The Midland Metro (Birmingham Eastside Extension) Order 2020
- (2) If during the construction of a specified work by the Authority, Network Rail gives notice to the Authority that Network Rail desires itself to construct that part of the specified work which in the opinion of the engineer is endangering the stability of railway property or the safe operation of traffic on the railways of Network Rail then, if the Authority decides that part of the specified work is to be constructed, Network Rail must assume construction of that part of the specified work and the Authority must, regardless of any such approval of a specified work under paragraph 5(3), pay to Network Rail all reasonable expenses to which Network Rail may be put and compensation for any loss which it may suffer by reason of the execution by Network Rail of that specified work.
- (3) The engineer must, in respect of the capitalised sums referred to in this paragraph and paragraph 10(a), provide such details of the formula by which those sums have been calculated as the Authority may reasonably require.
- (4) If the cost of maintaining, working or renewing railway property is reduced in consequence of any such alterations or additions a capitalised sum representing such saving is to be set off against any sum payable by the Authority to Network Rail under this paragraph.
10
The Authority must repay to Network Rail all reasonable fees, costs, charges and expenses reasonably incurred by Network Rail—
- (a) in constructing any part of a specified work on behalf of the Authority as provided by paragraph 5(3) or in constructing any protective works under the provisions of paragraph 5(4) including, in respect of any permanent protective works, a capitalised sum representing the cost of maintaining and renewing those works;
- (b) in respect of the approval by the engineer of plans submitted by the Authority and the supervision by the engineer of the construction of a specified work;
- (c) in respect of the employment or procurement of the services of any inspectors, signallers, watchkeepers and other persons whom it is reasonably necessary to appoint for inspecting, signalling, watching and lighting railway property and for preventing, so far as may be reasonably practicable, interference, obstruction, danger or accident arising from the construction or failure of a specified work;
- (d) in respect of any special traffic working resulting from any speed restrictions which may in the opinion of the engineer, require to be imposed by reason or in consequence of the construction or failure of a specified work or from the substitution of diversion of services which may be reasonably necessary for the same reason; and
- (e) in respect of any additional temporary lighting of railway property in the vicinity of the specified works, being lighting made reasonably necessary by reason or in consequence of the construction or failure of a specified work.
11
- (1) In this paragraph—
- “EMI” means, subject to sub-paragraph (2), electromagnetic interference with Network Rail apparatus generated by the operation of the authorised development where such interference is of a level which adversely affects the safe operation of Network Rail’s apparatus; and
- “Network Rail’s apparatus” means any lines, circuits, wires, apparatus or equipment (whether or not modified or installed as part of the authorised works) which are owned or used by Network Rail for the purpose of transmitting or receiving electrical energy or of radio, telegraphic, telephonic, electric, electronic or other like means of signalling or other communications.
- (2) This paragraph applies to EMI only to the extent that such EMI is not attributable to any change to Network Rail’s apparatus carried out after approval of plans under paragraph 5(1) for the relevant part of the authorised works giving rise to EMI (unless the Authority has been given notice in writing before the approval of those plans of the intention to make such change).
- (3) Subject to sub-paragraph (5), the Authority must in the design and construction of the authorised works take all measures necessary to prevent EMI and must establish with Network Rail (both parties acting reasonably) appropriate arrangements to verify their effectiveness.
- (4) In order to facilitate the Authority’s compliance with sub-paragraph (3)—
- (a) the Authority must consult with Network Rail as early as reasonably practicable to identify all Network Rail’s apparatus which may be at risk of EMI, and must continue to consult with Network Rail (both before and after formal submission of plans under paragraph 5(1)) in order to identify all potential causes of EMI and the measures required to eliminate them;
- (b) Network Rail must make available to the Authority all information in the possession of Network Rail reasonably requested by the Authority in respect of Network Rail’s apparatus identified under sub-paragraph (a); and
- (c) Network Rail must allow the Authority reasonable facilities for the inspection of Network Rail’s apparatus identified under sub-paragraph (a).
- (5) In any case where it is established that EMI can only reasonably be prevented by modifications to Network Rail’s apparatus, Network Rail must not withhold its consent unreasonably to modifications of Network Rail’s apparatus, but the means of prevention and the method of their execution must be selected in the reasonable discretion of Network Rail, and in relation to such modifications paragraph 5(1) has effect subject to this sub-paragraph.
- (6) If at any time prior to the completion of the authorised development and regardless of any measures adopted under sub-paragraph (3), the testing or commissioning of the authorised works causes EMI then the Authority must immediately upon receipt of notification by Network Rail of such EMI either in writing or communicated orally (such oral communication to be confirmed in writing as soon as reasonably practicable after it has been issued) cease to use (or procure the cessation of use of) the Authority’s apparatus causing such EMI until all measures necessary have been taken to remedy such EMI by way of modification to the source of such EMI or (in the circumstances, and subject to the consent, specified in sub-paragraph (5)) to Network Rail’s apparatus.
- (7) In the event of EMI having occurred—
- (a) the Authority must afford reasonable facilities to Network Rail for access to the Authority’s apparatus in the investigation of such EMI;
- (b) Network Rail must afford reasonable facilities to the Authority for access to Network Rail’s apparatus in the investigation of such EMI; and
- (c) Network Rail must make available to the Authority any additional material information in its possession reasonably requested by the Authority in respect of Network Rail’s apparatus or such EMI.
- (8) Where Network Rail approves modifications to Network Rail’s apparatus under subparagraphs (5) or (6)—
- (a) Network Rail must allow the Authority reasonable facilities for the inspection of the relevant part of Network Rail’s apparatus; and
- (b) any modifications to Network Rail’s apparatus approved under those sub-paragraphs must be carried out and completed by the Authority in accordance with paragraph 6.
- (9) To the extent that it would not otherwise do so, the indemnity referred to in paragraph 15(1) applies to the costs and expenses reasonably incurred or losses suffered by Network Rail through the implementation of the provisions of this paragraph (including costs incurred in connection with the consideration of proposals, approval of plans, supervision and inspection of works and facilitating access to Network Rail’s apparatus) or in consequence of any EMI to which subparagraph (6) applies.
- (10) For the purpose of paragraph 10(a) any modifications to Network Rail’s apparatus under this paragraph is to be deemed to be protective works referred to in that paragraph.
- (11) In relation to any dispute arising under this paragraph the reference in article 53 (arbitration) to the Institution of Civil Engineers is to be read as a reference to the Institution of Electrical Engineers.
12
- (1) If at any time after the completion of a specified work, not being a work vested in Network Rail, Network Rail gives notice to the Authority informing it that the state of maintenance of any part of the specified work appears to be such as adversely affects the operation of railway property, the Authority must, on receipt of such notice, take such steps as may be reasonably necessary to put that specified work in such state of maintenance as not adversely to affect railway property.
- (2) If at any time after the completion of a specified work, being a work vested in Network Rail, the Authority gives notice to Network Rail informing it that the state of maintenance of the specified work appears to be such as adversely affects the operation of the authorised tramway Network Rail must, on receipt of such notice, take such steps as may be reasonably necessary to put that specified work in such state of maintenance as not adversely to affect the authorised tramway.
13
The Authority must not provide any illumination or illuminated sign or signal on or in connection with a specified work in the vicinity of any railway belonging to Network Rail unless it has first consulted Network Rail and it must comply with Network Rail’s reasonable requirements for preventing confusion between such illumination or illuminated sign or signal and any railway signal or other light used for controlling, directing or securing the safety of traffic on the railway.
14
Any additional expenses which Network Rail may reasonably incur in altering, reconstructing or maintaining railway property under any powers existing at the making of this Order by reason of the existence of a specified work must, provided that 56 days’ previous notice of the commencement of such alteration, reconstruction or maintenance has been given to the Authority, be repaid by the Authority to Network Rail.
15
- (1) The Authority must pay to Network Rail all reasonable costs, charges, damages and expenses not otherwise provided for in this Schedule which may be occasioned to or reasonably incurred by Network Rail—
- (a) by reason of the construction or maintenance of a specified work or the failure of such a work; or
- (b) by reason of any act or omission of the Authority or of any person in its employ or of its contractors or others whilst engaged upon a specified work,
and the Authority must indemnify and keep indemnified Network Rail from and against all claims and demands arising out of or in connection with a specified work or any such failure, act or omission: and the fact that any act or thing may have been done by Network Rail on behalf of the Authority or in accordance with plans approved by the engineer or in accordance with any requirement of the engineer or under his supervision does not (if it was done without negligence on the part of Network Rail or of any person in its employ or of its contractors or agents) excuse the Authority from any liability under the provisions of this sub-paragraph.
- (2) Network Rail must give the Authority reasonable notice of any such claim or demand and no settlement or compromise of such a claim or demand is to be made without the prior consent of the Authority.
- (3) The sums payable by the Authority under sub-paragraph (1) include a sum equivalent to the relevant costs.
- (4) Subject to the terms of any agreement between Network Rail and a train operator regarding the timing or method of payment of the relevant costs in respect of that train operator, Network Rail must promptly pay to each train operator the amount of any sums which Network Rail receives under sub-paragraph (3) which relates to the relevant costs of that train operator.
- (5) The obligation under sub-paragraph (3) to pay Network Rail the relevant costs is, in the event of default, enforceable directly by any train operator concerned to the extent that such sums are payable to that operator under sub-paragraph (4).
- (6) In this paragraph—
- “the relevant costs” means the costs, direct losses and expenses (including loss of revenue) reasonably incurred by each train operator as a consequence of any restriction of the use of Network Rail’s railway network as a result of the construction, maintenance or failure of a specified work or any such act or omission as mentioned in subparagraph (1); and
- “train operator” means any person who is authorised to act as the operator of a train by a licence under section 8 (licences) of the Railways Act 1993.
16
Network Rail must, on receipt of a request from the Authority, from time to time provide the Authority free of charge with written estimates of the costs, charges, expenses and other liabilities for which the Authority is or will become liable under this Schedule (including the amount of the relevant costs mentioned in paragraph 15) and with such information as may reasonably enable the Authority to assess the reasonableness of any such estimate or claim made or to be made under this Schedule (including any claim relating to those relevant costs).
17
In the assessment of any sums payable to Network Rail under this Schedule no account is to be taken of any increase in the sums claimed that is attributable to any action taken by or any agreement entered into by Network Rail if that action or agreement was not reasonably necessary and was taken or entered into with a view to obtaining the payment of those sums by the Authority under this Schedule or increasing the sums so payable.
18
The Authority and Network Rail may, subject in the case of Network Rail to compliance with the terms of its network licence, enter into, and carry into effect, agreements for the transfer to the Authority of—
- (a) any railway property shown on the works and land plans and described in the book of reference;
- (b) any lands, works or other property held in connection with any such railway property; and
- (c) any rights and obligations (whether or not statutory) of Network Rail relating to any railway property or any lands, works or other property referred to in this paragraph.
19
Nothing in this Order, or in any enactment incorporated with or applied by this Order, prejudices or affects the operation of Part 1 of the Railways Act 1993.
20
The Authority must no later than 28 days from the date that the plans submitted to and certified by the Secretary of State in accordance with article 51 (certification of plans etc.) are certified by the Secretary of State, provide a set of those plans to Network Rail in the form of a computer disc with read only memory.
SCHEDULE 11 — FOR THE PROTECTION OF THE ENVIRONMENT AGENCY
1
- (1) The following provisions of this Schedule, unless otherwise agreed in writing between the Authority and the Agency, have effect.
- (2) In this Schedule—
- “the Agency” means the Environment Agency;
- “construction” includes execution, placing, altering, replacing, relaying and removal and “construct” and “constructed” are construed accordingly;
- “drainage work” means any watercourse and includes any land which provides or is expected to provide flood storage capacity for any watercourse and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage, flood defence or tidal monitoring;
- “plans” includes sections, drawings, specifications and method statements;
- “specified work” means so much of any work or operation authorised by this Order as is in, on, under, over or within 9 metres of a drainage work or is otherwise likely to— affect any drainage work or the volumetric rate of flow of water in or flowing to or from any drainage work; or affect the flow, purity or quality of water in any watercourse or ground water; and
- “watercourse” includes all rivers, streams, ditches, drains, culverts, dykes, sluices, sewers and passages through which water flows (whether or not the flow is intermittent) except a public sewer or drain.
2
- (1) Before beginning to construct any specified work, the Authority must submit to the Agency plans of the specified work and such further particulars available to it as the Agency may within 28 days of the submission of the plans reasonably require.
- (2) Any such specified work must not be constructed except in accordance with such plans as may be approved in writing by the Agency, or determined under paragraph 11.
- (3) Any approval of the Agency required under this paragraph—
- (a) must not be unreasonably withheld;
- (b) is deemed to have been given if it is neither given nor refused within 2 months of the submission of the plans for approval and, in the case of a refusal, accompanied by a statement of the grounds of refusal; and
- (c) may be given subject to such reasonable requirements as the Agency may make for the protection of any drainage work or for the protection of water resources, or for the prevention of flooding or pollution or in the discharge of its environmental duties.
- (4) The Agency must use its reasonable endeavours to respond to the submission of any plans before the expiration of the period mentioned in sub-paragraph (3)(b).
3
Without limitation on the scope of paragraph 2, the requirements which the Agency may make under that paragraph include conditions requiring the Authority at its own expense to construct such protective works, whether temporary or permanent, during the construction of the specified works (including the provision of flood banks, walls or embankments or other new works and the strengthening, repair or renewal of existing banks, walls or embankments) as are reasonably necessary—
- (a) to safeguard any drainage work against damage; or
- (b) to secure that its efficiency for flood defence purposes is not impaired and that the risk of flooding is not otherwise increased,
by reason of any specified work.
4
- (1) Subject to sub-paragraph (2), any specified work, and all protective works required by the Agency under paragraph 3, must be constructed—
- (a) without unreasonable delay in accordance with the plans approved or deemed to have been approved or settled under this Schedule; and
- (b) to the reasonable satisfaction of the Agency,
and an officer of the Agency is entitled to watch and inspect the construction of such works.
- (2) The Authority must give to the Agency not less than 14 days’ notice in writing of its intention to commence construction of any specified work and notice in writing of its completion not later than 7 days after the date on which it is brought into use.
- (3) If any part of a specified work or any protective work required by the Agency is constructed otherwise than in accordance with the requirements of this Schedule, the Agency may by notice in writing require the Authority at the Authority’s own expense to comply with the requirements of this Schedule or (if the Authority so elects and the Agency in writing consents, such consent not to be unreasonably withheld or delayed) to remove, alter or pull down the work and, where removal is required, to restore the site to its former condition to such extent and within such limits as the Agency reasonably requires.
- (4) Subject to sub-paragraph (5) and paragraph 7, if within a reasonable period, being not less than 28 days from the date when a notice under sub-paragraph (3) is served upon the Authority, it has failed to begin taking steps to comply with the requirements of the notice and subsequently to make reasonably expeditious progress towards their implementation, the Agency may execute the works specified in the notice and any expenditure incurred by it in so doing is recoverable from the Authority.
- (5) In the event of any dispute as to whether sub-paragraph (3) is properly applicable to any work in respect of which notice has been served under that sub-paragraph, or as to the reasonableness of any requirement of such a notice, the Agency must not except in emergency exercise the powers conferred by sub-paragraph (4) until the dispute has been finally determined.
5
- (1) Subject to the provisions of this Schedule and except to the extent that the Agency or another person is liable to maintain any such work and is not precluded by the exercise of the powers conferred by this Order from so doing, the Authority must from the commencement of the construction of the specified works maintain in good repair and condition and free from obstruction any drainage work which is situated within the limits of deviation or on land held by the Authority for the purposes of or in connection with the specified works, whether or not the drainage work is constructed under the powers conferred by this Order or is already in existence.
- (2) If any such drainage work which the Authority is liable to maintain is not maintained to the reasonable satisfaction of the Agency, the Agency may by notice in writing require the Authority to repair and restore the work, or any part of such work, or (if the Authority so elects and the Agency in writing consents, such consent not to be unreasonably withheld or delayed), to remove the work and restore the site to its former condition, to such extent and within such limits as the Agency reasonably requires.
- (3) Subject to paragraph 7, if, within a reasonable period being not less than 28 days beginning with the date on which a notice in respect of any drainage work is served under sub-paragraph (2) on the Authority, the Authority has failed to begin taking steps to comply with the reasonable requirements of the notice and has not subsequently made reasonably expeditious progress towards their implementation, the Agency may do what is necessary for such compliance and may recover any expenditure reasonably incurred by it in so doing from the Authority.
- (4) In the event of any dispute as to the reasonableness of any requirement of a notice served under sub-paragraph (2), the Agency must not except in a case of emergency exercise the powers conferred by sub-paragraph (3) until the dispute has been finally determined.
6
Subject to paragraph 7, if by reason of the construction of any specified work or of the failure of any such work the efficiency of any drainage work for flood defence purposes is impaired, or that drainage work is otherwise damaged, such impairment or damage must be made good by the Authority to the reasonable satisfaction of the Agency and if the Authority fails to do so, the Agency may make good the impairment or damage and recover from the Authority the expense reasonably incurred by it in doing so.
7
Nothing in paragraphs 4(4), 5(3) and 6 authorises the Agency to execute works on or affecting the authorised works.
8
The Authority must indemnify the Agency in respect of all costs, charges and expenses which the Agency may reasonably incur or have to pay or which it may sustain—
- (a) in the examination or approval of plans under this Schedule; and
- (b) in the inspection of the construction of the specified works or any protective works required by the Agency under this Schedule.
9
- (1) Without affecting the other provisions of this Schedule, the Authority must indemnify the Agency from all claims, demands, proceedings, costs, damages, expenses or loss, which may be made or taken against, recovered from, or incurred by, the Agency by reason of—
- (a) any damage to any drainage work so as to impair its efficiency for the purposes of flood defence;
- (b) any raising or lowering of the water table in land adjoining the authorised works or any sewers, drains and watercourses;
- (c) any flooding or increased flooding of any such lands; or
- (d) inadequate water quality in any watercourse or in any groundwater,
which is caused by the construction of any of the specified works or any act or omission of the Authority, its contractors, agents or employees whilst engaged upon the work.
- (2) The Agency must give to the Authority reasonable notice of any such claim or demand and no settlement or compromise may be made without the agreement of the Authority which agreement must not be unreasonably withheld or delayed.
10
The fact that any work or thing has been executed or done by the Authority in accordance with a plan approved or deemed to be approved by the Agency, or to its satisfaction, or in accordance with any directions or award of an arbitrator, does not relieve the Authority from any liability under the provisions of this Schedule.
11
Any dispute arising between the Authority and the Agency under this Schedule, if the parties agree, is to be determined by arbitration under article 53 (arbitration), but otherwise is to be determined by the Secretary of State for Environment, Food and Rural Affairs and the Secretary of State for Transport acting jointly on a reference to them by the Authority or the Agency, after notice in writing by one to the other.
Signed
Signed by authority of the Secretary of State for the Department for Transport
Susan Anderson — Head of the Transport and Works Act Orders Unit — Department for Transport — 12th February 2020
Explanatory note
(This note is not part of the Order)
EXPLANATORY NOTE
This Order authorises the West Midlands Combined Authority to construct, operate and maintain an extension to the Midland Metro tramway system in Birmingham city centre from the junction of Bull Street and Corporation Street, running east along Lower Bull Street and into Albert Street, across Moor Street Queensway, continuing south under the proposed new High Speed 2 station at Curzon Street and along New Canal Street and Meriden Street, before continuing east along High Street Deritend where the system terminates west of Heath Mill Lane.
The Order authorises the compulsory acquisition and the temporary use of land for the purposes of the works and confers other powers in connection with the construction, operation and maintenance of the works.
A copy of the works and land plans, the traffic regulation plans and the book of reference mentioned in the Order and certified in accordance with article 51 (certification of plans, etc.) may be inspected free of charge during normal working hours at the offices of West Midlands Combined Authority at 16 Summer Lane, Birmingham, B19 3SD.
Footnotes
[^f00001]: S.I. 2006/1466, amended by S.I. 2010/439, S.I. 2011/556, S.I. 2011/2085, S.I. 2012/147, S.I. 2012/1658, S.I. 2012/2590, S.I. 2013/755, S.I. 2014/469, S.I. 2015/377, S.I. 2015/627, S.I. 2015/1682 and S.I. 2017/979.
[^f00002]: 1992 c. 42; section 1 was amended by the Planning Act 2008 (c. 29), Schedule 2, paragraphs 51 and 52; section 5 was amended by S.I. 2012/1659.
[^f00003]: 1961 c. 33.
[^f00004]: 1965 c. 56.
[^f00005]: 1980 c. 66.
[^f00006]: 1984 c. 27.
[^f00007]: 1989 c. xv.
[^f00008]: 1990 c. 8.
[^f00009]: 1991 c. 22.
[^f00010]: S.I. 2005/1794.
[^f00011]: 2017 c. 7.
[^f00012]: S.I. 2016/653.
[^f00013]: 1989 c. 29. There are amendments to section 64(1) not relevant to this Order.
[^f00014]: 1981 c. 67. The definition of “owner” was amended by paragraph 9 of Schedule 15 to the Planning and Compensation Act 1991 (c. 34). There are other amendments to section 7 which are not relevant to this Order.
[^f00015]: 1845 c. 20.
[^f00016]: Section 75 was amended by section 49 of the Transport and Works Act 1992 (c. 42).
[^f00017]: Section 103 was amended by the Statute Law Revision Act 1892 (c. 19), part 3 of Schedule 7 to the Justices of the Peace Act 1949 (c. 101) and section 46 of the Criminal Justice Act 1982 (c. 48).
[^f00018]: Section 145 was amended by the Statute Law Revision Act 1892 (c. 19) and part 2 of Schedule 12 to the Transport Act 1962 (c. 46).
[^f00019]: 1991 c. ii.
[^f00020]: 1962 c. 46. Section 56 was amended by S.I. 2010/439.
[^f00021]: 2005 c. 14.
[^f00022]: 1992 c. vii.
[^f00023]: 1993 c. 43.
[^f00024]: 1992 c. viii.
[^f00025]: As amended by section 102 of, and Schedule 17 to, the Local Government Act 1985 (c. 51) and section 168(2) of, and Schedule 9 to, the New Roads and Street Works Act 1991 (c. 22).
[^f00026]: As amended by sections 35, 37, 38 and 46 of the Criminal Justice Act 1982 (c. 48), section 4 of, and paragraph 45(11) of Schedule 2 to, the Planning (Consequential Provisions) Act 1990 (c. 11) and section 168(1) and (2) of, and Part 1 of Schedule 8 and paragraph 9 of Schedule 9 to, the New Roads and Street Works Act 1991.
[^f00027]: Sections 54, 55, 57, 60, 68 and 69 were amended by section 40(1) and (2) of, and Schedule 1 to, the Traffic Management Act 2004 (c. 18).
[^f00028]: As also amended by section 102 of, and Schedule 17 to, the Local Government Act 1985 (c. 51) and Schedule 9 to the New Roads and Street Works Act 1991 (c. 22).
[^f00029]: As also amended by section 49(2) and 51(9) of the Traffic Management Act 2004.
[^f00030]: As also amended by section 52(3) of the Traffic Management Act 2004.
[^f00031]: As amended by section 42 of the Traffic Management Act 2004.
[^f00032]: S.I. 2016/1154, as amended by S.I. 2017/1012, S.I. 2017/1075, S.I. 2018/110, S.I. 2018/428 and S.I. 2018/575.
[^f00033]: 1991 c. 59.
[^f00034]: 1991 c. 57.
[^f00035]: 2017 c. 20.
[^f00036]: S.I. 1999/1026 was amended by S.I. 2000/1511.
[^f00037]: As amended by section 168(1) of, and paragraph 47 of Part 2 of Schedule 8 to, the New Roads and Street Works Act 1991.
[^f00038]: 1991 c. 56. Section 106 was amended by sections 35(1), 35(8) and 43(2) of, and Schedule 2 to, the Competition and Service (Utilities) Act 1992 (c. 43), sections 36(2) and 99 of the Water Act 2003 (c. 37) and paragraph 16(1) of Schedule 3 to the Flood and Water Management Act 2010 (c. 29).
[^f00039]: S.I. 2016/1154, as amended by S.I. 2017/1012, S.I. 2017/1075, S.I. 2018/110, S.I. 2018/428 and S.I. 2018/575.
[^f00040]: 1991 c. 57.
[^f00041]: Section 10 was amended by section 4 of, and paragraph 13(2) of Schedule 2 to, the Planning (Consequential Provisions) Act 1990 (c. 11) and S.I. 2009/1307.
[^f00042]: OJ No. L 26, 28.1.2012, p.1.
[^f00043]: OJ No. L 206, 22.7.1992, p. 7.
[^f00044]: As amended by paragraph 6 of Schedule 3 to the Planning and Compulsory Purchase Act 2004 (c. 5), paragraph 7(1) and (4) of Schedule 7 to the Planning (Wales) Act 2015 (anaw 4) and paragraphs 1 and 33 of Schedule 12 to the Housing and Planning Act 2016 (c. 22).
[^f00045]: 1979 c. 46.
[^f00046]: 1857 c. 81. Section 25 was substituted by section 2 of Church of England (Miscellaneous Provisions) Measure 2014 (2014 No. 1).
[^f00047]: S.I. 1950/792.
[^f00048]: 1981 c. 67.
[^f00049]: As inserted by section 202(1) of the Housing and Planning Act 2016 (c. 22).
[^f00050]: S.I. 2020/141.
[^f00051]: Subsection (1B) of section 11 was inserted by section 186(1) and (2)(b) of the Housing and Planning Act 2016.
[^f00052]: As inserted by section 186(3) of the Housing and Planning Act 2016.
[^f00053]: S.I. 2020/141.
[^f00054]: As inserted by paragraph 3 of Schedule 3 to the Housing and Planning Act 2016.
[^f00055]: 1981 c. 66.
[^f00056]: Inserted by section 182(2) of the Housing and Planning Act 2016.
[^f00057]: As inserted by section 202(2) of the Housing and Planning Act 2016.
[^f00058]: As amended by paragraph 52(2) of Schedule 2 to the Planning (Consequential Provisions) Act 1990 (c. 11) and paragraph 7 of Schedule 15 to the Housing and Planning Act 2016.
[^f00059]: As amended by paragraph 3 of Schedule 18 to the Housing and Planning Act 2016.
[^f00060]: As inserted by paragraph 6 of Schedule 18 to the Housing and Planning Act 2016.
[^f00061]: Section 11 was amended by section 34(1) of, and Schedule 4 to, the Acquisition of Land Act 1981 (c. 67), section 3 of, and Part 1 of Schedule 1 to, the Housing (Consequential Provisions) Act 1985 (c. 71), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), sections 186(2), 187(2) and 188 of, and paragraph 6 of Schedule 14 and paragraph 3 of Schedule 16 to, the Housing and Planning Act 2016 (c. 22) and S.I. 2009/1307.
[^f00062]: Section 10 was amended by section 4 of, and paragraph 13(2) of Schedule 2 to, the Planning (Consequential Provisions) Act 1990 (c. 11) and S.I. 2009/1307.
[^f00063]: Section 13 was amended by sections 62(3) and 139 of, and paragraph 27 and 28 of Schedule 13, and part 3 of Schedule 23, to, the Tribunals, Courts and Enforcement Act 2007 (c. 15).
[^f00064]: Section 11 was amended by section 34(1) of, and Schedule 4 to, the Acquisition of Land Act 1981 (c. 67), section 3 of, and part 1 of Schedule 1 to, the Housing (Consequential Provisions) Act 1985 (c. 71), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (2006 No 1), sections 186(2), 187(2) and 188 of, and paragraph 6 of Schedule 14 and paragraph 3 of Schedule 16 to, the Housing and Planning Act 2016 (c. 22) and S.I. 2009/1307.
[^f00065]: As amended by section 153 of the Local Government and Housing Act 1989 (c. 42), section 168(1) of, and paragraph 48 of Part 2 of Schedule 8 to, the 1991 Act, section 48 of, and paragraph 29 of Schedule 4 to, the Road Traffic Act 1991 (c. 40), and section 1(6) of, and paragraphs 70 and 82(1) to (3) of Part 2 of Schedule 1 to the Infrastructure Act 2015 (c. 7).
[^f00066]: Section 90(2A) was inserted by section 16(1) of the Transport and Works Act 1992 (c. 42).
[^f00067]: 1990 c. 43.
[^f00068]: Section 79(1) was amended by section 2(2) of the Noise and Statutory Nuisance Act 1993 (c. 40), section 120 of, and paragraph 2(a) of Schedule 17 and paragraph 89(2) of Schedule 22 to, the Environment Act 1995 (c. 25), sections 101(2) and 102(2) of the Clean Neighbourhoods and Environment Act 2005 (c. 16) and sections 109(2), 110(2), 111(2) and 112(2)(a) of the Public Health etc. (Scotland) Act 2008 (asp. 5).
[^f00069]: Section 61 was amended by Schedule 7 to the Building Act 1984 (c. 55), paragraph 15(3) of Schedule 15 to the Environmental Protection Act 1990 (c. 43), Schedule 24 to the Environment Act 1995 and paragraph 10 of Schedule 6 to the Building (Scotland) Act 2003 (asp. 8).
[^f00070]: 1974 c. 40.
[^f00071]: 1978 c. 30.
[^f00072]: S.I. 2020/141.
[^f00073]: 1973 c. 26.
[^f00074]: Section 11 was amended by section 34(1) of, and Schedule 4 to, the Acquisition of Land Act 1981 (c. 67), section 3 of, and Part 1 of Schedule 1 to, the Housing (Consequential Provisions) Act 1985 (c. 71), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), sections 186(2), 187(2) and 188 of, and paragraph 6 of Schedule 14 and paragraph 3 of Schedule 16 to, the Housing and Planning Act 2016 (c. 22) and S.I. 2009/1307.
[^f00075]: Section 11A was inserted by section 186(3) of the Housing and Planning Act 2016.
[^f00076]: Section 11B was inserted by section 187(2) of the Housing and Planning Act 2016.
[^f00077]: Section 12 was amended by section 56(2) of, and Part 1 of Schedule 9 to, the Courts Act 1971 (c. 23) and paragraph 4 of Schedule 16 to the Housing and Planning Act 2016.
[^f00078]: Section 13 was amended by sections 62(3), 139(4) to (9) and 146 of, and paragraphs 27 and 28 of Schedule 13 and Part 3 of Schedule 23 to, the Tribunals, Courts and Enforcement Act 2007 (c. 15).
[^f00079]: Section 20 was amended by paragraph 4 of Schedule 15 to the Planning and Compensation Act 1991 (c. 34) and S.I. 2009/1307.
[^f00080]: Sections 272 to 274 were amended by paragraph 103(1) and (2) of Schedule 17 to the Communications Act 2003 (c. 21).
[^f00081]: Section 279(3) was amended by paragraph 103(1) and (2), and section 280 was amended by paragraph 104, of Schedule 17 to the Communications Act 2003. Sections 280 and 282 were amended by S.I. 2009/1307.
[^f00082]: 2003 c. 21. Schedule 3A was inserted by section 4(2) of, and Schedule 1 to, the Digital Economy Act 2017 (c. 30).
[^f00083]: 1980 c. 66.
[^f00084]: 1993 c. 43. Section 8 was amended by paragraph 4 of Schedule 17 and Part 4 of Schedule 31 to the Transport Act 2000 (c.38), paragraphs 3 and 5 of Schedule 2 to the Railways and Transport Safety Act 2003 (c. 20), paragraph 3 of Schedule 1 and Part 1 of Schedule 13 to the Railways Act 2005 (c. 14) and S.I. 2015/1682.
[^f00085]: 2006 c. 46.
[^f00086]: Section 272 was amended by paragraph 103 of Schedule 17 to the Communications Act 2003 (c. 21).
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.