The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014
| Drawing title | Drawing number |
|---|---|
| Acton Storm tanks | |
| Access plan | DCO-PP-02X-ACTST-050003 |
| Hammersmith Pumping Station | Hammersmith Pumping Station |
| Access plan | DCO-PP-03X-HAMPS-060003 |
| Barn Elms | Barn Elms |
| Access plan | DCO-PP-04X-BAREL-070003 |
| Putney Embankment Foreshore | Putney Embankment Foreshore |
| Access plan | DCO-PP-05X-PUTEF-080003 – rev 1 |
| Access plan – Temporary slipway | DCO-PP-05X-PUTEF-080004 |
| Carnwath Road Riverside | Carnwath Road Riverside |
| Access plan | DCO-PP-06X-CARRR-090003 |
| Dormay Street | Dormay Street |
| Access plan | DCO-PP-08X-DRMST-100003 |
| King George’s Park | King George’s Park |
| Access plan | DCO-PP-09X-KNGGP-110003 |
| Falconbrook Pumping Station | Falconbrook Pumping Station |
| Access plan | DCO-PP-10X-FALPS-120003 |
| Cremorne Wharf Depot | Cremorne Wharf Depot |
| Access plan | DCO-PP-11X-CREWD-130003 |
| Chelsea Embankment Foreshore | Chelsea Embankment Foreshore |
| Access plan | DCO-PP-12X-CHEEF-140003 – rev 1 |
| Kirtling Street | Kirtling Street |
| Access plan | DCO-PP-13X-KRTST-150003 – rev 1 |
| Heathwall Pumping Station | Heathwall Pumping Station |
| Access plan | DCO-PP-14X-HEAPS-160003 – rev 2 |
| Albert Embankment Foreshore | Albert Embankment Foreshore |
| Access plan | DCO-PP-15X-ALBEF-170005 – rev 3 |
| Victoria Embankment Foreshore | Victoria Embankment Foreshore |
| Access plan | DCO-PP-16X-VCTEF-180005 – rev 2 |
| Blackfriars Bridge Foreshore | Blackfriars Bridge Foreshore |
| Access plan | DCO-PP-17X-BLABF-190005 – rev 2 |
| Shad Thames Pumping Station | Shad Thames Pumping Station |
| Access plan | DCO-PP-18X-SHTPS-200003 |
| Chambers Wharf | Chambers Wharf |
| Access plan | DCO-PP-19X-CHAWF-210003 |
| Earl Pumping Station | Earl Pumping Station |
| Access plan | DCO-PP-21X-EARPS-220003 |
| Deptford Church Street | Deptford Church Street |
| Access plan | DCO-PP-22X-DEPCS-230003 |
| Greenwich Pumping Station | Greenwich Pumping Station |
| Access plan | DCO-PP-23X-GREPS-240003 |
| King Edward Memorial Park Foreshore | King Edward Memorial Park Foreshore |
| Access plan | DCO-PP-24X-KEMPF-250003 – rev 1 |
| Bekesbourne Street | Bekesbourne Street |
| Access plan | DCO-PP-25X-BEKST-260002 |
| Abbey Mills Pumping Station | Abbey Mills Pumping Station |
| Access plan | DCO-PP-26X-ABMPS-270004 |
| Beckton Sewage Treatment Works | Beckton Sewage Treatment Works |
| Access plan | DCO-PP-27X-BESTW-280002 - rev 1 |
PART 4 — APPROVED PLANS
| Drawing title | Sheet number | Drawing number |
|---|---|---|
| Acton Storm tanks | Acton Storm tanks | Acton Storm tanks |
| Demolition and site clearance | 1 of 2 | DCO-PP-02X-ACTST-050004 |
| Demolition and site clearance | 2 of 2 | DCO-PP-02X-ACTST-050005 |
| Site works parameter plan | DCO-PP-02X-ACTST-050006 | |
| Hammersmith Pumping Station | Hammersmith Pumping Station | Hammersmith Pumping Station |
| Demolition and site clearance | DCO-PP-03X-HAMPS-060004 | |
| Site works parameter plan | DCO-PP-03X-HAMPS-060005 | |
| Barn Elms | Barn Elms | Barn Elms |
| Demolition and site clearance | 1 of 4 | DCO-PP-04X-BAREL-070004 |
| Demolition and site clearance | 2 of 4 | DCO-PP-04X-BAREL-070005 |
| Demolition and site clearance | 3 of 4 | DCO-PP-04X-BAREL-070006 – rev 1 |
| Demolition and site clearance | 4 of 4 | DCO-PP-04X-BAREL-070007 – rev 1 |
| Site works parameter plan | DCO-PP-04X-BAREL-070008 | |
| Putney Embankment Foreshore | Putney Embankment Foreshore | Putney Embankment Foreshore |
| Demolition and site clearance | 1 of 3 | DCO-PP-05X-PUTEF-080005 |
| Demolition and site clearance | 2 of 3 | DCO-PP-05X-PUTEF-080006 |
| Demolition and site clearance | 3 of 3 | DCO-PP-05X-PUTEF-080007 |
| Site works parameter plan | DCO-PP-05X-PUTEF-080008 – rev 1 | |
| Carnwath Road Riverside | Carnwath Road Riverside | Carnwath Road Riverside |
| Demolition and site clearance | DCO-PP-06X-CARRR-090004 | |
| Site works parameter plan | DCO-PP-06X-CARRR-090005 – rev 1 | |
| Dormay Street | Dormay Street | Dormay Street |
| Demolition and site clearance | DCO-PP-08X-DRMST-100004 – rev 1 | |
| Site works parameter plan | DCO-PP-08X-DRMST-100005 – rev 1 | |
| King George’s Park | King George’s Park | King George’s Park |
| Demolition and site clearance | DCO-PP-09X-KNGGP-110004 | |
| Site works parameter plan | DCO-PP-09X-KNGGP-110005 – rev 1 | |
| Falconbrook Pumping Station | Falconbrook Pumping Station | Falconbrook Pumping Station |
| Demolition and site clearance | 1 of 2 | DCO-PP-10X-FALPS-120004 |
| Demolition and site clearance | 2 of 2 | DCO-PP-10X-FALPS-120005 |
| Site works parameter plan | DCO-PP-10X-FALPS-120006 – rev 1 | |
| Cremorne Wharf Depot | Cremorne Wharf Depot | Cremorne Wharf Depot |
| Demolition and site clearance | DCO-PP-11X-CREWD-130004 – rev 2 | |
| Site works parameter plan | DCO-PP-11X-CREWD-130005 – rev 1 | |
| Listed structure interface – Lots Road Pumping Station | DCO-PP-11X-CREWD-130012 – rev 1 | |
| Chelsea Embankment Foreshore | Chelsea Embankment Foreshore | Chelsea Embankment Foreshore |
| Demolition and site clearance | 1 of 2 | DCO-PP-12X-CHEEF-140004 |
| Demolition and site clearance | 2 of 2 | DCO-PP-12X-CHEEF-140005 |
| Site works parameter plan | DCO-PP-12X-CHEEF-140006 – rev 2 | |
| Kirtling Street | Kirtling Street | Kirtling Street |
| Demolition and site clearance | DCO-PP-13X-KRTST-150004 | |
| Site works parameter plan | DCO-PP-13X-KRTST-150005 – rev 1 | |
| Heathwall Pumping Station | Heathwall Pumping Station | Heathwall Pumping Station |
| Demolition and site clearance | DCO-PP-14X-HEAPS-160004 | |
| Site works parameter plan | DCO-PP-14X-HEAPS-160005 – rev 1 | |
| Albert Embankment Foreshore | Albert Embankment Foreshore | Albert Embankment Foreshore |
| Demolition and site clearance | 1 of 2 | DCO-PP-15X-ALBEF-170006 |
| Demolition and site clearance | 2 of 2 | DCO-PP-15X-ALBEF-170007 – rev 1 |
| Site works parameter plan | DCO-PP-15X-ALBEF-170008 – rev 2 | |
| Victoria Embankment Foreshore | Victoria Embankment Foreshore | Victoria Embankment Foreshore |
| Demolition and site clearance | 1 of 2 | DCO-PP-16X-VCTEF-180006 |
| Demolition and site clearance | 2 of 2 | DCO-PP-16X-VCTEF-180007 - rev 2 |
| Site works parameter plan | DCO-PP-16X-VCTEF-180008 – rev 3 | |
| Proposed landscape plan | 2 of 2 | DCO-PP-16X-VCTEF-180013 – rev 1 |
| Blackfriars Bridge Foreshore | Blackfriars Bridge Foreshore | Blackfriars Bridge Foreshore |
| Demolition and site clearance | 1 of 5 | DCO-PP-17X-BLABF-190067 – rev 1 |
| Demolition and site clearance | 2 of 5 | DCO-PP-17X-BLABF-190006 – rev 1 |
| Demolition and site clearance | 3 of 5 | DCO-PP-17X-BLABF-190007 – rev 2 |
| Demolition and site clearance | 4 of 5 | DCO-PP-17X-BLABF-190008 – rev 1 |
| Demolition and site clearance | 5 of 5 | DCO-PP-17X-BLABF-190009 – rev 1 |
| Site works parameter plan | DCO-PP-17X-BLABF-190010 – rev 2 | |
| Extent of loss of listed river wall | 1 of 2 | DCO-PP-17X-BLABF-190022 – rev 1 |
| Extent of loss of listed river wall | 2 of 2 | DCO-PP-17X-BLABF-190023 |
| Shad Thames Pumping Station | Shad Thames Pumping Station | Shad Thames Pumping Station |
| Demolition and site clearance | DCO-PP-18X-SHTPS-200004 | |
| Site works parameter plan | DCO-PP-18X-SHTPS-200005 | |
| Proposed roof plan | DCO-PP-18X-SHTPS-200007 | |
| Chambers Wharf | Chambers Wharf | Chambers Wharf |
| Demolition and site clearance | DCO-PP-19X-CHAWF-210004 | |
| Site works parameter plan | DCO-PP-19X-CHAWF-210005 – rev 1 | |
| Finished site levels | DCO-PP-19X-CHAWF-210008 | |
| Earl Pumping Station | Earl Pumping Station | Earl Pumping Station |
| Demolition and site clearance | DCO-PP-21X-EARPS-220004 | |
| Site works parameter plan | DCO-PP-21X-EARPS-220005 | |
| Deptford Church Street | Deptford Church Street | Deptford Church Street |
| Demolition and site clearance | DCO-PP-22X-DEPCS-230004 | |
| Site works parameter plan | DCO-PP-22X-DEPCS-230005 – rev 1 | |
| Greenwich Pumping Station | Greenwich Pumping Station | Greenwich Pumping Station |
| Demolition and site clearance | 1 of 3 | DCO-PP-23X-GREPS-240004 – rev 1 |
| Demolition and site clearance | 2 of 3 | DCO-PP-23X-GREPS-240005 |
| Demolition and site clearance | 3 of 3 | DCO-PP-23X-GREPS-240006 |
| Site works parameter plan | DCO-PP-23X-GREPS-240007 | |
| King Edward Memorial Park Foreshore | King Edward Memorial Park Foreshore | King Edward Memorial Park Foreshore |
| Demolition and site clearance | DCO-PP-24X-KEMPF-250004 | |
| Site works parameter plan | DCO-PP-24X-KEMPF-250005 – rev 1 | |
| Bekesbourne Street | Bekesbourne Street | Bekesbourne Street |
| Demolition and site clearance | DCO-PP-25X-BEKST-260003 | |
| Site works parameter plan | DCO-PP-25X-BEKST-260004 – rev 1 | |
| Abbey Mills Pumping Station | Abbey Mills Pumping Station | Abbey Mills Pumping Station |
| Site works parameter plan | DCO-PP-26X-ABMPS-270005 – rev 1 | |
| Beckton Sewage Treatment Works | Beckton Sewage Treatment Works | Beckton Sewage Treatment Works |
| Site works parameter plan | DCO-PP-27X-BESTW-280003 – rev 1 |
Drawings where only part of the drawing is for approval—
| Drawing title | Sheet number | Drawing number |
|---|---|---|
| Putney Embankment Foreshore | Putney Embankment Foreshore | Putney Embankment Foreshore |
| As existing listed structure interface – kiosk Drawing is for information save for the maximum extent of loss of listed structures which is for approval | DCO-PP-05X-PUTEF-080024 | |
| Proposed listed structure interface – interception chamber Drawing is indicative save for the maximum extent of loss of listed structures which is for approval | DCO-PP-05X-PUTEF-080027 – rev 1 | |
| Victoria Embankment Foreshore | Victoria Embankment Foreshore | Victoria Embankment Foreshore |
| As existing and proposed detailed river elevation – impact on listed structure Drawing is illustrative save for the maximum extent of loss of listed structures which is for approval | DCO-PP-16X-VCTEF-180016 – rev 2 | |
| Proposed mooring access details Drawing is illustrative save for the detail of spanning the listed wall which is for approval | DCO-PP-16X-VCTEF-180027 – rev 1 | |
| As existing and proposed detailed river elevation – impact on listed structure Drawing is illustrative save for maximum extent of loss of listed structures which is for approval | DCO-PP-16X-VCTEF-180047 – rev 1 | |
| Blackfriars Bridge Foreshore | Blackfriars Bridge Foreshore | Blackfriars Bridge Foreshore |
| As existing listed structure interface – bridge stairs (west) Drawing is for information save for the maximum extent of loss of listed structures which is for approval | DCO-PP-17X-BLABF-190041 | |
| As existing listed structure interface – bridge stairs (east) Drawing is for information save for the maximum extent of loss of listed structures which is for approval | DCO-PP-17X-BLABF-190043 | |
| Permanent President mooring access plan and elevation Drawing is illustrative save for the detail of spanning the listed wall which is for approval | DCO-PP-17X-BLABF-190045 – rev 1 | |
| Greenwich Pumping Station | Greenwich Pumping Station | Greenwich Pumping Station |
| Existing floor plan with extent of loss Drawing is for information save for the maximum extent of loss of listed structures which is for approval | DCO-PP-23X-GREPS-240011 | |
| As existing beam engine house north elevation Drawing is for information save for the maximum extent of loss of listed structures which is for approval | DCO-PP-23X-GREPS-240018 – rev 1 | |
| As existing beam engine house south elevation with extent of loss Drawing is for information save for the maximum extent of loss of listed structures which is for approval | DCO-PP-23X-GREPS-240020 – rev 1 | |
| Beam engine house existing east elevation Drawing is for information save for the maximum extent of loss of listed structures which is for approval | DCO-PP-23X-GREPS-240022 – rev 1 | |
| Listed building internal elevations with extent of loss Drawing is for information save for the maximum extent of loss of listed structures which is for approval | DCO-PP-23X-GREPS-240024 – rev 1 |
SCHEDULE 3 — REQUIREMENTS
Interpretation
1
- (1) Where under any of the requirements the approval or agreement of the discharging authority or another person is required, that approval or agreement must be given in writing.
- (2) Where any requirement provides that the authorised project is to be carried out in accordance with a document or the details approved by the discharging authority, the document or approved details shall be taken to include any amendments or revised documents or plans that may subsequently be approved or agreed by the discharging authority, or other consent, agreement or approval of the discharging authority.
- (3) Where an approval is required under the terms of any requirement or a document referred to in a requirement, or any requirement specifies “unless otherwise approved” or “unless otherwise agreed” by the discharging authority or requires the applicant to demonstrate the existence of exceptional circumstances such approval shall not be given or exceptional circumstances agreed except in relation to minor or immaterial changes where it has been demonstrated to the satisfaction of the discharging authority that the subject-matter of the approval sought or the undertaker’s proposed response to exceptional circumstances is unlikely to give rise to any materially new or materially different environmental effects from those assessed in the Environmental Statement. This is not to be used to avoid or circumvent submission, discharge or consideration of matters properly to be dealt with through and in accordance with Schedule 17.
- (4) Subject to (2) where any requirement refers to a document or plan, that document or plan shall be taken to be the version certified by the Secretary of State pursuant to the provisions of this Order.
- (5) Where site specific requirements specify ‘commencement of development’ they refer to the commencement of development on that site only.
- (6) Where site specific requirements refer to ‘landscaping’ they refer to the zone within which required landscaping would be located, identified on the site works parameter plans. Elsewhere, land restoration will be undertaken in accordance with Article 35(4) of this Order.
Project-wide requirements
2
The table below sets out the requirements for the Project as a whole —
| Title | Ref | Text |
|---|---|---|
| Interpretation/definitions | PW1 | In this Schedule— “Air Management Plan” means the document with reference number 7.14; “Approved plans” means those drawings listed at part 4 of Schedule 2 to this Order; “CoCP Part A” means the Code of Construction Practice Part A— General Requirements (document reference number APP205.01) as varied by the CoCP Part B for each site; “CoCP Part B” means the Code of Construction Practice Part B— Site Specific Requirements (document reference numbers APP178.03-49) as varied by requirement KEMPF18 of this Order; “Design Principles” means the document with reference number APP206.01; “Draft Project Framework Travel Plan” means the document with reference number 7.11; “Heritage Statement” means the document with reference number 5.3; “OAWSI” means the Overarching Archaeological Written Scheme of Investigation (document reference number APP195); “SSAWSI” means a site-specific archaeological written scheme of investigation; “relevant stakeholder” means any of the following organisations which may be relevant in the opinion of the relevant planning authority depending on the nature of any proposed amendment to the Code of Construction Practice to be considered for approval by the relevant planning authority— the Environment Agency, the local highway authority, Transport for London, the Port of London Authority, the Marine Management Organisation or the Historic Buildings and Monuments Commission for England; “TfL” means Transport for London; “HBMCE” means the Historic Buildings and Monuments Commission for England. |
| Time limits | PW2 | The authorised development must be commenced within five years of the date of this Order. |
| Phasing of the authorised development – Project wide | PW3 | (1) The proposed construction phasing of the authorised project setting out the sequence of works numbered 1a, 1b, 1c, 1d, 7 and 20 shall be sent to the relevant planning authorities for information, no later than two months before the commencement of development. (2) The authorised development shall be carried out in accordance with the details provided further to (1). |
| Phasing of the authorised development – Site specific | PW4 | (1) Development of each of the works numbered 2 to 19 and 21 to 27 shall not commence unless the proposed phasing of the authorised project on the site is submitted to the relevant planning authority for information at least two months in advance. (2) These details shall include, for each part of the authorised project, the location and period of those works, including construction, landscaping, removal of temporary construction areas and works, and commissioning, and the details of the body responsible for carrying out those works. (3) Any revisions to the construction phasing shall be submitted to the relevant planning authority for information at least two months in advance. (4) The authorised development shall be carried out in accordance with the details provided further to paragraphs (1) to (3). |
| Drive strategy | PW5 | The tunnelling works that form part of the authorised development shall be driven in the directions set out below— Work No. 1a. From. Carnwath Road Riverside. To. Acton Storm Tanks. Work No. 1b. From. Kirtling Street. To. Carnwath Road Riverside. Work No. 1c. From. Kirtling Street. To. Chambers Wharf. Work No. 1d. From. Chambers Wharf. To. Abbey Mills Pumping Station. Work No. 7. From. Dormay Street. To. King George’s Park. Work No. 7. From. Dormay Street. To. Carnwath Road Riverside. Work No. 20. From. Greenwich Pumping Station. To. Chambers Wharf. |
| CoCP Part A | PW6 | Until completion of construction the authorised development described in Schedule 1 (authorised project) shall be carried out in accordance with the CoCP Part A subject to the provisions of paragraph 11 of Part 3 of Schedule 16 to this Order and any site-specific variations made through the approval of a revised CoCP Part B, unless otherwise agreed by the relevant planning authority, in consultation with other relevant stakeholders. This requirement is subject to requirement KEMPF18. |
| Air Management Plan | PW7 | (1) The authorised development shall be operated and maintained in accordance with the Air Management Plan (document reference 7.14). (2) Any alterations to the Air Management Plan shall be submitted to, and approved by, the Mayor of London in consultation with the relevant affected local authority. (3) The authorised development shall not be brought into use until details of odour management and monitoring for each site are submitted to the relevant planning authority for information. |
| Monitoring of and protective works to listed buildings and structures (including from settlement) | PW8 | (1) Where monitoring of effects on any listed building or structure is proposed, instrumentation and monitoring equipment shall be temporarily attached in accordance with the principles set out in Section 3.7 of the Heritage Statement, and in consultation with the landowner, unless otherwise approved by the relevant planning authority in consultation with the HBMCE before the equipment is attached. (2) Any intrusive protective works or mitigation which might affect the heritage significance of any listed buildings or structures, either during construction or to mitigate the effects of construction, shall not be carried out until details of those works are submitted for approval by the relevant planning authority in consultation with the HBMCE. (3) The authorised development shall be carried out in accordance with the approved details, unless otherwise agreed by the relevant planning authority in consultation with the HBMCE. |
| Built heritage recording | PW9 | (1) The built heritage assets set out in Appendix C of the OAWSI shall not be demolished or removed until a SSAWSI (which shall accord with the OAWSI) setting out how the asset shall be recorded is submitted for approval by the relevant planning authority in consultation with the HBMCE. (2) The works to record the built heritage asset shall be carried out in accordance with the approved details, unless otherwise agreed by the relevant planning authority in consultation with the HBMCE. |
| Signage for temporary footpath diversions | PW10 | (1) Any temporary diversion of a Public Right of Way shall not be implemented until a scheme for temporary signage at points of changes in direction is submitted for approval by the local planning authority in consultation with the relevant highway authority. Any approved temporary diversions must be publicised in order to give adequate notice to pedestrians and cyclists. (2) The signs shall be erected and maintained in accordance with the approved details throughout the construction period, unless otherwise agreed by the relevant planning authority in consultation with the relevant highway authority. |
| Interpretation strategy | PW11 | (1) A project-wide heritage interpretation strategy shall be developed in consultation with the HBMCE within 12 months of the start of construction, in accordance with the OAWSI and design principle HRTG.07. (2) The strategy shall be implemented at site level through the landscaping details to be submitted for approval by the relevant planning authorities, or pursuant to a site specific heritage interpretation requirement. (3) The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authorities in consultation with the HBMCE. |
| Excavated material and waste | PW12 | (1) Excavated material and waste arising during construction of the authorised development shall be managed in accordance with the Excavated Material and Waste Commitments (document reference APP142). (2) Any alterations to the Excavated Material and Waste Commitments shall be submitted for approval by the Mayor of London in consultation with Natural England, and shall be within the terms of the Habitats Regulations Assessment No Significant Effects Report and the Environmental Statement. |
| Groundwater and dewatering monitoring and management | PW13 | Groundwater and dewatering monitoring and management shall be carried out in accordance with the Groundwater Environmental Management – Dewatering and Monitoring Strategy (document reference APP141). Any alterations to the strategy shall be submitted to, and agreed by, the Environment Agency. |
| Operational noise | PW14 | (1) Use of the authorised development shall not commence until a noise report is submitted to and approved by the relevant planning authority for each site. This report shall be based on the methodology as defined in British Standard 4142—1997 and demonstrate that the rating noise level for permanent fixed plant / machinery at the nearest residential receptor is 10dB (A) below the typical background noise level for the quietest periods of time over which the plant / machinery will operate. (2) The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority. |
| River Transport Strategy | PW15 | The authorised development shall be carried out in accordance with Section 4 and Schedules 1 to 7 of the River Transport Strategy (document reference APP207.02), or such updated version of the River Transport Strategy which is the result of any approval given or other decision taken further to the terms of the River Transport Strategy. Notwithstanding this, for the purposes of paragraphs 4.1.1(c), 4.1.1(d) and 4.1.1(e) of the River Transport Strategy, Chambers Wharf shall also be considered and treated as a foreshore site. |
| Completion of construction | PW16 | The undertaker shall within 10 business days of completion of construction serve notice in writing of the date of completion of construction upon all the relevant planning authorities, and the Mayor of London, HBMCE, Natural England, Environment Agency, Transport for London, Marine Management Organisation, Port of London Authority, Metropolitan Police, City of London Police, and the London Fire and Civil Defence Authority. |
| Noise and vibration trigger values | PW17 | 1 Noise and vibration trigger values 1.1 This requirement sets out the noise and vibration trigger values for the provision of off-site noise mitigation under the Non-statutory off-site mitigation and compensation policy (Application document number— APP210.01). References in this document to trigger values are to be construed as references to the trigger values in this requirement. 2 Residential property (airborne noise) 2.1 Subject to paragraphs 2.2 and 2.3 the airborne noise trigger values for noise insulation and temporary rehousing for residential property are as set out in Table 1. All construction noise levels will be predicted or measured at a distance of 1m from any affected eligible façade, which must have windows to bedrooms or living habitable rooms. In this requirement “habitable room” has the same meaning as in the Building Regulations 2000 Approved Document F (2010 edition). 2.2 The trigger values shown in Table 1 do not apply where the ambient noise level is greater than the noise insulation trigger value. In such cases, where the ambient noise level (in the absence of construction noise) exceeds the relevant noise insulation trigger value shown above, then— 2.2.1 the ambient noise level shall be used as the construction noise level required to trigger insulation; and 2.2.2 the ambient noise level +10dB shall be used as the temporary rehousing trigger value. 2.3 The trigger values shown in Table 1 apply if— 2.3.1 the predicted or measured noise level exceeds the noise trigger value for noise insulation or temporary rehousing at the property for at least ten days out of any period of 15 consecutive days; or 2.3.2 the predicted or measured noise level exceeds the noise trigger value for noise insulation or temporary rehousing at the property for 40 days in any six-month period; or 2.3.3 where a significant effect is identified using the assessment methodology defined in the Environmental Statement and forecast noise level exceeds assessment category C defined in the Environmental Statement even if the duration trigger values in paragraphs 2.3.1 and 2.3.2 are not exceeded; and (a) noise insulation does not already exist that is of an equivalent standard to that which would be allowed for under the Noise Insulation (Railways and other Guided Systems) Regulations 1996 (the ‘1996 Regulations’); or (b) grants for noise insulation works in accordance with the Land Compensation Act 1973 have not already been paid. 3 Residential property (ground borne noise and vibration) 3.1 The following ground borne noise and vibration trigger values apply for off-site mitigation— 3.1.1 ground borne noise measured near, but not at, the centre of any room in a property— 45 dB LASmax. 3.1.2 ground borne vibration measured at the centre of any floor in a property— (a) daytime (7am to 11pm)— a vibration dose value (VDVb) of 0.8m/s1.75; and (b) night-time (11pm to 7am)— a vibration dose value (VDVb) of 0.4m/s1.75. 3.2 Temporary respite accommodation will be triggered if the predicted or measured vibration exceeds the trigger levels in the property for more than one day. 3.3 At any residential property where noise insulation cannot reasonably be installed the trigger value for temporary rehousing shall be the same as the trigger value for noise insulation as set out in Table 1. 4 Special cases— Residential 4.1 Night shift worker— the night-time trigger values in paragraphs 4.2.1 and 4.2.2 shall apply during the day and evening. 4.2 Vulnerable persons (as defined in the Non-statutory off-site mitigation and compensation policy (application document number— APP210.01))— 4.2.1 for airborne and ground borne noise the trigger levels at 2 and 3.1.1 minus 10 dB shall apply; 4.2.2 for ground borne vibration the trigger values at paragraph 3.1.2 divided by 2 shall apply. 5 Special cases - houseboats 5.1 Development shall not commence at Putney Embankment Foreshore, Kirtling Street, Heathwall Pumping Station or Chambers Wharf until trigger values for noise insulation and temporary rehousing in relation to noise and vibration impacts on houseboats in the vicinity of those work sites have been submitted to and approved by the relevant planning authority. 5.2 Trigger values for temporary rehousing where noise insulation in relation to houseboats cannot reasonably be installed shall be the same as the trigger values for noise insulation agreed under paragraph 5.1. 5.3 Thereafter the approved values shall be applied as the trigger values for houseboats as a special case. 6 Special cases— community facilities 6.1 Airborne noise trigger levels are set 5 dB above the prevailing ambient noise level (indoors or outdoors) or the guidelines / limits set in the following whichever is the higher— (a) BS8233 (1999) Sound Insulation and Noise Reduction for Buildings. Code of Practice. British Standards Institution; (b) Education Funding Agency (2012). Acoustics Performance Standards for the Priority Schools Building Programme. Department for Education. The Stationery Office Limited; (c) Department for Health (2011). Acoustics— Technical Design Manual 4032—0.3. The Stationery Office Limited; and (d) British Council for Offices (2009). Guide to Specification. |
| Notice of maintenance works | PW18 | The undertaker shall give notice to the relevant planning authority not less than 28 days in advance of carrying out ten yearly maintenance operations for any works at any of the sites in the area of the relevant planning authority. Such notice will provide a description of the works to be undertaken, the location and extent of the works, estimated duration and means of access to the site and necessary arrangements for maintenance/provision of associated services to be provided to the sites. |
| Baseline monitoring | PW19 | Development at any work site shall not commence until ambient noise monitoring has been carried out at sensitive receptors in the vicinity of that work site and the following conditions have been met- (a) locations for ambient baseline noise monitoring have been submitted to and approved by the relevant planning authority. (b) a method statement for noise monitoring, to include the duration of monitoring, has been submitted to and approved by the relevant planning authority. (c) noise monitoring has been carried out at the approved locations in accordance with the approved method statement. (d) the results of the noise monitoring have been submitted to the relevant planning authority. |
| Day | Time | Averaging period, T |
| --- | --- | --- |
| Mondays to Fridays | 7am to 8am | 1 hour |
| Mondays to Fridays | 8am to 6pm | 10 hours |
| Mondays to Fridays | 6pm to 7pm | 1 hour |
| Mondays to Fridays | 7pm to 10pm | 1 hour |
| Saturdays | 7am to 8am | 1 hour |
| Saturdays | 8am to 1pm | 5 hours |
| Saturdays | 1pm to 2pm | 1 hour |
| Saturdays | 2pm to 10pm | 1 hour |
| Sundays and Public Holidays | 7am to 10pm | 1 hour |
| Night-time Any day | 10pm to 7am | 1 hour |
Acton Storm Tanks
3
The table below sets out the specific requirements for the Acton Storm Tanks site—
| Title | Ref | Text |
|---|---|---|
| CoCP Part B | ACTST1 | Until completion of construction the authorised development shall be carried out in accordance with the CoCP Part A subject to the site specific variations set out in CoCP Part B for this site, unless otherwise agreed with the relevant planning authority in consultation with other relevant stakeholders. |
| Detailed design approval for permanent above-ground structures | ACTST2 | (1) Construction of any permanent above-ground structure shall not commence until details of the design (including size, external appearance and samples of materials) of these structures, which shall accord with the appropriate design principles for this site and the Site works parameter plan, are submitted to and approved by the relevant planning authority. (2) The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority. |
| Contaminated land | ACTST3 | Site-specific remediation strategy (1) No works shall be carried out at this site (except for demolition of existing buildings, works in the highway including site access, works to trees and installation of monitoring equipment) until the following are submitted to and approved by the relevant planning authority in consultation with the Environment Agency— a preliminary risk assessment and site investigation scheme which identifies— all previous uses potential contaminants associated with those uses a conceptual model of the site indicating sources, pathways and receptors a qualitative risk assessment of any potentially unacceptable risks arising from contamination at the site a proposed site investigation scheme providing information for a detailed quantitative assessment of the risk to all receptors that may be affected, including those off-site. a remediation strategy which includes— a detailed quantitative risk assessment an options appraisal giving full details of the remediation measures required and how they shall be carried out a verification plan providing details of the data to be collected in order to demonstrate that the works set out in the remediation strategy are complete and identifying any requirements for long-term monitoring of pollutant linkages, maintenance and arrangements for contingency action a programme for the submission of elements detailed in (3) and (4) below. (2) The authorised development shall be carried out in accordance with the approved details, unless otherwise agreed with the relevant planning authority in consultation with the Environment Agency. Verification report (3) Prior to completion of the works, a verification report demonstrating completion of the works set out in the approved remediation strategy and the effectiveness of the remediation shall be submitted to and approved by the relevant planning authority in consultation with the Environment Agency. The report shall include results of sampling and monitoring carried out in accordance with the approved details to demonstrate that the site remediation criteria were met. It shall also include a plan for long-term monitoring of pollutant linkages, maintenance and arrangements for contingency action as identified in the verification plan. (4) The long-term monitoring and maintenance plan shall be implemented in accordance with the approved details, unless otherwise agreed with the relevant planning authority in consultation with the Environment Agency. Unexpected contamination (5) If, in carrying out any works on this site, contamination not previously identified is found to be present, then unless otherwise agreed by the relevant planning authority, no further development or works shall be carried out in the part of the site in which the contamination is identified until a remediation strategy is submitted to and approved by the relevant planning authority in consultation with the Environment Agency. The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority. |
| Archaeology | ACTST4 | Site-specific archaeological written scheme of investigation (1) No excavation shall be carried out until a SSAWSI (which shall accord with the OAWSI) is submitted to and approved by the relevant planning authority in consultation with the HBMCE. (2) The authorised development shall be carried out in accordance with the approved details by a suitably qualified person or body. |
| Landscaping works | ACTST5 | (1) Construction of the permanent above-ground structures shall not commence until details of the landscaping works, which shall accord with the indicative Landscape plan (Drawing Nos. DCO-PP-02X-ACTST-050010 and DCO-PP-02X-ACTST-050011) and the design principles for this site, are submitted to and approved by the relevant planning authority. (2) Unless otherwise agreed by the relevant planning authority, the landscaping information required in paragraph (1) above shall comprise details of all hard and soft landscaping works including: a. location, quantity, species, size and density of any proposed planting b. cultivation, importation of materials and other operations to ensure plant establishment c. monitoring and maintenance (including any maintenance or restoration of landscaping required after tunnel commissioning) d. proposed finished ground levels e. hard-surfacing materials f. minor structures such as furniture, refuse or other storage units, signs and lighting g. retained historic landscape features and proposals for restoration, where relevant h. a programme for implementation of all landscaping works i. details of fencing/enclosures j. vehicular and pedestrian access, parking and circulation areas, (including details of areas of public access) k. proposed and existing functional services above and below ground, including drainage, power and communications cables and pipelines, manholes and supports l. details of existing trees to be retained (3) The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority. (4) The approved landscaping works shall be carried out by suitably trained or qualified personnel to a reasonable standard in accordance with the relevant recommendations of appropriate British Standards or other recognised codes of good practice. Replacement trees and shrubs (5) If, within a period of five years from the date of the planting of any tree or shrub, that tree or shrub (or any tree or shrub planted to replace it) is uprooted or destroyed or dies, another tree or shrub of the same species and size as that originally planted shall be planted in the same place, unless the relevant planning authority approves any variation. |
| Construction traffic management plan | ACTST6 | (1) Work No. 2a shall not commence until a traffic management plan (which shall accord with the CoCP) is submitted to and approved by the relevant planning authority in consultation with TfL. (2)The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority in consultation with TfL. |
| Travel plan | ACTST7 | (1) Work No. 2a shall not commence until a site-specific construction workforce travel plan, which shall accord with the Draft Project Framework Travel Plan, is submitted to and approved by the relevant planning authority in consultation with TfL. (2) The approved travel plan(s) shall be implemented from commencement of Work No. 2a and remain in place for the duration of the construction works, unless otherwise approved by the relevant planning authority in consultation with TfL. |
| Highway works | ACTST8 | Junction changes (1) Works to the Canham Road / Stanley Gardens junction shall not commence until details of those works are submitted to and approved by the local highway authority. Road strengthening (2) Road strengthening works to Canham Road shall not commence until details of those works are submitted to and approved by the local highway authority. Footpath widening (3) Works to widen the public footpath along the Canham Road frontage shall not commence until details of those works are submitted to and approved by the local highway authority. (4) The works shall be completed within 3 months of commencement of construction. (5) The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the local highway authority. |
| Specification of accesses (construction and operational) | ACTST9 | (1) No alterations shall be made to any existing access or any new access provided until details of the design, which shall accord with the design principles for this site, are submitted to and approved by the local highway authority. Any such works shall be completed prior to their use. (2) The authorised development shall be carried out in accordance with the approved details, unless otherwise agreed by the highway authority. |
| Surface water drainage | ACTST10 | (1) Construction of permanent above-ground structures or landscaping shall not commence until details of the surface water drainage system for this site (including means of pollution control, an assessment of the hydrological and hydrogeological context and details of how the scheme shall be maintained and managed following completion) in accordance with the appropriate design principles are submitted to and approved by the relevant planning authority in consultation with the Environment Agency. (2) The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority in consultation with the Environment Agency, and completed prior to use of the authorised development. |
| Lighting (operational phase) | ACTST11 | (1) Use of the authorised development shall not commence until details of the operational lighting, which shall accord with the design principles for this site, are submitted to and approved by the relevant planning authority. (2) The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority. |
Hammersmith Pumping Station
4
The table below sets out the specific requirements for the Hammersmith Pumping Station site—
| Title | Ref | Text |
|---|---|---|
| CoCP Part B | HAMPS1 | Until completion of construction the authorised development shall be carried out in accordance with the CoCP Part A subject to the site specific variations set out in CoCP Part B for this site, unless otherwise agreed with the relevant planning authority in consultation with other relevant stakeholders. |
| Contaminated land | HAMPS2 | Site-specific remediation strategy (1) No works shall be carried out at this site (except for demolition of existing buildings, works in the highway including site access, works to trees and installation of monitoring equipment), unless otherwise agreed, until the following are submitted to and approved by the relevant planning authority in consultation with the Environment Agency— a. a preliminary risk assessment and site investigation scheme which identifies— all previous uses potential contaminants associated with those uses a conceptual model of the site indicating sources, pathways and receptors a qualitative risk assessment of any potentially unacceptable risks arising from contamination at the site a proposed site investigation scheme providing information for a detailed quantitative assessment of the risk to all receptors that may be affected, including those off-site. b. a remediation strategy which includes— a detailed quantitative risk assessment an options appraisal giving full details of the remediation measures required and how they shall be carried out a verification plan providing details of the data to be collected in order to demonstrate that the works set out in the remediation strategy are complete and identifying any requirements for long-term monitoring of pollutant linkages, maintenance and arrangements for contingency action a programme for the submission of elements detailed in (3) and (4) below. (2) The authorised development shall be carried out in accordance with the approved details, unless otherwise agreed with the relevant planning authority in consultation with the Environment Agency. Verification report (3) Prior to completion of the works, a verification report demonstrating completion of the works set out in the approved remediation strategy and the effectiveness of the remediation shall be submitted to and approved by the relevant planning authority in consultation with the Environment Agency. The report shall include results of sampling and monitoring carried out in accordance with the approved details to demonstrate that the site remediation criteria were met. It shall also include a plan for long-term monitoring of pollutant linkages, maintenance and arrangements for contingency action as identified in the verification plan. (4) The long-term monitoring and maintenance plan shall be implemented in accordance with the approved details, unless otherwise agreed with the relevant planning authority in consultation with the Environment Agency. Unexpected contamination (5) If, in carrying out any works on this site, contamination not previously identified is found to be present, then unless otherwise agreed by the relevant planning authority, no further development or works shall be carried out in the part of the site in which the contamination is identified until a remediation strategy is submitted to and approved by the relevant planning authority in consultation with the Environment Agency. The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority. |
| Archaeology | HAMPS3 | Site-specific archaeological written scheme of investigation (1) No excavation shall be carried out until a SSAWSI (which shall accord with the OAWSI) is submitted to and approved by the relevant planning authority in consultation with the HBMCE. (2) The authorised development shall be carried out in accordance with the approved details by a suitably qualified person or body. |
| Construction traffic management plan | HAMPS4 | (1) Work No. 3a shall not commence until a traffic management plan (which shall accord with the CoCP) is submitted to and approved by the relevant planning authority in consultation with TfL. (2) The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority in consultation with TfL. |
| Travel plan | HAMPS5 | (1) Work No. 3a shall not commence until a site-specific construction workforce travel plan, which shall accord with the Draft Project Framework Travel Plan, is submitted to and approved by the relevant planning authority in consultation with TfL. (2) The approved travel plan(s) shall be implemented from commencement of Work No. 3a and 3b and remain in place for the duration of the construction works, unless otherwise approved by the relevant planning authority in consultation with TfL. |
| Specification of accesses (construction and operational) | HAMPS6 | (1) No alterations shall be made to any existing access or any new access provided until details of the design, which shall accord with the design principles for this site, are submitted to and approved by the local highway authority. Any such works shall be completed prior to their use. (2)The authorised development shall be carried out in accordance with the approved details, unless otherwise agreed by the highway authority. |
| Surface water drainage | HAMPS7 | (1) Construction of the permanent above-ground structures or landscaping shall not commence until details of the surface water drainage system for this site (including means of pollution control, an assessment of the hydrological and hydrogeological context and how the scheme shall be maintained and managed following completion), which shall accord with the design principles for this site, shall be submitted to and approved by the relevant planning authority in consultation with the Environment Agency. (2) The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority in consultation with the Environment Agency, and completed prior to use of the authorised development. |
| Detailed design approval for permanent above-ground structures | HAMPS8 | (1) Construction of any permanent above-ground structure shall not commence until details of the design (including size, external appearances and samples of materials), which shall accord with the appropriate design principles for this site and the Site works parameter plan, are submitted to and approved by the relevant planning authority. (2) The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority. |
| Heritage interpretation | HAMPS9 | (1) Prior to completion of the works (save for commissioning) any relevant details applicable to this site from the project wide heritage strategy required by PW11 shall be submitted to and approved by the relevant planning authority. (2) The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority. |
Barn Elms
5
The table below sets out the specific requirements for the Barn Elms site—
| Title | Ref | Text |
|---|---|---|
| CoCP Part B | BAREL1 | Until completion of construction the authorised development shall be carried out in accordance with the CoCP Part A subject to the site specific variations set out in CoCP Part B for this site, unless otherwise agreed with the relevant planning authority in consultation with other relevant stakeholders. |
| Detailed design approval for permanent above-ground structures | BAREL2 | (1) Construction of any permanent above-ground structure shall not commence until details of the design (including size, external appearance and samples of materials), which shall accord with the design principles for this site, the Site works parameter plan and the indicative Kiosk and ventilation column design intent plan (Drawing No. DCO-PP-04X-BAREL-070017), are submitted to and approved by the relevant planning authority. (2) The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority. |
| Contaminated land | BAREL3 | Site-specific remediation strategy (1) No works shall be carried out at this site (except for demolition of existing buildings, works in the highway including site access, works to trees and installation of monitoring equipment), unless otherwise agreed, until the following are submitted to and approved by the relevant planning authority in consultation with the Environment Agency— a. a preliminary risk assessment and site investigation scheme which identifies— all previous uses potential contaminants associated with those uses a conceptual model of the site indicating sources, pathways and receptors a qualitative risk assessment of any potentially unacceptable risks arising from contamination at the site a proposed site investigation scheme providing information for a detailed quantitative assessment of the risk to all receptors that may be affected, including those off-site. b. a remediation strategy which includes— (i) a detailed quantitative risk assessment (ii) an options appraisal giving full details of the remediation measures required and how they shall be carried out (iii) a verification plan providing details of the data to be collected in order to demonstrate that the works set out in the remediation strategy are complete and identifying any requirements for long-term monitoring of pollutant linkages, maintenance and arrangements for contingency action (iv) a programme for the submission of elements detailed in (3) and (4) below. (2) The authorised development shall be carried out in accordance with the approved details, unless otherwise agreed with the relevant planning authority in consultation with the Environment Agency. Verification report (3) Prior to completion of the works, a verification report demonstrating completion of the works set out in the approved remediation strategy and the effectiveness of the remediation shall be submitted to and approved by the relevant planning authority in consultation with the Environment Agency. The report shall include results of sampling and monitoring carried out in accordance with the approved details to demonstrate that the site remediation criteria were met. It shall also include a plan for long-term monitoring of pollutant linkages, maintenance and arrangements for contingency action as identified in the verification plan. (4) The long-term monitoring and maintenance plan shall be implemented in accordance with the approved details, unless otherwise agreed with the relevant planning authority in consultation with the Environment Agency. Unexpected contamination (5) If, in carrying out any works on this site, contamination not previously identified is found to be present, then unless otherwise agreed by the relevant planning authority, no further development or works shall be carried out in the part of the site in which the contamination is identified until a remediation strategy is submitted to and approved by the relevant planning authority in consultation with the Environment Agency. The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority. |
| Archaeology | BAREL4 | Site-specific archaeological written scheme of investigation (1) No excavation shall be carried out until a SSAWSI (which shall accord with the OAWSI) is submitted to and approved by the relevant planning authority in consultation with the HBMCE. (2) The authorised development shall be carried out in accordance with the approved details by a suitably qualified person or body. |
| Landscaping works | BAREL5 | (1) Construction of the permanent above-ground structures shall not commence until details of the landscaping, which shall accord with the indicative Proposed landscape plan (Drawing No. DCO-PP-04X-BAREL-070013) and the design principles for this site, are submitted to and approved by the relevant planning authority. (2) Unless otherwise agreed by the relevant planning authority, the landscaping information required in paragraph (1) above shall comprise details of all hard and soft landscaping works including: a. location, quantity, species, size and density of any proposed planting b. cultivation, importation of materials and other operations to ensure plant establishment c. monitoring and maintenance (including any maintenance or restoration of landscaping required after tunnel commissioning) d. proposed finished ground levels e. hard-surfacing materials f. minor structures such as furniture, refuse or other storage units, signs and lighting g. retained historic landscape features and proposals for restoration, where relevant h. a programme for implementation of all landscaping works i. details of fencing/enclosures j. vehicular and pedestrian access, parking and circulation areas, (including details of areas of public access) k. proposed and existing functional services above and below ground, including drainage, power and communications cables and pipelines, manholes and supports l. details of existing trees to be retained (3) The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority. (4) The approved landscaping works shall be carried out by suitably trained or qualified personnel to a reasonable standard in accordance with the relevant recommendations of appropriate British Standards or other recognised codes of good practice. Replacement trees and shrubs (5) If, within a period of five years from the date of the planting of any tree or shrub, that tree or shrub (or any tree or shrub planted to replace it) is uprooted or destroyed or dies, another tree or shrub of the same species and size as that originally planted shall be planted in the same place, unless the relevant planning authority approves any variation. |
| Construction traffic management plan | BAREL6 | (1) Work No. 4a shall not commence until a traffic management plan (which shall accord with the CoCP) is submitted to and approved by the relevant planning authority in consultation with TfL. (2) The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority in consultation with TfL. |
| Travel plan | BAREL7 | (1) Work No. 4a shall not commence until a site-specific construction workforce travel plan, which shall accord with the Draft Project Framework Travel Plan, is submitted to and approved by the relevant planning authority in consultation with TfL. (2) The approved travel plan(s) shall be implemented from commencement of development of Work Nos. 4a and 4b and remain in place for the duration of the construction works, unless otherwise approved by the relevant planning authority in consultation with TfL. |
| Specification of accesses (construction and operational) | BAREL8 | (1) Authorised development consisting of construction in or alteration of Rocks Lane or the construction or alteration of any highway structures which form part of Rocks Lane shall not commence until details of the design, which shall accord with the design principles for this site, are submitted to and approved by the local highway authority. Any such works shall be completed prior to their use. (2) The information required in paragraph 1 above shall include details of any permanent works for a new or altered surface and foul water drainage system for Rocks Lane and any permanent works for a new or modified highway lighting scheme for Rocks Lane. (3) The authorised development shall be carried out in accordance with the approved details, unless otherwise agreed by the highway authority. |
| Surface water drainage | BAREL9 | (1) Construction of the permanent above-ground structures or landscaping shall not commence until details of the surface water drainage system for this site (including means of pollution control, an assessment of the hydrological and hydrogeological context and how the scheme shall be maintained and managed following completion), which shall accord with the design principles for this site, are submitted to and approved by the relevant planning authority in consultation with the Environment Agency. (2) The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority in consultation with the Environment Agency, and completed prior to use of the authorised development. |
| Re-provision of changing rooms | BAREL10 | (1) Construction of the permanent replacement changing room shall not commence until details (including its location), which shall accord with the appropriate design principles, are submitted to and approved by the relevant planning authority. (2) The existing changing room facility shall not be demolished until the replacement changing room is complete and available for use, or a temporary replacement facility is installed and available for use. Any temporary replacement changing room facility shall not be installed until details are submitted to and approved by the relevant planning authority. (3) If any temporary replacement facility is installed, then a permanent replacement changing room shall subsequently be provided prior to the completion of the works at the site. |
| Relocation of track and field facilities | BAREL11 | Construction of the access road (Work No. 4c (ii)) shall not commence until details of the relocated track and field facilities are submitted to and approved by the relevant planning authority. The authorised development shall be carried out in accordance with the approved details. |
| Construction and operational access road | BAREL12 | (1) Construction of the proposed construction access road (Work No. 4c (ii)) shall not commence until details of the design of the construction access road including its alignment, vehicle passing points and hoarding arrangements, are submitted to and approved by the relevant planning authority in consultation with the landowner (the London Borough of Wandsworth). (2) Construction of the proposed permanent access road shall not commence until details of the design of the permanent access road, including its alignment and surface materials, are submitted to and approved by the relevant planning authority in consultation with the landowner (the London Borough of Wandsworth). (3) The authorised development shall be carried out in accordance with the approved details, unless otherwise approved by the relevant planning authority. |
| Commissioning works | BAREL13 | (1) On or before the completion of the landscaping works approved further to requirement BAREL5 (landscaping), the undertaker shall give notice to the relevant planning authority. (2) (Save for works carried out in accordance with (5) below) within 1 month of the notice under (1) the undertaker shall: a. remove all hoarding or other temporary enclosure from the site; and b. make the site available for sports use in accordance with the approved landscape scheme. (3) The undertaker shall provide a ‘commissioning notice’ to the relevant planning authority at least 2 months before undertaking any commissioning works. The notice shall include: a. a programme for the commissioning works; and b. a location plan for any fencing or hoarding associated with those works (including identifying areas to be available for sports use). (4) The undertaker shall provide a ‘commissioning confirmation notice’ 21 days prior to starting the commissioning works, confirming the date of commencement of commissioning. (5) The commissioning works shall be undertaken in accordance with the programme in the commissioning notice and the location plan unless otherwise agreed with the relevant planning authority. |
Putney Embankment Foreshore
6
The table below sets out the specific requirements for the Putney Embankment Foreshore site—
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.