The London Overground (Barking Riverside Extension) Order 2017
- (1) Where, in accordance with the provisions of this Part of this Schedule, TfL affords to a specified undertaker facilities and rights for the construction, use, maintenance and renewal in land of TfL of alternative apparatus in substitution for apparatus to be removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between TfL and the specified undertaker in question or in default of agreement settled by arbitration in accordance with article 45 (arbitration).
- (2) In settling those terms and conditions in respect of the alternative apparatus to be constructed across or along the authorised works, the arbitrator must—
- (a) give effect to all reasonable requirements of TfL for ensuring the safety and efficient operation of the authorised works and for securing any subsequent alterations or adaptations of the alternative apparatus which may be required to prevent interference with any proposed works of TfL or the traffic on the railway; and
- (b) so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions if any applicable to the apparatus constructed across or along the authorised works for which the alternative apparatus is to be substituted and to any other reasonable requirements of the specified undertaker.
- (3) If the facilities and rights to be afforded by TfL in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator more or less favourable on the whole to the specified undertaker in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation to or by TfL by or to that specified undertaker as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
Retained apparatus: protection and plan approval
42
- (1) Not less than 28 days before starting the execution of any works in, on or under any land purchased, held, appropriated or used under this Order that are near to, or will or may affect, any apparatus the removal of which has not been required by TfL under paragraph 40(1), TfL must submit to the specified undertaker in question plans of those works.
- (2) Those works are to be executed only in accordance with the plans submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the specified undertaker for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and an officer of the specified undertaker is entitled to watch and inspect the execution of those works.
- (3) Any requirements made by the specified undertaker under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which the plans under sub-paragraph (1) are submitted to it.
- (4) If a specified undertaker in accordance with sub-paragraph (3) and in consequence of the works proposed by TfL, reasonably requires the removal of any apparatus and gives written notice to TfL of that requirement, paragraphs 34 to 41 apply as if the removal of the apparatus had been required by TfL under paragraph 40(1).
- (5) Nothing in this paragraph precludes TfL from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, new plans instead of the plans previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plans.
- (6) TfL is not required to comply with sub-paragraph (1) in a case of emergency but in that case it must give to the specified undertaker in question notice as soon as is reasonably practicable and plans of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances.
- (7) Nothing in sub-paragraph (6) entitles TfL to carry out works to any apparatus but, upon receipt of notice from TfL, the specified undertaker must proceed to carry out such works as may be required without unreasonable delay.
Expenses
43
- (1) Subject to the following provisions of this paragraph, TfL must repay to a specified undertaker the reasonable expenses incurred by that specified undertaker in, or in connection with—
- (a) the inspection, removal and relaying or replacing, alteration or protection of any apparatus or the construction of any new apparatus under any provision of this Part of this Schedule (including any costs reasonably incurred or compensation properly paid in connection with the acquisition of facilities and rights or exercise of statutory powers for such apparatus);
- (b) the cutting off of any apparatus from any other apparatus, or the making safe of any redundant apparatus in consequence of the exercise by TfL of any power under this Order; and
- (c) the survey of any land, apparatus or works; the inspection, superintendence and monitoring of works; or the installation or removal of any temporary works reasonably necessary in consequence of the exercise by TfL of any power under this Order; and any other work or thing rendered reasonably necessary in consequence of the exercise by TfL of any such power,
within a reasonable time of being notified by the specified undertaker that it has incurred such expenses.
- (2) The value of any apparatus removed under the provisions of this Part of this Schedule is to be deducted from any sum payable under sub-paragraph (1), that value being calculated after removal.
- (3) If in accordance with the provisions of this Part of this Schedule—
- (a) alternative apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions, except where this has been solely due to using the nearest currently available type; or
- (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,
and the placing of apparatus of that type or capacity or those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by TfL or, in default of agreement, is not determined by arbitration in accordance with article 45 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this paragraph would be payable to the specified undertaker in question by virtue of sub-paragraph (1), is to be reduced by the amount of that excess.
- (4) For the purposes of sub-paragraph (3)—
- (a) an extension of apparatus to a length greater than the length of existing apparatus must not be treated as placing of apparatus of greater dimensions than those of the existing apparatus, except in a case where the apparatus as so extended serves a purpose (either additional to or instead of that served by the existing apparatus) which was not served by the existing apparatus; and
- (b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole must be treated as if it also had been agreed or had been so determined.
- (5) An amount which apart from this sub-paragraph would be payable to a specified undertaker in respect of works by virtue of sub-paragraph (1) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the specified undertaker any financial benefit by deferment of the time for renewal of the apparatus in the normal course, be reduced by the amount which represents that benefit as calculated in accordance with the Code of Practice entitled “Measures Necessary where Apparatus is Affected by Major Works (Diversionary Works)” and dated June 1992 and approved by the Secretary of State on 30th June 1992, as revised and re-issued from time to time.
- (6) In any case where work is carried out by TfL under paragraphs 40(6) to (8) and, if such work had been carried out by the specified undertaker, the repayment made to the specified undertaker under sub-paragraph (1) would fall to be reduced under sub-paragraphs (3) to (5), the specified undertaker must pay to the TfL such sum as represents the amount of that reduction.
Indemnity
44
- (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction, maintenance or failure of any of the authorised works, any damage is caused to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of a specified undertaker, or there is any interruption in any service provided, or in the supply of any goods, by any specified undertaker, TfL must bear and pay the cost reasonably incurred by that specified undertaker in making good such damage or restoring the supply, and must—
- (a) make reasonable compensation to that specified undertaker for any other expenses, loss, damages, penalty or costs incurred by the specified undertaker; and
- (b) indemnify the specified undertaker against all claims, demands, proceedings, costs, damages and expenses which may be made or taken against or recovered from, or incurred by, the specified undertaker,
by reason or in consequence of any such damage or interruption; and the fact that any act or thing may have been done by the specified undertaker on behalf of TfL or in accordance with plans approved by the specified undertaker or in accordance with any requirement of the specified undertaker or under its supervision does not, subject to sub-paragraph (2), excuse TfL from any liability under the provisions of this paragraph.
- (2) Nothing in sub-paragraph (1) imposes any liability on TfL with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of a specified undertaker, its officers, servants, contractors or agents.
- (3) A specified undertaker must give TfL reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of TfL, which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
Access
45
If in consequence of the exercise of the powers conferred by this Order the access to any apparatus is materially obstructed TfL must provide such alternative means of access to that apparatus as will enable the specified undertaker to maintain or use the apparatus no less effectively than was possible before the obstruction.
Cooperation
46
Where in consequence of the proposed construction of any of the authorised works, TfL or the specified undertaker requires the removal of apparatus under paragraph 40(1) or the specified undertaker makes requirements for the protection or alteration of apparatus under paragraph 42(2), TfL must use its best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised works and the specified undertaker must use all reasonable endeavours to co-operate with TfL for that purpose.
Exercise of safeguarding and survey powers
47
- (1) TfL must, so far as is reasonably practicable, exercise the powers conferred by article 16 (protective works to buildings) so as not to obstruct or render less convenient the access to any apparatus.
- (2) TfL must not, in the exercise of the powers conferred by section 11(3) (powers of entry) of the 1965 Act, as applied by this Order, or by article 18 (power to survey and investigate land, etc.), make any trial holes which interfere with any apparatus without the consent of the specified undertaker (which must not be unreasonably withheld).
Arbitration
48
Any difference arising between TfL and a specified undertaker under this Part of this Schedule (other than a difference as to its meaning or construction) must be determined by arbitration in the manner provided by article 45 (arbitration) and in determining any difference under this Part of this Schedule the arbitrator may, if the arbitrator thinks fit, require TfL to execute any temporary or other works so as to avoid, so far as may be reasonably possible, interference with the use of any apparatus.
PART 4 — PROTECTION FOR OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
49
- (1) The following provisions of this Part of this Schedule have effect unless otherwise agreed in writing between TfL and the operator.
- (2) In this Part of this Schedule—
- “conduit system” has the same meaning as in the electronic communications code and references to providing a conduit system are to be construed in accordance with paragraph 1(3A) of that code;
- “electronic communications apparatus” has the same meaning as in the electronic communications code;
- “the electronic communications code” has the same meaning as in Chapter 1 of Part 2 of the Communications Act 2003[^f00067];
- “electronic communications code network” means— so much of an electronic communications network or conduit system provided by an electronic communications code operator as is not excluded from the application of the electronic communications code by a direction under section 106 (application of the electronic communications code) of the Communications Act 2003; and an electronic communications network which the Secretary of State is providing or proposing to provide;
- “electronic communications code operator” means a person in whose case the electronic communications code is applied by a direction under section 106 (application of the electronic communications code) of the Communications Act 2003; and
- “operator” means the operator of an electronic communications code network.
50
- (1) Subject to sub-paragraphs (2) to (4), if as the result of the construction of the authorised works, or of any subsidence resulting from any of those works—
- (a) any damage is caused to any electronic communications apparatus belonging to an operator (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works), or other property of an operator; or
- (b) there is any interruption in the supply of the service provided by an operator,
TfL must bear and pay the cost reasonably incurred by the operator in making good such damage or restoring the supply and must—
- (i) make reasonable compensation to an operator for loss sustained by it; and
- (ii) indemnify an operator against claims, demands, proceedings, costs, damages and expenses which may be made or taken against, or recovered from, or incurred by, an operator by reason, or in consequence of, any such damage or interruption.
- (2) Nothing in sub-paragraph (1) imposes any liability on TfL with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an operator, its officers, servants, contractors or agents.
- (3) The operator must give TfL reasonable notice of any such claim or demand and no settlement or compromise of the claim or demand may be made without the consent of TfL which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
- (4) Any difference arising between TfL and the operator under this paragraph is to be referred to and settled by arbitration under article 45 (arbitration).
51
This Part of this Schedule does not apply to—
- (a) any apparatus in respect of which the relations between TfL and an operator are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act; or
- (b) any damage, or any interruption, caused by electro-magnetic interference arising from the construction or use of the authorised works.
SCHEDULE 9 — TEMPORARY TRAFFIC REGULATION
PART 1 — PARKING, WAITING AND LOADING BAYS
| (1) Road | (2) Extent | (3) Notes |
|---|---|---|
| London Borough of Barking and Dagenham | London Borough of Barking and Dagenham | London Borough of Barking and Dagenham |
| Renwick Road | Renwick Road between points PT1–PT2 and PT3–PT4 shown on the traffic regulation plans | To provide access for construction vehicles to construction site. |
PART 2 — SHUTTLE WORKING WITH TRAFFIC CONTROL
| (1) Road | (2) Extent | (3) Notes |
|---|---|---|
| London Borough of Barking and Dagenham | London Borough of Barking and Dagenham | London Borough of Barking and Dagenham |
| Renwick Road | Southern section of Renwick Road between points SC1–SC2 and SC3–SC4 shown on the traffic regulation plans | To assist traffic flow and maintain two-way operation of traffic. |
PART 3 — PEDESTRIAN CROSSINGS
| (1) Road | (2) Extent | (3) Notes |
|---|---|---|
| London Borough of Barking and Dagenham | London Borough of Barking and Dagenham | London Borough of Barking and Dagenham |
| Renwick Road | Southern section of Renwick Road between points SC1–SC2 and SC3–SC4 shown on the traffic regulation plans | To provide pedestrian crossing. |
Signed
Signed by the authority of the Secretary of State
Natasha Kopala — Head of the Transport and Works Act Orders Unit — Department for Transport — 15th August 2017
Explanatory note
(This note is not part of the Order)
EXPLANATORY NOTE
This Order authorises Transport for London to construct, operate and maintain an extension to the London Overground Gospel Oak to Barking line from Barking station to a new station at Barking Riverside in the London Borough of Barking and Dagenham.
The Order authorises the compulsory acquisition and the temporary use of land for the purposes of the works and confers other powers in connection with the construction, operation and maintenance of the works.
A copy of the deposited plans, the deposited sections, the traffic regulation plans, the book of reference and the environmental statement mentioned in the Order and certified in accordance with article 42 (certification of plans, etc.) may be inspected free of charge during normal working hours at the offices of Transport for London at Windsor House, 42–50 Victoria Street, London SW1H 0TL.
Footnotes
[^f00001]: S.I. 2006/1466, amended by S.I. 2010/439, S.I. 2011/556, S.I. 2011/2085, S.I. 2012/147, S.I. 2012/1658, S.I. 2012/2590 and S.I. 2013/755.
[^f00002]: 1992 c. 42. Section 1 was amended by paragraphs 51 and 52 of Schedule 2 to the Planning Act 2008 (c. 29); section 5 was amended by S.I. 2012/1659.
[^f00003]: 1961 c. 33.
[^f00004]: 1965 c. 56.
[^f00005]: 1980 c. 66.
[^f00006]: 1984 c. 27.
[^f00007]: 1990 c. 8.
[^f00008]: 1991 c. 22.
[^f00009]: 2004 c. 18.
[^f00010]: The definition of “cycle track” (in section 329(1) of the 1980 Act) was amended by section 1 of the Cycle Tracks Act 1984 (c. 38) and paragraph 21(2) of Schedule 3 to the Road Traffic (Consequential Provisions) Act 1988 (c. 54).
[^f00011]: 1981 c. 67. The definition of “owner” was amended by paragraph 9 of Schedule 15 to the Planning and Compensation Act 1992 (c. 34). There are other amendments to section 7 which are not relevant to this Order.
[^f00012]: 1964 c. 40.
[^f00013]: As amended by section 102 of, and Schedule 17 to, the Local Government Act 1985 (c. 51) and section 168(2) of, and Schedule 9 to, the New Roads and Street Works Act 1991 (c. 22).
[^f00014]: Sections 54, 55, 57, 60, 68 and 69 were amended by sections 40(1) and (2) of, and Schedule 1 to, the Traffic Management Act 2004 (c. 18).
[^f00015]: As also amended by section 49(1) of the Traffic Management Act 2004.
[^f00016]: As also amended by sections 49(2) and 51(9) of the Traffic Management Act 2004.
[^f00017]: As also amended by section 52(3) of the Traffic Management Act 2004.
[^f00018]: As amended by section 42 of the Traffic Management Act 2004.
[^f00019]: 1991 c. 59.
[^f00020]: 1991 c. 57.
[^f00021]: 2006 c. 26.
[^f00022]: 1989 c. 29.
[^f00023]: 1991 c. 56. Section 106 was amended by sections 35(1) and (8) and 43(2) of, and Schedule 2 to, the Competition and Service (Utilities) Act 1992 (c. 43), sections 36(2) and 99 of the Water Act 2003 (c. 37) and paragraph 16(1) of Schedule 3 to the Flood and Water Management Act 2010 (c. 29).
[^f00024]: S.I. 2016/1154.
[^f00025]: 1991 c. 57.
[^f00026]: Section 48A was inserted by section 24(1) of the Water Act 2003 (c. 37).
[^f00027]: Section 10 was amended by section 4 of, and paragraph 13(2) of Schedule 2 to, the Planning (Consequential Provisions) Act 1990 (c. 11) and S.I. 2009/1307.
[^f00028]: Section 90(2A) was inserted by section 16(1) of the Transport and Works Act 1992 (c. 42).
[^f00029]: 1981 c. 67.
[^f00030]: 1981 c. 66.
[^f00031]: 1989 c. 29.
[^f00032]: 1986 c. 44.
[^f00033]: 1991 c. 56.
[^f00034]: 2003 c. 21.
[^f00035]: Section 11 was amended by section 34(1) of, and Schedule 4 to, the Acquisition of Land Act 1981 (c. 67), section 3 of, and Part 1 of Schedule 1 to, the Housing (Consequential Provisions) Act 1985 (c. 71), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (No. 1) and S.I. 2009/1307.
[^f00036]: 1981 c. 66.
[^f00037]: Section 10 was amended by section 4 of, and paragraph 13(2) of Schedule 2 to, the Planning (Compulsory Purchase) Act 1990 (c. 11) and S.I. 2009/1307.
[^f00038]: Section 13 was amended by sections 62(3) and 139 of, and paragraphs 27 and 28 of Schedule 13, and Part 3 of Schedule 23 to, the Tribunals, Courts and Enforcement Act 2007 (c. 15).
[^f00039]: Section 11 was amended by section 34(1) of, and Schedule 4 to, the Acquisition of Land Act 1981 (c. 67), section 3 of, and part 1 of Schedule 1 to, the Housing (Consequential Provisions) Act 1985 (c. 71), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (No. 1) and S.I. 2009/1307.
[^f00040]: Section 272 was amended by paragraphs 103(1) and (2) of Schedule 17 to the Communications Act 2003 (c. 21).
[^f00041]: 1981 c. 66.
[^f00042]: 1990 c. 43. Section 82 was amended by section 5(2) of the Noise and Statutory Nuisance Act 1993 (c. 40) and paragraph 6 of Schedule 17 to the Environment Act 1995 (c. 25).
[^f00043]: Section 79(1) was amended by section 2(2) of the Noise and Statutory Nuisance Act 1993, section 120 of, and paragraph 2(a) of Schedule 17 and paragraph 89(2) of Schedule 22 to, the Environment Act 1995, sections 101(2) and 102(2) of the Clean Neighbourhoods and Environment Act 2005 (c. 16) and sections 109(2), 110(2), 111(2) and 112(2)(a) of the Public Health etc. (Scotland) Act 2008 (asp. 5).
[^f00044]: Section 61 was amended by Schedule 7 to the Building Act 1984 (c. 55), paragraph 15(3) of Schedule 15 to the Environmental Protection Act 1990 (c. 43), Schedule 24 to the Environment Act 1995 and paragraph 10 of Schedule 6 to the Building (Scotland) Act 2003 (asp. 8).
[^f00045]: 1974 c. 40.
[^f00046]: 1993 c. 43. As amended by the Transport Act 2000 (c. 38) and the Railways Act 2005 (c. 14).
[^f00047]: 1978 c. 30.
[^f00048]: 1973 c. 26.
[^f00049]: Section 11 was amended by section 34(1) of, and Schedule 4 to, the Acquisition of Land Act 1981 (c. 67), section 3 of, and part 1 of Schedule 1 to, the Housing (Consequential Provisions) Act 1985 (c. 71), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (No. 1) and S.I. 2009/1307.
[^f00050]: Section 12 was amended by section 56(2) of, and part 1 of Schedule 9 to, the Courts Act 1971 (c. 23).
[^f00051]: Section 13 was amended by sections 62(3), 139(4) to (9) and 146 of, and paragraphs 27 and 28 of Schedule 13 and part 3 of Schedule 23 to, the Tribunals, Courts and Enforcement Act 2007 (c. 15).
[^f00052]: Section 20 was amended by paragraph 4 of Schedule 15 to the Planning and Compensation Act 1991 and S.I. 2009/1307.
[^f00053]: 1981 c. 66, as amended by Part 7 of the Housing and Planning Act 2016 (c. 22).
[^f00054]: Sections 272 to 274 were amended by paragraphs 103(1) and (2) of Schedule 17 to the Communications Act 2003 (c. 21).
[^f00055]: Section 279(3) was amended by paragraphs 103(1) and (2), and section 280 was amended by paragraph 104, of Schedule 17 to the Communications Act 2003. Sections 280 and 282 were amended by S.I. 2009/1307.
[^f00056]: 2003 c. 21.
[^f00057]: 1980 c. 66 as amended by section 190(3) of, and part 1 of Schedule 27 to, the Water Act 1989 (c. 15) and section 112(4) of, and Schedule 18 to, the Electricity Act 1989 (c. 29).
[^f00058]: 1993 c. 43.
[^f00059]: 2006 c. 46.
[^f00060]: 1981 c. 66.
[^f00061]: 1995 c. 25.
[^f00062]: 2006 c. 16
[^f00063]: S.I. 2003/3242.
[^f00064]: 1989 c. 29.
[^f00065]: 1991 c. 56.
[^f00066]: 1986 c. 44.
[^f00067]: 2003 c. 21. See section 106.
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.