The Folkestone—Honiton Trunk Road A35 (Axminster Bypass and Slip Road) Order 1987

Type Statutory-Instrument
Publication 1987-12-21
State In force
Department Queen's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API

Made: 21st December 1987

Coming into force: 26th January 1988

The Secretary of State for Transport makes this Order in exercise of powers conferred by sections 10 and 41 of the Highways Act 1980[^f00001], and now vested in him[^f00002], and of all other enabling powers:

1

The new highways which the Secretary of State proposes to construct:—

shall become trunk roads as from the date when this Order comes into force.

2

The centre lines of the new trunk roads are indicated by heavy black lines on the deposited plan.

3

The Secretary of State directs as respects any part of a highway which crosses the route of any of the new trunk roads that—

until, in either case, a date to be specified in a notice given by the Secretary of State to the highway authority for that highway. The date specified will not be later than the date on which the relevant route is opened for the purposes of through traffic.

4

In this Order—

5

This Order shall come into force on 26th January 1988 and may be cited as the Folkestone—Honiton Trunk Road A35 (Axminster Bypass and Slip Road) Order 1987.

SCHEDULE 1 — ROUTE OF THE MAIN NEW TRUNK ROAD

The route of the main new trunk road is a route at or near Axminster in the County of Devon about 3.65 kilometres in length starting at a point on the Trunk Road approximately 190 metres west of the centre of the bridge which carries the Trunk Road over the River Yarty then going in a general easterly direction south of Axminster to rejoin the Trunk Road at a point approximately 438 metres west of the junction of the Trunk Road and the C69 road to Seaton.

SCHEDULE 2 — ROUTE OF THE SLIP ROAD

Junction with A358 Musbury Road

The route of the slip road is a route to connect the main new trunk road with the A358 Musbury Road (the new trunk road along this route being given the reference number 1 on the deposited plan).

Signed

Signed by authority of the Secretary of State

G.M. Wedd — Regional Director South West Region — Department of Transport — 21st December 1987

Footnotes

[^f00001]: 1980 c. 66.

[^f00002]: S.I. 1981/238.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.