The A63 Trunk Road (Selby Bypass) Order 1993

Type Statutory-Instrument
Publication 1993-02-11
State In force
Department Queen's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API

Made: 11th February 1993

Coming into force: 10th March 1993

The Secretary of State for Transport makes this Order in exercise of powers conferred by sections 10, 41 and 106 of the Highways Act 1980[^f00001], and now vested in him[^f00002], and of all other enabling powers:–

1

The new highways which the Secretary of State proposes to construct along the route described in Schedule 1 to this Order hereinafter referred to as “the new trunk road” shall become a trunk road as from the date when this Order comes into force.

2

The centre line of the new trunk road is indicated by a heavy black line on the deposited plan.

3

The Secretary of State directs as respects any part of a highway which crosses the route of the new trunk road that–

until, in either case, a date to be specified in a notice given by the Secretary of State to the highway authority for that highway. The date specified will not be later than the date on which the new trunk road is opened for the purposes of through traffic.

4

The Secretary of State is authorised to construct the bridges specified in Schedules 2 and 3 to this Order as part of the new trunk road.

5

In this Order–

6

This Order shall come into force on 10th March 1993 and may be cited as the A63 Trunk Road (Selby Bypass) Order 1993.

SCHEDULE 1

The route of the new trunk road is about 9.5 kilometres in length and is in the District of Selby in the County of North Yorkshire. It starts at a point on the A63, 80 metres west of its junction with Whinny Hagg Lane (marked “A” on the deposited plan), then goes in a generally easterly and then northerly direction to a point on the A19, 500 metres north east of the BOCM roundabout (marked “B” on the deposited plan).

SCHEDULE 2

Specifications of the road bridge which crosses the northern end of the Selby Canal south east of Brayton in the County of North Yorkshire.

Points of Commencement and Termination

From a point on the north western bank of Selby Canal approximately 158 metres south west of the north east corner of OS Parcel 8119 (reference Point A on Plan B).

To a point on the south eastern bank of Selby Canal approximately 240 metres south west of the dwelling "Sal-Que-Sun', Brayton Lane (reference Point B on Plan B).

Length

One fixed span of not less than 41 metres measured along the centre line of the new road.

Headroom and Waterway

Plan C–Elevation of Bridge.

SCHEDULE 3

Specifications of the road bridge over the River Ouse to the east of Selby in the County of North Yorkshire.

Points of Commencement and Termination

From a point on the south bank of the River Ouse approximately 66 metres north east of the south east corner of OS Parcel 4163 (reference Point A on Plan B).

To a point on the north bank of the River Ouse approximately 165 metres north east of the north west corner of OS Parcel 4163 (reference Point B on Plan B).

Length

One opening span of not less than 55 metres (navigation span).

One opening span of not less than 39 metres.

Headroom and Waterway

Signed

Signed by authority of the Secretary of State for Transport.

J P Henry — Regional Director Yorkshire and Humberside Region — 11th February 1993

Footnotes

[^f00001]: 1980 c. 66.

[^f00002]: S.I. 1981/238.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.