The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016

Type Statutory-Instrument
Publication 2016-09-02
Last updated 2017-11-30
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API
(1) Application Document (2) Drawing No. (3) Revision No. (4) Document Reference
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Key Plan TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301287
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 1 of 31, Theale TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301288
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 2 of 31, Calcot TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301289
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 3 of 31, Reading Motorway Service Area TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301290
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 4 of 31, Pingewood TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301291
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 5 of 31, Reading International Business Park TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301292
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 6 of 31, Whitley TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301293
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 7 of 31, Lower Earley TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301294
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 8 of 31, River Loddon TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301295
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 9 of 31, Winnersh TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301296
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 10 of 31, Wokingham TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301297
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 11 of 31, Bill Hill TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301298
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 12 of 31, The Straight Mile TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301299
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 13 of 31, Hammond’s Wood TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301300
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 14 of 31, Beenham’s Heath TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301301
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 15 of 31, Littlefield Green TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301302
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 16 of 31, Paley Street TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301303
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 17 of 31, Holyport TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301304
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 18 of 31, Bray TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301305
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 19 of 31, Dorney Reach TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301306
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 20 of 31, Cippenham TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301307
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 21 of 31, Slough South TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301308
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 22 of 31, Chalvey TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301309
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 23 of 31, Myrke TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301310
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 24 of 31, Datchet TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301311
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 25 of 31, Brands Hill TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301312
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 26 of 31, Sutton TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301313
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 27 of 31, M4/M25 TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301314
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 28 of 31, West Drayton TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301315
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 29 of 31, Harlington TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301316
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 30 of 31, Cranford TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301317
Volume 2.0: plans, drawings and sections - 2.3 Works Plans, Sheet 31 of 31, Heston TR010019-2.3 3F 514451-MUH-ML-ZZ-DR-WP-301318

SCHEDULE 11 — PROCEDURE FOR DISCHARGE OF CERTAIN APPROVALS

Applications made for certain approvals

1
  • (1) Where an application has been made to a discharging authority for any consent, agreement or approval required or contemplated by any of the provisions of this Order the discharging authority must give notice to the undertaker of their decision on the application before the end of the decision period.
  • (2) For the purposes of sub-paragraph (1), the decision period is—
  • (a) where no further information is requested under paragraph 2, 5 weeks from the day immediately following that on which the application is received by the authority;
  • (b) where further information is requested under paragraph 2, 5 weeks from the day immediately following that on which further information has been supplied by the undertaker under paragraph 2; or
  • (c) such longer period as may be agreed by the undertaker and the discharging authority in writing before the end of the period in paragraph (a) or (b).

Further information

2
  • (1) In relation to any application to which this Schedule applies, the discharging authority has the right to request such further information from the undertaker as is necessary to enable it to consider the application.
  • (2) If the discharging authority considers such further information to be necessary it must, within 7 business days of receipt of the application, notify the undertaker in writing specifying the further information required.
  • (3) If the discharging authority does not give such notification as specified in sub-paragraph (2) it is to be deemed to have sufficient information to consider the application and is not subsequently entitled to request further information without the prior agreement of the undertaker.

Fees

3
  • (1) Where an application is made to the discharging authority for consent, agreement or approval in respect of a requirement, a fee of £97.00 is to be paid to that authority.
  • (2) Any fee paid under this Schedule must be refunded to the undertaker within 8 weeks of—
  • (a) the application being rejected as invalidly made; or
  • (b) the discharging authority failing to determine the application within the decision period as determined under paragraph 1,

unless within that period the undertaker agrees, in writing, that the fee is to be retained by the discharging authority and credited in respect of a future application.

Appeals

4
  • (1) The undertaker may appeal in the event that—
  • (a) the discharging authority refuses an application for any consent, agreement or approval required or contemplated by any of the provisions of this Order or grants it subject to conditions;
  • (b) the discharging authority does not give notice of its decision to the undertaker within the decision period as determined under paragraph 1;
  • (c) on receipt of a request for further information under paragraph 2 the undertaker considers that either the whole or part of the specified information requested by the discharging authority is not necessary for consideration of the application; or
  • (d) on receipt of any further information requested, the discharging authority notifies the undertaker that the information provided is inadequate and requests additional information which the undertaker considers is not necessary for consideration of the application.
  • (2) The appeal process is to be as follows—
  • (a) any appeal by the undertaker must be made within 42 days of the date of the notice of the decision or determination, or (where no determination has been made) expiry of the decision period as determined under paragraph 1;
  • (b) the undertaker must submit the appeal documentation to the Secretary of State, a copy of the application submitted to the discharging authority and any supporting documentation which the undertaker may wish to provide (“the appeal documentation”);
  • (c) the undertaker must on the same day provide copies of the appeal documentation to the discharging authority;
  • (d) as soon as is practicable after receiving the appeal documentation, the Secretary of State must appoint a person to determine the appeal (“the appointed person”) and must notify the appeal parties of the identity of the appointed person and the address to which all correspondence for that person’s attention should be sent;
  • (e) the discharging authority must submit written representations to the appointed person in respect of the appeal within 10 business days of the date on which the appeal parties are notified of the appointment of a person under paragraph (d) and must ensure that copies of their written representations are sent to each other and to the undertaker on the day on which they are submitted to the appointed person;
  • (f) the appeal parties must make any counter-submissions to the appointed person within 10 business days of receipt of written representations under paragraph (e).
  • (3) The appointed person must make a decision and notify it to the appeal parties, with reasons, as soon as reasonably practicable.
  • (4) If the appointed person considers that further information is necessary to enable consideration of the appeal the appointed person must, as soon as practicable, notify the appeal parties in writing specifying the further information required, the appeal party from whom the information is sought, and the date by which the information is to be submitted.
  • (5) Any further information required under sub-paragraph (4) is to be provided by the party from whom the information is sought to the appointed person and to other appeal parties by the date specified by the appointed person. Any written representations concerning matters contained in the further information must be submitted to the appointed person, and made available to all appeal parties within 10 business days of that date.
  • (6) On an appeal under this paragraph, the appointed person may—
  • (a) allow or dismiss the appeal; or
  • (b) reverse or vary any part of the decision of the discharging authority (whether the appeal relates to that part of it or not),

and may deal with the application as if it had been made to the appointed person in the first instance.

  • (7) The appointed person may proceed to a decision on an appeal taking into account only such written representations as have been sent within the time limits prescribed, or set by the appointed person, under this paragraph.
  • (8) The appointed person may proceed to a decision even though no written representations have been made within those time limits, if it appears to the appointed person that there is sufficient material to enable a decision to be made on the merits of the case.
  • (9) The decision of the appointed person on an appeal is to be final and binding on the parties, and a court may entertain proceedings for questioning the decision only if the proceedings are brought by a claim for judicial review.
  • (10) If an approval is given by the appointed person under this Schedule, it is deemed to be an approval for the purpose of any consent, agreement or approval required under the Order or for the purpose of Schedule 2 (requirements) as if it had been given by the discharging authority. The discharging authority may confirm any determination given by the appointed person in identical form in writing but a failure to give such confirmation (or a failure to give it in identical form) is not to be taken to affect or invalidate the effect of the appointed person’s determination.
  • (11) Except where a direction is given under sub-paragraph (12) requiring the costs of the appointed person to be paid by the discharging authority, the reasonable costs of the appointed person are to be met by the undertaker.
  • (12) On application by the discharging authority or the undertaker, the appointed person may give directions as to the costs of the appeal parties and as to the parties by whom the costs of the appeal are to be paid. In considering whether to make any such direction and the terms on which it is to be made, the appointed person must have regard to the Planning Practice Guidance published by the Department for Communities and Local Government on 6th March 2014 or any circular or guidance which may from time to time replace it.

Interpretation of Schedule 11

5

In this Schedule—

  • “the appeal parties” means the discharging authority and the undertaker.

SCHEDULE 12 — ENGINEERING DRAWINGS, SECTIONS AND OTHER INFORMATION

(1) Application Document (2) Drawing No. (3) Revision (4) Drawing Description
Volume 2.0: plans, drawings and sections, 2.5 Engineering sections: M4 mainline and Sliproads TR010019 – 2.5 2F Engineering Sections, Regulation 5(2)(o) & (p) & 6(2), Sheet 1 of 7
TR010019 – 2.5 2F Engineering Sections, Regulation 5(2)(o) & (p) & 6(2), Sheet 2 of 7
TR010019 – 2.5 2F Engineering Sections, Regulation 5(2)(o) & (p) & 6(2), Sheet 3 of 7
TR010019 – 2.5 2F Engineering Sections, Regulation 5(2)(o) & (p) & 6(2), Sheet 4 of 7
TR010019 – 2.5 2F Engineering Sections, Regulation 5(2)(o) & (p) & 6(2), Sheet 5 of 7
TR010019 – 2.5 2F Engineering Sections, Regulation 5(2)(o) & (p) & 6(2), Sheet 6 of 7
TR010019 – 2.5 2F Engineering Sections, Regulation 5(2)(o) & (p) & 6(2), Sheet 7 of 7
Volume 2.0: plans, drawings and sections, 2.6 Side Road Plan and Profile TR010019 – 2.6 4F Side Road Plan & Profile, Regulations 5(2)(o), 5(2)(p) & 6(2) Key Plan
TR010019 – 2.6 4F Side Road Plan & Profile, Regulations 5(2)(o), 5(2)(p) & 6(2) Sheet 1 of 13
TR010019 – 2.6 4F Side Road Plan & Profile, Regulations 5(2)(o), 5(2)(p) & 6(2) Sheet 2 of 13
TR010019 – 2.6 4F Side Road Plan & Profile, Regulations 5(2)(o), 5(2)(p) & 6(2) Sheet 3 of 13
TR010019 – 2.6 4F Side Road Plan & Profile, Regulations 5(2)(o), 5(2)(p) & 6(2) Sheet 4 of 13
TR010019 – 2.6 4F Side Road Plan & Profile, Regulations 5(2)(o), 5(2)(p) & 6(2) Sheet 5 of 13
TR010019 – 2.6 4F Side Road Plan & Profile, Regulations 5(2)(o), 5(2)(p) & 6(2) Sheet 6 of 13
TR010019 – 2.6 4F Side Road Plan & Profile, Regulations 5(2)(o), 5(2)(p) & 6(2) Sheet 7 of 13
TR010019 – 2.6 4F Side Road Plan & Profile, Regulations 5(2)(o), 5(2)(p) & 6(2) Sheet 8 of 13
TR010019 – 2.6 4F Side Road Plan & Profile, Regulations 5(2)(o), 5(2)(p) & 6(2) Sheet 9 of 13
TR010019 – 2.6 4F Side Road Plan & Profile, Regulations 5(2)(o), 5(2)(p) & 6(2) Sheet 10 of 13
TR010019 – 2.6 4F Side Road Plan & Profile, Regulations 5(2)(o), 5(2)(p) & 6(2) Sheet 11 of 13
TR010019 – 2.6 4F Side Road Plan & Profile, Regulations 5(2)(o), 5(2)(p) & 6(2) Sheet 12 of 13
TR010019 – 2.6 4F Side Road Plan & Profile, Regulations 5(2)(o), 5(2)(p) & 6(2) Sheet 13 of 13
Volume 2.0: plans, drawings and sections, 2.7 Earthworks Standard Details TR010019 – 2.7 2F Earthworks Standard Details, Regulation 5(2)(o) & 5(2)(p) & 6(2), Sheet 1 to 2
TR010019 – 2.7 2F Earthworks Standard Details, Regulation 5(2)(o) & 5(2)(p) & 6(2), Sheet 2 to 2
Volume 2.0: plans, drawings and sections, 2.8 Gantry General Arrangements TR010019 – 2.8 3F Generic Gantry Details, Regulation 5(2)(o) & 5(2)(p) & 6(2), Gantry Type 1, Superspan Portal Gantry
TR010019 – 2.8 3F Generic Gantry Details, Regulation 5(2)(o) & 5(2)(p) & 6(2), Gantry Type 2, Single Span Portal Gantry
TR010019 – 2.8 3F Generic Gantry Details, Regulation 5(2)(o) & 5(2)(p) & 6(2), Gantry Type 3, Superspan Cantilever Gantry
TR010019 – 2.8 3F Generic Gantry Details, Regulation 5(2)(o) & 5(2)(p) & 6(2), Gantry Type 4, Sign Only Cantilever Gantry
TR010019 – 2.8 3F Generic Gantry Details, Regulation 5(2)(o) & 5(2)(p) & 6(2), Gantry Type 5A, MS4 Signal Gantry (Option A)
TR010019 – 2.8 3F Generic Gantry Details, Regulation 5(2)(o) & 5(2)(p) & 6(2), Gantry Type 5B, MS4 Signal Gantry (Option B)
TR010019 – 2.8 3F Generic Gantry Details, Regulation 5(2)(o) & 5(2)(p) & 6(2), Gantry Type 6, MS3 Signal Gantry
Volume 7 Other documents 7.4 Engineering and Design Report Annexes Annex A1 Environmental Masterplan 514451-MUH-ML-ZZ-DR-EM-300734 7F Environmental Masterplan, Key Plan
514451-MUH-ML-ZZ-DR-EM-300735 11F Environmental Masterplan, Sheet 1 of 31, Theale
514451-MUH-ML-ZZ-DR-EM-300736 11F Environmental Masterplan, Sheet 2 of 31, Calcot
514451-MUH-ML-ZZ-DR-EM-300737 11F Environmental Masterplan, Sheet 3 of 31, Reading Motorway Service Area
514451-MUH-ML-ZZ-DR-EM-300738 11F Environmental Masterplan, Sheet 4 of 31, Pingewood
514451-MUH-ML-ZZ-DR-EM-300739 11F Environmental Masterplan, Sheet 5 of 31, Reading International Business Park
514451-MUH-ML-ZZ-DR-EM-300740 11F Environmental Masterplan, Sheet 6 of 31, Whitley
514451-MUH-ML-ZZ-DR-EM-300741 11F Environmental Masterplan, Sheet 7 of 31, Lower Earley
514451-MUH-ML-ZZ-DR-EM-300742 11F Environmental Masterplan, Sheet 8 of 31, River Loddon
514451-MUH-ML-ZZ-DR-EM-300743 11F Environmental Masterplan, Sheet 9 of 31, Winnersh
514451-MUH-ML-ZZ-DR-EM-300744 11F Environmental Masterplan, Sheet 10 of 31, Wokingham
514451-MUH-ML-ZZ-DR-EM-300745 11F Environmental Masterplan, Sheet 11 of 31, Bill Hill
514451-MUH-ML-ZZ-DR-EM-300746 11F Environmental Masterplan, Sheet 12 of 31, The Straight Mile
514451-MUH-ML-ZZ-DR-EM-300747 11F Environmental Masterplan, Sheet 13 of 31, Hammond’s Wood
514451-MUH-ML-ZZ-DR-EM-300748 11F Environmental Masterplan, Sheet 14 of 31, Beenham’s Heath
514451-MUH-ML-ZZ-DR-EM-300749 11F Environmental Masterplan, Sheet 15 of 31, Littlefield Green
514451-MUH-ML-ZZ-DR-EM-300750 11F Environmental Masterplan, Sheet 16 of 31, Paley Street
514451-MUH-ML-ZZ-DR-EM-300751 11F Environmental Masterplan, Sheet 17 of 31, Holyport
514451-MUH-ML-ZZ-DR-EM-300752 11F Environmental Masterplan, Sheet 18 of 31, Bray
514451-MUH-ML-ZZ-DR-EM-300753 11F Environmental Masterplan, Sheet 19 of 31, Dorney Reach
514451-MUH-ML-ZZ-DR-EM-300754 11F Environmental Masterplan, Sheet 20 of 31, Cippenham
514451-MUH-ML-ZZ-DR-EM-300755 11F Environmental Masterplan, Sheet 21 of 31, Slough South
514451-MUH-ML-ZZ-DR-EM-300756 11F Environmental Masterplan, Sheet 22 of 31, Chalvey
514451-MUH-ML-ZZ-DR-EM-300757 11F Environmental Masterplan, Sheet 23 of 31, Myrke
514451-MUH-ML-ZZ-DR-EM-300758 11F Environmental Masterplan, Sheet 24 of 31, Datchet
514451-MUH-ML-ZZ-DR-EM-300759 11F Environmental Masterplan, Sheet 25 of 31, Brands Hill
514451-MUH-ML-ZZ-DR-EM-300760 11F Environmental Masterplan, Sheet 26 of 31, Sutton
514451-MUH-ML-ZZ-DR-EM-300761 11F Environmental Masterplan, Sheet 27 of 31, M4/M25
514451-MUH-ML-ZZ-DR-EM-300762 11F Environmental Masterplan, Sheet 28 of 31, West Drayton
514451-MUH-ML-ZZ-DR-EM-300763 11F Environmental Masterplan, Sheet 29 of 31, Harlington
514451-MUH-ML-ZZ-DR-EM-300764 11F Environmental Masterplan, Sheet 30 of 31, Cranford
514451-MUH-ML-ZZ-DR-EM-300765 11F Environmental Masterplan, Sheet 31 of 31, Heston
Volume 7 Other documents 7.4 Engineering and Design Report Annexes Annex A2 Vegetation Clearance 514451-MUH-ML-ZZ-DR-SC-301224 4F Vegetation Clearance, Key Plan
514451-MUH-ML-ZZ-DR-SC-301225 6F Vegetation Clearance, Sheet 1 of 31, Theale
514451-MUH-ML-ZZ-DR-SC-301226 6F Vegetation Clearance, Sheet 2 of 31, Calcot
514451-MUH-ML-ZZ-DR-SC-301227 6F Vegetation Clearance, Sheet 3 of 31, Reading Motorway Service Area
514451-MUH-ML-ZZ-DR-SC-301228 6F Vegetation Clearance, Sheet 4 of 31, Pingewood
514451-MUH-ML-ZZ-DR-SC-301229 6F Vegetation Clearance, Sheet 5 of 31, Reading International Business Park
514451-MUH-ML-ZZ-DR-SC-301230 6F Vegetation Clearance, Sheet 6 of 31, Whitley
514451-MUH-ML-ZZ-DR-SC-301231 6F Vegetation Clearance, Sheet 7 of 31, Lower Earley
514451-MUH-ML-ZZ-DR-SC-301232 6F Vegetation Clearance, Sheet 8 of 31, River Loddon
514451-MUH-ML-ZZ-DR-SC-301233 6F Vegetation Clearance, Sheet 9 of 31, Winnersh
514451-MUH-ML-ZZ-DR-SC-301234 6F Vegetation Clearance, Sheet 10 of 31, Wokingham
514451-MUH-ML-ZZ-DR-SC-301235 6F Vegetation Clearance, Sheet 11 of 31, Bill Hill
514451-MUH-ML-ZZ-DR-SC-301236 6F Vegetation Clearance, Sheet 12 of 31, The Straight Mile
514451-MUH-ML-ZZ-DR-SC-301237 6F Vegetation Clearance, Sheet 13 of 31, Hammond’s Wood
514451-MUH-ML-ZZ-DR-SC-301238 6F Vegetation Clearance, Sheet 14 of 31, Beenham’s Heath
514451-MUH-ML-ZZ-DR-SC-301239 6F Vegetation Clearance, Sheet 15 of 31, Littlefield Green
514451-MUH-ML-ZZ-DR-SC-301240 6F Vegetation Clearance, Sheet 16 of 31, Paley Street
514451-MUH-ML-ZZ-DR-SC-301241 6F Vegetation Clearance, Sheet 17 of 31, Holyport
514451-MUH-ML-ZZ-DR-SC-301242 6F Vegetation Clearance, Sheet 18 of 31, Bray
514451-MUH-ML-ZZ-DR-SC-301243 6F Vegetation Clearance, Sheet 19 of 31, Dorney Reach
514451-MUH-ML-ZZ-DR-SC-301244 6F Vegetation Clearance, Sheet 20 of 31, Cippenham
514451-MUH-ML-ZZ-DR-SC-301245 6F Vegetation Clearance, Sheet 21 of 31, Slough South
514451-MUH-ML-ZZ-DR-SC-301246 6F Vegetation Clearance, Sheet 22 of 31, Chalvey
514451-MUH-ML-ZZ-DR-SC-301247 6F Vegetation Clearance, Sheet 23 of 31, Myrke
514451-MUH-ML-ZZ-DR-SC-301248 6F Vegetation Clearance, Sheet 24 of 31, Datchet
514451-MUH-ML-ZZ-DR-SC-301249 6F Vegetation Clearance, Sheet 25 of 31, Brands Hill
514451-MUH-ML-ZZ-DR-SC-301250 6F Vegetation Clearance, Sheet 26 of 31, Sutton
514451-MUH-ML-ZZ-DR-SC-301251 6F Vegetation Clearance, Sheet 27 of 31, M4/M25
514451-MUH-ML-ZZ-DR-SC-301252 6F Vegetation Clearance, Sheet 28 of 31, West Drayton
514451-MUH-ML-ZZ-DR-SC-301253 6F Vegetation Clearance, Sheet 29 of 31, Harlington
514451-MUH-ML-ZZ-DR-SC-301254 6F Vegetation Clearance, Sheet 30 of 31, Cranford
514451-MUH-ML-ZZ-DR-SC-301255 6F Vegetation Clearance, Sheet 31 of 31, Heston
Volume 7 Other documents 7.4 Engineering and Design Report Annexes, Annex F1 General arrangement drawings 514451-MUH-ML-ZZ-DR-EN-300374 2F Engineering and Design Report, Mainline General Arrangement, Key Plan
514451-MUH-ML-ZZ-DR-GA-300767 2F Engineering and Design Report, Mainline General Arrangement, Sheet 1 of 61
514451-MUH-ML-ZZ-DR-GA-300768 2F Engineering and Design Report, Mainline General Arrangement, Sheet 2 of 61
514451-MUH-ML-ZZ-DR-GA-300769 2F Engineering and Design Report, Mainline General Arrangement, Sheet 3 of 61
514451-MUH-ML-ZZ-DR-GA-300770 2F Engineering and Design Report, Mainline General Arrangement, Sheet 4 of 61
514451-MUH-ML-ZZ-DR-GA-300771 2F Engineering and Design Report, Mainline General Arrangement, Sheet 5 of 61
514451-MUH-ML-ZZ-DR-GA-300772 2F Engineering and Design Report, Mainline General Arrangement, Sheet 6 of 61
514451-MUH-ML-ZZ-DR-GA-300773 2F Engineering and Design Report, Mainline General Arrangement, Sheet 7 of 61
514451-MUH-ML-ZZ-DR-GA-300774 2F Engineering and Design Report, Mainline General Arrangement, Sheet 8 of 61
514451-MUH-ML-ZZ-DR-GA-300775 2F Engineering and Design Report, Mainline General Arrangement, Sheet 9 of 61
514451-MUH-ML-ZZ-DR-GA-300776 2F Engineering and Design Report, Mainline General Arrangement, Sheet 10 of 61
514451-MUH-ML-ZZ-DR-GA-300777 2F Engineering and Design Report, Mainline General Arrangement, Sheet 11 of 61
514451-MUH-ML-ZZ-DR-GA-300778 2F Engineering and Design Report, Mainline General Arrangement, Sheet 12 of 61
514451-MUH-ML-ZZ-DR-GA-300779 2F Engineering and Design Report, Mainline General Arrangement, Sheet 13 of 61
514451-MUH-ML-ZZ-DR-GA-300780 2F Engineering and Design Report, Mainline General Arrangement, Sheet 14 of 61
514451-MUH-ML-ZZ-DR-GA-300781 2F Engineering and Design Report, Mainline General Arrangement, Sheet 15 of 61
514451-MUH-ML-ZZ-DR-GA-300782 2F Engineering and Design Report, Mainline General Arrangement, Sheet 16 of 61
514451-MUH-ML-ZZ-DR-GA-300783 2F Engineering and Design Report, Mainline General Arrangement, Sheet 17 of 61
514451-MUH-ML-ZZ-DR-GA-300784 2F Engineering and Design Report, Mainline General Arrangement, Sheet 18 of 61
514451-MUH-ML-ZZ-DR-GA-300785 2F Engineering and Design Report, Mainline General Arrangement, Sheet 19 of 61
514451-MUH-ML-ZZ-DR-GA-300786 2F Engineering and Design Report, Mainline General Arrangement, Sheet 20 of 61
514451-MUH-ML-ZZ-DR-GA-300787 2F Engineering and Design Report, Mainline General Arrangement, Sheet 21 of 61
514451-MUH-ML-ZZ-DR-GA-300788 2F Engineering and Design Report, Mainline General Arrangement, Sheet 22 of 61
514451-MUH-ML-ZZ-DR-GA-300789 2F Engineering and Design Report, Mainline General Arrangement, Sheet 23 of 61
514451-MUH-ML-ZZ-DR-GA-300790 2F Engineering and Design Report, Mainline General Arrangement, Sheet 24 of 61
514451-MUH-ML-ZZ-DR-GA-300791 2F Engineering and Design Report, Mainline General Arrangement, Sheet 25 of 61
514451-MUH-ML-ZZ-DR-GA-300792 2F Engineering and Design Report, Mainline General Arrangement, Sheet 26 of 61
514451-MUH-ML-ZZ-DR-GA-300793 2F Engineering and Design Report, Mainline General Arrangement, Sheet 27 of 61
514451-MUH-ML-ZZ-DR-GA-300794 2F Engineering and Design Report, Mainline General Arrangement, Sheet 28 of 61
514451-MUH-ML-ZZ-DR-GA-300795 2F Engineering and Design Report, Mainline General Arrangement, Sheet 29 of 61
514451-MUH-ML-ZZ-DR-GA-300796 2F Engineering and Design Report, Mainline General Arrangement, Sheet 30 of 61
514451-MUH-ML-ZZ-DR-GA-300797 2F Engineering and Design Report, Mainline General Arrangement, Sheet 31 of 61
514451-MUH-ML-ZZ-DR-GA-300798 2F Engineering and Design Report, Mainline General Arrangement, Sheet 32 of 61
514451-MUH-ML-ZZ-DR-GA-300799 2F Engineering and Design Report, Mainline General Arrangement, Sheet 33 of 61
514451-MUH-ML-ZZ-DR-GA-300800 2F Engineering and Design Report, Mainline General Arrangement, Sheet 34 of 61
514451-MUH-ML-ZZ-DR-GA-300801 2F Engineering and Design Report, Mainline General Arrangement, Sheet 35 of 61
514451-MUH-ML-ZZ-DR-GA-300802 2F Engineering and Design Report, Mainline General Arrangement, Sheet 36 of 61
514451-MUH-ML-ZZ-DR-GA-300803 2F Engineering and Design Report, Mainline General Arrangement, Sheet 37 of 61
514451-MUH-ML-ZZ-DR-GA-300804 2F Engineering and Design Report, Mainline General Arrangement, Sheet 38 of 61
514451-MUH-ML-ZZ-DR-GA-300805 2F Engineering and Design Report, Mainline General Arrangement, Sheet 39 of 61
514451-MUH-ML-ZZ-DR-GA-300806 2F Engineering and Design Report, Mainline General Arrangement, Sheet 40 of 61
514451-MUH-ML-ZZ-DR-GA-300807 2F Engineering and Design Report, Mainline General Arrangement, Sheet 41 of 61
514451-MUH-ML-ZZ-DR-GA-300808 2F Engineering and Design Report, Mainline General Arrangement, Sheet 42 of 61
514451-MUH-ML-ZZ-DR-GA-300809 2F Engineering and Design Report, Mainline General Arrangement, Sheet 43 of 61
514451-MUH-ML-ZZ-DR-GA-300810 2F Engineering and Design Report, Mainline General Arrangement, Sheet 44 of 61
514451-MUH-ML-ZZ-DR-GA-300811 2F Engineering and Design Report, Mainline General Arrangement, Sheet 45 of 61
514451-MUH-ML-ZZ-DR-GA-300812 2F Engineering and Design Report, Mainline General Arrangement, Sheet 46 of 61
514451-MUH-ML-ZZ-DR-GA-300813 2F Engineering and Design Report, Mainline General Arrangement, Sheet 47 of 61
514451-MUH-ML-ZZ-DR-GA-300814 2F Engineering and Design Report, Mainline General Arrangement, Sheet 48 of 61
514451-MUH-ML-ZZ-DR-GA-300815 2F Engineering and Design Report, Mainline General Arrangement, Sheet 49 of 61
514451-MUH-ML-ZZ-DR-GA-300816 2F Engineering and Design Report, Mainline General Arrangement, Sheet 50 of 61
514451-MUH-ML-ZZ-DR-GA-300817 2F Engineering and Design Report, Mainline General Arrangement, Sheet 51 of 61
514451-MUH-ML-ZZ-DR-GA-300818 2F Engineering and Design Report, Mainline General Arrangement, Sheet 52 of 61
514451-MUH-ML-ZZ-DR-GA-300819 2F Engineering and Design Report, Mainline General Arrangement, Sheet 53 of 61
514451-MUH-ML-ZZ-DR-GA-300820 2F Engineering and Design Report, Mainline General Arrangement, Sheet 54 of 61
514451-MUH-ML-ZZ-DR-GA-300821 2F Engineering and Design Report, Mainline General Arrangement, Sheet 55 of 61
514451-MUH-ML-ZZ-DR-GA-300822 2F Engineering and Design Report, Mainline General Arrangement, Sheet 56 of 61
514451-MUH-ML-ZZ-DR-GA-300823 2F Engineering and Design Report, Mainline General Arrangement, Sheet 57 of 61
514451-MUH-ML-ZZ-DR-GA-300824 2F Engineering and Design Report, Mainline General Arrangement, Sheet 58 of 61
514451-MUH-ML-ZZ-DR-GA-300825 2F Engineering and Design Report, Mainline General Arrangement, Sheet 59 of 61
514451-MUH-ML-ZZ-DR-GA-300826 2F Engineering and Design Report, Mainline General Arrangement, Sheet 60 of 61
514451-MUH-ML-ZZ-DR-GA-300827 2F Engineering and Design Report, Mainline General Arrangement, Sheet 61 of 61
Volume 7 Other documents 7.4 Engineering and Design Report Annexes, Annex F2 Underbridge General Arrangements 514451-MUH-00-ZZ-RP-EN-300374 2F Underbridge General Arrangement Key Plan
514451-MUH-ST-S2-DR-UB-301337 2F Thames Bray Underbridge Widening General Arrangement
514451-MUH-ST-S2-DR-UB-301336 2F Chalvey Culvert Widening General Arrangement
514451-MUH-ST-S2-DR-UB-301335 2F Windsor Branch Railway Underbridge Widening General Arrangement
514451-MUH-ST-S2-DR-UB-301334 2F Water and Gas Main Subway General Arrangement
514451-MUH-ST-S2-DR-UB-301333 2F Water Main Subway General Arrangement
514451-MUH-ST-S2-DR-UB-301332 2F Ashley’s Arch Widening General Arrangement
514451-MUH-ST-S2-DR-UB-301331 2F Langley Interchange Subway Widening General Arrangement
514451-MUH-ST-S2-DR-UB-301330 2F Langley Interchange Underbridges Widening
514451-MUH-ST-S1-DR-UB-301329 2F Sipson Road Subway Widening General Arrangement
Volume 7 Other documents 7.4 Engineering and Design Report Annexes, Annex F3 Overbridge General Arrangements 514451-MUH-00-ZZ-RP-EN-300374 2F Overbridge General Arrangement Key Plan
514451-MUH-ST-S2-DR-OB-301418 2F Ascot Road Overbridge General Arrangement, Sheet 1 of 2
514451-MUH-ST-S2-DR-OB-301419 2F Ascot Road Overbridge General Arrangement, Sheet 2 of 2
514451-MUH-ST-S2-DR-OB-301420 3F Monkey Island Lane Overbridge General Arrangement, Sheet 1 of 2
514451-MUH-ST-S2-DR-OB-301421 3F Monkey Island Lane Overbridge General Arrangement, Sheet 2 of 2
514451-MUH-ST-S2-DR-OB-301422 3F Marsh Lane Overbridge General Arrangement, Sheet 1 of 2
514451-MUH-ST-S2-DR-OB-301423 2F Marsh Lane Overbridge General Arrangement, Sheet 2 of 2
514451-MUH-ST-S2-DR-OB-301424 3F Lake End Road Overbridge General Arrangement, Sheet 1 of 2
514451-MUH-ST-S2-DR-OB-301425 2F Lake End Road Overbridge General Arrangement, Sheet 2 of 2
514451-MUH-ST-S2-DR-OB-301426 2F Huntercombe Spur Overbridge General Arrangement, Sheet 1 of 2
514451-MUH-ST-S2-DR-OB-301427 2F Huntercombe Spur Overbridge General Arrangement, Sheet 2 of 2
514451-MUH-ST-S2-DR-OB-301428 3F Oldway Lane Overbridge General Arrangement, Sheet 1 of 2
514451-MUH-ST-S2-DR-OB-301429 2F Oldway Lane Overbridge General Arrangement, Sheet 2 of 2
514451-MUH-ST-S2-DR-OB-301430 3F Wood Lane Overbridge General Arrangement, Sheet 1 of 2
514451-MUH-ST-S2-DR-OB-301431 3F Wood Lane Overbridge General Arrangement, Sheet 2 of 2
514451-MUH-ST-S2-DR-OB-301432 3F Datchet Road Overbridge General Arrangement, Sheet 1 of 3
514451-MUH-ST-S2-DR-OB-301433 3F Datchet Road Overbridge General Arrangement, Sheet 2 of 3
514451-MUH-ST-S2-DR-OB-301434 3F Datchet Road Overbridge General Arrangement, Sheet 3 of 3
514451-MUH-ST-S2-DR-OB-301435 2F Recreation Ground Overbridge General Arrangement, Sheet 1 of 2
514451-MUH-ST-S2-DR-OB-301436 2F Recreation Ground Overbridge General Arrangement, Sheet 2 of 2
514451-MUH-ST-S2-DR-OB-301437 3F Riding Court Road Overbridge General Arrangement, Sheet 1 of 2
514451-MUH-ST-S2-DR-OB-301438 3F Riding Court Road Overbridge General Arrangement, Sheet 2 of 2
514451-MUH-ST-S2-DR-OB-301439 3F Old Slade Lane Overbridge General Arrangement, Sheet 1 of 2
514451-MUH-ST-S2-DR-OB-301440 2F Old Slade Lane Overbridge General Arrangement, Sheet 2 of 2
Volume 7 Other documents, 7.4 Engineering and Design Report Annexes, Annex F5 CCTV typical detail WCCTV-15M-SSL-GA 1 15m CCTV Winch SSL GA
Volume 7 Other documents, 7.5 Drainage strategy report, Annex C J12-J8 Verge drainage drawings 514451-MUH-ML-ZZ-DR-DR-300945 2R Proposed Drainage J12 - J8/9, Surface Water collection, Verge, Key and Index
514451-MUH-ML-ZZ-DR-DR-300946 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 1 of 32 Ch 62300 – 62900
514451-MUH-ML-ZZ-DR-DR-300947 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 2 of 32 Ch 61400 – 62300
514451-MUH-ML-ZZ-DR-DR-300948 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 3 of 32 Ch 60500 – 61400
514451-MUH-ML-ZZ-DR-DR-300949 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 4 of 32 Ch 59600 – 60500
514451-MUH-ML-ZZ-DR-DR-300950 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 5 of 32 Ch 57800 – 59600
514451-MUH-ML-ZZ-DR-DR-300951 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 6 of 32 Ch 57800 – 57800
514451-MUH-ML-ZZ-DR-DR-300952 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 7 of 32 Ch 56900 – 57800
514451-MUH-ML-ZZ-DR-DR-300953 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 8 of 32 Ch 56000 – 56900
514451-MUH-ML-ZZ-DR-DR-300954 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 9 of 32 Ch 55100 – 56000
514451-MUH-ML-ZZ-DR-DR-300955 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 10 of 32 Ch 54200 – 55100
514451-MUH-ML-ZZ-DR-DR-300956 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 11 of 32 Ch 53300 – 54200
514451-MUH-ML-ZZ-DR-DR-300957 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 12 of 32 Ch 52400 – 53300
514451-MUH-ML-ZZ-DR-DR-300958 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 13 of 32 Ch 51500- 52400
514451-MUH-ML-ZZ-DR-DR-300959 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 14 of 32 Ch 50600 – 51500
514451-MUH-ML-ZZ-DR-DR-300960 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 15 of 32 Ch 49700 – 50600
514451-MUH-ML-ZZ-DR-DR-300961 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 16 of 32 Ch 48800 – 49700
514451-MUH-ML-ZZ-DR-DR-300962 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 17 of 32 Ch 47900 – 48800
514451-MUH-ML-ZZ-DR-DR-300963 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 18 of 32 Ch 47000 – 47900
514451-MUH-ML-ZZ-DR-DR-300964 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 19 of 32 Ch 46100 – 47000
514451-MUH-ML-ZZ-DR-DR-300965 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 20 of 32 Ch 45200 – 46100
514451-MUH-ML-ZZ-DR-DR-300966 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 21 of 32 Ch 44300 – 45200
514451-MUH-ML-ZZ-DR-DR-300967 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 22 of 32 Ch 43400 – 44300
514451-MUH-ML-ZZ-DR-DR-300968 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 23 of 32 Ch 42500- 43400
514451-MUH-ML-ZZ-DR-DR-300969 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 24 of 32 Ch 41600 – 42500
514451-MUH-ML-ZZ-DR-DR-300970 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 25 of 32 Ch 40700 – 41600
514451-MUH-ML-ZZ-DR-DR-300971 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 26 of 32 Ch 39800 – 40700
514451-MUH-ML-ZZ-DR-DR-300972 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 27 of 32 Ch 38900 – 39800
514451-MUH-ML-ZZ-DR-DR-300973 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 28 of 32 Ch 38000 – 38900
514451-MUH-ML-ZZ-DR-DR-300974 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 29 of 32 Ch 37100 – 38000
514451-MUH-ML-ZZ-DR-DR-300975 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 30 of 32 Ch 36200 – 37100
514451-MUH-ML-ZZ-DR-DR-300976 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 31 of 32 Ch 35300 – 36200
514451-MUH-ML-ZZ-DR-DR-300977 2R Proposed Drainage J12 - J8/9, Surface Water Collection, Verge, Sheet 32 of 32 Ch 34400 – 35300
Volume 7 Other documents, 7.5 Drainage strategy report, Annex D J12-J8 Central reserve drainage drawings 514451-MUH-ML-ZZ-DR-DR-300884 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Key and Index
514451-MUH-ML-ZZ-DR-DR-300885 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 1 of 32 Ch 62300 – 62900
514451-MUH-ML-ZZ-DR-DR-300886 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 2 of 32 Ch 61400 – 62300
514451-MUH-ML-ZZ-DR-DR-300887 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 3 of 32 Ch 60500 – 61400
514451-MUH-ML-ZZ-DR-DR-300888 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 4 of 32 Ch 59600 – 60500
514451-MUH-ML-ZZ-DR-DR-300889 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 5 of 32 Ch 57800 – 59600
514451-MUH-ML-ZZ-DR-DR-300890 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 6 of 32 Ch 57800 – 57800
514451-MUH-ML-ZZ-DR-DR-300891 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 7 of 32 Ch 56900 – 57800
514451-MUH-ML-ZZ-DR-DR-300892 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 8 of 32 Ch 56000 – 56900
514451-MUH-ML-ZZ-DR-DR-300893 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 9 of 32 Ch 55100 – 56000
514451-MUH-ML-ZZ-DR-DR-3008943 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 10 of 32 Ch 54200 – 55100
514451-MUH-ML-ZZ-DR-DR-300895 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 11 of 32 Ch 53300 – 54200
514451-MUH-ML-ZZ-DR-DR-300896 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 12 of 32 Ch 52400 – 53300
514451-MUH-ML-ZZ-DR-DR-300897 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 13 of 32 Ch 51500- 52400
514451-MUH-ML-ZZ-DR-DR-300898 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 14 of 32 Ch 50600 – 51500
514451-MUH-ML-ZZ-DR-DR-300899 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 15 of 32 Ch 49700 – 50600
514451-MUH-ML-ZZ-DR-DR-300900 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 16 of 32 Ch 48800 – 49700
514451-MUH-ML-ZZ-DR-DR-300901 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 17 of 32 Ch 47900 – 48800
514451-MUH-ML-ZZ-DR-DR-300902 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 18 of 32 Ch 47000 – 47900
514451-MUH-ML-ZZ-DR-DR-300903 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 19 of 32 Ch 46100 – 47000
514451-MUH-ML-ZZ-DR-DR-300904 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 20 of 32 Ch 45200 – 46100
514451-MUH-ML-ZZ-DR-DR-300905 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 21 of 32 Ch 44300 – 45200
514451-MUH-ML-ZZ-DR-DR-300906 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 22 of 32 Ch 43400 – 44300
514451-MUH-ML-ZZ-DR-DR-300907 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 23 of 32 Ch 42500- 43400
514451-MUH-ML-ZZ-DR-DR-300908 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 24 of 32 Ch 41600 – 42500
514451-MUH-ML-ZZ-DR-DR-300909 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 25 of 32 Ch 40700 – 41600
514451-MUH-ML-ZZ-DR-DR-300910 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 26 of 32 Ch 39800 – 40700
514451-MUH-ML-ZZ-DR-DR-300911 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 27 of 32 Ch 38900 – 39800
514451-MUH-ML-ZZ-DR-DR-300912 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 28 of 32 Ch 38000 – 38900
514451-MUH-ML-ZZ-DR-DR-300913 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 29 of 32 Ch 37100 – 38000
514451-MUH-ML-ZZ-DR-DR-300914 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 30 of 32 Ch 36200 – 37100
514451-MUH-ML-ZZ-DR-DR-300915 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 31 of 32 Ch 35300 – 36200
514451-MUH-ML-ZZ-DR-DR-300916 3R Proposed Drainage J12 – J8/9, Surface Water Collection, Central Reserve, Sheet 32 of 32 Ch 34400 – 35300
Volume 7 Other documents, 7.5 Drainage strategy report, Annex E J12-J8 Junction drainage drawings 537806-MUH-VR-S3-DR-DR-500150 1D Proposed Drainage J12- J8/9, Surface Water Collection, Junctions, Key and Index of Drawings
537806-MUH-VR-S3-DR-DR-500151 1D Proposed Drainage J12- J8/9, Surface Water Collection, Junctions, Sheet 1 of 6, Junction 12
537806-MUH-VR-S3-DR-DR-500152 1D Proposed Drainage J12- J8/9, Surface Water Collection, Junctions, Sheet 2 of 6, Reading MSA Junction
537806-MUH-VR-S3-DR-DR-500153 1D Proposed Drainage J12- J8/9, Surface Water Collection, Junctions, Sheet 3 of 6, Junction 11
537806-MUH-VR-S3-DR-DR-500154 1D Proposed Drainage J12- J8/9, Surface Water Collection, Junctions, Sheet 4 of 6, Junction 10
537806-MUH-VR-S3-DR-DR-500155 1D Proposed Drainage J12- J8/9, Surface Water Collection, Junctions, Sheet 5 of 6, Junction 10
537806-MUH-VR-S3-DR-DR-500156 1D Proposed Drainage J12- J8/9, Surface Water Collection, Junctions, Sheet 6 of 6, Junction 8/9
Volume 7 Other documents, 7.5 Drainage strategy report, Annex F J12-J8 ERA drainage drawings 537806-MUH-VR-S3-DR-DR-500100 1D Proposed Drainage J12 – J8/9, Surface Water Collection, Emergency Refuge Areas, Key and Index Sheet
537806-MUH-VR-S3-DR-DR-500101 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 1 of 19, ERA E7-A1
537806-MUH-VR-S3-DR-DR-500102 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 2 of 19 ERA E7-B1
537806-MUH-VR-S3-DR-DR-500103 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 3 of 19 ERA E7-A2
537806-MUH-VR-S3-DR-DR-500104 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 4 of 19 ERA E7-B2
537806-MUH-VR-S3-DR-DR-500105 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 5 of 19 ERA E7-A3
537806-MUH-VR-S3-DR-DR-500106 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 6 of 19 ERA E7-B3
537806-MUH-VR-S3-DR-DR-500107 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 7 of 19 ERA E7-A4
537806-MUH-VR-S3-DR-DR-500108 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 8 of 19 ERA E7-B4
537806-MUH-VR-S3-DR-DR-500109 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 9 of 19 ERA E8-A1
537806-MUH-VR-S3-DR-DR-500110 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 10 of 19 ERA E8-B1
537806-MUH-VR-S3-DR-DR-500111 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 11 of 19 ERA E8-A2
537806-MUH-VR-S3-DR-DR-500112 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 12 of 19 ERA E8-B2
537806-MUH-VR-S3-DR-DR-500113 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 13 of 19 ERA E8-A3
537806-MUH-VR-S3-DR-DR-500114 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 14 of 19 ERA E8-B3
537806-MUH-VR-S3-DR-DR-500115 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 15 of 19 ERA E9-A1
537806-MUH-VR-S3-DR-DR-500116 1D Proposed Drainage Surface Water Collection Emergency Refuge Areas Sheet 16 of 19 ERA E9-A1
537806-MUH-VR-S3-DR-DR-500117 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 17 of 19 ERA E9-A2
537806-MUH-VR-S3-DR-DR-500118 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 18 of 19 ERA E9-B3
537806-MUH-VR-S3-DR-DR-500119 1D Proposed Drainage J12 - J8/9, Surface Water Collection, Emergency Refuge Areas, Sheet 19 of 19 ERA E9-A3
Volume 7 Other documents, 7.5 Drainage strategy report, Annex G J8-J3 Indicative drainage drawings 514451-MUH-00-ZZ-DR-DR-300149 3R Indicative Drainage J8/9 to J3, Surface Water Collection Key, and Index of Drawings
514451-MUH-00-ZZ-DR-DR-300150 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 1 of 27, Ch 33500 - 34400
514451-MUH-00-ZZ-DR-DR-300151 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 2 of 27, Ch 32600 - 33500
514451-MUH-00-ZZ-DR-DR-300152 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 3 of 27, Ch 31700 - 32600
514451-MUH-00-ZZ-DR-DR-300153 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 4 of 27, Ch 30800 - 31700
514451-MUH-00-ZZ-DR-DR-300154 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 5 of 27, Ch 29900 - 30800
514451-MUH-00-ZZ-DR-DR-300155 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 6 of 27, Ch 29000 - 29900
514451-MUH-00-ZZ-DR-DR-300156 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 7 of 27, Ch 28100 - 29000
514451-MUH-00-ZZ-DR-DR-300157 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 8 of 27, Ch 27200 - 28100
514451-MUH-00-ZZ-DR-DR-300158 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 9 of 27, Ch26300 - 27200
514451-MUH-00-ZZ-DR-DR-300159 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 10 of 27, Ch 25400 - 26300
514451-MUH-00-ZZ-DR-DR-300160 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 11 of 27, Ch 24500 - 25400
514451-MUH-00-ZZ-DR-DR-300161 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 12 of 27, Ch 23600 - 24500
514451-MUH-00-ZZ-DR-DR-300162 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 13 of 27, Ch 22700 - 23600
514451-MUH-00-ZZ-DR-DR-300163 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 14 of 27, Ch 21800 - 22700
514451-MUH-00-ZZ-DR-DR-300164 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 15 of 27, Ch 20900 - 21800
514451-MUH-00-ZZ-DR-DR-300165 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 16 of 27, Ch 20000 - 20900
514451-MUH-00-ZZ-DR-DR-300166 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 17 of 27, Ch 19100 - 20000
514451-MUH-00-ZZ-DR-DR-300167 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 18 of 27, Ch 18200 - 19100
514451-MUH-00-ZZ-DR-DR-300168 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 19 of 27, Ch 17300 - 18200
514451-MUH-00-ZZ-DR-DR-300169 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 20 of 27, Ch 16400 - 17300
514451-MUH-00-ZZ-DR-DR-300170 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 21 of 27, Ch 15500 - 16400
514451-MUH-00-ZZ-DR-DR-300171 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 22 of 27, Ch 14600 - 15500
514451-MUH-00-ZZ-DR-DR-300172 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 23 of 27, Ch 13700 - 14600
514451-MUH-00-ZZ-DR-DR-300173 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 24 of 27, Ch 12800 - 13700
514451-MUH-00-ZZ-DR-DR-300174 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 25 of 27, Ch 11900 - 12800
514451-MUH-00-ZZ-DR-DR-300175 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 26 of 27, Ch 11000 - 11900
514451-MUH-00-ZZ-DR-DR-300176 3R Indicative Drainage J8/9 to J3, Surface Water Collection, Sheet 27 of 27, Ch 10100 - 11000

Signed

Signed by authority of the Secretary of State for Transport

Martin Woods — Head of the Transport and Works Act Orders Unit — Department for Transport — 2nd September 2016

Explanatory note

(This note is not part of the Order)

EXPLANATORY NOTE

This Order authorises the undertaker to make alterations to and to improve a carriageway between Junctions 3 to 12 of the M4 and carry out all associated works.

The Order permits the undertaker to acquire, compulsorily or by agreement, land and rights in land and to use land for this purpose.

The Order also makes provision in connection with the maintenance of the authorised development.

A copy of the plans, engineering drawings and sections and the book of reference and environmental statement mentioned in this Order and certified in accordance with article 40 of this Order (certification of plans, etc.) may be inspected free of charge during working hours at Highways England, The Cube, 199 Wharfside Street, Birmingham, B1 1RN

Highways England’s Manual of Contract Documents and Design Manual for Roads and Bridges are available at www.gov.uk/guidance/standards-for-highways-online-resources.

Footnotes

[^f00001]: 2008 c. 29. Parts 1 to 7 were amended by Chapter 6 of Part 6 of the Localism Act 2011 (c. 20).

[^f00002]: S.I. 2009/2264 as amended by S.I. 2010/602, S.I. 2012/635, S.I. 2012/2654, S.I, 2012/2732, S.I. 2013/522 and S.I. 2013/755.

[^f00003]: S.I. 2010/103 as amended by S.I. 2012/635.

[^f00004]: 1961 c. 33.

[^f00005]: 1965 c. 56.

[^f00006]: 1980 c. 66.

[^f00007]: 1981 c. 66.

[^f00008]: 1984 c. 27.

[^f00009]: 1990 c. 8.

[^f00010]: 1991 c. 22.

[^f00011]: 2008 c. 29.

[^f00012]: 1971 c. 80.

[^f00013]: The definition of “cycle track” was amended by section 1 of the Cycle Tracks Act 1984 (c. 38) and paragraph 21(2) of Schedule 3 to the Road Traffic (Consequential Provisions) Act 1988 (c. 54).

[^f00014]: S.I. 2009/2264, amended by S.I. 2010/439, S.I. 2010/602, S.I. 2012/635, S.I. 2012/2654, S.I. 2012/2732, S.I. 2013/522 and S.I. 2013/755.

[^f00015]: 1981 c. 67. Section 7 was amended by section 70 of, and paragraph 9 of Schedule 15 to, the Planning and Compensation Act 1991 (c. 34). There are other amendments to the 1981 Act which are not relevant to this Order.

[^f00016]: 2015 c. 7.

[^f00017]: As amended by section 102 of, and Schedule 17 to, the Local Government Act 1985 (c. 51) and section 168(2) of, and Schedule 9 to, the New Roads and Street Works Act 1991 (c. 22).

[^f00018]: Sections 54, 55, 57, 60, 68 and 69 were amended by section 40(1) and (2) of, and Schedule 1 to the Traffic Management Act 2004 (c. 18).

[^f00019]: As also amended by section 49(1) of the Traffic Management Act 2004.

[^f00020]: As also amended by section 49(2) and 51(9) of the Traffic Management Act 2004.

[^f00021]: As also amended by section 52(3) of the Traffic Management Act 2004.

[^f00022]: As amended by section 42 of the Traffic Management Act 2004.

[^f00023]: 1991 c. 57.

[^f00025]: Section 106 was amended by section 35(1) and (8) of, and Schedule 2 to, the Competition and Service (Utilities) Act 1992 (c. 43), sections 36(2) and 99 of the Water Act 2003 (c. 37) and paragraph 16(1) of Schedule 3 to the Flood and Water Management Act 2010 (c. 29)

[^f00026]: Section 8 was amended by S.I. 2009/1307.

[^f00027]: Section 11 was amended by section 34(1) of, and Schedule 4 to, the Acquisition of Land Act 1981 (c. 67), section 3 of, and part 1 of Schedule 1 to, the Housing (Consequential Provisions) Act 1985 (c. 71), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (No. 1) and S.I. 2009/1307.

[^f00028]: Section 13 was amended by sections 62(3) and 139 of, and paragraph 27 and 28 of Schedule 13, and part 3 of Schedule 23, to, the Tribunals, Courts and Enforcement Act 2007 (c. 15).

[^f00029]: 2003 c. 21.

[^f00030]: 1981 c. 67. Sub-paragraph (5) of paragraph 1 of Part 1 of Schedule 2 was amended by section 67 of, and paragraph 27(3) of Schedule 9 to, the Coal Industry Act 1994 (c. 21) and paragraph 8 of Part 3 of Schedule 2 was amended by section 46 of the Criminal Justice Act 1982 (c. 48). There are other amendments to the 1981 Act which are not relevant to this Order.

[^f00031]: 1990 c. 43. There are amendments to this Act which are not relevant to this Order.

[^f00032]: 1974 c. 40. Section 61(2) was amended by section 133(2) of, and Schedule 7 to, the Building Act 1984 (c. 55). Sections 61(9) and 65(8) were amended by section 162 of, and paragraph 15 of Schedule 3 to, the Environmental Protection Act 1990 (c. 25).

[^f00033]: 1978 c. 30.

[^f00034]: Section 32 was amended by section 102 of, and Schedule 17 to, the Local Government Act 1985 (c. 51) and section 168(1) of, and paragraph 39 of Schedule 8 to, the 1991 Act.

[^f00035]: 2004 c. 18.

[^f00037]: 1991 c. 56.

[^f00038]: 1973 c. 26.

[^f00039]: Section 58(1) was amended by section 16(3) of, and Schedule 5 to, the Compulsory Purchase (Vesting Declarations) Act 1981 (c. 66), section 4 of, and paragraph 29(1) of Schedule 2 to, the Planning (Consequential Provisions) Act 1990 (c. 11) and S.I. 2009/1307.

[^f00040]: S.I. 2016/863.

[^f00041]: Section 11 was amended by section 34(1) of, and Schedule 4 to, the Acquisition of Land Act 1981 (c. 67), section 3 of, and part 1 of Schedule 1 to, the Housing (Consequential Provisions) Act 1985 (c. 71), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (No. 1) and S.I. 2009/1307.

[^f00042]: Section 12 was amended by section 56(2) of, and part 1 of Schedule 9 to, the Courts Act 1971 (c. 23).

[^f00043]: Section 13 was amended by sections 62(3), 139(4) to (9) and 146 of, and paragraphs 27 and 28 of Schedule 13 and part 3 of Schedule 23 to, the Tribunals, Courts and Enforcement Act 2007 (c. 15).

[^f00044]: Section 20 was amended by paragraph 4 of Schedule 15 to the Planning and Compensation Act 1991 (c. 34) and S.I. 2009/1307.

[^f00045]: 1989 c. 29. The definition of “electrical plant” (in section 64) was amended by paragraphs 24 and 38(1) and (3) of Schedule 6 to the Utilities Act 2000 (c. 27).

[^f00046]: 1986 c. 44. A new section 7 was substituted by section 5 of the Gas Act 1995 (c. 45), and was further amended by sections 3(2) and 76 of, and paragraphs 1 and 4 of Schedule 6, and Schedule 8, to, the Utilities Act 2000 (c. 27), sections 149(1) and (5) and 197(9) of, and part 1 of Schedule 23 to, the Energy Act 2004 (c. 20) and S.I. 2011/2704.

[^f00047]: 1991 c. 56.

[^f00048]: Section 102(4) was amended by section 96(1)(c) of the Water Act 2003. Section 104 was amended by sections 96(4) and 101(2) of, and part 3 of Schedule 9 to, the Water Act 2003 and section 42(3) of the Flood and Water Management Act 2010 (c. 29).

[^f00049]: 1962 c. 58. Section 65(2) was amended by paragraphs 1 and 6 of Schedule 2 to the Energy Act 2011 (c. 16), S.I. 2000/1937 and S.I. 2011/2305.

[^f00050]: 2003 c. 21.

[^f00051]: Paragraph 1(3A) was inserted by section 106(2) of, and paragraphs 1 and 4 of Schedule 3 to, the Communications Act 2003.

[^f00052]: See section 106 of the 2003 Act.

[^f00053]: 1984 c. 12. Paragraph 23 was amended by section 190 of, and paragraph 68 of Schedule 25 and Part 1 of Schedule 27 to, the Water Act 1989 (c. 15), section 112(4) of, and Schedule 18 to, the Electricity Act 1989 (c. 29) and section 106(2) of, and paragraphs 1, 5(d) and 8 of Schedule 3 to, the Communications Act 2003.

[^f00054]: 1993 c. 43.

[^f00055]: 2006 c. 46.

[^f00056]: 1993 c. 43.

[^f00057]: 2016 c. 22.

[^f00058]: Clearances required are 15 metres or below in relation to most apparatus (except if a motorway or sky cradle is involved or in certain other specified situations where up to 30 metres clearance may be required).

[^f00059]: 1986 c. 44. A new section 7 was substituted by section 5 of the Gas Act 1995 (c. 45), and was further amended by sections 3(2) and 76 of, and paragraphs 1 and 4 of Schedule 6, and Schedule 8, to, the Utilities Act 2000 (c. 27), sections 149(1) and (5) and 197(9) of, and part 1 of Schedule 23 to, the Energy Act 2004 (c. 20) and S.I. 2011/2704.

[^f00060]: 1962 c. 58.

[^f00061]: S.I. 1996/825.

[^f00062]: 1962 c. 58. Section 65(2) was amended by paragraphs 1 and 6 of Schedule 2 to the Energy Act 2011 (c. 16), S.I. 2000/1937 and S.I. 2011/2305.

[^f00063]: 1991 c. vii.

[^f00064]: 1991 c. ix.

[^f00065]: S.I. 2002/1064.

[^f00066]: 1989 c. 29. The definition of “electrical plant” (in section 64) was amended by paragraphs 24 and 38(1) and (3) of Schedule 6 to the Utilities Act 2000 (c. 27).

Editorial notes

[^key-a8cc2dd85af4e4f16c2d07f8ff4c379d]: Art. 1 in force at 23.9.2016, see art. 1

[^key-81465f554fe64abb70d9d61602d4ffa2]: Art. 2 in force at 23.9.2016, see art. 1

[^key-7144f8541e65d78874135279e756b6a8]: Art. 3 in force at 23.9.2016, see art. 1

[^key-0f5fa0327f6f4eda8c852e3ad2f4d7d8]: Art. 4 in force at 23.9.2016, see art. 1

[^key-1d0e758a532249a7613b93fe2de161e0]: Art. 5 in force at 23.9.2016, see art. 1

[^key-6df9559daf33e127660597ffae12b141]: Art. 6 in force at 23.9.2016, see art. 1

[^key-b4479dd513005067fb147c9372fbe3f5]: Art. 7 in force at 23.9.2016, see art. 1

[^key-49878a9b735311e6bc50eeee46f97ef6]: Art. 8 in force at 23.9.2016, see art. 1

[^key-a56f19c63ce967304e081d7dbc2107cd]: Art. 9 in force at 23.9.2016, see art. 1

[^key-a800c57568c78fcce443971fba7d780c]: Art. 10 in force at 23.9.2016, see art. 1

[^key-b33cc26963a900ccbfa9ed8743e29727]: Art. 11 in force at 23.9.2016, see art. 1

[^key-fe918feffac0cd95c2760ab2b656a50a]: Art. 12 in force at 23.9.2016, see art. 1

[^key-9c7882fd0d3fa7e0f94cfc03badb1ffc]: Art. 13 in force at 23.9.2016, see art. 1

[^key-c58e757b82500b1819ba1d895634760a]: Art. 14 in force at 23.9.2016, see art. 1

[^key-50e6ae3daca7ac6cf01bb4caf780778a]: Art. 15 in force at 23.9.2016, see art. 1

[^key-def658da69e9b21af366b9c9c1f88163]: Art. 16 in force at 23.9.2016, see art. 1

[^key-328e3668307da35adb80225a9ceb76cf]: Art. 17 in force at 23.9.2016, see art. 1

[^key-c85a1a958cad9ad93d8e0ab9f13d6236]: Art. 18 in force at 23.9.2016, see art. 1

[^key-d59aa5179fb1d5e6ee958805e20df6c5]: Art. 19 in force at 23.9.2016, see art. 1

[^key-41ce76e6f26a2c4a8e0e90251bad641a]: Art. 20 in force at 23.9.2016, see art. 1

[^key-7ab3ac3c4b3bb16a0090171dbfbc8f0d]: Art. 21 in force at 23.9.2016, see art. 1

[^key-69f54ede5b8aea5c65af776a7f65161e]: Art. 22 in force at 23.9.2016, see art. 1

[^key-f00ef2ce9a3f005f86a354d721dc30ac]: Art. 23 in force at 23.9.2016, see art. 1

[^key-96dc293ebed15a17b4e6c8d61ea27383]: Art. 24 in force at 23.9.2016, see art. 1

[^key-3d32c942f041595088aa24ad2e80e814]: Art. 25 in force at 23.9.2016, see art. 1

[^key-70ada5680c27f464de30b5f790e2aa86]: Art. 26 in force at 23.9.2016, see art. 1

[^key-8b97f479e8a6679f4ed662be75feec12]: Art. 27 in force at 23.9.2016, see art. 1

[^key-42e653dd51701d137a7beebea5ddc839]: Art. 28 in force at 23.9.2016, see art. 1

[^key-77d08beaf7b466a29f93391703482661]: Art. 29 in force at 23.9.2016, see art. 1

[^key-7109da44cc3b480f4053274d1b5aa528]: Art. 30 in force at 23.9.2016, see art. 1

[^key-5b821ea728be5a1a264dbc1187b08f3e]: Art. 31 in force at 23.9.2016, see art. 1

[^key-0a355d6abbb6fcf2f1047d3cad543096]: Art. 32 in force at 23.9.2016, see art. 1

[^key-717cfb7b5fdb2741bd0bcfe5aec97b66]: Art. 33 in force at 23.9.2016, see art. 1

[^key-f31022e151acc0179ea9a012e90bca7d]: Art. 34 in force at 23.9.2016, see art. 1

[^key-0e9ee8fbf4f5abcb75cd242a31ea4a6f]: Art. 35 in force at 23.9.2016, see art. 1

[^key-247254662caa054af76b83b9bd004203]: Art. 36 in force at 23.9.2016, see art. 1

[^key-7d7ee2908746c854d0fd5be0a17b89a2]: Art. 37 in force at 23.9.2016, see art. 1

[^key-ab154007cebc198ff194a292e020faec]: Art. 38 in force at 23.9.2016, see art. 1

[^key-4b5c994ac61b2ba3cb851252466caad1]: Art. 39 in force at 23.9.2016, see art. 1

[^key-fb2e0dabf094013108f4e58e1b5d243e]: Art. 40 in force at 23.9.2016, see art. 1

[^key-fd5c5c175c2293623e25cf906a665bfb]: Art. 41 in force at 23.9.2016, see art. 1

[^key-99f4ce8ae39e963c0630b7341e1c3ff3]: Art. 42 in force at 23.9.2016, see art. 1

[^key-dd45ab25234cf172f9900a747de7bca5]: Art. 43 in force at 23.9.2016, see art. 1

[^key-0e23cf9f4e0e6aa46693351662f2db74]: Art. 44 in force at 23.9.2016, see art. 1

[^key-f77a60248f57d2969c1cbe0052f4daf6]: Sch. 2 para. 1 in force at 23.9.2016, see art. 1

[^key-2dddd2a89d941c7d0cfa0daa3b40373d]: Sch. 2 para. 2 in force at 23.9.2016, see art. 1

[^key-e11bed32a8f0da92db0b9ce0990e6071]: Sch. 2 para. 3 in force at 23.9.2016, see art. 1

[^key-75d7b160fa6a575c5c78ff8c83b0f5d7]: Sch. 2 para. 4 in force at 23.9.2016, see art. 1

[^key-a53375d89514d0394901a168da452d2e]: Sch. 2 para. 5 in force at 23.9.2016, see art. 1

[^key-b0eb2c3f19a20bc1316b26d8aa977ac2]: Sch. 2 para. 6 in force at 23.9.2016, see art. 1

[^key-72f9ae400ea0381bd5bea1340e31f442]: Sch. 2 para. 7 in force at 23.9.2016, see art. 1

[^key-cc4a1ddabcde8afed3c74dcf42a9ab89]: Sch. 2 para. 8 in force at 23.9.2016, see art. 1

[^key-325a13c69bf602efc23ae5853b22086a]: Sch. 2 para. 9 in force at 23.9.2016, see art. 1

[^key-96d33112ef2ce69f00a68fd47398406f]: Sch. 2 para. 10 in force at 23.9.2016, see art. 1

[^key-0a500159a17ad2deb561fb238d7acb8b]: Sch. 2 para. 11 in force at 23.9.2016, see art. 1

[^key-86872c58e16e0b0b401e2cfadc119f07]: Sch. 2 para. 12 in force at 23.9.2016, see art. 1

[^key-918831b7230208fc4b2ecfba4ea018b7]: Sch. 2 para. 13 in force at 23.9.2016, see art. 1

[^key-7d4cfa58a26306b5a8fd7164883ae5c4]: Sch. 2 para. 14 in force at 23.9.2016, see art. 1

[^key-2ae6d206bcbbfda06aa1ba7537a9b9e9]: Sch. 2 para. 15 in force at 23.9.2016, see art. 1

[^key-752bbd65bb0ff9db0fcf84b17ec51ed4]: Sch. 2 para. 16 in force at 23.9.2016, see art. 1

[^key-dd7ef584068bf54e1d24aede95d06304]: Sch. 2 para. 17 in force at 23.9.2016, see art. 1

[^key-76d71637e163c137195fba239cd54225]: Sch. 2 para. 18 in force at 23.9.2016, see art. 1

[^key-d4f982382e6277b6cda07f2887ab51c2]: Sch. 2 para. 19 in force at 23.9.2016, see art. 1

[^key-e0390b0d45be5c40195684ca7647ed09]: Sch. 2 para. 20 in force at 23.9.2016, see art. 1

[^key-9d1b9792a59bbb96182205736178435e]: Sch. 2 para. 21 in force at 23.9.2016, see art. 1

[^key-a13e46af20b712e2f5c42f3ced1a4102]: Sch. 2 para. 22 in force at 23.9.2016, see art. 1

[^key-db8c7eb73b9f400bd933537cfe29062a]: Sch. 2 para. 23 in force at 23.9.2016, see art. 1

[^key-fa44d214f7f2ab569850b2b020780396]: Sch. 2 para. 24 in force at 23.9.2016, see art. 1

[^key-9e4c4d94bb183b24a807742b1dd9c610]: Sch. 2 para. 25 in force at 23.9.2016, see art. 1

[^key-dbe5657ebd87a6e9df83d4e4489cd706]: Sch. 2 para. 26 in force at 23.9.2016, see art. 1

[^key-9371afa55abb923982f3eb88893c2cd6]: Sch. 2 para. 27 in force at 23.9.2016, see art. 1

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.