The (A41) East of Birmingham to Birkenhead and the (A49) Shrewsbury to Warrington Trunk Roads (Whitchurch Bypass) Order 1988

Type Statutory-Instrument
Publication 1988-05-13
State In force
Department Queen's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API

Made: 13th May 1988

Coming into force: 29th July 1988

The Secretary of State for Transport makes this Order in exercise of powers conferred by sections 10, 12, 41, 106 and 108 of the Highways Act 1980[^f00001], and now vested in him[^f00002], and of all other enabling powers:

1

The new highway which the Secretary of State proposes to construct along the route described in Schedule 1 shall become a trunk road as from the date when this order comes into force.

2

The centre line of the new trunk road is indicated by a heavy black line on the deposited plan.

3

The Secretary of State directs as respects any part of a highway which crosses the route of any of the new trunk road that—

until, in either case, a date to be specified in a notice given by the Secretary of State to the highway authority for that highway. The date specified will not be later than the date on which the relevant route is opened for the purposes of through traffic.

4

The lengths of trunk roads described in Schedule 2 and shown by broad striped hatching on the deposited plan shall cease to be trunk roads and shall be classified as classified roads as from the date on which the Secretary of State notifies the County Council of Shropshire that the new trunk road is open for through traffic.

5

The Secretary of State is authorised to construct the bridge specified in Schedule 3 as part of the new trunk road and, in connection with the construction of that bridge, to divert the part of the navigable watercourse specified in that schedule and the towing path adjacent to that part in the manner shown in that schedule.

6

The Secretary of State is authorised to construct the bridge specified in Schedule 4 as part of the new trunk road and, in connection with the construction of that bridge, to divert the part of the navigable water course specified in that schedule and the towing path adjacent to that part in the manner shown in that schedule.

7

In this Order:—

8

This Order shall come into force on 29th July 1988 and may be cited as the (A41) East of Birmingham to Birkenhead and the (A49) Shrewsbury to Warrington Trunk Roads (Whitchurch Bypass) Order 1988.

SCHEDULE 1ROUTE OF THE NEW TRUNK ROAD

The route of the new trunk road is at Whitchurch in the County of Shropshire and is about 5.49 kilometres in length, starting at a point on the Trunk Road (A41) 180 metres south of Heath Railway Bridge then going in a generally north-westerly direction and then in a generally north-easterly direction; to a point on the Trunk Road (A49), Tarporley Road 1,200 metres north-west of its junction with Chester Road.

SCHEDULE 2LENGTHS OF THE TRUNK ROAD CEASING TO BE TRUNK ROAD

1.

The A41 (which includes Heath Road (part) Prees Road, Sedgeford, Newport Road, part of Bridgewater Street, Brownlow Street, London Road and Chester Road (part)), from a point 170 metres south of the Heath Railway Bridge to a point 1,350 metres north-west of its junction with Tarporley Road.

2.

The A49 (Tarporley Road), from its junction with Chester Road in a northerly direction for a distance of 1,180 metres.

SCHEDULE 3

SPECIFICATION

Points of comencement and Termination

Froma point 52 metres east of the boundary between fields 5341 and 6140.

Toa point 102 metres east of the boundary between fields 5341 and 6140.

Headroom(Canal) not less than 2.6 metres above normal canal retention level to be maintained for a distance of approximately 6.0 metres.

Headroom(North Bank) not less than 2.2 metres above bank, to be maintained for a distance of approximately 5.0 metres.

Headroom(South Bank) not less than 2.4 metres above bank to be maintained for a distance of approximately 2.0 metres.

Waterwaywidth of canal is reduced to 6.0 metres at water level.

Length of Watercourse to be Diverted

SCHEDULE 4

SPECIFICATION

Points of comencement and Termination

Froma point 244 metres south-east of the existing Dansons Bridge over the canal.

Toa point 294 metres south-east of the existing Dansons Bridge.

Headroom(Canal) not less than 2.6 metres above normal canal retention level to be maintained for a distance of 7.0 metres.

Headroom(North Bank) not less than 3.0 metres above bank to be maintained for a distance of 2.1 metres.

Headroom(South Bank) not less than 2.6 metres above bank to be maintained for a distance of 2.1 metres.

Waterwaywidth of canal is reduced to 6.0 metres at water level.

Length of Watercourse to be Diverted

Length of Towing Path to be Diverted and New Length to be Provided

Signed

Signed by the authority of the Secretary of State

H. F. Ellis — Regional Director West Midlands Region — Department of Transport — 13th May 1988

Footnotes

[^f00001]: 1980 c. 66.

[^f00002]: S.I. 1981/238.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.