The Brechfa Forest Wind Farm Connection (Correction) Order 2017
Made: 9th March 2017
Coming into force: 10th March 2017
The Secretary of State, in exercise of the powers conferred by paragraphs 1(4) and (8) of Schedule 4 to the Act, makes the following Order:
Citation and commencement
1
This Order may be cited as the Brechfa Forest Wind Farm Connection (Correction) Order 2017 and comes into force on 10th March 2017.
Corrections
2
The Brechfa Forest Wind Farm Connection Order 2016 is corrected as follows.
- (1) In Part 3 of Schedule 2 (Plans), substitute the table with the following—
| (1) Drawing title | (2) Drawing number | (3) Revision |
|---|---|---|
| Access and Rights of Way Plans | Section A Key Plan – 15/WPD/021 | B |
| Access and Rights of Way Plans | Section A Plan Series – 15/WPD/022 | B |
| Access and Rights of Way Plans | Section B Key Plan – 15/WPD/023 | A |
| Access and Rights of Way Plans | Section B Plan Series – 15/WPD/024 | A |
| Access and Rights of Way Plans | Section C Key Plan – 15/WPD/025 | A |
| Access and Rights of Way Plans | Section C Plan Series – 15/WPD/026 | A |
- (2) In Part 5 of Schedule 2 (Plans), substitute the table with the following—
| (1)Drawing title | (2)Drawing number | (3)Revision |
|---|---|---|
| Key Plan for Design Drawings | 15/WPD/100 | A |
| 132kV Overhead Line Work No. 1 Profiles | 15/WPD/106 | B |
| 132kV Overhead Line Work No. 2 Profiles | 15/WPD/102 | A |
| 132kV Overhead Line Wood Pole Outlines | 15/WPD/103 | A |
| Design Drawings 132kV Underground Cables | 15/WPD/104 | A |
- (3) In Part 7 of Schedule 2 (Plans), substitute the table with the following—
| (1)Drawing title | (2)Drawing number | (3)Revision |
|---|---|---|
| Key Plan for Heritage Designations (Section A) | 15/WPD/033 | B |
| Key Plan for Heritage Designations (Section B) | 15/WPD/035 | A |
| Key Plan for Heritage Designations (Section C) | 15/WPD/037 | A |
| Heritage Designations Plan (Section A) | 15/WPD/034 | B |
| Heritage Designations Plan (Section B) | 15/WPD/036 | A |
| Heritage Designations Plan (Section C) | 15/WPD/038 | A |
- (4) In Part 8 of Schedule 2 (Plans), substitute the table with the following—
| (1)Drawing title | (2)Drawing number | (3)Revision |
|---|---|---|
| Land Plans | Section A Key Plan – 15/WPD/009 | B |
| Land Plans | Section A Plan Series – 15/WPD/010 | D |
| Land Plans | Section B Key Plan – 15/WPD/011 | A |
| Land Plans | Section B Plan Series – 15/WPD/012 | D |
| Land Plans | Section C Key Plan – 15/WPD/013 | A |
| Land Plans | Section C Plan Series – 15/WPD/014 | C |
- (5) In Part 9 of Schedule 2 (Plans), substitute the table with the following—
| (1)Drawing title | (2)Drawing number | (3)Revision |
|---|---|---|
| Trees and Hedges with the Potential to be Affected Plans | Section A Key Plan – 15/WPD/039 | B |
| Trees and Hedges with the Potential to be Affected Plans | Section A Plan Series – 15/WPD/110 | B |
| Trees and Hedges with the Potential to be Affected Plans | Section B Key Plan – 15/WPD/041 | A |
| Trees and Hedges with the Potential to be Affected Plans | Section B Plan Series – 15/WPD/111 | A |
| Trees and Hedges with the Potential to be Affected Plans | Section C Key Plan – 15/WPD/043 | A |
| Trees and Hedges with the Potential to be Affected Plans | Section C Plan Series – 15/WPD/044 | A |
- (6) In Part 10 of Schedule 2 (Plans), substitute the table with the following—
| (1)Drawing title | (2)Drawing number | (3)Revision |
|---|---|---|
| Works Plans | Section A Key Plan – 15/WPD/015 | B |
| Works Plans | Section A Plan Series – 15/WPD/107 | D |
| Works Plans | Section B Key Plan – 15/WPD/017 | A |
| Works Plans | Section B Plan Series – 15/WPD/109 | B |
| Works Plans | Section C Key Plan – 15/WPD/019 | A |
| Works Plans | Section C Plan Series – 15/WPD/020 | B |
- (7) In Requirement 5(4) of Schedule 3 (Requirements), replace “A/WP/PS/7” with “A/WP/PS/1 Sheet 7 of 7”,
Signed
Signed by the authority of the Secretary of State for Business, Energy and Industrial Strategy
Giles Scott — Head of Energy Infrastructure Planning and Coal Liabilities — Department for Business, Energy and Industrial Strategy — 9th March 2017
Explanatory note
(This note is not part of the Order)
EXPLANATORY NOTE
This Order corrects errors in the Brechfa Forest Wind Farm Connection Order 2016, which granted development consent under the Planning Act 2008, following a written request from Western Power Distribution (South Wales) Plc under paragraph 1(5)(a) of Schedule 4 to that Act.
Footnotes
[^f00001]: S.I. 2016/987.
[^f00002]: 2008 c.29. Paragraph 1 of Schedule 4 was amended by paragraph 70 of Schedule 13, and Part 20 of Schedule 25, to the Localism Act 2011 (c.20) and by paragraph 4 of Schedule 8 to the Marine and Coastal Access Act 2009 (c.23). There are other amendments to the Act which are not relevant to this Order.
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.