Apparatus and rights of statutory undertakers and utilities in stopped up streets

36
  • (1) Where a street is stopped up under article 10 (permanent stopping up of streets and private means of access), any statutory utility whose apparatus is under, in, on, along or across the street has the same powers and rights in respect of that apparatus, subject to the provisions of this article, as if this Order had not been made.
  • (2) Where a street is stopped up under article 10 any statutory utility whose apparatus is under, in, on, over, along or across the street may, and if reasonably requested to do so by the undertaker must—
  • (a) remove the apparatus and place it or other apparatus provided in substitution for it in such other position as the utility may reasonably determine and have power to place it; or
  • (b) provide other apparatus in substitution for the existing apparatus and place it in such position as described in sub-paragraph (a).
  • (3) Subject to the following provisions of this article, the undertaker must pay to any statutory utility an amount equal to the cost reasonably incurred by the utility in or in connection with—
  • (a) the carrying out of the relocation works required in consequence of the stopping up of the street; and
  • (b) the doing of any other work or thing rendered necessary by the carrying out of the relocation works.
  • (4) If in the course of the carrying out of relocation works under paragraph (2)—
  • (a) apparatus of a better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus; or
  • (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker, or, in default of agreement, is not determined by arbitration to be necessary, then, if it involves cost in the carrying out of the relocation works exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which, apart from this paragraph, would be payable to the statutory utility by virtue of paragraph (3) is to be reduced by the amount of that excess.

  • (5) For the purposes of paragraph (4)—
  • (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
  • (b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or a manhole is to be treated as if it also had been agreed or had been so determined.
  • (6) An amount which, apart from this paragraph, would be payable to a statutory utility in respect of works by virtue of paragraph (3) (and having regard, where relevant, to paragraph (4)) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the utility any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.
  • (7) Paragraphs (3) to (6) do not apply where the authorised development constitutes major highway works, major bridge works or major transport works for the purposes of Part 3 (street works in England and Wales) of the 1991 Act, but instead—
  • (a) the allowable costs of the relocation works are to be determined in accordance with section 85 (sharing of cost of necessary measures) of that Act and any regulations for the time being having effect under that section; and
  • (b) the allowable costs are to be borne by the undertaker and the statutory utility in such proportions as may be prescribed by any such regulations.
  • (8) In this article “relocation works” means work carried out, or apparatus provided, under paragraph (2).

Recovery of costs of new connection

37
  • (1) Where any apparatus of a statutory utility is removed under article 35 (statutory undertakers and utilities) any person who is the owner or occupier of premises to which a supply was given from that apparatus is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.
  • (2) Paragraph (1) does not apply in the case of the removal of a public sewer but where such a sewer is removed under article 35, any person who is—
  • (a) the owner or occupier of premises the drains of which communicated with that sewer; or
  • (b) the owner of a private sewer which communicated with that sewer,

is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the drain or sewer belonging to that person communicate with any other public sewer or with a private sewerage disposal plant.

  • (3) This article does not have effect in relation to apparatus to which article 36 (apparatus and rights of statutory undertakers and utilities in stopped up streets) or Part 3 of the 1991 Act applies.

Compensation

Disregard of certain interests and improvements

38
  • (1) In assessing the compensation payable to any person on the acquisition from that person of any land or right over any land under this Order, the tribunal must not take into account—
  • (a) any interest in land; or
  • (b) any enhancement of the value of any interest in land by reason of any building erected, works carried out or improvement or alteration made on relevant land,

if the tribunal is satisfied that the creation of the interest, the erection of the building, the carrying out of the works or the making of the improvement or alteration as part of the authorised development was not reasonably necessary and was undertaken with a view to obtaining compensation or increased compensation.

  • (2) In paragraph (1), “relevant land” means the land acquired from the person concerned or any other land with which that person is, or was at the time when the building was erected, the works carried out or the improvement or alteration made as part of the authorised development, directly or indirectly concerned.

Set-off for enhancement in value of retained land

39
  • (1) In assessing the compensation payable to any person in respect of the acquisition from that person under this Order of any land (including the subsoil) the tribunal must set off against the value of the land so acquired any increase in value of any contiguous or adjacent land belonging to that person in the same capacity which will accrue to that person by reason of the construction of the authorised development.
  • (2) In assessing the compensation payable to any person in respect of the acquisition from that person of any new rights over land (including the subsoil) under article 26 (compulsory acquisition of rights, etc.), the tribunal must set off against the value of the rights so acquired—
  • (a) any increase in the value of the land over which the new rights are required; and
  • (b) any increase in value of any contiguous or adjacent land belonging to that person in the same capacity,

which will accrue to that person by reason of the construction of the authorised development.

  • (3) The 1961 Act has effect, subject to paragraphs (1) and (2) as if this Order were a local enactment for the purposes of that Act.

No double recovery

40

Compensation is not payable in respect of the same matter both under this Order and under any other enactment, any contract or any rule of law, or under two or more different provisions of this Order.

PART 4 — OPERATIONAL PROVISIONS

Operation of the new bridge

41
  • (1) The undertaker must operate the new bridge in accordance with the Scheme of Operation.
  • (2) The Scheme of Operation may be varied or replaced by the undertaker at any time—
  • (a) on the undertaker's own volition, with the consent of the harbour authority (such consent not to be unreasonably withheld) or, in accordance with paragraph (5), the consent of the Secretary of State; or
  • (b) following receipt of a request made by the harbour authority for the undertaker to vary or replace the Scheme of Operation, which the undertaker must not unreasonably refuse to agree to, or then delay in proceeding with under this article.
  • (3) Before varying or replacing the Scheme of Operation under paragraph (2), the undertaker must request that the harbour authority consults the PMSC Stakeholder Group on the proposed variation to or replacement of the Scheme of Operation, and on receiving such a request the harbour authority must then consult the PMSC Stakeholder Group at the earliest opportunity.
  • (4) When consulting the PMSC Stakeholder Group under paragraph (3)—
  • (a) the harbour authority must provide to the PMSC Stakeholder Group information relating to the outcome of any review by the harbour authority of its navigation risk assessment or of any other formal risk assessment it may have carried out in connection with the proposed variation to or replacement of the Scheme of Operation; and
  • (b) the undertaker and the harbour authority must have regard to any representations made by the PMSC Stakeholder Group in relation to the proposed variation to or replacement of the Scheme of Operation, prior to the undertaker or the harbour authority providing its consent under paragraph (2)(a) or (b) (as applicable).
  • (5) If the consent of the undertaker or the harbour authority (as applicable) required under paragraph (2) is not given—
  • (a) within 28 days of submission to the other party of an application for its consent to a proposed variation to or replacement of the Scheme of Operation; or
  • (b) before the expiration of any extended deadline for that consent agreed to by the party proposing the amendment, the grant of such an extension not to be unreasonably withheld or delayed, then the proposed variation to or replacement of the Scheme of Operation must be submitted by the undertaker to the Secretary of State for approval.
  • (6) Any submission to the Secretary of State under paragraph (5) must also include a report setting out any representations of the PMSC Stakeholder Group made in response to the proposed variation to or replacement of the Scheme of Operation under paragraph (2).
  • (7) Following submission of the proposed variation to or replacement of the Scheme of Operation to the Secretary of State for approval under paragraph (5), the undertaker or the harbour authority (as applicable) may still grant its consent to the proposed variation to or replacement of the Scheme of Operation at any time prior to the Secretary of State's determination, but if the undertaker or the harbour authority does so it must on the same day inform the other party and the Secretary of State of its consent.
  • (8) The harbour authority must give a general direction imposing the requirements of the Scheme of Operation relating to the masters of vessels on the masters of vessels not less than 21 days prior to the new bridge opening for public use and, in relation to any variation to or replacement of the Scheme of Operation under paragraph (2), with such prior notice as the harbour authority considers appropriate in consultation with the undertaker or, in the event that prior notice cannot be given, as soon as practicable following any variation or replacement.
  • (9) Article 62 (arbitration) does not apply to any dispute arising under this article.
  • (10) In paragraph (8) “general direction” means a harbour direction given by the harbour authority under section 40A of the Harbours Act 1964 that applies generally to Lowestoft Harbour.

Extinguishment of right of navigation within Lake Lothing in connection with authorised development

42
  • (1) For the purpose of protecting the new bridge, the public right of navigation within the areas of Lake Lothing identified in paragraph (2) is extinguished in accordance with the provisions of this article.
  • (2) The areas referred to in paragraph (1) are—
  • (a) in relation to the pier located to the south of the north quay of Lowestoft Harbour, the area between the north quay wall and the outer edge of the fenders surrounding that pier; and
  • (b) in relation to the pier located to the north of the south quay of Lowestoft Harbour, the area between the south quay wall and the outer edge of the fenders surrounding that pier.
  • (3) Paragraph (1) does not take effect until the undertaker has, following practical completion of the new bridge—
  • (a) notified the harbour authority of the date from which the extinguishment is to have effect;
  • (b) published notice of the extinguishment and the date from which the extinguishment is to have effect in Lloyd's List and once in each of two successive weeks in a local newspaper published or circulating in the area of East Suffolk Council, with an interval between the earliest and latest notices of not less than 7 clear days; and
  • (c) displayed notice of the extinguishment and the date from which the extinguishment is to have effect in a conspicuous position adjacent to Lake Lothing from the date of the first notice published under sub-paragraph (b), until at least 7 days after the last notice published under sub-paragraph (b).
  • (4) The date that is notified, published and displayed pursuant to paragraph (3) as the date from which the extinguishment is to have effect must not be earlier than 14 days after the last date on which a notice is published pursuant to paragraph (3).
  • (5) As soon as possible following receipt by the harbour authority of notice given by the undertaker under paragraph (3), the harbour authority must issue a notice to mariners giving the commencement date and other particulars of the extinguishment to which the notice relates.
  • (6) A master of a vessel other than a vessel—
  • (a) which is under the control of the harbour authority;
  • (b) which is carrying out the statutory functions of the harbour authority, or
  • (c) is directed by the harbour master,

must not, except in an emergency, allow a vessel to enter into the areas referred to in paragraph (2) without first obtaining the consent of the undertaker, which may attach reasonable conditions to any consent.

  • (7) Before granting consent under paragraph (6), the undertaker must consult with the harbour master.

Maintenance of authorised development

43
  • (1) The undertaker may at any time maintain the authorised development except to the extent that this Order, or an agreement made under this Order, provides otherwise.
  • (2) Paragraph (1) does not extend to any maintenance works which would give rise to any materially new or materially different environmental effects than those assessed in the environmental statement.

Subsidiary works and operations in Lake Lothing

44
  • (1) Subject to the provisions of this Order, the undertaker may within the Order limits—
  • (a) carry out and maintain works for the accommodation or convenience of vessels within Lake Lothing (including but not limited to berthing and mooring facilities, ladders, buoys, bollards, dolphins, fenders, rubbing strips and fender panels, fender units and pontoons) as may be necessary or convenient for the purposes of, or in connection with or in consequence of, the operation or maintenance of the authorised development; and
  • (b) deepen, widen, capital dredge, maintenance dredge, scour, cleanse, alter and improve the bed of Lake Lothing for the purposes of maintaining the authorised development.
  • (2) Paragraph (1) does not extend to any works which would give rise to any materially new or materially different environmental effects than those assessed in the environmental statement.
  • (3) Except in the case of emergency, before exercising the powers of paragraph (1), the undertaker must use reasonable endeavours to notify the owner of any mooring and the owner or master of any vessel that may be affected by works undertaken in the exercise of the powers under this article.
  • (4) The undertaker must pay compensation to any person entitled to compensation under Part 1 (determination of questions of disputed compensation) of the 1961 Act who suffers any loss or damage from the exercise of the powers conferred by paragraph (1).
  • (5) Any dispute as to a person's entitlement to compensation under paragraph (4) or as to the amount of the compensation must be determined under Part 1 of the 1961 Act.
  • (6) All materials dredged up or removed by the undertaker in exercise of the powers under this article are the property of the undertaker and may be used, sold, deposited or otherwise disposed of by the undertaker.

Protection against dredging by the harbour authority

45
  • (1) The harbour authority must not undertake a capital dredge in Lake Lothing within the limits of dredging without first submitting the plans of the proposed dredging operation to the undertaker for its approval.
  • (2) Approval under paragraph (1) is not to be unreasonably withheld by the undertaker and approval is deemed to have been granted if the undertaker fails to notify the harbour authority of its decision within 28 days of the submission of the plans.
  • (3) The harbour authority must carry out the dredging in accordance with the plans approved under this article or settled by arbitration under article 62 (arbitration).
  • (4) The harbour authority must notify the undertaker at least 5 days before undertaking any maintenance dredge in Lake Lothing within the limits of dredging.

Byelaws

46
  • (1) The undertaker may make byelaws regulating the use and operation of the new bridge and the new bridge infrastructure, the maintenance of order and the conduct of persons in the new bridge area and the mooring of vessels to, and the passage of vessels under, the new bridge.
  • (2) Without limiting the scope of paragraph (1), byelaws made under this article may make provision—
  • (a) preventing interference with, or obstruction of, the operation of the new bridge, including from vessels or other facilities machinery apparatus tools or other things provided in connection with the operation of the new bridge;
  • (b) preventing interference with the new bridge or the new bridge infrastructure;
  • (c) preventing trespass in the new bridge area;
  • (d) preventing nuisances on the new bridge or in the new bridge area;
  • (e) requiring any person in charge of a motor vehicle which is at rest by reason of breakdown on any part of the new bridge or the new bridge approaches to report that fact and the position and circumstances in which the vehicle is at rest to the undertaker;
  • (f) prohibiting any person, other than an appointed person—
  • (i) from carrying out, or attempting to carry out a repair, adjustment or refuelling of such a vehicle to which sub-paragraph (e) applies except with permission expressly given by an appointed person; and
  • (ii) from moving, or attempting to move, such a vehicle from the position in which it is at rest;
  • (g) prohibiting a person from obstructing any action taken by an appointed person for the purpose of removing a vehicle;
  • (h) ensuring the safety of vehicles passing over the new bridge and through the new bridge area; and
  • (i) placing controls on the mooring and passage of vessels.
  • (3) The undertaker must consult the harbour authority before making byelaws under paragraph (1) and in the case of a byelaw the purpose of which is to control the navigation or mooring of vessels in the Order limits, must not make the byelaw without the consent of the harbour authority (such consent not to be unreasonably withheld).
  • (4) From the opening of the new bridge for public use, the byelaws in Schedule 10 (the Lowestoft Third Crossing Byelaws 2020) have effect until such time as they are amended or revoked by byelaws made under paragraph (1) and in the meantime they are to be treated as if they had been made by the undertaker under that paragraph and approved by the harbour authority under paragraph (3).
  • (5) On a date appointed by the undertaker, which must follow—
  • (za) the undertaker having first sought the harbour authority’s written consent to the proposed date not less than 35 days before the date intended to be appointed; and
  • (zb) the harbour authority having consented in writing to the date intended to be appointed (such consent not to be unreasonably withheld) not less than 28 days before that date,

the Lowestoft Harbour Byelaws 1993 are amended as follows—

  • (a) in Byelaw 4 (interpretation) insert the following definitions in the appropriate places alphabetically—
  • the Order” means the Lake Lothing (Lowestoft) Third Crossing Order 2020

the new bridge” means the bridge authorised by Work No. 1 in Schedule 1 (authorised development) to the Order

the new bridge control building” means the bridge control building authorised by Work No. 6 in Schedule 1 (authorised development) to the Order

the new bridge infrastructure” means the infrastructure elements supporting the new bridge including (without limitation) the cables, drainage, electricity and water supplies, and fenders relating to the new bridge, as well as any plant and machinery and any emergency, safety or communications equipment required for the construction, maintenance or operation of the new bridge

the new bridge undertaker” means Suffolk County Council or a person to whom the benefit of the relevant provisions of the Order has been transferred under article 49 (transfer of benefit of Order, etc.) of the Order

; and

the Scheme of Operation” means the Scheme of Operation having effect from time to time under article 41 (operation of the new bridge) of the Order

; and

  • (b) after Part IV (Conduct of Persons on Harbour) insert—

(37A) A master of a vessel must not moor the vessel— (a) to any pier or any other part of the new bridge or the new bridge infrastructure; or (b) in the vicinity of the new bridge if to do so might damage the new bridge or the new bridge infrastructure, or impede its operation in accordance with the Scheme of Operation, without the prior consent of the new bridge undertaker. (37B) A master of a vessel must observe and comply with the river traffic control signal lights exhibited from the new bridge and follow any instructions issued by the new bridge undertaker. (37C) A master of a vessel approaching or departing the new bridge must make every reasonable effort to maintain continuous contact with the new bridge undertaker within the new bridge control building on VHF channel 14 or (if this becomes obsolete) such other means of communication instructed by the new bridge undertaker. (37D) A master of a vessel awaiting passage under the new bridge must— (a) stay clear of the centre channel of Lake Lothing; (b) give transiting vessels sufficient room to manoeuvre; and (c) ensure that that the vessel does not advance beyond the outer edge of the fenders surrounding the new bridge until instructed to proceed by the new bridge undertaker. (37E) Unless otherwise directed by the harbour master, a master of a vessel must direct the vessel to pass under the new bridge by navigating between the two bridge piers which are within Lake Lothing, and must not allow the vessel to pass between a pier and the nearest quay wall of Lowestoft Harbour. (37F) A master of a vessel which has been involved in a collision with the new bridge must, as soon as reasonably practicable, report the occurrence to the new bridge undertaker and as soon as reasonably practicable thereafter provide the new bridge undertaker with details of the collision in writing.

  • (5A) The harbour authority must issue a notice to mariners setting out the changes to the Lowestoft Harbour Byelaws 1993 contained in paragraph (5) and the date on which those changes will have effect, not less than 21 days before the date appointed by the undertaker under paragraph (5).
  • (6) The harbour authority must not—
  • (a) amend or revoke the byelaws inserted into the Lowestoft Harbour Byelaws 1993 by paragraph (5); or
  • (b) make byelaws which affect the new bridge, the new bridge infrastructure or impede operation of the new bridge in accordance with the Scheme of Operation,

without first obtaining the consent of the undertaker, such consent not to be unreasonably withheld.

  • (7) Where there is any inconsistency between the provisions of the Lowestoft Harbour Byelaws 1993 as amended by paragraph (5) or any other byelaws made by the harbour authority and the byelaws made by the undertaker under paragraph (1), the byelaws made by the undertaker under paragraph (1) prevail.
  • (8) Subject to paragraph (9), the provisions of section 236(3) to (8), and (11) of the Local Government Act 1972 (procedure etc., for byelaws) apply in relation to byelaws made by the undertaker under paragraph (1).
  • (9) The undertaker may make byelaws under paragraph (1), in accordance with the procedure in the Byelaws (Alternative Procedure) (England) Regulations 2016 as if those regulations applied to the making, amending and revoking of byelaws under that paragraph.
  • (10) Byelaws made under this article are enforceable as follows—
  • (a) in the case of byelaws made under paragraph (1), by an appointed person; or
  • (b) in the case of the amendments to the Lowestoft Harbour Byelaws 1993, which have effect under paragraph (5), by an appointed person or the harbour authority.
  • (11) A person who breaches a byelaw made under paragraph (1) or (3) commits an offence and is liable on summary conviction to a fine not exceeding level 3 on the standard scale.
  • (12) Where damage to the new bridge is attributable to a person in charge of a vessel being in breach of a byelaw made under paragraph (1), or the amendments to the Lowestoft Harbour Byelaws 1993, which have effect under paragraph (5), the undertaker may recover all expenses reasonably incurred in repairing the damage as a debt.
  • (13) The harbour authority must, within ten days of the receipt of such a request provide all information reasonably requested by the undertaker where the undertaker reasonably suspects that a breach of a byelaw made under paragraph (1) or the amendments to the Lowestoft Harbour Byelaws 1993 which have effect under paragraph (5) has been committed by a person in charge of a vessel.
  • (14) In this article—
  • breakdown” in relation to a motor vehicle, includes mechanical defect, lack of fuel, oil or water required for the vehicle, and any other circumstances in which a person in charge of the vehicle could not immediately, safely and without damage to the vehicle or its accessories, drive it under its own power away from the new bridge; and
  • prescribed” means prescribed by byelaws made under paragraph (1).

Fixed penalty notices

47
  • (1) This article applies where it appears to an appointed person, or in the case of a byelaw having effect by virtue of article 46(5), the harbour authority, that a person has committed an offence as a result of byelaws made under article 46 (byelaws).
  • (2) The appointed person may serve on that person a fixed penalty notice in respect of the offence.
  • (3) Where a person is given a fixed penalty notice under this article in respect of an offence—
  • (a) no proceedings may be instituted for that offence before the expiration of 14 days after the date of the notice; and
  • (b) that person may not be convicted of the offence if the fixed penalty is paid before the expiration of 14 days after the date of the notice.
  • (4) A fixed penalty notice must state—
  • (a) the amount of the fixed penalty;
  • (b) particulars of the circumstances alleged to constitute the offence as are necessary for giving reasonable information of the offence;
  • (c) the time by which and the manner (including the number to be used for payments by credit or debit card) in which the fixed penalty must be paid; and
  • (d) that proceedings may be instituted if payment is not made within the time specified in the fixed penalty notice.
  • (5) The amount of the fixed penalty is—
  • (a) one fifth of the maximum amount of the fine to which the person to whom the fixed penalty notice is issued would be liable on summary conviction provided that person pays the fixed penalty in full within 7 days of issue of the fixed penalty notice; or
  • (b) one half of the maximum amount of the fine to which the person to whom the fixed penalty notice is issued would be liable on summary conviction.
  • (6) An appointed person may require a person to whom this article applies to pay a deposit of one tenth of the maximum amount of the fine to which a person may be liable under level 3 on the standard scale on accepting a fixed penalty notice if that person fails to provide, when requested, a residential address in the United Kingdom.
  • (7) Payment of the deposit must be made—
  • (a) in person to the appointed person by cash, credit or debit card, if the appointed person has the necessary means to accept payment in that manner;
  • (b) by telephone by credit or debit card to the number stipulated in the fixed penalty notice for making payments; or
  • (c) by App.
  • (8) The undertaker must apply the deposit towards payment of the fixed penalty.
  • (9) In any proceedings a certificate which—
  • (a) purports to be signed on behalf an officer of the undertaker appointed under section 151 (financial administration) of the Local Government Act 1972; and
  • (b) states that payment of a fixed penalty was or was not received by a date specified in the certificate,

is evidence of the facts stated.

  • (10) In this article—
  • App” means a software application for use on an electronic device which provides for payment by credit or debit card and which is provided by the undertaker for that purpose;
  • credit card” means a card or similar thing issued to any person, use of which enables the holder to defer payment of the deposit;
  • debit card” means a card or similar thing issued by any person, use of which causes the deposit to be paid by the electronic transfer of funds from any current account of the holder at a bank or other institution providing banking facilities; and
  • fixed penalty notice” means a notice offering the opportunity of the discharge of liability to conviction of an offence under byelaws made under article 46.

PART 5 — MISCELLANEOUS AND GENERAL

Benefit of Order

48
  • (1) Subject to article 49 (transfer of benefit of Order, etc.) and paragraph (2), the provisions of this Order conferring functions on the undertaker have effect solely for the benefit of the undertaker.
  • (2) Paragraph (1) does not apply to the works for which the consent is granted by this Order for the express protection, benefit or accommodation of owners and occupiers of land, statutory undertakers and other persons affected by the authorised development.

Transfer of benefit of Order, etc.

49
  • (1) The undertaker may, with the consent of the Secretary of the State—
  • (a) transfer to another person (“the transferee”) any or all of the benefit of the provisions of this Order that apply to the undertaker; and such statutory rights as may be agreed between the undertaker and the transferee; or
  • (b) grant to another person (“the grantee”) for a period agreed between the undertaker and the grantee any or all of the benefit of the provisions of this Order that apply to the undertaker and such related statutory rights as may be so agreed.
  • (2) Where an agreement has been made in accordance with paragraph (1) references in the provisions of this Order that apply to the undertaker must include references to the transferee or the grantee, as the case may be.
  • (3) The exercise by a person of any benefits or rights conferred in accordance with any transfer or grant under paragraph (1) is subject to the same restrictions, liabilities and obligations as would apply under this Order if those benefits or rights were exercised by the undertaker.
  • (4) The consent of the Secretary of State under this article is not required where the transfer of any provisions of this Order is to be made between the undertaker and the harbour authority or the harbour master.
  • (5) The undertaker must notify the MMO of any transfer of benefit made by the undertaker under this article.
  • (6) Before giving consent under this article to any transfer or grant under paragraph (1), the Secretary of State must consult Cadent and any other party as the Secretary of State considers appropriate.

Planning permission

50

If planning permission is granted under the 1990 Act after this Order comes into force for development partly or wholly within the Order limits and which is not—

  • (a) itself a nationally significant infrastructure project under the 2008 Act or part of such a project; or
  • (b) required to complete or enable the use or operation of any part of the authorised development,

then the carrying out, use or operation of that development under the terms of the planning permission does not constitute a breach of the terms of this Order.

Saving for undertaker's highway and planning functions

51

Except as expressly provided, nothing in this Order is to prejudice the rights, powers and duties of the undertaker under the 1980 Act, the 1990 Act and the 1991 Act in relation to the highways constructed as part of the authorised development.

Application of landlord and tenant law

52
  • (1) This article applies to any agreement entered into by the undertaker under article 49 (transfer of benefit of Order, etc.) so far as it relates to the terms on which any land is subject to a lease granted by or under that agreement.
  • (2) No enactment or rule of law regulating the rights and obligations of landlords and tenants prejudices the operation of any agreement to which this article applies.
  • (3) No enactment or rule of law to which paragraph (2) applies is to apply in relation to the rights and obligations of the parties to any lease granted by or under any such agreement so as to—
  • (a) exclude or in any respect modify any of the rights and obligations of those parties under the terms of the lease, whether with respect to the termination of the tenancy or any other matter;
  • (b) confer or impose on any such party any right or obligation arising out of or connected with anything done or omitted on or in relation to land which is the subject of the lease, in addition to any such right or obligation provided for by the terms of the lease; or
  • (c) restrict the enforcement (whether by action for damages or otherwise) by any party to the lease of any obligation of any other party under the lease.

Traffic regulation measures

53
  • (1) Subject to the provisions of this article, the undertaker may, for the purposes of the authorised development—
  • (a) make provision, in respect of those roads specified in column (2) of Part 1 (speed limits and restricted roads) of Schedule 11 (traffic regulation measures), as to the speed limit and restricted road status of those roads as specified in column (3) of that Part of that Schedule;
  • (b) make provision, in respect of those roads specified in column (2) of Part 2 (traffic regulation measures (clearways and prohibitions)) of Schedule 11, as to the permitting, prohibition or restriction of the stopping, waiting, parking, loading or unloading of vehicles as specified in column (3) of that Part of that Schedule;
  • (c) make provision, in respect of those roads specified in column (2) of Part 3 (revocations and variations of existing traffic regulation orders) of Schedule 11, as to prescribed routes to apply to those roads as specified in column (3) of that Part of that Schedule;
  • (d) in respect of those roads specified in column (2) of Part 3 of Schedule 11, revoke or vary the orders specified in column (3) of that Part of that Schedule in the manner specified in column (4) of that Part of that Schedule; and
  • (e) revoke, amend or suspend in whole or in part any order made, or having effect as if made, under the 1984 Act in so far as it is inconsistent with any prohibition, restriction or other provision made by the undertaker under this paragraph.
  • (2) No speed limit imposed by or under this Order applies to vehicles falling within regulation 3(4) of the Road Traffic Exemptions (Special Forces) (Variation and Amendment) Regulations 2011 when used in accordance with regulation 3(5) of those regulations.
  • (3) Without limiting the scope of the specific powers conferred by paragraph (1) but subject to the provisions of this article and the consent of the traffic authority in whose area the road concerned is situated, the undertaker may, in so far as necessary or expedient for the purposes of, in connection with, or in consequence of the construction, maintenance and operation of the authorised development—
  • (a) revoke, amend or suspend in whole or in part any order made, or having effect as if made, under the 1984 Act;
  • (b) as to the speed at which vehicles may proceed along any road;
  • (c) permit, prohibit or restrict the stopping, waiting, loading or unloading of vehicles on any road;
  • (d) authorise the use as a parking place of any road;
  • (e) make provision as to the direction or priority of vehicular traffic on any road; and
  • (f) permit or prohibit vehicular access to any road,

either at all times or at times, on days or during such periods as may be specified by the undertaker.

  • (4) The power conferred by paragraph (3) may be exercised at any time prior to the expiry of 24 months from the opening of the new bridge for public use but subject to paragraph (7) any prohibition, restriction or other provision made under paragraph (3) may have effect both before and after the expiry of that period.
  • (5) The undertaker must not exercise the powers conferred by paragraph (1) or (3) unless the undertaker has—
  • (a) given not less than—
  • (i) 12 weeks' notice in writing of the undertaker's intention so to do in the case of a prohibition, restriction or other provision intended to have effect permanently; or
  • (ii) 14 days' notice in writing of the undertaker's intention so to do in the case of a prohibition, restriction or other provision intended to have effect temporarily,

to the chief officer of police and to the traffic authority in whose area the road is situated and that notice must include the time periods within which the traffic authority may specify the manner in which, under sub-paragraph (b), the undertaker must advertise its intention to exercise the powers conferred by paragraph (1) or (3); and

  • (b) advertised the undertaker's intention in such manner as the traffic authority may specify in writing within 28 days of its receipt of notice of the undertaker's intention in the case of sub-paragraph (a)(i) or within 7 days of its receipt of notice of the undertaker's intention in the case of sub-paragraph (a)(ii).
  • (6) Any prohibition, restriction or other provision made by the undertaker under paragraph (1) or (3)—
  • (a) has effect as if duly made by, as the case may be—
  • (i) the traffic authority in whose area the road is situated, as a traffic regulation order under the 1984 Act; or
  • (ii) the local authority in whose area the road is situated, as an order under section 32 (power of local authorities to provide parking spaces) of the 1984 Act,

and the instrument by which it is effected may specify savings and exemptions to which the prohibition, restriction or other provision is subject;

  • (b) is deemed to be a traffic order for the purposes of Schedule 7 (road traffic contraventions subject to civil enforcement) to the 2004 Act.
  • (c) must be advertised in the same manner as the undertaker's intention to make the prohibition, restriction or other provision was under paragraph (5)(b).
  • (7) Any prohibition, restriction or other provision made under this article may be suspended, varied or revoked by the undertaker by subsequent exercise of the powers conferred by paragraph (1) or (3) within a period of 24 months from the opening of the new bridge for public use.
  • (8) Before exercising the powers conferred by paragraphs (1) or (3) the undertaker must consult such persons as the undertaker considers necessary and appropriate and have regard to the representations made to the undertaker by any such person.
  • (9) Expressions used in this article and in the 1984 Act have the same meaning in this article as in that Act.

Clearways

54
  • (1) From such day as the undertaker may determine, except as provided in paragraph (2) below no person is to cause or permit any vehicle to wait on any part of the lengths of road described in column (2) of Part 2 (traffic regulation measures (clearways and prohibitions)) of Schedule 11 (traffic regulation measures) where it is identified that such lengths of road are to become a clearway in the corresponding row of column (3) of that Part, except upon the direction of, or with the permission of, a uniformed constable or uniformed traffic officer.
  • (2) Nothing in paragraph (1) applies—
  • (a) to render it unlawful to cause or permit a vehicle to wait on any part of a road, for so long as may be necessary to enable that vehicle to be used in connection with—
  • (i) the removal of any obstruction to traffic;
  • (ii) the maintenance, improvement, reconstruction or operation of the road;
  • (iii) the laying, erection, inspection, maintenance, alteration, repair, renewal or removal in or near the road of any sewer, main pipe, conduit, wire, cable or other apparatus for the supply of gas, water, electricity, or any electronic communications apparatus as defined in Schedule 3A (the Electronic Communications Code) to the Communications Act 2003 ; or
  • (iv) any building operation or demolition;
  • (b) in relation to a vehicle being used—
  • (i) for police, ambulance, fire and rescue authority or traffic officer purposes;
  • (ii) in the service of a local authority, safety camera partnership or Drive and Vehicle Standards Agency in pursuance of statutory powers or duties;
  • (iii) in the service of a water or sewerage undertaker within the meaning of the Water Industry Act 1991 ; or
  • (iv) by a universal service provider for the purposes of providing a universal postal service as defined by the Postal Services Act 2000 ; or
  • (c) in relation to a vehicle waiting when the person in control of it is—
  • (i) required by law to stop;
  • (ii) obliged to stop in order to avoid an accident; or
  • (iii) prevented from proceeding by circumstances outside the person's control.
  • (3) No person is to cause or permit any vehicle to wait on any part of the roads described in paragraph (1) for the purposes of selling, or dispensing of, goods from that vehicle, unless the goods are immediately delivered at, or taken into, premises adjacent to the land on which the vehicle stood when the goods were sold or dispensed.
  • (4) Paragraphs (1), (2) and (3) have effect as if made by order under the 1984 Act, and their application may be varied or revoked by an order made under that Act or any other enactment which provides for the variation or revocation of such orders.
  • (5) In this article, “traffic officer” means an individual designated under section 2 (designation of traffic officers) of the 2004 Act.

Deemed marine licence

55

The undertaker is granted a deemed marine licence under Part 4 (marine licensing) of the 2009 Act to carry out the activities specified in Part 1 of Schedule 12 (deemed marine licence), subject to the conditions set out in Parts 2 to 4 of that Schedule.

Defence to proceedings in respect of statutory nuisance

56
  • (1) Where proceedings are brought under section 82(1) (summary proceedings by persons aggrieved by statutory nuisance) of the Environmental Protection Act 1990 in relation to a nuisance falling within paragraph (g) of section 79(1) (noise emitted from premises so as to be prejudicial to health or a nuisance) of that Act no order is to be made, and no fine may be imposed, under section 82(2) of that Act if—
  • (a) the defendant shows that the nuisance—
  • (i) relates to premises used by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development and that the nuisance is attributable to the carrying out of the authorised development in accordance with a notice served under section 60 (control of noise on construction sites), or a consent given under section 61 (prior consent for work on construction sites) of the Control of Pollution Act 1974 ; or
  • (ii) is a consequence of the construction or maintenance of the authorised development and that it cannot reasonably be avoided; or
  • (b) the defendant shows that the nuisance is a consequence of the use of the authorised development and that it cannot be reasonably be avoided.
  • (2) Section 61(9) of the Control of Pollution Act 1974 does not apply where the consent relates to the use of premises by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development.

Crown rights

57
  • (1) Nothing in this Order affects prejudicially any estate, right, power, privilege, authority or exemption of the Crown and in particular, nothing in this Order authorises the undertaker or any licensee to take, use, enter upon or in any manner interfere with any land or rights of any description—
  • (a) belonging to Her Majesty in right of the Crown and forming part of the Crown Estate without the consent in writing of the Crown Estate Commissioners;
  • (b) belonging to Her Majesty in right of the Crown and not forming part of the Crown Estate without the consent in writing of the government department having the management of that land; or
  • (c) belonging to a government department or held in trust for Her Majesty for the purposes of a government department without the consent in writing of that government department.
  • (2) Paragraph (1) does not apply to the exercise of any right under this Order for the compulsory acquisition of any interest in any Crown land (as defined in the 2008 Act) which is for the time being held otherwise than by or on behalf of the Crown.
  • (3) A consent given under paragraph (1) may be given unconditionally or subject to terms and conditions; and is deemed to have been given in writing where it is sent electronically.

Protective provisions

58

Schedule 13 (protective provisions) has effect.

Saving for Trinity House

59

Nothing in this Order prejudices or derogates from any of the rights, duties or privileges of Trinity House.

Certification of documents

60
  • (1) As soon as practicable after the making of this Order, the undertaker must submit copies of each of the plans and documents identified in Schedule 14 (documents to be certified) must be certified by the Secretary of State as true copies of those documents.
  • (2) Where any document identified in Schedule 14 requires to be amended to reflect the terms of the Secretary of State's decision to make this Order, that document in the form amended to the Secretary of State's satisfaction is the version of the document required to be certified under paragraph (1).
  • (3) A plan or document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.
  • (4) The undertaker must, following certification of the plans and documents in accordance with paragraph (1) make those plans and documents available in electronic form for inspection by members of the public.

Service of notices

61
  • (1) A notice or other document required or authorised to be served for the purposes of this Order may be served—
  • (a) by post;
  • (b) by delivering it to the person on whom it is to be served or to whom it is to be given or supplied; or
  • (c) with the consent of the recipient and subject to paragraphs (6) to (9) by electronic transmission.
  • (2) Subject to paragraph (3), where the person on whom a notice or other document to be served for the purposes of this Order is a body corporate, the notice or document is duly served if it is served on the secretary or clerk of that body.
  • (3) Notices to the harbour authority served by the methods set out in paragraph 1(a) or (b) must be served to the following locations—
  • (a) Associated British Ports, 25 Bedford Street, London WC2E 9ES; and
  • (b) Port of Lowestoft, North Quay Cargo Terminal, Commercial Road, Lowestoft, NR32 2TE.
  • (4) For the purposes of section 7 (references to service by post) of the Interpretation Act 1978 as it applies for the purposes of this article, the proper address of any person in relation to the service on that person of a notice or document under paragraph (1) is, if that person has given an address for service, that address, and otherwise—
  • (a) in the case of the secretary or clerk of a body corporate, the registered or principal office of that body; and
  • (b) in any other case, the last known address of that person at the time of service.
  • (5) Where for the purposes of this Order a notice or other document is required or authorised to be served on a person as having any interest in, or as the occupier of, land and the name or address of that person cannot be ascertained after reasonable enquiry, the notice may be served by—
  • (a) addressing it to that person by name or by the description of “owner”, or as the case may be “occupier”, of the land (describing it); and
  • (b) either leaving it in the hands of a person who is or appears to be resident or employed on the land or leaving it conspicuously affixed to some building or object on or near the land.
  • (6) Where a notice or other document required to be served or sent for the purposes of this Order is served or sent by electronic transmission the requirement is taken to be fulfilled only where—
  • (a) the recipient of the notice or other document to be transmitted has given consent to the use of electronic transmission in writing or by electronic transmission;
  • (b) the notice or document is capable of being accessed by the recipient;
  • (c) the notice or document is legible in all material respects; and
  • (d) the notice or document is in a form sufficiently permanent to be used for subsequent reference.
  • (7) Where the recipient of a notice or other document served or sent by electronic transmission notifies the sender within 7 days of receipt that the recipient requires a paper copy of all or part of that notice or other document the sender must provide such a copy as soon as reasonably practicable.
  • (8) Any consent to the use of electronic communication given by a person may be revoked by that person in accordance with paragraph (9).
  • (9) Where a person is no longer willing to accept the use of electronic transmission for any of the purposes of this Order—
  • (a) that person must give notice in writing or by electronic transmission revoking any consent given by that person for that purpose; and
  • (b) such revocation is final and takes effect on a date specified by the person in the notice but that date must not be less than 7 days after the date on which the notice is given.
  • (10) This article must not be taken to exclude the employment of any method of service not expressly provided for by it.
  • (11) In this article “legible in all material respects” means that the information contained in the notice or document is available to that person to no lesser extent than it would be if served, given or supplied by means of a notice or document in printed form.

Arbitration

62
  • (1) Except where otherwise expressly provided for in this Order and unless otherwise agreed in writing between the parties, any difference under any provision of this Order (other than a difference which falls to be determined by the tribunal) must be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after giving notice in writing to the other) by the President of the Institution of Civil Engineers.
  • (2) Subject to any other provision of this Order, any arbitration to be undertaken under paragraph (1) must be carried out using the same process as is set out in sub-paragraphs (2)(d) to (f), (4) to (8) and (12) of paragraph 19 of Schedule 2 subject to the modifications set out in paragraph (3).
  • (3) The modifications referred to in paragraph (2) are that references in those provisions of Schedule 2 to each of the terms set out in column (1) of the following table are replaced by the corresponding term in column (2) of the table—
(1) (2)
the adjudicator the arbitrator appointed under article 62(1)
the appeal the difference referred to arbitration
the discharging authority the person or body with whom the difference with the undertaker referred to arbitration exists

Consents, agreements, certifications and approvals

63
  • (1) Where any application is made to a relevant authority, the consent, agreement or approval concerned must, if given, be given in writing and is not to be unreasonably withheld or delayed.
  • (2) If a relevant authority which has received an application fails to notify the undertaker of its decision before the end of the period of 28 days beginning with the date on which the application was received, the relevant authority is deemed to have given its consent, certification, agreement or approval, as the case may be.
  • (3) Any application to which this article applies must include a written statement that the provisions of paragraph (2) apply to that application.
  • (4) In this article—
  • application” means an application or request for any consent, agreement or approval required or contemplated by articles 6 (street works), 8 (construction and maintenance of new, altered or diverted streets), 11 (temporary stopping up and restriction of use of streets), 12 (access to works), 15 (discharge of water), 17 (authority to survey and investigate land) and 53 (traffic regulation measures); and
  • relevant authority” means a planning authority, a traffic authority, a highway authority or a street authority.

SCHEDULE 1 — AUTHORISED DEVELOPMENT

In the administrative area of East Suffolk Council

A development which, in accordance with a direction made by the Secretary of State for Transport on 22 March 2016 under section 35 of the 2008 Act, is development for which development consent is required, and associated development within the meaning of section 115(2) of the 2008 Act, comprising—

Work No. 1 –as shown on sheets 1 and 2 of the works plans and being the construction of new highway comprising—

  • (a) Work No. 1A
  • (i) the construction of new highway comprising carriageway and cycleway and forming the new bridge northern approach;
  • (ii) the construction of a new roundabout, together with related approach roads and adjacent cycleways;
  • (iii) the construction of earth embankments supporting the new highway;
  • (iv) the construction of a building to accommodate electrical plant and the installation of electrical apparatus; and
  • (v) associated landscaping.
  • (b) Work No. 1B
  • (i) the construction of new highway comprising carriageway and cycleway;
  • (ii) the construction of a bridge deck supporting the new highway;
  • (iii) the construction of an abutment and pier supporting the new bridge deck;
  • (iv) the construction of piles and pile caps supporting the abutment and pier; and
  • (v) the construction of new private means of access as shown on sheet 1 of the rights of way and access plans.
  • (c) Work No. 1C
  • (i) the construction of new highway comprising carriageway and cycleway;
  • (ii) the construction of a bridge deck supporting the new highway;
  • (iii) the construction of piers supporting the new bridge deck;
  • (iv) the construction of piles and pile caps supporting the piers; and
  • (v) the construction of new private means of access as shown on sheet 1 of the rights of way and access plans.
  • (d) Work No. 1D
  • (i) the construction of new highway comprising carriageway and cycleway;
  • (ii) the construction of a bridge deck supporting the new highway;
  • (iii) the construction of piers within the watercourse supporting the new bridge deck;
  • (iv) the construction of piles and pile caps within the watercourse supporting the piers and fendering;
  • (v) the construction of an opening section of bridge and associated barriers and signage; and
  • (vi) the construction of fendering within the watercourse.
  • (e) Work No. 1E
  • (i) the construction of new highway comprising carriageway and cycleway and forming the new bridge southern approach;
  • (ii) the construction of a bridge deck supporting the new highway;
  • (iii) the construction of abutments and piers supporting the new bridge deck;
  • (iv) the construction of piles and pile caps supporting the abutments and piers;
  • (v) the construction of earth embankment with retaining walls to support the new highway;
  • (vi) the construction of new private means of access as shown on sheet 2 of the rights of way and access plans; and
  • (vii) the improvement of existing highways, including realignment, to facilitate tie-ins to Work No. 2.

Work No. 2 –as shown on sheet 2 of the works plans and being the alteration of the existing highway comprising—

  • (a) the construction of a new roundabout, together with related approach roads and adjacent cycleways;
  • (b) the improvement of existing highways, including realignment, to facilitate tie-ins to the works referred to at paragraph (a) above and the construction of new private means of access to premises as shown on sheet 2 of the rights of way and access plans; and
  • (c) construction of new turning head on Durban Road and provision of adjacent cycleway.

Work No. 3 –as shown on sheet 1 of the works plans and comprising—

  • (a) the improvement of existing highways and the provision of new cycleways, including the realignment of existing highways to facilitate tie-ins to Work No. 1A; and
  • (b) the construction of new private means of access as shown on sheet 1 of the rights of way and access plans.

Work No. 4 – as shown on sheet 2 of the works plans and being the construction of new highway comprising carriageway and cycleway and including the construction of a new turning head, to provide access to existing premises including the construction of new private means of access to premises as shown on sheet 2 of the rights of way and access plans.

Work No. 5 –as shown on sheet 2 of the works plans and comprising—

  • (a) the construction of new highway comprising carriageway and cycleway to provide access to existing premises including the construction of new private means of access to premises as shown on sheet 2 of the rights of way and access plans; and
  • (b) the improvement of existing highways, including realignment, to facilitate tie-ins to the existing highway network and Work No.4 and the construction of new private means of access to premises as shown on sheet 2 of the rights of way and access plans.

Work No. 6 –as shown on sheet 2 of the works plans and being the construction of a new control tower building area for the new bridge comprising—

  • (a) the construction of a new control tower building for the operation of the lifting section of the new bridge;
  • (b) the construction of a new electrical substation and plant room; and
  • (c) the construction of new highway to provide a new access road and parking facilities for the new control tower building and electrical substation and plant room referred to in paragraphs (a) and (b), and to accommodate the new private means of access being as shown on sheet 2 of the rights of way and access plans.

Work No. 7 –as shown on sheet 2 of the works plans and being the construction of a new mooring within Lowestoft Harbour.

And for the purposes of or in connection with the construction of any of the works and other development mentioned above, ancillary or related development which does not give rise to any materially new or materially different effects than those assessed in the environmental statement, consisting of—

works within highways, including—

  • (a) alteration of the layout of any street permanently or temporarily, including increasing the width of the carriageway of any street by reducing the width of any kerb, footway, cycleway, or verge within the street; and altering the level or increasing the width of any such kerb, footway, cycleway or verge within the street, works for the strengthening, improvement, repair, maintenance or reconstruction of any street;
  • (b) street works, including breaking up or opening a street, or any sewer, drain or tunnel under it, and tunnelling or boring under a street;
  • (c) relocation or provision of new road traffic signs, signals, street lighting and carriageway lane markings; and
  • (d) works to place, alter, remove or maintain street furniture or apparatus (including statutory undertakers’ apparatus) in, under or above a street, including mains, sewers, drains, pipes, cables, cofferdams, lights, fencing and other boundary treatments;

works within Lake Lothing (to the extent they are situated within the Order limits) to—

  • (e) alter, clean, modify, dismantle, refurbish, reconstruct, remove, relocate or replace any work or structure (including lake walls);
  • (f) carry out excavations and clearance, deepening, scouring, cleansing, dumping and pumping operations;
  • (g) carry out dredging, which may include such dredging works as may be required to provide side slopes or otherwise secure the dredged area against siltation, scouring or collapse;
  • (h) use, appropriate, sell, deposit or otherwise dispose of any materials (including liquids but excluding any wreck within the meaning of the Merchant Shipping Act 1995[^f00082]) obtained in carrying out any such operations;
  • (i) remove and relocate any vessel or structure sunk, stranded, abandoned, moored or left (whether lawfully or not);
  • (j) temporarily remove, alter, strengthen, interfere with, occupy and use the banks, bed, foreshore, waters and walls of the lake;
  • (k) construct, place and maintain works and structures including piled fenders, protection piles and cofferdams; and
  • (l) provide lighting, signage and aids to navigation;

other works and development—

  • (m) for the strengthening, alteration or demolition of any building;
  • (n) to place, alter, divert, relocate, protect, remove or maintain services, plant and other apparatus and equipment belonging to statutory undertakers, utility companies and others in, under or above land, including mains, sewers, drains, pipes, cables, lights, cofferdams, fencing and other boundary treatments including bollards;
  • (o) ramps, steps, footpaths, footways, cycle tracks, cycleways, bridleways, equestrian tracks, non-motorised user routes or links, byways open to all traffic and crossing facilities;
  • (p) embankments, viaducts, bridges, aprons, abutments, shafts, foundations, retaining walls, drainage works, outfalls, pollution control devices, pumping stations, culverts, wing walls, fire suppression system water tanks and associated plant and equipment, highway lighting and fencing;
  • (q) settlement mitigation measures for the benefit or protection of, or in relation to, any land, building or structure, including monitoring and safeguarding of existing infrastructure, utilities and services affected by the authorised development;
  • (r) to alter the course of, or otherwise interfere with, navigable or non-navigable watercourses;
  • (s) landscaping, noise barriers, works associated with the provision of ecological mitigation, and other works to mitigate any adverse effects of the construction, operation or maintenance of the authorised development;
  • (t) areas of hard or soft landscaping works, or public realm, at various locations adjacent to the proposed highway and associated works;
  • (u) site preparation works, site clearance (including fencing and other boundary treatments, vegetation removal, works of demolition, including demolition of existing structures, and the creation of alternative highways or footpaths) and earthworks (including soil stripping and storage and site levelling);
  • (v) construction compounds and working sites, temporary structures, storage areas (including storage of spoil and other materials), temporary vehicle parking, construction fencing, perimeter enclosure, security fencing, construction-related buildings, welfare facilities, office facilities, other ancillary accommodation, construction lighting, haulage roads and other buildings, machinery, apparatus, works and conveniences;
  • (w) service compounds, plant and equipment rooms, offices, staff mess rooms, welfare facilities, and other ancillary and administrative accommodation;
  • (x) for the benefit or protection of the authorised development; and
  • (y) of whatever nature, as may be necessary or expedient for the purposes of, or for purposes associated with or ancillary to, the construction, operation or maintenance of the authorised development.

SCHEDULE 2 — REQUIREMENTS

PART 1 — REQUIREMENTS

Interpretation

1

In this Schedule—

  • county planning authority” means Suffolk County Council in its role as county planning authority for the county of Suffolk under section 1(1)(a) of the 1990 Act ;
  • drainage strategy” means the document of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the drainage strategy for the purposes of this Order and which sets out the principles for the design and mitigation measures associated with the drainage of the authorised development;
  • ground investigation report” means the document of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the ground investigation report for the purposes of this Order;
  • highway lighting plan” means the document of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the highway lighting plan for the purposes of this Order and which set out the proposed highway lighting to be implemented as part of the authorised development;
  • interim code of construction practice” means the document of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the code of construction practice for the purposes of this Order and which sets a framework to control impacts arising from construction of the authorised development;
  • landscaping plans” means the plans of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the landscaping plans for the purposes of this Order and which set out the principles for the proposed landscaping to be implemented as part of the authorised development;
  • new bridge operating signals risk assessment” means the document of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the new bridge operating signals risk assessment for the purposes of this Order;
  • piling works risk assessment” means the document of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the piling works risk assessment for the purposes of this Order;
  • scheme-wide written scheme of investigation” means the document of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the scheme-wide written scheme of investigation for the purposes of this Order and which sets out the framework to control the impacts of the authorised development on heritage assets; and
  • transport assessment” means the document of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as transport assessment for the purposes of this Order and which sets out an assessment of the impact of the Scheme on the surrounding highway network.

Time limit for commencement of the authorised development

2

The authorised development must commence within 5 years of the date on which this Order comes into force.

Design of the authorised development

3
  • (1) The authorised development must be designed and implemented in general accordance with the general arrangement plans.
  • (2) Prior to the commencement of the authorised development the undertaker must submit to the county planning authority a final version of the design guidance manual for approval.
  • (3) The county planning authority must consult the local planning authority before approving the final version of the design guidance manual under sub-paragraph (2).
  • (4) The final version of the design guidance manual submitted under sub-paragraph (2) must be in accordance with the interim design guidance manual.
  • (5) The authorised development must be designed and implemented in accordance with the final version of the design guidance manual approved under sub-paragraph (2).
  • (6) No part of the authorised development which comprises the construction or improvement of a highway may commence until written details of those works have been submitted to and approved by the county planning authority.
  • (7) For the purposes of paragraph (6) “written details” means—
  • (a) highway cross-sections and long sections;
  • (b) details of earthworks, pavement construction, materials, carriageway layout, footways and cycleways, road restraints, road markings, traffic signs, traffic signals, crossing facilities, and street lighting;
  • (c) details of approach ramps, engineered fill, retaining structures, piles and foundations where those details have not already been submitted by the undertaker to the county planning authority as part of a scheme bridge approval in principle report pursuant to Volume 1 Section 1 Part BD2/12 (Technical Approval of Highways Structures) of Highways England's Design Manual for Roads and Bridges; and
  • (d) any other details requested by the county planning authority prior to or within 14 days of receiving a submission by the undertaker under paragraph (6).

Code of construction practice

4
  • (1) No part of the authorised development may commence until a code of construction practice for that part of the authorised development has been submitted to the county planning authority by the undertaker following consultation with the Environment Agency, the harbour authority and the local planning authority and the submitted code of construction practice has been approved by the county planning authority.
  • (2) Any code of construction practice produced under sub-paragraph (1) must be in accordance with the interim code of construction practice.
  • (3) The authorised development must be carried out in accordance with the code of construction practice produced under sub-paragraph (1).

Landscaping scheme

5
  • (1) No part of the authorised development may commence until a written landscaping scheme for the authorised development has been submitted to the county planning authority by the undertaker following consultation with the local planning authority and the written landscaping scheme has been approved in writing by the county planning authority.
  • (2) Any landscaping scheme prepared under sub-paragraph (1) must be in general accordance with the landscaping plans and set out details of all proposed hard and soft landscaping works, including—
  • (a) location, number, species, size and planting density of any proposed planting;
  • (b) cultivation, importing of materials and other operations to ensure plant establishment;
  • (c) proposed finished ground levels;
  • (d) hard surfacing materials;
  • (e) ecological areas;
  • (f) details of any existing trees to be retained;
  • (g) details of the maintenance regime for the landscaping scheme; and
  • (h) implementation timetables for all landscaping works.
  • (3) All landscaping works must be carried out and maintained to a reasonable standard in accordance with the relevant recommendations of appropriate British Standards or other recognised codes of good practice.

Surface water drainage

6
  • (1) No part of the authorised development which comprises any part of a surface water drainage system may commence until written details of that surface water drainage system have been submitted to the county planning authority by the undertaker following consultation with the local planning authority, the harbour authority and the surface water drainage system has been approved in writing by the county planning authority.
  • (2) The surface water drainage system submitted for approval by the county planning authority under sub-paragraph (1) must be in accordance with the drainage strategy.
  • (3) The surface water drainage system must be constructed in accordance with the approved details referred to in sub-paragraph (1).

Highways lighting

7
  • (1) No part of the authorised development may commence until a written scheme of the proposed highway lighting to be provided for that part of the authorised development has been submitted to the county planning authority by the undertaker following consultation with the local planning authority and the harbour authority and the written scheme of the proposed highway lighting for that part of the authorised development has been approved in writing by the county planning authority.
  • (2) The written scheme of proposed highway lighting submitted for approval by the county planning authority under sub-paragraph (1) must be in accordance with the highway lighting plan.
  • (3) The authorised development must be carried out in accordance with the scheme approved under sub-paragraph (1).
  • (4) Nothing in this requirement restricts lighting of the authorised development during its construction or where temporarily required for maintenance.

Contaminated land and groundwater

8
  • (1) The undertaker must carry out further ground investigation surveys—
  • (a) as near as reasonably practicable to boreholes BHC06 and BHC101 referred to in the ground investigation report, prior to the commencement of the construction of Work No. 1E; and
  • (b) of land within the limits of deviation of Work No. 5, prior to the commencement of the construction of Work No. 5.
  • (2) In the event that contaminated land, including groundwater—
  • (a) which was not previously identified in the environmental statement is found at any time when carrying out the authorised development; or
  • (b) is encountered following the further ground investigation of boreholes BHC06 and BHC101 referred to in the ground investigation report carried out under sub-paragraph (1)(a); or
  • (c) is encountered whilst following the further ground investigation within the limits of deviation of Work No. 5 carried out under sub-paragraph (1)(b),

it must be reported as soon as reasonably practicable to the county planning authority, the local planning authority, the Environment Agency, and, in the event of any contaminated land, including groundwater, being found within Lowestoft Harbour, the harbour authority.

  • (3) As soon as reasonably practicable (and in any event not later than 30 days) following the submission of a report pursuant to sub-paragraph (1), the undertaker must submit for approval a scheme to the county planning authority setting out how the nature and extent of contamination on site will be assessed by way of an investigation and risk assessment.
  • (4) The undertaker must implement the approved scheme and upon completion of it submit for approval to the county planning authority a written report of the findings of the scheme.
  • (5) If the county planning authority determines, following receipt of the report submitted by the undertaker pursuant to sub-paragraph (4), that remediation of the contaminated land is necessary, a written scheme and programme for the remedial measures to be taken to render the land fit for its intended purpose, must be submitted for approval by the county planning authority.
  • (6) Remediation must be carried out in accordance with the scheme approved under sub-paragraph (5).
  • (7) Following completion of the remediation carried out pursuant to sub-paragraph (5), a verification report that demonstrates the effectiveness of the remediation carried out must be submitted to the county planning authority for approval.
  • (8) In this paragraph, where approval or determination is sought by the undertaker from the county planning authority, before giving any approval or determination the county planning authority must consult with the local planning authority, the Environment Agency and, where the approval or determination relates to matters within Lowestoft Harbour, the harbour authority.

Mooring

9

The new bridge must not be opened for traffic until Work No. 7 has been made available for use by recreational vessels.

Written schemes of investigation

10

The authorised development must be carried out in accordance with the scheme-wide written scheme of investigation.

11
  • (1) Prior to commencement of construction of the new bridge and following consultation with the harbour authority, the undertaker must undertake a vessel simulation which takes account of the final design of the new bridge.
  • (2) Prior to commencement of construction of the new bridge and following consultation with the harbour authority and the PMSC Stakeholder Group, the undertaker must update the preliminary navigation risk assessment to take account of the final design and construction methodology of the new bridge and, in doing so, must use the results of the vessel simulation carried out under sub-paragraph (1).
  • (3) Following the update of the preliminary navigation risk assessment carried out pursuant to sub-paragraph (2), the undertaker must submit the updated navigation risk assessment to the harbour authority for its approval, which must not be unreasonably withheld.
  • (4) Following construction of the new bridge the harbour authority must incorporate the updated navigation risk assessment approved by it under sub-paragraph (3) into the wider navigational risk assessments relating to Lowestoft Harbour.
  • (5) The construction and operation of the new bridge must be carried out in accordance with the updated navigation risk assessment approved under sub-paragraph (3) and, subject to sub-paragraph (6), in accordance with any further updated navigation risk assessment prepared by the harbour authority in consequence of sub-paragraph (4).
  • (6) The obligation under sub-paragraph (5) to operate the new bridge in accordance with any further updated navigation risk assessment prepared by the harbour authority in consequence of sub-paragraph (4) is subject to the terms of a determination under article 62 of any dispute between the undertaker and the harbour authority that may arise relating to that further updated navigation risk assessment.
  • (7) Article 62 applies to any dispute arising under this paragraph between the undertaker and the harbour authority in place of the provisions of Part 2 of this Schedule.

Traffic mitigation

12
  • (1) The authorised development must not be opened for traffic until the undertaker has carried out and completed the following works—
  • (a) the installation of equipment to adapt traffic signals at the junction of the existing A12 Tom Crisp Way and the existing Blackheath Road;
  • (b) the widening of the existing Peto Way approach to the existing A1117 Normanston Drive/Peto Way roundabout; and
  • (c) the widening of the left turn kerb radius at the existing Kimberley Road for traffic turning left into that road from the existing B1531 Waveney Drive, at the existing Kimberly Road/B1531 Waveney Drive junction.
  • (2) The works required by sub-paragraph (1) must not commence until written details of the works have been submitted to and approved by the county planning authority, following consultation with the local planning authority.
  • (3) The undertaker must not utilise the power under article 53 and Schedule 11 to make provision for the prohibition of motorised vehicles on the existing Durban Road except for emergency vehicles and the motorised vehicles of owners, occupiers and visitors to No 1b Durban Road, as shown on sheet 1 of the traffic regulation measures plans (clearways and prohibitions), until it has exercised the powers under article 53 and Schedule 11 to make provision for no waiting at any time and no loading or unloading at any time as shown on sheet 3 of the traffic regulation measures plans (clearways and prohibitions).
  • (4) The undertaker must, in 2027 and 2037, undertake a review of the performance of the junctions described as junctions 6, 18 and 22 in the transport assessment.
  • (5) Following completion of each of the reviews required by sub-paragraph (4), the undertaker must submit for approval a report of that review to the county planning authority.
  • (6) Upon receipt of that report, the county planning authority must, within 8 weeks of receiving a report under sub-paragraph (5) determine—
  • (a) if any remedial measures are required at any of the junctions listed in sub-paragraph (4) having regard to the expected performance of these junctions in 2037 set out in the transport assessment; and
  • (b) whether such remedial measures must be carried out by the undertaker.
  • (7) If the county planning authority determines that the undertaker must implement those remedial measures, the undertaker must implement them.

Piling works risk assessment

13
  • (1) No piling work to be carried out as part of the authorised development may be undertaken until the undertaker has submitted an update to the piling works risk assessment for approval to the Environment Agency.
  • (2) Any piling work to be carried out as part of the authorised development must be in undertaken in accordance with the recommendations of the updated piling works risk assessment approved under sub-paragraph (1).

New bridge operating signals

14

The operating signals of the new bridge must be operated in accordance with the new bridge operating signals assessment or any update to that assessment as may be submitted to and approved by the county planning authority.

Amendment to approved details

15

With respect to any requirement which requires the authorised development to be carried out in accordance with the details approved under this Part of this Schedule, the approved details are taken to include any amendments that may subsequently be approved in writing by the body responsible for approving the details for that requirement, following consultation by the undertaker with the Environment Agency, the harbour authority or the local planning authority (where required to do so by the requirement) and the undertaker demonstrating to the body responsible that the amended details would not give rise to any materially new or materially different environmental effects than those assessed in the environmental statement.

PART 2 — PROCEDURE FOR DISCHARGE OF REQUIREMENTS

Interpretation

16

In this Part of this Schedule, “discharging authority” means—

  • (a) any body responsible for giving any consent, agreement or approval required by a requirement included in Part 1 of this Schedule, or for giving any consent, agreement or approval further to any document referred to in any such requirement; or
  • (b) the local planning authority in the exercise of its functions set out in sections 60 and 61 of the Control of Pollution Act 1974 .

Applications made under requirements

17
  • (1) Where an application has been made to the discharging authority for any consent, agreement or approval required by a requirement (including agreement or approval in respect of part of a requirement) contained in Part 1 of this Schedule, or a document referred to by a requirement, the discharging authority must give notice to the undertaker of the discharging authority's decision on the application with a period of 8 weeks beginning with—
  • (a) the day immediately following that on which the application is received by the discharging authority;
  • (b) the day immediately following that on which further information has been supplied by the undertaker under paragraph 18; or
  • (c) such longer period as may be agreed between the parties.
  • (2) Subject to paragraph (3), in the event that the discharging authority does not determine an application within the period set out in sub-paragraph (1), the discharging authority is taken to have granted all parts of the application (without any condition or qualification) at the end of that period.
  • (3) In determining any application made to the discharging authority for any consent, agreement or approval required by a requirement contained in Part 1 of this Schedule, the discharging authority may—
  • (a) give or refuse its consent, agreement or approval; or
  • (b) give its consent, agreement or approval subject to reasonable conditions,

and where consent, agreement or approval is refused or granted subject to conditions the discharging authority must provide its reasons for that decision with the notice of the decision.

Further information regarding requirements

18
  • (1) In relation to any part of an application made under this Schedule, the discharging authority has the right to request such further information from the undertaker as is necessary to enable the discharging authority to consider the application.
  • (2) If the discharging authority considers that further information is necessary and the requirement concerned contained in Part 1 of this Schedule does not specify that consultation with a consultee is required, the discharging authority must, within 10 business days of receipt of the application, notify the undertaker in writing specifying the further information required.
  • (3) If the requirement concerned contained in Part 1 of this Schedule specifies that consultation with a consultee is required, the discharging authority must issue the application to the consultee within five business days of receipt of the application, and notify the undertaker in writing specifying any further information requested by the consultee within five business days of receipt of such a request.
  • (4) If the discharging authority does not give the notification within the period specified in sub-paragraph (2) or (3) it (and the consultee, as the case may be) is deemed to have sufficient information to consider the application and is not entitled to request further information without the prior agreement of the undertaker.

Appeals

19
  • (1) Where the undertaker makes an application to the discharging authority, the undertaker may appeal to the Secretary of State in the event that—
  • (a) the discharging authority refuses an application for any consent, agreement or approval required by—
  • (i) a document referred to in Part 1 of this Schedule; or
  • (ii) a document referred to in any requirement contained in Part 1 of this Schedule;
  • (b) the discharging authority grants an application subject to conditions;
  • (c) the discharging authority issues a notice further to sections 60 or 61 of the Control of Pollution Act 1974;

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.