The Progress Power (Gas Fired Power Station) (Amendment) Order 2016

Type Statutory-Instrument
Publication 2016-11-11
State In force
Department Queen's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API

Made: 11th November 2016

Coming into force: 12th November 2016

Accordingly, the Secretary of State, in exercise of the powers conferred by paragraphs 2(1) and (9) of Schedule 6 to the Planning Act 2008, makes the following Order—

Citation and commencement

1

This Order may be cited as the Progress Power (Gas Fired Power Station) (Amendment) Order 2016 and comes into force on 12th November 2016.

Amendment to the Progress Power (Gas Fired Power Station) Order 2015

2

The Progress Power (Gas Fired Power Station) Order 2015 (“the 2015 Order”) is amended in accordance with this Order.

Amendments to Schedule 1 (authorised development)

3

(e) three black start diesel generators where one gas turbine generator is constructed and one black start diesel generator where two, three, four or five gas turbine generators are constructed;

(h) external fin fan cooler (where only one gas turbine generator is constructed).

Amendments to Schedule 2 (requirements)

4

In Schedule 2 (requirements) to the 2015 Order, Table 2 is replaced by Table 2 in the Schedule to this Order.

SCHEDULE

Building or structure Maximum height (metres above existing site level of approx-imately 48.5 metres AOD) Minimum height (metres above existing site level of approx-imately 48.5 metres AOD) Maximum length (metres) Minimum length (metres) Maximum width (metres) Minimum width (metres)
Each gas turbine generator (where one gas turbine generator is constructed) (part of numbered work 1A) 19.0 50.0 40.0
Each gas turbine generator (where two gas turbine generators are constructed) (part of numbered work 1A) 19.0 30.0 30.0
Each gas turbine generator (where three, four or five gas turbine generators are constructed) (part of numbered work 1A) 10.0 36.0 23.0
Each exhaust gas emission flue stack (where one gas turbine generator is constructed) (part of numbered work 1A) 30.0 25.0 11.0 (up to and including a height of 16.5 metres above 48.5 metres AOD) and 10.0 (from a height exceeding 16.5 metres above 48.5 metres AOD to a height of 30.0 metres above 48.5 metres AOD)
Each exhaust gas emission flue stack (where two gas turbine generators are constructed) (part of numbered work 1A) 30.0 25.0 8.4
Each exhaust gas emission flue stack (where three, four or five gas turbine generators are constructed) (part of numbered work 1A) 30.0 25.0 6.0
Control room/office/ workshop (part of numbered work 1B) 6.0 29.0 23.0
Each black start diesel generator (part of numbered work 1B) 5.0 17.0 5.0
Raw/fire water tank (part of numbered work 1B) 11.0 11.0 11.0
Demineralised water tank (part of numbered work 1B) 2.0 2.0 2.0
Natural gas receiving station (part of numbered work 1B) 5.0 50.0 36.0
Gas treatment compound (part of numbered work 1B) 5.0 29.0 16.0
External fin fan cooler (where only one gas turbine generator is constructed) (part of numbered work 1B) 6.0 - 13.0 - 10.0 -
Switchyard /banking compound (part of numbered work 1C) 11.3 60.0 60.0
Switchgear building (part of numbered work 1C) 11.3 21.0 15.0
Gatehouse (part of numbered work 1D) 4.5 9.0 8.0
Above ground installation (part of numbered work 3A) 3.0 72.0 52.0
Pipeline inspection gauge facility (part of numbered work 3A) 2.0 36.0 27.0
Minimum offtake connection (part of numbered work 3A) 2.0 36.0 25.0
Sealing end compound (part of numbered work 5) 12.5 22.0 45.0
Substation:
(gas insulated substation) – (maximum compound size) (part of numbered work 5) 12.5 80.0 100.0
(gas insulated substation) – (indoor switchgear hall) (part of numbered work 5) 12.5 21.0 62.0

Signed

Signed by authority of the Secretary of State for Business, Energy and Industrial Strategy

Giles Scott — Head of Energy Infrastructure Planning and Coal Liabilities — Department for Business, Energy and Industrial Strategy — 11th November 2016

Explanatory note

(This note is not part of the Order)

EXPLANATORY NOTE

This Order amends the Progress Power (Gas Fired Power Station) Order 2015, a development consent order under the Planning Act 2008, following an application made in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 for a non-material change under paragraph 2 of Schedule 6 to the Planning Act 2008. This Order amends the description of the authorised development (see article 3) and some of the requirements of the authorised development (see article 4 and the Schedule).

Footnotes

[^f00001]: 2008 c. 29. Paragraph 2 was amended by paragraph 4 of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23), by paragraphs 1 and 72 of Schedule 13 to the Localism Act 2011 (c. 20), and by section 28 of the Infrastructure Act 2015 (c.7). There are other amendments to the Act that are not relevant to this Order.

[^f00002]: S.I. 2011/2055, as amended by S.I. 2012/635 and S.I. 2015/760.

[^f00003]: S.I. 2015/1570, as amended by S.I. 2016/736.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.