The Renewables Obligation Order 2009
- (a) which was accredited as at 11th July 2006;
- (b) which has not ceased to be accredited since that date; and
- (2) Subject to paragraphs (3) to (6), the amount of electricity to be stated in each ROC issued in respect of electricity generated by a generating station to which this article applies is to be determined in accordance with article 27(4) and (5).
- (3) Where the electricity generated by a generating station to which this article applies is generated in a way described in the first column of Part 3 of Schedule 2, the amount of electricity to be stated in each ROC issued in respect of that electricity is (subject to paragraphs (4) to (6)) the amount which corresponds to that description in the second column of that Part of that Schedule.
- (4) Where, at the time it generates the electricity, the generating station’s total installed capacity is greater than it was on 11th July 2006, paragraph (3) applies only in relation to ROCs which are to be issued in respect of—
- (a) where electricity generated using the total installed capacity of the station as at 11th July 2006 (“the original capacity”) is measured separately from electricity generated using capacity which has been added to the station since that date (“additional capacity”), the electricity which is generated using the station’s original capacity;
- (b) in any other case, the appropriate percentage of the electricity generated by the station (the appropriate percentage for these purposes being the total installed capacity of the station as at 11th July 2006 expressed as a percentage of the total installed capacity of the station as at the date of generation of the electricity).
- (5) In relation to the remainder of the electricity generated by the generating station, the amount of electricity to be stated in each ROC is to be determined in accordance with article 27(4) and (5) except to the extent that the electricity—
- (a) is generated using additional capacity which was operational before 1st April 2011 (“relevant additional capacity”); and
- (b) is generated in a way described in the first column of Part 4 of Schedule 2.
- (6) Where the electricity generated by the generating station is generated using relevant additional capacity in a way described in the first column of Part 4 of Schedule 2, the amount of electricity to be stated in each ROC which is to be issued in respect of that electricity is the amount which corresponds to that description in the second column of that Part of that Schedule.
- (7) In paragraphs (5) and (6), the reference to electricity being generated using relevant additional capacity is a reference to—
- (a) where electricity generated using relevant additional capacity is measured separately from electricity generated otherwise than by using such capacity, the electricity which is generated using that capacity;
- (b) in any other case, the appropriate percentage of the electricity generated by the generating station (the appropriate percentage for these purposes being the relevant additional capacity of the station at the date of generation of the electricity expressed as a percentage of the total installed capacity of the station at that date).
- (8) This article is subject to article 32.
Generating stations which were accredited, or held preliminary accreditation, as at 31st March 2009
31
- (1) This article applies to a generating station—
- (a) which was accredited as at 31st March 2009;
- (b) which has not ceased to be accredited since that date; and
- (2) This article also applies to a generating station—
- (a) which was accredited on or before 31st March 2011;
- (b) which, since being accredited, has not ceased to be accredited at any time;
- (c) in respect of which preliminary accreditation was held—
- (i) as at 31st March 2009, and
- (ii) from that date until the date on which the station was accredited; and
- (3) Subject to paragraphs (4) to (6), the amount of electricity to be stated in each ROC issued in respect of electricity generated by a generating station to which this article applies is to be determined in accordance with article 27(4) and (5).
- (4) Where the electricity generated by a generating station to which this article applies is generated in a way described in the first column of Part 4 of Schedule 2, the amount of electricity to be stated in each ROC issued in respect of that electricity is (subject to paragraph (5)) the amount which corresponds to that description in the second column of that Part of that Schedule.
- (5) Where, at any time it generates electricity after 31st March 2011, the generating station’s total installed capacity is greater than it was on 31st March 2011, paragraph (4) applies only in relation to ROCs which are to be issued in respect of—
- (a) where electricity generated using the total installed capacity of the station as at 31st March 2011 (“the original capacity”) is measured separately from electricity generated using capacity which has been added to the station since that date, the electricity which is generated using the station’s original capacity;
- (b) in any other case, the appropriate percentage of the electricity generated by the station (the appropriate percentage for these purposes being the total installed capacity of the station as at 31st March 2011 expressed as a percentage of the total installed capacity of the station as at the date of generation of the electricity).
- (6) In relation to the remainder of the electricity generated by the generating station, the amount of electricity to be stated in each ROC is to be determined in accordance with article 27(4) and (5).
- (7) This article is subject to article 32.
Generating stations in respect of which a statutory grant has been awarded
32
- (1) This article applies to a generating station—
- (a) in respect of which a statutory grant was awarded on or before 11th July 2006, and
- (b) which either—
- (i) was granted accreditation which took effect after 11th July 2006, or
- (ii) generates electricity from biomass or waste (including fuels produced from biomass or waste by means of gasification, pyrolysis or anaerobic digestion).
- (2) The operation of articles 27 to 31 in relation to electricity generated by a generating station to which this article applies is conditional upon the operator of the station agreeing—
- (a) if the grant or any part of it has been paid, to repay to the Secretary of State on or before 31st March 2011 so much of the grant as has been paid,
- (b) to pay to the Secretary of State interest on an amount repayable under sub-paragraph (a) for such period, and at such rate, as may be determined by the Secretary of State, and
- (c) if the grant or any part of it has not yet been paid, to consent to the cancellation of the award of the grant or part.
- (3) Where a generating station to which this article applies generates electricity at a time when the operator of the station—
- (a) has not so agreed, or
- (b) having so agreed, has not produced to the Authority evidence of—
- (i) the repayment of all amounts due under paragraph (2)(a) or the payment of all amounts of interest due under paragraph (2)(b), and
- (ii) where a grant or any part has been cancelled under paragraph (2)(c), the cancellation of that grant or part,
the amount of electricity to be stated in each ROC issued in respect of that electricity is 1 megawatt hour or the amount determined in accordance with article 27 or 28, whichever is the greater.
- (4) In determining how electricity has been generated for the purposes of paragraph (1)(b)(ii), no account is to be taken of any waste which the generating station uses for permitted ancillary purposes.
Review of banding provisions
33
- (2) The Secretary of State may commence a review of the banding provisions in October 2010 and at subsequent four yearly intervals.
- (3) The Secretary of State may review all or any of the banding provisions at any time if satisfied that one or more of the following conditions is satisfied—
- (a) the charges imposed by network operators on persons, or a class of persons, making a request for connection to and use of a transmission or distribution system have changed significantly since the Secretary of State made the banding provisions;
- (b) the charges imposed by network operators on persons, or a class of persons, who generate electricity have changed significantly since the Secretary of State made the banding provisions;
- (c) a way of generating electricity is being or has been developed that—
- (i) is likely to be used to generate from renewable sources electricity which is supplied to customers in Great Britain, and
- (ii) is not listed in the first column of Part 2 of Schedule 2;
- (d) there has been a change, since the Secretary of State made the banding provisions, in any support, whether financial or otherwise, provided under any enactment other than sections 32 to 32M of the Act to persons generating electricity from renewable sources and that change is likely to have a significant impact on the generation of electricity from renewable sources;
- (e) the costs of generating electricity in any of the ways listed in the first column of Part 2 of Schedule 2 are significantly different from the costs of generating electricity in that way to which the Secretary of State had regard when making the banding provisions;
- (f) there is evidence over a significant period that the provisions of article 13(3) to (5) are having a material effect on trade in ROCs referred to in article 13(3) and (4);
- (g) in an obligation period the number of ROCs issued by, produced to or likely to be produced to the Authority exceeds or is likely to exceed the total number of ROCs required to be produced to the Authority in respect of that obligation period by designated electricity suppliers;
- (h) an event has occurred which—
- (i) is relevant to the matters set out in section 32D(4) of the Act,
- (ii) was not foreseen by the Secretary of State when making the banding provisions, and
- (iii) has had or is likely to have a material effect on the operation of this Order.
- (4) In this article, “network operators” are persons authorised by a licence under section 6(1)(b) or (c) of the Act to participate in the transmission of electricity or to distribute electricity.
PART 7 — Issue and revocation of ROCs
Issue of ROCs to generators and suppliers
34
- (1) Subject to paragraphs (2) to (4) and article 35 (issue of ROCs to agents), the Authority is to issue a ROC to the operator of the generating station by which the electricity to which the ROC relates was generated.
- (2) Where electricity—
- (a) is required to be generated by a generating station from renewable sources under a NFFO arrangement, or
- (b) in compliance with such an arrangement, is required to be made available to the nominated person,
ROCs are to be issued as set out in paragraphs (3) and (4).
- (3) Where by virtue of the NFFO arrangement the nominated person is entitled to the electricity, ROCs are to be issued to electricity suppliers notified to the Authority by the nominated person as being purchasers of the electricity and to each in such numbers as are appropriate to the amount of the electricity which the nominated person notifies the Authority each has purchased (subject to the total number of ROCs available to be issued in respect of the electricity).
- (4) Where electricity suppliers are entitled to electricity under a NFFO arrangement, ROCs are to be issued to those electricity suppliers, each in proportion to its entitlement.
Issue of ROCs to agents
35
- (1) This article applies to a ROC which certifies the matters within section 32B(5), (6) or (8) of the Act (a “relevant ROC”).
- (2) Where the generating stations to which a relevant ROC relates are operated by two or more persons (“the operators”), that ROC must be issued to an agent appointed for the purpose by the operators.
- (3) The Authority must be notified in writing of the agent’s appointment, name and address.
- (4) That notification may be provided to the Authority by the operators (or any of them) or the agent.
- (5) The Authority must also be notified in writing if the agent’s appointment is terminated.
- (6) That notification may also be provided to the Authority by the operators (or any of them) or the agent.
- (7) Where notice is given under paragraph (5) and received by the Authority, the termination will take effect (subject to paragraph (8)) at the end of the obligation period during which it is given, and until the expiration of that obligation period the Authority must continue to issue any relevant ROCs to the agent.
- (8) Notwithstanding paragraph (7), after the expiration of that obligation period the Authority must continue to issue relevant ROCs to the agent where those ROCs relate to electricity generated during that obligation period.
- (9) Paragraphs (7) and (8) do not apply in any case where the Authority is satisfied, by evidence produced to it, that owing to exceptional circumstances the termination should have immediate effect.
- (10) Where an agent’s appointment has been terminated the agent is required to return to the operators any relevant information relating to the generation of electricity by their stations.
- (11) Where any provision of this Order requires or permits something to be done by, to or in respect of an agent appointed under this article and the agent’s appointment is terminated before that thing is done, references to that agent (however framed) are to be construed—
- (a) where a successor to the agent has been appointed under this article, as references to that successor;
- (b) in any other case, as references to the operators of the generating stations for whom the agent acted before they terminated the appointment.
General criteria for the issue of ROCs
36
- (1) Subject to article 37, once during each obligation period the person to whom a ROC is to be issued must confirm to the Authority in writing, whether before or after the generation of the electricity to which the ROC relates, that that electricity, to the best of the person’s knowledge and belief, has been or (as the case may be) will be—
- (a) in the case of a ROC certifying the matters within section 32B(3) or (5) of the Act, supplied by a designated electricity supplier to customers in Great Britain;
- (b) in the case of a ROC certifying the matters within section 32B(4) or (6) of the Act, supplied by a Northern Ireland supplier to customers in Northern Ireland;
- (c) in the case of a ROC certifying the matters within section 32B(7) or (8) of the Act, used in a permitted way.
- (2) The electricity in respect of which a ROC is to be issued—
- (a) must be generated during a month in which the generating station generating it is accredited and any conditions to which the accreditation is subject are met;
- (b) subject to paragraph (3), must be measured using a meter which, if used for ascertaining the quantity of electricity supplied by an authorised supplier to a customer, would be approved for the purposes of paragraph 2(1)(a) of Schedule 7 to the Act; and
- (c) must not include electricity in respect of which a ROC—
- (i) has already been issued under this Order and has not been revoked; or
- (ii) has already been issued under an Order made under sections 32 to 32M of the Act by the Scottish Ministers (whether or not it has been revoked).
- (3) Paragraph (2)(b) does not apply in relation to electricity generated by a generating station the operator of which has agreed with the Authority that estimates may be provided instead of measurements using a meter.
- (4) Any information which—
- (a) is relevant to the question whether a ROC is to be issued, and
- (b) is requested by or required to be provided to the Authority under article 53 (provision of information to the Authority),
must be provided in the form and time requested and must be (in the Authority’s opinion) accurate and reliable.
- (5) Where such information relates to the fuel used in the generation of that electricity and the fuel did not originate at the generating station, in determining whether that information is accurate and reliable the Authority must have regard to—
- (a) the distance over which the fuel was transported; and
- (b) the conditions under which the fuel was prepared and transported.
Criteria applicable to ROCs where article 36(1)(a) or (b) cannot be complied with
37
- (1) Where a ROC certifying the matters within section 32B(3) or (5) of the Act is to be issued and article 36(1)(a) cannot be complied with because the electricity in respect of which the ROC is to be issued cannot be shown to have been supplied to customers in Great Britain, the person to whom the ROC is to be issued must confirm to the Authority in writing—
- (a) that the electricity in question is to be regarded as having been supplied to customers in Great Britain by virtue of article 15(2) or (3); and
- (b) where it is located otherwise than on land, that the generating station to which the ROC relates is connected directly to a transmission or distribution system (or the part of such a system) that is located in Northern Ireland (and to no other system or part thereof).
- (2) Where a ROC certifying the matters within section 32B(4) or (6) of the Act is to be issued and article 36(1)(b) cannot be complied with because the electricity in respect of which the ROC is to be issued cannot be shown to have been supplied to customers in Northern Ireland, the person to whom the ROC is to be issued must confirm to the Authority in writing that the electricity in question is to be regarded as having been supplied to customers in Northern Ireland by virtue of article 15(4).
- (3) In this article “Northern Ireland” has the same meaning as in Article 54(1) of the Northern Ireland Energy Order.
Further criterion applicable to ROCs certifying matters within section 32B(3) and (5) of the Act where electricity generated otherwise than on land
38
Where a ROC certifying the matters within section 32B(3) or (5) of the Act is to be issued in relation to a generating station which is not located on land and the confirmation required by article 36(1)(a) has been or is to be given in relation to the electricity generated or to be generated by that station, the person to whom the ROC is to be issued must confirm to the Authority in writing that the generating station to which the ROC relates is connected directly to a transmission or distribution system in Great Britain and the electricity in respect of which it is to be issued cannot be or have been conveyed to Great Britain through an electricity interconnector.
Further criteria applicable to ROCs certifying matters within section 32B(3) to (6) of the Act
39
- (1) Once during each obligation period the person to whom a ROC certifying the matters within section 32B(3), (4), (5) or (6) is to be issued must confirm to the Authority in writing, whether before or after the generation of the electricity to which the ROC relates—
- (a) that they are not a person who has been a party to an applicable NFFO arrangement (within the meaning of article 20);
- (b) that they are not (and to the best of their knowledge and belief will not during the obligation period in which the confirmation is given become) a person who is a party to an applicable NFFO arrangement (within the meaning of article 21); and
- (c) that they are not (and to the best of their knowledge and belief will not during the obligation period in which the confirmation is given become) a person who is a connected person or a linked person in relation to any such party.
- (2) Paragraph (1) does not apply where the person to whom the ROC is to be issued is an electricity supplier.
Further criteria applicable to ROCs certifying matters within section 32B(5), (6) and (8) of the Act
40
- (1) Once during each obligation period the person to whom a ROC certifying the matters within section 32B(5), (6) or (8) is to be issued must confirm to the Authority in writing, whether before or after the generation of the electricity to which the ROC relates, the matters set out in paragraph (2).
- (2) The matters set out in this paragraph are—
- (a) that each of the generating stations in relation to which the ROC is to be issued—
- (i) is a microgenerator, and
- (ii) is accredited as a generating station capable of generating electricity in the same way from the same renewable source, and
- (b) where the generating stations in relation to which the ROC is to be issued are operated by two or more persons (“the operators”), that the operators have each—
- (i) appointed the person providing the confirmation to act as agent to receive the ROC on their behalf in accordance with article 35 (issue of ROCs to agents), and
- (ii) agreed that their entitlement to ROCs should be determined in the same way (either on a monthly basis or on an annual basis, depending on whether or not a notice has been given to the Authority under article 60(2) (modifications of this Order in relation to microgenerators in certain circumstances)).
Refusing to issue and revoking ROCs
41
- (1) The Authority may refuse to issue a ROC—
- (b) where any information referred to in article 36(4) or any confirmation provided to it under this Part is not (in its opinion) accurate and reliable.
- (2) Where, in relation to any electricity generated by a generating station in a month, the Authority is satisfied that—
- (a) any information referred to in article 36(4) is false;
- (b) any confirmation provided to it under this Part is false; or
- (c) a ROC was issued on the basis of any fraudulent behaviour, statement or undertaking on the part of the operator of that generating station or a connected person or, where ROCs are issued to an agent by virtue of article 35, that agent,
the Authority must revoke all ROCs issued in respect of that electricity in that month.
- (3) The Authority must also revoke any ROC which it has issued—
- (a) where the ROC certifies the matters within section 32B(4) or (6) of the Act and (before the ROC is produced to it under article 5) the Northern Ireland authority has notified the Authority that it is not satisfied that the electricity in respect of which the ROC was issued has been supplied to customers in Northern Ireland;
- (b) where it is otherwise satisfied that the ROC is inaccurate.
- (4) Where the Authority—
- (a) is no longer satisfied that a ROC should have been issued;
- (b) has reasonable doubts as to the accuracy or reliability of the information upon which it relied prior to the issue of a ROC; or
- (c) has been unable, due to a failure or refusal by any person (whether inside or outside England and Wales) to provide it with any information reasonably requested by it, to check the accuracy of either a ROC or any information which it relied upon prior to the issue of a ROC,
it may revoke the ROC (or another ROC which is identical in all material respects and which has been issued to the same person).
- (5) In determining whether to revoke a ROC under paragraph (3)(b) or (4), the Authority may disregard any changes to the amounts for “gross output” (within the meaning of article 25) and “input electricity” (within the meaning of article 24) which were used by it to determine a generating station’s renewable output in a month if satisfied that, in all the circumstances, it is reasonable for it to do so.
- (6) Where the Authority revokes a ROC it must delete that ROC from the Register and as soon as reasonably practicable afterwards give notice in writing of such revocation to the person who was the registered holder of the ROC at the time of its revocation.
PART 8 — Payments to discharge the renewables obligation, dealing with the buy-out and late payment funds, and mutualisation
Interpretation
42
- (1) In this Part—
- “buy-out fund” means the fund held by the Authority on the 1st September of the settlement period, being the aggregate of— amounts received by the Authority under article 43 (those amounts relating to the renewables obligation in the relevant period); amounts held by the Authority by virtue of articles 46(4)(b), 47(4), 51(5) and 52(6)(b); and any interest earnt on those amounts;
- “compliant United Kingdom supplier” means a United Kingdom supplier which, at the end of the late payment period, has discharged or is treated as if it had discharged in full every UK renewables obligation imposed on it in respect of the relevant period;
- “GBRO costs” means the costs which have been or are expected to be incurred by the Authority in connection with the performance of any of its functions conferred by or under sections 32 to 32M of the Act during the settlement period;
- “instalment payment” is to be construed in accordance with article 49(5);
- “late payment fund” is the fund held by the Authority on the 1st November of the settlement period, being the aggregate of— amounts received by the Authority during that period under article 44 (those amounts relating to the renewables obligation in the relevant period); and any interest earnt on those amounts;
- “late payment period” means the period beginning on the 1st September and concluding on the 31st October in the settlement period;
- “mutualisation fund” means the aggregate at any given time of the amounts (excluding any amounts repaid under article 51(2)) received by the Authority under articles 49 and 51 (together with any interest earnt on those amounts) in relation to the relevant period;
- “mutualisation period” means the obligation period immediately following the settlement period;
- “NIRO costs” means the costs which have been or are expected to be incurred by the Northern Ireland authority in connection with the performance of any of its functions conferred by or under Articles 52 to 55F of the Northern Ireland Energy Order during a period which, in any order made under those Articles, corresponds to the settlement period;
- “non-compliant United Kingdom supplier” means a United Kingdom supplier which, at the end of the late payment period, has not discharged or is not treated as if it had discharged in full every UK renewables obligation imposed on it in respect of the relevant period;
- “recalculated supplier payment” is to be construed in accordance with article 50(5);
- “the relevant period” is to be construed in accordance with article 43(1);
- “relevant shortfall” is to be construed in accordance with article 48(3);
- “relevant supplier” means an electricity supplier which was a designated electricity supplier in the relevant period and which at the end of the late payment period had discharged or is treated as if it had discharged the whole or part of its renewables obligation for the relevant period;
- “renewables obligation order” is to be construed in accordance with section 32(4) of the Act;
- “the settlement period” is to be construed in accordance with article 43(1);
- “shortfall” is to be construed in accordance with article 48(2);
- “supplier payment” is to be construed in accordance with article 49(3);
- “total mutualisation sum” is to be construed in accordance with article 48;
- “total UK buy-out fund” means the fund existing on the 1st September of the settlement period, being the aggregate of— the buy-out fund held on that date; any fund provided for in a renewables obligation order made by the Scottish Ministers which corresponds to the buy-out fund held on that date; and any fund provided for in an order made under Articles 52 to 55F of the Northern Ireland Energy Order which corresponds to the buy-out fund held on that date;
- “UK renewables obligation” means— the renewables obligation imposed by article 5 of this Order; a renewables obligation imposed by a renewables obligation order made by the Scottish Ministers; or a renewables obligation imposed on Northern Ireland suppliers in an order made under Articles 52 to 55F of the Northern Ireland Energy Order;
- “United Kingdom supplier” means— a designated electricity supplier; any electricity supplier on which a UK renewables obligation is imposed under a renewables obligation order made by the Scottish Ministers; and any designated electricity supplier within the meaning of Article 52(2) of the Northern Ireland Energy Order.
- (2) In this Part, references to the late payment period, the mutualisation period, the relevant period and the settlement period, when used in the context of a United Kingdom supplier subject to a UK renewables obligation, are to be construed (where the United Kingdom supplier is not a designated electricity supplier)—
- (a) in the case of an electricity supplier on which a UK renewables obligation is imposed under a renewables obligation order made by the Scottish Ministers, as references to the period which corresponds to the late payment, mutualisation, relevant or (as the case may be) settlement period in that order;
- (b) in the case of an electricity supplier on which a UK renewables obligation is imposed under an order made under Articles 52 to 55F of the Northern Ireland Energy Order, as references to the period which corresponds to the late payment, mutualisation, relevant or (as the case may be) settlement period in the order under which that UK renewables obligation is imposed.
- (3) Any sum payable by suppliers under articles 43(1), 44(6), 49 or 51(1) is to be rounded to the nearest penny, with any half of a penny being rounded upwards.
Payments to discharge the renewables obligation
43
- (1) A designated electricity supplier may (in whole or in part) discharge its renewables obligation for an obligation period (“the relevant period”) by making a payment to the Authority before the 1st September in the following obligation period (“the settlement period”).
- (2) The payment referred to in paragraph (1) is an amount equal to £X × (Y − Z) where—
- (a) X is the sum which corresponds to a renewables obligation certificate by virtue of paragraph (4);
- (b) Y is the number of renewables obligation certificates that the designated electricity supplier, if it makes no payment under paragraph (1), would have to produce to the Authority in order for it to discharge its renewables obligation for the relevant period in full; and
- (c) Z is the number of renewables obligation certificates that it has actually produced to the Authority for that period (or, where it has not produced any at all, zero).
- (3) Where a designated electricity supplier makes a payment to the Authority which is less than the amount calculated under paragraph (2), its renewables obligation for the relevant period will be discharged by that payment to the extent of the appropriate number of renewables obligation certificates, which is the quotient obtained by dividing the payment made by the sum which corresponds to a renewables obligation certificate by virtue of paragraph (4).
- (4) The sum which corresponds to a renewables obligation certificate (“the buy-out price”) is—
- (a) for the relevant period commencing on 1st April 2009, £37.19; and
- (b) for each obligation period thereafter, the buy-out price for the previous obligation period increased or, as the case may be, decreased by the percentage increase or decrease in the retail prices index over the 12 month period ending on the 31st December in the previous obligation period (the resulting figure being rounded to the nearest penny, with any half of a penny being rounded upwards).
Late payments to discharge the renewables obligation
44
- (1) Where a designated electricity supplier fails (in whole or in part) to discharge its renewables obligation for the relevant period before the 1st September in the settlement period, the Authority must notify it of the extent of its default as soon as is reasonably practicable on or after that date.
- (2) The extent of the designated electricity supplier’s default is an amount equal to the amount calculated under article 43(2) less any amount that the designated electricity supplier has actually paid to the Authority under article 43.
- (3) Interest is payable on that amount (or, where all or part of it is paid to the Authority before the end of the late payment period, such part of that amount as remains unpaid) during the late payment period.
- (4) That interest is to be calculated on a daily basis at 5 percentage points above the base rate charged by the Bank of England on the first day of the late payment period.
- (5) Any payment made by a designated electricity supplier towards discharging its default under paragraph (2) will be applied first to any interest that is payable under paragraph (3).
- (6) If, by the end of the late payment period, the designated electricity supplier has paid to the Authority under this article the amount referred to in paragraph (2) and all interest required to be paid on that amount under paragraph (3), it will be treated as having discharged its renewables obligation for the relevant period.
- (7) The Authority must not, during the late payment period, impose a penalty under section 27A(1) of the Act30 on any supplier in respect of that supplier’s failure to discharge its renewables obligation in full before the 1st September in the settlement period.
Dealing with the buy-out fund: payments into the Consolidated Fund and to the Northern Ireland authority
45
- (1) Subject to paragraph (2), before the 1st November in the settlement period the Authority must pay—
- (a) into the Consolidated Fund the proportion of the buy-out fund which is equal to the proportion which the GBRO costs bear to the total UK buy-out fund; and
- (b) to the Northern Ireland authority the proportion of the buy-out fund which is equal to the proportion which the NIRO costs bear to the total UK buy-out fund.
- (2) Where the aggregate of the amounts to be paid by the Authority under paragraph (1) would exceed the buy-out fund, before the 1st November of the settlement period the Authority must pay the buy-out fund into the Consolidated Fund and to the Northern Ireland authority in the same ratio as the GBRO costs bear to the NIRO costs.
- (3) Where any amount to be paid under paragraph (1) or (2) is not a whole number when expressed in terms of pounds sterling, it is to be rounded down to the nearest pound sterling.
- (4) Where the buy-out fund exceeds the aggregate of the amounts to be paid by the Authority under paragraph (1), the Authority must pay the balance of the buy-out fund to United Kingdom suppliers under and in accordance with article 47 by the 1st November in the settlement period.
Dealing with the late payment fund: payments into the Consolidated Fund and to the Northern Ireland authority
46
- (1) Subject to paragraph (2), where the buy-out fund has been paid into the Consolidated Fund and to the Northern Ireland authority under article 45(2), before the 1st January in the settlement period the Authority must pay from the late payment fund—
- (a) into the Consolidated Fund an amount which is equal to the difference between the amount that was paid into the Consolidated Fund under article 45(2) and the amount that would have been paid into it under article 45(1) had the aggregate of the amounts to be paid by the Authority under article 45(1) not exceeded the buy-out fund; and
- (b) to the Northern Ireland authority an amount which is equal to the difference between the amount that was paid to it under article 45(2) and the amount that would have been paid to it under article 45(1) had the aggregate of the amounts to be paid by the Authority under article 45(1) not exceeded the buy-out fund.
- (2) Where the aggregate of the amounts to be paid by the Authority under paragraph (1) would exceed the late payment fund, before the 1st January of the settlement period the Authority must pay the late payment fund into the Consolidated Fund and to the Northern Ireland authority in the same ratio as the GBRO costs bear to the NIRO costs.
- (3) Where any amount to be paid under paragraph (1) or (2) is not a whole number when expressed in terms of pounds sterling, it is to be rounded down to the nearest pound sterling.
- (4) Where, after any payments required to be made during the settlement period under paragraph (1) or (2) have been made, the Authority—
- (a) holds more than £50,000 in the late payment fund, the Authority must pay the late payment fund to United Kingdom suppliers under and in accordance with article 47 by the 1st January in the settlement period;
- (b) holds £50,000 or less in the late payment fund, the Authority must retain that money, which is to constitute part of the buy-out fund held in the obligation period immediately following the settlement period.
Dealing with the buy-out and late payment funds: payments to United Kingdom suppliers
47
- (1) Each United Kingdom supplier must be paid a proportion of the amount (if any) that the Authority is required to pay to United Kingdom suppliers by virtue of article 45(4) or 46(4)(a) by the dates in the settlement period specified in those articles.
- (2) The proportion referred to in paragraph (1) is A ÷ B where—
- (a) A is the number of renewables obligation certificates presented by the United Kingdom supplier to the Authority or Northern Ireland authority in order to discharge (in whole or in part) any UK renewables obligation to which it was subject in the relevant period; and
- (b) B is the total number of renewables obligation certificates presented by United Kingdom suppliers to the Authority and the Northern Ireland authority in order to discharge (in whole or in part) any UK renewables obligations to which they were subject in that period.
- (3) Where any amount to be paid under this article is not a whole number when expressed in terms of pounds sterling, it is to be rounded down to the nearest pound sterling.
- (4) Where by virtue of the operation of paragraph (3) the Authority continues to hold any sum which otherwise would have been paid out under this article that sum is to be retained by the Authority and is to constitute part of the buy-out fund held in the obligation period immediately following the settlement period.
Shortfall in the buy-out and late payment funds: the total mutualisation sum
48
- (1) As soon as reasonably practicable after the 31st October in the settlement period, the Authority must—
- (a) determine whether a shortfall (within the meaning of paragraph (2)) has occurred; and
- (b) where such a shortfall has occurred and is a relevant shortfall (within the meaning of paragraph (3)), calculate the total sum to be recovered from relevant suppliers (“the total mutualisation sum”).
- (2) A shortfall occurs in relation to the relevant period where the amount referred to in sub-paragraph (a) is less than the amount referred to in sub-paragraph (b) and is the difference between the two—
- (a) the amount referred to in this sub-paragraph is the sum of—
- (i) the amount held in the buy-out fund on 1st September in the settlement period, and
- (ii) the amount held in the late payment fund on 31st October in that period (excluding from that amount any interest paid pursuant to article 44(3));
- (b) the amount referred to in this sub-paragraph is what the amount referred to in sub-paragraph (a) would have been if, on 31st October in the settlement period, each designated electricity supplier which, at the end of the late payment period, has not (and is not treated as having) discharged its renewables obligation in full were to pay to the Authority the amount notified to it by the Authority under article 44(1).
- (3) A shortfall is a relevant shortfall if—
- (a) the relevant period in relation to which it has occurred is identified in the first column of Schedule 3, and
- (b) it is equal to, or in excess of, the amount which corresponds to that period in the second column of that Schedule.
- (4) Subject to paragraphs (5) to (7), where a relevant shortfall has occurred in relation to the relevant period, the total mutualisation sum for that period is the amount of that shortfall.
- (5) Where any non-compliant United Kingdom supplier has produced renewables obligation certificates to the Authority or the Northern Ireland authority in order to discharge, in part, any UK renewables obligation to which it was subject in the relevant period, the total mutualisation sum for that period is equal to $R−( R × E F )$ where—
- (b) E is the number of renewables obligation certificates produced by non-compliant United Kingdom suppliers to the Authority or the Northern Ireland authority in order to discharge, in part, any UK renewables obligation to which they were subject in the relevant period; and
- (c) F is the total number of renewables obligation certificates produced by United Kingdom suppliers to the Authority or to the Northern Ireland authority in order to discharge, in whole or in part, any UK renewables obligation to which they were subject in the relevant period.
- (6) If the total mutualisation sum for the relevant period has to be recalculated by virtue of article 50(5), for the purposes of that recalculation (whether under paragraph (4) or (5)) the amount of the shortfall is to be reduced by the sum of all payments mentioned in article 50(1)(b) received by United Kingdom suppliers.
- (7) For the purposes of calculating or recalculating the total mutualisation sum for the relevant period, the amount (if any) by which the shortfall in relation to that period exceeds the mutualisation cap for that period is to be disregarded.
- (8) The mutualisation cap for the relevant period depends on which obligation period constitutes the relevant period and is—
- (a) for the relevant period commencing on 1st April 2009, £224,000,000; and
- (b) for each obligation period thereafter, the mutualisation cap for the previous obligation period increased or, as the case may be, decreased by the percentage increase or decrease in the retail prices index over the 12 month period ending on the 31st December in the previous obligation period (the resulting figure being rounded to the nearest penny, with any half of a penny being rounded upwards).
Payments to be made by suppliers towards the total mutualisation sum
49
- (1) Where a relevant shortfall has occurred in relation to the relevant period, as soon as reasonably practicable after the 31st October in the settlement period the Authority must notify each relevant supplier of—
- (a) the amount of the shortfall;
- (b) the total mutualisation sum; and
- (c) the payment which that supplier is required to make under paragraph (3).
- (2) Where the Authority notifies relevant suppliers under paragraph (1) it must publish a notice stating the amount of the shortfall in relation to the relevant period and the total mutualisation sum.
- (3) Where a relevant shortfall has occurred in relation to the relevant period, each relevant supplier must make a payment to the Authority (a “supplier payment”).
- (4) The supplier payment for each relevant supplier is equal to $T × C D$ where—
- (a) T is the total mutualisation sum;
- (b) C is the number of renewables obligation certificates that the supplier, if it had made no payments under article 43 or 44, would have had to produce to the Authority in order for it to have discharged its renewables obligation for the relevant period in full;
- (c) D is the total number of renewables obligation certificates that all relevant suppliers, if none of them had made payments under articles 43 or 44 would have had to produce in order for each of them to discharge their renewables obligation for the relevant period in full.
- (5) Subject to article 50 each relevant supplier must make its supplier payment in the following instalments (“instalment payments”)—
- (a) 25 per cent of the supplier payment required must be paid to the Authority before 1st September in the mutualisation period;
- (b) 25 per cent of the supplier payment must be paid to the Authority before 1st December in that period;
- (c) 25 per cent of the supplier payment must be paid to the Authority before 1st March in that period; and
- (d) 25 per cent of the supplier payment must be paid to the Authority before 1st June immediately following that period.
- (6) Where a person required to make a supplier payment—
- (a) fails to make payment in full, and
- (b) at any time during or after the end of the relevant period ceases to hold a licence to supply electricity under section 6(1) of the Act31,
sections 25 to 28 of the Act32 are to apply in respect of that person in respect of the obligations imposed by this article, as if that person still held a licence to supply electricity.
Circumstances in which payments towards the total mutualisation sum are to be re‑calculated
50
- (1) This article and article 51 apply where—
- (a) a relevant shortfall has occurred in relation to the relevant period; and
- (b) a designated electricity supplier which failed to discharge its renewables obligation for the relevant period makes a payment to other United Kingdom suppliers which, if it had been made to the Authority under article 43 or 44, would have increased the amounts that those suppliers would have received under article 47 from the buy-out and late payment funds, that payment being designed to compensate those suppliers for that loss.
- (2) A designated electricity supplier which makes a payment mentioned in paragraph (1)(b) must, immediately after making the payment, notify the Authority—
- (a) of the United Kingdom suppliers to which the payment was made;
- (b) how much each United Kingdom supplier received; and
- (c) to which obligation period the payment relates.
- (3) Any designated electricity supplier which receives a payment mentioned in paragraph (1)(b) must notify the Authority, immediately after receiving the payment, of the amount it received.
- (4) Where a designated electricity supplier receives a payment from an electricity supplier supplying electricity in Scotland in relation to the electricity supplier’s failure to discharge in full any UK renewables obligation imposed on it by a renewables obligation order made by the Scottish Ministers, the designated electricity supplier must notify the Authority, immediately after receiving the payment, of the amount it received.
- (5) Where, before 1st August in the obligation period immediately following the mutualisation period, the Authority receives a notification under paragraph (2) or (3), relevant suppliers shall cease to be required to make instalment payments in respect of dates specified in article 49(5) which have not yet passed and the Authority must, as soon as is reasonably practicable—
- (a) recalculate the total mutualisation sum (in relation to the relevant period);
- (b) recalculate the supplier payment (in relation to the relevant period) which each relevant supplier is required to make (to take account of the recalculated total mutualisation sum);
- (c) calculate, in accordance with article 51, the payments (if any) suppliers are required to make under that article; and
- (d) notify each relevant supplier of—
- (i) the recalculated total mutualisation sum;
- (ii) its recalculated supplier payment; and
- (iii) the payments (if any) the supplier is required to make under article 51.
Re-calculated payments to be made by suppliers towards the total mutualisation sum and repayments by the Authority
51
- (1) Where the sum of instalment payments already made by a relevant supplier is less than its recalculated supplier payment, the supplier must pay the difference between the two (“the outstanding amount”)—
- (a) where the only date mentioned in article 49(5) which has not yet passed is the final one, on that date;
- (b) where two or more of the dates mentioned in article 49(5) have not yet passed, in instalments on those dates (each instalment being equal to the outstanding amount divided by the number of dates which have not yet passed).
- (2) Where the sum of instalment payments already made by a relevant supplier is more than the supplier’s recalculated supplier payment and the Authority has received instalment payments, but has not yet paid out the mutualisation fund under article 52, the Authority must repay to the supplier from the mutualisation fund the difference between the amount that the supplier has paid (together with any interest earnt on that amount) and the supplier’s recalculated supplier payment.
- (3) Where the Authority is required to repay sums to relevant suppliers in accordance with paragraph (2) and the mutualisation fund is insufficient to enable the Authority to repay each relevant supplier in full, the Authority must pay each relevant supplier an amount equal to $G − ( G × ( J − H ) J )$ where—
- (a) G is the amount which the supplier would have received under paragraph (2) had the amount in the mutualisation fund been sufficient to enable the Authority to repay each relevant supplier in full;
- (b) H is the amount in the mutualisation fund; and
- (c) J is the sum of all payments that relevant suppliers would have received under paragraph (2) had the amount in the mutualisation fund been sufficient to enable the Authority to repay each relevant supplier in full.
- (4) Where any amount to be paid under paragraph (2) or (3) is not a whole number when expressed in terms of pounds sterling, it is to be rounded down to the nearest pound sterling.
- (5) Where by virtue of the operation of paragraph (4) the Authority continues to hold any sum which otherwise would have been paid out under this article that sum is to be retained by the Authority and is to constitute part of the buy-out fund held in the obligation period immediately following the mutualisation period.
Payments to be made to suppliers out of the mutualisation fund
52
- (1) The Authority must pay out the mutualisation fund to compliant United Kingdom suppliers in accordance with paragraphs (2) to (6).
- (2) When there is money in it, the mutualisation fund is to be paid out by—
- (a) 1st November in the mutualisation period;
- (b) 1st February in that period;
- (c) 1st May immediately following that period; and
- (d) 1st August immediately following that period.
- (3) On each occasion the mutualisation fund is paid out, each compliant United Kingdom supplier must be paid a proportion of the mutualisation fund.
- (4) The proportion referred to in paragraph (3) is A ÷ B where—
- (a) A is the number of renewables obligation certificates presented by the compliant United Kingdom supplier to the Authority or Northern Ireland authority in order to discharge (in whole or in part) any UK renewables obligation to which it was subject in the relevant period; and
- (b) B is the total number of renewables obligation certificates presented by all compliant United Kingdom suppliers to the Authority or Northern Ireland authority in order to discharge (in whole or in part) any UK renewables obligation to which they were subject in that period.
- (5) Where any amount to be paid under this article is not a whole number when expressed in terms of pounds sterling, it is to be rounded down to the nearest pound sterling.
- (6) Where following the making of a payment to compliant United Kingdom suppliers the Authority continues, by virtue of the operation of paragraph (5), to hold any sum which otherwise would have been paid out under this article—
- (a) the Authority must pay out that sum along with the next payment to be made under this article in respect of the relevant period; or
- (b) where there are no further payments to be made under this article in respect of the relevant period that sum is to be retained by the Authority and is to constitute part of the buy-out fund held in the obligation period immediately following the mutualisation period.
PART 9 — Provision of information, functions of the Authority and modification of this Order in relation to microgenerators in certain circumstances
Provision of information to the Authority
53
- (1) The Authority may, by the date (if any) specified by it, require—
- (a) a designated electricity supplier to provide it with information which in its opinion is relevant to the question whether the supplier is discharging, or has discharged, its renewables obligation;
- (b) a person to provide it with information which in its opinion is relevant to the question whether a ROC is, or was or will in future be, required to be issued to the person.
- (2) Without prejudice to paragraph (1), the Authority may, by the date (if any) specified by it, require any person who—
- (a) is the operator of a generating station generating electricity in respect of which a ROC has been or may be issued;
- (b) supplies, distributes or transmits such electricity; or
- (c) buys or sells (as a trader) such electricity or ROCs,
to provide it with such information as in its opinion it requires in order to carry out any of its functions under this Order.
- (3) Without prejudice to paragraphs (1) and (2), for the purposes of determining the renewable output of a generating station in a month (“the relevant month”) the operator of the station must provide the Authority with figures showing—
- (a) the amount of input electricity used by the station in the relevant month, and
- (b) the gross output of the station in that month,
by the end of the second month following the relevant month (and those figures may be estimated if the Authority has agreed to estimates being provided and to the way in which those estimates are to be calculated).
- (4) Nothing in paragraph (3) prevents the Authority from accepting figures, or further figures, provided after the end of the second month following the relevant month if the Authority considers it appropriate to do so.
- (5) Without prejudice to paragraphs (1) and (2), each designated electricity supplier must provide the Authority with—
- (a) estimates of the amount of electricity it has supplied to customers in England and Wales during each month of an obligation period by no later than 1st June following that period;
- (b) figures showing the amount of electricity it has actually supplied to customers in England and Wales during each month of an obligation period by no later than 1st July following that period; and
- (c) an estimate of the number of renewables obligation certificates it believes it would be required to produce to the Authority in order to discharge its renewables obligation for an obligation period if it did not discharge its renewables obligation for that period (in whole or in part) by some other means by no later than 1st July following that period.
- (6) When giving the information referred to in paragraph (5)(a) and (b), a designated electricity supplier must have regard to any sales figures relating to the electricity in respect of which it is giving that information which it has provided (or intends to provide) to the Department of Energy and Climate Change for publication in “Energy Trends”.
- (7) Without prejudice to paragraphs (1) and (2), for the purposes of determining whether a ROC certifying the matters within section 32B(5), (6) or (8) of the Act should be issued the person to whom any such ROC would be issued must provide the Authority with—
- (a) a figure representing the amount of electricity in respect of which ROCs should (in that person’s opinion) be issued; and
- (b) the data on which that person relied in arriving at that figure.
- (8) Information requested under or required to be provided by this article must be given to the Authority in whatever form it requires.
- (9) In this article “input electricity” and “gross output”, in relation to a generating station, have the same meaning as they have in articles 24 and 25 (calculating a generating station’s renewable output).
Information to be provided to the Authority where electricity is generated from biomass
54
- (1) This article applies to a generating station—
- (a) which generates electricity (wholly or partly) from biomass, and
- (b) which is not a microgenerator.
- (2) In relation to each consignment of biomass used in a generating station to which this article applies, the operator of the station must, by the 31st May immediately following the obligation period during which the biomass is used (“the relevant date”), provide the Authority with the information specified in paragraph (3).
- (3) The information specified in this paragraph is information identifying, to the best of the operator’s knowledge and belief—
- (a) the material from which the biomass was composed (for example, whether it was composed of wood);
- (b) where the biomass can take different forms (for example, wood can take a variety of forms, depending on whether and how it has been processed and what it is, is to be or has been used for), the form of the biomass;
- (c) where the biomass was solid, its mass;
- (d) where the biomass was fluid, its volume when measured at 25 degrees Celsius and 0.1 megapascals;
- (e) whether the biomass was a by-product of a process;
- (f) whether the biomass was waste;
- (g) where the biomass was plant matter or derived from plant matter, the country where the plant matter was grown;
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.