The Renewable Heat Incentive Scheme Regulations 2018
SCHEDULE 5 — Information to be provided to the Authority where solid biomass is used for combustion or production of biomethane
1
This Schedule specifies the information that a participant is required to provide under regulation 49(7).
2
The information is information identifying—
- (a) the material from which the solid biomass was composed;
- (b) the form of the solid biomass;
- (c) its mass;
- (d) whether the solid biomass was a by-product of a process;
- (e) whether the solid biomass was derived from waste;
- (f) where the solid biomass was plant matter or derived from plant matter, the country where the plant matter was grown;
- (g) where the information specified in paragraph (f) is not known or the solid biomass was not plant matter or derived from plant matter, the country from which the operator obtained the solid biomass;
- (h) whether any of the solid biomass used was an energy crop or derived from an energy crop and if so—
- (i) the proportion of the consignment which was or was derived from the energy crop, and
- (ii) the type of energy crop in question;
- (i) whether the solid biomass or any matter from which it was derived was certified under an environmental quality assurance scheme and, if so, the name of the scheme;
- (j) where the solid biomass was plant matter or derived from plant matter, the use to which the land on which the plant matter was grown has been put since 30th November 2005.
3
The information specified in paragraph 2 must be collated by reference to the following places of origin—
- (a) United States of America or Canada;
- (b) the European Union;
- (c) other.
SCHEDULE 6 — Tariffs
| Tariff name | Source of energy and technology | Installation capacity | Tariff (pence/kWh) |
|---|---|---|---|
| Biomass | Solid biomass including solid biomass contained in waste (including CHP systems, other than new solid biomass CHP systems, which generate heat and power from solid biomass including solid biomass contained in waste) | All capacities | Tier 1: 3.05 Tier 2: 2.14 |
| New solid biomass CHP systems | Solid biomass (excluding solid biomass contained in waste) used in CHP systems which comply with the requirements in regulation 13 | All capacities | 4.42 |
| Deep geothermal | Deep geothermal energy including CHP systems generating heat and power from such energy | All capacities | 5.38 |
| Small biogas | Biogas (including CHP systems which generate heat and power from biogas) | Below 200kWth | 4.64 |
| Medium biogas | Biogas (including CHP systems which generate heat and power from biogas) | Above 200kWth and above, but below 600kWth | 3.64 |
| Large biogas | Biogas (including CHP systems which generate heat and power from biogas) | 600kWth and above | 1.36 |
| Solar thermal | Solar collectors | All capacities | 10.75 |
| Small ground source heat pumps | Ground source heat pumps including shared ground loop systems | Below 100kWth | Tier 1: 9.36 Tier 2: 2.79 |
| Large ground source heat pumps | Ground source heat pumps including shared ground loop systems | 100kWth and above | Tier 1: 9.36 Tier 2: 2.79 |
| Air source heat pumps | Air source heat pumps | All capacities | 2.69 |
| Biomethane | Biomethane | Tier 1: 5.60 Tier 2: 3.29 Tier 3: 2.53 |
SCHEDULE 7 — Degression
Calculation of B
1
- (1) For the purposes of regulation 60, B is calculated in relation to a tariff category and an assessment date as follows.
- (2) For the purposes of this paragraph—
- (a) the first test is met in relation to an assessment date in the first column of Table 1 if the forecast for total expenditure as at that date exceeds the figure specified for that assessment date in the corresponding entry in the second column of Table 1;
- (b) the second test is met in relation to an assessment date if C, as calculated in accordance with paragraph 2 of this Schedule, is 0.10 or more.
- (3) B is 0 unless the circumstances set out in sub-paragraph (4) apply.
- (4) B is 0.05 if, in relation to the assessment date—
- (a) the first test is met; and
- (b) the second test is met.
Calculation of C
2
- (1) For the purposes of regulation 60, C is calculated in relation to a tariff category and an assessment date as follows.
- (2) For the purposes of this paragraph—
- (a) the first test is met in relation to an assessment date in the first column of the relevant table if, as at that assessment date, the forecast for expenditure in relation to that tariff category exceeds the figure specified for that assessment date in the corresponding entry in the second column of that table;
- (b) the second test is met in relation to an assessment date if, as at that assessment date, the increase in expenditure forecast applicable to that tariff category is at least 50% of, but less than 150% of, the figure specified for that assessment date in the corresponding entry in the third column of the relevant table (“the anticipated increase figure”);
- (c) the third test is met in relation to an assessment date if, as at that assessment date, the increase in expenditure forecast applicable to that tariff category is at least 150% of the anticipated increase figure;
- (d) in relation to an assessment date other than the assessment date which falls on 30th April 2018, the fourth test is met if during the tariff period that immediately preceded the tariff period in which the assessment date falls, the value of C applicable to that tariff category was 0.10 or more,
where the “relevant table” means whichever of Tables 2 to 9 in this Schedule is applicable to that tariff category.
- (3) C is 0 unless the circumstances set out in sub-paragraph (4) or (5) (a), (b) or (c) apply.
- (4) In relation to the assessment date which falls on 30th April 2018, C is 0.10 if—
- (a) the first test is met; and
- (b) the second or third test is met.
- (5) In relation to any subsequent assessment date—
- (a) C is 0.10 if—
- (i) the first test is met; and
- (ii) the second test is met, whether or not the fourth test is met;
- (b) C is 0.10 if in relation to the assessment date—
- (i) the first test is met; and
- (ii) the third test is met but the fourth test is not met; and
- (c) C is 0.20 if in relation to the assessment date—
- (i) the first test is met;
- (ii) the third test is met; and
- (iii) the fourth test is met.
| Assessment date | Total expenditure anticipated for subsequent year £million |
|---|---|
| 31st July 2019 | 894.04 |
| 31st October 2019 | 920.70 |
| 31st January 2020 | 946.55 |
| 30th April 2020 | 967.99 |
| 31st July 2020 | 983.66 |
| 31st October 2020 | 997.53 |
| Any date after 30th January 2021 | 1,009.26 |
| Assessment Date | Expenditure threshold when calculating C for the purposes of regulation 60 (£million) |
| --- | --- |
| 31st July 2019 | 421.00 |
| 31st October 2019 | 427.00 |
| 31st January 2020 | 433.00 |
| 30th April 2020 | 439.00 |
| 31st July 2020 | 445.00 |
| 31st October 2020 | 451.00 |
| Any date after 30th January 2021 | 457.00 |
| Assessment Date | Expenditure threshold when calculating C for the purposes of regulation 60 (£million) |
| --- | --- |
| 31st July 2019 | 77.50 |
| 31st October 2019 | 79.22 |
| 31st January 2020 | 80.94 |
| 30th April 2020 | 82.66 |
| 31st July 2020 | 84.38 |
| 31st October 2020 | 86.10 |
| Any date after 30th January 2021 | 87.82 |
| Assessment Date | Expenditure threshold when calculating C for the purposes of regulation 60 (£million) |
| --- | --- |
| 31st July 2019 | 26.00 |
| 31st October 2019 | 29.00 |
| 31st January 2020 | 32.00 |
| 30th April 2020 | 35.00 |
| 31st July 2020 | 38.00 |
| 31st October 2020 | 41.00 |
| Any date after 30th January 2021 | 44.00 |
| Assessment Date | Expenditure threshold when calculating C for the purposes of regulation 60 (£million) |
| --- | --- |
| 31st July 2019 | 9.22 |
| 31st October 2019 | 9.86 |
| 31st January 2020 | 10.53 |
| 30th April 2020 | 11.23 |
| 31st July 2020 | 11.94 |
| 31st October 2020 | 12.65 |
| Any date after 30th January 2021 | 13.37 |
| Assessment Date | Expenditure threshold when calculating C for the purposes of regulation 60 (£million) |
| --- | --- |
| 31st July 2019 | 1.00 |
| 31st October 2019 | 1.50 |
| 31st January 2020 | 2.00 |
| 30th April 2020 | 2.50 |
| 31st July 2020 | 3.00 |
| 31st October 2020 | 3.50 |
| Any date after 30th January 2021 | 4.00 |
| Assessment Date | Expenditure threshold when calculating C for the purposes of regulation 60 (£million) |
| --- | --- |
| 31st July 2019 | 57.00 |
| 31st October 2019 | 57.90 |
| 31st January 2020 | 58.80 |
| 30th April 2020 | 59.70 |
| 31st July 2020 | 60.60 |
| 31st October 2020 | 61.50 |
| Any date after 30th January 2021 | 62.40 |
| Assessment Date | Expenditure threshold when calculating C for the purposes of regulation 60 (£million) |
| --- | --- |
| 31st July 2019 | 389.84 |
| 31st October 2019 | 391.84 |
| 31st January 2020 | 393.84 |
| 30th April 2020 | 395.84 |
| 31st July 2020 | 397.84 |
| 31st October 2020 | 399.84 |
| Any date after 30th January 2021 | 401.84 |
| Assessment Date | Expenditure threshold when calculating C for the purposes of regulation 60 (£million) |
| --- | --- |
| 31st July 2019 | 3.30 |
| 31st October 2019 | 3.33 |
| 31st January 2020 | 3.36 |
| 30th April 2020 | 3.38 |
| 31st July 2020 | 3.41 |
| 31st October 2020 | 3.43 |
| Any date after 30th January 2021 | 3.46 |
Signed
Claire Perry — Minister of State — 2018-05-21
Explanatory note
(This note is not part of the Regulations)
Footnotes
[^f00001]: 2008 c.32. Section 100 was amended by section 51 of the Infrastructure Act 2015 (c.7) and by S.I. 2011/2195.
[^f00002]: Section 105 (Parliamentary control of subordinate legislation) was amended by section 51 of the Infrastructure Act 2015 which inserted subsections (3A) to (3I) concerning provisions which require the affirmative resolution procedure.
[^f00003]: The “Authority” means the Gas and Electricity Markets Authority; see section 100(3) of the Energy Act 2008.
[^f00004]: Details of which are available at www.microgenerationcertification.org
[^f00005]: The ISBN for the English language version of this standard is ISBN 0 580 29415 3. This standard was published by the British Standards Institution on 15th July 1990 and copies, including hard copies, can be obtained at www.bsigroup.com
[^f00006]: The ISBN for the English language version of this standard is ISBN 978 0 580 78472 9. This standard was published by the British Standards Institution on 31st October 2012 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00007]: This standard was published by the Department for Business, Energy and Industrial Strategy and is available, including in hard copy, at www.gov.uk/guidance/combined-heat-power-quality-assurance-programme.
[^f00008]: 2010 c.4.
[^f00009]: The ISBN for the English language version of this standard is ISBN 0 580 19482 5. This standard was published by the British Standards Institution on 28th June 2011 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00010]: S.I. 2016/1154, as amended by S.I. 2018/110. By virtue of regulation 73 of the Environmental Permitting (England and Wales) Regulations 2016 (“the 2016 Regulations”), a permit issued under the Environmental Permitting (England and Wales) Regulations 2010 (S.I. 2010/675), which are revoked by the 2016 Regulations, is treated as issued under the 2016 Regulations.
[^f00011]: S.S.I. 2012/360, as amended by S.S.I.2014/267. There are other amending instruments but none is relevant.
[^f00012]: S.I. 2012/3118, as amended by S.I. 2016/284. There are other amending instruments but none is relevant.
[^f00013]: S.S.I. 2008/309, to which there are amendments not relevant to these Regulations.
[^f00014]: 1986 c.44. Section 7 was substituted by section 5 of the Gas Act 1995 (c.45), and amended by sections 3(2) and 76 of, and paragraph 4 of Schedule 6, and paragraph 1 of Schedule 8 to, the Utilities Act 2000 (c.27), by section 149(5) of the Energy Act 2004 (c.20), and by S.I. 2011/2704.
[^f00015]: The ISBN for the English language version of this standard is ISBN 978 1903287 804. This standard was published by the Chartered Institute of Building Services Engineers in 2007 and copies, including hard copies, can be obtained at www.cibse.org.
[^f00016]: OJ L 96, 29.3.2014, p149.
[^f00017]: Section 5(6) to (10) was inserted by section 149(3) of the Energy Act 2004.
[^f00018]: The ISBN for the English language version of this standard is ISBN 978 20 580 84650 2. This standard was published by the British Standards Institution on 31st January 2009 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00019]: The ISBN for the English language versions of these standards are ISBN 978 0 580 83312 0, ISBN 978 0 580 83313 7, and ISBN 978 0 580 58239 4. The first two of these standards were published on 28th February 2010 and the latter on 28th February 2009 by the British Standards Institution and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00020]: The ISBN for the English language version of this standard is ISBN 978 0 580 58925 6. This standard was published by the British Standards Institution on 31st January 2009 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00021]: The ISBN for the English language version of this standard is ISBN 978 0 580 69184 3. This standard was published by the British Standards Institution on 31st December 2008 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00022]: OJ No L 312, 22.11.2008, p3.
[^f00023]: 1971 c.80.
[^f00024]: S.I. 2011/2860, as amended by S.I. 2013/1033, 2013/2410, 2013/3179, 2014/1413, 2015/197, 2015/477, 2016/718, 2016/1197, 2017/727 and 2017/857.
[^f00025]: The ISBN for the English language version of this standard is ISBN 0 580 46330 3. This standard was published by the British Standards Institution on 29th June 2005 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00026]: The ISBN for the English language version of this standard is ISBN 978 0 580 84107 1. This standard was published by the British Standards Institution on 22nd August 2003 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00027]: 1981 c.69.
[^f00028]: Details of which are available at www.microgenerationcertification.org
[^f00029]: The ISBN for the English language version of this standard is ISBN 0 580 29415 3. This standard was published by the British Standards Institution on 15th July 1998 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00030]: The ISBN for the English language version of this standard is ISBN 978 0 580 78472 9. This standard was published by the British Standards Institution on 31st October 2012 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00031]: Published on www.microgenerationcertification.org.
[^f00032]: Published on www.microgenerationcertification.org.
[^f00033]: Published on www.microgenerationcertification.org.
[^f00034]: This standard is available at https://www.chpqa.com/guidance_notes/documents/CHPQA_Standard_Issue3.pdf. Hard copies may be obtained from CHPQA Programme, The Gemini Building, Fermi Avenue, Didcot, OX11 0QR.
[^f00035]: S.I. 2014/928, to which there are amendments not relevant to these Regulations.
[^f00036]: 1993 c.39. Section 1 was amended by section 3 of the National Lottery Act 2006 (c.23).
[^f00037]: This is a factor to account for the calorific value per cubic metre of biomethane (10 kWh/m³) and proportion of eligible biomethane per unit of biomethane injected (0.91).
[^f00038]: 2003 c.33. Section 24(1) was amended by S.I. 2013/141.
[^f00039]: Section 21(3) was amended by S.I. 2011/2499.
[^f00040]: 1990 c.43. Section 30(3) was amended by paragraph 17(3) of Schedule 9 to the Local Government (Wales) Act 1994 (c.19), and subsection (3)(c) was amended by paragraph 167(3) of Schedule 13 to the Local Government etc. (Scotland) Act 1994 (c.39).
[^f00041]: Section 30(2)(f) was substituted by paragraph 17(2) of Schedule 9 to the Local Government (Wales) Act 1994, and paragraph (g) was amended by paragraph 167(3) of Schedule 13 to the Local Government etc. (Scotland) Act 1994.
[^f00042]: S.I. 2015/1947, as amended by S.I. 2016/1108, 2017/1234 and 2017/1289.
[^f00043]: S.S.I. 2009/140. Relevant amending instruments are S.S.I. 2010/147, 2011/225, 2013/116, 2014/94, 2015/384, 2016/1108 and 2017/432, and S.I. 2016/1108 and 2017/1234.
[^f00044]: International Standard on Assurance Engagements (ISAE) 3000 (Revised): Assurance Engagements other than Audits or Reviews of Historical Financial Information, published on 9th December 2013 by the International Federation of Accountants. Copies are available at www.ifac.org.
[^f00045]: S.I. 2011/2860, as amended by S.I. 2013/1033, 2013/2410, 2013/3179, 2014/1413, 2015/197, 2015/477, 2016/718, 2016/1197, 2017/727 and 2017/857
[^f00046]: S.I. 2009/785. Relevant amending instruments are S.I. 2010/1107, 2011/984, 2013/768 and 2014/893. The Order was revoked with savings by S.I. 2015/1947.
[^f00047]: S.S.I. 2009/140. Relevant amending instruments are S.S.I. 2010/147, 2011/225, 2013/116, 2014/94, 2015/384, 2016/1108 and 2017/432, and S.I. 2016/1108 and 2017/1234.
[^f00048]: S.I. 2015/1947, as amended by S.I. 2016/1108, 2017/1234 and 2017/1289.
[^f00049]: S.I. 2013/1033.
[^f00050]: S.I. 2013/2410.
[^f00051]: S.I. 2013/3179.
[^f00052]: S.I. 2014/1413.
[^f00053]: S.I. 2015/145.
[^f00054]: S.I. 2015/197.
[^f00055]: S.I. 2015/477.
[^f00056]: S.I. 2015/1459.
[^f00057]: S.I. 2016/257.
[^f00058]: S.I. 2016/718.
[^f00059]: S.I. 2016/1197.
[^f00060]: S.I. 2017/727.
[^f00061]: S.I. 2017/857.
[^f00062]: S.I. 2011/2860, as amended by S.I. 2013/1033, 2013/2410, 2013/3179, 2014/1413, 2015/197, 2015/477, 2016/718, 2016/1197, 2017/727 and 2017/857.
[^f00063]: The ISBN for the English language version of this standard is ISBN 0 580 46330 3. This standard was published by the British Standards Institution on 29th June 2005 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00064]: The ISBN for the English language version of this standard is ISBN 0 580 32356 0. This standard was published by the British Standards Institution on 15th November 1999 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00065]: The ISBN for the English language version of this standard is ISBN 978 0 580 71785 7. This standard was published by the British Standards Institution on 31st August 2012 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00066]: The ISBN for the English language version of this standard is ISBN 0 580 46990 5. This standard was published by the British Standards Institution on 4th January 2006 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00067]: The ISBN for the English language version of this standard is ISBN 0 580 38920 0. This standard was published by the British Standards Institution on 25th January 2002 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00068]: The ISBN for the English language version of this standard is ISBN 0 580 41276 8. This standard was published by the British Standards Institution on 24th February 2003 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00069]: S.I. 2010/675. Relevant amending instruments are S.I. 2011/988, 2012/630, 2013/390, 2014/255, and 2016/475.
[^f00070]: S.I. 2016/1154, as amended by S.I. 2018/110.
[^f00071]: S.S.I. 2012/360, as amended by S.S.I.2014/267. There are other amending instruments but none is relevant.
[^f00072]: The ISBN for the English language version of this standard is ISBN 978 0 580 84107 1. This standard was published by the British Standards Institution on 22nd August 2003 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00073]: Published on www.microgenerationcertification.org.
[^f00074]: The ISBN for the English language version of this standard is ISBN 0 580 19482 5. This standard was published by the British Standards Institution on 28th June 1991 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^f00075]: OJ L 140 5.6.2009, p16.
[^f00076]: OJ L 140 5.6.2009, p16; article 17 was amended by article 2(5) of Directive (EU) 2015/1513 of the European Parliament and of the Council amending Directive 98/70/EC relating to the quality of petrol and diesel fuels and amending Directive 2009/28/EC on the promotion of the use of energy from renewable sources (OJ L 239 15.9.2015, p1).
[^f00077]: OJ L 309 24.11.2009, p71.
[^f00078]: Lisbon Resolution L2 is entitled “Pan-European Criteria, Indicators and Operational Level Guidelines for Sustainable Forest Management”. Copies are available at http://www.foresteurope.org/ministerial_conferences/lisbon1998.
[^f00079]: S.I. 2000/3042, revoked by S.I. 2014/3263.
Editorial notes
[^c22955381]: 2008 c.32. Section 100 was amended by section 51 of the Infrastructure Act 2015 (c.7) and by S.I. 2011/2195.
[^c22955391]: Section 105 (Parliamentary control of subordinate legislation) was amended by section 51 of the Infrastructure Act 2015 which inserted subsections (3A) to (3I) concerning provisions which require the affirmative resolution procedure.
[^c22955401]: The “Authority” means the Gas and Electricity Markets Authority; see section 100(3) of the Energy Act 2008.
[^c22955411]: Details of which are available at www.microgenerationcertification.org
[^c22955431]: The ISBN for the English language version of this standard is ISBN 978 0 580 78472 9. This standard was published by the British Standards Institution on 31st October 2012 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^c22955441]: This standard was published by the Department for Business, Energy and Industrial Strategy and is available, including in hard copy, at www.gov.uk/guidance/combined-heat-power-quality-assurance-programme.
[^c22955451]: 2010 c.4.
[^c22955461]: The ISBN for the English language version of this standard is ISBN 0 580 19482 5. This standard was published by the British Standards Institution on 28th June 2011 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^c22955471]: S.I. 2016/1154, as amended by S.I. 2018/110. By virtue of regulation 73 of the Environmental Permitting (England and Wales) Regulations 2016 (“the 2016 Regulations”), a permit issued under the Environmental Permitting (England and Wales) Regulations 2010 (S.I. 2010/675), which are revoked by the 2016 Regulations, is treated as issued under the 2016 Regulations.
[^c22955481]: S.S.I. 2012/360, as amended by S.S.I.2014/267. There are other amending instruments but none is relevant.
[^c22955491]: S.I. 2012/3118, as amended by S.I. 2016/284. There are other amending instruments but none is relevant.
[^c22955501]: S.S.I. 2008/309, to which there are amendments not relevant to these Regulations.
[^c22955511]: 1986 c.44. Section 7 was substituted by section 5 of the Gas Act 1995 (c.45), and amended by sections 3(2) and 76 of, and paragraph 4 of Schedule 6, and paragraph 1 of Schedule 8 to, the Utilities Act 2000 (c.27), by section 149(5) of the Energy Act 2004 (c.20), and by S.I. 2011/2704.
[^c22955521]: The ISBN for the English language version of this standard is ISBN 978 1903287 804. This standard was published by the Chartered Institute of Building Services Engineers in 2007 and copies, including hard copies, can be obtained at www.cibse.org.
[^c22955531]: OJ L 96, 29.3.2014, p149.
[^c22955541]: Section 5(6) to (10) was inserted by section 149(3) of the Energy Act 2004.
[^c22955551]: The ISBN for the English language version of this standard is ISBN 978 20 580 84650 2. This standard was published by the British Standards Institution on 31st January 2009 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^c22955561]: The ISBN for the English language versions of these standards are ISBN 978 0 580 83312 0, ISBN 978 0 580 83313 7, and ISBN 978 0 580 58239 4. The first two of these standards were published on 28th February 2010 and the latter on 28th February 2009 by the British Standards Institution and copies, including hard copies, can be obtained at www.bsigroup.com.
[^c22955571]: The ISBN for the English language version of this standard is ISBN 978 0 580 58925 6. This standard was published by the British Standards Institution on 31st January 2009 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^c22955581]: The ISBN for the English language version of this standard is ISBN 978 0 580 69184 3. This standard was published by the British Standards Institution on 31st December 2008 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^c22955591]: OJ No L 312, 22.11.2008, p3.
[^c22955601]: 1971 c.80.
[^c22955611]: S.I. 2011/2860, as amended by S.I. 2013/1033, 2013/2410, 2013/3179, 2014/1413, 2015/197, 2015/477, 2016/718, 2016/1197, 2017/727 and 2017/857.
[^c22955641]: 1981 c.69.
[^c22955651]: Details of which are available at www.microgenerationcertification.org
[^c22955671]: The ISBN for the English language version of this standard is ISBN 978 0 580 78472 9. This standard was published by the British Standards Institution on 31st October 2012 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^c22955681]: Published on www.microgenerationcertification.org.
[^c22955711]: This standard is available at https://www.chpqa.com/guidance_notes/documents/CHPQA_Standard_Issue3.pdf. Hard copies may be obtained from CHPQA Programme, The Gemini Building, Fermi Avenue, Didcot, OX11 0QR.
[^c22955721]: S.I. 2014/928, to which there are amendments not relevant to these Regulations.
[^c22955731]: 1993 c.39. Section 1 was amended by section 3 of the National Lottery Act 2006 (c.23).
[^c22955741]: This is a factor to account for the calorific value per cubic metre of biomethane (10 kWh/m³) and proportion of eligible biomethane per unit of biomethane injected (0.91).
[^c22955751]: 2003 c.33. Section 24(1) was amended by S.I. 2013/141.
[^c22955761]: Section 21(3) was amended by S.I. 2011/2499.
[^c22955771]: 1990 c.43. Section 30(3) was amended by paragraph 17(3) of Schedule 9 to the Local Government (Wales) Act 1994 (c.19), and subsection (3)(c) was amended by paragraph 167(3) of Schedule 13 to the Local Government etc. (Scotland) Act 1994 (c.39).
[^c22955781]: Section 30(2)(f) was substituted by paragraph 17(2) of Schedule 9 to the Local Government (Wales) Act 1994, and paragraph (g) was amended by paragraph 167(3) of Schedule 13 to the Local Government etc. (Scotland) Act 1994.
[^c22955791]: S.I. 2015/1947, as amended by S.I. 2016/1108, 2017/1234 and 2017/1289.
[^c22955801]: S.S.I. 2009/140. Relevant amending instruments are S.S.I. 2010/147, 2011/225, 2013/116, 2014/94, 2015/384, 2016/1108 and 2017/432, and S.I. 2016/1108 and 2017/1234.
[^c22955811]: International Standard on Assurance Engagements (ISAE) 3000 (Revised): Assurance Engagements other than Audits or Reviews of Historical Financial Information, published on 9th December 2013 by the International Federation of Accountants. Copies are available at www.ifac.org.
[^c22955821]: S.I. 2011/2860, as amended by S.I. 2013/1033, 2013/2410, 2013/3179, 2014/1413, 2015/197, 2015/477, 2016/718, 2016/1197, 2017/727 and 2017/857
[^c22955831]: S.I. 2009/785. Relevant amending instruments are S.I. 2010/1107, 2011/984, 2013/768 and 2014/893. The Order was revoked with savings by S.I. 2015/1947.
[^c22955841]: S.S.I. 2009/140. Relevant amending instruments are S.S.I. 2010/147, 2011/225, 2013/116, 2014/94, 2015/384, 2016/1108 and 2017/432, and S.I. 2016/1108 and 2017/1234.
[^c22955851]: S.I. 2015/1947, as amended by S.I. 2016/1108, 2017/1234 and 2017/1289.
[^c22955861]: S.I. 2013/1033.
[^c22955871]: S.I. 2013/2410.
[^c22955881]: S.I. 2013/3179.
[^c22955891]: S.I. 2014/1413.
[^c22955901]: S.I. 2015/145.
[^c22955911]: S.I. 2015/197.
[^c22955921]: S.I. 2015/477.
[^c22955931]: S.I. 2015/1459.
[^c22955941]: S.I. 2016/257.
[^c22955951]: S.I. 2016/718.
[^c22955961]: S.I. 2016/1197.
[^c22955971]: S.I. 2017/727.
[^c22955981]: S.I. 2017/857.
[^c22955991]: S.I. 2011/2860, as amended by S.I. 2013/1033, 2013/2410, 2013/3179, 2014/1413, 2015/197, 2015/477, 2016/718, 2016/1197, 2017/727 and 2017/857.
[^c22956001]: The ISBN for the English language version of this standard is ISBN 0 580 46330 3. This standard was published by the British Standards Institution on 29th June 2005 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^c22956061]: S.I. 2010/675. Relevant amending instruments are S.I. 2011/988, 2012/630, 2013/390, 2014/255, and 2016/475.
[^c22956071]: S.I. 2016/1154, as amended by S.I. 2018/110.
[^c22956101]: Published on www.microgenerationcertification.org.
[^c22956111]: OJ L 140 5.6.2009, p16.
[^c22956121]: The ISBN for the English language version of this standard is ISBN 0 580 19482 5. This standard was published by the British Standards Institution on 28th June 1991 and copies, including hard copies, can be obtained at www.bsigroup.com.
[^c22956131]: OJ L 140 5.6.2009, p16; article 17 was amended by article 2(5) of Directive (EU) 2015/1513 of the European Parliament and of the Council amending Directive 98/70/EC relating to the quality of petrol and diesel fuels and amending Directive 2009/28/EC on the promotion of the use of energy from renewable sources (OJ L 239 15.9.2015, p1).
[^c22956141]: OJ L 309 24.11.2009, p71.
[^c22956151]: Lisbon Resolution L2 is entitled “Pan-European Criteria, Indicators and Operational Level Guidelines for Sustainable Forest Management”. Copies are available at http://www.foresteurope.org/ministerial_conferences/lisbon1998.
[^c22956161]: S.I. 2000/3042, revoked by S.I. 2014/3263.
[^key-9a3bbc34107bab2142a1fffc70536493]: Words in reg. 2(1) inserted (20.6.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(2), 9(a)(i)
[^key-f9e7167b1ddac3e5f06c265e9b9e42d6]: Words in reg. 2(1) inserted (20.6.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(2), 9(a)(ii)
[^key-64abbb0e86c7a38f0b30bb5ae698109a]: Words in reg. 2(1) inserted (20.6.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(2), 9(a)(iii)
[^key-4e6a22be6efa7cc11ad128ee2240d334]: Reg. 32(4A) inserted (20.6.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(2), 14(a)
[^key-d9d5cc2d412e188241f97a2bc82c0bf3]: Reg. 32(13)(d) inserted (20.6.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(2), 14(c)
[^key-f76e31c3f8d7c35ef3b566841cd954c1]: Word in reg. 34(9) inserted (20.6.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(2), 15
[^key-d442c4b5b4e97c2d14b79e0584f4f1ee]: Reg. 17A inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 13
[^key-ca800986de34415af26965dd9236f96d]: Reg. 55A inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 19
[^key-18b9b3eb963ce84ce4eab16dcb68f46a]: Words in reg. 2(1) substituted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 9(b)
[^key-e9e98d41cb0a8659aeac65d4bdbed24e]: Words in reg. 2(1) inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 9(c)
[^key-3b68c7897688ea00c12aa1fe5daa2941]: Words in reg. 2(1) inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 9(d)
[^key-13bd9427f1901d03549eafc74c166002]: Words in reg. 2(1) inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 9(e)
[^key-3510910053449ff81f8843418c0ed86a]: Reg. 3(8A)(8B) inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 10(2)
[^key-02d0505227012ef0efef9fd2fa1e4ba5]: Words in reg. 3(5)(b)(i) substituted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 10(1)(a)
[^key-6dc148a4f4ffd453d33e95d19e4afa32]: Words in reg. 3(5)(b)(ii) inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 10(1)(b)
[^key-91f5868a67ffe378db14a2b421612883]: Words in reg. 3(5)(b)(iii) inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 10(1)(c)
[^key-de7f74c3612402088633ea612823ac01]: Word in reg. 4(1)(b)(ii) omitted (1.10.2018) by virtue of The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 11(1)(a)
[^key-cd48af875e9b71494ea3782472ed2a03]: Reg. 4(1)(b)(iii)(iv) substituted for reg. 4(1)(b)(iii) (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 11(1)(b)
[^key-1f71bce1c886fdf5627d687076a1107a]: Words in reg. 4(2) substituted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 11(2)
[^key-148a041faa35525a2fcf81ccc26e25d7]: Words in reg. 17 substituted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 12
[^key-7227d6a8ed2a92b1c7da97a7cce9375a]: Reg. 32(12A) inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 14(b)
[^key-1216f4a8db41d91a39601ea0aefcf9df]: Reg. 43(xa) inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 16(a)
[^key-a037bbaa1e7b73c2adf13c8d36bde017]: Reg. 43(z)(z1) inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 16(b)
[^key-4e3029f6001c6d72fc1fbd6a54eb2761]: Reg. 45(4A) inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 17(b)
[^key-152a6b3107bd1efc42a07d3d27989145]: Words in reg. 45(4) inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 17(a)
[^key-f754e8d0228e6307b0951136e861e635]: Words in reg. 52(1)(b) substituted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 18
[^key-712ea6290d43f18424b9003bdddb9c0a]: Word in reg. 59(1) substituted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 20
[^key-fe5ac4721ef971292b0003002bda9c95]: Words in reg. 89(1)(a)(ii) inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 21
[^key-74a83d547cd05c2a4c1cd89cdb7e742e]: Words in Sch. 2 para. 1(2)(i) inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 22(a)
[^key-da84dbac0c4ec28b44f351df787375fc]: Sch. 2 para. 1(2)(ia) inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 22(b)
[^key-86707f7702bd23e159f80a71ea172564]: Sch. 2 para. 1(2)(dd) inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 22(d)
[^key-2b3f89d41ea9d0eb3cc8bdcf452481d9]: Words in Sch. 2 para. 1(2)(j) inserted (1.10.2018) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 22(c)
[^key-53254ef52869eb6cc4b126fe14613ea5]: Words in Sch. 4 para. 2 omitted (1.10.2018) by virtue of The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2018 (S.I. 2018/635), regs. 1(4), 23
[^key-eb40facc31648007bd859ad37daff285]: Sch. 7 Table 1 substituted (17.7.2019) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2019 (S.I. 2019/1052), regs. 1, 6(2)
[^key-60c2012b5f7f9208dbfee8c708cea6af]: Sch. 7 Table 2 substituted (17.7.2019) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2019 (S.I. 2019/1052), regs. 1, 6(3)
[^key-d28021f53bd3dedbb0536b3a00143c86]: Sch. 7 Table 3 substituted (17.7.2019) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2019 (S.I. 2019/1052), regs. 1, 6(4)
[^key-6e211c57cc8e9fe39d5b0902431692a7]: Sch. 7 Table 4 substituted (17.7.2019) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2019 (S.I. 2019/1052), regs. 1, 6(5)
[^key-83c6df766dbb31ee5f990dd6bb9ff8e8]: Sch. 7 Table 5 substituted (17.7.2019) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2019 (S.I. 2019/1052), regs. 1, 6(6)
[^key-6e94356722940011155261cb9dbdedb3]: Sch. 7 Table 6 substituted (17.7.2019) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2019 (S.I. 2019/1052), regs. 1, 6(7)
[^key-6e9293056cdb2722ba89e05a5342b8f2]: Sch. 7 Table 7 substituted (17.7.2019) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2019 (S.I. 2019/1052), regs. 1, 6(8)
[^key-905b03cf738d57052d479109c61912b4]: Sch. 7 Table 8 substituted (17.7.2019) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2019 (S.I. 2019/1052), regs. 1, 6(9)
[^key-883843733aba1ae2bb1d465222d0f974]: Sch. 7 Table 9 substituted (17.7.2019) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2019 (S.I. 2019/1052), regs. 1, 6(10)
[^key-975904ffead834c587f1e889e9a2d49f]: Reg. 35(11A) inserted (17.7.2019) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2019 (S.I. 2019/1052), regs. 1, 5(2)
[^key-02eb3d359ae7e8342407119268bea908]: Words in reg. 35(11) substituted (17.7.2019) by The Renewable Heat Incentive Scheme and Domestic Renewable Heat Incentive Scheme (Amendment) Regulations 2019 (S.I. 2019/1052), regs. 1, 5(1)
[^key-73ebd750d0f787d94c433b36d8c98dec]: Reg. 35(6)(c) substituted (20.7.2020) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2020 (S.I. 2020/650), regs. 1, 3(2)(a)
[^key-51756e321ace864ee155ff5d2af2ab6e]: Reg. 35(7A) inserted (20.7.2020) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2020 (S.I. 2020/650), regs. 1, 3(2)(b)
[^key-a0828fd7db9385ac7754a243731d7475]: Reg. 35(8A) inserted (20.7.2020) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2020 (S.I. 2020/650), regs. 1, 3(2)(c)
[^key-91cfeab10cdc95d062acd6663b8ccde0]: Words in reg. 35(11A) substituted (20.7.2020) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2020 (S.I. 2020/650), regs. 1, 3(2)(d)
[^key-fb034f88aeb8dccb9026d5c23464688d]: Reg. 35(11B) inserted (20.7.2020) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2020 (S.I. 2020/650), regs. 1, 3(2)(e)
[^key-e36dfb94e662b608495cd17ae5ebb3e8]: Words in reg. 35(14)(a) substituted (20.7.2020) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2020 (S.I. 2020/650), regs. 1, 3(2)(f)(i)
[^key-fd2210fcb248652492c7090883113973]: Reg. 35(14)(e) inserted (20.7.2020) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2020 (S.I. 2020/650), regs. 1, 3(2)(f)(ii)
[^key-76eb7b5d8714a09e14c8b00ec245276c]: Words in reg. 59(1) inserted (20.7.2020) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2020 (S.I. 2020/650), regs. 1, 3(3)(a)
[^key-2b90cd7a4da9193ab8102f8fa592cd63]: Reg. 59(1A) inserted (20.7.2020) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2020 (S.I. 2020/650), regs. 1, 3(3)(b)
[^key-0c27ae92ceca6c3a86022a00da445b88]: Regs. 3A-3C inserted (1.3.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(2)(b)(iii), 9
[^key-eae22e9c0353c9fd27f090abf27c7cc0]: Sch. 2A inserted (1.3.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(2)(b)(vii), 38
[^key-4c571a3104f374ed37c9dd512f92d13e]: Words in reg. 2(1) inserted (1.3.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(2)(b)(ii), 8(b)
[^key-6caf811b41b0d24331df750eb2ed1338]: Words in reg. 2(1) inserted (1.3.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(2)(b)(ii), 8(d)
[^key-fe06874bafe4cfd16e1314e68fbe0931]: Words in reg. 33(9) inserted (1.3.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(2)(b)(iv), 15
[^key-cfbf2b9447c226168cc35e9507258094]: Words in reg. 34(9) inserted (1.3.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(2)(b)(v), 16
[^key-a0a1b79b4ba96fd1128c1f96519047f5]: Reg. 64 omitted (1.3.2021) by virtue of The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(2)(b)(vi), 27(a)
[^key-ed4c0657e9a261b29f9f2953c7617619]: Reg. 65 omitted (1.3.2021) by virtue of The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(2)(b)(vi), 27(b)
[^key-62f86bac52a33910fba657deeebf1f91]: Reg. 32A inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 14
[^key-e2a17f2d2d782cf34a9c9879b935467d]: Reg. 40A inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 17
[^key-8ea55ae7a9734e59200cb756ecd09473]: Regs. 52A, 52B inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 23
[^key-55de44c278e35a14859dec85fa63f59b]: Reg. 54A inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 25
[^key-f5c29503600176a574f6c56879cf89e8]: Reg. 72A inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 32
[^key-fc4604c0d51cbe33f4dd7287185e0ca0]: Words in Sch. 2 heading inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 37(a)
[^key-ff42a72200bcac69eaff1c1f487919e4]: Word in Sch. 2 shoulder note inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 37(b)(i)
[^key-8c144a5fa5608cb745cfb17d6543c898]: Word in Sch. 2 shoulder note inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 37(b)(ii)
[^key-9bfeca9992b7cae958a617dbdbecee80]: Words in reg. 2(1) substituted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 8(a)
[^key-7ff950045921267091e6766f975f2f9f]: Words in reg. 2(1) substituted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 8(c)
[^key-fff33b91c0571eb6dc6deb626c4e2625]: Reg. 21 omitted (1.4.2021) by virtue of The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 10(a)
[^key-ba3f6317fe063ead1b34a675c00b632d]: Reg. 22 omitted (1.4.2021) by virtue of The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 10(b)
[^key-255c30c917b1ff76cf81d3fbc7ae193a]: Words in reg. 23 heading omitted (1.4.2021) by virtue of The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 11(a)
[^key-e257af2529ff253c29e13c10fbc391e4]: Words in reg. 23(1) omitted (1.4.2021) by virtue of The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 11(b)
[^key-3a89bd465cd677b299e20c3efe944986]: Reg. 30(6A)(6B) inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 12(a)
[^key-ffd8c6ba2c8797603a2f7fb2542cc94e]: Reg. 30(9A) inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 12(c)
[^key-698df5ffff6030e3fa0d43c774365d8d]: Word in reg. 30(9) inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 12(b)
[^key-e560b38e3ec294f9478aaa2db020e41c]: Word in reg. 32(10) inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 13(a)
[^key-e53f2d6f89292df13d9a7e1d74ab8bc1]: Words in reg. 32(10)(e) substituted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 13(b)
[^key-ffcfc2dfd09826a82c321fa5a8b348c0]: Words in reg. 41(3) inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 18(a)
[^key-4feee2802efde4f661f5ee342630c2b3]: Reg. 41(4) inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 18(b)
[^key-a1f003de690dd89c3579bd4e4db08468]: Words in reg. 52(1)(b) substituted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 22
[^key-2703fdfa5e8103e822612b8d0fba2515]: Words in reg. 54 heading inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 24
[^key-6e680daa55ce8d39e456814727ab03d0]: Reg. 55A(1A) inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 26
[^key-86b20fe91a32cfa6b9e02f2177b7ae71]: Words in reg. 66 heading omitted (1.4.2021) by virtue of The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 28(a)
[^key-7009d2dcfba1c6e1d442ae4c89eef130]: Words in reg. 66(1) omitted (1.4.2021) by virtue of The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 28(b)
[^key-0efcc25914ee6aa7cf00d60b21d9c78e]: Word in reg. 66(2) inserted (1.4.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 28(c)
[^key-d3f6a10c319527772df2ecd051d06db7]: Words in reg. 71(2) omitted (1.4.2021) by virtue of The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 30
[^key-4999f103382d7c5efd02fe9dc197070d]: Words in reg. 71(3) omitted (1.4.2021) by virtue of The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(4)(b), 30
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.