The Croxley Rail Link Order 2013
Upon signifying approval or disapproval of the plans the engineer may specify any protective works, whether temporary or permanent, which in the engineer’s opinion should be carried out before the commencement of the construction of the specified works to ensure the stability of railway property, the continuation of the safe and efficient operation of LUL’s railway undertaking and the comfort and safety of the passengers who may be affected by the specified works and such protective works as may be reasonably necessary for those purposes must be constructed by LUL at the expense of the Council without unnecessary delay, or if LUL so desires, such protective works must be carried out by the Council at its own expense without unnecessary delay to the satisfaction of the engineer and the Council must not commence the construction of the specified works until the engineer has notified the Council that the protective works have been completed to the engineer’s reasonable satisfaction.
42
The Council must give to the engineer not less than 56 days’ notice of its intention to commence the construction of any of the specified works or protective works and also except in emergency (when it must give such notice as may be reasonably practicable), of its intention to carry out any works for the maintenance of the specified works in so far as such works of repair or maintenance affect or interfere with railway property.
43
The construction of the specified works, any protective works and any alterations and additions to them carried out by the Council must be carried out in such a way so as not to prejudice the safety of LUL’s railway and without limitation to this obligation those works, when commenced, must be carried out—
- (a) without unnecessary delay in accordance with the plans approved or settled in accordance with this Part of this Schedule;
- (b) under the supervision (if required by the engineer), and to the reasonable satisfaction of the engineer;
- (c) in such manner as to mitigate against any damage to the railway property; and
- (d) so far as reasonably practicable, so as not to interfere with or obstruct the free uninterrupted and safe use of LUL’s railway, the conduct of traffic on the railways of LUL and the use by passengers of railway property,
and if any damage to railway property or any such interference or obstruction is caused by the carrying out of the specified works or any protective works carried out, the Council must, notwithstanding any approval in accordance with this Part of this Schedule, make good such damage and must pay to LUL all reasonable expenses to which LUL may be put and compensation for any loss which it may sustain by reason of any such damage, interference or obstruction.
44
Nothing in paragraph 43 imposes any liability on the Council with respect to any damage, cost, expense or loss which is attributable to the negligence of LUL or any person in its employ, or of its contractors or agents and any liability of the Council under paragraph 43 is to be reduced proportionately to the extent to which any damage, cost, expense or loss is attributable to the negligence of LUL or of any person in its employ, or of its contractors or agents.
45
The Council must at all times afford reasonable facilities to the engineer for access to the specified works during their construction and the construction of any protective works carried out by the Council under the provisions of paragraph 41 and must supply the engineer with all such information as the engineer may reasonably require with regard to the specified works or any such protective works or to the method of construction of them.
46
During the construction of any works by LUL under this Part of this Schedule, LUL must at all times afford reasonable facilities to the Council and its agents for access to those works, the Council complying at all times with LUL’s requirements for training and safety, and must supply the Council with such information as it may reasonably require with regard to such works or the method of constructing them.
47
If any alterations or additions, either permanent or temporary, to railway property are reasonably necessary during the construction of the specified works, or during a period of 12 months after the completion of the specified works, in consequence of the construction of the specified works, such alterations and additions may be carried out by LUL and if LUL gives to the Council reasonable notice of its intention to carry out such alterations and additions, the Council must pay to LUL the reasonable cost of such alterations and additions including, in respect of any permanent alterations and additions, a capitalised sum representing any increase in the costs which may be expected to be reasonably incurred by LUL in maintaining, working and, when necessary, renewing any such alterations or additions.
48
The Council must in the design and construction of the authorised works take all measures necessary to prevent EMI and must establish with LUL (both parties acting reasonably) appropriate arrangements to test and verify the effectiveness of works proposed to be constructed by the Council to prevent EMI.
49
If the cost of maintaining, working or renewing its railway property is reduced in consequence of any such alterations or additions referred to in paragraph 47, a capitalised sum representing such saving is to be set off against any sum payable by the Council to LUL under this Part of this Schedule.
50
The Council must repay to LUL all reasonable costs, charges and expenses reasonably incurred by LUL—
- (a) in constructing any part of a specified work on behalf of the Council as provided by paragraph 40 or in constructing any protective works under the provisions of paragraph 41, including, in respect of any permanent protective works, a capitalised sum representing the cost which may be expected to be reasonably incurred by LUL in maintaining and renewing such works;
- (b) in respect of the employment or procurement of the services of any inspectors, supervisory staff, signallers, watchkeepers and other persons appointed for inspecting, monitoring, signalling, watching and lighting railway property and for preventing, so far as may be reasonably practicable, interference, obstruction, danger or accident arising from the construction or failure of the specified works and to ensure the continued safe and efficient operation of LUL’s railway undertaking (including any relocation of works, apparatus and equipment necessitated by the specified works) and the comfort and safety of passengers;
- (c) in respect of any special traffic working resulting from any speed restrictions which may, in the opinion of the engineer, require to be imposed by reason or in consequence of the construction or failure of the specified works or from the substitution or diversion of railway services of LUL which may be reasonably necessary for the same reason;
- (d) in respect of any additional temporary lighting of railway property in the vicinity of the specified works, being lighting made reasonably necessary by reason or consequence of the construction or failure of the specified works; and
- (e) in respect of the approval of plans and any supervision by the engineer of the construction of the specified works.
51
The Council must be responsible for, and make good to LUL all reasonable costs, charges, damages and expenses not otherwise provided for in paragraph 50 which may be occasioned to or reasonably incurred by LUL—
- (a) by reason of the specified works or the failure of the specified works; and
- (b) by reason of any act or omission of the Council or of any person in its employ or of its contractors or others whilst engaged upon the construction of the specified works;
and the Council must indemnify LUL from and against all claims and demands arising out of or in connection with the construction of the specified works or any failure, act or omissions as referred to in this Part of this Schedule; and the fact that any act or thing may have been done in accordance with any requirement of the engineer or under the engineer’s supervision must not (if it was not attributable to the act, neglect or default of LUL or of any person in its employ, or of its contractors of agents) excuse the Council from any liability under the provisions of this Part of this Schedule.
52
- (1) Any liability of the Council under paragraph 51 is to be reduced proportionately to the extent to which any costs, charges, damages and expenses are attributable to the act, neglect or default of LUL or of any person in LUL’s employ, or of LUL’s contractors or agents.
- (2) LUL must give to the Council immediate notice of any claim or demand and no settlement or compromise of any claim or demand is to be made without the prior consent of the Council (such consent not to be unreasonably withheld).
53
Any difference arising between the Council and LUL under this Part of this Schedule must be referred to and settled by arbitration under article 47 (arbitration).
PART 5 — PROTECTION FOR THE CANAL & RIVER TRUST
Interpretation
54
- (1) The following provisions of this Part of this Schedule have effect unless otherwise agreed in writing between the Council and the Trust.
- (2) In this Part of this Schedule—
- “the Trust’s network” means the Trust’s network of waterways;
- “construction”, in relation to any specified work or protective work, includes– the execution and placing of that work; and any relaying, renewal, or maintenance of that work as may be carried out during the period of 24 months from the completion of that work; and “construct” and “constructed” have corresponding meanings;
- “detriment” means any damage to the waterway or any other property of the Trust and, without limitation on the scope of that meaning, includes— any obstruction of, or interference with, or hindrance or danger to, navigation or to any use of the waterway (including towing paths); the erosion of the bed or banks of the waterway, or the impairment of the stability of any works, lands or premises forming part of the waterway; the deposit of materials or the siltation of the waterway so as to damage the waterway; the pollution of the waterway; any significant alteration in the water level of the waterway, or significant interference with the supply of water to it, or drainage of water from it; any harm to the ecology of the waterway (including any adverse impact on any site of special scientific interest comprised in the Trust’s network); any interference with the exercise by any person of rights over the Trust’s network;
- “the engineer” means an engineer appointed by the Trust for the purpose in question;
- “plans” includes sections, designs, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction) and programmes;
- “practical completion” means practical completion of all of the specified work notwithstanding that items which would ordinarily be considered snagging items remain outstanding, and the expression “practically complete” and “practically completed” are to be construed accordingly;
- “protective work” means a work constructed under paragraph 59(3)(a);
- “specified work” means so much of any of the authorised works as is situated upon, across, under, over or within 15 metres of the waterway, or may in any way affect the waterway;
- “towing path” means the towing path forming part of the waterway;
- “the Trust” means the Canal & River Trust;
- “the waterway” means the Grand Union Canal, and includes any works, lands or premises belonging to the Trust, or under its management or control, that are held or used by the Trust in connection with that canal.
Powers requiring the Trust’s consent
55
- (1) The Council must not under the powers conferred by this Order acquire compulsorily any land of the Trust or any easement or other right over such land, or use any such land, unless such acquisition or use is with the consent of the Trust.
- (2) The Council must not in the exercise of the powers conferred by this Order obstruct or interfere with pedestrian or vehicular access to the waterway unless such obstruction or interference with such access is with the consent of the Trust.
- (3) The Council must not exercise the powers conferred by article 9(1) (temporary stopping up of streets) in relation to any way over land comprised in the waterway unless such exercise is with the consent of the Trust.
- (4) Nothing in article 15 (temporary interference with waterways) authorises the Council—
- (a) to discharge any water directly or indirectly into the waterway; or
- (b) to carry out any works to, or make any opening in, or otherwise interfere with, the waterway (including its banks and bed),
except with the consent of the Trust and on terms that the Trust may reasonably require, and in accordance with plans approved by, and under the supervision (if given) of, the engineer.
- (5) The Council must not exercise any power conferred by this Order in such a way as to interfere with the supply of water to or the drainage of water from the waterway unless such exercise is with the consent of the Trust.
- (6) The Council must not exercise the powers conferred by article 14 (power to survey and investigate land) and the powers conferred by article 15, or section 11(3) of the 1965 Act (power of entry for surveying land), in relation to the waterway unless such exercise is with the consent of the Trust.
- (7) The Council must not exercise the powers conferred by sections 271 or 272 of the 1990 Act, as applied by Schedule 8 (provisions relating to statutory undertakers etc.), so as to divert any right of access to the waterway, but such right of access may be diverted with the consent of the Trust.
- (8) The consent of the Trust under sub-paragraphs (1) to (7) and the approval of plans under sub-paragraph (4) must not be unreasonably withheld or delayed but may be given subject to reasonable terms and conditions which in the case of article 13 (discharge of water) may include conditions—
- (a) specifying the maximum volume of water which may be discharged in any period; and
- (b) authorising the Trust on giving reasonable notice (except in an emergency, when the Trust may require immediate suspension) to the Council to require the Council to suspend the discharge of water or reduce the flow of water where this is necessary by reason of any operational or environmental requirement of the Trust.
Vehicles, plant and machinery
56
The Council must not use any land or property of the Trust forming part of the waterway for the passage or siting of vehicles, plant or machinery employed in the construction of the specified works other than—
- (a) with the consent in writing of the engineer whose consent must not be unreasonably withheld; and
- (b) subject to compliance with such reasonable requirements as the engineer may from time to time specify—
- (i) for the prevention of detriment; or
- (ii) in order to avoid or reduce any inconvenience to the Trust, its officers and agents and all other persons lawfully on such land or property,
but nothing in this paragraph applies in relation to anything done in accordance with any approval given by the Trust under paragraph 59.
Fencing
57
Where required by the engineer the Council must to the reasonable satisfaction of the engineer fence off a specified work or a protective work or take such other steps as the engineer may require to be taken for the purpose of separating a specified work or a protective work from the waterway, whether on a temporary or permanent basis.
Survey of waterway
58
- (1) Before the commencement of the initial construction of any part of the specified works and again following practical completion of the specified works the Council must bear the reasonable cost of the carrying out by a qualified engineer (“the surveyor”), to be approved by the Trust and the Council, of a survey (including a dip-survey to measure the depth of the waterway) (“the survey”) of so much of the waterway and of any land and existing works of the Council which may provide support for the waterway as will or may be affected by the specified works.
- (2) For the purposes of the survey the Council must—
- (a) on being given reasonable notice (save in case of emergency, when immediate access must be afforded) afford reasonable facilities to the surveyor for access to the site of the specified works and to any land and existing works of the Council which may provide support for the waterway as will or may be affected by the specified works; and
- (b) supply the surveyor as soon as reasonably practicable with all such information as the surveyor may reasonably require with regard to such existing works of the Council and to the specified works or the method of their construction.
- (3) The reasonable costs of the survey must include the costs of any dewatering or reduction of the water level of any part of the waterway (where reasonably required) which may be effected to facilitate the carrying out of the survey and the provisions of this Part of this Schedule apply with all necessary modifications to any such dewatering or reduction in the water level as though these were specified works.
- (4) Copies of the report of the survey must be provided to both the Trust and the Council at no cost to the Trust.
Approval of plans, protective works etc.
59
- (1) The Council must before commencing construction of any specified work including any temporary works supply to the Trust proper and sufficient plans of that work and such further particulars available to it as the Trust may within 14 days of the submission of the plans reasonably require for the approval of the engineer and must not commence such construction of a specified work until plans of that work have been approved in writing by the engineer or settled by arbitration.
- (2) The approval of the engineer under sub-paragraph (1) must not be unreasonably withheld or delayed, and if within 56 days after such plans (including any other particulars reasonably required under sub-paragraph (1)) have been supplied to the Trust the engineer has not intimated disapproval of those plans and the grounds of disapproval the engineer is deemed to have approved the plans as submitted.
- (3) When signifying approval of the plans the engineer may specify—
- (a) any protective work (whether temporary or permanent) which in the reasonable opinion of the engineer should be carried out before the commencement of a specified work to prevent detriment; and
- (b) such other requirements as may be reasonably necessary to prevent detriment;
and such protective works must be constructed by the Council or by the Trust at the Council’s request with all reasonable dispatch and the Council must not commence the construction of a specified work until the engineer has notified the Council that the protective works have been completed to the engineer’s reasonable satisfaction.
- (4) The Council must pay to the Trust a capitalised sum representing the reasonably increased or additional cost of maintaining and, when necessary, renewing any works, including any permanent protective works provided under sub-paragraph (3), and of carrying out any additional dredging of the waterway necessitated by the exercise of any of the powers of this Order but if the cost of maintaining the waterway, or of works of renewal of the waterway, is reduced in consequence of any such works, a capitalised sum representing such reasonable saving must be set off against any sum payable by the Council to the Trust under this paragraph.
- (5) In the event that the Council fails to complete the construction of, or part of, the specified works the Trust may, if it is reasonably required in order to avoid detriment, construct any of the specified works, or part of such works, (together with any adjoining works) in order to complete the construction of, or part of, the specified works and the Council must reimburse the Trust all costs, fees, charges and expenses it has reasonably incurred in carrying out such works.
Design of works
60
Without affecting its obligations under the provisions of this Part of this Schedule the Council must consult, collaborate and respond constructively to any approach, suggestion, proposal or initiative made by the Trust on—
- (a) the design and appearance of the specified works, including the materials to be used for their construction; and
- (b) the environmental effects of the specified works;
and must have regard to such views as may be expressed by the Trust to the extent that these accord with the requirements of the local planning authority in response to such consultation pursuant in particular to the requirements imposed on the Trust by section 22 (general environmental and recreational duties) of the British Waterways Act 199538 and to the interest of the Trust in preserving and enhancing the environment of its waterways.
Notice of works
61
The Council must give to the engineer 56 days’ notice of its intention to commence the construction of any of the specified or protective works, or, in the case of repair carried out in an emergency, such notice as may be reasonably practicable so that, in particular, the Trust may where appropriate arrange for the publication of notices bringing those works to the attention of users of the Trust’s network.
Lighting
62
The Council must provide and maintain at its own expense in the vicinity of the specified or protective works such temporary lighting and such signal lights for the control of navigation as the engineer may reasonably require during the construction or failure of the specified or protective works.
Construction of specified works
63
- (1) Any specified or protective works must, when commenced, be constructed—
- (a) without unnecessary delay in accordance with the plans approved or deemed to have been approved or settled in accordance with this Part of this Schedule and with any requirements made under paragraph 59(3) and paragraph 60;
- (b) under the supervision (if given) and to the reasonable satisfaction of the engineer;
- (c) in such manner as to cause as little detriment as is reasonably practicable;
- (d) in such manner as to cause as little inconvenience as is reasonably practicable to the Trust, its officers and agents and all other persons lawfully using the waterways, except to the extent that temporary obstruction has otherwise been agreed by the Trust.
- (2) Nothing in this Order authorises the Council to make or maintain any permanent works in or over the waterway so as to impede or prevent (whether by reducing the width of the waterway or otherwise) the passage of any relevant vessel.
- (3) For the purpose of sub-paragraph (2) a relevant vessel is a vessel of a kind and dimensions for the use of which the Trust is required by section 105(1)(b) and (2) of the Transport Act 196839 (maintenance of waterways) to maintain the waterway.
- (4) Following the completion of the construction of the specified works the Council must restore the waterway to a condition no less satisfactory than its condition immediately prior to the commencement of those works.
Prevention of pollution
64
The Council must not in the course of constructing a specified work or a protective work or otherwise in connection with those works do or permit anything which may result in the pollution of the waterway or the deposit of materials in it and must take such steps as the engineer may reasonably require to avoid or make good any breach of its obligations under this paragraph.
Access to work: provision of information
65
- (1) The Council on being given reasonable notice must—
- (a) at all times allow reasonable facilities to the engineer for access to a specified work during its construction; and
- (b) supply the engineer with all such information as the engineer may reasonably require with regard to a specified work or the method of constructing it.
- (2) The Trust on being given reasonable notice must—
- (a) at all times afford reasonable facilities to the Council and its agents for access to any works carried out by the Trust under this Part of this Schedule during their construction; and
- (b) supply the Council with such information as it may reasonably require with regard to such works or the method of constructing them and the Council must reimburse the Trust’s reasonable costs in relation to the supply of such information.
Alterations to waterway
66
- (1) If during the construction of a specified work or a protective work or during a period of 24 months after the completion of those works any alterations or additions, either permanent or temporary, to the waterway are reasonably necessary in consequence of the construction of the specified work or the protective work in order to avoid detriment, and the Trust gives to the Council reasonable notice of its intention to carry out such alterations or additions (which must be specified in the notice), the Council must pay to the Trust the reasonable cost of those alterations or additions including, in respect of any such alterations and additions as are to be permanent, a capitalised sum representing the increase of the costs which may be expected to be reasonably incurred by the Trust in maintaining, working and, when necessary, renewing any such alterations or additions.
- (2) If the cost of maintaining, working or renewing the waterway is reduced in consequence of any such alterations or additions a capitalised sum representing such saving must be set off against any sum payable by the Council to the Trust under this paragraph.
Maintenance of works
67
If at any time after the completion of a specified work or a protective work, not being a work vested in the Trust, the Trust gives notice to the Council informing it that the state of maintenance of the work appears to be such that the work is causing or likely to cause detriment, the Council must, on receipt of such notice, take such steps as may be reasonably necessary to put the work in such state of maintenance as not to cause such detriment.
Repayment of the Trust’s fees, etc.
68
The Council must repay to the Trust all fees, costs, charges and expenses reasonably incurred by the Trust—
- (a) in constructing any protective works under the provisions of paragraph 59(3)(a);
- (b) in respect of the approval by the engineer of plans submitted by the Council and the supervision by the engineer of the construction or repair of a specified work and any protective works;
- (c) in respect of the employment during the construction of the specified works or any protective works of any inspectors, watchkeepers and other persons whom it is reasonably necessary to appoint for inspecting, watching and lighting any waterway and for preventing, so far as may be reasonably practicable, interference, obstruction, danger or accident arising from the construction or failure of the specified works or any protective works; and
- (d) in bringing the specified works or any protective works to the notice of users of the Trust’s network.
Costs of alterations, etc.
69
Any additional expenses which the Trust may reasonably incur in altering, reconstructing or maintaining the waterway under any powers existing at the date when this Order was made by reason of the existence of a specified work, provided that 56 days’ previous notice of the commencement of such alteration, reconstruction or maintenance has been given to the Council, are to be repaid by the Council to the Trust.
Making good of detriment; compensation and indemnity, etc.
70
- (1) If any detriment is caused by the construction or failure of the specified works or the protective works if carried out by the Council, the Council (if so required by the Trust) must make good such detriment and pay to the Trust all reasonable expenses to which the Trust may be put, and compensation for any loss which the Trust may sustain, in making good or otherwise by reason of the detriment.
- (2) The Council is responsible for and must make good to the Trust all costs, charges, damages, expenses and losses not otherwise provided for in this Part of this Schedule which may be occasioned to or reasonably incurred by the Trust—
- (a) by reason of the construction of a specified work or a protective work or the failure of such a work; or
- (b) by reason of any act or omission of the Council or of any person in its employ or of its contractors or others whilst engaged upon the construction of a specified work or a protective work;
and subject to sub-paragraph (4) the Council must effectively indemnify and hold harmless the Trust from and against all claims and demands arising out of or in connection with any of the matters referred to in paragraphs (a) and (b).
- (3) The fact that any act or thing may have been done by the Trust on behalf of the Council or in accordance with plans approved by the engineer or in accordance with any requirement of the engineer or under the engineer’s supervision or in accordance with any directions or awards of an arbitrator does not (if it was done without negligence on the part of the Trust or of any person in its employ or of its contractors or agents) excuse the Council from any liability under the provisions of this paragraph.
- (4) The Trust must give the Council reasonable notice of any such claim or demand and no settlement or compromise of such a claim or demand is to be made without the prior consent of the Council.
Details of capitalised sums to be provided
71
If the Trust or the Council cannot jointly agree the formula by which the capitalised sum (referred to in paragraphs 59(4) and 66) is calculated it is to be settled by arbitration in accordance with article 47 (arbitration).
Arbitration
72
Any difference arising between the Council and the Trust under this Part of this Schedule (other than a difference as to the meaning or construction of this Part of this Schedule) is to be referred to and settled by arbitration in accordance with article 47 (arbitration).
PART 6 — PROTECTION FOR THE ENVIRONMENT AGENCY
73
- (1) The following provisions of this Part of this Schedule have effect unless otherwise agreed in writing between the Council and the Agency.
- (2) In this Part of this Schedule—
- “the Agency” means the Environment Agency;
- “construction” includes execution, placing, altering, replacing, relaying and removal and “construct” and “constructed” are construed accordingly;
- “drainage work” means any watercourse and includes any land which provides or is expected to provide flood storage capacity for any watercourse and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage, flood defence or tidal monitoring;
- “the fishery” means any waters containing fish and the spawn, habitat or food of such fish;
- “plans” includes sections, drawings, specifications and method statements; and
- “specified work” means so much of any work or operation authorised by this Order as is in, on, under, over or within 16 metres of a drainage work or is otherwise likely to— affect any drainage work or the volumetric rate of flow of water in or flowing to or from any drainage work; affect the flow, purity or quality of water in any watercourse or other surface waters or ground water; cause obstruction to the free passage of fish or damage to any fishery; or affect the conservation, distribution or use of water resources.
74
- (1) Before beginning to construct any specified work, the Council must submit to the Agency plans of the specified work and such further particulars available to it as the Agency may within 28 days of the submission of the plans reasonably require.
- (2) Any such specified work must not be constructed except in accordance with such plans as may be approved in writing by the Agency, or determined under paragraph 85.
- (3) Any approval of the Agency required under this paragraph—
- (a) must not be unreasonably withheld;
- (b) is deemed to have been given if it is neither given nor refused within 2 months of the submission of the plans for approval and, in the case of a refusal, accompanied by a statement of the grounds of refusal; and
- (c) may be given subject to such reasonable requirements as the Agency may make for the protection of any drainage work or the fishery or for the protection of water resources, or for the prevention of flooding or pollution or in the discharge of its environmental duties.
- (4) The Agency must use its reasonable endeavours to respond to the submission of any plans before the expiration of the period mentioned in sub-paragraph (3)(b).
75
Without limitation on the scope of paragraph 74, the requirements which the Agency may make under that paragraph include conditions requiring the Council at its own expense to construct such protective works, whether temporary or permanent, during the construction of the specified works (including the provision of flood banks, walls or embankments or other new works and the strengthening, repair or renewal of existing banks, walls or embankments) as are reasonably necessary—
- (a) to safeguard any drainage work against damage; or
- (b) to secure that its efficiency for flood defence purposes is not impaired and that the risk of flooding is not otherwise increased,
by reason of any specified work.
76
- (1) Subject to sub-paragraph (2), any specified work, and all protective works required by the Agency under paragraph 75, must be constructed—
- (a) without unreasonable delay in accordance with the plans approved or deemed to have been approved or settled under this Part of this Schedule; and
- (b) to the reasonable satisfaction of the Agency,
and an officer of the Agency is entitled to watch and inspect the construction of such works.
- (2) The Council must give to the Agency not less than 14 days’ notice in writing of its intention to commence construction of any specified work and notice in writing of its completion not later than 7 days after the date on which it is brought into use.
- (3) If any part of a specified work or any protective work required by the Agency is constructed otherwise than in accordance with the requirements of this Part of this Schedule, the Agency may by notice in writing require the Council at the Council’s own expense to comply with the requirements of this Part of this Schedule or (if the Council elects and the Agency in writing consents, such consent not to be unreasonably withheld or delayed) to remove, alter or pull down the work and, where removal is required, to restore the site to its former condition to such extent and within such limits as the Agency reasonably requires.
- (4) Subject to sub-paragraph (5) and paragraph 80, if within a reasonable period, being not less than 28 days from the date when a notice under sub-paragraph (3) is served upon the Council, it has failed to begin taking steps to comply with the requirements of the notice and subsequently to make reasonably expeditious progress towards their implementation, the Agency may execute the works specified in the notice and any expenditure incurred by it in so doing is recoverable from the Council.
- (5) In the event of any dispute as to whether sub-paragraph (3) is properly applicable to any work in respect of which notice has been served under that sub-paragraph, or as to the reasonableness of any requirement of such a notice, the Agency must not except in emergency exercise the powers conferred by sub-paragraph (4) until the dispute has been finally determined.
77
- (1) Subject to sub-paragraph (5) the Council must from the commencement of the construction of the specified works maintain in good repair and condition and free from obstruction any drainage work which is situated within the limits of deviation or on land held by the Council for the purposes of, or in connection with the specified works, whether or not the drainage work is constructed under the powers conferred by this Order or is already in existence.
- (2) If any such drainage work which the Council is liable to maintain is not maintained to the reasonable satisfaction of the Agency, the Agency may by notice in writing require the Council to repair and restore the work, or any part of such work, or (if the Council elects and the Agency in writing consents, such consent not to be unreasonably withheld or delayed), to remove the work and restore the site to its former condition, to such extent and within such limits as the Agency reasonably requires.
- (3) Subject to paragraph 80, if, within a reasonable period being not less than 28 days beginning with the date on which a notice in respect of any drainage work is served under sub-paragraph (2) on the Council, the Council has failed to begin taking steps to comply with the reasonable requirements of the notice and has not subsequently made reasonably expeditious progress towards their implementation, the Agency may do what is necessary for such compliance and may recover any expenditure reasonably incurred by it in so doing from the Council.
- (4) In the event of any dispute as to the reasonableness of any requirement of a notice served under sub-paragraph (2), the Agency must not except in a case of emergency exercise the powers conferred by sub-paragraph (3) until the dispute has been finally determined.
- (5) This paragraph does not apply to—
- (a) drainage works which are vested in the Agency, or which the Agency or another person is liable to maintain and is not prescribed by the powers of the Order from doing so; and
- (b) any obstruction of a drainage work for the purpose of a work or operation authorised by this Order and carried out in accordance with the provisions of this Part of this Schedule.
78
Subject to paragraph 80, if by reason of the construction of any specified work or of the failure of any such work the efficiency of any drainage work for flood defence purposes is impaired, or that drainage work is otherwise damaged, such impairment or damage must be made good by the Council to the reasonable satisfaction of the Agency and if the Council fails to do so, the Agency may make good the impairment or damage and recover from the Council the expense reasonably incurred by it in doing so.
79
- (1) The Council must take all such measures as may be reasonably practicable to prevent any interruption of the free passage of fish in the fishery during the construction of any specified work.
- (2) If by reason of—
- (a) the construction of any specified work; or
- (b) the failure of any such work,
damage to the fishery is caused, or the Agency has reason to expect that such damage may be caused, the Agency may serve notice on the Council requiring it to take such steps as may be reasonably practicable to make good the damage, or, as the case may be, to protect the fishery against such damage.
- (3) Subject to paragraph 80, if within such time as may be reasonably practicable for that purpose after the receipt of written notice from the Agency of any damage or expected damage to a fishery, the Council fails to take such steps as are described in sub-paragraph (2), the Agency may take those steps and may recover from the Council the expense reasonably incurred by it in doing so.
- (4) Subject to paragraph 80, in any case where immediate action by the Agency is reasonably required in order to secure that the risk of damage to the fishery is avoided or reduced, the Agency may take such steps as are reasonable for the purpose, and may recover from the Council the reasonable cost of so doing provided that notice specifying those steps is served on the Council as soon as reasonably practicable after the Agency has taken, or commenced to take, the steps specified in the notice.
80
Nothing in paragraphs 76(4), 77(3), 78, 79(3) and (4) authorises the Agency to execute works on or affecting a railway forming part of the authorised works without the prior consent in writing of the Council such consent not to be unreasonably withheld or delayed.
81
The Council must indemnify the Agency in respect of all costs, charges and expenses which the Agency may reasonably incur or have to pay or which it may sustain—
- (a) in the examination or approval of plans under this Part of this Schedule; and
- (b) in the inspection of the construction of the specified works or any protective works required by the Agency under this Part of this Schedule.
82
- (1) Without affecting the other provisions of this Part of this Schedule, the Council must indemnify the Agency from all claims, demands, proceedings, costs, damages, expenses or loss, which may be made or taken against, recovered from, or incurred by, the Agency by reason of—
- (a) any damage to any drainage work so as to impair its efficiency for the purposes of flood defence;
- (b) any damage to the fishery;
- (c) any raising or lowering of the water table in land adjoining the authorised works or any sewers, drains and watercourses;
- (d) any flooding or increased flooding of any such lands; or
- (e) inadequate water quality in any watercourse or other surface waters or in any groundwater,
which is caused by the construction of any of the specified works or any act or omission of the Council, its contractors, agents or employees whilst engaged upon the work.
- (2) The Agency must give to the Council reasonable notice of any such claim or demand and no settlement or compromise may be made without the agreement of the Council which agreement must not be unreasonably withheld or delayed.
83
The fact that any work or thing has been executed or done by the Council in accordance with a plan approved or deemed to be approved by the Agency, or to its satisfaction, or in accordance with any directions or award of an arbitrator, does not relieve the Council from any liability under the provisions of this Part of this Schedule.
84
For the purposes of section 109 of the Water Resources Act 199140 (as to structures in, over or under a main river) as applying to the construction of any specified work, any consent or approval given or deemed to be given by the Agency under this Part of this Schedule with respect to such construction is deemed also to constitute a consent or approval under that section.
85
Any dispute arising between the Council and the Agency under this Part of this Schedule, if the parties agree, is to be determined by arbitration under article 47 (arbitration), but otherwise is to be determined by the Secretary of State for Environment, Food and Rural Affairs and the Secretary of State for Transport acting jointly on a reference to them by the Council or the Agency, after notice in writing by one to the other.
Signed
Signed by authority of the Secretary of State
Martin Woods — Head of the Transport and Works Act Orders Unit — Department for Transport — 31st July 2013
Explanatory note
(This note is not part of the Order)
EXPLANATORY NOTE
This Order authorises Hertfordshire County Council (“the Council”) to construct and operate a rail link extending the London Underground Limited (“LUL”) Metropolitan Line from Croxley to Watford Junction via Watford High Street station. The Order authorises the acquisition and use of land for the purposes of the works and confers powers in connection with construction and operation of the railway.
The powers are conferred on the Council in the first instance, but the Order authorises the transfer of the powers by agreement to LUL or Network Rail.
A copy of the deposited plans and the deposited sections and Book of Reference mentioned in the Order and certified in accordance with article 44 may be inspected at County Hall, Pegs Lane, Hertford SG13 8DQ.
Footnotes
1992 c. 42. Relevant amending instruments are S.I. 1995/1541, S.I. 1998/2226, S.I. 2000/3199 and S.I. 2006/958.
1991 c. 22. As amended by the Traffic Management Act 2004 c. 18.
1993 c. 43. As amended by the Transport Act 2000 (c. 38) and the Railways Act 2005 (c. 14).
1986 c. 44. A new section 7 was substituted by section 5 of the Gas Act 1995 (c. 45), and was further amended by section 76 of the Utilities Act 2000 (c. 27).
2003 c. 21. See section 106.
1968 c. 73. This is amended by Schedule 2 of S.I. 2012/1659.
Editorial notes
Art. 1 in force at 21.8.2013, see art. 1
Art. 2 in force at 21.8.2013, see art. 1
Art. 3 in force at 21.8.2013, see art. 1
Art. 4 in force at 21.8.2013, see art. 1
Art. 5 in force at 21.8.2013, see art. 1
Art. 6 in force at 21.8.2013, see art. 1
Art. 7 in force at 21.8.2013, see art. 1
Art. 8 in force at 21.8.2013, see art. 1
Art. 9 in force at 21.8.2013, see art. 1
Art. 10 in force at 21.8.2013, see art. 1
Art. 11 in force at 21.8.2013, see art. 1
Art. 12 in force at 21.8.2013, see art. 1
Art. 13 in force at 21.8.2013, see art. 1
Art. 14 in force at 21.8.2013, see art. 1
Art. 15 in force at 21.8.2013, see art. 1
Art. 16 in force at 21.8.2013, see art. 1
Art. 17 in force at 21.8.2013, see art. 1
Art. 18 in force at 21.8.2013, see art. 1
Art. 19 in force at 21.8.2013, see art. 1
Art. 20 in force at 21.8.2013, see art. 1
Art. 21 in force at 21.8.2013, see art. 1
Art. 22 in force at 21.8.2013, see art. 1
Art. 23 in force at 21.8.2013, see art. 1
Art. 24 in force at 21.8.2013, see art. 1
Art. 25 in force at 21.8.2013, see art. 1
Art. 26 in force at 21.8.2013, see art. 1
Art. 27 in force at 21.8.2013, see art. 1
Art. 28 in force at 21.8.2013, see art. 1
Art. 29 in force at 21.8.2013, see art. 1
Art. 30 in force at 21.8.2013, see art. 1
Art. 31 in force at 21.8.2013, see art. 1
Art. 32 in force at 21.8.2013, see art. 1
Art. 33 in force at 21.8.2013, see art. 1
Art. 34 in force at 21.8.2013, see art. 1
Art. 35 in force at 21.8.2013, see art. 1
Art. 36 in force at 21.8.2013, see art. 1
Art. 37 in force at 21.8.2013, see art. 1
Art. 38 in force at 21.8.2013, see art. 1
Art. 39 in force at 21.8.2013, see art. 1
Art. 40 in force at 21.8.2013, see art. 1
Art. 41 in force at 21.8.2013, see art. 1
Art. 42 in force at 21.8.2013, see art. 1
Art. 43 in force at 21.8.2013, see art. 1
Art. 44 in force at 21.8.2013, see art. 1
Art. 45 in force at 21.8.2013, see art. 1
Art. 46 in force at 21.8.2013, see art. 1
Art. 47 in force at 21.8.2013, see art. 1
Sch. 5 para. 1 in force at 21.8.2013, see art. 1
Sch. 5 para. 2 in force at 21.8.2013, see art. 1
Sch. 5 para. 3 in force at 21.8.2013, see art. 1
Sch. 5 para. 4 in force at 21.8.2013, see art. 1
Sch. 5 para. 5 in force at 21.8.2013, see art. 1
Sch. 5 para. 6 in force at 21.8.2013, see art. 1
Sch. 5 para. 7 in force at 21.8.2013, see art. 1
Sch. 5 para. 8 in force at 21.8.2013, see art. 1
Sch. 5 para. 9 in force at 21.8.2013, see art. 1
Sch. 8 para. 1 in force at 21.8.2013, see art. 1
Sch. 8 para. 2 in force at 21.8.2013, see art. 1
Sch. 9 para. 1 in force at 21.8.2013, see art. 1
Sch. 9 para. 2 in force at 21.8.2013, see art. 1
Sch. 9 para. 3 in force at 21.8.2013, see art. 1
Sch. 9 para. 4 in force at 21.8.2013, see art. 1
Sch. 9 para. 5 in force at 21.8.2013, see art. 1
Sch. 9 para. 6 in force at 21.8.2013, see art. 1
Sch. 9 para. 7 in force at 21.8.2013, see art. 1
Sch. 9 para. 8 in force at 21.8.2013, see art. 1
Sch. 9 para. 9 in force at 21.8.2013, see art. 1
Sch. 9 para. 10 in force at 21.8.2013, see art. 1
Sch. 9 para. 11 in force at 21.8.2013, see art. 1
Sch. 9 para. 12 in force at 21.8.2013, see art. 1
Sch. 9 para. 13 in force at 21.8.2013, see art. 1
Sch. 9 para. 14 in force at 21.8.2013, see art. 1
Sch. 9 para. 15 in force at 21.8.2013, see art. 1
Sch. 9 para. 16 in force at 21.8.2013, see art. 1
Sch. 9 para. 17 in force at 21.8.2013, see art. 1
Sch. 9 para. 18 in force at 21.8.2013, see art. 1
Sch. 9 para. 19 in force at 21.8.2013, see art. 1
Sch. 9 para. 20 in force at 21.8.2013, see art. 1
Sch. 9 para. 21 in force at 21.8.2013, see art. 1
Sch. 9 para. 22 in force at 21.8.2013, see art. 1
Sch. 9 para. 23 in force at 21.8.2013, see art. 1
Sch. 9 para. 24 in force at 21.8.2013, see art. 1
Sch. 9 para. 25 in force at 21.8.2013, see art. 1
Sch. 9 para. 26 in force at 21.8.2013, see art. 1
Sch. 9 para. 27 in force at 21.8.2013, see art. 1
Sch. 9 para. 28 in force at 21.8.2013, see art. 1
Sch. 9 para. 29 in force at 21.8.2013, see art. 1
Sch. 9 para. 30 in force at 21.8.2013, see art. 1
Sch. 9 para. 31 in force at 21.8.2013, see art. 1
Sch. 9 para. 32 in force at 21.8.2013, see art. 1
Sch. 9 para. 33 in force at 21.8.2013, see art. 1
Sch. 9 para. 34 in force at 21.8.2013, see art. 1
Sch. 9 para. 35 in force at 21.8.2013, see art. 1
Sch. 9 para. 36 in force at 21.8.2013, see art. 1
Sch. 9 para. 37 in force at 21.8.2013, see art. 1
Sch. 9 para. 38 in force at 21.8.2013, see art. 1
Sch. 9 para. 39 in force at 21.8.2013, see art. 1
Sch. 9 para. 40 in force at 21.8.2013, see art. 1
Sch. 9 para. 41 in force at 21.8.2013, see art. 1
Sch. 9 para. 42 in force at 21.8.2013, see art. 1
Sch. 9 para. 43 in force at 21.8.2013, see art. 1
Sch. 9 para. 44 in force at 21.8.2013, see art. 1
Sch. 9 para. 45 in force at 21.8.2013, see art. 1
Sch. 9 para. 46 in force at 21.8.2013, see art. 1
Sch. 9 para. 47 in force at 21.8.2013, see art. 1
Sch. 9 para. 48 in force at 21.8.2013, see art. 1
Sch. 9 para. 49 in force at 21.8.2013, see art. 1
Sch. 9 para. 50 in force at 21.8.2013, see art. 1
Sch. 9 para. 51 in force at 21.8.2013, see art. 1
Sch. 9 para. 52 in force at 21.8.2013, see art. 1
Sch. 9 para. 53 in force at 21.8.2013, see art. 1
Sch. 9 para. 54 in force at 21.8.2013, see art. 1
Sch. 9 para. 55 in force at 21.8.2013, see art. 1
Sch. 9 para. 56 in force at 21.8.2013, see art. 1
Sch. 9 para. 57 in force at 21.8.2013, see art. 1
Sch. 9 para. 58 in force at 21.8.2013, see art. 1
Sch. 9 para. 59 in force at 21.8.2013, see art. 1
Sch. 9 para. 60 in force at 21.8.2013, see art. 1
Sch. 9 para. 61 in force at 21.8.2013, see art. 1
Sch. 9 para. 62 in force at 21.8.2013, see art. 1
Sch. 9 para. 63 in force at 21.8.2013, see art. 1
Sch. 9 para. 64 in force at 21.8.2013, see art. 1
Sch. 9 para. 65 in force at 21.8.2013, see art. 1
Sch. 9 para. 66 in force at 21.8.2013, see art. 1
Sch. 9 para. 67 in force at 21.8.2013, see art. 1
Sch. 9 para. 68 in force at 21.8.2013, see art. 1
Sch. 9 para. 69 in force at 21.8.2013, see art. 1
Sch. 9 para. 70 in force at 21.8.2013, see art. 1
Sch. 9 para. 71 in force at 21.8.2013, see art. 1
Sch. 9 para. 72 in force at 21.8.2013, see art. 1
Sch. 9 para. 73 in force at 21.8.2013, see art. 1
Sch. 9 para. 74 in force at 21.8.2013, see art. 1
Sch. 9 para. 75 in force at 21.8.2013, see art. 1
Sch. 9 para. 76 in force at 21.8.2013, see art. 1
Sch. 9 para. 77 in force at 21.8.2013, see art. 1
Sch. 9 para. 78 in force at 21.8.2013, see art. 1
Sch. 9 para. 79 in force at 21.8.2013, see art. 1
Sch. 9 para. 80 in force at 21.8.2013, see art. 1
Sch. 9 para. 81 in force at 21.8.2013, see art. 1
Sch. 9 para. 82 in force at 21.8.2013, see art. 1
Sch. 9 para. 83 in force at 21.8.2013, see art. 1
Sch. 9 para. 84 in force at 21.8.2013, see art. 1
Sch. 9 para. 85 in force at 21.8.2013, see art. 1
Sch. 1 in force at 21.8.2013, see art. 1
Sch. 2 in force at 21.8.2013, see art. 1
Sch. 3 in force at 21.8.2013, see art. 1
Sch. 4 in force at 21.8.2013, see art. 1
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.