The National Grid (Richborough Connection Project) Development Consent Order 2017
- (3) Where any person notifies the undertaker in writing that anything done or proposed to be done by the undertaker or by virtue of this Order would amount to a contravention of a statutory provision of local application, the undertaker must as soon as reasonably practicable, and at any rate within 14 days of receipt of the notice, respond in writing setting out—
- (a) whether the undertaker agrees that the action taken or proposed does or would contravene the provision of local application;
- (b) if the undertaker does agree, the grounds (if any) on which the undertaker believes that the provision is excluded by this article; and
- (c) the extent of that exclusion.
No double recovery
47
Compensation is not payable in respect of the same matter both under this Order and under any other enactment, any contract or any rule of law, or under two or more different provisions of this Order.
Arbitration
48
Subject to article 45 (procedure regarding certain approvals, etc.) and except where otherwise expressly provided for in this Order or unless otherwise agreed between the parties, any difference under any provision of this Order must be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after giving notice in writing to the other) by the Secretary of State.
SCHEDULE 1 — AUTHORISED DEVELOPMENT
A nationally significant infrastructure project as defined in sections 14 and 16 of the 2008 Act and associated development within the meaning of section 115(2) of the 2008 Act comprising—
400Kv OVERHEAD LINE
In the City of Canterbury and the District of Thanet and the District of Dover
Work No.1—PC route Canterbury North 400kV Substation to Richborough 400kV Substation
Works to construct a 400kV overhead electric line of approximately 20.6km in length commencing at the Canterbury PC Gantry at Canterbury North 400kV Substation as shown on Works Plan Sheet 1, and terminating at the Richborough PC Gantry at Richborough 400kV Substation as shown on Works Plan Sheet 17. The overhead line consists of 60 pylons and the installation of conductors, insulators and fittings.
In the City of Canterbury
Work No.2 — Temporary site compound
Works to construct a temporary site compound, at the location shown on Works Plan Sheet 4 to include—
- (a) temporary car parking, hard standing and roadways;
- (b) temporary offices and staff welfare portable cabins;
- (c) temporary materials, tools and fuel storage areas;
- (d) temporary storage of plant and equipment;
- (e) wheel cleaning facilities;
- (f) security fencing; and
- (g) construction and security lighting.
In the District of Thanet
Work No.3 — Temporary site compound
Works to construct a temporary site compound, at the location shown on Works Plan Sheet 17 to include—
- (a) temporary car parking, hard standing and roadways;
- (b) temporary offices and staff welfare portable cabins;
- (c) temporary materials, tools and fuel storage areas;
- (d) temporary storage of plant and equipment;
- (e) wheel cleaning facilities;
- (f) security fencing; and
- (g) construction and security lighting.
UK POWER NETWORKS WORKS
In the City of Canterbury
Work No.4A — PX route temporary diversion
Works to allow the construction and installation of two single circuit 132kV overhead electric lines supported by wooden poles and the installation of conductors, insulators and fittings between pylons PX8 and PX9, as shown on Works Plan Sheet 2.
Work No.4B – PX route temporary diversion
Works to allow the construction and installation of two single circuit 132kV overhead electric lines supported by wooden poles and the installation of conductors, insulators and fittings between pylons PX44 and PX46. The removal of existing pylon PX45 and associated conductors, insulators and fittings as shown on Works Plan Sheet 10.
In the District of Thanet
Work No.4C — PX route temporary diversion
Works to allow the construction and installation of two single circuit 132kV overhead electric lines supported by wooden poles and the installation of conductors, insulators and fittings between pylons PX56 and PX60. The removal of existing pylons PX57, PX58 and PX59 and associated conductors, insulators and fittings as shown on Works Plan Sheets 12 and 13.
Work No.5A — Temporary diversion of part of the PY route.
Works to allow the temporary diversion of part of the 132kV overhead electric line as shown on Works Plan Sheets 12 and 13 comprising the construction and installation of a single circuit 132kV overhead electric line supported by wooden poles and the installation of conductors, insulators and fittings between pylons PY19 and PY20TB1.
Work No.5B — Temporary diversion of part of the PY route.
Works to allow the temporary diversion of part of the 132kV overhead electric line as shown on Works Plan Sheets 12 and 13 comprising the construction and installation of a single circuit 132kV overhead electric line supported by wooden poles and the installation of conductors, insulators and fittings between pylons PY19 and PY20TA1.
Work No.5C —PY route
Works to construct and install a new section of 132kV overhead electricity line between PY19 and PY22 as shown on Works Plan Sheet 12 and 13. The overhead line consists of 6 pylons and the installation of conductors, insulators and fittings.
Work No.5D – Removal of part of the PY route
Works to allow the removal of part of the 132kV PY route between PY19 and PY22 as shown on Works Plan Sheets 12 and 13 comprising the removal of existing pylons PY20 and PY21 and the two single circuit 132kV overhead electric line temporary wooden pole diversion between pylons PY19 and PY20TB1 and between pylons PY19 and PY20TA1 and all associated conductors, insulators and fittings.
In the City of Canterbury
Work No.6A — PX route removal
Works to allow the removal of 1.3km of the 132kV PX route overhead electric line commencing at the Canterbury South 132kV Substation PX connection and terminating at Cable Sealing End pylon PX6, including the removal of 6 pylons (PX2 to PX 5, PX5A and PX 6), and associated conductors, insulators and fittings, as shown on Works Plan Sheet 1.
Work No.6B — PX route removal
Works to allow the removal of 9.7km of the 132kV PX route overhead electric line commencing at Cable Sealing End pylon PX7 as shown on Works Plan Sheet 2, and terminating at pylon PX44 as shown on Works Plan Sheet 10 to include the removal of the two single circuit 132kV overhead electric lines between pylons PX8 and PX9 as shown on Works Plan Sheet 2 including the removal of 37 pylons, the wooden poles and associated conductors, insulators and fittings.
Work No.6C — PX route removal
Works to allow the removal of the two single circuit 132kV overhead electric lines commencing at pylon PX44 and terminating at pylon PX46 as shown on Works Plan Sheet 10, including the removal of the wooden poles and associated conductors, insulators and fittings.
In the City of Canterbury and the District of Thanet
Work No.6D — PX route removal
Works to allow the removal of 2.6km of the 132kV PX route overhead electric line commencing at pylon PX46 as shown on Works Plan Sheet 10 and terminating at pylon PX56 as shown on Works Plan Sheet 12 including the removal of 11 pylons and associated conductors, insulators and fittings.
In the District of Thanet
Work No.6E — PX route removal
Works to allow the removal of the two temporary single circuit 132kV overhead electric lines commencing at pylon PX56 as shown on Works Plan Sheet 12 and terminating at pylon PX60 as shown on Works Plan Sheet 13, including the removal of the wooden poles and associated conductors, insulators and fittings.
In the District of Thanet and the District of Dover
Work No.6F — PX route removal
Works to allow the removal of 5.2km of the 132kV PX route overhead electric line commencing at pylon PX60 as shown on Works Plan Sheet 13 and terminating at the Richborough 132kV Substation PX connection as shown on Works Plan Sheet 17 including the removal of 19 pylons and associated conductors, insulators and fittings.
ASSOCIATED DEVELOPMENT
Such associated development within the Order limits as may be necessary or expedient for the purposes of or in connection with the construction or maintenance of the above Work Nos. or any of them consisting of—
- (a) ramps, means of access, footpaths, bridleways, trackways and pontoons;
- (b) embankment, bridge, aprons, abutments, foundations, retaining walls, drainage, wing walls, fencing and culverts;
- (c) works to alter the position of apparatus, including mains, sewers, drains and cables;
- (d) works to alter the course of, or otherwise interfere with a watercourse;
- (e) landscaping and other works to mitigate any adverse effects of the construction, maintenance or operation of the authorised development;
- (f) works for the benefit or protection of land affected by the authorised development;
- (g) works required for the strengthening, improvement, maintenance, or reconstruction of any streets;
- (h) works to alter or remove or replace road furniture;
- (i) site preparation works, site clearance (including scaffolding, fencing, vegetation removal, demolition of existing structures and the creation of alternative footpaths); earthworks (including soil stripping and storage, site levelling);
- (j) establishment of site construction compounds, temporary offices, temporary vehicle parking, scaffolding, construction fencing, temporary perimeter enclosure, temporary security fencing, construction related buildings, temporary welfare facilities, construction and security lighting and temporary haulage roads;
- (k) installation of wires, cables, ducts, pipes and conductors;
- (l) such other works, including working sites storage areas, and works of demolition, as may be necessary for the purposes of or in connection with the construction of the authorised development and which do not give rise to any different environmental effects from those assessed in the Environmental Statement; and
- (m) such other works as may be necessary for the purposes of or in connection with the maintenance of the authorised development.
SCHEDULE 2 — PLANS AND DRAWINGS
PART 1 — LOCATION PLAN
| Drawing Title | Drawing Number | Revision |
|---|---|---|
| Location Plan | PDD-21497-2-OHL-1000 | B |
PART 2 — ACCESS AND RIGHTS OF WAY AND PUBLIC RIGHTS OF NAVIGATION PLANS
| Drawing Title | Drawing Number | Revision |
|---|---|---|
| Key Plan for Access, Rights of Way and Public Rights of Navigation Plans | PDD-21497-2-OHL-1141 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 1 of 18 | PDD-21497-2-OHL-1142 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 2 of 18 | PDD-21497-2-OHL-1143 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 3 of 18 | PDD-21497-2-OHL-1144 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 4 of 18 | PDD-21497-2-OHL-1145 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 5 of 18 | PDD-21497-2-OHL-1146 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 6 of 18 | PDD-21497-2-OHL-1147 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 7 of 18 | PDD-21497-2-OHL-1148 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 8 of 18 | PDD-21497-2-OHL-1149 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 9 of 18 | PDD-21497-2-OHL-1150 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 10 of 18 | PDD-21497-2-OHL-1151 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 11 of 18 | PDD-21497-2-OHL-1152 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 12 of 18 | PDD-21497-2-OHL-1153 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 13 of 18 | PDD-21497-2-OHL-1154 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 14 of 18 | PDD-21497-2-OHL-1155 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 15 of 18 | PDD-21497-2-OHL-1156 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 16 of 18 | PDD-21497-2-OHL-1157 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 17 of 18 | PDD-21497-2-OHL-1158 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Sheet 18 of 18 | PDD-21497-2-OHL-1159 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Plan A | PDD-21497-2-OHL-1160 | B |
| Access, Rights of Way and Public Rights of Navigation Plans – Plan B | PDD-21497-2-OHL-1110 | B |
PART 3 — DESIGN DRAWINGS
| Drawing Title | Drawing Number | Revision |
|---|---|---|
| Drawing References for Design Drawings | PDD-21497-2-OHL-0058 | D |
| Maximum and Minimum Pylon Heights – Sheet 1 of 21 | PDD-21497-2-OHL-0051 | C |
| Dimensions of Typical Poles and Pylons – Sheet 1A of 21 | PDD-21497-2-OHL-0060 | A |
| Plan and Profile Drawing – Sheet 2 of 21 | PDD-21497-2-OHL-0401 | B |
| Plan and Profile Drawing – Sheet 3 of 21 | PDD-21497-2-OHL-0402 | B |
| Plan and Profile Drawing – Sheet 4L of 21 | PDD-21497-2-OHL-0434 | B |
| Plan and Profile Drawing – Sheet 5 of 21 | PDD-21497-2-OHL-0404 | B |
| Plan and Profile Drawing – Sheet 6 of 21 | PDD-21497-2-OHL-0405 | B |
| Plan and Profile Drawing – Sheet 7 of 21 | PDD-21497-2-OHL-0406 | B |
| Plan and Profile Drawing – Sheet 8 of 21 | PDD-21497-2-OHL-0407 | B |
| Plan and Profile Drawing – Sheet 9 of 21 | PDD-21497-2-OHL-0408 | B |
| Plan and Profile Drawing – Sheet 10 of 21 | PDD-21497-2-OHL-0409 | B |
| Plan and Profile Drawing – Sheet 11 of 21 | PDD-21497-2-OHL-0410 | B |
| Plan and Profile Drawing – Sheet 12 of 21 | PDD-21497-2-OHL-0411 | B |
| Plan and Profile Drawing – Sheet 13 of 21 | PDD-21497-2-OHL-0412 | B |
| Plan and Profile Drawing – Sheet 14 of 21 | PDD-21497-2-OHL-0413 | B |
| Plan and Profile Drawing – Sheet 15 of 21 | PDD-21497-2-OHL-0414 | B |
| Plan and Profile Drawing – Sheet 16 of 21 | PDD-21497-2-OHL-0415 | B |
| Plan and Profile Drawing – Sheet 17 of 21 | PDD-21497-2-OHL-0416 | B |
| Plan and Profile Drawing – Sheet 18 of 21 | PDD-21497-2-OHL-0417 | B |
| Plan and Profile Drawing – Sheet 19 of 21 | PDD-21497-2-OHL-0418 | B |
| Plan and Profile Drawing – Sheet 20 of 21 | PDD-21497-2-OHL-0419 | B |
| Staking Table – Sheet 21 of 21 | PDD-21497-2-OHL-0421 | A |
PART 4 — LAND PLANS
| Drawing Title | Drawing Number | Revision |
|---|---|---|
| Key Plan for Land Plans | PDD-21497-2-OHL-1021 | B |
| Drawing References for Land Plans | PDD-21497-2-OHL-0959 | C |
| Land Plans – Sheet 1 of 18 | PDD-21497-2-OHL-0900 | B |
| Land Plans – Sheet 1A of 18 | PDD-21497-2-OHL-0901 | B |
| Land Plans – Sheet 1B of 18 | PDD-21497-2-OHL-0902 | B |
| Land Plans – Sheet 1C of 18 | PDD-21497-2-OHL-0903 | B |
| Land Plans – Sheet 1D of 18 | PDD-21497-2-OHL-0904 | B |
| Land Plans – Sheet 1E of 18 | PDD-21497-2-OHL-0905 | B |
| Land Plans – Sheet 1F of 18 | PDD-21497-2-OHL-0906 | B |
| Land Plans – Sheet 2 of 18 | PDD-21497-2-OHL-0907 | B |
| Land Plans – Sheet 2A of 18 | PDD-21497-2-OHL-0908 | B |
| Land Plans – Sheet 2B of 18 | PDD-21497-2-OHL-0909 | B |
| Land Plans – Sheet 2C of 18 | PDD-21497-2-OHL-0910 | B |
| Land Plans – Sheet 2D of 18 | PDD-21497-2-OHL-0911 | B |
| Land Plans – Sheet 3 of 18 | PDD-21497-2-OHL-0912 | B |
| Land Plans – Sheet 3A of 18 | PDD-21497-2-OHL-0913 | B |
| Land Plans – Sheet 3B of 18 | PDD-21497-2-OHL-0914 | B |
| Land Plans – Sheet 4 of 18 | PDD-21497-2-OHL-0915 | B |
| Land Plans – Sheet 4A of 18 | PDD-21497-2-OHL-0916 | B |
| Land Plans – Sheet 4B of 18 | PDD-21497-2-OHL-0917 | B |
| Land Plans – Sheet 5 of 18 | PDD-21497-2-OHL-0918 | B |
| Land Plans – Sheet 5A of 18 | PDD-21497-2-OHL-0919 | B |
| Land Plans – Sheet 5B of 18 | PDD-21497-2-OHL-0920 | B |
| Land Plans – Sheet 5C of 18 | PDD-21497-2-OHL-0921 | B |
| Land Plans – Sheet 5D of 18 | PDD-21497-2-OHL-0922 | B |
| Land Plans – Sheet 6 of 18 | PDD-21497-2-OHL-0923 | B |
| Land Plans – Sheet 7 of 18 | PDD-21497-2-OHL-0924 | B |
| Land Plans – Sheet 7A of 18 | PDD-21497-2-OHL-0925 | B |
| Land Plans – Sheet 7B of 18 | PDD-21497-2-OHL-0926 | B |
| Land Plans – Sheet 7C of 18 | PDD-21497-2-OHL-0927 | B |
| Land Plans – Sheet 8 of 18 | PDD-21497-2-OHL-0928 | B |
| Land Plans – Sheet 8A of 18 | PDD-21497-2-OHL-0929 | B |
| Land Plans – Sheet 8B of 18 | PDD-21497-2-OHL-0930 | B |
| Land Plans – Sheet 8C of 18 | PDD-21497-2-OHL-0931 | B |
| Land Plans – Sheet 9 of 18 | PDD-21497-2-OHL-0932 | B |
| Land Plans – Sheet 9A of 18 | PDD-21497-2-OHL-0933 | B |
| Land Plans – Sheet 10 of 18 | PDD-21497-2-OHL-0934 | B |
| Land Plans – Sheet 10A of 18 | PDD-21497-2-OHL-0935 | B |
| Land Plans – Sheet 10B of 18 | PDD-21497-2-OHL-0936 | B |
| Land Plans – Sheet 10C of 18 | PDD-21497-2-OHL-0937 | B |
| Land Plans – Sheet 10D of 18 | PDD-21497-2-OHL-0938 | B |
| Land Plans – Sheet 11 of 18 | PDD-21497-2-OHL-0939 | B |
| Land Plans – Sheet 11A of 18 | PDD-21497-2-OHL-0940 | B |
| Land Plans – Sheet 11B of 18 | PDD-21497-2-OHL-0941 | B |
| Land Plans – Sheet 11C of 18 | PDD-21497-2-OHL-0942 | B |
| Land Plans – Sheet 11D of 18 | PDD-21497-2-OHL-0943 | B |
| Land Plans – Sheet 12 of 18 | PDD-21497-2-OHL-0944 | B |
| Land Plans – Sheet 12A of 18 | PDD-21497-2-OHL-0945 | B |
| Land Plans – Sheet 12B of 18 | PDD-21497-2-OHL-0946 | B |
| Land Plans – Sheet 12C of 18 | PDD-21497-2-OHL-0947 | B |
| Land Plans – Sheet 13 of 18 | PDD-21497-2-OHL-0948 | B |
| Land Plans – Sheet 14 of 18 | PDD-21497-2-OHL-0949 | B |
| Land Plans – Sheet 15 of 18 | PDD-21497-2-OHL-0950 | B |
| Land Plans – Sheet 15A of 18 | PDD-21497-2-OHL-0951 | B |
| Land Plans – Sheet 15B of 18 | PDD-21497-2-OHL-0952 | B |
| Land Plans – Sheet 16 of 18 | PDD-21497-2-OHL-0953 | B |
| Land Plans – Sheet 16A of 18 | PDD-21497-2-OHL-0954 | B |
| Land Plans – Sheet 17 of 18 | PDD-21497-2-OHL-0955 | D |
| Land Plans – Sheet 17A of 18 | PDD-21497-2-OHL-0956 | C |
| Land Plans – Sheet 17B of 18 | PDD-21497-2-OHL-0957 | B |
| Land Plans – Sheet 18 of 18 | PDD-21497-2-OHL-0958 | B |
PART 5 — SPECIAL CATEGORY LAND AND CROWN LAND PLANS
| Drawing Title | Drawing Number | Revision |
|---|---|---|
| Key Plan for Special Category Land Plans & Crown Land Plans | PDD-21497-2-OHL-1061 | C |
| Special Category Land Plans & Crown Land Plans – Sheet 1 of 18 | PDD-21497-2-OHL-1062 | C |
| Special Category Land Plans & Crown Land Plans – Sheet 2 of 18 | PDD-21497-2-OHL-1063 | B |
| Special Category Land Plans & Crown Land Plans – Sheet 3 of 18 | PDD-21497-2-OHL-1064 | B |
| Special Category Land Plans & Crown Land Plans – Sheet 4 of 18 | PDD-21497-2-OHL-1065 | B |
| Special Category Land Plans & Crown Land Plans – Sheet 5 of 18 | PDD-21497-2-OHL-1066 | B |
| Special Category Land Plans & Crown Land Plans – Sheet 6 of 18 | PDD-21497-2-OHL-1067 | B |
| Special Category Land Plans & Crown Land Plans – Sheet 7 of 18 | PDD-21497-2-OHL-1068 | B |
| Special Category Land Plans & Crown Land Plans – Sheet 8 of 18 | PDD-21497-2-OHL-1069 | B |
| Special Category Land Plans & Crown Land Plans – Sheet 9 of 18 | PDD-21497-2-OHL-1070 | B |
| Special Category Land Plans & Crown Land Plans – Sheet 10 of 18 | PDD-21497-2-OHL-1071 | B |
| Special Category Land Plans & Crown Land Plans – Sheet 11 of 18 | PDD-21497-2-OHL-1072 | C |
| Special Category Land Plans & Crown Land Plans – Sheet 12 of 18 | PDD-21497-2-OHL-1073 | C |
| Special Category Land Plans & Crown Land Plans – Sheet 13 of 18 | PDD-21497-2-OHL-1074 | B |
| Special Category Land Plans & Crown Land Plans – Sheet 14 of 18 | PDD-21497-2-OHL-1075 | B |
| Special Category Land Plans & Crown Land Plans – Sheet 15 of 18 | PDD-21497-2-OHL-1076 | B |
| Special Category Land Plans & Crown Land Plans – Sheet 16 of 18 | PDD-21497-2-OHL-1077 | B |
| Special Category Land Plans & Crown Land Plans – Sheet 17 of 18 | PDD-21497-2-OHL-1078 | B |
| Special Category Land Plans & Crown Land Plans – Sheet 18 of 18 | PDD-21497-2-OHL-1079 | B |
PART 6 — EXTINGUISHMENT OF EASEMENTS, SERVITUDES AND OTHER RIGHTS PLANS
| Drawing Title | Drawing Number | Revision |
|---|---|---|
| Key Plan for Extinguishment of Easements, Servitudes and Other Rights Plans | PDD-21497-2-OHL-1081 | B |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 1 of 18 | PDD-21497-2-OHL-1082 | A |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 2 of 18 | PDD-21497-2-OHL-1083 | A |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 3 of 18 | PDD-21497-2-OHL-1084 | A |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 4 of 18 | PDD-21497-2-OHL-1085 | A |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 5 of 18 | PDD-21497-2-OHL-1086 | A |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 6 of 18 | PDD-21497-2-OHL-1087 | A |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 7 of 18 | PDD-21497-2-OHL-1088 | A |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 8 of 18 | PDD-21497-2-OHL-1089 | A |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 9 of 18 | PDD-21497-2-OHL-1090 | A |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 10 of 18 | PDD-21497-2-OHL-1091 | A |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 11 of 18 | PDD-21497-2-OHL-1092 | A |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 12 of 18 | PDD-21497-2-OHL-1093 | A |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 13 of 18 | PDD-21497-2-OHL-1094 | A |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 14 of 18 | PDD-21497-2-OHL-1095 | A |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 15 of 18 | PDD-21497-2-OHL-1096 | A |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 16 of 18 | PDD-21497-2-OHL-1097 | A |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 17 of 18 | PDD-21497-2-OHL-1098 | B |
| Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 18 of 18 | PDD-21497-2-OHL-1099 | A |
PART 7 — TRAFFIC REGULATION ORDER PLANS
| Drawing Title | Drawing Number | Revision |
|---|---|---|
| Key Plan for Traffic Regulation Order Plans | PDD-21497-2-OHL-1250 | A |
| Traffic Regulation Order Plans – Sheet 1 of 18 | PDD-21497-2-OHL-1251 | A |
| Traffic Regulation Order Plans – Sheet 2 of 18 | PDD-21497-2-OHL-1252 | A |
| Traffic Regulation Order Plans – Sheet 3 of 18 | PDD-21497-2-OHL-1253 | A |
| Traffic Regulation Order Plans – Sheet 4 of 18 | PDD-21497-2-OHL-1254 | A |
| Traffic Regulation Order Plans – Sheet 5 of 18 | PDD-21497-2-OHL-1255 | A |
| Traffic Regulation Order Plans – Sheet 6 of 18 | PDD-21497-2-OHL-1256 | A |
| Traffic Regulation Order Plans – Sheet 7 of 18 | PDD-21497-2-OHL-1257 | A |
| Traffic Regulation Order Plans – Sheet 8 of 18 | PDD-21497-2-OHL-1258 | A |
| Traffic Regulation Order Plans – Sheet 9 of 18 | PDD-21497-2-OHL-1259 | A |
| Traffic Regulation Order Plans – Sheet 10 of 18 | PDD-21497-2-OHL-1260 | A |
| Traffic Regulation Order Plans – Sheet 11 of 18 | PDD-21497-2-OHL-1261 | A |
| Traffic Regulation Order Plans – Sheet 12 of 18 | PDD-21497-2-OHL-1262 | A |
| Traffic Regulation Order Plans – Sheet 13 of 18 | PDD-21497-2-OHL-1263 | A |
| Traffic Regulation Order Plans – Sheet 14 of 18 | PDD-21497-2-OHL-1264 | A |
| Traffic Regulation Order Plans – Sheet 15 of 18 | PDD-21497-2-OHL-1265 | A |
| Traffic Regulation Order Plans – Sheet 16 of 18 | PDD-21497-2-OHL-1266 | A |
| Traffic Regulation Order Plans – Sheet 17 of 18 | PDD-21497-2-OHL-1267 | A |
| Traffic Regulation Order Plans – Sheet 18 of 18 | PDD-21497-2-OHL-1268 | A |
PART 8 — TREES AND HEDGEROWS TO BE REMOVED OR MANAGED PLANS
| Drawing Title | Drawing Number | Revision |
|---|---|---|
| Key Plan for Trees and Hedgerows to be Removed or Managed Plans | PDD-21497-2-OHL-1161 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 1 of 18 | PDD-21497-2-OHL-1162 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 2 of 18 | PDD-21497-2-OHL-1163 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 3 of 18 | PDD-21497-2-OHL-1164 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 4 of 18 | PDD-21497-2-OHL-1165 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 5 of 18 | PDD-21497-2-OHL-1166 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 6 of 18 | PDD-21497-2-OHL-1167 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 7 of 18 | PDD-21497-2-OHL-1168 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 8 of 18 | PDD-21497-2-OHL-1169 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 9 of 18 | PDD-21497-2-OHL-1170 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 10 of 18 | PDD-21497-2-OHL-1171 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 11 of 18 | PDD-21497-2-OHL-1172 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 12 of 18 | PDD-21497-2-OHL-1173 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 13 of 18 | PDD-21497-2-OHL-1174 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 14 of 18 | PDD-21497-2-OHL-1175 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 15 of 18 | PDD-21497-2-OHL-1176 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 16 of 18 | PDD-21497-2-OHL-1177 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 17 of 18 | PDD-21497-2-OHL-1178 | B |
| Trees and Hedgerows to be Removed or Managed Plans – Sheet 18 of 18 | PDD-21497-2-OHL-1179 | B |
PART 9 — WORKS PLANS
| Drawing Title | Drawing Number | Revision |
|---|---|---|
| Key Plan for Works Plans | PDD-21497-2-OHL-1121 | B |
| Works Plans – Sheet 1 of 18 | PDD-21497-2-OHL-1122 | B |
| Works Plans – Sheet 2 of 18 | PDD-21497-2-OHL-1123 | B |
| Works Plans – Sheet 3 of 18 | PDD-21497-2-OHL-1124 | B |
| Works Plans – Sheet 4 of 18 | PDD-21497-2-OHL-1125 | B |
| Works Plans – Sheet 5 of 18 | PDD-21497-2-OHL-1126 | B |
| Works Plans – Sheet 6 of 18 | PDD-21497-2-OHL-1127 | B |
| Works Plans – Sheet 7 of 18 | PDD-21497-2-OHL-1128 | B |
| Works Plans – Sheet 8 of 18 | PDD-21497-2-OHL-1129 | B |
| Works Plans – Sheet 9 of 18 | PDD-21497-2-OHL-1130 | B |
| Works Plans – Sheet 10 of 18 | PDD-21497-2-OHL-1131 | B |
| Works Plans – Sheet 11 of 18 | PDD-21497-2-OHL-1132 | B |
| Works Plans – Sheet 12 of 18 | PDD-21497-2-OHL-1133 | B |
| Works Plans – Sheet 13 of 18 | PDD-21497-2-OHL-1134 | B |
| Works Plans – Sheet 14 of 18 | PDD-21497-2-OHL-1135 | B |
| Works Plans – Sheet 15 of 18 | PDD-21497-2-OHL-1136 | B |
| Works Plans – Sheet 16 of 18 | PDD-21497-2-OHL-1137 | B |
| Works Plans – Sheet 17 of 18 | PDD-21497-2-OHL-1138 | B |
| Works Plans – Sheet 18 of 18 | PDD-21497-2-OHL-1139 | B |
SCHEDULE 3 — REQUIREMENTS
Interpretation
1
- (1) In this Schedule unless the context requires otherwise—
- “Ancient Woodland Easement Management Plan” means a plan prepared for each easement that is within Kemberland Wood and Lynne Wood Ancient Woodland, describing the woodland management to be undertaken by National Grid within that easement;
- “bird flight diverter” means a protective measure to reduce bird collisions with overhead lines;
- “commence” means the carrying out of a material operation, as defined in section 155 of the 2008 Act (when development begins), comprised in or carried out for the purposes of the authorised development, but does not include any engineering investigation, environmental (including archaeological) investigation and monitoring, site or soil survey, environmental mitigation measures, erection of temporary amphibian or reptile fencing, erection of temporary stock fencing to site boundaries or temporary demarcation fencing marking out site boundaries;
- “Concept Mitigation Planting Plan” means the plan referred to in Requirement 8(1) identifying locations for planting for proposed mitigation (Document 8.11(A));
- “Drainage Management Plan” means a plan prepared in accordance with Requirement 6(1)(b) and the principles set out in sections 4.4 and 4.5 of the CEMP;
- “Emergency Response Plan for Flood Events” means the plan prepared in accordance with Requirement 6(1)(e) detailing emergency procedures in the event of a flood as outlined in section 4.5 of the CEMP;
- “Lighting Scheme” means the scheme prepared in accordance with Requirement 6(1)(d) and in accordance with section 3.6 of the CEMP;
- “Pollution Incident Control Plan” means the plan prepared in accordance with Requirement 6(1)(c) detailing remedial measures in the event of an incident and in accordance with section 2.13 of the CEMP;
- “the relevant drainage authority” means, in any given Requirement, the drainage authority or the Lead Local Flood Authority for the area to which the Requirement relates;
- “Site Waste Management Plan” means the detailed plan for the collection, segregation, treatment and disposal of waste prepared in accordance with Requirement 6(1)(f) and the measures set out in the Outline Waste Management Plan;
- “Soil and Aftercare Management Plan” means the plan prepared in accordance with Requirement 6(1)(a) and section 4.4 of the CEMP describing how works should be undertaken to minimise effects on the nature and quality of soil and agricultural land;
- “stage” means a defined stage of the authorised development, the extent of which is shown in a scheme submitted to and approved by the relevant planning authority pursuant to Requirement 4;
- “start up and close down activities” means general works that will not create an audible disturbance to local residents, including but not restricted to— arrival and departure of workforce and staff at site and movement to and from places of work (staff to remain considerate of neighbours, no loud music or raised voices); general refuelling of plant; site inspections and safety checks; site meetings (daily briefings and quiet inspections/walkovers); site clean-up (site housekeeping that does not require the use of plant); general site maintenance; and low key maintenance and safety checking of plant and machinery (provided this does not require or cause loud hammering or banging);
- “travel plan” means the plan prepared in accordance with Requirement 6(1)(h) and section 5.19 of the Construction Traffic Management Plan describing the travel arrangements of the contractor; and
- “the tree and hedgerow protection strategy” means the plan detailing the trees, groups of tree and hedgerows to be retained during the construction of the authorised development prepared in accordance with Requirement 6(1)(g).
- (2) Where under any of the Requirements the approval or agreement of the highway authority or the relevant planning authority is required, that approval must be given in writing.
- (3) Where an approval is required under the terms of any Requirement or a document referred to in a Requirement, or any Requirement specifies “unless otherwise approved” or “unless otherwise agreed” by the highway authority or the relevant planning authority such approval or agreement may only be given if the changes are minor or immaterial and where it has been demonstrated to the satisfaction of the highway authority or the relevant planning authority that the subject matter of the approval or agreement sought is unlikely to give rise to any materially new or materially different environmental effects from those assessed in the Environmental Statement.
- (4) Where any Requirement which requires the authorised development to be carried out in accordance or general accordance with the details approved by the highway authority or by the relevant planning authority, the approved details are to be taken to include any amendments that may subsequently be approved in writing by the highway authority or by the relevant planning authority.
Time Limits
2
The authorised development must be commenced within 5 years of the date of this Order.
Design drawings
3
- (1) Subject to Requirement 21, the authorised development must be carried out in general accordance with the design drawings.
- (2) Notwithstanding Requirement 21, the authorised development will not be in general accordance with the design drawings to the extent that any departure from the design drawings gives rise to any materially new or different environmental effects from those assessed in the Environmental Statement.
Stages of authorised development
4
- (1) The authorised development may not commence until a written scheme setting out all the stages of the authorised development has been submitted to and approved by the relevant planning authority following consultation with the highway authority.
- (2) Written notice of the commencement and completion of each stage of the authorised development and the operational use of that stage of the authorised development must be given to the relevant planning authority within ten business days prior to the commencement of that stage or operational use of that stage or within 10 business days of completion of that stage.
Construction Environmental Management Plan
5
- (1) All construction works for the authorised development must be carried out in accordance with the CEMP, unless otherwise agreed with the relevant planning authority or the highway authority, as may be appropriate to the relevant plan, scheme or strategy concerned.
- (2) The CEMP, which specifies measures to be used to minimise the impacts of construction works, includes the following approved plans, scheme and strategy—
- (a) Outline Waste Management Plan;
- (b) Biodiversity Mitigation Strategy;
- (c) Archaeological Mitigation Written Scheme of Investigation;
- (d) Construction Traffic Management Plan;
- (e) Public Rights of Way Management Plan; and
- (f) Noise and Vibration Management Plan.
- (3) Any works carried out in accordance with the approved plans, scheme and strategy referred to in sub-paragraph (2) must be carried out in accordance with those approved plans, scheme or strategy, unless agreed with the relevant planning authority or the highway authority, as may be appropriate to the relevant plan, scheme or strategy concerned.
- (4) The plans, scheme and strategy referred to in sub-paragraph (2) must be implemented as approved, unless agreed with the relevant planning authority or the highway authority, as may be appropriate to the relevant plan, scheme or strategy concerned and, in relation to the Biodiversity Mitigation Strategy only, following consultation with Natural England.
- (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Approval and implementation of construction mitigation plans
6
- (1) No stage of the authorised development may commence until, for that stage, the following plans, scheme and strategy to minimise the impacts of construction works have been submitted to and approved by the relevant planning authority after consultation with any of the relevant sewerage authority, the relevant drainage authority, Natural England and the Environment Agency, as may be appropriate to the relevant plan, scheme or strategy concerned—
- (a) Soil and Aftercare Management Plan;
- (b) Drainage Management Plan;
- (c) Pollution Incident Control Plan;
- (d) Lighting Scheme;
- (e) Emergency Response Plan for Flood Events;
- (f) Site Waste Management Plan;
- (g) Tree and Hedgerow Protection Strategy; and
- (h) Travel Plan.
- (2) The construction works for each stage of the authorised development and mitigation works to minimise the impact of construction must be carried out in accordance with the approved plans, scheme and strategy referred to in sub-paragraph (1) or with any amended plans, scheme or strategy that may subsequently be approved by the relevant planning authority.
Construction hours
7
- (1) Subject to sub-paragraphs (2), (3) and (4) work may only take place between 0700 and 1900 Mondays to Fridays and between 0800 and 1700 on Saturdays, Sundays and Bank Holidays (the core working hours).
- (2) Working on a consecutive Saturday and Sunday may only take place on two out of any four alternate weekends in each relevant local authority area.
- (3) The following operations may take place outside the core working hours referred to in sub-paragraph (1)—
- (a) the installation and removal of conductors, pilot wires and associated protective netting across highways, railway lines or watercourses;
- (b) the completion of operations commenced during the core working hours which cannot safely be stopped;
- (c) any highway works requested by the highway authority to be undertaken on a Saturday or a Sunday or outside the core working hours;
- (d) security monitoring;
- (e) the testing or commissioning of any electrical plant installed as part of the authorised development; and
- (f) the completion of works delayed or held up by severe weather conditions which disrupted or interrupted normal construction activities.
- (4) The specified construction activity at locations identified in Table 1.3 (Construction activities/locations subject to restricted working hours) of the Noise and Vibration Management Plan (Document 8.8(B)) may only take place between 0800 and 1800 Mondays to Fridays (the restricted working hours).
- (5) The restricted working hours referred to in sub-paragraph (4) include start up and close down activities up to 1 hour either side of the restricted working hours.
Mitigation planting
8
- (1) No stage of the authorised development may commence until, for that stage, a scheme for the planting of trees, hedgerows, shrubs, climbing plants, wild flower and grass seeding that accords with the Arboricultural Impact Assessment report (Document 5.4.3I) and its Addendum (Document 5.4.3I.1(A)) and the Biodiversity Mitigation Strategy (Document 5.4.3E(C)) and reflects the Concept Mitigation Planting Plan (Document 8.11(A)) has been submitted to and approved by the relevant planning authority, unless otherwise agreed with the relevant planning authority.
- (2) The planting scheme submitted under sub-paragraph (1) must include details of—
- (a) the location of planting and a schedule noting quantities, species, size and planting density of all proposed planting or seeding and the location of any areas for natural regeneration where appropriate;
- (b) cultivation, importing of materials, stock provenance, protection measures for planting and other operations to ensure plant and seed establishment;
- (c) the five year maintenance regime including monitoring and management; and
- (d) opportunities for early mitigation planting during and after implementation of the authorised development.
Implementation of mitigation planting
9
- (1) All mitigation planting works referred to in Requirement 8 must be implemented at the earliest opportunity and no later than by the first available planting season after the stage of the authorised development to which the mitigation planting works apply is first brought into operational use and in relation to the removal of the existing 132kV overhead line, the implementation of mitigation planting works must be implemented at the earliest opportunity and no later than the first available planting season after completion of the removal of that line.
- (2) All mitigation planting works referred to in Requirement 8 must be carried out in accordance with specification set out in the NBS Landscape Specification for Planting (Document 5.4.6D) and the relevant mitigation scheme for that stage of the authorised development, and to a reasonable standard in accordance with the relevant recommendations of appropriate British Standard or other recognised codes of good practice.
- (3) Any tree or shrub planted as part of an approved mitigation planting scheme that, within a period of five years after planting, is removed, dies or becomes in the opinion of the relevant planning authority seriously damaged or diseased, must be replaced in the first available planting season with a specimen of the same species and size as that originally planted, unless otherwise approved by the relevant planning authority.
Retention and protection of existing trees and hedgerows
10
- (1) No stage of the authorised development may commence until, for that stage, a Tree and Hedgerow Protection Strategy (THPS) as referred to in Requirement 6(1)(g) and prepared in accordance with the Arboricultural Impact Assessment report (Document 5.4.3I) and its Addendum, Figures 3I.2a to 3I.2v of the Arboricultural Impacts Plan (Document 5.4.3I.1(A)) and BS 5837:2012 (Trees in relation to design, demolition and construction) identifying the trees, groups of trees and hedgerows to be retained during that stage has been submitted to and approved by the relevant planning authority.
- (2) The THPS referred to in sub-paragraph (1) must include—
- (a) Tree Protection Plans detailing the alignment of temporary physical tree protection measures according to BS 5837:2012 and, where practicable, including a minimum 5 metres stand-off from hedges;
- (b) a schedule of all proposed tree and hedgerow removal and management with annotated plans;
- (c) specifications for temporary physical protection for trees and hedgerows; and
- (d) details of an auditable system of compliance with the approved protection measures.
- (3) The trees, groups of trees and hedgerows identified in the THPS referred to in sub-paragraph (1) must not be felled or otherwise removed in connection with the construction of the authorised development.
- (4) The relevant stage of the authorised development must not commence until the approved protection measures referred to in sub-paragraph (1) are in place, and they must thereafter be maintained during the construction of the relevant stage of the authorised development.
Bird flight diverters
11
- (1) Bird flight diverters must be fitted to the 400kV overhead line in the vicinity of—
- (a) Monkton between pylons PC41 and PC43; and
- (b) Ash Levels between pylons PC51 and PC60,
during its construction and must thereafter be retained, unless otherwise agreed by the relevant planning authority, after consultation with Natural England.
Reinstatement schemes
12
- (1) Subject to sub-paragraph (2), any land within the Order limits which is used temporarily for construction is to be reinstated to its former condition, or such condition as the relevant planning authority may approve, within six months of completion of the construction of the stage of authorised development for which it was required, or such further time as may be approved by the relevant planning authority.
- (2) The requirement to reinstate the land to its former condition is subject to the provisions of article 28 (temporary use of land by National Grid) and article 29 (temporary use of land by UK Power Networks).
Contamination of land or groundwater and controlled waters
13
- (1) No stage of the authorised development may commence until a written scheme applicable to that stage to deal with the ground conditions, including contamination of any land or groundwater, within the Order limits which are likely to cause significant harm to persons or pollution of controlled waters or the environment has been submitted to and approved by the relevant planning authority, after consultation with the Environment Agency.
- (2) The scheme must accord with the approach set out in the Environmental Statement Appendix 14A Land Contamination Desk Study (Document5.4.14A(A)), to identify the extent of any contamination and the remedial measures to be taken to render the land fit for its intended purpose, should remedial measures be required then the implementation and validation of these will be documented in a verification report, to be submitted to the relevant planning authority.
- (3) If during any stage of the authorised development, contamination not identified in Document 5.4.14A or addressed in the scheme prepared in accordance with sub-paragraph (1) is found to be present within the Order limits and which is likely to cause a significant possibility of significant harm to persons or pollution of controlled waters or the environment then, except in the case of emergency, no further development in the vicinity of the contamination may be carried out until a written scheme to deal with the associated risks has been submitted to and approved by the relevant local planning authority, following consultation with the Environment Agency.
- (4) Remediation measures must be carried out in accordance with the approved scheme referred to in sub-paragraph (1) or (3) as appropriate.
- (5) In this Requirement, “controlled waters” has the same meaning as in Part 3 of the Water Resources Act 1991[^f00029].
Inspection of temporary watercourses
14
- (1) No stage of the authorised development may commence until a written scheme for the inspection and clearance of debris from any temporary watercourse required in connection with that stage has been submitted to and approved by the relevant planning authority, after consultation with the Environment Agency and the relevant drainage authority.
- (2) The approved scheme must be implemented for each temporary watercourse during the construction of that stage of the authorised development until such time as the temporary watercourse has been removed.
Removal of temporary bridges and culverts
15
Any temporary bridge or culvert required in connection with any stage of the authorised development must be removed within twelve months of completion of the construction of that stage of authorised development for which it was required, or such further time as may be approved by the relevant planning authority, after consultation with the Environment Agency or the relevant drainage authority as appropriate.
Highway works
16
- (1) No work to construct or temporarily alter any new or existing means of access to a highway to be used by vehicular traffic may commence until written details of the design and layout of that means of access has been submitted to and approved by the highway authority.
- (2) The highway accesses must be constructed in accordance with the details approved under sub-paragraph (1).
- (3) The undertaker must carry out road safety audits of the highway works authorised by this Order in accordance with Standard HD 19/15 of the Department for Transport’s Design Manual for Roads and Bridges or in accordance with any standard that supersedes that Standard and must, to the reasonable satisfaction of the highway authority, implement any recommendations to mitigate or remove road safety problems and defects identified in any such road safety audits arising out of the authorised development.
Clearance over the tidal River Stour
17
No part of any 400kV overhead electric line shall be installed or maintained directly above the tidal River Stour at a height of less than 10 metres above the mean high water level of that river.
Removal of UK Power Networks Works
18
Any existing UK Power Networks infrastructure to be removed as part of the UK Power Networks works must be removed no later than 36 months after the 400kV overhead line (Work No.1 of Schedule 1 (authorised development)) is first brought into operational use.
Decommissioning
19
- (1) In the event that, at some future date, the authorised development, or any part of it, is to be decommissioned, a written scheme of decommissioning must be submitted for approval by the relevant planning authority at least six months prior to any decommissioning works.
- (2) The approved scheme must be implemented as approved following the decommissioning of the authorised development or relevant part of it.
- (3) This Requirement does not apply to the authorised development and associated development described in Schedule 1 (authorised development) for the dismantling and removal of existing infrastructure or apparatus.
Ancient Woodland Easement Management Plan
20
- (1) An Ancient Woodland Easement Management Plan (AWEMP) prepared in accordance with the Arboricultural Impact Assessment (Document 5.4.3I) and its Addendum (Document 5.4.3I.1A); Biodiversity Mitigation Strategy (Document 5.4.3E(C)), BS 5837:2012 (Trees in relation to design, demolition and construction recommendations), and BS 3998: 2010 (Tree works recommendations) must be submitted for approval by the relevant planning authority, following consultation with Natural England and the Woodland Trust, no later than the end of the 5 year maintenance period relating to that part of the 400 kV overhead line (Work No.1 of Schedule 1 (authorised development)) crossing over Kemberland Wood and Lynne Wood Ancient Woodland.
- (2) Once the relevant planning authority approves the AWEMP under this requirement the undertaker must cease to carry out mitigation maintenance measures in relation to Kemberland Wood and Lynne Wood Ancient Woodland in accordance with Requirement 8 (Mitigation Planting) and Requirement 10 (Retention and protection of existing trees and hedgerows) in relation to that part of the authorised development covered by the AWEMP and must from that point carry out woodland management operations in compliance with the AWEMP.
- (3) Notwithstanding paragraph (2), the undertaker may discharge any requirement in relation to that part of the authorised development covered by the AWEMP at any time prior to or following the submission of the AWEMP under paragraph (1).
- (4) All woodland management operations in relation to that part of the authorised development covered by the AWEMP must be carried out in accordance with the AWEMP ....
Location of Pylon PC10
21
Subject to article 5, as limited by paragraph 15 of Part 5 of Schedule 14, Pylon PC10 must be located as set out in National Grid Drawing Ref PDD-21497-2-OHL-0434 Version B (REP8-021, Sheet 4L of 21).
Exercise of powers of compulsory acquisition in relation to the imposition of restrictions by National Grid
22
The powers of compulsory acquisition under this order, in relation to the imposition of restrictions as set out in the Book of Reference, may only be exercised reasonably, taking into account the rights of other persons with an interest in the land subject to the imposition of such restrictions.
SCHEDULE 4 — DISCHARGE OF REQUIREMENTS
Applications made under requirements
1
- (1) Where an application has been made to a relevant authority for any consent, agreement or approval required by a Requirement, the relevant authority must give notice to the undertaker of its decision on the application within a period of 35 days beginning with—
- (a) where no further information is requested under paragraph 1(2), the day immediately following that on which the application is received by the authority;
- (b) where further information is requested under paragraph 1(2), the day immediately following that on which further information has been supplied by the undertaker; or
- (c) such longer period as may be agreed in writing by the undertaker and the relevant authority.
- (2) Where an application has been made under paragraph 1(1) the relevant authority may request such reasonable further information from the undertaker as it considers is necessary to enable it to consider the application.
- (3) If the relevant authority considers further information is necessary and the Requirement does not specify that consultation with a requirement consultee is required, the relevant authority must, within 7 business days of receipt of the application, notify the undertaker in writing specifying the further information required.
- (4) If the Requirement specifies that consultation with a requirement consultee is required, the relevant authority must issue the consultation to the requirement consultee within 3 business days of receipt of the application and must notify the undertaker in writing specifying any further information requested by the requirement consultee within 3 business days of receipt of such a request and in any event within 21 business days of receipt of the application.
- (5) If the relevant authority does not give the notification mentioned in sub-paragraph (3) or (4) it is deemed to have sufficient information to consider the application and is not thereafter entitled to request further information without the prior agreement of the undertaker.
Fees
2
- (1) Where an application is made to a relevant planning authority for any consent, agreement or approval required by a Requirement, a fee must be paid to the relevant planning authority as follows—
- (a) a fee of £97 per request; or
- (b) such other fee as may be prescribed (under sections 303 and 333(2A) of the 1990 Act for the discharge of conditions attached to a planning permission).
- (2) Any fee paid under this Schedule must be refunded to the undertaker within 35 days of—
- (a) the application being rejected as invalidly made; or
- (b) the relevant planning authority failing to determine the application within 35 days from the date on which it is received,
unless within that period the undertaker agrees in writing that the fee may be retained by the relevant planning authority and credited in respect of a future application.
Appeals
3
- (1) The undertaker may appeal if—
- (a) the relevant authority refuses an application for any consent, agreement or approval required by—
- (i) a Requirement and any document referred to in any Requirement; or
- (ii) a licence condition in the deemed marine licence set out in Schedule 9 (deemed marine licence); or
- (iii) any other consent, agreement or approval required under this Order,
or grants it subject to conditions to which the undertaker objects;
- (b) the relevant authority does not give notice of its decision to the undertaker within the period specified in paragraph 1(1);
- (c) having received a request for further information under paragraph 1(3) the undertaker considers that either the whole or part of the specified information requested by the relevant authority is not necessary for consideration of the application; or
- (d) having received any further information requested, the relevant authority notifies the undertaker that the information provided is inadequate and requests additional information which the undertaker considers is not necessary for consideration of the application.
- (2) The procedure for appeals is as follows—
- (a) the undertaker must submit to the Secretary of State a copy of the application submitted to the relevant authority and any supporting documents which the undertaker may wish to provide (“the appeal documents”);
- (b) the undertaker must on the same day provide copies of the appeal documents to the relevant authority and the requirement consultee (if applicable);
- (c) as soon as is practicable after receiving the appeals documents the Secretary of State must appoint a person to determine the appeal (“the appointed person”) and notify the appeal parties of the identity of the appointed person and the address to which all correspondence for the appointed person must be sent;
- (d) the relevant authority and the requirement consultee (if applicable) may submit any written representations in respect of the appeal to the appointed person within 10 business days beginning with the first day immediately following the date on which the appeal parties are notified of the appointment of the appointed person and must ensure that copies of their written representations are sent to each other and to the undertaker on the day on which they are submitted to the appointed person;
- (e) the appeal parties may make any counter-submissions to the appointed person within 10 business days beginning with the first day immediately following the date of receipt of written representations pursuant to paragraph (d) above; and
- (f) the appointed person must make a decision and notify it to the appeal parties, with reasons, as soon as reasonably practicable.
- (3) If the appointed person considers that further information is necessary to consider the appeal, the appointed person must as soon as practicable notify the appeal parties in writing specifying the further information required, the appeal party from whom the information is sought, and the date by which the information must be submitted.
- (4) Any further information required pursuant to sub-paragraph (3) must be provided by the party from whom the information is sought to the appointed person and to other appeal parties by the date specified by the appointed person.
- (5) The appeal parties may submit written representations to the appointed person concerning matters contained in the further information.
- (6) Any such representations must be submitted to the appointed person and made available to all appeal parties within 10 business days of the date mentioned in sub-paragraph (3).
Outcome of appeals
4
- (1) On an appeal under paragraph 3, the appointed person may—
- (a) allow or dismiss the appeal; or
- (b) reverse or vary any part of the decision of the relevant authority (whether the appeal relates to that part of it or not),
and may deal with the application as if it had been made to the appointed person in the first instance.
- (2) The appointed person may proceed to a decision on an appeal taking into account only such written representations as have been sent within the time limits prescribed or set by the appointed person under this paragraph.
- (3) The appointed person may proceed to a decision even though no written representations have been made within those time limits if it appears to the appointed person that there is sufficient material to enable a decision to be made on the merits of the case.
- (4) The decision of the appointed person on an appeal is final and binding on the parties, and a court may entertain proceedings for questioning the decision only if the proceedings are brought by a claim for judicial review.
- (5) Any consent, agreement or approval given by the appointed person pursuant to this Schedule is deemed to be an approval for the purpose of Schedule 3 (requirements) as if it had been given by the relevant authority.
- (6) The relevant authority may confirm any determination given by the appointed person in identical form in writing but a failure to give such confirmation (or a failure to give it in identical form) does not affect or invalidate the effect of the appointed person’s determination.
- (7) Except where a direction is given pursuant to sub-paragraph (8) requiring the costs of the appointed person to be paid by the relevant authority, the reasonable costs of the appointed person must be met by the undertaker.
- (8) On application by the relevant authority or the undertaker, the appointed person may give directions as to the costs of the appeal parties and as to the parties by whom the costs of the appeal are to be paid.
- (9) In considering whether to make any such direction as to the costs of the appeal parties and the terms on which it is made, the appointed person must have regard to the Planning Practice Guidance or any guidance which may from time to time replace it.
Interpretation of Schedule 4
5
- (1) In this Schedule—
- “the appeal parties” means the relevant authority, the requirement consultee and the undertaker;
- “relevant authority” means the relevant planning authority, highway authority, street authority, Environment Agency, the Marine Management Organisation, Natural England, relevant drainage authority or relevant owner of a watercourse, sewer or drain as may be appropriate to the consent or approval sought; and
- “requirement consultee” means any body named in a Requirement which is the subject of an appeal as a body to be consulted by the relevant authority in discharging that Requirement.
SCHEDULE 5 — STREETS SUBJECT TO STREET WORKS
| (1) | (2) |
|---|---|
| Authority | Street subject to street works |
| Canterbury City Council | Broad Oak Road |
| Canterbury City Council | Vauxhall Road |
| Canterbury City Council | Shalloak Road |
| Canterbury City Council | Viridor Business Park |
| Canterbury City Council | Mayton Lane |
| Canterbury City Council | Barnets Lane |
| Canterbury City Council | A291 (Herne Bay Road) |
| Canterbury City Council | Hoath Road |
| Canterbury City Council | Bredlands Lane |
| Canterbury City Council | Vauxhall Road, Broad Oak Road and Shalloak Road |
| Canterbury City Council | Herne Bay Road |
| Canterbury City Council | Hoath Road and Bredlands Road |
| Canterbury City Council | Nethergong Hill and Sandpit Hill |
| Canterbury City Council | Old Road, Sarre |
| Canterbury City Council/ Thanet District Council | A28 (Island Road) |
| Thanet District Council | A253 (Ramsgate Road/Mile Road) |
| Thanet District Council | Gore Street |
| Dover District Council | A256 (Ramsgate Road) |
SCHEDULE 6 — STREETS SUBJECT TO TEMPORARY ALTERATION OF LAYOUT
| (1) | (2) |
|---|---|
| Street subject to alteration of layout | Description of alteration of layout as shown on the Access and Rights of Way and Public Rights of Navigation Plans |
| Broad Oak Road | At BM01, BM02 and BM05 (as shown on Sheet 1) the creation of three temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required. |
| Vauxhall Road | At BM03 and BM04 (as shown on Sheet 1) the creation of two temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required. |
| Shalloak Road | At BM06, BM08, BM09, BM10, BM11 and BM12 (as shown on Sheet 2) the creation of six temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required. |
| Broad Oak Road | At BM07 (as shown on Sheet 2) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required. |
| Mayton Lane | At BM13 (as shown on Sheet 3) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required. |
| Barnets Lane | At BM14 and BM15 (as shown on Sheet 3) the creation of two temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required. |
| A291 Herne Bay Road | At BM16, BM17, BM18, BM19, BM20 and BM21 (as shown on Sheet 2 and Sheet 3) the creation of six temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required. |
| Hoath Road | At BM22 (as shown on Sheet 4) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required. |
| Bredlands Lane | At BM23 and BM24 (as shown on Sheet 4) the creation of two temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required. |
| Chislet Park Access (A28) | At BM25 and BM26 (as shown on Sheet 7) the creation of two temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required. |
| A28 Island Road | At BM27, BM30, BM32 (as shown on Sheet 7 and Sheet 10) the creation of three temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required. |
| Sandpit Hill | At BM28 and BM29 (as shown on Sheet 8) the creation of two temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required. |
| Old Road | At BM31 (as shown on Sheet 10) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required. |
| Westbere Compound | At BM39 (as shown on Sheet 4) entrance of existing bellmouth will be widened to allow HGV access and egress. Comprising the installation of a new road surface, white lining, kerbing and suitable drainage system where required. |
| (1) | (2) |
| --- | --- |
| Street subject to alteration of layout | Description of alteration of layout as shown on the Access and Rights of Way and Public Rights of Navigation Plans |
| A253 Ramsgate Road/Mile Road | At BM33 (as shown on Sheet 11) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required. |
| A253 via Gore Street | At BM34, BM35, BM36 and BM37 (as shown on Sheet 11) the creation of four temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required. |
| (1) | (2) |
| --- | --- |
| Street subject to alteration of layout | Description of alteration of layout as shown on the Access and Rights of Way and Public Rights of Navigation Plans |
| A256 | At BM38 (as shown on Sheet 17) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required. |
SCHEDULE 7 — STREETS OR PUBLIC RIGHTS OF WAY TO BE TEMPORARILY STOPPED UP
PART 1 — STREETS OR PUBLIC RIGHTS OF WAY TO BE TEMPORARILY STOPPED UP FOR WHICH A DIVERSION IS TO BE PROVIDED
| (1) | (2) | (3) | (4) |
|---|---|---|---|
| Area | Street or public right of way to be temporarily stopped up | Extent of temporary stopping up as shown on the Access and Rights of Way and Public Rights of Navigation Plans | Temporary diversion as shown on the Access and Rights of Way and Public Rights of Navigation Plans |
| Canterbury City Council | CC16 | Between points RW1 and RW2 as shown on Sheet 1. | Between points RWD1 and RWD2 via RWD3, RWD4 and RWD5 as shown on Sheet 1 & Plan A. |
| Canterbury City Council | CB47A | Between points RW3 and RW4 as shown on Sheet 1. | Between points RWD6 and RWD12 via RWD7, RWD8, RWD9, RWD10 and RWD11 as shown on Sheet 1. |
| Canterbury City Council | Farleigh Road | Between points ST1.1 and ST1.2 as shown on Sheet 1. | Diversion Route from Point DV1.1 to DV1.6 via DV1.2, DV1.3, DV1.4 and DV1.5 as shown on Sheet 1 and Plan A. |
| Canterbury City Council | Vauxhall Road | Between points ST2.1 and ST2.2 as shown on Sheet 1. | Diversion Route from Point DV2.1 to DV2.4 via DV2.2 and DV2.3 as shown on Sheet 1 and Plan A. |
| Canterbury City Council | CB51 | Between points RW5 and RW6 as shown on Sheets 1 and 2. | Between points RWD13 and RWD17 via RWD14, RWD15 and RWD16 as shown on Sheets 1 and 2. |
| Canterbury City Council | Shalloak Road | Between points ST3.1, ST3.2, ST3.3, and ST3.4 as shown on Sheets 1, 2 and 3. | Diversion Route from Point DV3.1 to DV3.4 via DV3.2 and DV3.3 as shown on Sheets 1, 2 and 3. |
| Canterbury City Council | CB48 | Between points RW6 and RW7 as shown on Sheet 2. | Between points RWD17 and RWD16 via RWD18, RWD19, RWD13, RWD14 and RWD15 as shown on Sheets 1 and 2. |
| Canterbury City Council | CB64 | Between points RW8 and RW9 as shown on Sheets 1 and 2. | Between points RWD13 and RWD14 via RWD19, RWD18, RWD17, RWD16, RWD15 and RWD14 as shown on Sheets 1 and 2. |
| Canterbury City Council | CB60 | Between points RW10 and RW11 as shown on Sheet 2. | Between points RWD20 and RWD15 via RWD21 as shown on Sheet 2. |
| Canterbury City Council | CB44/CB46 | Between points RW12 and RW13 as shown on Sheet 2 and Plan A. | Between points RWD22 and RWD26 via RWD23, RWD24 and RWD25 as shown on Sheets 2, 3 and Plan A. |
| Canterbury City Council | Herne Bay Road | Between points ST4.1, ST4.1A, ST4.2 and ST4.3 as shown on Sheets 2, 3 and Plan A. | Diversion Route from Point DV4.1 to DV4.3 via DV4.2, Rheims Way, St Peters Place, A290 and A293 as shown on Sheet 2. |
| Canterbury Council and Thanet District Council | A28 Island Road | Between points ST5.1, ST5.1A, ST5.1B, ST5.1C, ST5.1D, ST5.1E, ST5.1F and ST5.2 as shown on Sheets 2, 4, 5, 7 – 10 and Plan A and Plan B. | Diversion Route from Point DV5.1 to DV5.3 via DV5.2, A293 and A28 as shown on Sheets 2, 3, 10, 11 and Plan A and Plan B. |
| Canterbury City Council | CB71 | Between points RW14 and RW15 as shown on Sheet 3. | Between points RWD27 and RWD30 via RWD28 and RWD29 as shown on Sheet 3. |
| Canterbury City Council | CB80 | Between points RW16 and RW17 as shown on sheet 3 of the access and rights of way plans. | Between points RWD31 and RWD35 via RWD32, RWD33 and RWD34 as shown on sheet 3 of the access and rights of way plans. |
| Canterbury City Council | CB73 | Between points RW18 and RW19 as shown on Sheets 2 and 3. | Between points RWD36 and RWD37 as shown on Sheets 2 and 3. |
| Canterbury City Council | CB59 | Between points RW20 and RW21 as shown on Sheet 2 | Between points RWD38 and RWD40 via RWD39 as shown on Sheet 2. |
| Canterbury City Council | CB58 | Between points RW22, RW22A and RW23 as shown on Sheets 3 and 4. | Between points RWD41 and RWD43 via RWD38, RWD39, RWD40 and RWD42 as shown on Sheets 2, 3 and 4. |
| Canterbury City Council | Bredlands Lane | Between points ST7.1, and ST7.2 as shown on Sheet 4. | Diversion Route from Point DV7.1 to DV7.2 via DV7.3 as shown on Sheet 4 and Plan A. |
| Canterbury City Council | Hoath Road | Between points ST6.1, ST6.2 and ST6.3 as shown on Sheet 4 and Plan A. | Diversion Route from Point DV6.1 to DV6.9 via DV6.2, DV6.2A, DV6.2B, DV6.2C, DV6.3, DV6.4, DV6.5, DV6.6, DV6.7, Mill Road and DV6.8, DV6.8A as shown on Sheets 4, 5, 6, 7, 8 and Plan A and Plan B. |
| Canterbury City Council | Hoath Road | Between points ST6.1, and ST6.2 shown on Sheets 4, 6 and Plan A and Plan B. | Diversion Route from Point DV6.1 to DV6.2 via DV6.3 as shown on Sheet 4 and Plan A. |
| Canterbury City Council | CB100 | Between points RW24 and RW25 as shown on Sheet 7. | Between points RWD44 and RWD48 via RWD45, RWD46 and RWD47 as shown on Sheets 7 and 8. |
| Canterbury City Council | CB100A | Between points RW25 and RW26 as shown on Sheet 6. | Between points RWD48 and RWD53 via RWD49, RWD50, RWD51 and RWD52 as shown on Sheet 6 and Plan A and Plan B. |
| Canterbury City Council | CB119 | Between points RW25 and RW27 as shown on Sheets 7 and 8. | Between points RWD48 and RWD47 via RWD44, RWD45 and RWD46 as shown on Sheets 7 and 8. |
| Canterbury City Council | Sandpit Hill | Between points ST8.1, ST8.2, and ST8.3 as shown on Sheet 8 and Plan A and Plan B of the access and rights of way plans. | Diversion Route from Point DV8.1 to DV8.7 via DV8.1A, DV8.1B, DV8.2, DV8.3, DV8.3A, DV8.4, DV8.4A, DV8.5, Max Mill Lane and DV8.6 as shown on Sheets 4, 6 – 8 and Plan A and Plan B. |
| Canterbury City Council | CB101 | Between points RW28 and RW29 as shown on Sheet 6. | Between points RWD49 and RWD51 via RWD48, RWD53, RWD52 and RWD51 as shown on Sheet 6. |
| Canterbury City Council | CB118 | Between points RW27 and RW30 as shown on Sheet 8. | Between points RWD47 and RWD46 via RWD48, RWD44, and RWD45 as shown on Sheets 7 and 8. |
| Canterbury City Council | CB117 | Between points RW30 and RW31 as shown on Sheet 7. | Between points RWD46 and RWD45 via RWD54 as shown on Sheet 7. |
| Canterbury City Council | CB118 (2nd Diversion) | Between points RW30 and RW32 as shown on Sheets 7 and 8 and Plan A and Plan B. | Between points RWD46 and RWD54 via RWD45 as shown on Sheet 7. |
| Canterbury City Council | CB123 | Between points RW33 and RW34 as shown on Sheet 8. | Between points RWD 58 and RWD59 via RWD57 and RWD 56 as shown on Sheet 8 and Plan A and Plan B. |
| Canterbury City Council | CB124 | Between points RW35 and RW36 as shown on Sheet 8. | Between points RWD60 and RWD62 via RWD55 and RWD61 as shown on Sheet 8 and Plan A and Plan B. |
| Canterbury City Council | CB128 | Between points RW36 and RW37 as shown on Sheets 8 and 9 and Plan A and Plan B. | Between points RWD62 and RWD61 via RWD60 and RWD58 as shown on Sheets 8 and 9 and Plan A and Plan B. |
| Canterbury City Council | CB125 | Between points RW38 and RW39 as shown on Sheet 9. | Between points RWD63 and RWD64 via RWD61 and RWD62 as shown on Sheets 8 and 9 and Plan A and Plan B. |
| Thanet District Council | TE24 | Between points RW41 and RW42 as shown on Sheets 11 and 12. | Between points RWD65 and RWD67 via RWD65A, RWD66 and RWD66A as shown on Sheets 11, 12 and 13 and Plan A and Plan B. |
| Canterbury City Council, Thanet District Council & Dover District Council | Gore Street | Between points ST9.1, ST9.2, and ST9.3 as shown on Sheet 11 and Plan A and Plan B. | Diversion Route from Point DV9.1 to DV9.5 via Stourmouth Road, Grove Road, Grove Ferry Road, DV9.2, DV9.3, DV9.3A and DV9.4 as shown on Sheets 9, 10 and 11 and Plan A and Plan B. |
| Thanet District Council | TE23 | Between points RW42, RW42A and RW43 as shown on Sheets 12 and 13 and Plan B. | Between points RWD66 and RWD67 via RWD65 as shown on Sheets 11 and 12 and Plan A and Plan B. |
| Thanet District Council | TE32 | Between points RW44, RW44A and RW45 as shown on Sheets 13 and 14. | Between points RWD68 and RWD73 via RWD69, RWD70, RWD71, RWD72 and RWD73A as shown on Sheets 13, 14 and 15 and Plan B. |
| Thanet District Council | TE26 | Between points RW44 and RW46 as shown on Sheets 13 and 15. | Between points RWD69 and RWD68 via RWD70, RWD71, RWD72 and RWD73 as shown on Sheets 13, 14 and 15 and Plan B. |
| Dover District | EE42 | Between points RW47, RW47A, RW47B and RW48 as shown on Sheets 15 to 18 and Plan B. | Between points RWD74 and RWD82 via RWD75, RWD76, RWD77, RWD78, RWD79, RWD80 and RWD81 as shown on Sheets 13 and 15 and Plan B. |
PART 2 — STREETS OR PUBLIC RIGHTS OF WAY TO BE TEMPORARILY STOPPED UP FOR WHICH NO DIVERSION IS TO BE PROVIDED
| (1) | (2) | (3) |
|---|---|---|
| Area | Street or public right of way to be temporarily stopped up | Extent of temporary stopping up as shown on the Access and Rights of Way and Public Rights of Navigation Plans |
| Canterbury City Council | CB114 | Between points RW39 and RW40 as shown on Sheet 9. |
| Canterbury City Council | Mayton Lane | Between points ST10.1, ST10.2, and ST10.3 as shown on Sheet 3. |
| Canterbury City Council | Barnets Lane | Between points ST11.1 and ST11.2 as shown on Sheet 3. |
SCHEDULE 8 — EXTINGUISHMENT OF PRIVATE RIGHTS AND RESTRICTIVE COVENANTS RELATING TO APPARATUS REMOVED FROM LAND SUBJECT TO TEMPORARY POSSESSION
PART 1 — NATIONAL GRID
| (1) | (2) |
|---|---|
| Area | Plot |
| Canterbury City Council | 1,2, 3, 4, 5, 6, 7, 8, 9, 10, 12, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83, 84, 85, 86, 87, 88, 89, 90, 91, 92, 93, 94, 95, 96, 97, 98, 99, 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 112, 113, 114, 115, 116, 117, 118, 119, 120, 121, 122, 123, 124, 125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 139, 140, 142, 146, 147, 148, 149, 150, 151, 284b, 285, 292, 294, 298, 300, 305a, 468, 474, 475, 476, 479, 480, 481, 482, 483, 484, 489, 491, 492, 493, 494, 496, 497, 498, 499, 500, 503, 506, 508, 509, 510, 514, 515, 517, 519, 521, 523, 526, 527, 528, 529, 530, 533, 536, 547, 548, 553, 598, 602, 603, 609, 622, 625, 626, 631, 641, 652, 665, 686, 688, 689, 690, 692, 694, 698, 701, 703, 706, 734, 756, 757, 766, 770, 783, 784, 786, 792, 795, 796, 811, 840, 851, 862, 867, 885, 896, 903, 905, 906, 909, 924, 926, 927, 928, 934, 935, 948, 951, 952, 961, 962, 964, 965, 971, 972, 973, 974, 975, 980, 982, 983, 984, 985, 987, 989, 990, 991, 995, 996, 1000, 1006, 1011, 1023, 1025, 1430, 1434, 1040, 1045, 1046 & 1049 |
| Canterbury City Council and Thanet District Council | 1046 |
| Thanet District Council | 1053, 1060, 1069, 1088, 1102, 1118, 1121, 1123, 1124, 1127, 1133, 1146, 1147, 1148, 1151, 1153, 1159, 1161, 1162, 1167, 1169, 1173, 1176, 1177, 1178, 1179, 1181, 1182, 1183, 1186, 1187, 1188, 1189, 1190, 1194, 1195, 1199, 1201, 1204, 1205, 1214, 1225, 1226, 1230, 1239, 1272, 1276, 1277, 1279, 1300, 1306, 1310, 1317, 1329, 1332, 1341, 1343, 1344, 1346, 1355, 1356, 1357, 1364, 1391, 1395, 1401, 1407, 1408, 1415, 1422, 1425, 1429 & 1649 |
| Thanet District Council and Dover District Council | 1392, 1439, 1635, 1636 & 1654 |
| Dover District Council | 1448, 1471, 1487, 1488, 1489, 1495, 1496, 1505, 1508, 1511, 1531, 1539, 1540, 1544, 1549, 1555, 1558, 1561, 1563, 1566, 1573, 1575, 1588, 1589A, 1589B, 1589C, 1589D, 1656, 1658, 1661, 1663 & 1668 |
PART 2 — UK POWER NETWORKS
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk