The Carriage of Dangerous Goods and Use of Transportable Pressure Equipment Regulations 2004

Type Statutory-Instrument
Publication 2004-04-01
Last updated 2007-07-01
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API
7

1947 c. 41; section 10 was amended by the Local Government Act 1972 (c. 70), section 197(5), the Local Government Act 1992 (c. 19), section 27 and Schedule 3, paragraph 2 and the Regional Assemblies (Preparations) Act 2003 (c. 10), section 17(6) and paragraphs 1(1) and 3 to the Schedule. Section 10 was modified in relation to the making of combination schemes as a result of local government reorganisation under Part II of the Local Government Act 1992 by structural orders made under sections 17, 18 and 28 of that Act; there are other amendments to the 1947 Act not relevant to these Regulations.

8

1988 c. 52; section 66A was inserted by the Road Traffic Act 1991 (c. 40), section 9(1) and amended by the Goods Services (Licensing of Operators) Act 1995 (c. 23), section 60(1) and Schedule 7, paragraph 11.

9

S.I. 1987/37, amended by S.I. 1996/2092, 1996/2095, 1997/2367 and 2003/1431 and to which there are other amendments not relevant to these Regulations.

10

Current edition (2004): ISBN 92-801-5140-1.

12

OJ No. L262, 27.9.1976, p153; relevant amending Directives are Council Directive 87/354/EEC of 25th June 1987 (OJ No. L192, 11.7.1987, p43) and Council Directive 88/665/EEC of 21st December 1988 (OJ No. L382, 31.12.1988, p42).

13

S.I. 1999/2024, to which there are amendments not relevant to these Regulations.

15

OJ No. L235, 17.9.1996, p25; relevant amending Directives are Directive 2000/62/EC of the European Parliament and the Council of 10th October 2000 (OJ No. L279, 1.11.2000, p44) and Commission Directive 2003/29/EC of 7th April 2003 (OJ No. L90, 8.4.2003, p47).

16

ISBN 0-11-55-2553-X.

18

1875 c. 17; the relevant amending instrument is S.I. 1974/1885.

20

OJ No. L300, 19.11.1984, pp1, 20 and 48 respectively.

24

1954 c. 70; section 180 was amended by the Quarries Regulations 1999 (S.I. 1999/2024), regulation 47(2) and Schedule 2, Part II. The words “the Health and Safety Executive” were substituted by the Mines and Quarries Act 1954 to 1971 (Repeals and Modifications) Regulations 1974 (S.I. 1974/2013), regulation 2(1)(b) and Schedule 2, paragraph 3. There are other amendments to the Act not relevant to these Regulations.

25

Current edition (2003): ISBN 92-1-139078-8. Existing corrigenda are corrigendum 1 (February 2003) and corrigendum 2 (June 2003).

26

S.I. 1999/2001, to which there are amendments not relevant to these Regulations.

27

Current edition (2003–04): ISBN 92-9194-010-0 and ISSN 1726-6181.

28

S.I. 1989/1796, to which there are amendments not relevant to these Regulations.

29

1958 c. 7; section 1(3)(a)(i) was substituted by the Water Act 1989 (c. 15), section 190 and Schedule 25, paragraph 24. In section 1(3)(a)(i) the words “Environment Agency” were substituted by the Environment Act 1995 (Consequential Amendments) Regulations 1996 (S.I. 1996/593), regulation 2 and Schedule 1. In section 1(3)(a)(iii) the words “Countryside Agency” were substituted by the Development Commission (Transfer of Functions and Miscellaneous Provisions) Order 1999 (S.I. 1999/416), article 3. There are other amendments not relevant to these Regulations.

32

OJ No. L145, 19.6.1996, p10.

33

S.I. 1999/257, to which there are amendments not relevant to these Regulations.

34

OJ No. L398, 30.12.1989, p33.

36

Current Edition (2003): ISBN 92-1-139078-8. Existing corrigenda are corrigendum 1 (February 2003) and corrigendum 2 (June 2003).

37
38

OJ No. L138, 1.6.1999, p20.

39

S.I. 1991/1531, to which there are amendments not relevant to these Regulations.

40

S.I. 1987/37, amended by S.I. 1996/2092, 1996/2095, 1997/2367 and 2003/1431 and to which there are other amendments not relevant to these Regulations.

42

S.I. 1998/494, to which there are amendments not relevant to these Regulations.

43

S.R.&O. 1919/809, amended by S.I. 1974/1885 and to which there are amendments not relevant to these Regulations.

44

S.R.&O. 1937/54, to which there are amendments not relevant to these Regulations.

45

ISBN 0-7176-1226-0.

46

S.I. 1996/2095, amended by S.I. 1999/303 and to which there are amendments not relevant to these Regulations.

47

S.I. 1996/2092, amended by S.I. 2001/2046 and to which there are amendments not relevant to these Regulations.

49

S.I. 1996/2089, amended by S.I. 1999/303 and to which there are amendments not relevant to these Regulations.

50

S.I. 1996/2093, amended by S.I. 1999/303 and to which there are amendments not relevant to these Regulations.

51

S.I. 1991/2097, to which there are amendments not relevant to these Regulations.

52

Current edition (2003): ISBN 92-1-139078-8. Existing corrigenda are corrigendum 1 (February 2003) and corrigendum 2 (June 2003).

53

S.I. 1986/1078, amended by S.I. 1987/676 and 1991/1526 and to which there are amendments not relevant to these Regulations.

54

S.I. 1981/1089 (revoked by the Road Traffic (Carriage of Dangerous Substances in Road Tankers and Tank-containers) Regulations 1992 (S.I. 1992/743)).

62

Current edition (2003): ISBN 92-1-139078-8.

63

Current edition (2003).

64

Current edition (2003–2004): ISBN 92-9194-010-0.

65

Current edition (2002): ISBN 92-801-5140-1.

66

Current edition (2003): ISBN 0-11-552553-X.

71

1928, c. 32; section 18 was amended by S.I. 1974/1942, 1986/1951, 1992/743 and 2002/2776; section 18 was repealed in relation to the carriage of petroleum mixtures and liquid methane in a road tanker or tank-container by S.I. 1992/743; there are other amendments to the Act not relevant to these Regulations.

73

S.I. 1978/1723, amended by S.I. 2001/1426 and to which there are other amendments not relevant to these Regulations.

75

S.I. 1987/37, amended by S.I. 1996/2092, 1996/2095, 1997/2367 and 2003/1431 and to which there are other amendments not relevant to these Regulations.

76

Current edition (2003): ISBN 92-1-136078-8.

79

S.I. 1990/304, amended by S.I. 1993/1746, 1994/669 and 1996/2092 and to which there are other amendments not relevant to these Regulations.

82

Current edition (2002): ISBN 92-801-5140-1.

83

Current edition (2003–2004): ISBN 92-9194-010-1.

84

S.I. 1991/1531, to which there are amendments not relevant to these Regulations.

86

S.I. 1993/208, as amended by S.I. 1996/2093 and to which there are other amendments not relevant to these Regulations.

88

S.I. 1993/3050, amended by S.I. 2002/2176 and to which there are other amendments not relevant to these Regulations.

90

S.I. 1995/3163, amended by S.I. 1996/2089 and 1996/2092 and to which there are other amendments not relevant to these Regulations.

92

S.I. 1996/341, amended by S.I. 1996/2092 and to which there are other amendments not relevant to these Regulations.

96

S.I. 2001/2975, amended by S.I. 2002/2099 and to which there are other amendments not relevant to these Regulations.

101

S.I. 2002/2677 to which there are amendments not relevant to these Regulations.

...

Module A—internal production control

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Module A1—internal manufacturing checks with monitoring of the final assessment

In addition to the requirements of module A, the following applies.

Final assessment must be performed by the manufacturer and monitored by means of unexpected visits by a notified body chosen by the manufacturer.

During such visits, the notified body must:

  • — ensure that the manufacturer actually performs final assessment,
  • — take samples of transportable pressure equipment at the manufacturing or storage premises in order to conduct checks. The notified body assesses the number of items of equipment to sample and whether it is necessary to perform, or have performed, all or part of the final assessment of the equipment samples.

Should one or more of the items of transportable pressure equipment not conform, the notified body must take appropriate measures.

On the responsiblity of the notified body, the manufacturer must affix that body’s identification number to each item of transportable pressure equipment.

Module B—EC type-examination

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Module B1—EC design examination

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Module C1—conformity to type

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Module D—production quality assurance

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Module D1—production quality assurance

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Module E—product quality assurance

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Module E1—production quality assurance

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Module F—product verification

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Module G—EC unit verification

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Module H—full quality assurance

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Module H1—full quality assurance with design examination and special surveillance of the final test

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

...

. . . . . .
. . . . . .
. . . . . .

...

...

Module 1—periodic inspection of products

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Module 2—periodic inspection through quality assurance

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

...

If the mark is reduced or enlarged, the proportions of the above drawing must be respected.

The various components of the mark must have substantially the same vertical dimensions, which may not be less than 5mm.

This minimum dimension may be waived for small devices.

Amendments to the Radiation (Emergency Peparedness and Public Information) Regulations 2001

Amendment to the Contol of Lead at Work Regulations 2002

Editorial notes

Security provisions

10A

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Class 7 goods for carriage by rail

Safety advisers

Reports on accidents or incidents

Emergency plans for marshalling yards

Classification of goods

Prohibition from carriage

Dangerous goods list and special provisions

Use of packagings

Use of tanks, battery-vehicles, battery-wagons, MEGCs and UN MEGCs

Consignment

Construction and testing of packagings and packages

Construction and testing of tanks, battery-vehicles, battery-wagons, MEGCs, UN MEGCs and bulk containers

Carriage, loading, unloading and handling

Vehicle crews, equipment, operation and documentation

Construction and approval of vehicles

Fees

Fees for certificates and applications for the issuing of driver training certificates and safety adviser vocational training certificates

56A

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Transitional defence

Defence and enforcement

Amendments to the Health and Safety (Fees) Regulations 2004

Amendments to Chemicals (Hazard Information and Packaging for Supply) Regulations 2002

Amendments to the Classification and Labelling of Explosives Regulations 1983

Consequential amendments

Revocations and savings

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.