The Offshore Installations (Safety Zones) Order 2015

Type Statutory-Instrument
Publication 2015-02-23
Last updated 2015-07-14
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API

Made: 23rd February 2015

Coming into force in accordance with article 1(2)

The Secretary of State makes this Order— in exercise of the powers conferred by section 22 of the Petroleum Act 1987[^f00001]; and for the purpose of giving effect to proposals submitted to him by the Health and Safety Executive under section 24(2A)[^f00002] of that Act.

in exercise of the powers conferred by section 22 of the Petroleum Act 1987[^f00001]; and

for the purpose of giving effect to proposals submitted to him by the Health and Safety Executive under section 24(2A)[^f00002] of that Act.

Citation and commencement

1

Establishment of safety zones

2

SCHEDULE — INSTALLATIONS

(1)Name or other designation of the offshore installation (2)Latitude (3)Longitude
Catcher Area Development Project, Block 28/9a, Burgman Field 56°44.55′ North 00°40.61′ East
Catcher Area Development Project, Block 28/9a, Catcher Field 56°46.30′ North 00°46.30′ East
Catcher Area Development Project, Block 28/9a, Varadero Field 56°48.37′ North 00°42.30′ East
Cawdor Manifold and Production Wells, Block 30/13a, CawdorField 56°32.35′ North 02°34.47′ East
Cayley/Montrose Intermediate Towheads, Block 22/17s, Cayley Field 57°26.16′ North 01°18.42′ East
Cladhan Field Development Project, Block 210/9a and 210/30a, Cladhan Field 61°08.86′ North 00°47.17′ East
Flyndre Manifold and Production Wells, Block 30/14a, Flyndre Field 56°33.55′ North 02°37.85′ East
Golden Eagle Northern Drill Centre, Block 14/26a, Golden Eagle Field 58°00.79′ North 00°55.38′ West
Shaw Drill Centre, Block 22/22a, Montrose Field 57°17.81′ North 01°21.77′ East
Shaw Water Injection, Block 22/22a, Montrose Field 57°17.37′ North 01°22.31′ East
Western Isles SDC Development Project, Block 210/24a, Barra Field 61°11.74′ North 00°43.67′ East

Signed

Signed by authority of the Secretary of State for Work and Pensions

Freud — Parliamentary Under Secretary of State — Department for Work and Pensions — 23rd February 2015

Explanatory note

(This note is not part of the Order)

EXPLANATORY NOTE

The Order establishes, under section 22 of the Petroleum Act 1987, safety zones having a radius of 500 metres from the specified point around the eleven installations (which are subsea installations) specified in the Schedule to this Order to be stationed in waters to which section 21(7) of that Act applies (these include territorial waters and waters in areas designated under section 1(7) of the Continental Shelf Act 1964 (c. 29)).

Vessels, which for this purpose include hovercraft, submersible apparatus and installations in transit, are prohibited from entering or remaining in a safety zone except with the consent of the Health and Safety Executive or in accordance with regulations made under section 23(1) of the Petroleum Act 1987 (currently the Offshore Installations (Safety Zones) Regulations 1987 (S.I. 1987/1331)).

The United Kingdom Hydrographic Office (UKHO) (http://www.ukho.gov.uk/Pages/Home.aspx) publishes nautical charts covering the area in which installations are located, which include information on the existence and, where the scale allows, the location of safety zones. Mariners are advised to keep paper charts up-to-date using appropriate Notices to Mariners or, where electronic charts are used, to subscribe to an appropriate updating service. Vessels meeting the requirements of the International Convention for the Safety of Life at Sea 1974 will carry nautical charts and nautical publications (such as Notices to Mariners) to plan and display the ship’s route for the intended voyage and to plot and monitor positions throughout the voyage. This may be compulsory for some vessels, for example under the Merchant Shipping (Safety of Navigation) Regulations 2002 (S.I. 2002/1473). The UKHO also broadcasts Radio Navigational Warnings in relation to safety zones where updates to charts have yet to take effect and where installations are in transit.

Maritime safety information, which includes information on safety zones, is issued via the appropriate International Maritime Organisation, Global Maritime Distress and Safety System broadcast systems as defined by the World-Wide Navigational Warning Service.

It is estimated that the installations, which are not on station at the time of making this Order, will arrive at their stations at the approximate time set opposite their name in the table below:

Name of installation Estimated arrival at station
Catcher Area Development Project, Burgman Field 1st May 2015
Catcher Area Development Project, Catcher Field 1st May 2015
Catcher Area Development Project, Varadero Field 1st May 2015
Cawdor Manifold and Production Wells 1st April 2015
Cayley/Montrose Intermediate Towheads 1st March 2015
Cladhan Field Development Project 1st May 2015
Flyndre Manifold and Production Wells 1st April 2015
Golden Eagle Northern Drill Centre 1st May 2015
Shaw Drill Centre 1st April 2015
Shaw Water Injection 1st April 2015
Western Isles SDC Development Project 28th February 2015

Footnotes

[^f00001]: 1987 c. 12.

[^f00002]: Section 24(2A) was inserted by S.I. 1993/1823 and amended by S.I. 2008/960.

[^f00003]: The World Geodetic System 1984 (“WGS 84”) defines a reference frame for the earth, for use in geodesy and navigation. It was developed by the United States’ National Geospatial-Intelligence Agency and is maintained by it. WGS 84 is defined at paragraph 2.1 of the United States’ National Imagery and Mapping Agency Technical Report TR8350.2, third edition, amendment 1 of 3rd January 2000 entitled “Department of Defense World Geodetic System 1984” (http://earth-info.nga.mil/GandG/publications/tr8350.2/wgs84fin.pdf).

Editorial notes

[^key-29ade558fcff9798b6d604402c425d30]: Art. 1 in force at 18.3.2015, see art. 1(2)

[^key-da6a6f0f9d7ac3333effca1278c42322]: Art. 2(1) comes into force in accordance with art. 2(2)

[^key-fef91d1d6dcaa256b19f91425c316918]: Art. 2(2) in force at 18.3.2015, see art. 1(2)

[^key-d95964030b6207e09d8f688d7b3b8557]: Sch. in force in accordance with art. 2(2)

[^key-271530a9b27c6c54b6e2da161c52dcbe]: Words in Sch. substituted (14.7.2015) by The Offshore Installations (Safety Zones) (No. 2) Order 2015 (S.I. 2015/1406), arts. 1(2), 3

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.