The Network Rail (East West Rail) (Bicester to Bedford Improvements) Order 2020

Type Statutory-Instrument
Publication 2020-02-04
State In force
Department Queen's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API

The provisions of Schedule 15 (provisions relating to statutory undertakers etc.) have effect.

Certification of plans etc.

42

Network Rail must, as soon as practicable after the making of this Order, submit copies of the book of reference, the deposited sections and the deposited plans to the Secretary of State for certification that they are, respectively, true copies of the book of reference, the deposited sections and the deposited plans referred to in this Order; and a document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.

Service of notices

43
  • (1) A notice or other document required or authorised to be served for the purposes of this Order may be served—
  • (a) by post; or
  • (b) with the consent of the recipient and subject to paragraphs (6) to (8) by electronic transmission.
  • (2) Where the person on whom a notice or other document to be served for the purposes of this Order is a body corporate, the notice or document is duly served if it is served on the secretary or clerk of that body.
  • (3) For the purposes of section 7 (references to service by post) of the Interpretation Act 1978[^f00063] as it applies for the purposes of this article, the proper address of any person in relation to the service on that person of a notice or document under paragraph (1) is, if that person has given an address for service, that address, and otherwise—
  • (a) in the case of the secretary or clerk of a body corporate, the registered or principal office of that body; and
  • (b) in any other case, the last known address of that person at the time of service.
  • (4) Where for the purposes of this Order a notice or other document is required or authorised to be served on a person as having any interest in, or as the occupier of, land and the name or address of that person cannot be ascertained after reasonable enquiry, the notice may be served by—
  • (a) addressing it to that person by name or by the description of “owner”, or as the case may be “occupier”, of the land (describing it); and
  • (b) either leaving it in the hands of a person who is or appears to be resident or employed on the land or leaving it conspicuously affixed to some building or object on or near the land.
  • (5) Where a notice or other document required to be served or sent for the purposes of this Order is served or sent by electronic transmission the requirement is taken to be fulfilled where the recipient of the notice or other document to be transmitted has given consent to the use of electronic transmission either in writing or by electronic transmission.
  • (6) Where the recipient of a notice or other document served or sent by electronic transmission notifies the sender within 7 days of receipt that the recipient requires a paper copy of all or any part of that notice or other document the sender must provide such a copy as soon as reasonably practicable.
  • (7) Any consent to the use of electronic communication given by a person may be revoked by that person in accordance with paragraph (8).
  • (8) Where a person is no longer willing to accept the use of electronic transmission for any of the purposes of this Order—
  • (a) that person must give notice in writing or by electronic transmission revoking any consent given by that person for that purpose; and
  • (b) such revocation is final and takes effect on a date specified by the person in the notice but that date must not be less than 7 days after the date on which the notice is given.
  • (9) This article does not exclude the employment of any method of service not expressly provided for by it.

Protection of interests

44

Schedule 16 (protective provisions) has effect.

No double recovery

45

Compensation is not payable in respect of the same matter both under this Order and under any other enactment, any contract or any rule of law.

Arbitration

46

Any difference under any provision of this Order, unless otherwise provided for, must be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after giving notice in writing to the other) by the President of the Institution of Civil Engineers.

SCHEDULE 1 — SCHEDULED WORKS

In the County of Oxfordshire, District of Cherwell and in the County of Buckinghamshire, District of Aylesbury Vale—

Work No.1 – A railway (8,185 metres in length), on the course of the existing railway (Oxford to Bletchley line), commencing by a junction 300 metres east of the bridge carrying the Chiltern Line railway over said Oxford to Bletchley line and terminating at a point 26 metres eastwards of the bridge carrying Main Street Charndon over the existing railway.

In the County of Buckinghamshire, District of Aylesbury Vale and in the District of Milton Keynes—

Work No.2 – A railway (18,827 metres in length), on the course of the existing railway (Oxford to Bletchley line), commencing at a point 209 metres west of the intersection of existing Queen Catherine Road and the existing railway and terminating at a point 183 metres west of the intersection of Saxon Street and the existing railway (Bletchley to Bedford line).

In the District of Milton Keynes—

Work No.3 – A railway (358 metres in length) on the course of the existing railway (Denbigh Hall Flyover line), commencing at a junction with Work No.2 at a point 18,297 metres east along its commencement and terminating at a point 358 metres north of its commencement.

In the County of Oxfordshire, District of Cherwell—

Work No.4 – A footbridge carrying Jarvis’ Lane Footpath over Work No.1 commencing at a point 326 metres north-west of the junction of Charbridge Way with the A4421 Charbridge Lane and terminating at a point 25 metres north of its commencement.

Work No.5 – Realignment of the A4421 Charbridge Lane (including a bridge over Work No.1) commencing at a point 25 metres north of the junction of Charbridge Way with the A4421 Charbridge Lane and terminating at the roundabout junction with Bicester Road.

Work No.6 – Realignment of The Tythe Barn rear access road, commencing at a point 124 metres north-east of the junction of Charbridge Way with the A4421 Charbridge Lane and terminating at a point 113 metres south-west of its commencement.

Work No.7 – Temporary diversion of the A4421 Charbridge Lane, commencing at a point 120 metres north of the junction of Charbridge Way with the A4421 Charbridge Lane and terminating at a point 15 metres south of the roundabout junction with Bicester Road.

Work No.8 – Temporary diversion of the A4421 Charbridge Lane, commencing at a point 23 metres south of the junction of Charbridge Way with the A4421 Charbridge Lane and terminating at a point 293 metres north of its commencement.

Work No.9 – Realignment of Manor farm access (including a bridge over Work No.1), commencing at a point 37 metres south-west of Launton Sports and Social Club building and terminating at a point 391 metres north-east of its commencement.

Work No.10 – A footbridge carrying Footpath 272/11/10 over Work No.1, commencing at a point 329 metres north of the junction of Footpath 272/11/10 with Footpath 272/12/10 and terminating at a point 33 metres north-west of its commencement.

Work No.11 – Realignment of Station Road (including a bridge over Work No.1), commencing at a point 47 metres north-east of the entrance to Upper Laurels Farm and terminating at a point 360 metres south-west of its junction with Bicester Road.

Work No.12 – An access road, forming an access to Station Cottage, commencing by a junction with Work No.11 at a point 143 metres north-east of the junction of Station Road with the entrance to Folly Cottage and terminating at a point 47 metres north of its commencement.

Work No.13 – An access road, commencing by a junction with Work No.11 at a point 78 metres south-east of Station Cottage and terminating at a point 104 metres south-east of its commencement.

In the County of Buckinghamshire, District of Aylesbury Vale—

Work No.14 – Realignment of Marsh Gibbon access (including a bridge over Work No.1), commencing at a point 70 metres north of the junction of Footpath MGI/5/1 with Footpath MGI/5/2 and terminating at a point 240 metres north of its commencement.

Work No.15 – A diversion of a high-pressure gas main, commencing at a point 269 metres north of the junction of Footpath MGI/5/1 with Footpath MGI/5/2 and terminating at a point 37 metres north-east of its commencement.

Work No.16 – A footbridge carrying footpaths POD/2/1 over Work No.1, commencing at a point 338 metres south of the junction of Footpath POD/3/1 with Footpath POD/2/1 and terminating at a point 45 metres south-east of its commencement.

Work No.17 – A footbridge carrying Footpaths TWY/2/2 and TWY/2/3 over Work No.1, commencing at a point 553 metres south of the junction of Footpath TWY/3/1 with Footpath TWY/2/2 and terminating at a point 17 metres south of its commencement.

Work No.18 – Realignment of Queen Catherine Road (including a bridge carrying the realigned road over the railway), commencing at a point 11 metres north-west of the junction of Queen Catherine Road with the entrance to Rectory Farm and terminating at a point 397 metres south-east of the junction of Buckingham Road with Queen Catherine Road.

Work No.19 – A road, forming an access to Railway Cottages, commencing by a junction with Work No.18 at a point 257 metres north-west of the junction of Queen Catherine Road with the entrance to railway cottages and terminating at a point 98 metres south-east of its commencement.

Work No.20 – A road, forming an access to the eastern fields, commencing by a junction with Work No.18 at a point 214 metres north-west of the junction of Queen Catherine Road with the entrance to Rectory Farm and terminating at a point 111 metres north-west of its commencement.

Work No.21 – A footbridge carrying Footpaths SCL/1/3 and MCL/8/1 over Work No.2, commencing at a point 205 metres north of Rectory Farm and terminating at a point 17 metres south of its commencement.

Work No.22 – A footbridge carrying the Footpaths MCL/4/1, MCL/6/1, MCL/4/2 and MCL/6/2 over Work No.2, commencing at a point 19 metres north-west of the junction of Footpath MCL/6/2 with Footpath MCL/4/2 and terminating at the said existing junction of those footpaths.

Work No.23 – Realignment of Sandhill Road, commencing at a point on that road 119 metres south-east of the bridge carrying the existing road over the existing railway and terminating at a point 269 metres north-west of its commencement. Work No.23 includes the reconstruction of the bridge carrying Sandhill Road over the existing railway.

Work No.24 – Realignment of the Littleworth Farm access road and Footpath MCL/2/1 and Footpath MCL/3/1 (including a bridge over Work No.2), commencing at a point 175 metres south-west of the entrance to the Verney Arms Hotel building on the existing Verney Road and terminating at a point 271 metres north-west of the junction of Footpath MCL/2/2 with Footpath MCL/3/2.

Work No.25 – Diversion of a high-pressure gas main, commencing at a point 247 metres north-west of existing Verney Junction level crossing and terminating at a point 72 metres east of its commencement.

Work No.25A– A bridge, carrying an access road over Claydon Brook, commencing at a point 276 metres north-west of the bridge carrying Verney Road over the existing railway (Oxford to Bletchley line) and terminating at a point 15 metres north-east of its commencement.

Work No.26 – A footbridge (being a replacement of the existing footbridge) carrying Footpaths WIP/6/9 and WIS/6/1 over Work No.2, commencing at a point 160 metres east of the bridge carrying Furze Lane over the existing railway (Oxford to Bletchley line) and terminating at a point 42 metres north of its commencement.

Work No.26A – A bridge, carrying an access road over Horwood Brook, commencing at a point 330 metres north-west of the bridge carrying Horwood Road under the existing railway (Oxford to Bletchley line) and terminating at a point 15 metres north of its commencement.

Work No.26B – A temporary bridge, carrying an access road over Horwood Brook, commencing at a point 124 metres south-west of the bridge carrying Horwood Road under the existing railway (Oxford to Bletchley line) and terminating at a point 15 metres north-east of its commencement.

Work No.27 – Realignment of the Moco Farm access road and Footpath SWA/17/1 (including a bridge over Work No.2), commencing at a point 138 metres south-west of the bridge carrying the existing Moco farm access road over the existing railway (Oxford to Bletchley line) and terminating at a point 332 metres west of the junction of Footpath SWA/17/1 and Footpath SWA/1/1.

Work No.28 – A footbridge carrying Footpaths SWA/1/1 and SWA/1/2 over Work No.2, commencing at a point 121 metres south-east of the junction of Footpath SWA/1/1 with Footpath SWA/17/1 and terminating at a point 17 metres north of its commencement.

Work No.28A – Diversion of Horwood Brook, commencing at a junction with Horwood Brook a point 242 metres north-east of the junction of Footpath SWA/1/1 with Footpath SWA/17/1 and terminating at a junction with Horwood Brook at a point 82 metres north-east of its commencement.

Work No.29 – A footbridge carrying Footpaths LHO/20/1 and MUR/13/1 over Work No.2, commencing at a point 56 metres north of the junction of Footpath LHO/20/1 with Byway MUR/18/2 and terminating at a point 46 meters north-west of its commencement.

Work No.30 – Realignment of Salden Lane (including a bridge over Work No.2), commencing at a point 273 metres south-west of the bridge carrying the existing Salden Wood access road over the existing railway (Oxford to Bletchley line) and terminating at a point 428 metres north of its commencement.

Work No.31 – Realignment of restricted byway MUR/15/1, commencing at a junction with Work No.30 and terminating at a point 377 metres north-east of its commencement.

Work No.32 – Diversion of a high-pressure gas main, commencing at a point 115 metres south-west of the crossing of the existing Salden Wood access road over the existing railway (Oxford to Bletchley line) and terminating at a point 73 metres north-east of its commencement.

In the County of Buckinghamshire, District of Milton Keynes—

Work No.32A – A temporary bridge carrying an access road over Water Eaton Road, commencing at a point 14 metres south-east of the viaduct carrying the existing railway (Oxford to Bletchley line) over Water Eaton Road and terminating at a point 12 metres north-east of its commencement.

Work No.33 – Realignment of Woodley’s Farm access road and Woburn Sands Footpath 002 (including a bridge over the existing railway - Bletchley to Bedford line), commencing at a point 517 metres north-west of the junction of Bow Brickhill Road with the existing Woodley’s Farm access road and terminating at a point 350 metres north-west of its commencement.

In the County of Bedfordshire, District of Central Bedfordshire—

Work No.34 – An access road, commencing at a point 16 metres north-west of Aspley Guise level crossing at a junction with Salford Road and terminating at a point 28 metres north-east of Berry Lane level crossing at a junction with Berry Lane.

Work No.35 – An access road, commencing at a point 39 metres north-east of Berry Lane level crossing at a junction with Berry Lane and terminating at a point 105 metres north of the bridge carrying the Bedford Road over the existing railway (Bletchley to Bedford line).

Work No.36 – An access road, commencing at a point 29 metres south-west of Long Leys level crossing and terminating at a point 653 metres south-east of its commencement at a junction with Bedford Road.

Work No.37 – Realignment of Marston Road (including a bridge over the existing railway - Bletchley to Bedford line), commencing at a point 44 metres east of the roundabout junction of The Lane with Marston Road and terminating at a point 595 metres north-east of its commencement.

In the County of Bedfordshire, District of Bedford—

Work No.38 – Realignment of Manor Road (including a bridge over the existing railway - Bletchley to Bedford line), commencing at a point 11 metres south-west of the Eastwood Cottage building and terminating at a point 550 metres north-west of its commencement and 478 metres south-east of the junction of Woburn Road with Manor Road.

Work No.39 – A footbridge carrying Footpaths KEU1B and KERA1A over the existing railway – (Bletchley to Bedford line), commencing at a point 52 metres north of Woburn Road level crossing level and terminating at a point 44 metres north of its commencement.

In the County of Buckinghamshire, District of Aylesbury Vale—

Work No.40 – A railway (6,899 metres in length), on the course of the existing railway (Aylesbury to Claydon Junction line), commencing at a point 381 metres north-west of the bridge carrying Station Road over the existing railway and terminating at a point 11 metres north-west of the bridge carrying Terry’s access road over the existing railway.

Work No.41 – A footbridge carrying Footpath WAD/3/5 over the Work No.40, commencing at a point 20 metres south-west of North Bucks Way level crossing and terminating at a point 27 metres north-east of its commencement and 15 metres north-west of North Bucks Way level crossing.

Work No.42 – Realignment of Lower Blackgrove Farm access road (including a bridge over Work No.40), commencing at a point 56 metres north-east of 3 Lower Blackgrove Farm Cottage building and terminating at a point 343 metres north-east of its commencement.

Work No.43 – A temporary bridge, carrying an access road over Fleet Marston brook, commencing at a point 91 metres south-west of the bridge carrying the A41 under the existing railway (Aylesbury to Claydon Junction line) and terminating at a point 21 metres east of its commencement.

SCHEDULE 2 — ACQUISITION OF LAND FOR ANCILLARY WORKS

(1) Area (2) Number of land shown on the deposited plans (3) Purposes for which land may be acquired
In the County of Oxfordshire In the District of Cherwell 0036, 0041 Environmental mitigation.
0113 Environmental mitigation.
0127, 0128, 0136, 0141 Worksite and access for construction and maintenance and environmental mitigation.
0133 Environmental mitigation.
0148 Environmental mitigation.
0166 Environmental mitigation.
0169 Worksite and access for construction, environmental mitigation and utility diversions.
0185 Environmental mitigation and utility diversions.
0192 Worksite and access for construction.
0204, 0205 Environmental mitigation.
0217 Environmental mitigation.
0223, 0249 Environmental mitigation utility diversions.
0224, 0227 Maintenance compound.
0241, 0247, 0248 Environmental mitigation and utility diversions.
0264 Environmental mitigation.
0270, 0271 Worksite and access for construction and maintenance.
0292 Environmental mitigation.
0305 Environmental mitigation.
In the County of Buckinghamshire In the District of Aylesbury Vale 0324, 0329, 0332 Environmental mitigation.
0336a Environmental mitigation.
0345 Worksite and access for construction and maintenance.
0363 Environmental mitigation.
0372, 0373 Environmental mitigation.
0379, 0380 Worksite and access for construction.
0382, 0383 Worksite and access for construction.
0390 Environmental mitigation.
0391, 0392 Worksite and access for construction.
0393 Worksite and access for construction.
0397 Environmental mitigation.
0407, 0408, 0409, 0410 Worksite and access for construction and maintenance and vehicle restraint barrier.
0414, 0415 Reprofiling of embankments and vehicle restraint barrier.
0420, 0423 Reprofiling of embankments and vehicle restraint barrier.
0438 Environmental mitigation.
0450, 0455, 0459 Worksite and access for construction and maintenance compound.
0476 Environmental mitigation.
0480 Environmental mitigation.
0491 Environmental mitigation.
0494 Environmental mitigation.
0524 Environmental mitigation.
0526 Environmental mitigation.
0532, 0534 Worksite and access for construction and maintenance compound.
0533 Environmental mitigation.
0578 Environmental mitigation.
0585 Worksite and access for construction and maintenance compound.
0613 Environmental mitigation and creation of a new public right of way.
0622, 0623, 0628, 0630 Worksite and access for construction and maintenance, environmental Mitigation and vehicle restraint barrier.
0624, 0626 Environmental mitigation.
0635 Environmental mitigation.
0644 Environmental mitigation.
0646 Environmental mitigation and creation of a new public right of way.
0653 Environmental mitigation.
0663 Environmental mitigation.
0677 Environmental mitigation.
0681, 0683 Environmental mitigation.
0713 Worksite and access for construction and maintenance compound.
0717, 0724 Environmental mitigation.
0738 Environmental mitigation.
0745 Environmental mitigation.
0756 Environmental mitigation.
0786a Environmental mitigation.
0787 Environmental mitigation.
0809 Worksite and access for construction and maintenance.
0823 Environmental mitigation.
0834 Environmental mitigation.
0884a Worksite and access for construction and maintenance.
0868 Worksite and access for construction, a maintenance compound and environmental mitigation.
0904, 0907, 0909 Worksite and access for construction and maintenance compound.
0911, 0917, 0921, 0930 Environmental mitigation and access for maintenance.
0912a Worksite and access for construction and maintenance.
0928 Environmental mitigation.
0934 Environmental mitigation.
0945, 0951 Worksite and access for construction and maintenance compound.
0948, 0954, 0955 Environmental mitigation.
0953, 0956 Worksite and access for construction and maintenance, environmental mitigation and vehicle restraint barrier.
0963 Environmental mitigation.
0965 Environmental mitigation.
0977, 0978 Worksite and access for construction and maintenance.
0981 Environmental mitigation.
0986, 0987, 0993 Environmental mitigation.
In the County of Buckinghamshire In the District of Milton Keynes 1029, 1032, 1033 Environmental mitigation.
1056 Worksite and access for construction and environmental mitigation.
1101, 1102, 1104, 1105, 1108, 1110, 1111 Worksite and access for construction and creation of a new public right of way.
1121 Environmental mitigation.
1127 Extension of platforms.
1131 Worksite and access for construction and permanent access to station.
1140, 1144 Worksite and access for construction and environmental mitigation.
In the County of Bedfordshire In the District of Central Bedfordshire 1152 Environmental mitigation.
1154 Environmental mitigation.
1163, 1163a, 1163b, 1163c, 1163d Extinguishment of level crossing and worksite and access for construction.
1165, 1165a, 1165b, 1165c, 1165d Extinguishment of level crossing and worksite and access for construction.
1171 Environmental mitigation.
1195 Environmental mitigation.
1204, 1208, 1212 Extension of platforms.
1225 Station improvements.
1238,1238a, 1238b Extinguishment of level crossing.
1255 Environmental mitigation.
1257 Extinguishment of level crossing.
1270 Environmental Mitigation.
1276, 1281 Environmental mitigation and worksite and access for construction.
1287 Worksite and access for construction and environmental mitigation.
1292 Environmental mitigation.
In the County of Bedfordshire In the District of Bedford 1299, 1300 Environmental mitigation.
1311 Worksite and access for construction.
1319 Environmental mitigation.
1320 Worksite and access for construction.
1333, 1333b Worksite and access for construction.
In the County of Buckinghamshire In the District of Aylesbury Vale 1349 Provision of structure for environmental mitigation
1365 Environmental mitigation.
1370 Worksite and access for construction and maintenance and vehicle restraint barrier.
1372 Worksite and access for construction and maintenance compound.
1374 Worksite and access for construction and maintenance and vehicle restraint barrier.
1387, 1391, 1393 Worksite and access for construction.
1388 Reprofiling of embankments and vehicle restraint barrier.
1400 Environmental mitigation.
1409 Environmental mitigation.
1422, 1424 Worksite and access for construction and maintenance compound.
1427 Environmental mitigation.
1444 Environmental mitigation and worksite and access for construction.
1445 Environmental mitigation and worksite and access for construction.
1449 Environmental mitigation.
1456 Environmental mitigation.
1465 Environmental mitigation.
1469 Embankment works.
1470 Embankment works.
1473 Environmental mitigation.
1474 Embankment works.
1477 Embankment works.
1479 Embankment works and environmental mitigation.
1491 Environmental mitigation.

SCHEDULE 3 — LAND IN WHICH ONLY NEW RIGHTS ETC., MAY BE ACQUIRED

(1) Area (2) Number of land shown on the deposited plans (3) Purpose for which rights may be acquired
In the County of Oxfordshire In the District of Cherwell 0043, 0046 Access for construction, maintenance and utilities.
0091, 0092, 0104 Access for construction, maintenance and utilities.
0162a, 0162b Access for construction and maintenance.
0168 Access for construction and maintenance.
0184 Access for construction and maintenance.
0198, 0198a Utility diversions.
0216 New right of access for a third party.
0245 New right of access for a third party.
0252 New right of access for a third party.
0255 New right of access for a third party and utility diversions.
0259 Utility diversions.
0260 New right of access for a third party.
In the County of Buckinghamshire In the District of Aylesbury Vale 0356 Access for maintenance.
0375 Access for maintenance.
0442a, 0442b Utilities and access for maintenance.
0454a Access for utilities.
0479 Access for maintenance.
0490a Access for maintenance.
0519c, 0519d, 0543 Access for maintenance.
0647 Access for construction and maintenance.
0670 Access for maintenance.
0679, 0679a Access for maintenance.
0706, 0712 Access for construction and maintenance.
0725, 0729, 0731 Access for construction and maintenance.
0799, 0806 Access for maintenance.
0830, 0837 Access for construction and maintenance.
0844, 847, 856, 860 Access for construction and maintenance.
0884b Access for maintenance.
0910, 0918 Access for maintenance and a new right of access for a third party.
0926 Right of access for maintenance.
In the County of Buckinghamshire In the District of Milton Keynes 1044 Access for maintenance.
1060, 1061, 1062 Access for construction and maintenance.
1122a, 1122b, 1124 Access for construction and maintenance.
1135 Access for construction and maintenance.
In the County of Bedfordshire In the District of Central Bedfordshire 1185, 1188, 1189, 1190, 1192 Access for construction, maintenance and creation of a new public right of way.
1194 Access for maintenance.
1291 Access for maintenance.
1316 Access for maintenance.
1361a, 1370a Access for maintenance.
1346, 1347, 1348 Access for construction and maintenance.
In the County of Buckinghamshire In the District of Aylesbury Vale 1386, 1390 Access for construction and maintenance.
1393a, 1394, 1395, Access for maintenance.
1401, 1402 Access for maintenance.
1426, 1429 Access for maintenance.
1447 Access for maintenance.
1450a, 1452, 1454 Access for maintenance.
1461 Access for construction.
1480a Access for utilities.
1480, 1481a, 1488, 1489 Access for maintenance.
1493a Access for maintenance and utilities.

SCHEDULE 4 — LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

(1) Area (2) Number of land shown on the deposited plans (3) Purpose for which temporary possession may be taken (4) Relevant part of the authorised works
In the County of Oxfordshire In the District of Cherwell 0001, 0003, 0004, 0005, 0006 Worksite for construction. Work No.1
0008, 0010 Worksite and access for construction and creation of a new public right of way. Work Nos. 1 and 4
0011, 0015, 0017, 0017a, 0028, 0033 Worksite and access for construction. Work Nos. 1 and 4
0012 Worksite and access for construction. Work Nos. 1 and 4
0016 Worksite and access for construction. Work Nos. 1 and 4
0043, 0046 Worksite and access for construction and utility diversions. Work Nos. 1, 5, 6, 7, 8 and 9
0058 Worksite and access for construction. Work Nos. 1, 5, 6, 7, 8 and 9
0085, 0095 Worksite and access for construction. Work Nos. 1, 5, 6, 7, 8 and 9
0091, 0092, 0104 Worksite and access for construction and utility diversions. Work Nos. 1, 5, 6, 7, 8 and 9
0110 Worksite and access for construction. Work Nos. 1, 5, 6, 7, 8 and 9
0124 Worksite and access for construction. Work Nos. 1, 5, 6, 7, 8 and 9
0125 Worksite and access for construction and highway improvements. Work Nos. 1, 5, 6, 7, 8 and 9
0150, 0151, 0153, 0156, 0159 Worksite and access for construction. Work No.1
0155, 0168 Worksite and access for construction, utility diversions and environmental mitigation. Work Nos. 1, 5, 6, 7, 8 and 9
0182, 0188 Worksite and access for construction. Work Nos. 1, 9 and 10
0184 Worksite and access for construction. Work Nos. 1 and 9
0194 Worksite and access for construction. Work Nos. 1 and 10
0195, 0197, 0203 Worksite and access for construction and creation of a new public right of way. Work Nos. 1 and 10
0200 Worksite and access for construction. Work Nos. 1 and 10
0198, 0198a Worksite and access for construction. Work Nos. 1 and 10
0216, 0245 Worksite and access for construction. Work Nos. 1, 10, 11, and 12
0221 Worksite and access for construction. Work Nos. 1, 10, 11, and 12
0229, 0238, 0240, Worksite and access for construction. Work Nos. 1, 10, 11, and 12
0234, 0253, 0268 Worksite and access for construction. Work Nos. 1, 10, 11, 12 and 13
0235, 0237 Worksite and access for construction. Work Nos. 1, 10, 11, and 12
0252, 0255, 0260 Worksite and access for construction and utility diversions. Work Nos. 1, 10, 11, and 12
0259, 0263, 0272, 0278 Worksite and access for construction. Work Nos. 1, 10, 11, 12 and 13
0275, 0289 Worksite and access for construction. Work No.1
0279, 0280, 0282, 0285 Worksite and access for construction. Work No.1
0299 Worksite and access for construction. Work No.1
In the County of Oxfordshire and Buckinghamshire, In the District of Cherwell and Aylesbury Vale 0303 Worksite and access for construction and utility diversions. Work Nos. 1, 14 and 15
0312 Worksite and access for construction. Work Nos. 1, 14 and 15
In the County of Buckinghamshire In the District of Aylesbury Vale 0317 Worksite and access for construction. Work Nos. 1, 14 and 15
0319 Creation of a new public right of way. Work No.15
0325 Worksite and access for construction. Work Nos. 1, 14 and 15
0334 Worksite and access for construction. Work Nos. 1 and 16
0337 Worksite and access for construction and creation of a new public right of way. Work Nos. 1 and 16
0340 Passing place. Work No.1
0353, 0369 Worksite and access for construction. Work No.1
0357, 0375 Worksite and access for construction. Work Nos. 1, 16 and 17
0362, 0365 Worksite and access for construction. Work No.1
0336b Worksite and access for construction. Work No.1
0370 Worksite and access for construction. Work No.1
0375a Kerb realignment and widening of road. Temporary highway works and Work No.1
0375b Kerb realignment and widening of road. Temporary highway works and Work No.1
0375c Kerb realignment and widening of road. Temporary highway works and Work No.1
0378, 0378a Worksite and access for construction. Work No.1
0381 Worksite and access for construction. Work Nos. 1 and 17
0388, 0394, 0396 Worksite and access for construction. Work Nos. 1 and 17
0401 Worksite and access for construction and creation of a new public right of way. Work Nos. 1 and 17
0402 Worksite and access for construction and creation of a new public right of way. Work Nos. 1 and 17
0404, 0406 Worksite and access for construction. Work No.1
0419 Worksite and access for construction. Work No.1
0425 Worksite and access for construction. Work No.1
0429 Worksite and access for construction. Work Nos. 2, 18 and 19
0433 Worksite and access for construction. Work Nos. 2, 18 and 19
0436 Worksite and access for construction. Work Nos. 2, 18 and 19
0442, 0442a Worksite and access for construction and utility diversions. Work Nos. 2, 18 and 20
0442b Creation of a temporary public right of way. Work Nos. 2, 18 and 20
0454, 0454a, 0454b Worksite and access for construction. Work Nos. 2, 18 and 20
0463 Worksite and access for construction. Work No.2
0465 Worksite and access for construction. Work No.2
0466 Worksite and access for construction. Work Nos. 2, 18 and 20
0467 Worksite and access for construction. Work No.2
0470, 0478 Worksite and access for construction. Work Nos. 2 and 21
0472 Worksite and access for construction. Work No.2
0479 Worksite and access for construction. Work Nos. 2 and 21
0481 Worksite and access for construction. Work No.2
0482 Worksite and access for construction. Work No.2
0485 Worksite and access for construction. Work No.2
0486 Worksite and access for construction. Work Nos. 2 and 22
0488 Worksite and access for construction. Work Nos. 2 and 22
0490a Worksite and access for construction. Work Nos. 2 and 22
0492 Worksite and access for construction. Work Nos. 2 and 22
0495, 0499 Worksite and access for construction. Work Nos. 2 and 23
0495a Kerb realignment and widening of road. Temporary highway works and Work No.2
0499a Kerb realignment and widening of road. Temporary highway works and Work No.2
0499b Kerb realignment and widening of road. Temporary highway works and Work No.2
0499c Kerb realignment and widening of road. Temporary highway works and Work No.2
0499d Kerb realignment and widening of road. Temporary highway works and Work No.2
0499e Kerb realignment and widening of road. Temporary highway works and Work No.2
0499f Kerb realignment and widening of road. Temporary highway works and Work No.2
0499g Kerb realignment and widening of road. Temporary highway works and Work No.2
0499h Kerb realignment and widening of road. Temporary highway works and Work No.2
0496, 0497, 0501 Worksite and access for construction. Work Nos. 2 and 23
0505 Worksite and access for construction. Work Nos. 2 and 23
0507 Worksite and access for construction. Work Nos. 2 and 23
0507a Passing place. Temporary highway works and Work No. 2
0509 Worksite and access for construction. Work No.2
0510 Worksite and access for construction. Work Nos. 2, 24 and 25
0513 Worksite and access for construction. Work Nos. 2, 23, 24 and 25
0516 Creation of a new public right of way. Work Nos. 2, 24 and 25
0519 Worksite and access for construction. Work Nos. 2, 24 and 25
0519a Creation of a new public right of way. Work Nos. 2, 24, 25 and 25A
0519c, 0519d Worksite and access for construction. Work Nos. 2 and 25A
0521 Worksite and access for construction. Work No.2
0531 Worksite and access for construction. Work No.2
0543 Worksite and access for construction. Work Nos. 2 and 25A
0570 Worksite and access for construction. Work No.2
0571 Worksite and access for construction. Work No.2
0577 Worksite and access for construction. Work No.2
0580 Worksite and access for construction and creation of a new public right of way. Work No.2
0585a Worksite and access for construction. Work No.2
0590 Worksite and access for construction. Work No.2
0598 Worksite and access for construction. Work No.2
0600, 0605, 0608 Worksite and access for construction and creation of a new public right of way. Work No.2
0602 Worksite and access for construction and creation of a new public right of way. Work No.2
0614 Worksite and access for construction. Work Nos. 2 and 26
0617, 0620 Worksite and access for construction. Work No.2
0617a Kerb realignment and widening of road. Temporary highway works and Work No.2
0633a Highway widening and worksite and access for construction Work No.2
0634 Worksite and access for construction. Work No.2
0636, 0639 Worksite and access for construction. Work Nos. 2 and 26
0641 Worksite and access for construction creation of a new public right of way. Work Nos. 2 and 26
0645 Worksite and access for construction. Work Nos. 2 and 26
0647 Worksite and access for construction. Work Nos. 2 and 26
0654 Worksite and access for construction. Work Nos. 2 and 26
0661 Creation of a new public right of way. Work Nos. 2 and 26
0669 Worksite and access for construction. Work No.2
0670 Worksite and access for construction. Work Nos. 2 and 26A
0671, 0673 Worksite and access for construction. Work No.2
0674 Worksite and access for construction. Work No.2
0684, 0692 Worksite and access for construction. Work No.2
0685, 0690, 0693, 0699 Worksite and access for construction. Work No.2
0700 Worksite and access for construction. Work Nos. 2 and 26B
0700a Kerb realignment and widening of road. Temporary highway works and Work No.2
0700b Kerb realignment and widening of road. Temporary highway works and Work No.2
0712 Worksite and access for construction. Work No.2
0716, 0725, 0729, 0731 Worksite and access for construction. Work No.2
0720 Worksite and access for construction. Work No.2
0740 Worksite and access for construction. Work Nos. 2 and 27
0742 Worksite and access for construction and creation of a new public right of way. Work Nos. 2 and 27
0744 Drainage works. Work Nos. 2 and 27
0751 Worksite and access for construction. Work Nos. 2 and 27
0752 Worksite and access for construction. Work Nos. 2 and 27
0754 Worksite and access for construction. Work Nos. 2 and 27
0755, 0758, 0761, 0764, 0765, 0767, 0768 Creation of a new public right of way. Work Nos. 2 and 28
0762 Worksite and access for construction. Work Nos. 2 and 28
0763 Kerb realignment and widening of road. Temporary highway works and Work No.2
0774 Worksite and access for construction. Work Nos. 2 and 28
0777a Passing Place. Temporary highway works Work No.2
0791, 0799, 0806 Worksite and access for construction. Work No.2
0796, 0797, 0798 Kerb realignment and widening of road. Temporary highway works and Work No.2
0802 Passing Place. Temporary highway works and Work No.2
0805 Worksite and access for construction and drainage works. Work No.2
0807 Worksite and access for construction. Work No.2
0815 Worksite and access for construction and drainage works. Work No.2
0817, 0824, 0825, 0830 Worksite and access for construction. Work No.2
0824a Kerb realignment and widening of road. Temporary highway works and Work No.2
0824b Kerb realignment and widening of road. Temporary highway works and Work No.2
0824c Kerb realignment and widening of road. Temporary highway works and Work No.2
0824d Kerb realignment and widening of road. Temporary highway works and Work No.2
0824e Kerb realignment and widening of road. Temporary highway works and Work No.2
0824f Kerb realignment and widening of road. Temporary highway works and Work No.2
0824g Kerb realignment and widening of road. Temporary highway works and Work No.2
0822, 0828, 0835 Worksite and access for construction. Work Nos. 2 and 29
0840, 0840a, 0843a, 0835a Worksite and access for construction and creation of a new public right of way. Work Nos. 2 and 29
0836 Worksite and access for construction. Work Nos. 2 and 29
0843, 0850, 0857 Worksite and access for construction. Work Nos. 2 and 29
0844 Worksite and access for construction and creation of a new public right of way. Work Nos. 2 and 29
0846 Worksite and access for construction. Work Nos. 2 and 29
0851, 0854, 0862 Worksite and access for construction. Work No.2
0870 Worksite and access for construction. Work No.2
0872, 0880, 0884 Worksite and access for construction. Work Nos. 2, 30, 31 and 32
0875, 0876, 0877 Drainage Works. Work No.2
0883 Worksite and access for construction. Work Nos. 2, 30, 31 and 32
0884b Worksite and access for construction. Work Nos. 2, 30, 31 and 32
0890, 0892, 0894, 0898 Worksite and access for construction. Work Nos. 2, 30, 31 and 32
0902, 0906a, 0914a, Worksite and access for construction. Work Nos. 2, 30, 31 and 32
0906, 0908, 0914, 0914e, 0923, 0931 Worksite and access for construction. Work Nos. 2, 30, 31 and 32
0910, 0918 Worksite and access for construction. Work No.2
0912 Worksite and access for construction. Work Nos. 2, 30, 31 and 32
0914c Worksite and access for construction. Work Nos. 2, 30, 31 and 32
0926 Worksite and access for construction. Work No.2
0937, 0941 Worksite and access for construction. Work No.2
0939 Worksite and access for construction. Work No.2
0950 Worksite and access for construction. Work No.2
0968, 0969 Worksite and access for construction. Work No.2
0972, 0988 Worksite and access for construction. Work No.2
0973, 0974, 0975 Worksite and access for construction. Work No.2
0979 Worksite and access for construction. Work No.2
0980 Worksite and access for construction. Work No.2
0992, 0997 Worksite and access for construction. Work No.2
1002, 1003 Worksite and access for construction. Work No.2
1004 Worksite and access for construction. Work No.2
1008 Worksite and access for construction. Work No.2
1011, 1012 Worksite and access for construction. Work No.2
In the County of Buckinghamshire In the Districts of Aylesbury Vale and Milton Keynes 1015, 1023 Worksite and access for construction. Work No.2
In the County of Buckinghamshire In the District of Milton Keynes 1015a, 1025, 1027 Worksite and access for construction. Work No.2
1017 Worksite and access for construction. Work No.2
1041, 1042, 1045 Worksite and access for construction. Work No.2
1044 Worksite and access for construction. Work No.2
1050, 1054 Worksite and access for construction. Work No.2
1058, 1059 Worksite and access for construction. Work No.2
1106, 1107, 1109, 1112 Worksite and access for construction and creation of a new public right of way. A public right of way diversion
1116 Worksite and access for construction. Work No.33
1117 Worksite and access for construction. Work No.33
1117a Worksite and access for construction and creation of a new public right of way. Work No.33
1117b Worksite and access for construction. Work No.33
1120, 1122a Worksite and access for construction and creation of a new public right of way. Work No.33
1122 Worksite and access for construction. Work No.33
1122b, 1124 Worksite and access for construction. Work No.33
1123 Worksite and access for construction. Work No.33
1128 Worksite and access for construction and creation of a temporary public right of way. Work No.33
1130 Worksite and access for construction. Station Works
1143 Creation of a new public right of way. Extinguishment of level crossing
In the County of Bedfordshire In the District of Central Bedfordshire 1191 Worksite and access for construction. Work Nos. 34, 35 and 36
1194 Worksite and access for construction and maintenance. Work Nos. 34, 35 and 36
1200, 1205, 1207 Worksite and access for construction and creation of a new public right of way. Extinguishment of level crossing and station works
1206, 1209, 1213, 1214, 1221 Worksite and access for construction. Station works
1219, 1220, 1222, 1227, 1229 Worksite and access for construction. Station works
1226, 1228, 1232 Worksite and access for construction and creation of a new public right of way. Extinguishment of level crossing
1243 Creation of a new public right of way. Extinguishment of level crossing
1251, 1252, 1256, 1258, 1259 Creation of a new public right of way. Work No.37
1253 Worksite and access for construction. Extinguishment of level crossing
1254 Worksite and access for construction. Extinguishment of level crossing
1261 Worksite and access for construction. Work No.37
1262 Worksite and access for construction. Work No.37
1265, 1267, 1269, 1271, 1273 Worksite and access for construction. Work No.37
In the District of Bedford 1296 Worksite and access for construction. Extinguishment of level crossing
1298 Worksite and access for construction. Extinguishment of level crossing
1302 Worksite and access for construction. Work No.38
1304 Worksite and access for construction. Work No.38
1316 Worksite and access for construction. Work No.38
1317 Worksite and access for construction. Work No.38
1323 Worksite and access for construction. Work No.38
1336, 1337 Worksite and access for construction and creation of a new public right of way. Work No.39
1338 Worksite and access for construction. Work No.39
1339 Worksite and access for construction and creation of a new public right of way. Work No.39
1342 Worksite and access for construction. Work No.39
1343, 1344 Worksite and access for construction. Work No.39
In the County of Buckinghamshire In the District of Aylesbury Vale 1361, 1361a, 1361b, 1362, 1368 Worksite and access for construction. Work No.40
1370a Worksite and access for construction. Work No.40
1364 Worksite and access for construction. Work No.40
1371, 1384 Worksite and access for construction. Work No.40
1391a Worksite and access for construction. Work No.40
1398 Worksite and access for construction. Work No.40
1401, 1402 Worksite and access for construction. Work No.40
1410, 1412 Worksite and access for construction. Work No.40
1414 Worksite and access for construction. Work Nos.40 and 41
1415 Worksite and access for construction. Work No.40
1418 Worksite and access for construction. Work Nos.40 and 41
1419 Worksite and access for construction. Work No.40
1421, 1423 Worksite and access for construction. Work No.40
1421a Creation of a temporary public right of way. Work No.40
1426, 1429 Worksite and access for construction. Work No.40
1430 Worksite and access for construction. Work No.40
1432, 1440 Worksite and access for construction. Work Nos.40 and 42
1434, 1435 Worksite and access for construction. Work No.40
1441 Worksite and access for construction. Work Nos. 40 and 42
1447 Worksite and access for construction. Work Nos. 40 and 42
1450 Worksite and access for construction. Work Nos. 40 and 42
1455 Worksite and access for construction. Work No.40
1457, 1462 Worksite and access for construction. Work No.40
1459, 1461 Worksite and access for construction. Work No.40
1464 Worksite and access for construction. Work No.40
1450a, 1452, 1454 Worksite and access for construction. Work No.40
1468, 1480, 1480a, 1480b Worksite and access for construction. Work No.40
1475, 1476, 1481 Worksite and access for construction. Work No.40
1481a, 1486, 1488, 1489, 1493, 1493a, 1493b, 1513, 1515 Worksite and access for construction. Work No.40
1499 Worksite and access for construction. Work No.40
1504, 1521 Worksite and access for construction. Work No.40
1518, 1520 Worksite and access for construction. Work No.40
1525, 1528, 1529, 1530, 1531, 1532, 1533, 1534, 1536, 1537, 1538, 1539, 1541, 1542 Worksite and access for construction. Extinguishment of level crossing.
1527 Worksite and access for construction and creation of a new public right of way. Extinguishment of level crossing.

SCHEDULE 5 — REPLACEMENT AND CLOSURE OF ROAD LEVEL CROSSINGS

PART 1 — LEVEL CROSSINGS FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

(1) Area (2) Level crossing to be discontinued (3) Street to be stopped up (4) New street to be substituted
County of Oxfordshire District of Cherwell Parishes of Bicester and Launton The level crossing known as Bicester Eastern Perimeter Road level crossing whereby A4421 Charbridge Lane is crossed on the existing railway between Bicester and Bletchley stations. A4421 Charbridge Lane between points P6 and P7 (on sheet 2). Work No.5
Parish of Launton The level crossing known as Launton Highway level crossing whereby Station Road is crossed on the existing railway between Bicester and Bletchley stations. Station Road between points P12 and P13 and between points P14 and P15 (on sheets 4 and 5). Work No.11
County of Buckinghamshire District of Aylesbury Vale Parishes of Steeple Claydon and Middle Claydon The level crossing known as Queen Catherine Road level crossing whereby Queen Catherine Road is crossed on the existing railway between Bicester and Bletchley stations. Queen Catherine Road between points P1 and P2, between points P3 and P4 and between points P5 and P6 (on sheets 15 and 16). Work No.18, 19 and 20
County of Bedfordshire District of Bedford Parishes of Lillington The level crossing known as Marston Road level crossing whereby Marston Road is crossed on the existing railway between Bletchley and Bedford stations. Marston Road between points P12 and P13 (on sheet 54). Work No.37
County of Bedfordshire District of Central Bedfordshire Parish of Stewartby The level crossing known as Kempston Hardwick crossing whereby Manor Road is crossed on the existing railway between Bletchley and Bedford stations. Manor Road between points P1 and P2 (on sheet 57). Work No.38

PART 2 — LEVEL CROSSINGS FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED

(1) Area (2) Level crossing to be discontinued (3) Highway to be stopped up
County of Bedfordshire District of Central Bedfordshire Parish of Aspley Guise The level crossing known as Berry Lane level crossing whereby Berry Lane is crossed on the railway between Bletchley and Bedford stations. Berry Lane between points P1 and P2 (on sheet 49)

SCHEDULE 6 — REPLACEMENT AND CLOSURE OF FOOTPATH LEVEL CROSSINGS

PART 1 — LEVEL CROSSINGS FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

(1) Area (2) Footpath level crossing to be discontinued (3) Right of way to be stopped up (4) New right of way to be substituted
County of Oxfordshire District of Cherwell Parish of Bicester The level crossing known as Jarvis’ Lane level crossing Jarvis’ Lane Footpath not on the definitive map between points P1 and P2 (on sheet 2). Footpath between points P3, P4, Work No.4 and point P5 (on sheet 2).
Parish of Launton The level crossing known as Grange Farm level crossing Footpath 272/11/10 between points P1 and P4 (on sheet 3). Footpath between points P1, P2, Work No.10, points P3 and P4 (on sheet 3).
The level crossing known as Launton No.1 level crossing Footpath 272/12/10 between points P5 and P7 (on sheets 3 and 4). Footpath between points P5, P3, Work No.10, points P2 and P8 (on sheets 3 and 4)
The level crossing known as Launton No.2 level crossing Footpath 272/21/10 and path not on definitive map between points P10 and P11 (on sheet 4). Footpath between points P6, P5, P3, Work No.10, points P2, P8 and P10 (on sheets 3 and 4).
County of Buckinghamshire District of Aylesbury Vale Parish of Marsh Gibbon The level crossing known as Marsh Gibbon combined Footpath and user works level crossing Footpath MGI/5/1 between points P1 and P2 (on sheet 7). Footpath between points P1, P3, Work No.14, points P4 and P5 (on sheet 7).
Parish of Poundon The level crossing known as Poundon No.2 level crossing Footpath POD/2/1 between points P1 and P2 (on sheet 8). Footpath between points P1, P4, Work No.16, points P3 and P2 (on sheet 8).
Parish of Charndon The level crossing known as Charndon No.3 level crossing Footpath CHA/3/1 between points P1 and P2 (on sheets 9 and 11). Footpath between points P1 and P3 (on sheets 9 and 11).
Parish of Twyford The level crossing known as Twyford No.2 level crossing Footpath TWY/2/3 between points P1 and P3 and Footpath TWY2/2 between points P3 and P4 (on sheet 12). Footpath between points P1, P2, Work No.17, points P3 and P4 (on sheet 12).
The level crossing known as Twyford No.3 level crossing Footpath TWY/3/1 between points P5 and P4 (on sheet 12). Footpath between points P5, P2, Work No.17, points P3 and P4 (on sheet 12).
Parishes of Middle Claydon and Steeple Claydon The level crossing known as Middle Claydon Footpath No.8 level crossing Footpath SCL/1/3, path not on definitive map and Footpath MCL/8/1 between points P1 and P3 (on sheet 17). Footpath between points P1, Work No.21, points P2 and P3 (on sheet 17).
Parish of Middle Claydon The level crossing known as Middle Claydon Footpaths No.4 & No.6 level crossing Footpath MCL/4/1 between points P1 and P5, Footpath MCL/6/1 between points P2 and P5, Footpath MCL/6/2 between points P3 and P5, Footpath MCL/4/2 between points P4 and P5 (on sheet 18). Footpath between points P1 and P6, between points P2 and P6, Work No.22, points P7 and P3 and between points P7 and P4 (on sheet 18).
Parish of Middle Claydon The level crossing known as Verney Junction level crossing Footpath MCL/2/1 and path not on definitive map between points P1 and P2 and Footpath MCL/3/1 and path not on definitive map between points P1 and P3 (on sheets 20 and 21). Footpath between points P6, Work No.24, point P5 and P2 and between points P7 and P8 (on sheets 20 and 21).
Parishes of Winslow and Addington The level crossing known as Winslow Footpath No.5 level crossing Footpath ADD/11/1 between points P1 and P2 and Footpath WIS/5/1 between points P2 and P3 (on sheet 23). Footpath between points P1, P4, P5 and P3 (on sheet 23).
Parish of Swanbourne The level crossing known as Winslow Footpath No.17 level crossing Footpath SWA/17/1 between points P1 and P2 (on sheets 27 and 28). Footpath between points P1, P3, Work No.27 and point P2 (on sheets 27 and 28).
The level crossing known as Moco Farm No. 2 Footpath SWA/1/2 between points P4 and P7 (on sheet 28). Footpath between points P4, P5, Work No.28, points P6 and P7 (on sheet 28).
Parishes of Little Horwood, Swanbourne and Mursley The level crossing known as Swanbourne Old Station level crossing Footpath LHO/27/1 between points P9 and P10, Footpath MUR/19/1 between points P10 and P11 and Footpath SWA/20/1 between points P11 and P12 (on sheets 28 and 29). Footpath between points P9and P8and between points P4, P5, Work No.28, point P6 and P7 (on sheet 28).
Parishes of Little Horwood and Mursley The level crossing known as Swan’s Way level crossing Footpath LH0/20/1 between points P1 and P5 and Footpath MUR/13/1 between points P5 and P6 (on sheet 30). Footpath between points P1, P2, Work No.29, points P3 and P4 (on sheet 30).
County of Buckinghamshire District of Milton Keynes Parish of Woburn Sands The level crossing known as Fisherman’s Path level crossing Woburn Sands Footpath 002 between points P1 and P2 (on sheet 46). Footpath between points P1, P3, Work No.33, points P4, P5 and P2 (on sheets 45 and 46).
The level crossing known as School Crossing Woburn Sands level crossing Woburn Sands Footpath 003 between points P6 and P7 (on sheet 46). Footpath between points P9 and P7 (on sheet 46).
County of Bedfordshire District of Central Bedfordshire Parishes of Husbourne Crawley and Brogbourgh The level crossing known as Husbourne Crawley level crossing Footpath 10 Footpath 10 between points P1 and P2 and Footpath BRG/17/10 between points P2 and P3 (on sheets 51 and 52). Footpath between points P1, P4, P5 and P6 (on sheets 51 and 52).
Parish of Lidlington The level crossing known as Pilling Farm South level crossing Footpath 1 and path not on definitive map between points P5 and P6 (on sheet 53). Footpath between points P6, P7 and P8 and bridleway between points P5, P10 and P11 (on sheets 53 and 54)
District of Bedford Parish of Kempston The level crossing known as Woburn Road level crossing Footpath KEU1B (FP 1), path not on definitive map and Footpath KERA1A (FP A1) between points P1 and P2 (on sheet 58). Footpath between points P1, P3 Work No.39, point P4 and P5 (on sheet 58).
County of Buckinghamshire District of Aylesbury Vale Parish of Waddesdon The level crossing known as North Bucks Way No.1 level crossing Footpath WAD/3/5 between points P1 and P4 (on sheet 61). Footpath between points P1, P2, Work No.41, point P3 and P4 (on sheet 61).
Parish of Aylesbury The level crossing known as Griffin Lane level crossing Footpath AYL/8/1 between points P1 and P6, and Footpath AYL/7/1 between points P5 and P6 (on sheet 70). Footpath between points P3, P4 and P5 (on sheet 70).

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.