Planning Act 2008
[^key-04aaadd4cd9d130d1212392f21e7cde3]: Sch. 6 para. 2(10) repealed (1.4.2012) by Localism Act 2011 (c. 20), s. 240(2), Sch. 13 para. 72(6), Sch. 25 Pt. 20; S.I. 2012/628, art. 7
[^key-462308e78d33c60ba90b170362fa9b0a]: Word in Sch. 6 para. 3(7) substituted (1.4.2012) by Localism Act 2011 (c. 20), s. 240(2), Sch. 13 para. 72(9); S.I. 2012/628, art. 7(a)
[^key-5cb494947d6072128afa62da3c97367d]: Sch. 6 para. 3(6) repealed (1.4.2012) by Localism Act 2011 (c. 20), s. 240(2), Sch. 13 para. 72(8), Sch. 25 Pt. 20; S.I. 2012/628, art. 7
[^key-82a73d5552c0a8a9ad0e58b7ee7a12b5]: Words in Sch. 6 para. 4(9) inserted (1.4.2012) by Localism Act 2011 (c. 20), s. 240(2), Sch. 13 para. 72(11); S.I. 2012/628, art. 7(a)
[^key-e5e5cdcff7307d6a9426a6f61e01855d]: Sch. 6 para. 4(8) repealed (1.4.2012) by Localism Act 2011 (c. 20), s. 240(2), Sch. 13 para. 72(10), Sch. 25 Pt. 20; S.I. 2012/628, art. 7
[^key-fef764d2967840c222a57d36948f40a5]: Words in Sch. 6 para. 6(1)(b) repealed (1.4.2012) by Localism Act 2011 (c. 20), s. 240(2), Sch. 25 Pt. 20; S.I. 2012/628, art. 7(b)
[^key-4368eac5d25cafc07bbca5f15916b4c9]: Words in Sch. 6 para. 6(2) substituted (1.4.2012) by Localism Act 2011 (c. 20), s. 240(2), Sch. 13 para. 72(12); S.I. 2012/628, art. 7(a)
[^key-6cd59eab24e9c8fa5982c2f60ba3fd35]: Sch. 12 para. 4(c) and preceding word inserted (1.4.2012) by Localism Act 2011 (c. 20), ss. 131(4)(d), 240(2) (with s. 144); S.I. 2012/628, art. 7(a)
[^key-fade2871c57b31abe860a5876da5d62d]: Words in Sch. 12 para. 4(b) substituted (1.4.2012) by Localism Act 2011 (c. 20), ss. 131(4)(c), 240(2) (with s. 144); S.I. 2012/628, art. 7(a)
[^key-603499cafd3e44145eb71f1cd80d6b76]: Word in Sch. 12 para. 4(a) repealed (1.4.2012) by Localism Act 2011 (c. 20), ss. 131(4)(b), 240(2), Sch. 25 Pt. 21 (with s. 144); S.I. 2012/628, art. 7
[^key-6a3bde1fd6741df1c7beaf5a9eaf7110]: Sch. 12 para. 4(a)(i) substituted (1.4.2012) by Localism Act 2011 (c. 20), ss. 131(4)(a), 240(2) (with s. 144); S.I. 2012/628, art. 7(a)
[^key-65c57f8054995bbf84cc6636b7fe486e]: Word in Sch. 12 para. 6(b) repealed (1.4.2012) by Localism Act 2011 (c. 20), s. 240(2), Sch. 25 Pt. 20; S.I. 2012/628, art. 7(b)
[^key-be804365dafb582e886d8e88637f05a1]: Sch. 12 para. 6(d)(e) inserted (1.4.2012) by Localism Act 2011 (c. 20), ss. 135(10), 240(2) (with s. 144); S.I. 2012/628, art. 7(a)
[^key-c35363e246c8f38d0c013c3865226a73]: Sch. 12 para. 7(za) inserted (1.4.2012) by Localism Act 2011 (c. 20), ss. 136(7), 240(2) (with s. 144); S.I. 2012/628, art. 7(a)
[^key-64025ed97ff34a3b4126b1c82fce537f]: Words in Sch. 12 para. 27 inserted (1.4.2012) by Localism Act 2011 (c. 20), s. 240(2), Sch. 13 para. 73; S.I. 2012/628, art. 7(a)
[^key-775a6fd0b04407f375650cee6a71337e]: S. 192 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-d72a9c542fff032d4ecd51bb61ec4e4f]: Sch. 8 para. 1 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-6386fd2b9d8d429a707dd1917020dc61]: Sch. 8 para. 2 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-fc654f13355a5de8987eefd8329a0b14]: Sch. 8 para. 3 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-82a28f769f03ea1ef69ef5c7441ec165]: Sch. 8 para. 4 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-3173f2f008aaeeebfa97bb3854ef67f3]: Sch. 8 para. 5 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-622222977096bb096d1596b963a65727]: Sch. 8 para. 6 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-0c0f9932c0d54b40718222560de53fa9]: Sch. 8 para. 7 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-9b5c9ab72b4e8250c9eb89fab08e9828]: Sch. 8 para. 8 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-fcd6671f01b6495bcff3f7a14b8d8751]: Sch. 8 para. 9 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-3359ea518bcc27978ac9ef483f55d5b5]: Sch. 8 para. 10 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-54dfc1157ca6fc29ec1af532d7c935be]: Sch. 8 para. 11 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-439750633e664b2bb25b7856845a51ad]: Sch. 8 para. 12 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-64a1a6a7673bc16ec88cc793c7f713ee]: Sch. 8 para. 13 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-fd7ddefb7f77077a299313b6797a0c0f]: Sch. 8 para. 14 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-6a86c57af1b245e047a87efabcc1f617]: Sch. 8 para. 15 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-9c6e83d9138b2c30e6a9859c837ba524]: Sch. 8 para. 16 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-c4830a6bcb8e5ea1e0265cd21931f47e]: Sch. 8 para. 17 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-f9fea1dd205ef6eddda835f72b8c1a3f]: Sch. 8 para. 18 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-0b213d039f464624d5bfe7ca77c553b9]: Sch. 8 para. 19 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-97c9a3479a69879745b80a6ab8622b0f]: Sch. 8 para. 20 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(a)
[^key-27dcab195236629abb129cbd0ffe9627]: S. 238 in force at 6.4.2012 for specified purposes for E. by S.I. 2012/601, art. 2(c)
[^key-dd283114b74c1574ca2ca835903c3652]: Sch. 13 in force at 6.4.2012 for specified purposes for E. by S.I. 2012/601, art. 2(c)
[^key-2c22f8663cd7d5c14a5fbdc03ccbe8ff]: S. 193 in force at 6.4.2012 for E. by S.I. 2012/601, art. 2(b)
[^key-f7202ded8cac231d68b636ffa274017f]: S. 188 in force at 30.4.2012 for W. by S.I. 2012/802, art. 2(a)
[^key-33899a01d9f64c23520764c43a21f8a7]: S. 197 in force at 30.4.2012 for W. by S.I. 2012/802, art. 2(b)
[^key-841ba4d48a6d584d490046fa95fe1649]: Sch. 11 para. 1 in force at 30.4.2012 for W. by S.I. 2012/802, art. 2(b)
[^key-bf80d02c7ed2430d428a86f9aa263f0f]: Sch. 11 para. 2 in force at 30.4.2012 for W. by S.I. 2012/802, art. 2(b)
[^key-486b93d9aba9c65e93bdb4b2998f4064]: Sch. 11 para. 3 in force at 30.4.2012 for W. by S.I. 2012/802, art. 2(b)
[^key-153f3854be9b92c84614d316dbbf17df]: Sch. 11 para. 4 in force at 30.4.2012 for W. by S.I. 2012/802, art. 2(b)
[^key-cc6fb74e693cb790258ccf810bafc525]: Sch. 11 para. 5 in force at 30.4.2012 for W. by S.I. 2012/802, art. 2(b)
[^key-b6e0b86744f7cd78aa74b7651c25f45a]: Sch. 11 para. 6 in force at 30.4.2012 for W. by S.I. 2012/802, art. 2(b)
[^key-c5b42b117396e3985ca60c1b783682ef]: S. 238 in force at 30.4.2012 for specified purposes for W. by S.I. 2012/802, art. 2(c)
[^key-7bb371a89c20a76b9625d8bcaa1f2b9b]: Sch. 13 in force at 30.4.2012 for specified purposes for W. by S.I. 2012/802, art. 2(c)
[^key-5431eadd5387dbc5087416eb45625d87]: Words in s. 14(1)(o) added (23.6.2012) by The Infrastructure Planning (Waste Water Transfer and Storage) Order 2012 (S.I. 2012/1645), arts. 1(1), 2(2) (with art. 3)
[^key-ee546d5db7557ed90458bc8cca64dcb0]: S. 29(1A) inserted (23.6.2012) by The Infrastructure Planning (Waste Water Transfer and Storage) Order 2012 (S.I. 2012/1645), arts. 1(1), 2(3)(a) (with art. 3)
[^key-12e2bd370d2a3b0bc738236e16e66787]: S. 29(2A) inserted (23.6.2012) by The Infrastructure Planning (Waste Water Transfer and Storage) Order 2012 (S.I. 2012/1645), arts. 1(1), 2(3)(b) (with art. 3)
[^key-c90c3e49688c3d757f9acca539ed942f]: S. 152 applied (26.9.2012) by The Network Rail (Ipswich Chord) Order 2012 (S.I. 2012/2284), arts. 1, 19(5) (with art. 26(2))
[^key-de318b2fe1ab7bb8bfe45728cb935640]: S. 152 applied (6.11.2012) by The Network Rail (North Doncaster Chord) Order 2012 (S.I. 2012/2635), arts. 1, 25(5) (with art. 35(2))
[^key-052b3c61fde854c068c771f2c38d390d]: S. 156(1) applied (20.2.2013) by The Kentish Flats Extension Order 2013 (S.I. 2013/343), arts. 1, 7(1) (with arts. 13, 14)
[^key-486af15c8b562e604a72ee19bb7aae04]: S. 156(1) applied (28.2.2013) by The Rookery South (Resource Recovery Facility) Order 2011 2013 (S.I. 2013/680), art. 7(1)
[^key-309a3be21b72fb68a7b07a3aa36fac3d]: Words in Sch. 8 para. 2(1A)(a) substituted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 440 (with Sch. 7)
[^key-e5ce89dcd2b0469a722c4bf3cb17701a]: Words in Sch. 8 para. 2(5A)(a) substituted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 440 (with Sch. 7)
[^key-444a65419b34030ec04c4dd6902a059d]: Ss. 35, 35A substituted for s. 35 (25.4.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 26(2), 35(2)
[^key-09bcb10e89d32b18d7f1daf62d6c91e0]: Words in s. 232(5)(e) inserted (25.4.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 26(4)(a), 35(2)
[^key-3d5d693c71ca934d0f9a024d8b277181]: Words in s. 232(7) inserted (25.4.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 26(4)(b), 35(2)
[^key-21a89923533858b2a4025f5a7b8f5fd7]: Word in s. 35A(5) substituted (25.4.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 26(3), 35(2)
[^key-a8cda04d3bf06292735fc95d1ec88935]: S. 16(3A) inserted (18.6.2013) by The Planning Act 2008 (Nationally Significant Infrastructure Projects) (Electric Lines) Order 2013 (S.I. 2013/1479), arts. 1, 2(b) (with art. 3)
[^key-a18276f8a5393601ee33dab72ec1d63c]: S. 16(3)(aa)(ab) inserted (18.6.2013) by The Planning Act 2008 (Nationally Significant Infrastructure Projects) (Electric Lines) Order 2013 (S.I. 2013/1479), arts. 1, 2(a) (with art. 3)
[^key-a5bd474815d852c4379062dc212d0ffb]: S. 16(4) substituted (18.6.2013) by The Planning Act 2008 (Nationally Significant Infrastructure Projects) (Electric Lines) Order 2013 (S.I. 2013/1479), arts. 1, 2(c) (with art. 3)
[^key-0291e862bc06faa7fb03eb7e171da929]: S. 127(7) omitted (25.6.2013) by virtue of Growth and Infrastructure Act 2013 (c. 27), ss. 23(2)(c), 35(1); S.I. 2013/1124, art. 4(b) (with art. 6)
[^key-1801b93c9777910f4ea831317801abe9]: Words in s. 127(2) substituted (25.6.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 23(2)(a), 35(1); S.I. 2013/1124, art. 4(b) (with art. 6)
[^key-9867aa0b511b7314f712d1a85c58854a]: Words in s. 127(5) substituted (25.6.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 23(2)(b), 35(1); S.I. 2013/1124, art. 4(b) (with art. 6)
[^key-4141caf68b87a5434f0b700013635ffc]: S. 129 repealed (25.6.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 24(1), 35(1) (with s. 24(6)); S.I. 2013/1124, art. 4(c) (with art. 7)
[^key-cbaf088fa0e1e2f257e067e743623932]: S. 130(3A) inserted (25.6.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 24(5), 35(1) (with s. 24(6)); S.I. 2013/1124, art. 4(c) (with art. 7)
[^key-bb214727f3002afa43af294bc2aaef74]: S. 131(4A)(4B) inserted (25.6.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 24(2)(b), 35(1) (with s. 24(6)); S.I. 2013/1124, art. 4(c) (with art. 7)
[^key-0de1ea1da040970db31a11eb5c934d51]: Words in s. 131(3) substituted (25.6.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 24(2)(a), 35(1) (with s. 24(6)); S.I. 2013/1124, art. 4(c) (with art. 7)
[^key-15f654e5bdfda5407b10775cab0bc654]: S. 131(6)-(10) omitted (25.6.2013) by virtue of Growth and Infrastructure Act 2013 (c. 27), ss. 24(2)(c), 35(1) (with s. 24(6)); S.I. 2013/1124, art. 4(c) (with art. 7)
[^key-77c969cbcd1d1c8b59115f80f1971e8e]: S. 132(4A)(4B) inserted (25.6.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 24(3)(b), 35(1) (with s. 24(6)); S.I. 2013/1124, art. 4(c) (with art. 7)
[^key-332fcade0e1568f96f31fe60bd39f3ae]: Words in s. 132(2) substituted (25.6.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 24(3)(a), 35(1) (with s. 24(6)); S.I. 2013/1124, art. 4(c) (with art. 7)
[^key-bf7a6a6a2eab5e19e91adb1898deefab]: S. 132(6)-(10) omitted (25.6.2013) by virtue of Growth and Infrastructure Act 2013 (c. 27), ss. 24(3)(c), 35(1) (with s. 24(6)); S.I. 2013/1124, art. 4(c) (with art. 7)
[^key-b881280c13c6ebcc67df5a9f40aec9d2]: S. 137 repealed (25.6.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 23(3), 35(1); S.I. 2013/1124, art. 4(b) (with art. 6)
[^key-a7c4b67541a570e0fed74cf8f0f8cf5c]: S. 138(4A)(4B) inserted (25.6.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 23(4)(b), 35(1); S.I. 2013/1124, art. 4(b) (with art. 6)
[^key-3f2a2e187a9459edb50c1316448f3393]: Words in s. 138(4) substituted (25.6.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 23(4)(a), 35(1); S.I. 2013/1124, art. 4(b) (with art. 6)
[^key-1d08b798443bde99d022adfd609abd3a]: S. 138(5)(6) omitted (25.6.2013) by virtue of Growth and Infrastructure Act 2013 (c. 27), ss. 23(4)(c), 35(1); S.I. 2013/1124, art. 4(b) (with art. 6)
[^key-a5232685b158017ef0252e4f89914ce8]: S. 144(2A)(2B) inserted (25.6.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 27(2), 35(1); S.I. 2013/1124, art. 9 (with arts. 10, 11)
[^key-90972b1e9f3ea44ba2562674b1cb01a1]: S. 144(3) omitted (25.6.2013) by virtue of Growth and Infrastructure Act 2013 (c. 27), ss. 27(3), 35(1); S.I. 2013/1124, art. 9 (with arts. 10, 11)
[^key-8fd7920c9e6504acb3abe56c6f4b8122]: S. 33(1)(e) omitted (25.6.2013) by virtue of Growth and Infrastructure Act 2013 (c. 27), ss. 18(3)(a), 35(3)
[^key-c09a152e08bb2f1ad2823d94774feb45]: Sch. 12 paras. 12, 13 repealed (25.6.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 24(4)(a), 35(1) (with s. 24(6)); S.I. 2013/1124, art. 4(c) (with art. 7)
[^key-a1b6c50af6d35711c5e5be788ce99e50]: Words in Sch. 12 para. 18 substituted (25.6.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 23(5), 35(1); S.I. 2013/1124, art. 4(b) (with art. 6)
[^key-a0e92d2c74f0fc7454ffe883ebee6679]: Sch. 2 para. 15 omitted (25.6.2013) by virtue of Growth and Infrastructure Act 2013 (c. 27), ss. 18(3)(b), 35(3)
[^key-14249fe93d01d169afd45838419883ba]: S. 22 substituted (25.7.2013) by The Highway and Railway (Nationally Significant Infrastructure Project) Order 2013 (S.I. 2013/1883), arts. 1(2), 3 (with art. 5)
[^key-0be61cddf631f7648b44bb7a99ee592c]: S. 25(2A) inserted (25.7.2013) by The Highway and Railway (Nationally Significant Infrastructure Project) Order 2013 (S.I. 2013/1883), arts. 1(2), 4(4) (with art. 5)
[^key-beb6fa25005fb81a8329205de946e0fe]: S. 25(1)(ba) inserted (25.7.2013) by The Highway and Railway (Nationally Significant Infrastructure Project) Order 2013 (S.I. 2013/1883), arts. 1(2), 4(2) (with art. 5)
[^key-3028c827d8f4900764dcf8ee932be06c]: S. 25(2)(ba) inserted (25.7.2013) by The Highway and Railway (Nationally Significant Infrastructure Project) Order 2013 (S.I. 2013/1883), arts. 1(2), 4(3) (with art. 5)
[^key-91fa3e761e5ca6b1849923a18a1e29a3]: Words in s. 25(7) inserted (25.7.2013) by The Highway and Railway (Nationally Significant Infrastructure Project) Order 2013 (S.I. 2013/1883), arts. 1(2), 4(5) (with art. 5)
[^key-0fcc2077e02d5ae71776cf3fe3367891]: Words in s. 25(8) substituted (25.7.2013) by The Highway and Railway (Nationally Significant Infrastructure Project) Order 2013 (S.I. 2013/1883), arts. 1(2), 4(6) (with art. 5)
[^key-086cda2926be52a432d1f863d8d066a2]: S. 95(3) omitted (19.9.2013) by virtue of The Public Bodies (Abolition of Administrative Justice and Tribunals Council) Order 2013 (S.I. 2013/2042), art. 1(2), Sch. para. 40(a)
[^key-30cf153514c78fe6523a3f35fcffb85e]: Words in s. 97(1) omitted (19.9.2013) by virtue of The Public Bodies (Abolition of Administrative Justice and Tribunals Council) Order 2013 (S.I. 2013/2042), art. 1(2), Sch. para. 40(b)
[^key-090d638fbe2409e2581ec8c9a552aa05]: S. 211(7A) modified by S.I. 2010/948, reg. 14(5) (as inserted (24.2.2014) by The Community Infrastructure Levy (Amendment) Regulations 2014 (S.I. 2014/385), regs. 1, 5(3)(b) (with reg. 14(2)(7)))
[^key-037a273cf9df5cf14e1756531f32f6fe]: S. 152 applied (21.4.2014) by The Network Rail (Norton Bridge Area Improvements) Order 2014 (S.I. 2014/909), arts. 1, 23(5) (with art. 34(2))
[^key-6d3a4e080cb07d00d4390b0214722db0]: Words in s. 171(4) substituted (22.4.2014) by Crime and Courts Act 2013 (c. 22), s. 61(3), Sch. 9 para. 52; S.I. 2014/954, art. 2(c) (with art. 3) (with transitional provisions and savings in S.I. 2014/956, arts. 3-11)
[^key-59159fae87fdc2a58811473bc3ab9d45]: Words in Sch. 12 para. 24 substituted (22.4.2014) by Crime and Courts Act 2013 (c. 22), s. 61(3), Sch. 9 para. 52; S.I. 2014/954, art. 2(c) (with art. 3) (with transitional provisions and savings in S.I. 2014/956, arts. 3-11)
[^key-9371b74c1f1bbd6be0f30d14d6c374fa]: S. 158(1) excluded (24.7.2014) by The Daventry International Rail Freight Interchange Alteration Order 2014 (S.I. 2014/1796), arts. 1, 9 (with art. 24(2), Sch. 6 para. 3)
[^key-e15effe80e2262471541397ae36b946f]: S. 158(2) excluded (24.7.2014) by The Daventry International Rail Freight Interchange Alteration Order 2014 (S.I. 2014/1796), arts. 1, 9 (with art. 24(2), Sch. 6 para. 3)
[^key-90dfb3087e9d1c50d6128325808e44af]: S. 185 in force at 8.8.2014 for W. by S.I. 2014/1769, art. 2(a)
[^key-c8e541fb50c835c20b5ff48631a8f4fa]: S. 199 in force at 8.8.2014 for W. by S.I. 2014/1769, art. 2(b)
[^key-c49aa74026525e64e9c9f13e3821d6b3]: S. 152 applied (18.9.2014) by The A556 (Knutsford to Bowdon Improvement) Development Consent Order 2014 (S.I. 2014/2269), arts. 1, 21(5) (with art. 21(6))
[^key-220542a1bf2dc0c7e3eb920c57759702]: S. 158 modified (2.10.2014) by The Clocaenog Forest Wind Farm Order 2014 (S.I. 2014/2441), arts. 1, 9(4) (with art. 33)
[^key-cc920aa154e0b0d56df2aff115f82114]: S. 198 in force at 28.11.2014 for W. by S.I. 2014/2780, art. 2
[^key-9d8a9cd1ac7f7f3ad503392da7ea8e2d]: S. 152 applied (7.1.2015) by The Willington C Gas Pipeline Order 2014 (S.I. 2014/3328), arts. 1, 19(3)(a)
[^key-b70fc31399d0c9a6d58bf654f5ecf616]: Words in s. 22(2)(b) inserted (5.3.2015) by Infrastructure Act 2015 (c. 7), s. 57(1), Sch. 1 para. 153(2); S.I. 2015/481, reg. 2(a)
[^key-4dbc3c6bea34bf6957a154a4bf2b5656]: Words in s. 22(3)(b) inserted (5.3.2015) by Infrastructure Act 2015 (c. 7), s. 57(1), Sch. 1 para. 153(2); S.I. 2015/481, reg. 2(a)
[^key-4e21ed65aeca7df19085c1bf69f339e7]: Words in s. 22(5)(b) inserted (5.3.2015) by Infrastructure Act 2015 (c. 7), s. 57(1), Sch. 1 para. 153(2); S.I. 2015/481, reg. 2(a)
[^key-63d6d59f8a68fe61f16d89b5985fe2f0]: Words in s. 22(9) inserted (5.3.2015) by Infrastructure Act 2015 (c. 7), s. 57(1), Sch. 1 para. 153(3); S.I. 2015/481, reg. 2(a)
[^key-283187a6b9dc8e65d896b7c9c4547979]: S. 160(3) omitted (E.W.) (12.3.2015) by virtue of The Legal Aid, Sentencing and Punishment of Offenders Act 2012 (Fines on Summary Conviction) Regulations 2015 (S.I. 2015/664), reg. 1(1), Sch. 4 para. 41(2)(b) (with reg. 5(1))
[^key-2d9dd33e7a1323dda5fde4e108b479b3]: S. 161(5) omitted (E.W.) (12.3.2015) by virtue of The Legal Aid, Sentencing and Punishment of Offenders Act 2012 (Fines on Summary Conviction) Regulations 2015 (S.I. 2015/664), reg. 1(1), Sch. 4 para. 41(3)(b) (with reg. 5(1))
[^key-6db1fe5511fabc2e764d4435d2705dc5]: Words in s. 160(2) substituted (E.W.) (12.3.2015) by The Legal Aid, Sentencing and Punishment of Offenders Act 2012 (Fines on Summary Conviction) Regulations 2015 (S.I. 2015/664), reg. 1(1), Sch. 4 para. 41(2)(a) (with reg. 5(1))
[^key-13f88683b90a7e68bf3d35df725e4aaa]: Words in s. 161(4) substituted (E.W.) (12.3.2015) by The Legal Aid, Sentencing and Punishment of Offenders Act 2012 (Fines on Summary Conviction) Regulations 2015 (S.I. 2015/664), reg. 1(1), Sch. 4 para. 41(3)(a) (with reg. 5(1))
[^key-61da44e8c344511b6c611f8938b09641]: S. 14(1)(q) inserted (27.3.2015) by The Infrastructure Planning (Radioactive Waste Geological Disposal Facilities) Order 2015 (S.I. 2015/949), arts. 1(1), 2(2)(a)
[^key-7d2c54f60d1013b02610a505da4b74dc]: Word in s. 14(2) substituted (27.3.2015) by The Infrastructure Planning (Radioactive Waste Geological Disposal Facilities) Order 2015 (S.I. 2015/949), arts. 1(1), 2(2)(b)
[^key-5c7a3710524ed5ec3481254f039223d4]: Word in s. 240(1)(b) substituted (27.3.2015) by The Infrastructure Planning (Radioactive Waste Geological Disposal Facilities) Order 2015 (S.I. 2015/949), arts. 1(1), 2(4)
[^key-cda0f0e957aae2575dd5aea6f854bec4]: Word in Sch. 12 para. 2(a)(ii) substituted (27.3.2015) by The Infrastructure Planning (Radioactive Waste Geological Disposal Facilities) Order 2015 (S.I. 2015/949), arts. 1(1), 2(5)(a)
[^key-25ed8e2e4dde6cf443891753e02d026d]: Word in Sch. 12 para. 2(b) substituted (27.3.2015) by The Infrastructure Planning (Radioactive Waste Geological Disposal Facilities) Order 2015 (S.I. 2015/949), arts. 1(1), 2(5)(b)
[^key-a7fd76b3c4094d508f5feec424f7bc64]: S. 30A inserted (27.3.2015) by The Infrastructure Planning (Radioactive Waste Geological Disposal Facilities) Order 2015 (S.I. 2015/949), arts. 1(1), 2(3)
[^key-a4fefb56523f22d1cdd39440bb3d900e]: S. 61(1) substituted (12.4.2015) by Infrastructure Act 2015 (c. 7), ss. 26, 57(5)(a); S.I. 2015/758, reg. 2 (with art. 4(2))
[^key-dca9bd425568bb896bc8ea5dab52abf4]: Words in s. 13(1)(b) substituted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(3)(a), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-b8a2758464d54aa8d1a9005d812ba9e0]: Words in s. 13(1)(b) inserted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(3)(b), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-60d869e6e86e30a107814177f9c320b9]: Words in s. 13(2)(b) substituted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(3)(a), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-2fa11c9b21b9f1d7b894e27eb83cb105]: Words in s. 13(2)(b) inserted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(3)(b), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-24bf24a5b9069cf4bfd5a585065c7798]: Words in s. 13(3)(b) substituted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(3)(a), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-696f0035a31ef5030033f96df34d5afb]: Words in s. 13(3)(b) inserted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(3)(b), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-fc9837fdda56aab96b72b1da9636b292]: Words in s. 13(4)(b) substituted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(3)(a), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-61a102add8074c046e4a696e1b65838b]: Words in s. 13(4)(b) inserted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(3)(b), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-980b08e53ef25a7a78e5317c1512f258]: Words in s. 13(5)(b) substituted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(3)(a), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-4c7660d8fbf7e60cb17a6a12fde9df3d]: Words in s. 13(5)(b) inserted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(3)(b), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-d58be0f70674f8a80310035f725ebee8]: Words in s. 13(6)(b) substituted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(3)(a), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-751c5c5057a477360933eb1fdcaff86e]: Words in s. 13(6)(b) inserted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(3)(b), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-1dc48148735ad9aabea3d4a2d4b92782]: Words in s. 118(1)(b) substituted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(4)(a)(i), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-99de61f6416f5f4b0c176beaa980271f]: Words in s. 118(1)(b) inserted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(4)(a)(ii), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-6677d04636e433e0839dd470306d8d71]: Words in s. 118(2)(b) substituted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(4)(a)(i), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-5ab578e53e23e310a67b2a2534ff5952]: Words in s. 118(2)(b) inserted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(4)(a)(ii), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-41271f56221f3ae1b6adc06319753a04]: Words in s. 118(3)(b) substituted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(4)(a)(i), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-a0998e3c004c35e056a464cfa2961a1f]: Words in s. 118(3)(b) inserted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(4)(a)(ii), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-7d049c163164bdf3d7433c9df189e203]: Words in s. 118(4)(b) substituted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(4)(b)(i), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-2b54efb77b22c770d75654eed3ad2bc1]: Words in s. 118(4)(b) inserted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(4)(b)(ii), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-75a72851ee909b8f8de11ff5b9426192]: Words in s. 118(5)(b) substituted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(4)(b)(i), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-a5fcc62c5e6218be32852899ce7eae45]: Words in s. 118(5)(b) inserted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(4)(b)(ii), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-34f8387b8a035977778b390c5a2d955d]: Words in s. 118(6)(b) substituted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(4)(b)(i), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-c74c8d18850382bad5748e2b941c2c77]: Words in s. 118(6)(b) inserted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(4)(b)(ii), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-d495b16f39960a66b8bd90a12460fd78]: Words in s. 118(7)(b) substituted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(4)(c)(i), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-c41436fbe442ad544557d3499ae7a538]: Words in s. 118(7)(b) inserted (13.4.2015) by Criminal Justice and Courts Act 2015 (c. 2), ss. 92(4)(c)(ii), 95(1); S.I. 2015/778, art. 3, Sch. 1 para. 71
[^key-5d0da986a19c8828e66aac7159be9be9]: S. 152 applied (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), arts. 1, 24(5) (with art. 24(6))
[^key-ff390126776adf82cc736584aef2ffda]: S. 152 applied (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), arts. 1, 25(5) (with arts. 51, 53)
[^key-6eb00f51241f30f3e08b1ad87b157825]: Words in Sch. 6 para. 2(8) inserted (12.2.2015 for specified purposes, 14.7.2015 in so far as not already in force) by Infrastructure Act 2015 (c. 7), ss. 28(2)(a), 57(5)(b); S.I. 2015/758, reg. 3 (with reg 4(3))
[^key-4574616a0f036568fe546eb05afd00b5]: Sch. 6 para. 2(8A) inserted (12.2.2015 for specified purposes, 14.7.2015 in so far as not already in force) by Infrastructure Act 2015 (c. 7), ss. 28(2)(b), 57(5)(b); S.I. 2015/758, reg. 3 (with reg 4(3))
[^key-e87157dc08beb056e3838a2d129eb371]: Sch. 6 para. 4(5A) inserted (12.2.2015 for specified purposes, 14.7.2015 in so far as not already in force) by Infrastructure Act 2015 (c. 7), ss. 28(4), 57(5)(b); S.I. 2015/758, reg. 3 (with reg. 4(3))
[^key-674049b6bf2816c63e2e5f0665a01226]: Sch. 6 para. 3(5A) inserted (14.7.2015) by Infrastructure Act 2015 (c. 7), ss. 28(3), 57(5)(b); S.I. 2015/758, reg. 3 (with reg. 4(3))
[^key-7453a474eccb5f7313d3381e79f1f0bd]: S. 8(1) excluded (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), arts. 1, 25(1)
[^key-8b7505a4e0c397b94b2d62c0629405c2]: S. 152 applied (18.2.2016) by The A19/A1058 Coast Road (Junction Improvement) Development Consent Order 2016 (S.I. 2016/73), arts. 1, 22(5) (with arts. 22(6), 37)
[^key-0074eb38ee15929a36f7a2b68873c7c3]: S. 152 applied (25.3.2016) by The Thorpe Marsh Gas Pipeline Order 2016 (S.I. 2016/297), arts. 1, 24(4) (with arts. 24(5), 39)
[^key-2359f2f1282f55cef625eb2a9c5caa72]: Sch. 9 omitted (13.7.2016) by virtue of Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 19 para. 15; S.I. 2016/733, reg. 3(m)
[^key-5c8d86167484a842e837917e250baddf]: S. 125(3)(c) omitted (13.7.2016) by virtue of Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 16 para. 17; S.I. 2016/733, reg. 3(j)
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.