The Electricity (Exemption from the Requirement for a Generation Licence) (Gunfleet Sands II) (England and Wales) Order 2008
Made: 22nd November 2008
Laid before Parliament: 25th November 2008
Coming into force: 22nd December 2008
In accordance with section 5(2) of that Act the Secretary of State has given notice of the proposal to make the Order. No representations in respect of the proposal have been made.
Citation, commencement and extent
1
- (1) This Order may be cited as the Electricity (Exemption from the Requirement for a Generation Licence) (Gunfleet Sands II) (England and Wales) Order 2008 and shall come into force on 22nd December 2008.
- (2) This Order does not extend to Scotland.
Interpretation
2
In this Order—
- “the Act” means the Electricity Act 1989;
- “Gunfleet Sands II Wind Farm” means the offshore wind farm known as Gunfleet Sands II Wind Farm located at Ordnance Survey map reference TM250092, approximately 7 kilometres south-east of Clacton-on-Sea;
- “the company” means Gunfleet Sands II Wind Farm Limited, registered in England and Wales with number 06114226;
- “total system in England and Wales” has the same meaning as it has in the Electricity (Class Exemptions from the Requirement for a Licence) Order 20012.
Exemption from section 4(1)(a) of the Act
3
Exemption is granted from section 4(1)(a) of the Act (prohibition of unlicensed generation of electricity for supply) to the company in respect of Gunfleet Sands II Wind Farm.
Conditions on exemption
4
The exemption granted by article 3 to the company is subject to compliance with the following conditions—
- (a) that the company does not hold a licence under section 6(1)(a) of the Act3 (a generation licence);
- (b) that Gunfleet Sands II Wind Farm is connected to the total system in England and Wales;
- (c) that, except in circumstances outside the reasonable control of the company, Gunfleet Sands II Wind Farm does not export more than 100 megawatts of electrical power to the total system in England and Wales.
Signed
Mike O’Brien — Minister of State — Department of Energy and Climate Change — 22nd November 2008
Explanatory note
(This note is not part of the Order)
EXPLANATORY NOTE
This Order grants an exemption from the requirements of section 4(1)(a) of the Electricity Act 1989 (which prohibits the generation of electricity for supply without a licence) to Gunfleet Sands II Wind Farm Limited in respect of the Gunfleet Sands II Wind Farm which is located approximately 7 kilometres south-east of Clacton-on-Sea.
A regulatory impact assessment in respect of exemptions from the requirements of section 4(1)(a) of the Electricity Act 1989 was prepared in 2001 and can be obtained from the Energy Strategy, Security and Markets Directorate, Department of Energy and Climate Change, 1 Victoria Street, London, SW1H 0ET. Copies have been placed in the libraries of both Houses of Parliament.
Footnotes
1989 c.29; section 5 was substituted by section 29 of the Utilities Act 2000 (c.27).
S.I. 2001/3270; the definitions of “total system in England and Wales”, “total system in Scotland” and “total system in Great Britain” were substituted for the definition of “total system” by the Electricity (Class Exemption from the Requirement for a Licence) (Amendment) Order 2005 (S.I. 2005/488), article 3.
Section 6 was substituted by section 30 of the Utilities Act 2000.
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.