The A1 Motorway (Kirk Deighton New Junction to Walshford Section and Connecting Roads) Scheme 1994

Type Statutory-Instrument
Publication 1994-09-22
State In force
Department Queen's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API

Made: 22nd September 1994

Coming into force: 21st October 1994

The Secretary of State for Transport makes this Scheme in exercise of powers conferred by sections 16, 17 and 19 of the Highways Act 1980[^f00001], and now vested in him[^f00002], and of all other enabling powers:—

1

This Scheme may be cited as the A1 Motorway (Kirk Deighton New Junction to Walshford Section and Connecting Roads) Scheme 1994 and shall come into force on 21st October 1994.

2

In this Scheme:

3

The Secretary of State is authorised to provide the special roads for the exclusive use of traffic of Classes I and II of the classes of traffic set out in Schedule 4 to the Highways Act 1980.

4

The centre line of each of the special roads is indicated by a heavy black line on the plan.

5

Each of the special roads shall become a trunk road on the date when this Scheme comes into force.

SCHEDULE 1 — ROUTE OF THE MOTORWAY

The route of the Motorway is 4.65 kilometres in length from a point east of the existing A1 Trunk Road 164 metres north of Sandbeck Lane (marked “A” on the deposited plan) then going in a generally northerly direction to a point on the A1 Trunk Road 528 metres north of the Moor Lane overbridge (marked “B” on the deposited plan) all in the Borough of Harrogate in the County of North Yorkshire).

SCHEDULE 2 — ROUTES OF THE CONNECTING ROADS

The routes of the connecting roads are routes in the Borough of Harrogate in the County of North Yorkshire and are both at the junction with the proposed Deighton Road link.

1 A route to connect the northbound carriageway of the Motorway with a roundabout to be constructed as part of the proposed Kirk Deighton New Junction (the connecting road along this route being given the reference number 1 on the deposited plan).

2 A route to connect the southbound carriageway of the Motorway with the roundabout referred to in (a) of this Schedule (the connecting road along this route being given the reference number 2 on the deposited plan).

Signed

Signed by authority of the Secretary of State for Transport

R. R. Bineham — Deputy Director Yorkshire and Humberside Construction Programme Division — 22nd September 1994

Footnotes

[^f00001]: 1980. c.66.

[^f00002]: S.I. 1981/238.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.