(1) Area (2) Highway to be stopped up (3) Extent of stopping up (4) New highway to be substituted/provided
Rights of way and access plans – Sheet 1 Rights of way and access plans – Sheet 1 Rights of way and access plans – Sheet 1 Rights of way and access plans – Sheet 1
Perranzabuloe Civil Parish B3277 From Blackwater Roundabout to the existing Chiverton Cross Roundabout for a length of 156 metres including the northern section of the existing Chiverton Cross Roundabout Reference A Re-aligned B3277 west of the existing Blackwater Roundabout for a length 851 metres including a new length of adjacent footway/cycleway within the verge for a length of 747 metres and an adjoining new length of footway/cycleway between the realigned B3277 and new A30 for a length of 94 metres
Perranzabuloe, Kenwyn Civil Parishes A390 From a point 154 metres from the existing Chiverton Cross Roundabout including the southern section of the existing Chiverton Cross Roundabout Reference B Re-aligned A390 east of the existing Chiverton Cross Roundabout for a length of 1078 metres including a new length of adjacent footway/cycleway within the verge for a length of 704 metres and an adjoining new length of footway/cycleway between the realigned A390 and existing footway/cycleway for a length of 21 metres
Perranzabuloe Civil Parish Reference F (PR2) A new restricted byway underbridge north-south to allow access under the new A30 mainline and side roads, for a total length of 135 metres
Perranzabuloe Civil Parish Existing A30 For a length of 850 metres from a point east of the existing Chiverton Cross Roundabout to the north of Roscarnick Farm Reference G A new length of classified road (A30) for a length of 178 metres to the south of the new grade separated junction at Chiverton including a new length of adjacent footway/cycleway within the verge from the new grade separated junction at Chiverton for a length of 221 metres
Perranzabuloe Civil Parish Reference H A new unclassified road to serve as access to Trevissome Park for a length of 70 metres from its junction with the new A30 (T)
Perranzabuloe Civil Parish C0005 For a length of 32 metres from its junction with the existing A30 (T) Reference I A new length of the C0005 for a length of 50 metres to the east of the new grade separated junction at Chiverton
Perranzabuloe Civil Parish Reference J (PR3) A new restricted byway to the south of the new grade separated junction at Chiverton, for a total length of 90 metres
Perranzabuloe Civil Parish Reference K A new circulatory carriageway on the new grade separated junction at Chiverton for a length of 479 metres including a new length of adjacent footway/cycleway within the eastern verge of the new grade separated junction at Chiverton for a length of 115 metres
Perranzabuloe Civil Parish Reference L (PR3) A new restricted byway to the north of the new grade separated junction at Chiverton, for a total length of 88 metres
Perranzabuloe Civil Parish U6072 For a length of 195 metres from the existing A3075 Reference M A new length of U6072 for a length of 99 metres from its junction with the realigned A3075
Perranzabuloe, Kenwyn Civil Parishes Reference Z1 New A30 eastbound off-slip to the new grade separated junction at Chiverton for a length of 637 metres
Perranzabuloe Civil Parish Reference Z2 New A30 eastbound on-slip from the new grade separated junction at Chiverton for a length of 399 metres
Perranzabuloe Civil Parish Reference Z3 A30 westbound off-slip to the new grade separated junction at Chiverton for a length of 514 metres
Perranzabuloe Civil Parish Reference Z4 A30 westbound on-slip from the new grade separated junction at Chiverton for a length of 471 metres
Perranzabuloe Civil Parish Reference Z16 A new unclassified road to provide access to BOAT 314/1/1 for a length of 30 metres
Kenwyn, Perranzabuloe, St Allen, St Erme, St Newlyn East Civil Parishes Reference ZZ A30 for a length of 13820 metres as shown on sheets 1 to 8 of the rights of way and access plans
Rights of way and access plans – Sheet 2 Rights of way and access plans – Sheet 2 Rights of way and access plans – Sheet 2 Rights of way and access plans – Sheet 2
Perranzabuloe Civil Parish A3075 From a point on the existing Chiverton Cross Roundabout to where it meets the existing A3075 for a length of 1480 metres, as shown on sheets 1 and 2 of the rights of way and access plans Reference D Re-aligned A3075 north of the existing Chiverton Cross Roundabout for a length of 767 metres as shown on sheets 1 and 2 of the rights of way and access plans including a new length of adjacent footway/cycleway within the northern verge for a length of 317 metres between the new grade separated junction at Chiverton and the U6072 and a new length of adjacent footway/cycleway within the southern verge from the new grade separated junction at Chiverton for a length of 177 metres
Perranzabuloe, Kenwyn Civil Parishes Existing A30 From a point at the existing Chybucca Junction for a length of 850 metres in a westerly direction, as shown on sheets 2 and 3 of the rights of way and access plans Reference E Re-aligned A30 from a point at the existing Chybucca Junction for a length of 805 metres in a westerly direction, as shown on sheets 2 and 3 of the rights of way and access plans
Rights of way and access plans – Sheet 3 Rights of way and access plans – Sheet 3 Rights of way and access plans – Sheet 3 Rights of way and access plans – Sheet 3
Perranzabuloe, Kenwyn Civil Parishes B3284 For a length of 134 metres from its junction with the existing A30 (T) Reference R A new length of re-aligned B3284 to the east of Callestick Vean for a length of 852 metres to the northern roundabout of the new grade separated junction at Chybucca including a new length of adjacent footway/cycleway within the verge from the new grade separated junction at Chybucca for a length of 201 metres
Perranzabuloe Civil Parish Reference S (PR4) A new bridleway from west to east to connect BR314/64/1 and BR314/65/1, for a total length of 690 metres
Kenwyn Civil Parish B3284 For a length of 290 metres to the south of the southern roundabout of the Chybucca grade separated junction Reference T A new length of classified road (A30) to the west of the new grade separated junction at Chybucca to where it meets the southern roundabout of the new grade separated junction at Chybucca for a length of 245 metres including a new length of adjacent footway/cycleway within the verge from the new grade separated junction at Chybucca for a length of 50 metres
Kenwyn Civil Parish Reference U A new length of B3284 for a length of 147 metres from its junction with the southern roundabout of the new grade separated junction at Chybucca including a new length of adjacent footway/cycleway within the verge from the new grade separated junction at Chybucca for a length of 165 metres
Kenwyn Civil Parish Reference V A new link between the northern and southern roundabouts on the new grade separated junction at Chybucca for a length of 148 metres including a new length of adjacent footway/cycleway within the eastern verge for a length of 211 metres
Kenwyn Civil Parish Existing A30 (T) For a length 379 metres from a point south of Creegmeor Farm to a point east of the northern roundabout of the new grade separated junction at Chybucca Reference W A new length of classified road (A30) from its junction with the northern roundabout of the new grade separated junction at Chybucca for a length of 150 metres including a new length of adjacent footway/cycleway within the verge from the new grade separated junction at Chybucca for a length of 160 metres
Kenwyn Civil Parish Reference Z (PR5) A new footpath with adjacent hard surface slope to connect to BR314/65/1 at Creegmeor Farm, for a total length of 20 metres
Kenwyn Civil Parish Reference EE A new circulatory carriageway on the northern roundabout of the new grade separated junction at Chybucca for a length of 106 metres
Kenwyn Civil Parish Reference GG A new circulatory carriageway on the southern roundabout of the new grade separated junction at Chybucca for a length of 106 metres
Kenwyn Civil Parish Reference Z5 A30 eastbound off-slip to the new grade separated junction at Chybucca for a length of 490 metres
Kenwyn Civil Parish Reference Z6 A30 westbound on-slip from the new grade separated junction at Chybucca for a length of 383 metres
Rights of way and access plans – Sheet 4 Rights of way and access plans – Sheet 4 Rights of way and access plans – Sheet 4 Rights of way and access plans – Sheet 4
Kenwyn Civil Parish C0049 From a point 311 metres from its junction with the existing A30 (T) Reference AA A new side road to redirect 367 metres of C0049
Perranzabuloe Civil Parish U6082 and FP 319/16/1 U6082 for a length of 107 metres from its junction with existing A30 (T) FP 319/16/1 for a length of 68 metres from its junction with the existing A30 (T) Reference BB (PR7) A new bridleway over a green bridge north of the existing A30 (T) in a southerly direction, for a total length of 350 metres
St Allen Civil Parish Reference CC (PR8) A new footpath to join a new bridleway over a green bridge, for a total length of 15 metres
Perranzabuloe Civil Parish C0364 From a point east of the telecommunication mast for a length of 365 metres, as shown on sheet 5 of the rights of way and access plans Reference DD Re-aligned A30 for a length of 1159 metres from a point to the east of Elmsleigh to a point east of Tolgroggan Farm, as shown on sheets 4 and 5 of the rights of way and access plans
St Allen Civil Parish Reference Z18 Widening of the U6082 for a length of 30 metres north of the property known as Burnetts
Rights of way and access plans – Sheet 5 Rights of way and access plans – Sheet 5 Rights of way and access plans – Sheet 5 Rights of way and access plans – Sheet 5
Perranzabuloe Civil Parish C0089 For a length of 96 metres from its junction with the existing A30 (T) Reference DD Re-aligned A30 for a length of 1159 metres from a point to the east of Elmsleigh to a point east of Tolgroggan Farm, as shown on sheets 4 and 5 of the rights of way and access plans
St Allen Civil Parish Bridleway 319/9/1 From the intersection with BR319/9/1 along its length south of the existing A30(T) for a total length of 320 metres Reference HH (PR9) A new bridleway for a total length of 342 metres
St Allen Civil Parish Bridleway 319/1/1 From a point 50 metres east of the Chapel along its length for a total distance of 214 metres Reference JJ (PR10) A new bridleway from a point 40 metres east of the Chapel in an easterly direction for a total length of 260 metres
St Allen Civil Parish U6083 For a length of 67 metres from its junction with the existing A30 (T) Reference KK (PR11) A new bridleway as an underbridge for a total length of 103 metres
St Allen Civil Parish Reference LL A new length of U6083 for a length of 75 metres
Rights of way and access plans – Sheet 6 Rights of way and access plans – Sheet 6 Rights of way and access plans – Sheet 6 Rights of way and access plans – Sheet 6
St Allen Civil Parish C0364 For length of 167 metres from its junction with the existing A30 (T) Reference MM A new length of C0364 from its junction with the existing A30 (T) for a length of 243 metres
St Allen Civil Parish U6083 For a length of 76 metres from its junction with the existing A30 (T) Reference NN A new length of U6083 for a length of 220 metres from a point to the west of Trevalso Farm to where it meets the new length of C0364
St Allen Civil Parish C0075 For a length of 325 metres from its junction with the existing A30 (T) Reference OO A new length of C0075 for a length of 380 metres from its junction with the existing A30 (T)
Rights of way and access plans – Sheet 7 Rights of way and access plans – Sheet 7 Rights of way and access plans – Sheet 7 Rights of way and access plans – Sheet 7
St Erme Civil Parish U6093 For a total length of 284 metres from its junction with the existing A30 (T) Reference PP A length of new U0693 for a length of 140 metres south of the existing A30 (T)
Rights of way and access plans – Sheet 8 Rights of way and access plans – Sheet 8 Rights of way and access plans – Sheet 8 Rights of way and access plans – Sheet 8
St Erme, St Newlyn East Civil Parishes Existing A30 (T) For a length of 624 metres westbound from its junction with the existing Carland Cross Roundabout as shown on sheets 7 and 8 of the rights of way and access plans Reference QQ A length of re-aligned A30 from a point to the east of Four Winds to the northern roundabout of the new grade separated junction at Carland Cross for a length of 654 metres as shown on sheets 7 and 8 of the rights of way and access plans
St Erme, St Newlyn East Civil Parishes Reference SS The new link between the new northern roundabout and the reconfigured southern roundabout at the new grade separated junction at Carland Cross for a length of 155 metres
St Erme, St Newlyn East Civil Parishes Reference TT New circulatory carriageway on the northern roundabout of the new grade separated junction at Carland Cross for a length of 163 metres
St Erme Civil Parish Reference UU (PR14) A new bridleway through an underbridge from a point 80 metres north of the existing A30(T) to a point east of the existing Carland Cross roundabout, for a total length of 486 metres including equine refuges
St Erme, St Newlyn East Civil Parishes Reference VV (PR15) A new bridleway south of the existing A30(T) to its junction north of Treventon Farm, for a total length of 1127 metres
St Erme, St Newlyn East Civil Parishes Reference WW (PR16) A new footpath south of the existing A30(T) west of the existing Carland Cross junction for a total length of 90 metres
St Erme, St Newlyn East Civil Parishes Reference Z7 A30 eastbound off-slip to the new grade separated junction at Carland Cross for a length of 570 metres
St Erme, St Newlyn East Civil Parishes Reference Z8 A30 eastbound on-slip from the new grade separated junction at Carland Cross for a length of 366 metres
St Erme, St Newlyn East Civil Parishes Existing A30 For a length of 503 metres eastbound from the junction with the existing Carland Cross Roundabout Reference Z9 A30 westbound off-slip to the new grade separated junction at Carland Cross for a length of 624 metres
St Erme Civil Parish Reference Z10 A30 westbound on-slip from the new grade separated junction at Carland Cross for a length of 355 metres

PART 3 — PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED

(1) Area (2) Private means of access to be stopped up (3) Extent of stopping up
Kenwyn Civil Parish Reference d Access to field south of the existing A30 (T) from the existing B3284, as shown on sheet 3 of the rights of way and access plans From the existing B3284 for a length of 28 metres as shown on sheet 3 of the rights of way and access plans

PART 4 — PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW PRIVATE MEANS OF ACCESS WHICH ARE OTHERWISE TO BE PROVIDED

(1) Area (2) Private means of access to be stopped up (3) Extent of stopping up (4) New private means of access to be substituted/provided
Rights of way and access plans – Sheet 1 Rights of way and access plans – Sheet 1 Rights of way and access plans – Sheet 1 Rights of way and access plans – Sheet 1
Perranzabuloe Civil Parish Reference a Access to Silversprings north of the A3075 At a point north west of the junction with the A3075 for a length of 73 metres Reference 1 A new private access to Silversprings to the north east of the existing Chiverton Cross Roundabout, 113 metres south west of its existing access
Perranzabuloe and Kenwyn Civil Parishes Reference b Access to Three Burrows south east of the existing A30(T) and to the north east of the existing Chiverton Cross Roundabout At a point south east with the A30(T) for a length of 20 metres Reference 25 A new private access to Three Burrows to the north east of the existing Chiverton Cross Roundabout to the south of its existing access for a length of 12 metres
Rights of way and access plans – Sheet 2 Rights of way and access plans – Sheet 2 Rights of way and access plans – Sheet 2 Rights of way and access plans – Sheet 2
Perranzabuloe Civil Parish Reference 2 A new private access to the field west of the A3075 for a length of 13 metres
Perranzabuloe Civil Parish Reference 3 A new private access to the field east of the A3075 for a length of 14 metres
Rights of way and access plans – Sheet 3 Rights of way and access plans – Sheet 3 Rights of way and access plans – Sheet 3 Rights of way and access plans – Sheet 3
Perranzabuloe Civil Parish Reference c Access to Creegmeor Farm At a point to the north of the existing A30(T) for a length of 76 metres Reference 4 A new private access to the north of the B3284 at Callestick Vean for a length of 690 metres to Creegmeor Farm
Kenwyn Civil Parish Reference 5 A new private access to the field south of the re-aligned A30 for a length of 11 metres
Kenwyn Civil Parish Reference 6 A new private access to the south of the new grade separated junction at Chybucca from the re-aligned B3284 for a length of 95 metres
Kenwyn Civil Parish Reference 26 A new private access to the field south of the re-aligned A30 for a length of 11 metres
Rights of way and access plans – Sheet 4 Rights of way and access plans – Sheet 4 Rights of way and access plans – Sheet 4 Rights of way and access plans – Sheet 4
St Allen and Kenwyn Civil Parishes Reference e Access to Nanteague Farm At a point south of the existing A30(T) at Town and Country Motors for a total length of 272 metres Reference 7 A new private access to the south of the existing A30(T), 475 metres to the west of the existing access, north east for a length of 1160 metres
St Allen Civil Parish Reference e Access to Nanteague Farm At a point south of the existing A30(T) at Town and Country Motors for a length of 272 metres as shown on sheet 3 of the rights of way and access plans Reference 8 A new private access to Nanteague Farm for a length of 22 metres
St Allen Civil Parish Reference e Access to Nanteague Farm At a point south of the existing A30(T) at Town and Country Motors for a length of 272 metres Reference 9 A new private access to Nanteague Solar Farm for a length of 7 metres
St Allen Civil Parish Reference h Access to Nancarrow Farm At a point to the south of the existing A30(T) to the east of Elmsleigh for a length of 83 metres Reference 10 A new private access to Nancarrow Farm south of the existing A30(T), 210 metres south west of the existing access, north east for a length of 200 metres
St Allen Civil Parish Reference 27 A new private access to a telecommunications mast for a length of 5.4 metres
Rights of way and access plans – Sheet 5 Rights of way and access plans – Sheet 5 Rights of way and access plans – Sheet 5 Rights of way and access plans – Sheet 5
Perranzabuloe Civil Parish Reference i Access to O2 Telecommunications Mast At a point to the north of the existing A30(T) to the west of Chyverton Lodge for a length of 4 metres Reference 11 A new private access to a telecommunications mast to the north of the realigned A30 for a length of 6 metres
Perranzabuloe Civil Parish Reference 12 A private access to Bracken Woods from the realigned C0364 for a length of 118 metres
Perranzabuloe Civil Parish Reference 13 A private access to Chyverton Park and Chyverton Lodge from the realigned C0364 for a length of 23 metres
St Allen Civil Parish Reference j Access to the property known as Tolgroggan Farm At a point to the south of C0364 and to the east of The Chapel for a length of 214 metres Reference 14 A new private access to Tolgroggan Farm to the south of C0364, 52 metres south east of the existing access, south east for a length of 260 metres
St Allen Civil Parish Reference 15 A new private access to Tolgroggan Farm to the south of the new A30 for a length of 342 metres
St Allen Civil Parish Reference 16 A new private access to Trevalso Farm to the south of Church Lane for a length of 182 metres
Rights of way and access plans – Sheet 6 Rights of way and access plans – Sheet 6 Rights of way and access plans – Sheet 6 Rights of way and access plans – Sheet 6
St Allen Civil Parish Reference 17 A new private access to Trevalso Farm to the east of U6083 for a length of 776 metres
St Allen Civil Parish Reference 18 A new private access to Pennycomequick from C0075 for a length of 29 metres
St Allen Civil Parish Reference k Access track from unnamed road C0075 to field access At a point south of the existing A30(T) to the south east of Pennycomequick for a length of 35 metres Reference 19 A new private access to field to the south of the A30(T), 80 metres from the existing access for a length of 13 metres
St Allen Civil Parish Reference 20 A new private access to the field south of Pennycomequick from the stopped C0075 for a length of 9 metres
St Allen Civil Parish Reference 28 A new private access to the field south of the A30(T) to the east of Pennycomequick for a length of 7 metres
Rights of way and access plans – Sheet 8 Rights of way and access plans – Sheet 8 Rights of way and access plans – Sheet 8 Rights of way and access plans – Sheet 8
St Newlyn East and St Erme Civil Parishes Reference l Access to Carland Cross Wind Farm At a point north west of the existing Carland Cross Roundabout for a total length of 1075 metres References 21, 22, 23 A new private access to wind turbines at Carland Cross Wind Farm 205 metres to the north of the existing Carland Cross roundabout for a total length of 506 metres
St Newlyn East Civil Parish Reference m Access to Treventon Farm At a point to the south of the existing A30(T) to the north of Rosehill Farm for a length of 585 metres Reference 24 A new private access to Treventon Farm to the south of the existing A30(T) for a distance of 871 metres to the north of Rosehill Farm
St Newlyn East Civil Parish Reference 29 A new private access to Newlyn Downs / Trewithen Estate to the north of the existing Carland Cross roundabout for a length of 10 metres

SCHEDULE 5 — LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED

(1) Plot reference number shown on land plans (2) Purpose for which rights over land may be acquired (3) Relevant part of the authorised development
Land Plans – Sheet 1 Land Plans – Sheet 1 Land Plans – Sheet 1
1/1 New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(a)
1/1a New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(a)
1/1b New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(a)
1/1c New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(a)
1/1d New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(a)
1/1g New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(a)
1/1h New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(a)
1/7 New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(b)
1/8 New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(b)
1/9b New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of South West Water Work No. 16
1/9c New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of South West Water Work Nos. 1(b) and 16
1/10b New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of South West Water New right to construct, use, protect, inspect and maintain a new culvert and equipment Work Nos. 1(cc) and 14
1/10c New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of South West Water Work No. 14
1/10h New right to construct, use, protect, inspect and maintain a new electrical pole and equipment for the benefit of Western Power Distribution Work No. 15
1/10k New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of South West Water New right to construct, use, protect, inspect and maintain a new culvert and equipment Work No. 16
Land Plans – Sheet 2 Land Plans – Sheet 2 Land Plans – Sheet 2
2/3b New right to construct, use, protect, inspect and maintain a new culvert and equipment Work No. 1(cc)
2/3p New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(c)
2/6 New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(c)
2/6a New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(c)
2/7c New right to construct, use, protect, inspect and maintain a new culvert and equipment Work No. 1(cc)
2/7d New right to construct, use, protect, inspect and maintain a new culvert and equipment Work No. 1(cc)
Land Plans – Sheet 3 Land Plans – Sheet 3 Land Plans – Sheet 3
3/3a New right to construct, use, protect, inspect and maintain a new culvert and equipment Work No. 1(cc)
3/3c New right to construct, use, protect, inspect and maintain a new electrical pole and equipment for the benefit of Western Power Distribution Work No. 19
3/3g New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work Nos. 1(d) and 2(d)
3/3k New right to construct, use, protect, inspect and maintain a new private means of access north of the B3284 at Callestick Vean to Creegmeor Farm New right to construct, use, protect, inspect and maintain a new bridleway (PR4) from west to east to connect BR314/64/1 and BR314/65/1 Work No. 4
3/4b New right to construct, use, protect, inspect and maintain a new culvert, ditch and equipment Work No. 1(cc)
3/5 New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work Nos. 1(d) and 2(d)
3/5a New right to construct, use, protect, inspect and maintain a new drainage ditch and equipment Work No. 1(bb)
3/5b New right to construct, use, protect, inspect and maintain a new private means of access north of the B3284 at Callestick Vean to Creegmeor Farm New right to construct, use, protect, inspect and maintain a new bridleway (PR4) from west to east to connect BR314/64/1 and BR314/65/1 Work No. 4
Land Plans – Sheet 4 Land Plans – Sheet 4 Land Plans – Sheet 4
4/4f New right to construct, use, protect, inspect and maintain a new gas pipeline and equipment for the benefit of Wales and West Utilities Limited Work No. 22
4/4k New right to construct, use, protect, inspect and maintain a new gas pipeline and equipment for the benefit of Wales and West Utilities Limited Work No. 22
4/4q New right to construct, use, protect, inspect and maintain a new gas pipeline and equipment for the benefit of Wales and West Utilities Limited Work No. 22
4/4v New right to construct, use, protect, inspect and maintain a new gas pipeline and equipment for the benefit of Wales and West Utilities Limited Work No. 22
4/8d New right to construct, use, protect, inspect and maintain a new gas pipeline and equipment for the benefit of Wales and West Utilities Limited Work No. 22
4/8j New right to construct, use, protect, inspect and maintain a new gas pipeline and equipment for the benefit of Wales and West Utilities Limited Work No. 22
4/9 New right to construct, use, protect, inspect and maintain a new culvert and equipment Work No. 1(cc)
4/9e New right to construct, use, protect, inspect and maintain a new gas pipeline and equipment for the benefit of Wales and West Utilities Limited New right to construct, use, protect, inspect and maintain a new culvert and equipment 4/9e
4/9f New right to demolish existing structure and construct, use, protect, inspect and maintain a new gas pipeline and equipment for the benefit of Wales and West Utilities Limited Work No. 22
4/10 New right to construct, use, protect, inspect and maintain a new gas pipeline and equipment for the benefit of Wales and West Utilities Limited Work No. 22
4/10f New right to construct, use, protect, inspect and maintain a private access to Nanteague Farm New right of access with or without vehicles plant and machinery for the benefit of KS SPV 11 Limited Work No. 1
4/10g New right to construct, use, protect, inspect and maintain a new gas pipeline and equipment for the benefit of Wales and West Utilities Limited New right to construct, use, protect, inspect and maintain a new culvert and equipment Work Nos. 1(bb) and 22
4/10h New right to construct, use, protect, inspect and maintain a new drainage ditch and equipment Work No. 1(bb)
4/10k New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(e)
4/10m New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(e)
4/10n New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment 4/10n
4/10r New right to construct, use, protect, inspect and maintain a private access to Nanteague Farm New right of access with or without vehicles plant and machinery for the benefit of KS SPV 11 Limited Work No. 1
4/10s New right to construct, use, protect, inspect and maintain a new gas pipeline and equipment for the benefit of Wales and West Utilities Limited Work No. 22
4/10t New right to construct, use, protect, inspect and maintain a private access to Nanteague Farm New right of access with or without vehicles plant and machinery for the benefit of KS SPV 11 Limited Work No. 1
Land Plans – Sheet 5 Land Plans – Sheet 5 Land Plans – Sheet 5
5/2a New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of Wales and West Utilities Limited Work No. 22
5/2g New right to construct, use, protect, inspect and maintain a private access to Nanteague Farm New right of access with or without vehicles plant and machinery for the benefit of KS SPV 11 Limited New right to construct, use, protect, inspect and maintain a new culvert and equipment Work Nos. 1 and 1(cc)
5/2h New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of Wales and West Utilities Limited Work No. 22
5/2j New right to construct, use, protect, inspect and maintain a private access to Nanteague Farm New right of access with or without vehicles plant and machinery for the benefit of KS SPV 11 Limited New right to construct, use, protect, inspect and maintain a new culvert and equipment Work Nos. 1 and 1(cc)
5/3 New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of South West Water New right to construct, use, protect, inspect and maintain a new culvert and equipment Work No. 25
5/7a New right to construct, use, protect, inspect and maintain a new bat roost and equipment Work No. 1
5/7b New right to construct, use, protect, inspect and maintain a new bridleway (PR7) and a new footpath Work No. 1(m)
5/7g New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(f)
5/7h New right to construct, use, protect, inspect and maintain a new bridleway (PR7) and a new footpath Work No. 1(m)
5/8a New right to construct, use, protect, inspect and maintain a new bridleway (PR7) and a new footpath Work No. 1(m)
5/8b New right to construct, use, protect, inspect and maintain a new bridleway (PR7) and a new footpath Work No. 1(m)
5/9b New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(f)
5/11 New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(f)
5/11a New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(f)
Land Plans – Sheet 6 Land Plans – Sheet 6 Land Plans – Sheet 6
6/1g New right to construct, use, protect, inspect and maintain a new bridleway New right to construct, use, protect, inspect and maintain a private access to fields for Boswellick Farm Work No. 1
6/1r New right to construct, use, protect, inspect and maintain a new drainage ditch and equipment Work No. 1(bb)
6/7f New right to construct, use, protect, inspect and maintain a new bridleway New right to construct, use, protect, inspect and maintain a private access to fields for Boswellick Farm Work No. 1
6/8a New right to construct, use, protect, inspect and maintain a new bridleway New right to construct, use, protect, inspect and maintain a private access to fields for Boswellick Farm Work No. 1
6/10a New right to construct, use, protect, inspect and maintain a new bridleway New right to construct, use, protect, inspect and maintain a private access to fields for Boswellick Farm Work No. 1
6/10f New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(g)
6/11g New right to construct, use, protect, inspect and maintain a private access to fields for Trevalso Farm Work No. 1
6/11h New right to construct, use, protect, inspect and maintain a private access to fields for Trevalso Farm Work No. 1
6/11j New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of South West Water Work No. 36
6/11n New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of South West Water Work No. 36
6/11p New right to construct, use, protect, inspect and maintain a private access to fields for Trevalso Farm Work No. 1
6/11q New right to construct, use, protect, inspect and maintain a new drainage ditch and equipment Work No. 1(bb)
Land Plans – Sheet 7 Land Plans – Sheet 7 Land Plans – Sheet 7
7/2 New right to construct, use, protect, inspect and maintain new electrical apparatus and equipment for the benefit of Western Power Distribution Work No. 37
7/3b New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of South West Water Work No. 36
7/3e New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of South West Water New right to construct, use, protect, inspect and maintain a private access to fields for Trevalso Farm Work No. 36
7/3f New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of South West Water Work No. 36
7/3g New right to construct, use, protect, inspect and maintain a new drainage pipeline and equipment Work No. 10(c)
7/3k New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 10(c)
7/3m New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 10(c)
7/3n New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 10(c)
7/3r New right to construct, use, protect, inspect and maintain a new drainage outlet ditch and equipment Work No. 10(c)
7/3s New right to construct, use, protect, inspect and maintain a new drainage outlet ditch and equipment Work No. 10(c)
7/3t New right to construct, use, protect, inspect and maintain a new drainage outlet ditch and equipment Work No. 10(c)
7/3u New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of South West Water Work No. 36
7/3v New right to construct, use, protect, inspect and maintain a new drainage outlet ditch and equipment Work No. 10(c)
7/3x New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of South West Water New right to construct, use, protect, inspect and maintain a private access to fields for Trevalso Farm Work No. 36
7/3y New right to construct, use, protect, inspect and maintain a new culvert and equipment Work No. 1(cc)
7/3z New right to construct, use, protect, inspect and maintain a new culvert and equipment Work No. 1(cc)
7/3aa New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of South West Water Work Nos. 10(d) and 36
7/4c New right to construct, use, protect, inspect and maintain new electrical apparatus and equipment for the benefit of Western Power Distribution Work No. 40
7/7 New right to construct, use, protect, inspect and maintain a new drainage outlet ditch and equipment Work No. 10(c)
7/9 New right to construct, use, protect, inspect and maintain new electrical apparatus and equipment for the benefit of Western Power Distribution Work No. 40
Land Plans – Sheet 8 Land Plans – Sheet 8 Land Plans – Sheet 8
8/2c Required for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton.
8/3k New right to construct, use, protect, inspect and maintain a new culvert and equipment Work No. 1(cc)
8/3m New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(i)
8/3n New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and ditch and equipment Work No. 1(i)
8/6b New right to construct, use, protect, inspect and maintain a new drainage outlet ditch and equipment Work No. 1(i)
8/6e New right to construct, use, protect, inspect and maintain new electrical apparatus and equipment for the benefit of Western Power Distribution Work No. 43
Land Plans – Sheet 9 Land Plans – Sheet 9 Land Plans – Sheet 9
9/1s New right to construct, use, protect, inspect and maintain a new culvert and equipment Work No. 1(cc)
9/2c New right to construct, use, protect, inspect and maintain a new water pipeline and equipment for the benefit of South West Water Work No. 45
Land Plans – Sheet 10 Land Plans – Sheet 10 Land Plans – Sheet 10
10/1t New right of access with or without vehicles plant and machinery Work No. 1(l)
10/2 New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(l)
10/2a New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(l)
10/3 New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(l)
10/3b New right to construct, use, protect, inspect and maintain a new drainage outlet pipeline and equipment Work No. 1(l)
10/3d New right of access with or without vehicles plant and machinery Work No. 1(l)

SCHEDULE 6 — MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS AND IMPOSITION OF RESTRICTIVE COVENANTS

Compensation enactments

1

The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply, with the necessary modifications as respects compensation, in the case of a compulsory acquisition under this Order of a right by the creation of a new right or imposition of a restrictive covenant as they apply as respects compensation for the compulsory purchase of land and interests in land.

2
  • (1) Without limitation on the scope of paragraph 1, the 1961 Act has effect subject to the modification set out in sub-paragraph (2).
  • (2) For section 5A(5A) (relevant valuation date) of the 1961 Act substitute—

(5A) If— (a) the acquiring authority enters on land for the purposes of exercising a right in pursuance of a notice of entry under section 11(1) of the Compulsory Purchase Act 1965 (as modified by paragraph 5(5) of Schedule 6 to the A30 Chiverton to Carland Cross Development Consent Order 2020 (the “2020 Order”)); (b) the acquiring authority is subsequently required by a determination under paragraph 12 of Schedule 2A to the Compulsory Purchase Act 1965 (as substituted by paragraph 5(8) of Schedule 6 to the 2020 Order) to acquire an interest in the land; and (c) the acquiring authority enter on and take possession of that land, the authority is deemed for the purposes of subsection (3)(a) to have entered on that land when it entered on that land for the purpose of exercising that right.

3
  • (1) Without limitation on the scope of paragraph 1, the Land Compensation Act 1973[^f00068] has effect subject to the modifications set out in sub-paragraph (2).
  • (2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 (measure of compensation in case of severance) of the 1965 Act as substituted by paragraph 5(3)—
  • (a) for “land is acquired or taken from” substitute “a right or restrictive covenant over land is purchased from or imposed on”; and
  • (b) for “acquired or taken from him” substitute “over which the right is exercisable or the restrictive covenant enforceable”.

Application of Part 1 of the 1965 Act

4

Part 1 of the 1965 Act, as applied by section 125 (application of compulsory acquisition provisions) of the 2008 Act (and modified by article 29 (modification of Part 1 of the 1965 Act)) to the acquisition of land under article 23 (compulsory acquisition of land), applies to the compulsory acquisition of a right by the creation of a new right, or to the imposition of a restrictive covenant under article 26(1) (compulsory acquisition of rights)—

  • (a) with the modifications specified in paragraph 5; and
  • (b) with such other modifications as may be necessary.
5
  • (1) The modifications referred to in paragraph 4(a) are as follows.
  • (2) References in the 1965 Act to land are, in the appropriate contexts, to be read (according to the requirements of the particular context) as referring to, or as including references to—
  • (a) the right acquired or to be acquired, or the restriction imposed or to be imposed; or
  • (b) the land over which the right is or is to be exercisable, or the restriction is or is to be enforceable.
  • (3) For section 7 (measure of compensation in case of severance) of the 1965 Act substitute—

(7) In assessing the compensation to be paid by the acquiring authority under this Act, regard must be had not only to the extent (if any) to which the value of the land over which the right is to be acquired or the restrictive covenant is to be imposed is depreciated by the acquisition of the right or the imposition of the restrictive covenant but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.

  • (4) The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—
  • (a) section 9(4) (failure by owners to convey);
  • (b) paragraph 10(3) of Schedule 1 (owners under incapacity);
  • (c) paragraph 2(3) of Schedule 2 (absent and untraced owners); and
  • (d) paragraphs 2(3) and 7(2) of Schedule 4 (common land),

are modified so as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired or the restrictive covenant which is to be imposed is vested absolutely in the acquiring authority.

  • (5) Section 11[^f00069] (powers of entry) of the 1965 Act is modified so as to secure that, where the acquiring authority has served notice to treat in respect of any right or restrictive covenant, as well as the notice of entry required by subsection (1) of that section (as it applies to a compulsory acquisition under article 23), it has power, exercisable in equivalent circumstances and subject to equivalent conditions, to enter for the purpose of exercising that right or enforcing that restrictive covenant; and sections 11A[^f00070] (powers of entry: further notices of entry), 11B[^f00071] (counter-notice requiring possession to be taken on specified date), 12[^f00072] (unauthorised entry) and 13[^f00073] (refusal to give possession to acquiring authority) of the 1965 Act are modified correspondingly.
  • (6) Section 20[^f00074] (tenants at will, etc.) of the 1965 Act applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right or the enforcement of the restrictive covenant in question.
  • (7) Section 22 (interests omitted from purchase) of the 1965 Act as modified by article 29(4) is also modified so as to enable the acquiring authority in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired or enforce the restrictive covenant imposed, subject to compliance with that section as respects compensation.
  • (8) For Schedule 2A of the 1965 Act substitute—

SCHEDULE 2A (1) (1) This Schedule applies where an acquiring authority serves a notice to treat in respect of a right over, or a restrictive covenant affecting, the whole or part of a house, building or factory and have not executed a general vesting declaration under section 4 of the 1981 Act as applied by article 30 (application of the 1981 Act) of the A30 Chiverton to Carland Cross Development Consent Order 2020 in respect of the land to which the notice to treat relates. (2) But see article 31(3) (acquisition of subsoil or airspace only) of the A30 Chiverton to Carland Cross Development Consent Order 2020 which excludes the acquisition of subsoil or airspace only from this Schedule. (2) In this Schedule, “house” includes any park or garden belonging to a house. (3) A person who is able to sell the house, building or factory (“the owner”) may serve a counter-notice requiring the acquiring authority to purchase the owner’s interest in the house, building or factory. (4) A counter-notice under paragraph 3 must be served within the period of 28 days beginning with the day on which the notice to treat was served. (5) On receiving a counter-notice, the acquiring authority must decide whether to— (a) withdraw the notice to treat, (b) accept the counter-notice, or (c) refer the counter-notice to the Upper Tribunal. (6) The authority must serve notice of their decision on the owner within the period of 3 months beginning with the day on which the counter-notice is served (“the decision period”). (7) If the authority decide to refer the counter-notice to the Upper Tribunal they must do so within the decision period. (8) If the authority do not serve notice of a decision within the decision period it is to be treated as if it had served notice of a decision to withdraw the notice to treat at the end of that period. (9) If the authority serve notice of a decision to accept the counter-notice, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in the house, building or factory. (10) On a referral under paragraph 7, the Upper Tribunal must determine whether the acquisition of the right of the imposition of the restrictive covenant would— (a) in the case of a house, building or factory, cause material detriment to the house, building or factory, or (b) in the case of a park or garden, seriously affect the amenity or convenience of the house to which the park or garden belongs. (11) In making the determination, the Upper Tribunal must take into account— (a) the effect of the acquisition of the right or the imposition of the covenant, (b) the use to be made of the right or covenant proposed to be acquired or imposed, and (c) if the right or covenant is proposed to be acquired or imposed for works or other purposes extending to other land, the effect of the whole of the works and the use of the other land. (12) If the Upper Tribunal determines that the acquisition of the right or the imposition of the covenant would have either of the consequences described in paragraph 10, it must determine how much of the house, building or factory the acquiring authority ought to be required to take. (13) If the Upper Tribunal determines that the acquiring authority ought to be required to take some or all of the house, building or factory, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in that land. (14) (1) If the Upper Tribunal determines that the acquiring authority ought to be required to take some or all of the house, building or factory, the acquiring authority may at any time within the period of 6 weeks beginning with the day on which the Upper Tribunal makes its determination withdraw the notice to treat in relation to that land. (2) If the acquiring authority withdraws the notice to treat under this paragraph it must pay the person on whom the notice was served compensation for any loss or expense caused by the giving and withdrawing of the notice. (15) Any dispute as to the compensation is to be determined by the Upper Tribunal.

SCHEDULE 7 — LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.