The City of Manchester (Egerton Street West Bridge Scheme) 1994 Confirmation Instrument 1997

Type Statutory-Instrument
Publication 1997-03-06
State In force
Department Queen's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API

Made: 6th March 1997

The Secretary of State for Transport makes this Instrument in exercise of powers conferred by section 106(3) of the Highways Act 1980[^f00001] and now vested in him[^f00002] and of all other powers enabling him in that behalf:

1

This Instrument may be cited as “The City of Manchester (Egerton Street West Bridge Scheme) 1994 Confirmation Instrument 1997” and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2

The City of Manchester (Egerton Street West Bridge Scheme) 1994 (“the Scheme”) is hereby confirmed with modifications.

3

The Scheme as confirmed is set out in the Schedule hereto and copies of the Scheme with its accompanying plans as modified are deposited at the offices of the Department of Transport and at the offices of the Council of the City of Manchester at the Town Hall, Albert Square, Manchester, M60 2LA.

THE SCHEDULE — The City of Manchester (Egerton Street West Bridge Scheme) 1994

The Council of the City of Manchester (“the Council”) make this Scheme in exercise of their powers under Sections 106(3) and 108(4) of the Highways Act 1980 and of all other powers enabling them in that behalf:—

1 The Council are authorised to construct over the navigable waters of the Bridgewater Canal the bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to improve between Chester Road and Regent Road in the City of Manchester.

2 The Council are also authorised in connection with the construction of the said bridge to divert part of the navigable watercourse specified in the said Schedule in the manner shown in that Schedule.

3 This Scheme may be cited as “The City of Manchester (Egerton Street West Bridge Scheme) 1994”.

THE SCHEDULE TO THE SCHEME — SPECIFICATION

POINTS OF COMMENCEMENT AND TERMINATION (See Plan ‘C’)

From a point north of the canal whose co-ordinates are 382807.58E, 397480.45N, to a point south of the canal whose co-ordinates are 382814.22E, 397468.56N.

CONSTRUCTION

SPAN

WIDTH

HEADROOM

LENGTH OF WATERCOURSE TO BE DIVERTED

The existing south bank retaining wall will be retained. A new abutment will be constructed and act as a retaining wall to the canal on the north side. The existing width of the canal varies from 13 metres to 18 metres and will be reduced to 10 metres.

Signed

Signed by authority of the Secretary of State for Transport

Pamela Denham — Regional Director Government Office for the North East — 6th March 1997 TAKE IN FOUR MAPS

Footnotes

[^f00001]: 1980 c. 66.

[^f00002]: S.I. 1981/238.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.