The Designation of Features (Notices) (England) Regulations 2012

Type Statutory-Instrument
Publication 2012-06-27
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API

Made: 27th June 2012

Laid before Parliament: 29th June 2012

Coming into force: 25th July 2012

The Secretary of State in exercise of the powers conferred by sections 30 and 48(2) of, and paragraph 16 of Schedule 1 to, the Flood and Water Management Act 2010[^f00001], makes the following Regulations.

Citation, commencement and application

1

These Regulations—

2

Review

3

Signed

Richard Benyon — Parliamentary Under Secretary of State — Department for Environment, Food and Rural Affairs — 27th June 2012

Explanatory note

(This note is not part of the Regulations)

EXPLANATORY NOTE

Under section 30 of, and Schedule 1 to, the Flood and Water Management Act 2010 (c. 29) (“the Act”), the Environment Agency, lead local flood authority or an internal drainage board may designate structures or environmental features that affect a flood or coastal erosion risk, though they may not necessarily have been designed or constructed for that purpose. Once designated, the owner of the designated feature cannot alter, remove or replace it without consent from the relevant authority, being either the authority which designated the feature or the authority who has since taken over responsibility for the designation in accordance with Schedule 1 to the Act (the “Responsible Authority”). Paragraph 6(3)(b) of Schedule 1 to the Act gives power to the Responsible Authority to issue a consent to alter, remove or replace a designated structure or feature (or a variation or withdrawal of such a consent) other than in response to an application by an owner (a “paragraph 6(3)(b) notice”). Paragraph 16 of Schedule 1 to the Act gives the Minister the power to make provision about the form, content and method of service of a notice made under Schedule 1 to the Act.

These Regulations provide a requirement for all paragraph 6(3)(b) notices to specify a minimum notice period before they have effect and an exception to this requirement. The specified notice period is 28 days after the date on which the notice is issued although a Responsible Authority may specify a shorter notice period if it considers it necessary in an emergency.

Regulation 3 requires the Secretary of State to review the operation and effect of these Regulations in relation to designations of structures or features and to publish a report within 5 years after these Regulations come into force.

An impact assessment of the effect that this instrument will have on the costs of business, the voluntary sector and the public sector is available from the website of the Department for Environment, Food and Rural Affairs at www.defra.gov.uk and is published with the Explanatory Memorandum alongside this instrument on www.legislation.gov.uk.

Footnotes

[^f00001]: 2010 c. 29. Paragraph 16 of Schedule 1 to the Flood and Water Management Act 2010 confers powers on “the Minister”, and paragraph 17 of Schedule 1 to that Act defines “the Minister” for the purposes of that Schedule.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.