The Meaford Gas Fired Generating Station Order 2016

Type Statutory-Instrument
Publication 2016-07-19
Last updated 2017-01-01
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API
  • (b) any other plans, drawings, documents, details, schemes, statements or strategies which are approved by the relevant planning authority pursuant to any requirement (as the same may be amended by approval of the relevant planning authority pursuant to requirement 19(1))—
works plans Submission document reference number 2.3
access rights of way plan Submission document reference number 2.4
  • (2) The authorised development must not exceed the maximum parameters specified in Table 2 and Table 3 below (as the same may be amended by approval of the relevant planning authority under requirement 19(1))—
(1) Element of authorised development (2) Maximum height (metres) above a site level of approximately 99 metres AOD (3) Maximum width (metres) (4) Maximum length (metres) (5) Other parameters
Gas turbine building (part of numbered work 1A) 25 metres 45 metres 60 metres Maximum height 124m AOD
Each Heat Recovery Steam Generator Building (part of numbered work 1A) 35 metres 13 metres 25 metres Maximum height AOD 134 metres
Each exhaust gas emission flue stack (part of numbered work 1A) 50 metres – – Maximum height AOD 149 metres Maximum diameter 6.5 metres
Steam turbine building (part of numbered work 1A) 21 metres 26 metres 45 metres –
Air cooled condenser (part of numbered work 1A) 26 metres 48 metres 48 metres –
Switchgear room (part of numbered work 1A) 5 metres 10 metres 15 metres –
Raw/fire water storage tank (part of numbered work 1B) 20 metres – – Maximum diameter 15 metres
Each water storage tank (part of numbered work 1B) 20 metres – – Maximum diameter 5 metres
Water treatment system (part of numbered work 1B) 10 metres 25 metres 20 metres –
Workshop (part of numbered work 1B) 10 metres 20 metres 30 metres –
Natural gas pressure regulating installation (PRI) (part of numbered work 1B) 5 metres 25 metres 35 metres –
Administration/ control building (part of numbered work 1C) 10 metres 10 metres 20 metres –
Heat network interface building (part of numbered work 1C) 15 metres 20 metres 30 metres –
Each transformer compound (part of numbered work 1D) 8 metres 15 metres 15 metres –
132kV switchyard (part of work numbered 1D) 10 metres 42 metres 72 metres –
Perimeter fencing (part of numbered work 1E) 2.5 metres – 770 metres –
(1) Element of authorised development (2) Maximum height (metres) above the existing site level (3) Maximum width (metres) (4) Maximum length (metres) (5) Other parameters
--- --- --- --- ---
Above Ground Installation (numbered work 2A) 2.5 metres 13 metres 13 metres –
Pipeline inspection gauge facility (part of numbered work 2A) 1.6 metres 1 metre 5.5 metres –
Perimeter fencing (part of numbered work 2A) 2.5 metres – 52 metres –
Pipeline support plinth including crown of pipe (part of numbered work 2B) 2 metres 0.8 metres 1.4 metres –
  • (3) To the extent that design objectives relating to any numbered work are set out in the design objectives statement, that numbered work must be designed substantially in accordance with the relevant design objective set out therein.
  • (4) Numbered works 1, 2 and 4 may not commence until, for that numbered work, written details have been submitted to and approved by the relevant planning authority (in consultation with the National Trust regarding the external appearance and the colour of all permanent buildings and structures) concerning—
  • (a) the siting, design, external appearance, dimensions and floor levels of all permanent buildings and structures; and
  • (b) the colour, materials and surface finishes of the pipeline and all permanent buildings and structures.
  • (5) The details to be submitted for approval under sub-paragraph (4) must include appropriately scaled plans and sectional drawings.

Provision of and implementation and maintenance landscaping

4
  • (1) No authorised development may commence until a landscaping scheme incorporating a written statement and plans has been submitted to and approved by the relevant planning authority. The landscaping scheme must be substantially in accordance with the illustrative landscaping plan and the illustrative cross sections drawing and must include details of all proposed hard and soft landscaping works, including—
  • (a) location, number, species, size and planting density of any proposed planting;
  • (b) site restoration cultivation, importing of materials including topsoil and subsoil handling and storage in accordance with BS 3882:2007 and other landscape reinstatement operations in accordance with BS 4428 Code of Practice for general Landscape Operations, and the earthworks specification to ensure plant establishment;
  • (c) proposed finished ground levels;
  • (d) hard surfacing materials;
  • (e) vehicular access, parking and circulation areas;
  • (f) minor structures, such as furniture, refuse or other storage units, signs and lighting;
  • (g) an arboricultural method statement including details of existing trees and tree groups identified for retention, management and reinforcement with the type and extent of protection to be in accordance with BS 5837: 2012;
  • (h) implementation timetables for all landscaping works;
  • (i) a 10 metre screening vegetation buffer as shown on the indicative landscaping plan;
  • (j) surface water attenuation pond designed to incorporate native marginal planting;
  • (k) the locations of low fertility (where applicable) for invertebrates; and
  • (l) butterfly bank planting.
  • (2) The landscaping works must be carried out in accordance with the approved landscaping scheme.
  • (3) The landscaping works must be carried out in accordance with implementation timetables approved under sub-paragraph (1).
  • (4) Any tree or shrub planted as part of the approved landscaping scheme that, within a period of five years after planting, is removed, dies or becomes, in the opinion of the relevant planning authority, seriously damaged or diseased, must be replaced in the first available planting season with a specimen of the same species and size as that originally planted, unless otherwise approved by the relevant planning authority.
  • (5) The landscaping works must be managed and maintained throughout the life of the MEC to ensure the long term adequacy of the approved landscaping scheme.

Construction and Environment Management Plan

5
  • (1) No authorised development may commence until a construction and environmental management plan has been submitted to and approved by the relevant planning authority. The construction and environmental management plan must be substantially in accordance with the draft construction environment management plan set out in appendix 17.1 to volume 4 of the environmental statement and must include the following—
  • (a) the mechanism for ensuring that all relevant environmental controls and mitigation are incorporated into a construction method statement;
  • (b) confirmation that no explosive blasting will be carried out during any demolition;
  • (c) environmental objectives and targets;
  • (d) environmental monitoring;
  • (e) roles and responsibilities;
  • (f) means of communication, record keeping, reporting, auditing and review;
  • (g) complaints procedures;
  • (h) nuisance management including measures to avoid or minimise the impacts of construction works (covering dust, lighting, noise and vibration);
  • (i) details of construction lighting to protect potential foraging/commuting features;
  • (j) habitats protection measures, including fencing to delineate the Trent and Mersey Canal Local Wildlife Site, protection zones for retained trees and bat roosts, means of escape for badgers and other small mammals;
  • (k) measures to minimise the spread of invasive species;
  • (l) site waste management plan;
  • (m) surface and ground water protection measures (including bunding potential contaminate sources);
  • (n) construction drainage strategy;
  • (o) pre-construction works otter survey to be undertaken beneath Canal Bridge 101 (Malkin’s Bridge);
  • (p) methodology for using harvested water where possible;
  • (q) ecology, landscape and visual impact mitigation (covering protection of trees to be retained and minimising visual intrusion of construction works); and
  • (r) protocol in the event that unexpected contaminated land is identified during ground investigation or construction.
  • (2) The construction works must be undertaken in accordance with the approved construction environment management plan unless otherwise agreed with the relevant planning authority.
  • (3) The undertaker may submit for approval by the relevant planning authority a construction and environment management plan for each of numbered work 1, numbered work. 2, numbered work 3, numbered work 4, numbered work 5, numbered work 6 and numbered work 7 individually, and, in such a case, only those parts of the authorised development forming the numbered work the subject of the construction and environment management plan may be commenced following the approval of such a construction and environment management plan.

Ground investigation

6
  • (1) Numbered work 1 may not commence until an intrusive ground investigation has been undertaken.
  • (2) A geo-environmental interpretative report detailing all investigative works and sampling undertaken pursuant to this requirement, together with the results of the analysis, risk assessment to any receptors and a proposed remediation strategy (if required) must be submitted to the relevant planning authority for approval prior to any remediation commencing.
  • (3) If during any works, contamination is encountered which has not previously been identified under sub-paragraph (1) then the additional contamination must be fully assessed and an appropriate remediation scheme submitted to and approved by the relevant planning authority.
  • (4) Upon completion of the works, a closure report must be submitted to and approved by the relevant planning authority, such closure report to include the following—
  • (a) details of the remediation works;
  • (b) details of any post remediation sampling and analysis to show the site has reached the required clean-up criteria; and
  • (c) any necessary documentation detailing what waste materials have been removed from site.
  • (5) Any remediation strategy approved under sub-paragraph (2) and any remediation scheme approved under sub-paragraph (3) must be implemented in accordance with the approved details.

Piling

7
  • (1) No piling may commence until a piling strategy has been submitted to and approved by the relevant planning authority, such strategy to include a piling risk assessment, the results of such assessment and the piling techniques to be used in carrying out the authorised development.
  • (2) Piling must be carried out in accordance with an approved strategy under paragraph (1).

Fencing and other means of enclosure

8
  • (1) No authorised development may commence until details of the proposed means of enclosure for the authorised development have been submitted to and approved by the relevant planning authority.
  • (2) Fencing and other means of enclosure must be carried out in accordance with the approved details.
  • (3) The undertaker may submit for approval by the relevant planning authority details of the proposed means of enclosure for each of numbered work 1E, numbered work 2A, numbered work 2B, numbered work 5A and numbered work 5B individually and, in such a case, only those parts of the authorised development forming the numbered work the subject of the details of the proposed means of enclosure may be commenced following the approval of such details.

Habitat management plan

9
  • (1) No authorised development may commence until a written habitat management plan, reflecting the survey results and ecological mitigation and enhancement measures, together with ecological monitoring and management included in the environmental statement, has been submitted to and approved by the relevant planning authority.
  • (2) The habitat management plan must include an implementation timetable and must be carried out as approved.
  • (3) The undertaker may submit for approval by the relevant planning authority a written habitat management plan for each of numbered work 1E, numbered work 5B, numbered work 6 and numbered work 7 individually and, in such a case, only those parts of the authorised development forming the numbered work the subject of the written habitat management plan may be commenced following the approval of such a written habitat management plan.

Construction traffic

10
  • (1) No authorised development may commence until a construction traffic management plan has been submitted to and approved by the relevant planning authority in consultation with the relevant highway authority. The construction traffic management plan must be substantially in accordance with the draft construction traffic management plan set out in appendix 7.11 to volume 4 of the environmental statement and must include the following—
  • (a) details of a plan to encourage car sharing between construction workers travelling to the site;
  • (b) construction vehicle routing plans and the reasonable mechanisms to be put in place to enforce compliance;
  • (c) details of a HGV vehicle booking management system;
  • (d) site access plans and 24 hour access arrangements;
  • (e) proposals for the management of junctions to and crossings of highways and other public rights of way;
  • (f) proposals for the scheduling and timing of movements of delivery vehicles including details of abnormal indivisible loads together with the staggering of construction workers start and finish times;
  • (g) route assessment is undertaken before abnormal indivisible loads are brought to the site to assess the need for street furniture removal, if required, and its reinstatement and that pre-notification of deliveries involving abnormal indivisible loads and details of where police escorts would be required;
  • (h) proposals for temporary warning signs and banksman and police escort details;
  • (i) details of the on-site parking arrangements for construction plant and vehicles; and
  • (j) proposals for traffic management controls (such as temporary signals), diversion routes and signage required during construction of the authorised development.
  • (2) The construction traffic management plan must be implemented as approved.
  • (3) The undertaker may submit for approval by the relevant planning authority a construction traffic management plan for and, in such a case, only those parts of the authorised development forming the numbered work the subject of the construction traffic management plan may be commenced following the approval of such a construction traffic management plan.
  • (4) During the operation of the generating station no abnormal indivisible loads may be transported into or out of the site without the prior written approval of the relevant planning authority in consultation the relevant highways authority.

Travel plan during operational phase

11
  • (1) Prior to the date of final commissioning a written operational travel plan must be submitted to and approved by the relevant planning authority. Such operational travel plan to include—
  • (a) objectives and targets; and
  • (b) measures and initiatives to promote sustainable travel.
  • (2) The operational travel plan must be carried out as approved.

Construction hours

12
  • (1) Construction work for the authorised development must not take place outside the hours of—
  • (a) 07:00 to 19:00 on Monday to Friday; and
  • (b) 07:00 to 13:00 Saturdays,

except with the prior written approval of the relevant planning authority.

  • (2) Nothing in sub-paragraph (1) precludes a start-up period from 06:30 to 07:00 and a shut-down period from 19:00 to 19:30 on weekdays (excluding public holidays) and start-up period from 06:30 to 07:00 and a shut-down period from 13:00 to 13:30 on Saturdays.

Foul and surface water drainage

13
  • (1) Numbered work 1 must not commence until written details of the surface and foul water drainage system and sustainable drainage systems, including the subsequent maintenance and management of the system for the operation of the authorised development has been submitted to and approved by the relevant planning authority. The surface and foul water drainage system must be substantially in accordance with the illustrative foul and surface water drainage strategy plan.
  • (2) The surface and foul water drainage system for the authorised development must be constructed in accordance with the approved details.

Artificial lighting

14
  • (1) Prior to the date of final commissioning written details of the control of artificial lighting during maintenance and operation of the authorised development must be submitted to and approved by the relevant planning authority, such details to include measures to keep external lighting to the minimum necessary for operational safety and security reasons, incorporating cut-offs to reduce light pollution.
  • (2) The artificial lighting for the authorised development must be implemented in accordance with the approved details.
  • (3) The undertaker may submit for approval by the relevant planning authority written details of the artificial lighting during maintenance and operation of the authorised development for each of numbered work 1E, numbered work 5A and numbered work 5B individually forming the numbered work the subject of the written details of the control of artificial lighting and, in such a case, only those parts of the authorised development may be commissioned following the approval of such details.
  • (4) Prior to the date of final commissioning the exhaust gas emission flue stack(s) must be fitted, if reasonably required with infra-red light fitted at the highest practicable point of the structure.
  • (5) No authorised development may commence until the undertaker has notified the Defence Geographic Centre (or any successor organisation to the same) with the following information—
  • (a) precise location of development;
  • (b) date of commencement of construction;
  • (c) anticipated date of completion of construction;
  • (d) the height above ground level of the tallest structure;
  • (e) the maximum extension height of any construction equipment; and
  • (f) details of aviation warning lighting fitted to the structure(s).

Emergency Access

15

The undertaker must not use the existing closed access (marked N-O on the access and rights of way plan) unless and until an emergency access strategy has been submitted to and approved by relevant planning authority, such strategy to include details of—

  • (a) how the existing closed access is to be secured at all times (save in an emergency event as outlined in (b); and
  • (b) how and when the existing closed access may be opened in the event of an emergency.

Bridge plinths

16
  • (1) No pipeline support plinths forming numbered work 2B(b)(vi) must be installed on canal bridge 101 (Malkin’s Bridge) as marked on the works plans.
  • (2) The crown of the pipeline over canal bridge 101 must not protrude above the repaired parapet by more than 150mm in height.
  • (3) Numbered work 2B(c) may not commence until a method statement detailing the extent and nature of the repairs for the parapet of Canal Bridge 101 (Malkin’s Bridge) has been submitted to and approved by the relevant planning authority.

Highway works

17
  • (1) For any highway work in a street for which the highway authority is the street authority, prior to the carrying out of any such work authorised pursuant to article 4 (maintenance of authorised development), article 10 (power to alter layout, etc. of streets) or article 11 (street works) of this Order, the undertaker must submit all necessary technical specifications required for that work for the prior approval of the highway authority.
  • (2) The highway work must be carried out in accordance with the approved technical specification.

Local economic benefit

18
  • (1) No part of the authorised development must commence until a scheme for the promotion of local economic benefit from the authorised development in the area of Staffordshire has been submitted to and approved by the relevant planning authority. Such scheme must include—
  • (a) a commitment on the undertaker to invite to tender companies with addresses in Staffordshire as the relevant planning authority may notify to the undertaker in writing;
  • (b) a methodology for the use of local people and local businesses, where appropriate, in relation to the construction of the authorised development; and
  • (c) a strategy for the provision of training opportunities for local companies (who are successful under sub-paragraph (a)) or local people who are employed to work on the authorised development under sub-paragraph (b).
  • (2) The authorised development must be carried out in accordance with the scheme approved under sub-paragraph (1).

Amendments to approved details

19
  • (1) Save in respect of the approved plans specified in requirement 3(1), the undertaker may submit to the relevant planning authority for approval any amendments to the parameters in Tables 2 and 3 of requirement 3(2), plans, drawings, documents, details, schemes, statements or strategies which require approval by the relevant planning authority pursuant to any requirement (the “Approved Plans, Details or Schemes”). Following any such approval by the relevant planning authority the Approved Plans, Details or Schemes are to be taken to include the amendments approved pursuant to this sub-paragraph(1).
  • (2) Approval under paragraph 19(1) must not be given except where it has been demonstrated to the satisfaction of the relevant planning authority that the subject-matter of the approval sought is unlikely to give rise to any materially new or materially different environmental effects in comparison with the authorised development as approved (as identified in the environmental statement).

Combined heat and power

20
  • (1) Prior to the date of final commissioning, a review of potential opportunities for the use of heat from the authorised development must be submitted to and approved by the relevant planning authority.
  • (2) The review shall provide for the on-going monitoring and full exploration of potential opportunities to use heat from the authorised development and for the provision of subsequent reviews of such opportunities as necessary.
  • (3) Where viable opportunities for the use of heat are identified, a scheme for the provision of the necessary plant and pipework to the boundary of Work No. 1 shall be submitted to and approved by the relevant planning authority; any plant and pipework installed up to the boundary of Work No.1 to enable the use of heat shall be installed in accordance with the agreed details.

Decommissioning strategy

21
  • (1) Subject to obtaining the necessary consents and unless otherwise agreed with the relevant planning authority, within twenty four months of the Order land ceasing to be used for the purposes of electricity generation (either actively generating electricity or being available to generate electricity on a standby basis), a scheme for the demolition and removal of Work No. 1 must be submitted to the relevant planning authority.
  • (2) The demolition and removal of Work No. 1 must be implemented in accordance with the approved scheme.
  • (3) On the one year anniversary of the Order land ceasing to be used for the purposes of electricity generation (either actively generating electricity or being available to generate electricity on a standby basis) the undertaker must notify the relevant planning authority of the same.

Requirements for written approval, etc.

22
  • (1) Where under any of the above requirements the approval or agreement of the relevant planning authority or any other party is required, that approval or agreement must be provided in writing.
  • (2) Where under any of the above requirements a written scheme is required it shall be accompanied by such illustrations as are necessary and appropriate in the circumstances.

SCHEDULE 3 — MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS

Compensation enactments

1

The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply, with the necessary modifications as respects compensation, in the case of a compulsory acquisition under this Order of a right by the creation of a new right or the imposition of a restriction as they apply as respects compensation on the compulsory purchase of land and interests in land.

2
  • (1) Without prejudice to the generality of paragraph 1, the Land Compensation Act 197322 has effect subject to the modifications set out in sub-paragraphs (2) and (3).
  • (2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 of the 1965 Act as substituted by paragraph 4—
  • (a) for the words “land is acquired or taken” there is substituted the words “a right or restrictive covenant over land is purchased from or imposed on”; and
  • (b) for the words “acquired or taken from him” there is substituted the words “over which the right is exercisable or the restrictive covenant enforceable”.
  • (3) In section 58(1) (determination of material detriment where part of house etc. proposed for compulsory acquisition), as it applies to determinations under section 8 of the 1965 Act as substituted by paragraph 5—
  • (a) for the word “part” in paragraphs (a) and (b) there is substituted the words “a right over or restrictive covenant affecting land consisting”;
  • (b) for the word “severance” there is substituted the words “right or restrictive covenant over or affecting the whole of the house, building or manufactory or of the house and the park or garden”;
  • (c) for the words “part proposed” there are substituted the words “right or restrictive covenant proposed”; and
  • (d) for the words “part is” there are substituted the words “right or restrictive covenant is”.

Application of the 1965 Act

3
  • (1) The 1965 Act has effect with the modifications necessary to make it apply to the compulsory acquisition under this Order of a right, by the creation of a new right, or to the imposition under this Order of a restrictive covenant, as it applies to the compulsory acquisition of land, so that, in appropriate contexts, references in that Act to land are read (according to the requirements of the particular context) as referring to, or as including references to—
  • (a) the right acquired or to be acquired;
  • (b) the restrictive covenant imposed or to be imposed;
  • (c) the land over which the right is or is to be exercisable; or
  • (d) the land over which the restrictive covenant is or is to be applied.
  • (2) Without prejudice to the generality of sub-paragraph (1), Part 1 of the 1965 Act applies in relation to the compulsory acquisition under this Order of a right by the creation of a new right or the imposition of a restriction with the modifications specified in the following provisions of this Schedule.
4

For section 7 of the 1965 Act (measure of compensation) there is substituted the following section—

(7) In assessing the compensation to be paid by the acquiring authority under this Act, regard is had not only to the extent (if any) to which the value of the land over which the right is to be acquired or the restrictive covenant is to be imposed is depreciated by the acquisition of the right or the imposition of the restrictive covenant but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.

5

For section 8 of the 1965 Act (provisions as to divided land) there is substituted the following section—

(8) (1) Where in consequence of the service on a person under section 5 of this Act of a notice to treat in respect of a right over land consisting of a house, building or manufactory or of a park or garden belonging to a house (“the relevant land”)— (a) a question of disputed compensation in respect of the purchase of the right or the imposition of the restrictive covenant would apart from this section fall to be determined by the Upper Tribunal (“the tribunal”); and (b) before the tribunal has determined that question the tribunal is satisfied that the person has an interest in the whole of the relevant land and is able and willing to sell that land and— (i) where that land consists of a house, building or manufactory, that the right cannot be purchased or the restrictive covenant imposed without material detriment to that land; or (ii) where that land consists of such a park or garden, that the right cannot be purchased or the restrictive covenant imposed without seriously affecting the amenity or convenience of the house to which that land belongs, the Meaford Gas Fired Generating Station Order 2016 (“the Order”) ceases, in relation to that person, to authorise the purchase of the right and be deemed to authorise the purchase of that person’s interest in the whole of the relevant land including, where the land consists of such a park or garden, the house to which it belongs, and the notice is deemed to have been served in respect of that interest on such date as the tribunal directs. (2) Any question as to the extent of the land in which the Order is deemed to authorise the purchase of an interest by virtue of subsection (1) of this section must be determined by the tribunal. (3) Where in consequence of a determination of the tribunal that it is satisfied as mentioned in subsection (1) of this section the Order is deemed by virtue of that subsection to authorise the purchase of an interest in land, the acquiring authority may, at any time within the period of 6 weeks beginning with the date of the determination, withdraw the notice to treat in consequence of which the determination was made; but nothing in this subsection prejudices any other power of the authority to withdraw the notice.

6

The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—

  • (a) section 9(4) (failure by owners to convey);
  • (b) paragraph 10(3) of Schedule 1 (owners under incapacity);
  • (c) paragraph 2(3) of Schedule 2 (absent and untraced owners); and
  • (d) paragraphs 2(3) and 7(2) of Schedule 4 (common land),

are so modified as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily created and acquired or the restrictive covenant which is to be imposed is vested absolutely in the acquiring authority.

7

Section 11 of the 1965 Act (powers of entry) is so modified as to secure that, as from the date on which the acquiring authority has served notice to treat in respect of any right or restrictive covenant it has power, exercisable in equivalent circumstances and subject to equivalent conditions, to enter for the purpose of exercising that right or enforcing that restrictive covenant (which is deemed for this purpose to have been created on the date of service of the notice); and sections 12 (penalty for unauthorised entry) and 13 (entry on warrant in the event of obstruction) of the 1965 Act is modified correspondingly.

8

Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right or the enforcement of the restrictive covenant in question.

9

Section 22 of the 1965 Act (protection of acquiring authority’s possession where by inadvertence an estate, right or interest has not been got in) is so modified as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right created and acquired and to continue to be entitled to the benefit of the restrictive covenant imposed, subject to compliance with that section as respects compensation.

SCHEDULE 4 — STREETS SUBJECT TO PERMANENT ALTERATION OF LAYOUT

(1) Area (2) Street subject to alteration of layout (3) Description of alteration
In the Borough of Stafford Northern Access Road From line A-B to points C and D as shown on the access and rights of way plan improvements to the existing access (the bellmouth of the Northern Access Road with Meaford Road as shown at line A-B on the access rights of way plan), removal of existing traffic island, improved visibility splays to provide a safer entrance and exit flow and widening and resurfacing of the Northern Access Road

SCHEDULE 5 — STREETS SUBJECT TO STREET WORKS

(1) Area (2) Streets subject to street works (3) Description of street works
In the Borough of Stafford Meaford Road Street works to facilitate the replacement, maintenance and/or refurbishment of the existing surface water drainage pipe in relation to numbered work 6 between lines E-F and G-H as shown on the access rights of way plan
In the Borough of Stafford Northern Access Road Street works to upgrade the existing access (the bellmouth of the Northern Access Road with Meaford Road as shown between line A-B on the access rights of way plan) and to upgrade and widen the Northern Access Road between line A-B and points C and D on the access rights of way plan

SCHEDULE 6 — TEMPORARY PROHIBITION OR RESTRICTION OF THE USE OF STREETS

(1) Area (2) Street subject to temporary prohibition or restriction of use (3) Extent of temporary prohibition or restriction of use of streets
In the Borough of Stafford Meaford Road Prohibition/Restriction: Between lines J-K and L-M on the access rights of way plan being approximately 130 metres Purpose of the Prohibition/Restriction: Temporary closure of no more than half the width of Meaford Road at any time in order to carry out numbered work 6
In the Borough of Stafford Northern Access Road Prohibition/Restriction:Between line A-B and points C and D on the access rights of way plan. Purpose of the Prohibition/Restriction: Temporary closure of no more than half the width of the Northern Access Road at any time in order to carry out numbered work 4

SCHEDULE 7 — PROTECTIVE PROVISIONS

PART 1 — FOR THE PROTECTION OF NATIONAL GRID

Application

1

For the protection of National Grid as referred to in this part of this Schedule the following provisions shall, unless otherwise agreed in writing between the undertaker and National Grid, have effect.

Interpretation

2

In this Part of this Schedule—

  • “alternative apparatus” means appropriate alternative apparatus to the satisfaction of National Grid to enable National Grid to fulfil its statutory functions in a manner no less efficient than previously;
  • “apparatus” means mains, pipes or other apparatus belonging to or maintained by National Grid for the purposes of gas supply;
  • “authorised development” has the same meaning as in article 2 (interpretation) of this Order and (unless otherwise specified) for the purposes of this Schedule shall include the use and maintenance of the authorised development;
  • “functions” includes powers and duties;
  • “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over, across, along or upon such land;
  • “plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe and assess the works to be executed;
  • “National Grid” means National Grid Gas PLC (Company No. 200600) whose registered office is at 1-3 Strand, London, WC2N 5EH; and
  • [“specified work” means so much of any of the authorised development that will or may be situated 15m (measured in any direction) of, or which may affect, any apparatus.]
3

Except for paragraphs 4 (apparatus in streets subject to temporary prohibition or restriction), 8(retained apparatus: protection), 9 (expenses) and 10 (indemnity) this Schedule does not apply to apparatus in respect of which the relations between the undertaker and National Grid are regulated by the provisions of Part 3 of the 1991 Act.

Apparatus of National Grid in streets subject to temporary prohibition or restriction

4

Notwithstanding the temporary prohibition or restriction under the powers of article 12 (temporary prohibition or restriction of use of streets), National Grid shall be at liberty at all times to take all necessary access across any such street and/or to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the prohibition or restriction was in that street.

Acquisition of land

5
  • (1) Regardless of any provision in this Order or anything shown on the land plans or contained in the book of reference to the Order the undertaker must not acquire any land interest or apparatus or override any easement or other interest of National Grid otherwise than by agreement (such agreement not to be unreasonably withheld).
  • (2) The undertaker and National Grid agree that where there is any inconsistency or duplication between the provisions set out in this Schedule relating to the relocation and/or removal of apparatus (including but not limited to the payment of costs and expenses relating to such relocation and/or removal of apparatus) and the provisions of any existing easement, rights, agreements and licences granted, used, enjoyed or exercised by National Grid as of right or other use in relation to the apparatus then the provisions in this Schedule shall prevail.

Removal of apparatus

6
  • (1) If, in the exercise of the agreement reached in accordance with paragraph 5 or in any other authorised manner, the undertaker acquires any interest in any land in which any apparatus is placed, that apparatus must not be removed under this part of this Schedule and any right of National Grid to maintain that apparatus in that land shall not be extinguished until alternative apparatus has been constructed, and is in operation to the reasonable satisfaction of National Grid in accordance with sub-paragraphs (3) to (6) inclusive.
  • (2) As a condition of agreement between the parties in paragraph 6(1), prior to the carrying out of any part of the authorised works (or in such other timeframe as may be agreed between the National Grid and the undertaker) that are subject to the requirements of this Part of this Schedule that will cause any conflict with or breach the terms of any easement and/or other legal or land interest of National Grid and/or affects the provisions of any enactment or agreement regulating the relations between National Grid and the undertaker in respect of any apparatus laid or erected in land belonging to or secured by the undertaker, the undertaker must as National Grid reasonably requires enter into such deeds of consent upon such terms and conditions as may be agreed between National Grid and the undertaker acting reasonably and which must be no less favourable on the whole to National Grid unless otherwise agreed by National Grid, and it will be the responsibility of the undertaker to procure and/or secure the consent and entering into of such deeds and variations by all other third parties with an interest in the land at that time who are affected by such authorised works.
  • (3) If, for the purpose of executing any works comprised in the authorised development in, on, under or over any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give to National Grid 56 days’ advance written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order National Grid reasonably needs to remove any of its apparatus) the undertaker shall, subject to sub-paragraph (4) afford to National Grid to their satisfaction (taking into account paragraph 7(1) below) the necessary facilities and rights for—
  • (a) the construction of alternative apparatus in other land of the undertaker; and
  • (b) subsequently for the maintenance of that apparatus.
  • (4) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (3), in the land in which the alternative apparatus or part of such apparatus is to be constructed, National Grid must, on receipt of a written notice to that effect from the undertaker, take such steps as are reasonable in the circumstances in an endeavour to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed save that this obligation shall not extend to the requirement for National Grid to use its compulsory purchase powers to this end unless it elects to so do.
  • (5) Any alternative apparatus to be constructed in land of the undertaker under this part of this Schedule shall be constructed in such manner and in such line or situation as may be agreed between National Grid and the undertaker.
  • (6) National Grid must, after the alternative apparatus to be provided or constructed has been agreed, and subject to the grant to National Grid of any such facilities and rights as are referred to in sub-paragraph (3) or (4), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this part of this Schedule.

Facilities and rights for alternative apparatus

7
  • (1) Where, in accordance with the provisions of this part of this Schedule, the undertaker affords to National Grid facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights shall be granted upon such terms and conditions as may be agreed between the undertaker and National Grid and must be no less favourable on the whole to National Grid than the facilities and rights enjoyed by it in respect of the apparatus to be removed unless agreed by National Grid.
  • (2) If the facilities and rights to be afforded by the undertaker and agreed with National Grid under sub-paragraph (1) above in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are less favourable on the whole to National Grid than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject in the matter shall be referred to arbitration and, the arbitrator shall make such provision for the payment of compensation by the undertaker to National Grid as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case. In respect of the appointment of an arbitrator under this sub-paragraph (2), article 36 (arbitration) of the Order shall apply.

Retained apparatus: protection of National Grid as Gas Undertaker

8
  • (1) Not less than 56 days before the commencement of any specified work that does not require the removal of apparatus under paragraph 6(3) (removal of apparatus) the undertaker must submit to National Grid a plan and seek from National Grid details of the apparatus belonging to or maintained by National Grid.
  • (2) The plan to be submitted to National Grid under sub-paragraph (1) must show—
  • (a) the exact position of the works;
  • (b) the level at which these are proposed to be constructed or renewed;
  • (c) the manner of their construction or renewal including details of excavation, positioning of plant;
  • (d) the position of all apparatus; and
  • (e) by way of detailed drawings, every alteration proposed to be made to or close to any such apparatus.
  • (3) The undertaker must not commence any works to which sub-paragraphs (1) and (2) apply until National Grid has given written approval of the plan so submitted.
  • (4) Any approval of National Grid required under sub-paragraph (2)—
  • (a) may be given subject to reasonable conditions for any purpose mentioned in sub-paragraphs (5) or (7); and
  • (b) must not be unreasonably withheld or delayed.
  • (5) In relation to any work to which sub-paragraphs (1) and/or (2) apply, National Grid may require such modifications to be made to the plans as may be reasonably necessary for the purpose of securing its apparatus against interference or risk of damage or for the purpose of providing or securing proper and convenient means of access to any apparatus.
  • (6) Works to which this paragraph applies must only be executed in accordance with the plan, submitted under sub-paragraph (1) or as relevant sub-paragraph (4), as approved or as amended from time to time by agreement between the undertaker and National Grid and in accordance with such reasonable requirements as may be made in accordance with sub-paragraphs (5) or (7) by National Grid for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and National Grid will be entitled to watch and inspect the execution of those works.
  • (7) Where National Grid requires any protective works to be carried out by itself or by the undertaker (whether of a temporary or permanent nature) such protective works, inclusive of any measures or schemes required and approved as part of the plan approved pursuant to this paragraph, must be carried out to National Grid’s satisfaction prior to the commencement of any authorised works (or any relevant part thereof) for which protective works are required and National Grid must give 56 days’ notice of such works from the date of submission of a plan pursuant to this paragraph (except in an emergency).
  • (8) If National Grid in accordance with sub-paragraphs (5) or (7) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 1 to 3 and 5 to 7 apply as if the removal of the apparatus had been required by the undertaker under paragraph 6(2).
  • (9) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 56 days before commencing the execution of the authorised works, a new plan, instead of the plan previously submitted, and having done so the provisions of this paragraph will apply to and in respect of the new plan.
  • (10) The undertaker will not be required to comply with sub-paragraph (1) where it needs to carry out emergency works as defined in the 1991 Act but in that case it must give to National Grid notice as soon as is reasonably practicable and a plan of those works and must—
  • (a) comply with sub-paragraphs (5), (6) and (7) insofar as is reasonably practicable in the circumstances; and
  • (b) comply with sub-paragraph (11) at all times.
  • (11) At all times when carrying out any works authorised under the Order the undertaker must comply with National Grid’s policies for safe working in proximity to gas apparatus “Specification for safe working in the vicinity of National Grid, High pressure Gas pipelines and associated installation requirements for third parties T/SP/SSW22” and HSE’s “HS(~G)47 Avoiding Danger from underground services” as the same may be replaced from time to time.
  • (12) As soon as reasonably practicable after any ground subsidence event attributable to the authorised development the undertaker shall implement an appropriate ground mitigation scheme save that National Grid retains the right to carry out any further necessary protective works for the safeguarding of its apparatus and can recover any such costs in line with paragraph 9.

Expenses

9
  • (1) Subject to the following provisions of this paragraph, the undertaker shall pay to National Grid on demand all charges, costs and expenses reasonably anticipated or incurred by that undertaker in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in this Schedule including without limitation—
  • (a) any costs reasonably incurred or compensation properly paid in connection with the acquisition of rights or the exercise of statutory powers for such apparatus including without limitation in the event that National Grid elects to use compulsory purchase powers to acquire any necessary rights under paragraph 6(4) all costs incurred as a result of such action;
  • (b) in connection with the cost of the carrying out of any diversion work or the provision of any alternative apparatus;
  • (c) the cutting off of any apparatus from any other apparatus or the making safe of redundant apparatus;
  • (d) the approval of plans;
  • (e) the carrying out of protective works, plus a capitalised sum to cover the cost of maintaining and renewing permanent protective works; and
  • (f) the survey of any land, apparatus or works, the inspection and monitoring of works or the installation or removal of any temporary works reasonably necessary in consequence of the execution of any such works referred to in this Schedule.
  • (2) There must be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Schedule and which is not re-used as part of the alternative apparatus, that value being calculated after removal.
  • (3) If in accordance with the provisions of this part of this Schedule—
  • (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
  • (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or in default of agreement settled by arbitration in accordance with article 36 (arbitration) of the Order to be necessary, then, if such placing involves cost in the construction of works under this part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to National Grid by virtue of sub-paragraph (1) shall be reduced by the amount of that excess save where it is not possible in the circumstances to obtain the existing type of operations, capacity, dimensions or place at the existing depth in which case full costs shall be borne by the undertaker.

  • (4) For the purposes of sub-paragraph (3)—
  • (a) an extension of apparatus to a length greater than the length of existing apparatus shall not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
  • (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole shall be treated as if it also had been agreed or had been so determined.
  • (5) An amount which apart from this sub-paragraph would be payable to National Grid in respect of works by virtue of sub-paragraph (1) shall, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on National Grid any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.

Indemnity

10
  • (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any works authorised by this Schedule or in consequence of the construction, use, maintenance or failure of any of the authorised development by or on behalf of the undertaker or in consequence of any act or default of the undertaker (or any person employed or authorised by him) in the course of carrying out such works (including without limitation works carried out by the undertaker under this Schedule or any subsidence resulting from any of these works), any material damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of National Grid, or there is any interruption in any service provided, or in the supply of any goods, by National Grid, or National Grid becomes liable to pay any amount to any third party, the undertaker shall—
  • (a) bear and pay on demand the cost reasonably incurred by National Grid in making good such damage or restoring the supply; and
  • (b) indemnify National Grid for any other expenses, loss, demands, proceedings, damages, claims, penalty or costs incurred by or recovered from National Grid, by reason or in consequence of any such damage or interruption or National Grid becoming liable to any third party as aforesaid.
  • (2) The fact that any act or thing may have been done by National Grid on behalf of the undertaker or in accordance with a plan approved by National Grid or in accordance with any requirement of National Grid as a consequence of the authorised development or under its supervision shall not (unless sub-paragraph (3) applies) excuse the undertaker from liability under the provisions of sub-paragraph (1) unless National Grid fails to carry out and execute the works properly with due care and attention and in a skilful and workman like manner or in a manner that does not materially accord with the approved plan or as otherwise agreed between the undertaker and National Grid.
  • (3) Nothing in sub-paragraph (1) shall impose any liability on the undertaker in respect of—
  • (a) any damage or interruption to the extent that it is attributable to the neglect or default of National Grid, its officers, servants, contractors or agents; and
  • (b) any authorised development and/or any other works authorised by this Schedule carried out by National Grid as an assignee, transferee or lessee of the undertaker with the benefit of the Order pursuant to section 156 of the 2008 Act or under article 6 of the Order subject to the proviso that once such works become apparatus (“new apparatus”), any works yet to be executed and not falling within this sub-section (b) shall be subject to the full terms of this Schedule including this paragraph 10 in respect of such new apparatus.
  • (4) National Grid must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise shall, unless payment is required in connection with a statutory compensation scheme, be made without first consulting the undertaker and considering their representations.

Enactments and agreements

11

Nothing in this part of this Schedule shall affect the provisions of any enactment or agreement regulating the relations between the undertaker and National Grid in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.

Co-operation

12
  • (1) Where in consequence of the proposed construction of any of the authorised development, the undertaker or National Grid requires the removal of apparatus under paragraph 6(3) or National Grid makes requirements for the protection or alteration of apparatus under paragraph 8, the undertaker shall use its reasonable endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of National Grid’s undertaking and National Grid shall use its best endeavours to co-operate with the undertaker for that purpose.
  • (2) For the avoidance of doubt whenever National Grid’s consent, agreement or approval to is required in relation to plans, documents or other information submitted by the undertaker or the taking of action by National Grid, it must not be unreasonably withheld or delayed.

Access

13

If in consequence of the agreement reached in accordance with paragraph 5(1) or the powers granted under this Order the access to any apparatus is materially obstructed, the undertaker shall provide such alternative means of access to such apparatus as will enable National Grid to maintain or use the apparatus no less effectively than was possible before such obstruction.

Arbitration

14

Save for differences or disputes arising under paragraph 6(3), 6(5), 7(1) and 8 any difference or dispute arising between the undertaker and National Grid under this Schedule shall, unless otherwise agreed in writing between the undertaker and National Grid, be determined by arbitration in accordance with article 36 (arbitration) of the Order.

PART 2 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS

15

For the protection of the utility undertakers referred to in this part of this Schedule (save for National Grid which is protected by Part 1 of this Schedule), the following provisions have effect, unless otherwise agreed in writing between the undertaker and the utility undertakers concerned.

16

In this part of this Schedule—

  • “alternative apparatus” means alternative apparatus adequate to enable the utility undertaker in question to fulfil its statutory functions in a manner not less efficient than previously;
  • “apparatus” means—in the case of an electricity undertaker, electric lines or electrical plant (as defined in the Electricity Act 198923), belonging to or maintained by that utility undertaker;in the case of a gas undertaker, any mains, pipes or other apparatus belonging to or maintained by a gas transporter for the purposes of gas supply;in the case of a water undertaker—mains, pipes or other apparatus belonging to or maintained by that utility undertaker for the purposes of water supply; andany water mains or service pipes (or part of a water main or service pipe) that is the subject of an agreement to adopt made under section 51A of the Water Industry Act 199124);in the case of a sewerage undertaker—any drain or works vested in the utility undertaker under the Water Industry Act 1991; andany sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4) of that Act or an agreement to adopt made under section 104 of that Act,and includes a sludge main, disposal main (within the meaning of section 219 of that Act) or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works, and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;
  • “functions” includes powers and duties;
  • “in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land; and
  • “utility undertaker” means—any licence holder within the meaning of Part 1 of the Electricity Act 1989;a gas transporter within the meaning of Part 1 of the Gas Act 198625;a water undertaker within the meaning of the Water Industry Act 1991; anda sewerage undertaker within the meaning of Part 1 of the Water Industry Act 1991,for the area of the authorised development, and in relation to any apparatus, means the utility undertaker to whom it belongs or by whom it is maintained.
17

This part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and the utility undertaker are regulated by the provisions of Part 3 of the 1991 Act.

18

Regardless of the temporary prohibition or restriction of use of streets under the powers conferred by article 12 (temporary prohibition or restriction of use of streets), a utility undertaker is at liberty at all times to take all necessary access across any such street and to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the prohibition or restriction was in that street.

19

Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement.

20
  • (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or over which access to any apparatus is enjoyed or requires that the utility undertaker’s apparatus is relocated or diverted, that apparatus must not be removed under this part of this Schedule, and any right of a utility undertaker to maintain that apparatus in that land and to gain access to it must not be extinguished, until alternative apparatus has been constructed and is in operation, and access to it has been provided, to the reasonable satisfaction of the utility undertaker in question in accordance with sub-paragraphs (2) to (7).
  • (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give to the utility undertaker in question written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order a utility undertaker reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to the utility undertaker the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.
  • (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed, the utility undertaker in question must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use reasonable endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
  • (4) Any alternative apparatus to be constructed in land of the undertaker under this part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between the utility undertaker in question and the undertaker or in default of agreement settled by arbitration in accordance with article 36 (arbitration).
  • (5) The utility undertaker in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 36 (arbitration), and after the grant to the utility undertaker of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this part of this Schedule.
  • (6) Regardless of anything in sub-paragraph (5), if the undertaker gives notice in writing to the utility undertaker in question that it desires itself to execute any work, or part of any work, in connection with the construction or removal of apparatus in any land controlled by the undertaker, that work, instead of being executed by the utility undertaker, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the utility undertaker.
  • (7) Nothing in sub-paragraph (6) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus.
21
  • (1) Where, in accordance with the provisions of this part of this Schedule, the undertaker affords to a utility undertaker facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and the utility undertaker in question or in default of agreement settled by arbitration in accordance with article 36 (arbitration).
  • (2) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the utility undertaker in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to that utility undertaker as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
22
  • (1) Not less than 28 days before starting the execution of any works in, on or under any land purchased, held, appropriated or used under this Order that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 20(2), the undertaker must submit to the utility undertaker in question a plan, section and description of the works to be executed.
  • (2) Those works must be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the utility undertaker for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker is entitled to watch and inspect the execution of those works.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.