d)

[^c1252347]: 1991 c. 57.

[^c1252349]: Words in Sch. 15 Pt. VI para. 11(1) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 37(a)

[^c1252350]: Sch. 15 Pt. VI para. 11(2) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 37(b)

[^c1252348]: Sch. 15 Pt. VI (paras. 1-11) applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(j), 3(5)

[^c1252352]: 1968 c. xxxii.

[^c1252353]: 1991 c. 57.

[^c1252354]: 1968 c. xxxii.

[^c1252351]: Sch. 15 Pt. VII (paras. 1-10) applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(j), 3(10)

[^key-2d96ff05cf9c691f4b694d5fe8655447]: Words in s. 21(7)(b) substituted (1.4.2003) by Enterprise Act 2002 (c. 40), s. 279, Sch. 25 para. 35(2)(a); S.I. 2003/766, art. 2, Sch. (with art. 3) (as amended (20.7.2007) by S.I. 2007/1846, reg. 3(2), Sch.)

[^key-efbd8aa33a7f17e888dea13011463a37]: Word in s. 21(7)(b) substituted (1.4.2003) by Enterprise Act 2002 (c. 40), s. 279, Sch. 25 para. 35(2)(b); S.I. 2003/766, art. 2, Sch. (with art. 3) (as amended (20.7.2007) by S.I. 2007/1846, reg. 3(2), Sch.)

[^key-32d5dacee5a0894aff15d66431aad6af]: S. 24 repealed (20.6.2003) by The Enterprise Act 2002 (Consequential and Supplemental Provisions) Order 2003 (S.I. 2003/1398), art. 1, Sch. para. 24(3)

[^key-97c17f650db78995302883d07c399b22]: S. 26 repealed (20.6.2003) by The Enterprise Act 2002 (Consequential and Supplemental Provisions) Order 2003 (S.I. 2003/1398), art. 1, Sch. para. 24(3)

[^M_F_d2f44bcf-7608-4242-d482-cd350b4bd8df]: Words in Sch. 15 Pt. 4 para. 1(1) substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), Sch. 17 para. 139(2) (with Sch. 18); S.I. 2003/1900, Sch. 1.

[^M_F_f182129d-37fc-4eff-c252-691cf1443e76]: Words in Sch. 15 Pt. 4 para. 1(2) repealed (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), Sch. 19(1) (with Sch. 18); S.I. 2003/1900, Sch. 1.

[^M_F_2f17b4c9-0056-4c7f-ba8c-b7987d58eae0]: Words in Sch. 15 Pt. 4 para. 5 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), Sch. 17 para. 139(4)(a), (with Sch. 18);S.I. 2003/1900, Sch. 1

[^M_F_ceb990c7-45a1-4fa5-ecaf-6cf54e4019cb]: Words in Sch. 15 Pt. 4 para. 5 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), Sch. 17 para. 139(4)(b), (with Sch. 18); S.I. 2003/1900, Sch. 1.

[^M_F_7c238151-4115-4b6b-e7d6-056c8f65a6f1]: Words in Sch. 15 Pt. 4 para. 5 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), Sch. 17 para. 139(4)(c), (with Sch. 18; S.I. 2003/1900, Sch. 1.

[^key-11272365e2b04ef2abe8442281955b31]: Words in Sch. 6 para. 6(4) substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 138 (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3)); S.I. 2003/3142, art. 3(2) (with art. 11)

[^key-206b7a470c3448718f65ce087935b972]: Words in Sch. 6 para. 15(4) substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 138 (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3)); S.I. 2003/3142, art. 3(2) (with art. 11)

[^key-332a823529b1e59e65dacf7ba83fab68]: Words in Sch. 15 paras. 2-4 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 139(3)(a) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3))

[^key-ca3a514c6d17ab3cd16de18598408964]: Words in Sch. 15 paras. 2-4 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 139(3)(b) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3))

[^key-c02de330873d8e17f19e8ec9fafdff6f]: Words in Sch. 15 paras. 2-4 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 139(3)(c) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3))

[^key-050b25e060b68b37a599ed285680797a]: Words in Sch. 15 paras. 2-4 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 139(3)(d) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3))

[^key-944e256864590166ce2dddf06b64381a]: Words in Sch. 15 paras. 2-4 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 139(3)(e) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3))

[^key-cf040167d98cde4acfa8d6e5426f0825]: Words in Sch. 15 paras. 2-4 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 139(3)(f) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3))

[^key-7cc0b2807c664a8685f961b3bcf83902]: Words in s. 17 substituted (5.7.2004) by Railways and Transport Safety Act 2003 (c. 20), Sch. 2 para. 19(o); S.I. 2004/827, art. 4(g)

[^key-70f1045cf0f746083ebb28ff3c1dad77]: Words in s. 21 substituted (5.7.2004) by Railways and Transport Safety Act 2003 (c. 20), Sch. 2 para. 19(o); S.I. 2004/827, art. 4(g)

[^key-7292bd6db22dd2e6ac84fee8cfafc9d5]: Words in s. 21 substituted (5.7.2004) by Railways and Transport Safety Act 2003 (c. 20), Sch. 2 para. 22(a); S.I. 2004/827, art. 4(g)

[^M_F_0ad925cb-96f0-43ab-dd58-6a21b6f728a6]: Words in s. 21 substituted (5.7.2004) by Railways and Transport Safety Act 2003 (c. 20), Sch. 2 para. 22(b); S.I. 2004/827, art. 4(g)

[^key-60faa627d83a020fde3504e8b9630b1a]: S. 19(2) repealed (E.W.S.) (24.7.2005) by Railways Act 2005 (c. 14), s. 60(2), Sch. 13 Pt. 1 (with s. 14(4)(5), Sch. 11 para. 11(2)); S.I. 2005/1909, art. 2, Sch.

[^key-edace47030e70461dd2c205487246a75]: S. 19(5)(6) repealed (E.W.S.) (24.7.2005) by Railways Act 2005 (c. 14), s. 60(2), Sch. 13 Pt. 1 (with s. 14(4)(5), Sch. 11 para. 11(2)); S.I. 2005/1909, art. 2, Sch.

[^key-35e8b144d4ac16b1cf6d1fcbf09c29ca]: S. 22 omitted (28.11.2005) by virtue of Railways Infrastructure (Access and Management) Regulations 2005 (S.I. 2005/3049), reg. 1(1), Sch. 1 para. 6 (with reg. 4)

[^key-33bfa5833a3d7295f762aca3a18be0f3]: Words in Sch. 14 para. 7(4) substituted (1.10.2006) by Natural Environment and Rural Communities Act 2006 (c. 16), s. 107, Sch. 11 para. 148; S.I. 2006/2541, art. 2 (with Sch.)

[^key-68ed752a1accbf35d50863d07a4545ec]: Words in Sch. 6 para. 27(4) substituted (1.10.2006) by Natural Environment and Rural Communities Act 2006 (c. 16), s. 107, Sch. 11 para. 147; S.I. 2006/2541, art. 2 (with Sch.)

[^key-36cd2ff35f99e48d830bb989f8c09981]: S. 42A repealed (E.W.S.) (1.12.2006) by Railways Act 2005 (c. 14), s. 60(2), Sch. 13 Pt. 1 (with s. 14(4)(5), Sch. 11 para. 11(2)); S.I. 2006/2911, art. 2, Sch.

Proceedings in respect of statutory nuisance: defence.

Duty to co-operate.

Strategic Rail Authority as agent of Secretary of State.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Proceedings in respect of statutory nuisance: defence.

Duty to co-operate.

Strategic Rail Authority as agent of Secretary of State.

Blight: compensation for pre-enactment acquisition.