The National Grid (King’s Lynn B Power Station Connection) Order 2013

Type Statutory-Instrument
Publication 2013-12-18
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API
  • “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over or upon land; and
  • “statutory undertaker” means— any licence holder within the meaning of Part 1 of the Electricity Act 1989; a gas transporter within the meaning of Part 1 of the Gas Act 1986[^f00020]; a water undertaker within the meaning of the Water Industry Act 1991; and a sewerage undertaker within the meaning of Part 1 of the Water Industry Act 1991, for the area of the authorised development, and in relation to any apparatus, means the undertaker to whom it belongs or by whom it is maintained.

2

This Part of this Schedule does not apply to apparatus in respect of which the relations between the statutory undertaker and the undertaker are regulated by the provisions of Part 3 of the 1991 Act.

3

Regardless of any provision in this Order or anything shown on the land plans, the undertaker is not to acquire any apparatus otherwise than by agreement.

4

  • (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed, that apparatus is not to be removed under this Part of this Schedule and any right of a statutory undertaker to maintain that apparatus in that land is not to be extinguished until alternative apparatus has been constructed and is in operation to the reasonable satisfaction of the statutory undertaker in question.
  • (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give to the statutory undertaker in question written notice of that requirement, together with a plan and section of the work proposed.
  • (3) If alternative apparatus or any part of such apparatus is to be constructed as a consequence of the removal of apparatus placed on the land referred to in sub-paragraph (2), the statutory undertaker in question must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use its best endeavours to obtain the necessary facilities and rights in other land in which the alternative apparatus is to be constructed.
  • (4) The statutory undertaker in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 34, and after the grant to the statutory undertaker of any such facilities and rights as are referred to in sub-paragraph (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.
  • (5) Regardless of anything in sub-paragraph (4), if the undertaker gives notice in writing to the statutory undertaker in question that it desires itself to execute any work, or part of any work in connection with the construction or removal of apparatus, that work, instead of being executed by the statutory undertaker, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the statutory undertaker.
  • (6) Nothing in sub-paragraph (5) is to authorise the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus.

5

  • (1) Not less than 28 days before starting the execution of any works of the type referred to in paragraph 4(2) that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under that paragraph, the statutory undertaker must submit to the undertaker in question a plan, section and description of the works to be executed.
  • (2) Those works must be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the statutory undertaker for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and the statutory undertaker shall be entitled to watch and inspect the execution of those works.
  • (3) Any requirements made by a statutory undertaker under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan, section and description under sub-paragraph (1) are submitted to it.
  • (4) If a statutory undertaker in accordance with sub-paragraph (3) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, sub-paragraphs (1) to (4) are to apply as if the removal of the apparatus had been required by the undertaker under paragraph 4(2).
  • (5) Nothing in this paragraph is to preclude the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan, section and description.
  • (6) The undertaker is not to be required to comply with sub-paragraph (1) in a case of emergency but in that case it must give to the statutory undertaker in question notice as soon as is reasonably practicable and a plan, section and description of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances.

6

  • (1) Subject to the following provisions of this paragraph, the undertaker must repay to a statutory undertaker the proper and reasonable expenses reasonably incurred by that statutory undertaker in, or in connection with, the inspection, removal, alteration or protection of any apparatus.
  • (2) There is to be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule, that value being calculated after removal.
  • (3) If in accordance with the provisions of this Part of this Schedule—
  • (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
  • (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 34 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the statutory undertaker in question by virtue of sub-paragraph (1) is to be reduced by the amount of that excess.

  • (4) For the purposes of sub-paragraph (3)—
  • (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
  • (b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.
  • (5) An amount which apart from this sub-paragraph would be payable to a statutory undertaker in respect of works by virtue of sub-paragraph (1) is to, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the statutory undertaker any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.

PART 2 — For the protection of National Grid Gas plc

For the protection of National Grid Gas plc (Company Number 2006000) (“NG Gas”) the undertaker and NG Gas have entered into an agreement dated 24 June 2013 containing provisions for the protection and benefit of NG Gas in relation to the exercise operation and use of new rights over the Order land in which NG Gas has rights. These provisions are to have effect unless otherwise varied or amended in writing between the undertaker and NG Gas.

PART 3 — For the protection of Network Rail Infrastructure Limited

For the protection of Network Rail Infrastructure Limited and any associated Undertaker of Network Rail Infrastructure Limited which holds property for railway purposes (and for the purpose of this definition “associated Undertaker” means any undertaker which is (within the meaning of sections 1161 and 1162 of the Companies Act 2006[^f00021]) the parent undertaking of Network Rail Infrastructure Limited, the subsidiary undertaking of Network Rail Infrastructure Limited or another subsidiary undertaking of the holding undertaking of Network Rail Infrastructure Limited) the undertaker and Network Rail Infrastructure Limited have entered into an agreement dated 20 May 2013 containing provisions for the protection and benefit of Network Rail Infrastructure Limited and any such associated Undertaker in relation to the exercise operation and use of new rights over the Order land owned, operated and managed by Network Rail Infrastructure Limited and any such associated Undertaker. These provisions are to have effect unless otherwise varied or amended in writing between the undertaker and Network Rail Infrastructure Limited.

PART 4 — For the protection of operators of electronic communications code networks

1

For the protection of any operator, the following provisions are to have effect, unless otherwise agreed in writing between the undertaker and the operator.

2

In this Part of this Schedule—

  • “the 2003 Act” means the Communications Act 2003[^f00022];
  • “conduit system” has the same meaning as in the electronic communications code and references to providing a conduit system are to be construed in accordance with paragraph 1(3A) of that code;
  • “electronic communications apparatus” has the same meaning as in the electronic communications code;
  • “the electronic communications code” has the same meaning as in Chapter 1 of Part 2 of the 2003 Act;
  • “electronic communications code network” means— so much of an electronic communications network or conduit system provided by an electronic communications code operator as is not excluded from the application of the electronic communications code by a direction under section 106 of the 2003 Act; and an electronic communications network which the Secretary of State is providing or proposing to provide;
  • “electronic communications code operator” means a person in whose case the electronic communications code is applied by a direction under section 106 of, or paragraph 17 of Schedule 18 to, the 2003 Act; and
  • “operator” means the operator of an electronic communications code network.

3

The exercise of the powers of article 27 (statutory undertakers) are subject to paragraph 23 of Schedule 2 to the Telecommunications Act 1984[^f00023].

4

  • (1) Subject to sub-paragraphs (2) and (3), if as the result of the authorised development or their construction, or of any subsidence resulting from any of those works any damage is caused to any electronic communications apparatus belonging to an operator (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works, or other property of an operator) the undertaker must bear and pay the cost reasonably and properly incurred by the operator in making good such damage.
  • (2) Nothing in sub-paragraph (1) is to impose any liability on the undertaker with respect to any damage to the extent that it is attributable to the act, neglect or default of an operator, its officers, servants, contractors or agents.
  • (3) Any difference arising between the undertaker and the operator under this paragraph is to be referred to and settled by arbitration under article 34 (arbitration).

5

This Part of this Schedule does not apply to—

  • (a) any apparatus in respect of which the relations between the undertaker and an operator are regulated by the provisions of Part 3 of the 1991 Act; or
  • (b) any damage caused by electro-magnetic interference arising from the construction or use of the authorised development.

6

Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and an operator in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.

SCHEDULE 9 — Discharge of requirements

Applications made under requirement

1

Where an application has been made to the relevant planning authority for any agreement or approval required pursuant to a Requirement included in this Order, the relevant planning authority must give notice to the undertaker of their decision including the reasons on the application, within a period of 8 weeks beginning with—

  • (a) the day immediately following that on which the application is received by the authority; or
  • (b) such longer period as may be agreed by the undertaker and the relevant planning authority.

Further information

2

  • (1) Where an application has been made under paragraph 1 the relevant planning authority shall have the right to request such reasonable further information from the undertaker as is necessary to enable it to consider the application.
  • (2) If the relevant planning authority considers further information is needed, and the requirement does not specify that consultation with a requirement consultee is required, it must, within 14 business days of receipt of the application, notify the undertaker in writing specifying the further information required.
  • (3) If the requirement indicates that consultation must take place with a requirement consultee the relevant planning authority must issue the consultation to the requirement consultee within 5 business day of receipt of the application and must notify the undertaker in writing specifying any further information requested by the requirement consultee within 3 business day of receipt of such a request and in any event within 21 business days of receipt of the application.
  • (4) In the event that the relevant planning authority does not give such notification as specified in sub-paragraph (2) or (3) it is deemed to have sufficient information to consider the application and is not thereafter be entitled to request further information without the prior agreement of the undertaker.

Appeals

3

The undertaker may appeal in the event that—

  • (a) the relevant planning authority refuses an application for any consent, agreement or approval required by a requirement included in this Order or grants it subject to conditions; or
  • (b) the relevant planning authority does not give notice of its decision to the undertaker within the time period specified in paragraph 1;

and any appeal must be made within 42 business days following the occurrence of any of the events in sub-paragraphs (a) and (b).

Appeal process

4

  • (1) Any appeal under this Schedule shall take place by written representations only. The appeal process shall be as follows—
  • (a) the undertaker must submit to the Secretary of State a copy of the application submitted to the relevant planning authority and any supporting documents which the undertaker may wish to provide (“the appeal documentation”) and must on the same day provide copies of the appeal documentation to the relevant planning authority and any requirement consultee;
  • (b) as soon as is practicable after receiving the appeal documentation, the Secretary of State shall appoint a person to determine the appeal (“the appointed person”) and shall notify the appeal parties of the identity of the appointed person and the address to which all correspondence for that person’s attention should be sent;
  • (c) the relevant planning authority and the requirement consultee (if any) must submit written representations to the appointed person in respect of the appeal within 10 business days of the date on which the appeal parties are notified of the appointed person under paragraph (b) and must ensure that copies of their written representations are sent to each other and to the undertaker on the day on which they are submitted to the appointed person;
  • (d) the appeal parties must make any counter-submissions to the appointed person within 10 business days of receipt of written representations pursuant to paragraph (c); and
  • (e) the appointed person shall make a decision and notify it to the appeal parties, with reasons, as soon as practicable.
  • (2) The appointment of the person pursuant to sub-paragraph (1)(b) may be undertaken by a person appointed by the Secretary of State for this purpose instead of by the Secretary of State.
  • (3) In the event that the appointed person considers that further information is necessary to enable him to consider the appeal he shall, as soon as practicable, notify the appeal parties in writing specifying the further information required, the party from whom the information is sought and the date by which the information is to be submitted.
  • (4) Any further information required pursuant to sub-paragraph (3) must be provided to the appointed person and the other appeal parties on or before the date specified by the appointed person. Any written representations concerning matters contained in the further information must be provided to the appointed person and the other appeal parties within 10 business days of that date.
  • (5) On an appeal under this paragraph, the appointed person may—
  • (a) allow or dismiss the appeal; or
  • (b) reverse or vary any part of the decision of the relevant planning authority (whether the appeal relates to that part of it or not),

and may deal with the application as if it had been made to him in the first instance and must state in writing the reasons for any decision.

  • (6) The appointed person may proceed to a decision on an appeal taking into account only such written representations as have been sent within the time limits set by the appointed person under this paragraph.
  • (7) The appointed person may proceed to a decision even though no written representations have been made within the relevant time limits, if it appears to him that there is sufficient material to enable a decision to be made on the merits of the case.
  • (8) The decision of the appointed person on an appeal is final and binding on the parties, and a court may entertain proceedings for questioning the decision only if the proceedings are brought by a claim for judicial review.
  • (9) If an approval is given by the appointed person pursuant to this Schedule, it is deemed to be an approval for the purpose of Schedule 2 to this Order as if it had been given by the relevant planning authority.
  • (10) Save where a direction is given pursuant to sub-paragraph (11) requiring the costs of the appointed person to be paid by the relevant planning authority, the reasonable costs of the appointed person must be met by the undertaker.
  • (11) On application by the relevant planning authority or the undertaker, the appointed person may give directions as to the costs of the appeal parties and as to the parties by whom the costs of the appeal are to be paid. In considering whether to make any such direction and the terms on which it is to be made, the appointed person is to have regard to Communities and Local Government Circular 03/2009 or any circular or guidance which may from time to time replaces it.

Fees

5

  • (1) Where an application is made to the relevant planning authority for agreement or approval in respect of a requirement a fee of £97.00 is to be paid to it.
  • (2) Any fee paid under this Schedule must be refunded to the undertaker within 4 weeks of—
  • (a) the application being rejected as invalidly made; or
  • (b) the relevant planning authority failing to determine the application within the period determined under sub-paragraph (1);

unless within that period the undertaker agrees in writing that the fee is to be retained by the relevant planning authority and credited in respect of a future application.

Interpretation of Schedule 9

6

In this Schedule—

  • “the appeal parties” means the relevant planning authority, the requirement consultee and the undertaker;
  • “business day” means a day other than Saturday or Sunday which is not Christmas Day, Good Friday or a bank holiday under section 1 of the Banking and Financial Dealings Act 1971[^f00024];
  • “requirement consultee” means any body named in a Requirement which is the subject of an appeal as a body to be consulted by the relevant planning authority in discharging that Requirement.

Signed

Signed by authority of the Secretary of State for Energy and Climate Change

Giles Scott — Head of National Infrastructure Consents — Department of Energy and Climate Change — 18th December 2013

Explanatory note

(This note is not part of the Order)

EXPLANATORY NOTE

This Order grants development consent for, and authorises National Grid Electricity Transmission plc to construct and maintain, a 400 kV overhead line connection from a new substation serving the King’s Lynn B 981 MW Combined Cycle Gas Turbine power station to the existing Norwich-Walpole 400 kV overhead line. For the purposes of the development that it authorises, National Grid Electricity Transmission plc is authorised by this Order compulsorily to acquire new rights in land as well as to override interests, rights and restrictions. The Order imposes requirements in connection with the development for which it grants development consent. A copy of the plans and book of reference referred to in this Order and certified in accordance with article 32 (certification of plans etc) of this Order may be inspected free of charge at Borough Council of King’s Lynn and West Norfolk, King’s Court, Chapel Street, King’s Lynn, PE30 1EX.

Footnotes

[^f00001]: S.I. 2009/2264, amended by S.I. 2010/439, 602, 2012/635, 1659, 2654, 2732, 2013/522, 755.

[^f00002]: 2008 c. 29. The relevant provisions of the Planning Act 2008 are amended by Chapter 6 of Part 6 of, and Schedule 13 to, the Localism Act 2011 (c. 20), and by sections 22-27 of the Growth and Infrastructure Act 2013 (c. 27).

[^f00003]: S.I. 2010/103, amended by S.I. 2012/635.

[^f00004]: 1961 c. 33. Sections 1 and 4 were amended by the Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307). Sections 2 and 3 were repealed by that Order.

[^f00005]: 1965 c. 56. The Act has been substantially amended by subsequent legislation. The principal amendments relevant to this Order are that the Courts Act 1971 (c. 23) amended section 12; the Statute Law (Repeals) Act 1973 (c. 39) amended sections 9, 25 and 29; the Rentcharges Act 1977 (c. 30) repealed section 24 subject to savings; the Acquisition of Land Act 1981 (c. 67) amended sections 1, 11, 30, 31 and 32; the Housing (Consequential Provisions) Act 1985 (c. 71) amended section 11; the Planning (Consequential Provisions) Act 1990 (c. 11) amended sections 1 and 10; the Local Government Finance (Repeals, Savings and Consequential Amendments) Order 1990 (S.I. 1990/776) repealed section 27; the Planning and Compensation Act 1991 (c. 34) amended sections 3, 5, 20 and 31; the Courts Act 2003 (c. 39) amended section 1; the Constitutional Reform Act 2005 (c. 4) amended sections 23 and 25; the Church of England (Miscellaneous Provisions) Measure 2006 (2006 No.1) amended sections 11 and 31; the Tribunals, Courts and Enforcement Act 2007 (c. 15) amended section 13; and the Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307) amended sections 5, 6, 8, 10, 11, and 15 to 20.

[^f00006]: 1980 c. 66. Section 1(1) was amended by section 21(2) of the New Roads and Street Works Act 1991 (c. 22); sections 1(2), 1(3) and 1(4) were amended by section 8 of, and paragraph 1 of Schedule 4 to, the Local Government Act 1985 (c. 51); section 1(2A) was inserted, and section 1(3) was amended, by section 259 (1), (2) and (3) of the Greater London Authority Act 1999 (c. 29); sections 1(3A) and 1(5) were inserted by section 22(1) of, and paragraph 1 of Schedule 7 to, the Local Government (Wales) Act 1994 (c. 19). Section 36(2) was amended by section 4(1) of, and paragraphs 47(a) and (b) of Schedule 2 to, the Housing (Consequential Provisions) Act 1985 (c. 71), by S.I. 2006/1177, by section 4 of, and paragraph 45(3) of Schedule 2 to, the Planning (Consequential Provisions) Act 1990 (c. 11), by section 64(1), (2) and (3) of the Transport and Works Act (c. 42) and by section 57 of, and paragraph 5 of Part 1 of Schedule 6 to, the Countryside and Rights of Way Act 2000 (c. 37); section 36(3A) was inserted by section 64(4) of the Transport and Works Act 1992 and was amended by S.I. 2006/1177; section 36(6) was amended by section 8 of, and paragraph 7 of Schedule 4 to, the Local Government Act 1985 (c. 51); and section 36(7) was inserted by section 22(1) of, and paragraph 4 of Schedule 7 to, the Local Government (Wales) Act 1994 (c. 19). Section 329 was amended by section 112(4) of, and Schedule 18 to, the Electricity Act 1989 (c. 29) and by section 190(3) of, and Part 1 of Schedule 27 to, the Water Act 1989 (c. 15). There are other amendments to the 1980 Act which are not relevant to this Order.

[^f00007]: 1981 c. 66. Sections 2(3), 6(2) and 11(6) were amended by section 4 of, and paragraph 52 of Schedule 2 to, the Planning (Consequential Provisions) Act 1990 (c. 11). Section 15 was amended by sections 56 and 321(1) of, and Schedules 8 and 16 to, the Housing and Regeneration Act 2008 (c. 17). Paragraphs 4, 8 and 9 of Schedule 1 were amended by Schedule 1 to the Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307). Paragraph 1 of Schedule 2 was amended by section 76 of, and Part 2 of Schedule 9 to, the Housing Act 1988 (c. 50); section 161(4) of, and Schedule 19 to, the Leasehold Reform, Housing and Urban Development Act 1993 (c. 28); and sections 56 and 321(1) of, and Schedule 8 to, the Housing and Regeneration Act 2008. Paragraph 3 of Schedule 2 was amended by section 76 of, and Schedule 9 to, the Housing Act 1988 and section 56 of, and Schedule 8 to, the Housing and Regeneration Act 2008. Paragraph 2 of Schedule 3 was repealed by the Inheritance Tax Act 1984 (c. 51). There are other amendments to the 1981 Act which are not relevant to this Order.

[^f00008]: 1990 c. 8. There are amendments to the 1990 Act not relevant to this Order.

[^f00009]: 1991 c. 22. Section 48(3A) was inserted by section 124 of the Local Transport Act 2008 (c. 26). Part 3 of the 1991 Act was amended by Part 4 of the Traffic Management Act 2004 (c. 18). Section 74 was amended, and sections 74A and 74B inserted, by sections 255 and 256 of the Transport Act 2000 (c. 38). There are other amendments to the 1991 Act which are not relevant to this Order.

[^f00010]: 1981 c. 67. The definition of “owner” in section 7 of the Act was amended by section 70 of and Schedule 15 to the Planning and Compensation Act 1991 (c. 34). There are other amendments to this Act which are not relevant to this Order.

[^f00011]: 1991 c. 56. Section 106(1) amended by the Competition and Service (Utilities) Act 1992 (c. 43) Part II section 43(2); section 106(1A) added by the Water Act 2003 (c. 37) Part 3 section 99(2); section 106(4)(a) and (b) amended by the Water Act 2003 Part 3 section 99(3); section 106(5A) added by the Water Act 2003 Part 3 section 99(4); section 106(6) amended by the Water Act 2003 Part 3 sections 36(2) and 99(5); section 106(7) repealed by the Competition and Service (Utilities) Act 1992 Schedule 2, paragraph 1. There are other amendments to this Act that are not relevant to this Order.

[^f00012]: S.I. 2010/675. There are amendments to the Regulations that are not relevant to this Order.

[^f00013]: 1990 c. 43. There are amendments to this Act which are not relevant to this Order.

[^f00014]: 1974 c. 40. Sections 61(9) and 65(8) were amended by section 162 of, and paragraph 15 of Schedule 15 to, the Environmental Protection Act 1990 (c. 43). There are other amendments to this Act which are not relevant to this Order.

[^f00015]: 1845 c. 18. There are amendments to this Act which are not relevant to this Order.

[^f00016]: 1978 c. 30. There are amendments to this Act which are not relevant to this Order.

[^f00017]: 1973 c. 26. Section 20 was amended by subsection (6) and (12) of section 146 of, and Schedule 13 to, the Road Traffic Regulation Act 1984 (c. 27). Subsection (10) of section 20 was repealed by section 343(3) of, and Schedule 25 to, the Highways Act 1980 (c. 66) and subsection (11) was repealed by section 155 of, and Schedule 25 to, the Rent Act 1977 (c. 42). Section 44 was amended by Schedule 24 to the Highways Act 1980 (c. 66), by section 67(1) and Schedule 7 to the Gas Act 1986 (c. 44), and Schedule 1 to the Water Consolidation (Consequential Provisions) Act 1991 (c. 60). There are other amendments to the 1973 Act which are not relevant to this Order.

[^f00018]: 1989 c. 29. The definition of “electrical plant” in section 64 was amended by section 108 of and Schedule 6 to the Utilities Act 2000 (c. 27). Part 1 of the Act was amended by Part 4 of the Utilities Act. There are other amendments to the Act not relevant to this Order.

[^f00019]: 1991 c. 56.

[^f00020]: 1986 c. 44. A new section 7 was substituted by section 5 of the Gas Act 1995 (c. 45), and was further amended by section 76 of the Utilities Act 2000 (c. 27).

[^f00021]: 2006 c. 46. There are amendments to the Act which are not relevant to this Order.

[^f00022]: 2003 c. 21. There are amendments to the Act which are not relevant to this Order.

[^f00023]: 1984 c. 12. There are amendments to the Act which are not relevant to this Order.

[^f00024]: 1971 c. 80. There are amendments to this Act which are not relevant to this Order.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.