The A1 Trunk Road (Wetherby to Kirk Deighton New Junction and Connecting Roads) Order 1994

Type Statutory-Instrument
Publication 1994-09-22
State In force
Department Queen's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API

Made: 22nd September 1994

Coming into force: 21st October 1994

The Secretary of State for Transport makes this Order in exercise of powers conferred by sections 10 and 41 of the Highways Act 1980[^f00001], and now vested in him[^f00002] and of all other enabling powers: —

1

This Order may be cited as the A1 Trunk Road (Wetherby to Kirk Deighton New Junction and Connecting Roads) Order 1994 and shall come into force on 21st October 1994.

2

In this Order:

3

The main new road and the slip roads shall become trunk roads from the date when this Order comes into force.

4

The centre line of each of the new trunk roads is indicated by a heavy black line on the plan.

5

The Secretary of State directs as respects any part of a highway which crosses the route of any of the new trunk roads that —

until, in either case, a date to be specified in a notice given by the Secretary of State to the highway authority for that highway. The date specified will not be later than the date on which the relevant route is opened for traffic.

SCHEDULE 1 — ROUTE OF THE MAIN NEW ROAD

The route of the main new road is 542 metres in length, from a point on the A1 Trunk Road 164 metres north of its junction with Carr Lane in the City of Leeds in the County of West Yorkshire (marked 'A' on the deposited plan) then northwards to a point 164 metres north of Sandbeck Lane in the District of Harrogate in the County of North Yorkshire (marked 'B' on the deposited plan).

SCHEDULE 2 — ROUTES OF THE SLIP ROADS

1.

A route to connect the northbound carriageway of the main new road with a roundabout to be constructed as part of the Kirk Deighton New Junction (the slip road along this route being given the reference number 1 on the deposited plan), and

2.

a route to connect the southbound carriageway of the main new road with the roundabout referred to in (a) of this Schedule (the slip road along this route being given the reference number 2 on the deposited plan).

Signed

Signed by authority of the Secretary of State for Transport.

R. R. Bineham — Deputy Director, Yorkshire and Humberside, Construction Programme Division — 22nd September 1994

Footnotes

[^f00001]: 1980 c. 66.

[^f00002]: S.I. 1981/238.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.