Infrastructure Act 2015
(333DA) (1) The Secretary of State may at any time make one or more schemes for the transfer of designated property, rights or liabilities of a specified public body to— (a) the Authority, or (b) a company or body through which the Authority exercises functions in relation to housing or regeneration. (2) In subsection (1) “specified public body” means a public body which is for the time being specified, or of a description specified, by regulations made by the Secretary of State. (3) On the date specified by a scheme as the date on which the scheme is to have effect, the designated property, rights or liabilities are transferred and vest in accordance with the scheme. (4) The Secretary of State may not make a scheme under this section unless the specified public body to which the scheme relates has consented to its provisions. (5) A scheme under this section may not make provision in relation to land which is held by the Secretary of State and was acquired, or is treated as having been acquired, under section 39 of the Forestry Act 1967 (power to acquire land which is suitable for afforestation or purposes connected with forestry). (6) In this section— - “designated”, in relation to a scheme, means specified in or determined in accordance with the scheme; - “public body” means a person or body with functions of a public nature. (7) This section and sections 333DB and 333DC bind the Crown, but do not have effect in relation to property, rights or liabilities belonging to— (a) Her Majesty in right of the Crown, (b) Her Majesty in right of Her private estates, (c) Her Majesty in right of the Duchy of Lancaster, or (d) the Duchy of Cornwall. (8) The reference in subsection (7) to Her Majesty's private estates is to be construed in accordance with section 1 of the Crown Private Estates Act 1862. (333DB) (1) A transfer scheme may— (a) create for the transferor interests in, or rights over, property transferred by virtue of the scheme, (b) create for a transferee interests in, or rights over, property retained by the transferor or transferred to another transferee, (c) create rights or liabilities between the transferor and a transferee or between transferees. (2) A transfer scheme may provide for the transfer of property, rights or liabilities that would not otherwise be capable of being transferred or assigned. (3) In particular, a transfer scheme may provide for the transfer to take effect regardless of a contravention, liability or interference with an interest or right that would otherwise exist by reason of a provision having effect in relation to the terms on which the transferor is entitled to the property or right, or subject to the liability, in question. (4) It does not matter whether the provision referred to in subsection (3) has effect under an enactment or an agreement or in any other way. (5) A certificate by the Secretary of State that anything specified in the certificate has vested in any person by virtue of a transfer scheme is conclusive evidence for all purposes of that fact. (6) A transfer scheme may contain provision for the payment of compensation by the Secretary of State to any person whose interests are adversely affected by it. (7) A transfer by virtue of a transfer scheme does not affect the validity of anything done by or in relation to the transferor before the transfer takes effect. (8) Anything which— (a) is done by the transferor for the purposes of, or otherwise in connection with, anything transferred by virtue of a transfer scheme, and (b) is in effect immediately before the transfer date, is to be treated as done by the transferee. (9) There may be continued by or in relation to the transferee anything (including legal proceedings)— (a) which relates to anything transferred by virtue of a transfer scheme, and (b) which is in the process of being done by or in relation to the transferor immediately before the transfer date. (10) Subsection (11) applies to any document— (a) which relates to anything transferred by virtue of a transfer scheme, and (b) which is in effect immediately before the transfer date. (11) Any references in the document to the transferor are to be read as references to the transferee. (12) A transfer scheme may include supplementary, incidental, transitional and consequential provision. (13) In this section— - “enactment” includes subordinate legislation within the meaning of the Interpretation Act 1978; - “transfer scheme” means a transfer scheme under section 333DA; - “transfer date” means a date specified by a transfer scheme as the date on which the scheme is to have effect. (333DC) (1) The Treasury may by regulations make provision for varying the way in which a relevant tax has effect from time to time in relation to— (a) any property, rights or liabilities transferred in accordance with a transfer scheme, or (b) anything done for the purposes of, or in relation to, or in consequence of, the transfer of any property, rights or liabilities in accordance with such a transfer scheme. (2) The provision that may be made under subsection (1)(a) includes, in particular, provision for— (a) a tax provision not to apply, or to apply with modifications, in relation to any property, rights or liabilities transferred; (b) any property, rights or liabilities transferred to be treated in a specified way for the purposes of a tax provision; (c) the Secretary of State to be required or permitted, with the consent of the Treasury, to determine, or to specify the method for determining, anything which needs to be determined for the purposes of any tax provision so far as relating to any property, rights or liabilities transferred. (3) The provision that may be made under subsection (1)(b) includes, in particular, provision for— (a) a tax provision not to apply, or to apply with modifications, in relation to anything done for the purposes of, or in relation to, or in consequence of, the transfer; (b) anything done for the purposes of, or in relation to, or in consequence of, the transfer to have or not to have a specified consequence or be treated in a specified way; (c) the Secretary of State to be required or permitted, with the consent of the Treasury, to determine, or to specify the method for determining, anything which needs to be determined for the purposes of any tax provision so far as relating to anything done for the purposes of, or in relation to, or in consequence of, the transfer. (4) In this section— - “enactment” includes subordinate legislation within the meaning of the Interpretation Act 1978; - “relevant tax” means income tax, corporation tax, capital gains tax, stamp duty, stamp duty land tax or stamp duty reserve tax; - “tax provision” means a provision of an enactment about a relevant tax; - “transfer scheme” means a transfer scheme under section 333DA. (5) References in this section to the transfer of property, rights or liabilities in accordance with a transfer scheme include references to— (a) the creation of interests, rights or liabilities under the scheme, and (b) the modification of interests, rights or liabilities under the scheme, (and “transferred”, in relation to property, rights or liabilities, is to be read accordingly).
- (7) In section 408 (transfers of property, rights or liabilities to the Greater London Authority etc) after subsection (8) insert—
(8A) An order under subsection (1) above may not make provision in relation to land which is held by the Secretary of State and was acquired, or is treated as having been acquired, under section 39 of the Forestry Act 1967 (power to acquire land which is suitable for afforestation or purposes connected with forestry).
- (8) In section 409 (transfer schemes for transfers to the Greater London Authority etc) after subsection (8) insert—
(8A) A scheme under subsection (1) or (2) above may not make provision in relation to land which is held by the Secretary of State and was acquired, or is treated as having been acquired, under section 39 of the Forestry Act 1967 (power to acquire land which is suitable for afforestation or purposes connected with forestry).
- (9) In section 420 (regulations and orders)—
- (a) in subsection (7) (instruments subject to annulment in pursuance of a resolution of either House of Parliament) after the entry for section 243(7) insert— “ section 333DA(2);”, and ”, and
- (b) after subsection (8) insert—
(8A) A statutory instrument which contains regulations under section 333DC shall be subject to annulment in pursuance of a resolution of the House of Commons.
Easements etc affecting land
32
- (1) The Housing and Regeneration Act 2008 is amended in accordance with subsections (2) to (4).
- (2) In section 11 (which introduces the provision made about land of the HCA in Schedule 3) for “land of the HCA” substitute “ land acquired by the HCA ”.
- (3) In the title to Schedule 3 (main powers in relation to land of the HCA) for “land of the HCA” substitute “ land acquired by the HCA ”.
- (4) In paragraph 1 of that Schedule (powers to override easements etc in undertaking works on, or using, land of the HCA) in each of sub-paragraphs (1) and (3) for “land of the HCA” substitute “ land which has been vested in or acquired by the HCA ”.
- (5) Section 333ZB of the Greater London Authority Act 1999 (powers in relation to land held for housing or regeneration purposes) is amended in accordance with subsections (6) to (9).
- (6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- (7) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- (8) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- (9) After subsection (4) insert—
(5) In this section references to the Authority include a company or body through which the Authority exercises functions in relation to housing or regeneration. (6) Subsection (5) does not affect the application of Parts 3 and 4 of Schedule 4 to the Housing and Regeneration Act 2008— (a) in relation to the acquisition of land by the Authority under this Part, or (b) in relation to land in respect of which functions of the Authority relating to housing or regeneration are being or have been exercised.
- (10) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- (11) The amendments made by this section do not apply in relation to land the freehold interest in which was disposed of by the Homes and Communities Agency, the Greater London Authority, a company or body through which the Authority exercises functions in relation to housing or regeneration or a Mayoral development corporation before the day on which this section comes into force.
- (12) The reference in subsection (11) to land disposed of by the Greater London Authority does not include land disposed of to a company or body through which the Authority exercises functions in relation to housing or regeneration.
Expenditure of Greater London Authority on housing or regeneration
33
- (1) In section 31 of the Greater London Authority Act 1999 (limits of the general power) after subsection (5A) insert—
(5B) Nothing in subsection (1)(a) above shall be taken to prevent the Authority incurring expenditure in doing anything for the purposes of, or relating to, housing or regeneration.
- (2) The amendment made by subsection (1) applies in relation to expenditure incurred before as well as after the coming into force of this section.
Her Majesty's Land Registry
Transfer of responsibility for local land charges to Land Registry
34
- (1) Schedule 5 (transfer of responsibility for local land charges to Land Registry) has effect.
- (2) In that Schedule—
- (a) Part 1 amends the Local Land Charges Act 1975,
- (b) Part 2 amends the Land Registration Act 2002,
- (c) Part 3 amends other Acts, and
- (d) Part 4 contains transitional provision.
Conferral of additional powers on Land Registry
35
- (1) In section 105 of the Land Registration Act 2002 (power of registrar to provide or arrange for the provision of consultancy or advisory services about the registration of land in England and Wales or elsewhere) in subsection (1) for the words from “, consultancy or advisory services” to the end substitute
— (a) consultancy or advisory services about land or other property in England and Wales or elsewhere, (b) information services about land or other property in England and Wales, or (c) services relating to documents or registers which relate to land or other property in England and Wales.
- (2) For the title to that section substitute “ Services relating to land or other property ”.
Transfer of power to nominate member of Rule Committee
36
- (1) In section 127(2)(h) of the Land Registration Act 2002 (power of Lord Chancellor to nominate consumer affairs member of Rule Committee) for “Lord Chancellor” substitute “ Secretary of State ”.
- (2) This section applies in relation to the nomination of a member of the Rule Committee on or after the day on which this section comes into force.
Off-site carbon abatement measures
Provision in building regulations for off-site carbon abatement measures
37
- (1) The Building Act 1984 is amended as follows.
- (2) In section 1(1A) (matters that may be covered by building regulations) after paragraph (c) insert
; (d) the action to be taken as a result of a building's contribution to or effect on emissions of carbon dioxide (whether or not from the building itself).
- (3) Schedule 1 (building regulations) is amended as follows.
- (4) After paragraph 7 insert—
(7A) (1) This paragraph applies if building regulations impose a requirement in relation to a building as respects its contribution to or effect on emissions of carbon dioxide (whether or not the requirement relates to emissions from the building itself). (2) Building regulations may make provision for a person to whom the requirement applies to meet it (in whole or in part) by taking action otherwise than in relation to the building. (3) Such action may include— (a) doing things which consist of, or cause or contribute, directly or indirectly to— (i) reductions in emissions of carbon dioxide, or (ii) the removal of carbon dioxide from the atmosphere; (b) agreeing with another person that the person will do things within paragraph (a); (c) making a payment or payments to a fund— (i) which is administered by, or by a person acting on behalf of, the Secretary of State or the Welsh Ministers, and (ii) the proceeds of which are used to pay (directly or indirectly) for activities within paragraph (a). (4) Provision made under paragraph 4A for the use of certificates as evidence of compliance with building regulations by virtue of action within sub-paragraph (3) may include provision— (a) for the creation and maintenance of a register for keeping track of the use of certificates for that purpose; (b) about the administration of the register; (c) for charges to be imposed in connection with the registration of any matter in the register or for the disclosure of information held in the register. (5) If building regulations make provision for the creation and maintenance of a register, building regulations must make provision for the register to be administered by, or by a person acting on behalf of, the Secretary of State or the Welsh Ministers. (6) Building regulations made by the Welsh Ministers may make provision for the use, in relation to action taken in respect of a building in Wales, of a register administered by, or by a person acting on behalf of, the Secretary of State. (7) Building regulations made by the Secretary of State may make provision about the use of such a register for that purpose. (8) Building regulations may make provision for the creation and maintenance of a fund of a kind referred to in sub-paragraph (3)(c), including provision about— (a) the administration of such a fund; (b) the purposes for which proceeds from such a fund may be used. (9) Building regulations may make provision about— (a) the calculation of payments to be made into a fund of a kind referred to in sub-paragraph (3)(c); (b) the maximum payment which may be required to be made into such a fund in respect of a building. (10) Building regulations made by the Welsh Ministers may make provision for a payment or payments in respect of a building in Wales to be made to a fund administered by, or by a person acting on behalf of, the Secretary of State. (11) Building regulations made by the Secretary of State may make provision about the use of such a fund for that purpose. (12) Paragraph 8(2) does not prevent building regulations from providing for action within sub-paragraph (3) to be taken in relation to a building erected before the date on which the regulations come into force.
- (5) In paragraph 8(2) (requirement for building regulations not to apply to buildings erected before regulations come into force, subject to exceptions) after “Subject to sub-paragraphs (3) to (6) below and to” insert “ paragraph 7A(12) above and ”.
- (6) The reference to the Building Act 1984 in article 2(a) of the Welsh Ministers (Transfer of Functions) (No 2) Order 2009 (SI 2009/3019) is to be treated as referring to that Act as amended by this section.
PART 6 — Energy
The community electricity right
The community electricity right
38
- (1) The Secretary of State may make regulations which give individuals resident in a community or groups connected with a community (or both) the right to buy a stake in a renewable electricity generation facility that is located—
- (a) in the community (if it is a land-based facility), or
- (b) adjacent to the community (if it is an offshore facility).
- (2) The Secretary of State may make regulations about—
- (a) the kind, or kinds, of body which may be a facility operator,
- (b) ownership of facility operators, and
- (c) matters relating to the ownership of facility operators (including the rights, duties and powers arising from ownership),
if the Secretary of State considers that the regulations are appropriate in connection with the right to buy.
- (3) The Secretary of State may make regulations about the supply of information in connection with the following—
- (a) the right to buy;
- (b) ownership of stakes in qualifying facilities (including the transfer of ownership);
- (c) operation of qualifying facilities;
- (d) ownership of facility operators (including matters relating to the ownership of facility operators);
- (e) monitoring and assessing—
- (i) the operation of the right to buy, and
- (ii) the ownership of stakes in qualifying facilities.
- (4) The Secretary of State may make regulations about the enforcement of obligations imposed by regulations made under any of subsections (1) to (3); and the regulations about enforcement may include—
- (a) provision for obligations to be enforceable as, or as if they were, generation licence conditions or relevant requirements;
- (b) a power to impose financial penalties for breach of obligations.
- (5) The Secretary of State may by regulations modify—
- (a) any generation licence condition, or
- (b) any generation licence exemption,
if the Secretary of State considers that the modification is appropriate in connection with regulations made under any of subsections (1) to (4) or this subsection.
- (6) Schedule 6 (which describes certain provision that community electricity right regulations can make, including provision about renewable electricity generation facilities, communities, and individuals and groups who may exercise the right to buy) has effect.
- (7) In this section, Schedule 6 and section 39—
- “community electricity right regulations” means regulations under this section;
- “electricity generation licence” means a licence granted under section 6(1)(a) of the Electricity Act 1989;
- “facility operator” means a person who generates, or is expected to generate, electricity at a qualifying facility for the purpose of giving a supply to any premises or enabling a supply to be so given;
- “generation licence condition” means—the conditions of a particular electricity generation licence, orthe standard conditions so far as they are incorporated in electricity generation licences by virtue of section 8A of the Electricity Act 1989;
- “generation licence exemption” means an exemption from section 4(1)(a) of the Electricity Act 1989 granted under section 5(1) of that Act;
- “land-based facility” means a renewable electricity generation facility that is not an offshore facility;
- “offshore facility” means a renewable electricity generation facility that is located in waters in or adjacent to Great Britain that are beyond the mean low water mark;
- “qualifying facility” means a renewable electricity generation facility in relation to which the right to buy is to be, is, or has been, exercisable;
- “relevant requirement” has the same meaning as in section 25 of the Electricity Act 1989;
- “renewable electricity generation facility” means a facility using a renewable source of energy to generate electricity (and here “renewable source” has the same meaning as in sections 32 to 32LB of the Electricity Act 1989 — see section 32M of that Act) which is located in—Great Britain,waters in or adjacent to Great Britain which are between the mean low water mark and the seaward limits of the territorial sea adjacent to Great Britain, but do not form part of that territorial sea,the territorial sea adjacent to Great Britain, orthe Renewable Energy Zone (within the meaning of Chapter 2 of Part 2 of the Energy Act 2004), except for any part of that Zone which forms part of the territorial sea adjacent to Northern Ireland;
- “right to buy” means the right to buy a stake in a renewable electricity generation facility that is given by regulations under subsection (1).
Supplementary provision
39
- (1) Community electricity right regulations may confer a function on—
- (a) the Secretary of State, or
- (b) any other person, apart from the Scottish Ministers or the Welsh Ministers.
- (2) The functions that may be imposed include—
- (a) a duty (including a restriction or prohibition);
- (b) a function involving the exercise of a discretion;
- (c) a requirement to consult;
- (d) a requirement to take account of guidance.
- (3) The provisions of section 38, Schedule 6 and this section which specify particular kinds of provision that may be made in community electricity right regulations do not limit the powers conferred by section 38 to make such regulations.
- (4) The duties under Schedule 6 to make particular provision in community electricity right regulations do not apply unless the Secretary of State decides to exercise the power conferred by section 38 to make such regulations.
- (5) Provision which commences community electricity right regulations may be framed so as to secure that the regulations do not apply to a renewable electricity generation facility if development of the facility has reached a stage of advancement specified in the commencement provision.
- (6) A reference in section 38 or Schedule 6 to buying a stake in a renewable electricity generation facility includes a reference to making a loan in relation to a renewable electricity generation facility.
- (7) The Secretary of State must carry out a review of section 38, Schedule 6 and the preceding provisions of this section as soon as reasonably practicable after the end of the period of 5 years beginning with the day on which they come into force.
The Extractive Industries Transparency Initiative
The Extractive Industries Transparency Initiative
40
After section 8 of the Commissioners for Revenue and Customs Act 2005 insert—
(8A) (1) The Commissioners may do anything which they think necessary or expedient in connection with the Extractive Industries Transparency Initiative in so far as it relates to taxes the collection and management of which is the responsibility of the Commissioners. (2) In this section “the Extractive Industries Transparency Initiative” means the international initiative of that name which has the aim of promoting openness in the management of revenues from natural resources.
Recovery of UK petroleum
Maximising economic recovery of UK petroleum
41
After section 9 of the Petroleum Act 1998 insert—
(9A) (1) In this Part the “principal objective” is the objective of maximising the economic recovery of UK petroleum, in particular through— (a) development, construction, deployment and use of equipment used in the petroleum industry (including upstream petroleum infrastructure), and (b) collaboration among the following persons— (i) holders of petroleum licences; (ii) operators under petroleum licences; (iii) owners of upstream petroleum infrastructure; (iv) persons planning and carrying out the commissioning of upstream petroleum infrastructure. (2) The Secretary of State must produce one or more strategies for enabling the principal objective to be met. (3) A strategy may relate to matters other than those mentioned in subsection (1)(a) and (b). (4) For provision about producing and revising a strategy, see sections 9F and 9G. (9B) The Secretary of State must act in accordance with the current strategy or strategies when— (a) exercising functions under the other Parts of this Act (except Part 4), (b) exercising functions under Part 4 to the extent that they concern reduction of the costs of abandonment of offshore installations and submarine pipelines, (c) exercising functions under Chapter 3 of Part 2 of the Energy Act 2011 (upstream petroleum infrastructure), (d) exercising any function or using any power under a petroleum licence, and (e) exercising any other function or using any power— (i) to provide advice or assistance to another person, or (ii) to acquire, use or supply information, for the purpose of enabling the principal objective to be met. (9C) (1) A person who is the holder of a petroleum licence must act in accordance with the current strategy or strategies when planning and carrying out activities as the licence holder. (2) A person who is an operator under a petroleum licence must act in accordance with the current strategy or strategies when planning and carrying out activities as the operator under the licence. (3) A person who is the owner of upstream petroleum infrastructure must act in accordance with the current strategy or strategies when planning and carrying out the person's activities as the owner of upstream petroleum infrastructure (including the development, construction, deployment and use of the infrastructure). (4) A person must act in accordance with the current strategy or strategies when planning and carrying out the commissioning of upstream petroleum infrastructure. (9D) (1) As soon as practicable after the end of each reporting period, the Secretary of State must— (a) consider the extent to which, during that period, these persons have followed section 9C by acting in accordance with the current strategy or strategies— (i) licence holders, (ii) operators under petroleum licences, (iii) owners of upstream petroleum infrastructure, and (iv) persons planning and carrying out the commissioning of upstream petroleum infrastructure; and (b) produce a report on the results of the consideration of that question. (2) The report may contain other material, including a statement of action which the Secretary of State has taken, or is proposing to take, in response to any matter included in the report (including changes to a strategy). (3) The Secretary of State must publish, and lay before each House of Parliament, a copy of each report produced under this section. (4) In this section “reporting period” means— (a) the period of two years beginning with the day when this section comes into force, and (b) each subsequent period of one year beginning with the day after the end of a previous reporting period. (9E) (1) This Part does not limit the exercise of the Secretary of State's security and resilience functions. (2) This Part is subject to the exercise of the security and resilience functions by the Secretary of State. (3) In this section “security and resilience function” means any function which relates to— (a) the security of petroleum supplies, or (b) the resilience of the petroleum industry. (9F) (1) The Secretary of State must produce the first strategy before the end of the period of one year beginning with the day on which this section comes into force. (2) The Secretary of State may subsequently— (a) produce a new strategy, or (b) revise a current strategy, whenever the Secretary of State thinks appropriate. (3) The Secretary of State must review each current strategy before the end of each relevant four year period. (4) In reviewing a current strategy, the Secretary of State must (in particular) take account of the results of any consideration undertaken under section 9D in respect of reporting periods falling within the relevant four year period. (5) In this section “relevant four year period”, in relation to a current strategy, means a period of four years beginning with— (a) the date on which the strategy was issued, or (b) if later, the date on which the last review under subsection (3) was concluded. (9G) (1) Before— (a) producing the first strategy, (b) producing a new strategy, or (c) revising a current strategy, the Secretary of State must prepare a draft of the strategy or revised strategy. (2) The Secretary of State must— (a) consult such persons as the Secretary of State thinks appropriate about the draft, and (b) consider any representations made by them. (3) If, after complying with that duty, the Secretary of State decides to proceed with the draft (in its original form or with modifications), the Secretary of State must lay a copy of the draft before each House of Parliament. (4) The Secretary of State may not take any further steps in relation to the draft if, within the 40 day period, either House resolves not to approve the draft (a “negative resolution”). (5) If neither House passes a negative resolution, the Secretary of State may issue the strategy or revised strategy in the form laid before Parliament. (6) The strategy or revised strategy comes into force on the date specified by the Secretary of State (which must not be before the date when it is issued). (7) Subsection (4) does not prevent a new draft of a strategy or revised strategy from being laid before Parliament. (8) In this section “40 day period”, in relation to the draft of a strategy or revised strategy, means the period of 40 days beginning with the day on which the draft is laid before Parliament (or if the draft is not laid before each House on the same day, the later of the 2 days on which it is laid). (9) For the purposes of calculating the 40 day period, no account is to be taken of any period during which Parliament is dissolved or prorogued or during which both Houses are adjourned for more than four days. (9H) (1) In this Part “upstream petroleum infrastructure” means— (a) a gas processing facility, (b) an oil processing facility, or (c) an upstream petroleum pipeline, if and in so far as it meets conditions A and B. (2) A facility or pipeline meets condition A if and in so far as it is situated in Great Britain or relevant UK waters. (3) A facility or pipeline meets condition B if and in so far as it is used in relation to UK petroleum (including such petroleum after it has been got). (4) But an upstream petroleum pipeline is not “upstream petroleum infrastructure” if it is a pipeline to which section 17GA applies (petroleum pipelines subject to Norwegian access system). (5) In this section, the following expressions have the same meanings as in Chapter 3 of Part 2 of the Energy Act 2011 (see section 90 of that Act)— (a) “gas processing facility”; (b) “oil processing facility”; (c) “upstream petroleum pipeline”. (6) In this Part, “owner”, in relation to upstream petroleum infrastructure, means— (a) a person in whom the pipeline or facility is vested; (b) a lessee and any person occupying or controlling the pipeline or facility; and (c) a person who has the right to have things conveyed by the pipeline or processed by the facility. (9I) In this Part— - “current strategy”, in relation to any particular time, means a strategy under section 9A(2) in force at that time; - “operator under a petroleum licence” means a person who is responsible for organising or supervising any of the operations of searching for, boring for, or getting UK petroleum in pursuance of the petroleum licence; - “owner”, in relation to upstream petroleum infrastructure, has the meaning given in section 9H; - “petroleum” has meaning given in section 1; - “petroleum licence” means a licence granted under— 1. section 3 of this Act, or 2. section 2 of the Petroleum (Production) Act 1934; - “principal objective” has the meaning given in section 9A; - “relevant UK waters” means— 1. the territorial sea adjacent to the United Kingdom, and 2. the sea in any area designated under section 1(7) of the Continental Shelf Act 1964; - “UK petroleum” means petroleum which for the time being exists in its natural condition in strata beneath relevant UK waters; - “upstream petroleum infrastructure” has the meaning given in section 9H.
Levy on holders of certain energy industry licences
42
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Petroleum and geothermal energy in deep-level land
Petroleum and geothermal energy: right to use deep-level land
43
- (1) A person has the right to use deep-level land in any way for the purposes of exploiting petroleum or deep geothermal energy.
- (2) Land is subject to the right of use (whether for the purposes of exploiting petroleum or deep geothermal energy) only if it is—
- (a) deep-level land, and
- (b) within a landward area.
- (3) But that does not prevent deep-level land that is within a landward area from being used for the purposes of exploiting petroleum or deep geothermal energy outside a landward area.
- (4) Deep-level land is any land at a depth of at least 300 metres below surface level.
Further provision about the right of use
44
- (1) The ways in which the right of use may be exercised include—
- (a) drilling, boring, fracturing or otherwise altering deep-level land;
- (b) installing infrastructure in deep-level land;
- (c) keeping, using or removing any infrastructure installed in deep-level land;
- (d) passing any substance through, or putting any substance into, deep-level land or infrastructure installed in deep-level land;
- (e) keeping, using or removing any substance put into deep-level land or into infrastructure installed in deep-level land.
- (2) The purposes for which the right of use may be exercised include—
- (a) searching for petroleum or deep geothermal energy;
- (b) assessing the feasibility of exploiting petroleum or deep geothermal energy;
- (c) preparing for exploiting petroleum or deep geothermal energy;
- (d) decommissioning, and other activity which falls to be continued or undertaken, in consequence of activities undertaken for the purposes of exploiting petroleum or deep geothermal energy.
- (3) The right of use includes the right to leave deep-level land in a different condition from the condition it was in before an exercise of the right of use (including by leaving any infrastructure or substance in the land).
- (4) The right of use—
- (a) does not give a person (“R”) any power which is greater than, or different from, the power which R would have had if the right had been granted by a person legally entitled to grant it; and
- (b) does not relieve a person (“R”) from any obligation or liability to which R would have been subject if the right had been granted by a person legally entitled to grant it.
- (5) A person (“L”) who owns land (the “relevant land”) is not liable, as the owner of that land, in tort for any loss or damage which is attributable to the exercise, or proposed exercise, of the right of use by another person (whether in relation to the relevant land or any other land).
- (6) For that purpose, loss or damage is not attributable to the exercise, or proposed exercise, of the right of use (in particular) if, or to the extent that, the loss or damage is attributable to a deliberate omission by L.
- (7) There is a “deliberate omission by L” if L, as owner of the relevant land, decides—
- (a) not to do an act, or
- (b) not to allow another person to do an act,
and the circumstances at the time of that decision were such that L would not have had to bear any of the costs incurred (whether by L or any other person) in doing or allowing the act.
- (8) Section 43 and this section bind the Crown.
Payment scheme
45
- (1) The Secretary of State may, by regulations, require relevant energy undertakings to make payments in respect of the proposed exercise, or exercise, of—
- (a) the right to use deep-level land in England for the purposes of exploiting petroleum, and
- (b) the right to use deep-level land for the purposes of exploiting deep geothermal energy.
- (1A) The Welsh Ministers may, by regulations, require relevant energy undertakings to make payments in respect of the proposed exercise, or exercise, of the right to use deep-level land in Wales for the purposes of exploiting petroleum.
- (2) Regulations under subsection (1) may require payments to be made—
- (a) to owners of relevant land or interests in relevant land;
- (b) to other persons for the benefit of areas in which relevant land is situated.
- (3) Regulations under subsection (1) may—
- (a) specify the amount or amounts of payments;
- (b) make provision for determining the amount or amounts of payments.
- (4) Regulations under subsection (1) may require relevant energy undertakings to provide the Secretary of State, or any other specified person, with specified information about—
- (a) the proposed exercise, or exercise, of the right of use; to which the regulations relate
- (b) the making of payments in accordance with regulations under subsection (1).
- (4A) Regulations under subsection (1A) may require relevant energy undertakings to provide the Welsh Ministers, or any other specified person, with specified information about—
- (a) the proposed exercise, or exercise, of the right of use to which the regulations relate;
- (b) the making of payments in accordance with regulations under subsection (1A).
- (5) Before making any regulations under subsection (1), the Secretary of State must consult such persons as the Secretary of State considers appropriate.
- (6) Before making any regulations under subsection (1A), the Welsh Ministers must consult such persons as they consider appropriate.
Notice scheme
46
- (1) The Secretary of State may, by regulations, require relevant energy undertakings to give notice of the proposed exercise, or exercise, of —
- (a) the right to use deep-level land in England for the purposes of exploiting petroleum, and
- (b) the right to use deep-level land for the purposes of exploiting deep geothermal energy.
- (1A) The Welsh Ministers may, by regulations, require relevant energy undertakings to give notice of the proposed exercise, or exercise, of the right to use deep-level land in Wales for the purposes of exploiting petroleum.
- (2) The regulations may require relevant energy undertakings—
- (a) to give notice—
- (i) to owners of relevant land or interests in relevant land;
- (ii) to persons of other specified descriptions;
- (b) to display notice within the area in which relevant land is situated or elsewhere;
- (c) to publish notice (otherwise than by displaying the notice).
- (3) The regulations may make provision about the information which the notice is to contain, including provision about information relating to—
- (a) any payment scheme regulations which are in force;
- (b) the application of any payment scheme regulations to the proposed exercise, or exercise, of the right of use; to which the regulations relate
- (c) the method for obtaining a payment under any payment scheme regulations.
- (4) The regulations may make provision about the manner in which notice is to be given, displayed or published, including provision requiring notice to be—
- (a) displayed at specified places or places of specified descriptions;
- (b) published in specified publications or publications of specified descriptions.
- (5) Regulations under subsection (1) may require relevant energy undertakings to provide the Secretary of State, or any other specified person, with specified information about—
- (a) the proposed exercise, or exercise, of the right of use to which the regulations relate;
- (b) the giving of notice in accordance with regulations under subsection (1).
- (5A) Regulations under subsection (1A) may require relevant energy undertakings to provide the Welsh Ministers, or any other specified person, with specified information about—
- (a) the proposed exercise, or exercise, of the right of use to which the regulations relate;
- (b) the giving of notice in accordance with regulations under subsection (1A).
- (6) Before making regulations under subsection (1), the Secretary of State must consult such persons as the Secretary of State considers appropriate.
- (6A) Before making regulations under subsection (1A), the Welsh Ministers must consult such persons as they consider appropriate.
- (7) In this section “payment scheme regulations” means regulations under section 45.
Payment and notice schemes: supplementary provision
47
- (1) Regulations under section 45 or 46 may make provision about the enforcement of relevant requirements, including provision for the imposition of financial penalties in respect of breach of relevant requirements.
- (2) Regulations made by the Secretary of State under section 45 or 46 may confer a function on—
- (a) the Secretary of State, or
- (b) any other person, apart from the Welsh Ministers.
- (2A) Regulations made by the Welsh Ministers under section 45 or 46 may confer a function on—
- (a) the Welsh Ministers, or
- (b) any other person apart from a Minister of the Crown (within the meaning of the Ministers of the Crown Act 1975).
- (3) The functions that may be imposed include—
- (a) a duty (including a restriction or prohibition);
- (b) a function involving the exercise of a discretion;
- (c) a requirement to consult.
- (4) The provisions of sections 45 and 46 and this section which specify particular kinds of provision that may be made in regulations under section 45 or 46 do not limit the powers conferred by that section to make such regulations.
- (5) The Secretary of State must carry out a review of the Secretary of State's powers under sections 45 and 46 and the preceding provisions of this section as soon as reasonably practicable after the end of the period of 5 years beginning with the day on which they come into force.
- (6) The Secretary of State must by regulations—
- (a) repeal section 45(1), and make any consequential amendments (including repeals) of the other provisions of this Act that the Secretary of State considers appropriate, if the relevant conditions are met in relation to the power under section 45(1);
- (b) repeal section 46(1), and make any consequential amendments (including repeals) of the other provisions of this Act that the Secretary of State considers appropriate, if the relevant conditions are met in relation to the power under section 46(1).
- (7) The relevant conditions are met in relation to the power under section 45(1) or the power under section 46(1) if—
- (a) that power is not exercised within the period of 7 years beginning with the day on which that section comes into force, and
- (b) the Secretary of State is satisfied that there is no convincing case for retaining that power.
Interpretation
48
- (1) For the purposes of deciding whether land is deep-level land—
- (a) the depth of a point in land below surface level is the distance between that point and the surface of the land vertically above that point; and
- (b) in determining what is the surface of the land, any building or other structure on the land, and any water covering the land, must be ignored.
- (1A) The Secretary of State may make regulations setting out the definition of “landward area” as it applies in relation to—
- (a) the right to use deep-level land in England for the purposes of exploiting petroleum, and
- (b) the right to use deep-level land for the purposes of exploiting deep geothermal energy.
- (1B) The Welsh Ministers may make regulations setting out the definition of “landward area” as it applies in relation to the right to use deep-level land in Wales for the purposes of exploiting petroleum within the Welsh onshore area.
- (1C) Until regulations are made under subsection (1A) or (1B), “landward area” means those parts of the landward area, within the meaning of the 2014 Regulations, that are in England and Wales.
- (2) In sections 43 to 47 and this section—
- “the 2014 Regulations” means the Petroleum Licensing (Exploration and Production) (Landward Areas) Regulations 2014 (S.I. 2014/1686), as in force on the day on which subsections (1A) to (1C) come into force;
- “deep geothermal energy” means geothermal energy in deep-level land (including in water or any other fluid in deep-level land);
- “deep-level land” has the meaning given in section 43(4);
- “England” includes the sea adjacent to England out as far as— the seaward boundary of the territorial sea, orif nearer to the land, any boundary between waters that are treated as part of the sea adjacent to Wales and those that are not, as determined by an order made under section 158(3) of the Government of Wales Act 2006;
- ...
- “petroleum” has the same meaning as in Part 1 of the Petroleum Act 1998 (see section 1 of that Act);
- “relevant energy undertaking” means a person who proposes to exercise, or exercises, the right of use;
- “relevant land” means land in respect of which the right of use is proposed to be, or is, exercised;
- “relevant requirement” means a requirement imposed by regulations under section 45 or 46;
- “right of use” means the right conferred by section 43;
- “specified” means specified in regulations under section 45 or 46;
- “substance” includes electricity and any other intangible thing;
- “Wales” has the same meaning as in the Government of Wales Act 2006 (see section 158(1) and (3) of that Act);
- “Welsh onshore area” has the same meaning as in Section D2 in Part 2 of Schedule 7A to the Government of Wales Act 2006.
- (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Other provision about onshore petroleum
Advice on likely impact of onshore petroleum on the carbon budget
49
- (1) The Secretary of State must from time to time request the Committee on Climate Change to provide advice (in accordance with section 38 of the CCA 2008) on the impact which combustion of, and fugitive emissions from, petroleum got through onshore activity in England is likely to have on the Secretary of State's ability to meet the duties imposed by—
- (a) section 1 of the CCA 2008 (net UK carbon account target for 2050), and
- (b) section 4(1)(b) of the CCA 2008 (UK carbon account not to exceed carbon budget).
- (2) As soon as practicable after each reporting period, the Secretary of State must—
- (a) lay before Parliament a copy of advice received under subsection (1) during the reporting period, and
- (b) lay before Parliament a draft of regulations under subsection (3) or a report under subsection (5).
- (3) Regulations under this subsection are regulations providing for section 43 to cease to have effect in England to such extent as may be specified in the regulations.
- (4) No provision made in regulations under subsection (3) has effect in relation to anything done in exercise of the right of use conferred by section 43 before the date on which the regulations come into force.
- (5) A report under this subsection is a report explaining why a draft of regulations under subsection (3) has not been laid.
- (6) Regulations under this section may make such consequential amendments or repeals of sections 43 to 48 and this section as the Secretary of State considers appropriate.
- (7) In this section—
- “CCA 2008” means the Climate Change Act 2008;
- “petroleum got through onshore activity in England” means petroleum got from the strata in which it exists in its natural condition by activity carried out on land in England (excluding land covered by the sea or any tidal waters);
- “petroleum” has the same meaning as in Part 1 of the Petroleum Act 1998 (see section 1 of that Act);
- “reporting period” means—the period ending with 1 April 2016, andeach subsequent period of 5 years.
Onshore hydraulic fracturing: safeguards
50
After section 4 of the Petroleum Act 1998 insert—
(4A) (1) The Secretary of State must not issue a well consent that is required by an onshore licence for England or Wales unless the well consent imposes— (a) a condition which prohibits associated hydraulic fracturing from taking place in land at a depth of less than 1000 metres; and (b) a condition which prohibits associated hydraulic fracturing from taking place in land at a depth of 1000 metres or more unless the licensee has the Secretary of State's consent for it to take place (a “hydraulic fracturing consent”). (2) A hydraulic fracturing consent is not to be issued unless an application for its issue is made by, or on behalf of, the licensee. (3) Where an application is made, the Secretary of State may not issue a hydraulic fracturing consent unless the Secretary of State— (a) is satisfied that— (i) the conditions in column 1 of the following table are met, and (ii) the conditions in subsection (6) are met, and (b) is otherwise satisfied that it is appropriate to issue the consent. (4) The existence of a document of the kind mentioned in column 2 of the table in this section is sufficient for the Secretary of State to be satisfied that the condition to which that document relates is met. (5) But the absence of such a document does not prevent the Secretary of State from being satisfied that that condition is met.
| Column 1: conditions | Column 1: conditions | Column 2: documents |
|---|---|---|
| 1 | The environmental impact of the development which includes the relevant well has been taken into account by the local planning authority | A notice given by the local planning authority that the environmental information was taken into account in deciding to grant the relevant planning permission |
| 2 | Appropriate arrangements have been made for the independent inspection of the integrity of the relevant well | A certificate given by the Health and Safety Executive that it— (a) has received a well notification under regulation 6 of the Borehole Sites and Operations Regulations 1995, (b) has received the information required by regulation 19 of the Offshore Installations and Wells (Design and Construction, etc.) Regulations 1996, and (c) has visited the site of the relevant well |
| 3 | The level of methane in groundwater has, or will have, been monitored in the period of 12 months before the associated hydraulic fracturing begins | An environmental permit has been given by the relevant environmental regulator which contains a condition that requires compliance with a waste management plan which provides for monitoring of the level of methane in groundwater in the period of 12 months before the associated hydraulic fracturing begins |
| 4 | Appropriate arrangements have been made for the monitoring of emissions of methane into the air | An environmental permit which contains a condition requiring compliance with a waste management plan which provides for the monitoring of emissions of methane into the air for the period of the permit |
| 5 | The associated hydraulic fracturing will not take place within protected groundwater source areas | A decision document given by the relevant environmental regulator (in connection with an environmental permit) which indicates that the associated hydraulic fracturing will not take place within protected groundwater source areas |
| 6 | The associated hydraulic fracturing will not take place within other protected areas | A notice given by the local planning authority that the area in respect of which the relevant planning permission has been granted does not include any land which is within any other protected areas |
| 7 | In considering an application for the relevant planning permission, the local planning authority has (where material) taken into account the cumulative effects of— (a) that application, and (b) other applications relating to exploitation of onshore petroleum obtainable by hydraulic fracturing | A notice given by the local planning authority that it has taken into account those cumulative effects |
| 8 | The substances used, or expected to be used, in associated hydraulic fracturing— (a) are approved, or (b) are subject to approval, by the relevant environmental regulator | An environmental permit has been given by the relevant environmental regulator which contains a condition that requires substances used in associated hydraulic fracturing to be approved by that regulator |
| 9 | In considering an application for the relevant planning permission, the local planning authority has considered whether to impose a restoration condition in relation to that development | A notice given by the local planning authority that it has considered whether to impose such a condition |
| 10 | The relevant undertaker has been consulted before grant of the relevant planning permission | A notice given by the local planning authority that the relevant undertaker has been consulted |
| 11 | The public was given notice of the application for the relevant planning permission | A notice given by the local planning authority which confirms that the applicant for the relevant planning permission has certified that public notification requirements, as set out in a development order, have been met |
(6) The conditions mentioned in subsection (3)(a)(ii) are— (a) that appropriate arrangements have been made for the publication of the results of the monitoring referred to in condition 4 in the table; (b) that a scheme is in place to provide financial or other benefit for the local area. (7) A hydraulic fracturing consent may be issued subject to any conditions which the Secretary of State thinks appropriate. (8) A breach of such a condition is to be treated as if it were a breach of a condition of a well consent. (4B) (1) “Associated hydraulic fracturing” means hydraulic fracturing of shale or strata encased in shale which— (a) is carried out in connection with the use of the relevant well to search or bore for or get petroleum, and (b) involves, or is expected to involve, the injection of— (i) more than 1,000 cubic metres of fluid at each stage, or expected stage, of the hydraulic fracturing, or (ii) more than 10,000 cubic metres of fluid in total. (2) For the purposes of deciding the depth at which associated hydraulic fracturing is taking place in land— (a) the depth of a point in land below surface level is the distance between that point and the surface of the land vertically above that point; and (b) in determining what is the surface of the land, any building or other structure on the land, and any water covering the land, must be ignored. (3) Subsections (1) and (2) apply for the purposes of section 4A and this section. (4) The Secretary of State must, by regulations made by statutory instrument, specify— (a) the descriptions of areas which are “protected groundwater source areas”, and (b) the descriptions of areas which are “other protected areas”, for the purposes of section 4A. (5) A statutory instrument which contains regulations under subsection (4) may not be made unless a draft of the instrument has been laid before and approved by a resolution of each House of Parliament. (6) The Secretary of State must lay a draft of the first such regulations before each House of Parliament on or before 31 July 2015. (7) The Secretary of State must consult— (a) the Environment Agency before making any regulations under subsection (4)(a) in relation to England; (b) the Natural Resources Body for Wales before making any regulations under subsection (4)(a) in relation to Wales. (8) These expressions have the meanings given— - “development order” has the meaning given in section 59 of the Town and Country Planning Act 1990; - “environmental permit” means a permit granted under regulation 13 of the Environmental Permitting (England and Wales) Regulations 2010; - “hydraulic fracturing consent” has the meaning given in subsection (1)(b); - “licensee” means the holder of the onshore licence for England or Wales; - “local planning authority” means— 1. the planning authority to which the application for the relevant planning permission was made (unless the Secretary of State or Welsh Ministers are responsible for determining the application), or 2. the Secretary of State or Welsh Ministers (if responsible for determining the application); - “onshore licence for England or Wales” means a licence granted under section 3 which authorises a person to search or bore for or get petroleum in those parts of the landward area (within the meaning of the Petroleum Licensing (Exploration and Production) (Landward Areas) Regulations 2014) that are in England or Wales or are beneath waters (other than waters adjacent to Scotland); - “relevant environmental regulator” means— 1. the Environment Agency, if the relevant well is situated in England, or 2. the Natural Resources Body for Wales, if the relevant well is situated in Wales; - “relevant planning permission” means planning permission to be granted, or granted, in respect of development which includes the relevant well; - “relevant undertaker” means the water undertaker or sewerage undertaker in whose area of appointment the relevant well is located; - “relevant well” means the well to which a well consent relates; - “well consent” means a consent in writing of the Secretary of State to the commencement of drilling of a well. (9) The power of the Secretary of State to make regulations under section 4 includes power to make such amendments of the definition of “onshore licence for England or Wales” in this section as the Secretary of State considers appropriate in consequence of any other exercise of the power under section 4. (10) The Secretary of State may, by regulations made by statutory instrument— (a) make such amendments of column 2 of the table in section 4A as the Secretary of State considers appropriate, and (b) make such other amendments of section 4A or this section as the Secretary of State considers appropriate in consequence of provision made under paragraph (a). (11) A statutory instrument which contains regulations under subsection (10) may not be made unless a draft of the instrument has been laid before and approved by a resolution of each House of Parliament.
Renewable heat incentives
Renewable heat incentives
51
- (1) Section 100 of the Energy Act 2008 (renewable heat incentives) is amended in accordance with subsections (2) to (4).
- (2) After subsection (1) insert—
(1A) Regulations under this section may confer any function on any person. (1B) Regulations under this section may provide for a function conferred on a person to be exercisable on behalf of another person.
- (3) In subsection (2)—
- (a) in paragraph (a), for the words before sub-paragraph (i) substitute—
(a) make provision giving any of the following persons entitlements to payments (“RHI payments”) in specified circumstances—
;
- (b) in paragraph (b), for “such payments” substitute “ RHI payments ”;
- (c) after paragraph (b) insert—
(ba) make provision about the circumstances in which, and descriptions of persons to whom, the whole or a part of an entitlement to an RHI payment may be assigned (whether the person has the entitlement by virtue of regulations under paragraph (a) or regulations under this paragraph); (bb) authorise or require the Secretary of State, the Authority, designated fossil fuel suppliers, or any person with any other administration function, to make an RHI payment— (i) to the person who is entitled to the payment by virtue of regulations under paragraph (a), or (ii) where that entitlement has been wholly or partly assigned in accordance with regulations under this section, to the person or persons for the time being enjoying the entitlement or any part of it;
;
- (d) in paragraph (c), for “such payments” substitute “ RHI payments ”;
- (e) for paragraph (d) substitute—
(d) authorise or require a person to provide specified information;
;
- (f) in paragraph (e), omit “to the Secretary of State or the Authority”;
- (g) in paragraph (h), omit “for the Secretary of State or the Authority”;
- (h) omit paragraph (i);
- (i) at the end insert—
(j) authorise the Secretary of State to make payments to a person in respect of the exercise by the person of functions under regulations under this section; (k) make provision about the resolution of disputes relating to the exercise of functions under regulations under this section, including provision about arbitration or appeals (which may, in particular, provide for the person conducting an arbitration or determining an appeal to order the payment of costs or compensation).
- (4) In subsection (3), after the definition of “fossil fuel supplier” insert—
“other administration function” means a function relating to the administration of a scheme established under this section, other than a function conferred by regulations under subsection (2)(bb);
.
- (5) Section 105 of the Energy Act 2008 (Parliamentary control of subordinate legislation) is amended in accordance with subsections (6) to (8).
- (6) In subsection (2)—
- (a) in paragraph (a), omit sub-paragraph (vi);
- (b) after paragraph (aa) insert—
(ab) regulations which contain (whether alone or together with other provision) affirmative resolution provision made under section 100 (renewable heat incentives);
.
- (7) In subsection (3), after “(2)(a)” insert “ , (ab) ”
- (8) After subsection (3) insert—
(3A) Provision made under section 100 is affirmative resolution provision if— (a) the provision is made under any of the powers which always attract the affirmative resolution procedure, or (b) the provision— (i) is not made under any of those powers, and (ii) meets condition A, B, C or D. (3B) The powers which always attract the affirmative resolution procedure are the powers conferred by— (a) section 100(2)(c), (e), (f), (g), (h) and (k), (b) section 100(5), and (c) section 100(6). (3C) Provision meets condition A if— (a) it is made under the power conferred by section 100(2)(bb), and (b) it requires a designated fossil fuel supplier to make a payment under an RHI scheme. (3D) Provision meets condition B if— (a) it confers an administration function on a person who is not the Secretary of State or the Authority, and (b) the time when the provision comes into force will be the first time that an administration function under the RHI scheme concerned is exercisable by a person who is not the Secretary of State or the Authority. (3E) Provision meets condition C if— (a) it is made under a power conferred by paragraph (ba) or (bb)(ii) of section 100(2), (b) it is made in relation to an RHI scheme that was in existence immediately before the coming into force of this subsection, and (c) it is the first provision to be made under that power in relation to that RHI scheme. (3F) Provision meets condition D if— (a) it is made under a power conferred by paragraph (a), (b), (ba), (bb), (d) or (j) of section 100(2), (b) it is made in relation to an RHI scheme that was not in existence immediately before the coming into force of this subsection, and (c) it is the first provision to be made under that power in relation to that RHI scheme. (3G) In deciding whether provision meets condition B, the following matters must be ignored— (a) for the purposes of subsection (3D)(a): any provision which confers a payment function on designated fossil fuel suppliers; (b) for the purposes of subsection (3D)(b): any payment function under the RHI scheme concerned which (before the time when the provision comes into force) is, or has been, exercisable by designated fossil fuel suppliers. (3H) The fact that provision is to some extent made under a power conferred by section 100(1), (1A) or (1B) does not prevent that provision from being taken (for the purposes of subsections (3A) to (3F)) as being made under any other power conferred by section 100. (3I) In subsections (3B) to (3H) and this subsection— - “administration function” means a function relating to the administration of an RHI scheme; - “designated fossil fuel suppliers” has the same meaning as in section 100; - “payment function” means a function of making a payment under an RHI scheme (whether the function authorises or requires the making of the payment); - “RHI scheme” means a scheme under section 100 to facilitate and encourage renewable generation of heat.
- (9) In section 105 of the Utilities Act 2000 (general restrictions on disclosure of information), in subsection (3)—
- (a) in paragraph (a), omit “or section 100”;
- (b) after paragraph (a) insert—
(aa) it is made for the purpose of facilitating any functions of any person under section 100 of the Energy Act 2008;
.
Reimbursement of persons who have met expenses
Reimbursement of persons who have met expenses of making electrical connections
52
- (1) The Electricity Act 1989 is amended in accordance with this section.
- (2) In section 19 (power to recover expenditure)—
- (a) omit subsections (2) and (3);
- (b) after subsection (3) insert—
(3A) Schedule 5B (reimbursement of persons who have met expenses) has effect.
;
- (c) in subsection (4), after “this section” insert “ and Schedule 5B ”.
- (3) After Schedule 5A insert—
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.