The London–King’s Lynn Trunk Road (A10) (Brandon Creek – Southery Improvement) Order 1989

Type Statutory-Instrument
Publication 1989-11-03
State In force
Department Queen's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API

Made: 3rd November 1989

Coming into force: 28th November 1989

The Secretary of State for Transport makes this Order in exercise of the powers conferred by sections 10 and 41 of the Highways Act 1980[^f00001], and now vested in him[^f00002], and of all other enabling powers:

1

The new highway which the Secretary of State proposes to construct along the route described in Schedule 1 to this Order shall become a trunk road as from the date when this Order comes into force.

2

The centre line of the new trunk road is indicated by a heavy black line on the deposited plan.

3

The Secretary of State directs as respects any part of a highway which crosses the route of the new trunk road that–

until, in either case, a date to be specified in a notice given by the Secretary of State to the highway authority for that highway. The date specified will not be later than the date on which the new trunk road is opened for the purposes of through traffic.

4

The length of the trunk road which is described in Schedule 2 to this Order and is shown by broad striped hatching on the deposited plan shall cease to be a trunk road as from the date on which the Secretary of State notifies the County Council of Norfolk that the new trunk road is open for through traffic.

5

In this Order–

6

This Order shall come into force on 28th November 1989 and may be cited as the London–King’s Lynn Trunk Road (A10) (Brandon Creek – Southery Improvement) Order 1989.

SCHEDULE 1 — ROUTE OF THE NEW TRUNK ROAD

From Brandon Creek to Southery, in the County of Norfolk, starting at a point on the trunk road 200 metres north of the Brandon Creek Bridge and terminating at a point on the trunk road 350 metres south of its junction with Sedge Fen Road, at Southery (a distance of approximately 0.96 kilometres).

SCHEDULE 2 — LENGTH OF THE TRUNK ROAD CEASING TO BE A TRUNK ROAD

The length of the trunk road ceasing to be a trunk road is between the starting and termination points of the route of the new trunk road (described in Schedule 1 above).

Signed

Signed by authority of the Secretary of State

Alan Whitfield — Regional Director Eastern Region — Department of Transport — 3rd November 1989

Footnotes

[^f00001]: 1980 c. 66.

[^f00002]: S.I. 1981/238.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.