The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019
Made: 21st February 2019
Laid before Parliament: 26th February 2019
Coming into force in accordance with regulation 1
The Secretary of State makes the following Regulations in exercise of the powers conferred by section 247 of the Transport Act 20001.
PART 1 — Introduction
Citation and commencement
1
- (1) These Regulations may be cited as the Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019.
- (2) These Regulations come into force on exit day.
PART 2 — Amendments to secondary legislation
Amendments to the Railways Interoperability Regulations 2011
2
- (1) The Railways (Interoperability) Regulations 20112 (“the Regulations”) are amended as follows.
- (2) In regulation 2 (definitions)—
- (a) after the definition of “the 1974 Act”, insert—
- “the 2016 Directive” means Directive (EU) 2016/797 of the European Parliament and of the Council of 11 May 2016 on the interoperability of the rail system within the European Union;
- “approved body” has the meaning set out in regulation 30;
- “authorised representative” means—a person who—immediately before IP completion day was established in an EEA state and appointed to act by a manufacturer or contracting entity to perform specified tasks for that manufacturer or contracting entity in relation to the Directive, andon or after IP completion day continues to be so established and appointed by the manufacturer or contracting entity to perform those tasks; ora person who on or after IP completion day is appointed in accordance with regulation 3A;
- (b) for the definition of “certificate of verification”, substitute—
- “certificate of verification” means an EC certificate of verification or a UK certificate of verification;
- (c) omit the definition of “the Commission”;
- (d) in the definition of “Competent Authority”, for “DRDNI” substitute “DFI”;
- (e) for the definition of “DRDNI”, substitute—
- “DFI” means the Department for Infrastructure as established by section 1(6) of the Departments Act (Northern Ireland) 20163;
- (f) after the definition of “DFI”, insert—
- “EC certificate of verification” means a certificate drawn up by an EU notified body as part of the EC verification assessment procedure for a structural subsystem;
- (g) in the definition of “EC declaration of conformity or suitability for use”, for “regulation 25”, substitute “Article 13 and Annex IV of the Directive or in accordance with Articles 9 and 10 of the 2016 Directive ”;
- (h) after the definition of “EC declaration of conformity or suitability for use”, insert—
- “EC declaration of verification” means a declaration drawn up by a project entity in relation to a structural subsystem in accordance with Article 18 of and Annex V to the Directive;
- “EC verification assessment procedure” means the procedure set out in Annex VI to the Directive or Annex IV to the 2016 Directive;
- (i) in the definition of “essential requirements”, for “Annex III to the Directive”, substitute “Schedule 2”;
- (j) after the definition of “essential requirements”, insert—
- “European Commission” means the Commission of the European Union;
- (k) omit the definition of “European Railway Agency”;
- (ka) after the definition of “European specification” insert—
- “European Union Agency for Railways” means the Agency established by Regulation (EU) 2016/796 of the European Parliament and of the Council of 11 May 2016 on the European Union Agency for Railways and repealing Regulation (EC) No 881/2004;
- (l) omit the definition of “European specification”;
- (m) after the definition of “European vehicle number” insert—
- “EU notified body” means a body which either—has been appointed by an EU Member State and notified by the EU Member State concerned to the European Commission and the other EU Member States pursuant to Article 20(1) of the Conventional Directive, Article 20(1) of the High-Speed Directive or Article 28(1) of the Directive; orhas been notified to the European Commission in accordance with Chapter VI of the 2016 Directive;unless its appointment has been terminated or its notification has been withdrawn;
- (n) in the definition of “functional subsystem” for “Annex II to the Directive”, substitute “Schedule 3”;
- (o) omit the definition of “functional TSI”;
- (p) for the definition of “interoperability”, substitute—
- “interoperability” means the ability of the rail system to allow the safe and uninterrupted movement of trains which accomplish the required levels of performance for those lines;
- (q) after the definition of “interoperability constituent”, insert—
- “ISV” means an intermediate statement of verification issued by any one of the following—an approved body in relation to the design stage or the production stage of a subsystem in accordance with section 2 of Schedule 4;an EU notified body in relation to the design stage or the production stage of a subsystem in accordance with section 2 of Annex VI to the Directive or in accordance with section 2 of Annex IV to the 2016 Directive;a designated body at an intermediate stage of the UK verification assessment procedure referred to in section 3 of Schedule 4;a designated body at an intermediate stage of the EC verification assessment procedure referred to in section 3 of Annex VI to the Directive;
- “NTRs” means National Technical Rules setting out standards, technical specifications and technical rules in relation to the rail system, as amended or varied from time to time, a list of which is published by the Secretary of State in accordance with regulation 3C;
- “NTSN” means a National Technical Specification Notice published by the Secretary of State pursuant to regulation 3B setting out the standards, technical specifications and technical rules in use in the United Kingdom as amended or varied from time to time;
- (r) omit the definition of “notified body”;
- (s) in the definition of “notified national technical rules”, for “have been notified by the Secretary of State to the Commission”, substitute “were notified by the Secretary of State to the European Commission before IP completion day”;
- (t) omit the definition of “Official Journal”;
- (u) in the definition of “project entity”, omit “established in the EU”;
- (v) for the definition of “rail system”, substitute—
- “rail system” means the structure composed of lines and fixed installations of the existing rail system in the United Kingdom plus the vehicles of all categories and origin travelling on that infrastructure;
- (w) in the definition of “Safety Authority”, for “DRDNI”, substitute “DFI”;
- (x) in the definition of “structural subsystem”, for “Annex II to the Directive”, substitute “Schedule 3”;
- (y) in the definition of “subsystem”, for “Annex II to the Directive”, substitute “Schedule 3”;
- (z) in the definition of “trans-European rail system”, omit “as those sections are amended from time to time”;
- (aa) for the definition of “TSI”, substitute—
- “TSI” means technical specifications for interoperability adopted from time to time by the European Commission pursuant to the Directive, or the Conventional Directive, or the High Speed Directive or the 2016 Directive, as those TSIs have effect in EU law, and as they are amended from time to time;
- (ab) in the definition of “TSI conform authorisation”, after “placed in service” insert “or placed on the market”;
- (bb) after the definition for “upgrading” insert—
- “UK certificate of verification” means a certificate drawn up by an approved body or designated body as part of the UK verification assessment procedure for a structural subsystem;
- “UK declaration of conformity or suitability for use” means a declaration drawn up in accordance with regulation 25 and Schedule 7;
- “UK declaration of verification” means a declaration of verification drawn up by a project entity in relation to a structural subsystem pursuant to regulation 16(3) and Schedule 5;
- “UK specific case” means a special provision in relation to the technical specifications for a subsystem or an interoperability constituent to allow for its compatibility with the rail system, which is set out in an NTSN or an NTR and described in that NTSN or that NTR as a “UK specific case”;
- “UK specific rules” means all UK specific cases and NTRs, including any dispensation granted against NTRs under regulation 46(1);
- “UK verification assessment procedure” means the procedure referred to in regulation 17 and Schedule 4
- (cc) omit the definition of “verification assessment procedure”;
- (dd) omit the definition of “verification declaration”;
- (ee) omit paragraph (2);
- (ff) in paragraph (3), omit “Except for the references to the EU in the definitions of “the Commission” and “Official Journal””.
- (3) Schedules 1 and 2 have effect.
- (4) In regulation 3 (application)—
- (a) for sub-paragraph (1)(a), substitute—
(a) the rail system;
- (b) in sub-paragraph (7), for “DRDNI”, substitute “DFI”.
- (5) After regulation 3, insert—
(3A) (1) A manufacturer or contracting entity may, in writing, appoint a person established in the United Kingdom as its authorised representative to perform certain tasks pursuant to these Regulations. (2) A manufacturer or contracting entity who has appointed an authorised representative to perform, on behalf of that manufacturer or contracting entity, a task under these Regulations remains responsible for the proper performance of that task. (3) An authorised representative must comply with all the duties imposed on the manufacturer or contracting entity in relation to each obligation under these Regulations that the representative is appointed to perform, and will be subject to the same penalties as a manufacturer or contracting entity for failure to comply with those duties.
- (6) After new Regulation 3A, insert—
(3B) (1) The Secretary of State may set standards to be complied with in relation to the design, construction, placing in service, upgrading, renewal, operation and maintenance of the parts of the rail system, as well as the professional qualifications and health and safety conditions of the staff who contribute to its operation and maintenance. (2) Those standards may be set out in National Technical Specification Notices (NTSNs), which must be published by the Secretary of State. (3) NTSNs may be varied from time to time by the Secretary of State. (4) Any variation must be published by the Secretary of State. (5) Regulations 39 and 40 apply to the enforcement of the standards set out in NTSNs as they apply to the enforcement of these Regulations. (6) When the Secretary of State publishes an NTSN for the first time, and the NTSN is intended to take the place of a particular TSI as it had effect immediately before IP completion day, the NTSN must specify the TSI it replaces. (7) When the Secretary of State publishes an NTSN or a variation of an NTSN and that NTSN substantially reproduces the provisions of a TSI, the NTSN must specify the title of the TSI it substantially reproduces at the time of publication. (3C) (1) The Secretary of State may set supplementary standards to be complied with in relation to the design, construction, placing in service, upgrading, renewal, operation and maintenance of the parts of the rail system, as well as the professional qualifications and health and safety conditions of the staff who contribute to its operation and maintenance. (2) Those standards may be set out in NTRs which supplement NTSNs. (3) On IP completion day, the Secretary of State must publish a list of all NTRs applying in the United Kingdom. (4) Where appropriate, the list must specify the notified national technical rule that an NTR replaces. (5) The list of NTRs may be varied from time to time by the Secretary of State. (6) Any variation to the list must be published by the Secretary of State. (7) Regulations 39 and 40 apply to the enforcement of the standards set out in NTRs as they apply to the enforcement of these Regulations.
- (7) In regulation 4 (requirement for authorisation)—
- (a) in paragraph (1)—
- (i) at the end of sub-paragraph (a), insert “or”,
- (ii) at the end of sub-paragraph (b), omit “or”, and sub-paragraph (c);
- (b) in paragraph (2), omit “in the United Kingdom”;
- (c) in paragraph (3), before “verification assessment procedure”, insert “relevant EC or UK”;
- (d) after paragraph (3) insert—
(4) The requirements set out in paragraph (1) apply to a vehicle even if there is an extant authorisation granted in an EU Member State or by the European Union Agency for Railways. A person wishing to put a vehicle into use in the UK beyond the Channel Tunnel system which has such an authorisation must apply for an authorisation under regulation 6.
- (8) In regulation 5 (application for authorisation)—
- (a) in paragraph (1)—
- (i) at the end of sub-paragraph (a), insert “or”,
- (ii) at the end of sub-paragraph (b), omit “or”, and sub-paragraph (c);
- (b) for paragraph (2)(b), substitute—
(b) the UK declaration of verification;
- (c) in paragraph (3), before “verification assessment procedure”, insert “UK”;
- (d) in paragraph (7), for “DRDNI”, substitute “DFI”;
- (e) omit paragraph (8).
- (9) In regulation 6 (authorisation for a vehicle already authorised for another Member State)—
- (a) in the heading, for “another”, substitute “an EU”;
- (b) for paragraph (1), substitute—
(1) This regulation applies where an authorisation is required under regulation 4(4).
- (c) in paragraph (3)—
- (i) in sub-paragraph (a), for “4(1)(c)” substitute “4(4)”,
- (ii) in sub-paragraph (b)(ii), after “applicable TSI”, insert “in force at the time when the vehicle was first authorised”,
- (iii) at the end of sub-paragraph (b)(iv), omit “and”,
- (iv) for sub-paragraph (b)(v), substitute—
(v) any UK certificate of verification in relation to UK specific rules; and
- (v) after sub-paragraph (b)(v), insert—
(vi) sufficient documentary evidence to satisfy the Safety Authority that the first authorisation has not been revoked;
- (vi) at the end of sub-paragraph (c)(iv), omit “and”,
- (vii) for sub-paragraph (c)(v), substitute—
(v) any UK certificate of verification in relation to UK specific rules; and
- (viii) after sub-paragraph (c)(v), insert—
(vi) sufficient documentary evidence to satisfy the Safety Authority that the first authorisation has not been revoked;
- (viiia) in sub-paragraph (d), after “the Directive”, insert “or Article 24 of the 2016 Directive”,
- (ix) in sub-paragraph (e), for “verification declaration”, substitute “UK declaration of verification”;
- (d) for paragraph (4), substitute—
(4) If the first authorisation is a TSI conform authorisation, the Safety Authority may, after consultation with the applicant, by notice in writing require the applicant to carry out additional tests on the network concerned or risk analysis and to provide any additional information which the Safety Authority considers necessary in order to check compatibility between the vehicle and the network concerned, including compatibility with UK specific rules.
- (e) in paragraph (5), for “notified national technical rules”, substitute “UK specific rules”;
- (f) in paragraph (7)—
- (i) for “notified national technical rules”, substitute “UK specific rules”,
- (ii) omit the words from “or if the engagement”, to “notified body”;
- (g) omit paragraph (8);
- (h) for paragraph (9), substitute—
(9) If a body is engaged in accordance with paragraph (7), in order for the application to proceed, the project entity must draw up a UK declaration of verification in relation to the project subsystem in accordance with Schedule 5, after the body appointed under paragraph (7) has, in accordance with Schedule 4, drawn up a UK certificate of verification and compiled a technical file.
- (i) omit paragraphs (10) and (11).
- (10) Schedule 3 has effect.
- (11) In regulation 7 (authorisation decision)—
- (a) in paragraph (2)(a)—
- (i) for “verification declaration”, substitute “UK declaration of verification”,
- (ii) for “Annex V to the Directive”, substitute “Schedule 5”;
- (b) at the end of paragraph (2)(b), omit “and”;
- (c) at the end of paragraph (2)(c), insert—
and, (d) the project entity has satisfactorily completed any tests required by regulations 5(4), and 6(4) and 6(5).
- (d) in paragraph (5)—
- (i) for “5(1)(c) submitted in accordance with regulation 6”, substitute “6(1)”,
- (ii) in sub-paragraphs (a) and (b), for “another Member State”, substitute “an EU Member State”.
- (12) Schedule 4 has effect.
- (13) In regulation 8 (determination of type)—
- (a) in paragraph (5), for “changes to TSIs or notified national technical rules”, substitute “material changes to the applicable standards”;
- (b) for paragraph (6), substitute—
(6) The Safety Authority must publish and keep up to date a list of determinations of type for vehicles issued in accordance with this regulation (including those determinations issued by the Safety Authority before IP completion day) and any modification, suspension or withdrawal of such a determination. (6A) In maintaining that list, the Safety Authority may have regard to the requirements set out in Annex II to Commission Implementing Decision 2011/665/EU of 4 October 2011 on the European register of authorised types of railway vehicles4 as that Decision has been amended by Commission Implementing Regulation (EU) 2019/776 of 16 May 2019 amending Commission Regulations (EU) No 321/2013, (EU) No 1299/2014, (EU) No 1301/2014, (EU) No 1302/2014, (EU) No 1303/2014 and (EU) 2016/919 and Commission Implementing Decision 2011/665/EU as regards the alignment with Directive (EU) 2016/797 of the European Parliament and of the Council and the implementation of specific objectives set out in Commission Delegated Decision (EU) 2017/1474.
- (c) after paragraph (8), insert—
(9) In regulations 8, 9 and 10, “applicable standards” means the applicable standards in force at the time when type was determined, which are— (a) before IP completion day, standards set out in TSIs and notified national technical rules; (b) on or after IP completion day, standards set out in NTSNs and NTRs. (10) In regulations 8, 9 and 10, any reference to “material” changes to standards does not include the replacement of the standards contained in TSIs or notified national technical rules by the standards published by the Secretary of State in accordance with regulations 3B and 3C on IP completion day and contained in NTSNs or NTRs.
- (14) In regulation 9 (type authorisation)—
- (a) in paragraphs (2)(b) and (3)(b), for “changes to the applicable TSI or notified national technical rules”, substitute “material changes to the applicable standards”;
- (b) in paragraph (5), for the words “Commission Regulation” to the end of the sentence, substitute “Schedule 6”.
- (15) Schedule 5 has effect.
- (16) In regulation 10 (type authorisation: changes to TSIs etc)—
- (a) in the heading, for “TSIs etc”, substitute “applicable standards”;
- (b) in paragraphs (1) and (5) for “TSI or notified national technical rules”, substitute “standards”.
- (17) In regulation 12(2)(c), for “TSI”, substitute “NTSN”.
- (18) In regulation 13 (authorisation requirements for the renewal or upgrading of subsystems)—
- (a) in paragraph (2)(c)—
- (i) for “TSI, or part of a TSI”, substitute “NTSN, or part of an NTSN”,
- (ii) for “derogations”, substitute “exemptions”;
- (b) in paragraph (2)(d), for “TSI, or part of a TSI”, substitute “NTSN, or part of an NTSN”;
- (c) in paragraph (5)(a)—
- (i) for “strategy”, substitute “plan”,
- (ii) for “TSI”, substitute “NTSN”;
- (d) in paragraph (8)—
- (i) for “derogations under regulation 14”, substitute “exemptions under regulations 14 and 14A”,
- (ii) for “TSIs”, substitute “NTSNs”.
- (19) In regulation 14 (exemption from need to conform with TSIs (derogations))—
- (a) in the heading for “TSIs (derogations)”, substitute “NTSNs (exemptions)”;
- (b) for “TSI” each time it occurs, substitute “NTSN”;
- (c) in paragraph (1), for “a derogation”, substitute “an exemption”;
- (d) in paragraph (2)—
- (i) in sub-paragraph (a), for sub-paragraph (iii) substitute—
(iii) concerns the design, construction, placing in service, upgrading, renewal, operation and maintenance of the parts of the rail system as well as the professional qualifications and health and safety conditions of the staff who contribute to its operation and maintenance,
- (ii) omit sub-paragraph (c),
- (iii) for sub-paragraph (f), substitute—
(f) a project which employs innovative solutions which either do not comply with the relevant NTSNs or to which the assessment methods in those NTSNs cannot be applied.
- (e) after paragraph (2), insert—
(2A) In this regulation and in regulation 14A, a reference to a project at an advanced stage of development means a project whose planning or construction stage has reached a point where the impact of a change in technical specifications would present a significant legal, contractual, economic, financial, social or environmental impediment to the project concerned.
- (f) omit paragraphs (3) to (6).
- (20) After regulation 14, insert—
(14A) (1) Where a project entity applies for an exemption under regulation 14, they must apply to the Competent Authority in writing. (2) The following information must be included in the application for an exemption— (a) a description of the work, goods and services subject to the exemption, specifying the key dates, the location, and the operational and technical area; (b) a precise reference to the NTSN (or its parts) from which an exemption is sought; (c) a precise reference to, and details of, the alternative provisions which will be applied; (d) for requests made under regulation 14(2)(a), evidence in support of the fact that the project is at an advanced stage of development; (e) for requests made under regulation 14(2)(f), information which outlines how the solution deviates from or complements the applicable NTSNs; (f) justification of the exemption, including the main reasons of a technical, economic, commercial, operational and/or administrative nature; and (g) any other information justifying the application for an exemption. (3) After receipt of the information specified in paragraph (2), the Competent Authority must determine the application for an exemption. (4) When the Competent Authority has made a determination it must inform the applicant of that determination. (5) When the Competent Authority makes a determination of a case under regulation 14(2)(f) (innovative solutions), and informs the applicant of the outcome of the application, the Competent Authority must also publish its determination.
- (21) In regulation 15 (essential requirements for project subsystems)—
- (a) in paragraph (1)(a), for “TSIs”, substitute “NTSNs”;
- (b) in paragraph (1)(b), for “notified national technical rules”, substitute “NTRs”;
- (c) after paragraph (1), insert—
(1A) For the purposes of paragraph (1)(a), a project subsystem is deemed to conform with an applicable NTSN, save for any UK specific case set out in that NTSN, if— (a) the person applying for an authorisation provides evidence that the project subsystem has been assessed under EU law as conforming with a TSI in force at the time when the application for authorisation is made; and (b) the applicable NTSN specifies that it substantially reproduces the provisions of that TSI, in accordance with regulation 3B(7).
- (d) in paragraph (2)—
- (i) in sub-paragraph (a), for “TSIs”, substitute “NTSNs”,
- (ii) in sub-paragraph (b), for “TSI”, substitute “NTSN”,
- (iii) for sub-paragraph (c), substitute—
(c) an exemption from conformity with the whole or part of a relevant NTSN has been granted in accordance with regulations 14 and 14A in relation to that subsystem; or
- (iv) in sub-paragraph (d), for “a TSI”, substitute “an NTSN”.
- (22) In regulation 16 (role of project entity)—
- (a) for “notified national technical rules” each time it occurs, substitute “UK specific rules”;
- (b) for paragraph (1)(a) substitute—
(a) engage an EU notified body to carry out the EC verification assessment procedure, or engage an approved body to carry out the UK verification assessment procedure, other than in relation to UK specific rules;
- (c) in paragraph (1)(b) for “a notified body”, substitute “an EU notified body or an approved body”;
- (d) in paragraph (1)(c)—
- (i) omit the words from “or if the engagement is made before the day” to “or a notified body,”,
- (ii) after “to carry out the”, insert “UK”,
- (iii) after “regulation 17”, insert “and Schedule 4”;
- (e) in paragraph (2), for “a notified body”, substitute “an EU notified body or an approved body”;
- (f) in paragraph (3)—
- (i) for “verification declaration”, substitute “UK declaration of verification”,
- (ii) for sub-paragraph (b), substitute—
(b) either— (i) the EC verification assessment procedure has been carried out by an EU notified body, or (ii) the UK verification assessment procedure has been carried out by an approved body, and, if applicable in either case, the UK verification assessment procedure has been carried out by a designated body;
- (g) for sub-paragraph (c), substitute—
(c) either— (i) an EC certificate of verification has been drawn up by an EU notified body, or (ii) a UK certificate of verification has been drawn up by an approved body, and, if applicable in either case, a UK certificate of verification has been drawn up by a designated body; and
- (h) omit paragraph (4);
- (i) in paragraph (5), for “5(1)(c)”, substitute “6(1)”.
- (23) In regulation 17 (project subsystems: verification assessment procedure)—
- (a) in the heading, after “Project subsystems:” insert “UK”;
- (b) in paragraph (1)—
- (i) in the opening words—
- (aa) after “The”, insert “UK”,
- (bb) for “a notified body”, substitute “an approved body”,
- (cc) omit “other than in relation to notified national technical rules”,
- (ii) in sub-paragraph (a), for “TSI” each time it occurs, substitute “NTSN”,
- (iii) in sub-paragraph (b), for “Annex VI to the Directive”, substitute “Schedule 4”;
- (c) in paragraph (2)—
- (i) in the opening words—
- (aa) for “notified body”, substitute “approved body”,
- (bb) omit “other than in relation to notified national technical rules”,
- (ii) in sub-paragraph (a)—
- (aa) paragraph (i), for “Annex VI to the Directive”, substitute “Schedule 4”,
- (bb) paragraph (v), for “TSI”, substitute “NTSN”,
- (cc) for paragraph (vi) substitute—
(vi) documentation or records of a determination of the Competent Authority in relation to an exemption from an applicable NTSN, pursuant to regulations 14 and 14A; and;
- (d) in paragraph (3)—
- (i) for “TSI”, substitute “NTSN”,
- (ii) after “registers”, insert “or lists”,
- (iii) for “Article 34” to the end of the sentence, substitute “regulations 8 (Determination of type), 35 (Register of infrastructure) and 36 (National vehicle register)”;
- (e) in paragraph (4), at the start, after “The”, insert “UK”;
- (f) in paragraphs (4) and (5)—
- (i) for “notified national technical rules”, substitute “UK specific rules”, and
- (ii) for “Annex VI to the Directive”, substitute “Schedule 4”.
- (24) In regulation 18 (project subsystems: verification declaration)—
- (a) in the heading, for “verification declaration”, substitute “UK declaration of verification”;
- (b) in paragraph (1), for “verification declaration”, substitute “UK declaration of verification”;
- (c) in paragraph (2), before “verification”, insert “UK”.
- (25) In regulation 19(1)—
- (a) for “Member State”, substitute “country”;
- (b) for “verification declaration”, substitute “UK declaration of verification”;
- (c) in sub-paragraph (a)—
- (i) in sub-paragraph (i), after “regulations 6(3)(b)”, insert “or (c)”,
- (ii) for sub-paragraph (ii), substitute—
(ii) the relevant UK declaration of verification, and;
- (d) in sub-paragraph (b), for “any other Member State that requests one”, substitute “the national body responsible for railway safety in the country in which the project subsystem is used, in response to a reasonable request from that body.”.
- (26) In regulation 20 (continuing duty on operator in relation to standards)—
- (a) in paragraph (2)(a)—
- (i) for “sub-paragraph (b)”, substitute “sub-paragraphs (b) and (ba)”,
- (ii) for “the TSIs and notified national technical rules”, substitute “either the TSIs and notified national technical rules, or the NTSNs and NTRs”;
- (b) in paragraph (2)(b)—
- (i) for “a TSI or notified national technical rule”, substitute “an NTSN or NTR”,
- (ii) for “TSI or rule” where it occurs, substitute “NTSN or NTR”;
- (c) after paragraph (2)(b), insert—
(ba) where a TSI or notified national technical rule referred to in sub-paragraph (a) has been replaced by an NTSN or by an NTR, either in conformity with the relevant NTSN or NTR currently in force or in conformity with the original TSI or rule,
- (d) in paragraph (2)(c), for “TSI”, substitute “NTSN”;
- (e) for paragraph (5), substitute—
(5) In this regulation— - “functional NTSN” means an NTSN applying to a functional subsystem; - “project subsystem” includes a vehicle deemed to be authorised under these Regulations by the operation of regulation 44.
- (27) For regulation 23, substitute—
(23) (1) No person may place an interoperability constituent on the market for which there is an applicable NTSN with a view to its use on the rail system, unless— (a) the interoperability constituent meets the essential requirements that are relevant to an interoperability constituent of that type; (b) the appropriate procedure for assessing the conformity or suitability for use of the interoperability constituent has been carried out; and (c) subject to paragraph (2), a UK declaration of conformity or suitability for use in relation to that interoperability constituent has been drawn up. (2) A person may place an interoperability constituent on the market in reliance on an EC declaration of conformity or suitability for use drawn up in relation to that interoperability constituent where one of the following conditions applies— (a) an EC declaration of conformity or suitability for use was drawn up before, on or before or after IP completion day, and there is no UK specific case applicable to the interoperability constituent; or (b) all of the following apply— (i) an EC declaration of conformity or suitability for use was drawn up before IP completion day, (ii) there is a UK specific case applicable to the interoperability constituent, (iii) there is no material difference between the technical specifications of the applicable UK specific case and a pre-exit specific case against which the interoperability constituent was previously assessed, and (iv) there are no other applicable UK specific cases. (3) In this regulation, “a pre-exit specific case” means special provision in relation to the technical specifications for subsystems and interoperability constituents to allow for their compatibility with the rail system, which was applicable to the interoperability constituent and was set out and described in a TSI or notified national technical rule before IP completion day. (4) In this regulation, a “material difference” in relation to technical specifications does not include the replacement of the standards contained in TSIs or notified national technical rules by the standards set by the Secretary of State in accordance with regulations 3B and 3C, and contained (on or after IP completion day) in NTSNs or NTRs.
- (28) In regulation 24 (assessment procedure for interoperability constituents)—
- (a) for “applicable TSI” where it occurs, substitute “applicable NTSN”;
- (b) at the start of paragraph (1), insert “Subject to paragraph (4),”;
- (c) in paragraph (1) for “a notified body”, substitute “an approved body or, where assessment against an applicable UK specific case is required, a designated body”;
- (d) in paragraph (3) for “TSI”, substitute “NTSN”;
- (e) after paragraph (3), insert—
(4) Except for cases which fall within regulation 23(2), where an EC declaration of conformity or suitability for use has already been drawn up, an assessment of the conformity or suitability for use against an applicable UK specific case must be carried out by a designated body in accordance with the procedure set out in the NTSN concerning the further assessment of interoperability constituents which hold an EC declaration of conformity or suitability for use.
- (29) In regulation 25 (EC declaration of conformity or suitability for use)—
- (a) in the title to the regulation for “EC”, substitute “UK”;
- (b) in paragraph (1) for the opening words, substitute—
(1) Where neither a UK declaration of conformity or suitability for use, nor an EC declaration of conformity or suitability for use which satisfies one of the conditions in regulation 23(2) has been drawn up by the manufacturer or the manufacturer’s representative, a UK declaration of conformity or suitability for use must be drawn up by any person who—
- (c) in paragraph (2)—
- (i) at the start of the paragraph, for “An EC declaration”, substitute “A UK declaration”,
- (ii) for “Annex IV to the Directive”, substitute “Schedule 7”;
- (d) for paragraph (3), substitute—
(3) A person may only draw up a UK declaration of conformity or suitability for use if satisfied that the interoperability constituent satisfies the relevant conditions of the applicable NTSN, including any applicable UK specific case.
- (e) in paragraph (4)—
- (i) for “an EU Directive”, substitute “any enactment or rule of law”,
- (ii) for “an EC” substitute “a UK”;
- (f) after paragraph (4), insert—
(5) In this regulation, and in Schedule 7, the “manufacturer’s representative” means either an authorised representative or a person appointed by the manufacturer to perform specified tasks relating to the conformity or suitability for use of interoperability constituents, on or after IP completion day.
- (30) Schedule 6 has effect.
- (31) In regulation 26 (effect of conformity and suitability declarations)—
- (a) in the heading, for “conformity and suitability declarations”, substitute “declarations of conformity or suitability for use”;
- (b) in paragraph (1)—
- (i) in the opening words—
- (aa) for “an EC”, substitute “a UK”;
- (bb) after “suitability for use”, insert “or an EC declaration of conformity or suitability for use which satisfies the criteria set out in regulation 23(2)(a) or (b)”,
- (ii) in sub-paragraph (b), for “TSI”, substitute “NTSN”.
- (32) In regulation 27 (duties on operators)—
- (a) for “TSI”, substitute “NTSN”;
- (b) omit “located in the United Kingdom”.
- (33) Omit regulation 28.
- (34) In regulation 29 (notification to the Commission of incorrect declaration)—
- (a) in the heading, before “Commission”, insert “European”;
- (b) in paragraph (1)—
- (i) for “must immediately”, substitute “may”,
- (ii) for “Commission and the other Member States”, substitute “European Commission and EU Member States”;
- (c) in paragraph (2), for “must”, substitute “may”;
- (d) after paragraph (2) insert—
(3) This regulation does not apply in relation to the Channel Tunnel system.
- (35) For the heading to Part 4, substitute “Approved and Designated Bodies”.
- (36) For regulation 30, substitute—
(30) (1) An approved body is a body which— (a) has been approved by the Secretary of State pursuant to the procedure set out in regulation 31; or (b) immediately before IP completion day was a notified body which has not received notice from the Secretary of State terminating its appointment as a notified body. (2) In this Regulation, “a notified body” means a body which has been— (a) appointed by the Strategic Rail Authority5 as a notified body and notified to the European Commission and EU Member States pursuant to regulation 5 of the Railways (Interoperability) (High-Speed) Regulations 20026; (b) appointed by the Secretary of State as a notified body and notified to the European Commission and EU Member States pursuant to regulation 25 of the Railways (Interoperability) Regulations 20067 or regulation 31 of these Regulations as they had effect immediately before IP completion day.
- (37) In regulation 31 (appointment of notified bodies and designated bodies)—
- (a) in the heading, for “notified bodies”, substitute “approved bodies”;
- (b) for “a notified body” each time it occurs, substitute “an approved body’;
- (c) for “notified” in paragraphs (6)(b), (8)(a) and (b), and (9)(a) and (b), each time it occurs, substitute “approved”;
- (d) in paragraphs (2)(b), (3), and (7)(b) for “Annex VIII to the Directive”, substitute “Schedule 8”.
- (38) Schedule 7 has effect.
- (39) In regulation 32 (notified bodies and designated bodies: certificates etc)—
- (a) in the heading, for “notified bodies”, substitute “approved bodies”;
- (b) for “a notified body” each time it occurs, substitute “an approved body”;
- (c) in paragraphs (1) and (2), before “certificate of verification”, insert “UK”;
- (d) in paragraphs (1) and (3), for “an EC declaration”, substitute “a UK declaration”;
- (e) in paragraph (2), for “Annex VI to the Directive”, substitute “Schedule 4”;
- (f) in paragraph (3), for “European specifications or TSIs”, substitute “NTSNs”;
- (g) after paragraph (3), insert—
(3A) A designated body must not confirm that a UK declaration of conformity or suitability for use can be drawn up in respect of an interoperability constituent unless satisfied that the constituent conforms to such of the UK specific cases as are required by regulation 25.
- (ga) omit paragraph (4);
- (h) in paragraph (5), for “notified body”, substitute “approved body”.
- (40) In regulation 33 (fees of notified bodies and designated bodies)—
- (a) in the heading, for “notified bodies”, substitute “approved bodies”;
- (b) in paragraph (1) for “a notified body”, substitute “an approved body”;
- (c) in paragraphs (2)(a) and (2)(b)(i), for “notified body”, substitute “approved body”.
- (41) After regulation 34, insert—
(34A) (1) The Secretary of State must— (a) assign an approved body identification number to each approved body; and (b) compile and maintain a register of— (i) approved bodies; (ii) their approved body identification number; (iii) the activities for which they have been approved; and (iv) any restrictions on those activities. (2) The register referred to in paragraph (1) must be made publicly available. (34B) (1) The Secretary of State may authorise the UK national accreditation body to carry out the following activities on behalf of the Secretary of State— (a) assessing whether a body meets the approved body or designated body requirements; (b) exercising functions in accordance with regulation 31; (c) compiling and maintaining the register of approved bodies in accordance with regulation 34A. (2) In this regulation— - “RAMS” means Regulation (EC) No 765/2008 of the European Parliament and of the Council setting out the requirements for accreditation and market surveillance relating to the marketing of products and repealing Regulation (EEC) No 339/93; - “UK national accreditation body” means the body appointed by the Secretary of State in accordance with Article 4 of RAMS.
- (41A) In regulation 35—
- (a) in paragraph (2)(c), for “a publicly accessible website” substitute “request by an applicant for authorisation under these Regulations, or by an approved body”;
- (b) after paragraph (2) insert—
(2A) The owner must make the information requested under paragraph (2)(c) available within 28 days of receiving the request.
- (42) In regulation 36 (national vehicle register)—
- (a) omit paragraph (4);
- (b) for paragraph (9), substitute—
(9) Where a vehicle is also registered in an EU Member State the registration entity may notify the entity responsible for the national vehicle register in that EU Member State of any relevant changes to the National Vehicle Register.
- (c) in paragraph (10)—
- (i) for sub-paragraph (a), substitute—
(a) by the Safety Authority or the Rail Accident Investigation Branch8;
- (ii) in sub-paragraph (b)—
- (aa) for sub-paragraph (i), substitute—
(i) the Office of Rail and Road, DFI, the Intergovernmental Commission, or any EU regulatory body designated in accordance with relevant EU law,
- (bb) for sub-paragraph (ii), substitute—
(ii) the European Union Agency for Railways
- (cc) at the end of sub-paragraph (iv), omit “or”,
- (dd) at the end of sub-paragraph (v), omit the full stop, and insert—
; or (vi) the national body or bodies responsible for railway safety in the country where the project subsystem is used.
- (d) in paragraph (11), for “DRDNI”, substitute “DFI”;
- (e) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- (43) In regulation 37(10), for “DRDNI”, substitute “DFI”.
- (44) In regulation 38, for “DRDNI” each time it occurs, substitute “DFI”.
- (45) In regulation 40(5), for “DRDNI”, substitute “DFI”.
- (46) In regulation 41(1) after “EC” insert “or UK”.
- (47) In regulation 42—
- (a) in the heading, after “EC” insert “or UK”;
- (b) in paragraph (1), for “regulation 25” substitute “relevant EU law, or the UK declaration of conformity or suitability for use has not been drawn up in accordance with the requirements of regulation 25 and Schedule 7”;
- (c) for paragraph (2)(a) substitute—
(a) state that the Office of Rail and Road or the Health and Safety Executive for Northern Ireland considers that the EC declaration of conformity or suitability for use has not been drawn up in accordance with the requirements of relevant EU law, or the UK declaration of conformity or suitability for use has not been drawn up in accordance with the requirements of regulation 25 and Schedule 7;
- (48) In regulation 45 (accessibility for people with reduced mobility)—
- (a) for paragraph (a), substitute—
(a) the TSI relating to persons with reduced mobility set out in the Annex to Decision 2008/164/EC of the European Commission of 21 December 2007, or any amended version of it, or Commission Regulation 1300/2014 of the European Commission of 18 November 2014 which replaced it, or the NTSN that replaced Commission Regulation 1300/2014, or any variation of that NTSN, or any NTSN which replaces it;
- (b) in paragraph (d)—
- (i) after “TSI replacing it,”, insert “or the NTSN”,
- (ii) in sub-paragraph (ii), for “has been granted under regulation 14”, substitute “was granted under regulation 14 before IP completion day, or an exemption from part of it has been granted under regulations 14 and 14A”.
- (49) In regulation 46 (dispensations)—
- (a) in paragraph (1), for “notified national technical rules”, substitute “NTRs”;
- (b) in paragraph (2), omit “for the purposes of Article 17(3) of the Directive”.
- (50) After regulation 47, insert—
(47A) (1) Where a structural subsystem was authorised to be placed in service on the rail system in accordance with regulation 7 or regulation 9 as they had effect before IP completion day and that authorisation has not been revoked, it is treated as authorised under these Regulations as they have effect on or after IP completion day. (2) Where an application for authorisation was made pursuant to regulation 5 as it had effect before IP completion day and that authorisation was not issued before IP completion day, it is, on or after IP completion day, treated as a valid application under these Regulations and any EC declaration of verification and technical file submitted with that application are treated as a UK declaration of verification and technical file submitted in accordance with these Regulations as they have effect on or after IP completion day. (3) Where an application for type authorisation was made pursuant to regulation 9 as it had effect before IP completion day and that authorisation was not issued before IP completion day, it is, on or after IP completion day, treated as a valid application under these Regulations and any reference to an applicable TSI or notified national technical rule in the documentation accompanying that application is treated as a reference to the applicable NTSN or NTR which replaces them. (4) Where a Competent Authority has made a decision about the requirement for authorisation and the extent to which TSIs must apply to a project subsystem pursuant to regulation 13(8) before IP completion day, a reference to a TSI in that decision is treated as a reference to the NTSN that replaces it. (5) Where an application for a decision by the Competent Authority as to whether an authorisation is required was made pursuant to regulation 13 as it had effect before IP completion day and the Competent Authority has not made the decision before IP completion day, it is treated as an application under regulation 13 as it has effect on or after IP completion day, and any reference in that application to TSIs or parts of TSIs is treated as a reference to the NTSNs or parts of NTSNs that replace them. (6) A derogation granted against a TSI by the Competent Authority in accordance with Article 9 of the Directive and these Regulations as they had effect before IP completion day is treated on or after IP completion day as an exemption granted by the Competent Authority against the NTSN which replaces that TSI in accordance with regulations 14 and 14A. (7) Except for a project subsystem authorised under regulation 9, if a project subsystem was authorised before IP completion day, the project entity must (in addition to the requirements of regulation 19(2)) keep the documents it was required to retain in accordance with regulation 19(1)(a) as it had effect before IP completion day. (8) Where an interoperability constituent was placed on the market anywhere in the European Union before IP completion day, it is treated on or after IP completion day as an interoperability constituent placed on the UK market in accordance with Part 3. (9) Where a notified body (as defined in regulation 30(2)) was engaged before IP completion day to carry out an EC verification assessment procedure in relation to TSIs or notified national technical rules pursuant to Annex VI of the Directive and regulation 16 as it had effect before IP completion day, the work carried out by that body before IP completion day is treated as work undertaken pursuant to regulation 16 and Schedule 4 as they have effect from IP completion day to carry out the UK verification assessment procedure in relation to NTSNs. (10) Where a designated body was engaged before IP completion day to carry out an EC verification assessment procedure in relation to TSIs or notified national technical rules pursuant to Annex VI of the Directive and regulation 16 as it had effect before IP completion day, the work carried out by that body before IP completion day is treated as work undertaken pursuant to regulation 16 and Schedule 4 as they have effect from IP completion day to carry out the UK verification assessment procedure in relation to UK specific rules. (11) A dispensation from a notified national technical rule granted by the Competent Authority pursuant to regulation 46 as it had effect before IP completion day, is treated on or afterIP completion day as a dispensation from the NTR specified as replacing it.
- (51) In the heading of the Schedule to the Regulations, after “Schedule” insert “1”.
Consequential amendments
3
Schedule 8 has effect.
SCHEDULE 1
After Schedule 1 to the Regulations insert—
SCHEDULE 2 (1) General requirements (1.1) Safety (1.1.1) The design, construction or assembly, maintenance and monitoring of safety-critical components, and more particularly of the components involved in train movements, must be such as to guarantee safety at the level corresponding to the aims laid down for the network, including those for specific degraded situations. (1.1.2) The parameters involved in the wheel/rail contact must meet the stability requirements needed in order to guarantee safe movement at the maximum authorised speed. The parameters of brake equipment must guarantee that it is possible to stop within a given brake distance at the maximum authorised speed. (1.1.3) The components used must withstand any normal or exceptional stresses that have been specified during their period of service. The safety repercussions of any accidental failures must be limited by appropriate means. (1.1.4) The design of fixed installations and rolling stock and the choice of the materials used must be aimed at limiting the generation, propagation and effects of fire and smoke in the event of a fire. (1.1.5) Any devices intended to be handled by users must be so designed as not to impair the safe operation of the devices or the health and safety of users if used in a foreseeable manner, albeit not in accordance with the posted instructions. (1.2) Reliability and availability - The monitoring and maintenance of fixed or moveable components that are involved in train movements must be organised, carried out and quantified in such a manner as to maintain their operation under the intended conditions. (1.3) Health (1.3.1) Materials likely, by virtue of the way they are used, to constitute a health hazard to those having access to them must not be used in trains and railway infrastructures. (1.3.2) Those materials must be selected, deployed and used in such a way as to restrict emission of harmful and dangerous fumes or gases, particularly in the event of fire. (1.4) Environmental protection (1.4.1) The environmental impact of establishment and operation of the rail system must be assessed and taken into account at the design stage of the system in accordance with any relevant enactment or rule of law. (1.4.2) The materials used in the trains and infrastructures must prevent the emission of fumes or gases which are harmful and dangerous to the environment, particularly in the event of fire. (1.4.3) The rolling stock and energy-supply systems must be designed and manufactured in such a way as to be electromagnetically compatible with the installations, equipment and public or private networks with which they might interfere. (1.4.4) The design and operation of the rail system must not lead to an inadmissible level of noise generated by it— (i) in areas close to the railway infrastructure as defined in Article 3 of Directive 2012/34/EU, and (ii) in the driver’s cab. (1.4.5) Operation of the rail system must not give rise to an inadmissible level of ground vibrations for the activities and areas close to the infrastructure and in a normal state of maintenance. (1.5) Technical compatibility - The technical characteristics of the infrastructure and fixed installations must be compatible with each other and with those of the trains to be used on the rail system. - If compliance with these characteristics proves difficult on certain sections of the network, temporary solutions, which ensure compatibility in the future, may be implemented. (1.6) Accessibility (1.6.1) The ‘infrastructure’ and ‘rolling stock’ subsystems must be accessible to persons with disabilities and persons with reduced mobility in order to ensure access on an equal basis with others by way of the prevention or removal of barriers, and by way of other appropriate measures. This shall include the design, construction, renewal, upgrade, maintenance and operation of the relevant parts of the subsystems to which the public has access. (1.6.2) The ‘operations’ and ‘telematics applications for passengers’ subsystems must provide for the necessary functionality required to facilitate access to persons with disabilities and persons with reduced mobility on an equal basis with others by way of the prevention or removal of barriers, and by way of other appropriate measures. (2) Requirements specific to each subsystem (2.1) Infrastructure (2.1.1) Safety - Appropriate steps must be taken to prevent access to or undesirable intrusions into installations. - Steps must be taken to limit the dangers to which persons are exposed, particularly when trains pass through stations. - Infrastructure to which the public has access must be designed and made in such a way as to limit any human safety hazards (stability, fire, access, evacuation, platforms, etc.). - Appropriate provisions must be laid down to take account for the particular safety conditions in very long tunnels and viaducts. (2.1.2) Accessibility (2.1.2.1) Infrastructure subsystems to which the public has access must be accessible to persons with disabilities and persons with reduced mobility in accordance with paragraph 1.6. (2.2) Energy (2.2.1) Safety - Operation of the energy-supply systems must not impair the safety either of trains or of persons (users, operating staff, trackside dwellers and third parties). (2.2.2) Environmental protection - The functioning of the electrical or thermal energy-supply systems must not interfere with the environment beyond the specified limits. (2.2.3) Technical compatibility - The electricity/thermal energy supply systems used must:enable trains to achieve the specified performance levels,in the case of electricity energy supply systems, be compatible with the collection devices fitted to the trains. (2.3) Control-command and signalling (2.3.1) Safety - The control-command and signalling installations and procedures used must enable trains to travel with a level of safety which corresponds to the objectives set for the network. The control-command and signalling systems should continue to provide for safe passage of trains permitted to run under degraded conditions. (2.3.2) Technical compatibility - All new infrastructure and all new rolling stock manufactured or developed after adoption of compatible control-command and signalling systems must be tailored to the use of those systems. - The control-command and signalling equipment installed in the train drivers’ cabs must permit normal operation, under the specified conditions, throughout the rail system. (2.4) Rolling stock (2.4.1) Safety - The rolling-stock structures and those of the links between vehicles must be designed in such a way as to protect the passenger and driving compartments in the event of collision or derailment. - The electrical equipment must not impair the safety and functioning of the control-command and signalling installations. - The braking techniques and the stresses exerted must be compatible with the design of the tracks, engineering structures and signalling systems. - Steps must be taken to prevent access to electrically-live constituents in order not to endanger the safety of persons. - In the event of danger devices must enable passengers to inform the driver and accompanying staff to contact him. - The access doors must incorporate an opening and closing system which guarantees passenger safety. - Emergency exits must be provided and indicated. - Appropriate provisions must be laid down to take account of the particular safety conditions in very long tunnels. - All trains must have an emergency lighting system of sufficient intensity and duration on board. - Trains must be equipped with a public address system which provides a means of communication to the public from on-board staff. (2.4.2) Reliability and availability - The design of the vital equipment and the running, traction and braking equipment and also the control and command system must, in a specific degraded situation, be such as to enable the train to continue without adverse consequences for the equipment remaining in service. (2.4.3) Technical compatibility - The electrical equipment must be compatible with the operation of the control-command and signalling installations. - In the case of electric traction, the characteristics of the current-collection devices must be such as to enable trains to travel under the energy-supply systems for the rail system. - The characteristics of the rolling stock must be such as to allow it to travel on any line on which it is expected to operate, taking account of relevant climatic conditions. (2.4.4) Controls - Trains must be equipped with a recording device. The data collected by this device and the processing of the information must be harmonised. (2.4.5) Accessibility - Rolling stock subsystems to which the public has access must be accessible to persons with disabilities and persons with reduced mobility in accordance with paragraph 1.6. (2.5) Maintenance (2.5.1) Health and safety - The technical installations and the procedures used in the centres must ensure the safe operation of the subsystem and not constitute a danger to health and safety. (2.5.2) Environmental protection - The technical installations and the procedures used in the maintenance centres must not exceed the permissible levels of nuisance with regard to the surrounding environment. (2.5.3) Technical compatibility - The maintenance installations for rolling stock must be such as to enable safety, health and comfort operations to be carried out on all stock for which they have been designed. (2.6) Operation and traffic management (2.6.1) Safety - Alignment of the network operating rules and the qualifications of drivers and on-board staff and of the staff in the control centres must be such as to ensure safe operation, bearing in mind the different requirements of cross-border and domestic services. - The maintenance operation and intervals, the training and qualifications of the maintenance and control centre staff and the quality assurance system set up by the operators concerned in the control and maintenance centres must be such as to ensure a high level of safety. (2.6.2) Reliability and availability - The maintenance operations and periods, the training and qualifications of the maintenance and control centre staff and the quality assurance system set up by the operators concerned in the control and maintenance centres must be such as to ensure a high level of system reliability and availability. (2.6.3) Technical compatibility - Alignment of the network operating rules and the qualifications of drivers, on-board staff and traffic managers must be such as to ensure operating efficiency on the rail system, bearing in mind the different requirements of cross-border and domestic services. (2.6.4) Accessibility - Appropriate steps must be taken to ensure that operating rules provide for the necessary functionality required to ensure accessibility for persons with disabilities and persons with reduced mobility. (2.7) Telematics applications for freight and passengers (2.7.1) Technical compatibility - The essential requirements for telematics applications guarantee a minimum quality of service for passengers and carriers of goods, particularly in terms of technical compatibility. - Steps must be taken to ensure:that the databases, software and data communication protocols are developed in a manner allowing maximum data interchange between different applications and operators, excluding confidential commercial data,easy access to the information for users. (2.7.2) Reliability and availability - The methods of use, management, updating and maintenance of these databases, software and data communication protocols must guarantee the efficiency of these systems and the quality of the service. (2.7.3) Health - The interfaces between these systems and users must comply with the minimum rules on ergonomics and health protection. (2.7.4) Safety - Suitable levels of integrity and dependability must be provided for the storage or transmission of safety-related information. (2.7.5) Accessibility - Appropriate steps must be taken to ensure that telematics applications for passengers subsystems provide for the necessary functionality required to ensure accessibility for persons with disabilities and persons with reduced mobility.
SCHEDULE 2
After Schedule 2 to the Regulations, insert—
SCHEDULE 3 (1) For the purposes of these Regulations, the system constituting the rail system may be broken down into the following subsystems, either— (a) structural areas— - infrastructure, - energy, - trackside control-command and signalling, - on-board control-command and signalling, - rolling stock. (b) functional areas— - operation and traffic management, - maintenance, - telematics applications for passenger and freight services. (2) For each subsystem or part of a subsystem, the list of constituents and aspects relating to interoperability is proposed by the Secretary of State at the time of drawing up the relevant draft NTSN. Without prejudging the choice of aspects and constituents relating to interoperability or the order in which they will be made subject to NTSNs, the subsystems include the following— (2.1) Infrastructure The track, points, engineering structures (bridges, tunnels etc.), associated station infrastructure (platforms, zones of access, including the needs of persons with reduced mobility, etc.), safety and protective equipment. (2.2) Energy The electrification system, including overhead lines and the trackside of the electricity consumption measuring system. (2.3) Trackside control-command and signalling All the trackside equipment required to ensure safety and to command and control movements of trains authorised to travel on the network. (2.4) On-board control-command and signalling All the on-board equipment required to ensure safety and to command and control movements of trains authorised to travel on the network. (2.5) Operation and traffic management The procedures and related equipment enabling coherent operation of the various structural subsystems, during both normal and degraded operation, including in particular train composition and train driving, traffic planning and management. The professional qualifications which may be required for carrying out cross-border services. (2.6) Telematics applications This subsystem comprises two elements— (a) applications for passenger services, including systems which provide passengers with information before and during the journey, reservation and payment systems, luggage management and management of connections between trains and other modes of transport; (b) applications for freight services, including information systems (realtime monitoring of freight and trains), marshalling and allocation systems, reservation, payment and invoicing systems, management of connections with other modes of transport and production of electronic accompanying documents. (2.7) Rolling stock Structure, command and control system for all train equipment, electric current collection devices, traction and energy conversion units, on-board equipment for electricity consumption measuring, braking, coupling and running gear (bogies, axles, etc.) and suspension, doors, man/machine interfaces (driver, on-board staff and passengers, including the needs of persons with reduced mobility), passive or active safety devices and requisites for the health of passengers and on-board staff. (2.8) Maintenance The procedures, associated equipment, logistics centres for maintenance work and reserves providing the mandatory corrective and preventive maintenance to ensure the interoperability of the rail system and guarantee the performance required.
SCHEDULE 3
After Schedule 3 to the Regulations, insert—
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.