The Electricity (Non-Fossil Fuel Sources) (England and Wales) Order 1991

Type Statutory-Instrument
Publication 1991-10-31
State In force
Department Queen's Printer of Acts of Parliament
PDF Download
articles 2
Reform history JSON API

Made: 31st October 1991

Laid before Parliament: 5th November 1991

Coming into force: 6th November 1991

Now, therefore, the Secretary of State, in exercise of the powers conferred by section 32(1) of the said Act of 1989, and of all other enabling powers, after consultation in accordance with the requirements of the said section 32(1), hereby makes the following Order:–

Citation, commencement and application

1

Requirement to make arrangements etc.

2

Each public electricity supplier in England and Wales shall, before 20th November 1991, make (in so far as he has not already done so) and produce to the Director evidence showing that he has made such additional arrangements as will secure that for each period shown in Tables A to F in Schedule 1 (specified aggregate amounts of generating capacity) to this Order the aggregate amount of generating capacity available to him from non-fossil fuel generating stations of the description specified in the heading to each particular Table will not be less than the amount specified in that Table in relation to him for that period.

3

SCHEDULE 1 — SPECIFIED AGGREGATE AMOUNTS OF GENERATING CAPACITY

Name of supplier Period Period Period Period Period Period Period
1 2 3 4 5 6 7
In this Table A and in Table F— “wind generating stations” means generating stations which are driven by wind; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table A and in Table F— “wind generating stations” means generating stations which are driven by wind; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table A and in Table F— “wind generating stations” means generating stations which are driven by wind; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table A and in Table F— “wind generating stations” means generating stations which are driven by wind; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table A and in Table F— “wind generating stations” means generating stations which are driven by wind; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table A and in Table F— “wind generating stations” means generating stations which are driven by wind; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table A and in Table F— “wind generating stations” means generating stations which are driven by wind; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table A and in Table F— “wind generating stations” means generating stations which are driven by wind; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW).
Eastern Electricity plc — — 3.057 11.293 11.293 11.293 11.293
East Midlands Electricity plc — — 2.008 7.419 7.419 7.419 7.419
London Electricity plc — — 2.231 8.243 8.243 8.243 8.243
Manweb plc — — 1.294 4.781 4.781 4.781 4.781
Midlands Electricity plc — — 2.164 7.996 7.996 7.996 7.996
Northern Electric plc — — 1.182 4.369 4.369 4.369 4.369
NORWEB plc — — 1.874 6.924 6.924 6.924 6.924
SEEBOARD plc — — 1.852 6.842 6.842 6.842 6.842
Southern Electric plc — — 2.767 10.221 10.221 10.221 10.221
South Wales Electricity plc — — 0.781 2.885 2.885 2.885 2.885
South Western Electricity plc — — 1.272 4.699 4.699 4.699 4.699
Yorkshire Electricity Group plc — — 1.830 6.759 6.759 6.759 6.759
Name of supplier Period Period Period Period Period Period Period
--- --- --- --- --- --- --- ---
1 2 3 4 5 6 7
In this Table B— “hydro generating stations” means generating stations of a declared net capacity not exceeding 20 megawatts which are driven by any form of water power other than tidal or wave power; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table B— “hydro generating stations” means generating stations of a declared net capacity not exceeding 20 megawatts which are driven by any form of water power other than tidal or wave power; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table B— “hydro generating stations” means generating stations of a declared net capacity not exceeding 20 megawatts which are driven by any form of water power other than tidal or wave power; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table B— “hydro generating stations” means generating stations of a declared net capacity not exceeding 20 megawatts which are driven by any form of water power other than tidal or wave power; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table B— “hydro generating stations” means generating stations of a declared net capacity not exceeding 20 megawatts which are driven by any form of water power other than tidal or wave power; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table B— “hydro generating stations” means generating stations of a declared net capacity not exceeding 20 megawatts which are driven by any form of water power other than tidal or wave power; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table B— “hydro generating stations” means generating stations of a declared net capacity not exceeding 20 megawatts which are driven by any form of water power other than tidal or wave power; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table B— “hydro generating stations” means generating stations of a declared net capacity not exceeding 20 megawatts which are driven by any form of water power other than tidal or wave power; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW).
Eastern Electricity plc 0.021 0.021 1.337 1.419 1.419 1.419 1.419
East Midlands Electricity plc 0.014 0.014 0.878 0.932 0.932 0.932 0.932
London Electricity plc 0.015 0.015 0.976 1.036 1.036 1.036 1.036
Manweb plc 0.009 0.009 0.566 0.601 0.601 0.601 0.601
Midlands Electricity plc 0.015 0.015 0.946 1.005 1.005 1.005 1.005
Northern Electric plc 0.008 0.008 0.517 0.549 0.549 0.549 0.549
NORWEB plc 0.013 0.013 0.820 0.870 0.870 0.870 0.870
SEEBOARD plc 0.013 0.013 0.810 0.860 0.860 0.860 0.860
Southern Electric plc 0.019 0.019 1.210 1.284 1.284 1.284 1.284
South Wales Electricity plc 0.005 0.005 0.341 0.362 0.362 0.362 0.362
South Western Electricity plc 0.009 0.009 0.556 0.590 0.590 0.590 0.590
Yorkshire Electricity Group plc 0.013 0.013 0.800 0.849 0.849 0.849 0.849
Name of supplier Period Period Period Period Period Period Period
--- --- --- --- --- --- --- ---
1 2 3 4 5 6 7
In this Table C and in Table F— “landfill gas generating stations” means generating stations which are fuelled by gas derived from landfill sites; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table C and in Table F— “landfill gas generating stations” means generating stations which are fuelled by gas derived from landfill sites; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table C and in Table F— “landfill gas generating stations” means generating stations which are fuelled by gas derived from landfill sites; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table C and in Table F— “landfill gas generating stations” means generating stations which are fuelled by gas derived from landfill sites; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table C and in Table F— “landfill gas generating stations” means generating stations which are fuelled by gas derived from landfill sites; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table C and in Table F— “landfill gas generating stations” means generating stations which are fuelled by gas derived from landfill sites; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table C and in Table F— “landfill gas generating stations” means generating stations which are fuelled by gas derived from landfill sites; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table C and in Table F— “landfill gas generating stations” means generating stations which are fuelled by gas derived from landfill sites; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW).
Eastern Electricity plc 0.417 0.417 5.059 6.430 6.551 6.576 6.576
East Midlands Electricity plc 0.274 0.274 3.324 4.224 4.304 4.320 4.320
London Electricity plc 0.305 0.305 3.693 4.693 4.782 4.800 4.800
Manweb plc 0.177 0.177 2.142 2.722 2.774 2.784 2.784
Midlands Electricity plc 0.295 0.295 3.582 4.552 4.638 4.656 4.656
Northern Electric plc 0.161 0.161 1.957 2.487 2.534 2.544 2.544
NORWEB plc 0.256 0.256 3.102 3.942 4.017 4.032 4.032
SEEBOARD plc 0.253 0.253 3.065 3.895 3.969 3.984 3.984
Southern Electric plc 0.378 0.378 4.579 5.819 5.930 5.952 5.952
South Wales Electricity plc 0.107 0.107 1.292 1.643 1.674 1.680 1.680
South Western Electricity plc 0.174 0.174 2.105 2.675 2.726 2.736 2.736
Yorkshire Electricity Group plc 0.250 0.250 3.028 3.848 3.921 3.936 3.936
Name of supplier Period Period Period Period Period Period Period
--- --- --- --- --- --- --- ---
1 2 3 4 5 6 7
In this Table D and in Table F— “municipal and general industrial waste generating stations” means generating stations which are fuelled by municipal or general industrial waste; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table D and in Table F— “municipal and general industrial waste generating stations” means generating stations which are fuelled by municipal or general industrial waste; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table D and in Table F— “municipal and general industrial waste generating stations” means generating stations which are fuelled by municipal or general industrial waste; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table D and in Table F— “municipal and general industrial waste generating stations” means generating stations which are fuelled by municipal or general industrial waste; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table D and in Table F— “municipal and general industrial waste generating stations” means generating stations which are fuelled by municipal or general industrial waste; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table D and in Table F— “municipal and general industrial waste generating stations” means generating stations which are fuelled by municipal or general industrial waste; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table D and in Table F— “municipal and general industrial waste generating stations” means generating stations which are fuelled by municipal or general industrial waste; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table D and in Table F— “municipal and general industrial waste generating stations” means generating stations which are fuelled by municipal or general industrial waste; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW).
Eastern Electricity plc — — — 0.795 8.645 35.823 35.823
East Midlands Electricity plc — — — 0.522 5.679 23.533 23.533
London Electricity plc — — — 0.580 6.310 26.148 26.148
Manweb plc — — — 0.336 3.660 15.166 15.166
Midlands Electricity plc — — — 0.563 6.121 25.364 25.364
Northern Electric plc — — — 0.307 3.344 13.858 13.858
NORWEB plc — — — 0.487 5.300 21.964 21.964
SEEBOARD plc — — — 0.481 5.237 21.703 21.703
Southern Electric plc — — — 0.719 7.824 32.424 32.424
South Wales Electricity plc — — — 0.203 2.209 9.152 9.152
South Western Electricity plc — — — 0.331 3.597 14.904 14.904
Yorkshire Electricity Group plc — — — 0.476 5.174 21.441 21.441
Name of supplier Period Period Period Period Period Period Period
--- --- --- --- --- --- --- ---
1 2 3 4 5 6 7
In this Table E and in Table F— “sewage gas generating stations” means generating stations which are fuelled by gas derived from domestic and other sewage; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table E and in Table F— “sewage gas generating stations” means generating stations which are fuelled by gas derived from domestic and other sewage; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table E and in Table F— “sewage gas generating stations” means generating stations which are fuelled by gas derived from domestic and other sewage; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table E and in Table F— “sewage gas generating stations” means generating stations which are fuelled by gas derived from domestic and other sewage; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table E and in Table F— “sewage gas generating stations” means generating stations which are fuelled by gas derived from domestic and other sewage; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table E and in Table F— “sewage gas generating stations” means generating stations which are fuelled by gas derived from domestic and other sewage; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table E and in Table F— “sewage gas generating stations” means generating stations which are fuelled by gas derived from domestic and other sewage; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table E and in Table F— “sewage gas generating stations” means generating stations which are fuelled by gas derived from domestic and other sewage; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW).
Eastern Electricity plc 0.319 0.319 2.904 3.680 3.680 3.680 3.680
East Midlands Electricity plc 0.210 0.210 1.908 2.417 2.417 2.417 2.417
London Electricity plc 0.233 0.233 2.120 2.686 2.686 2.686 2.686
Manweb plc 0.135 0.135 1.230 1.558 1.558 1.558 1.558
Midlands Electricity plc 0.226 0.226 2.056 2.605 2.605 2.605 2.605
Northern Electric plc 0.123 0.123 1.124 1.424 1.424 1.424 1.424
NORWEB plc 0.196 0.196 1.781 2.256 2.256 2.256 2.256
SEEBOARD plc 0.193 0.193 1.760 2.229 2.229 2.229 2.229
Southern Electric plc 0.289 0.289 2.629 3.331 3.331 3.331 3.331
South Wales Electricity plc 0.082 0.082 0.742 0.940 0.940 0.940 0.940
South Western Electricity plc 0.133 0.133 1.208 1.531 1.531 1.531 1.531
Yorkshire Electricity Group plc 0.191 0.191 1.738 2.202 2.202 2.202 2.202
Name of supplier Period Period Period Period Period Period Period
--- --- --- --- --- --- --- ---
1 2 3 4 5 6 7
In this Table F— “other non-fossil fuel generating stations” means non-fossil fuel generating stations which are not— wind generating stations; hydro generating stations; landfill gas generating stations; municipal and general industrial waste generating stations; sewage gas generating stations; or fuelled by nuclear fuel; “hydro generating stations” means generating stations which are driven by any form of water power other than tidal or wave power; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table F— “other non-fossil fuel generating stations” means non-fossil fuel generating stations which are not— wind generating stations; hydro generating stations; landfill gas generating stations; municipal and general industrial waste generating stations; sewage gas generating stations; or fuelled by nuclear fuel; “hydro generating stations” means generating stations which are driven by any form of water power other than tidal or wave power; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table F— “other non-fossil fuel generating stations” means non-fossil fuel generating stations which are not— wind generating stations; hydro generating stations; landfill gas generating stations; municipal and general industrial waste generating stations; sewage gas generating stations; or fuelled by nuclear fuel; “hydro generating stations” means generating stations which are driven by any form of water power other than tidal or wave power; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table F— “other non-fossil fuel generating stations” means non-fossil fuel generating stations which are not— wind generating stations; hydro generating stations; landfill gas generating stations; municipal and general industrial waste generating stations; sewage gas generating stations; or fuelled by nuclear fuel; “hydro generating stations” means generating stations which are driven by any form of water power other than tidal or wave power; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table F— “other non-fossil fuel generating stations” means non-fossil fuel generating stations which are not— wind generating stations; hydro generating stations; landfill gas generating stations; municipal and general industrial waste generating stations; sewage gas generating stations; or fuelled by nuclear fuel; “hydro generating stations” means generating stations which are driven by any form of water power other than tidal or wave power; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table F— “other non-fossil fuel generating stations” means non-fossil fuel generating stations which are not— wind generating stations; hydro generating stations; landfill gas generating stations; municipal and general industrial waste generating stations; sewage gas generating stations; or fuelled by nuclear fuel; “hydro generating stations” means generating stations which are driven by any form of water power other than tidal or wave power; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table F— “other non-fossil fuel generating stations” means non-fossil fuel generating stations which are not— wind generating stations; hydro generating stations; landfill gas generating stations; municipal and general industrial waste generating stations; sewage gas generating stations; or fuelled by nuclear fuel; “hydro generating stations” means generating stations which are driven by any form of water power other than tidal or wave power; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW). In this Table F— “other non-fossil fuel generating stations” means non-fossil fuel generating stations which are not— wind generating stations; hydro generating stations; landfill gas generating stations; municipal and general industrial waste generating stations; sewage gas generating stations; or fuelled by nuclear fuel; “hydro generating stations” means generating stations which are driven by any form of water power other than tidal or wave power; period 1 means 1 January 1992 to 31 March 1992; period 2 means 1 April 1992 to 31 March 1993; period 3 means 1 April 1993 to 31 March 1994; period 4 means 1 April 1994 to 31 March 1995; period 5 means 1 April 1995 to 31 March 1996; period 6 means 1 April 1996 to 31 March 1997; period 7 means 1 April 1997 to 31 December 1998; capacity amounts are expressed in megawatts (MW).
Eastern Electricity plc — — — 3.857 3.857 3.857 3.857
East Midlands Electricity plc — — — 2.534 2.534 2.534 2.534
London Electricity plc — — — 2.815 2.815 2.815 2.815
Manweb plc — — — 1.633 1.633 1.633 1.633
Midlands Electricity plc — — — 2.731 2.731 2.731 2.731
Northern Electric plc — — — 1.492 1.492 1.492 1.492
NORWEB plc — — — 2.365 2.365 2.365 2.365
SEEBOARD plc — — — 2.336 2.336 2.336 2.336
Southern Electric plc — — — 3.491 3.491 3.491 3.491
South Wales Electricity plc — — — 0.985 0.985 0.985 0.985
South Western Electricity plc — — — 1.605 1.605 1.605 1.605
Yorkshire Electricity Group plc — — — 2.308 2.308 2.308 2.308

SCHEDULE 2 — CONDITIONS PRECEDENT

The requirements referred to in article 3(2)(a) of this Order are—

Note:

In the above provisions, “the Act” means the Electricity Act 1989.

SCHEDULE 3 — TERMINATION EVENTS

The events referred to in article 3(3)(a) of this Order are—

Note:

In the above provisions, “the Act” means the Electricity Act 1989.

Signed

John Wakeham — Secretary of State for Energy — 31st October 1991

Explanatory note

(This note is not part of the Order)

This Order imposes on public electricity suppliers in England and Wales obligations to make arrangements to secure the availability during specified periods of specified aggregate amounts of generating capacity from non-fossil fuel generating stations of particular descriptions. The arrangements must be made, and evidence of their making must be produced to the Director General of Electricity Supply, before 20th November 1991.

Article 2 , read with the Tables in Schedule 1, imposes on the suppliers obligations to secure the availability during specified periods of specified amounts of capacity from non-fossil fuel generating stations of the descriptions (wind, hydro, landfill gas, municipal and general industrial waste, sewage gas, or other) specified in the headings to the Tables. The amounts are specified in megawatts (one megawatt equals one million watts).

Article 3 provides a mechanism whereby, if certain conditions are not satisfied (see Schedule 2) or if certain events occur (see Schedule 3), the Order is to have effect as if the relevant period specified in the appropriate Table in Schedule 1 were replaced by a different period and, as a consequence of that, as if the relevant amount of capacity specified in that Table were a reduced amount, the amount of the reduction being the amount of capacity which has ceased to be available by reason of (as the case may be) the condition not having been satisfied or the event having occurred.

Footnotes

[^f00001]: S.I. 1990/263, as amended by S.I. 1990/494; S.I. 1990/1859.

[^f00002]: 1989 c. 29.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.