The A47 Trunk Road (East Norton Bypass) Order 1989

Type Statutory-Instrument
Publication 1989-09-01
State In force
Department Queen's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API

Made: 1st September 1989

Coming into force: 21st September 1989

The Secretary of State for Transport makes this Order in exercise of powers conferred by sections 10, 12 and 41 of the Highways Act 1980[^f00001] and now vested in him[^f00002], and of all other enabling powers:

1

The new highway which the Secretary of State proposes to construct along the route described in Schedule 1 to this Order shall become a trunk road as from the date when this Order comes into force.

2

The centre line of the new trunk road is indicated by a heavy black line on the deposited plan.

3

The Secretary of State directs as respects any part of a highway which crosses the route of the new trunk road that–

until, in either case, a date to be specified in a notice given by the Secretary of State to the highway authority for that highway. The date specified will not be later than the date on which the new trunk road is opened for the purpose of through traffic.

4

The length of the Trunk Road described in Schedule 2 to this Order and shown by broad striped hatching on the deposited plan shall cease to be a trunk road and shall be classified as a classified road as from the date on which the Secretary of State notifies the County Council of Leicestershire that the new trunk road is open for through traffic.

5

In this Order–

2 i “classified road” as a classification for a highway, means that the highway is not a principal road for the purposes of enactments or instruments which refer to highways classified as principal roads but is a classified road for the purpose of every enactment and instrument which refers to highways classified by the Secretary of State and which does not specifically refer to their classification as principal roads;
ii “the deposited plan” means the plan numbered HA10/EM57 marked “The A47 Trunk Road (East Norton Bypass) Order 1989” signed by authority of the Secretary of State and deposited at the Department of Transport, Romney House, 43 Marsham Street, London SW1P 3PY.
iii “the new trunk road” means the highway mentioned in article 1 of this Order; and
iv “the Trunk Road” means the A47 Trunk Road.

6

This Order shall come into force on 21st September and may be cited as the A47 Trunk Road (East Norton Bypass) Order 1989.

SCHEDULE 1 — ROUTE OF THE NEW TRUNK ROAD

The route of the new trunk road is at East Norton in the County of Leicestershire, about 995 metres in length, starting at a point on the Trunk Road 381 metres west of its junction with Church Lane then going to the south of the village of East Norton to a point on the Trunk Road 350 metres west of the disused railway line.

SCHEDULE 2 — LENGTH OF TRUNK ROAD CEASING TO BE A TRUNK ROAD

The length of the Trunk Road ceasing to be a trunk road is between the starting and termination points of the route of the new trunk road, described in Schedule 1 above.

Signed

Signed by authority of the Secretary of State

P. M. Hewitt — Regional Director East Midlands Region — Department of Transport — 1st September 1989

Footnotes

[^f00001]: 1980 c. 66.

[^f00002]: S.I. 1981/238.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.