The Norfolk Boreas Offshore Wind Farm Order 2021

Type Statutory-Instrument
Publication 2021-12-10
Last updated 2025-12-19
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API

SCHEDULE 2A Introduction (1) (1) This Schedule applies where an acquiring authority serves a notice to treat in respect of a right over the whole or part of a house, building or factory and has not executed a general vesting declaration under section 4 (execution of declaration) of the 1981 Act as applied by article 22 (application of the 1981 Act) of the Norfolk Boreas Offshore Wind Farm Order 2021 in respect of land to which the notice to treat relates. (2) But see article 24(3) (acquisition of subsoil or airspace only) of the Norfolk Boreas Offshore Wind Farm Order 2021, which excludes acquisition of subsoil or airspace only from this Schedule. (2) In this Schedule “house” includes any park or garden belonging to a house. (3) A person who is able to sell the house, building or factory (“the owner”) may serve a counter-notice requiring the undertaker to purchase the owner’s interest in the house, building or factory. (4) A counter-notice under paragraph 3 must be served within the period of 28 days beginning with the day on which the notice to treat was served. (5) On receiving a counter-notice the undertaker must decide whether to— (a) withdraw the notice to treat, (b) accept the counter-notice, or (c) refer the counter-notice to the Upper Tribunal. (6) The undertaker must serve notice of their decision on the owner within the period of 3 months beginning with the day on which the counter-notice is served (“the decision period”). (7) If the undertaker decides to refer the counter-notice to the Upper Tribunal they must do so within the decision period. (8) If the undertaker does not serve notice of a decision within the decision period they are to be treated as if they had served notice of a decision to withdraw the notice to treat at the end of that period. (9) If the undertaker serves notice of a decision to accept the counter-notice, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in the house, building or factory. (10) On a referral under paragraph 7 the Upper Tribunal must determine whether the acquisition of the right would— (a) in the case of a house, building or factory, cause material detriment to the house, building or factory, or (b) in the case of a park or garden, seriously affect the amenity or convenience of the house to which the park or garden belongs. (11) In making its determination, the Upper Tribunal must take into account— (a) the effect of the acquisition of the right, (b) the proposed use of the right, and (c) if the right is proposed to be acquired for works or other purposes extending to other land, the effect of the whole of the works and the use of the other land. (12) If the Upper Tribunal determines that the acquisition of the right would have either of the consequences described in paragraph 10 it must determine how much of the house, building or factory the authority ought to be required to take. (13) If the Upper Tribunal determines that the undertaker ought to be required to take some or all of the house, building or factory the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in that land. (14) (1) If the Upper Tribunal determines that the undertaker ought to be required to take some or all of the house, building or factory, the authority may at any time within the period of 6 weeks beginning with the day on which the Upper Tribunal makes its determination withdraw the notice to treat in relation to that land. (2) If the undertaker withdraws the notice to treat under this paragraph they must pay the person on whom the notice was served compensation for any loss or expense caused by the giving and withdrawal of the notice. (3) Any dispute as to the compensation is to be determined by the Upper Tribunal.

7

The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—

  • (a) section 9(4) (failure by owners to convey);
  • (b) paragraph 10(3) of Schedule 1 (owners under incapacity);
  • (c) paragraph 2(3) of Schedule 2 (absent and untraced owners); and
  • (d) paragraphs 2(3) and 7(2) of Schedule 4 (common land),

are so modified as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired or the restrictive covenant which is to be imposed is vested absolutely in the acquiring authority.

8

Section 11 of the 1965 Act (powers of entry) is so modified as to secure that, as from the date on which the acquiring authority has served notice to treat in respect of any right or restrictive covenant, as well as the notice of entry required by subsection (1) of that section (as it applies to compulsory acquisition under article 18), it has power, exercisable in equivalent circumstances and subject to equivalent conditions, to enter for the purpose of exercising that right or enforcing that restrictive covenant (which is deemed for this purpose to have been created on the date of service of the notice); and sections 11A (powers of entry: further notices of entry), 11B (counter-notice requiring possession to be taken on specified date), 12 (unauthorised entry) and 13 (refusal to give possession to acquiring authority) of the 1965 Act are modified correspondingly.

9

Section 20 of the 1965 Act (tenants at will, etc.) applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right or the enforcement of the restrictive covenant in question.

10

Section 22 of the 1965 Act (interests omitted from purchase) is so modified as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired, subject to compliance with that section as respects compensation.

SCHEDULE 8 — Land of which temporary possession may be taken

PART 1 — Scenario 1

(1) Area (2) Number of land shown on land plan (3) Purpose for which temporary possession may be taken (4) Part of the authorised project
District of North Norfolk 01/01, 01/19, 01/02, 01/03, 01/05, 01/17, 01/18, 01/20, 01/04, 01/06, 01/07, 01/08, 01/09, 01/10, 02/01, 02/02 and 02/03 Facilitating construction and carrying out the authorised project; construction compounds for carrying out the authorised project; access for carrying out the authorised project. Work Nos. 4A, 4B, 4C and 5
District of North Norfolk 01/11, 01/12, 01/13, 02/04, 02/05, 02/09, 02/11, 02/12, 02/13, 02/14, 02/16, 02/18, 02/19, 02/21, 02/22, 02/23, 03/01, 03/02, 03/04, 03/05, 03/06, 03/07, 03/08, 03/09, 03/10, 03/11, 03/13, 04/01, 04/02, 04/03, 04/05, 04/08, 04/09, 04/10, 04/11, 04/12, 05/01, 05/03, 05/04, 05/06, 05/07, 05/08, 05/10, 06/01, 06/02, 06/03, 06/04, 06/05, 06/10, 06/14, 07/01, 07/03, 07/04, 07/06, 07/09, 07/10, 08/02, 08/05, 08/08, 08/10, 08/13, 08/15, 08/17, 08/19, 08/20, 08/21, 08/23, 09/03, 09/07, 09/08, 09/11, 09/12, 09/15, 09/16, 10/01, 10/02, 10/04, 10/05, 10/11, 10/14, 10/15, 10/16, 10/17, 11/01, 11/03, 11/05, 11/06, 11/09, 11/10, 11/12, 11/13, 11/14, 12/02, 12/03, 12/04, 12/05, 12/06, 12/10, 13/02, 13/05, 13/08, 13/09, 13/10, 13/11, 13/13, 14/02, 14/03, 14/04 and 14/05 Facilitating construction and carrying out the authorised project; carrying out the authorised project; access for carrying out the authorised project. Work Nos. 4A, 4B, 4C and 5
District of North Norfolk 01/14, 01/15, 01/16, 02/06, 02/07, 02/08, 02/10, 02/15, 02/17, 02/20, 03/03, 03/12, 04/04, 05/02, 05/05, 05/09, 05/11, 06/06, 06/08, 06/09, 06/11, 06/13, 07/02, 07/05, 07/07, 07/08, 07/12, 08/03, 08/04, 08/06, 08/12, 09/06, 09/09, 09/10, 09/13, 09/14, 10/07, 10/08, 10/09, 11/02, 11/04, 11/07, 11/08, 11/11, 11/15, 12/01, 12/07, 12/09, 13/01, 13/04, 13/06, 13/07, 13/12, 14/01 and 14/06 Laying of hardstanding and improvements to tracks; access for carrying out the authorised project. Work Nos. 4A, 4B, 4C, 5 and 6
Districts of North Norfolk and Broadland 14/07 Facilitating construction and carrying out the authorised project; carrying out the authorised project; access for carrying out the authorised project. Work Nos. 5 and 6
District of Broadland 14/09, 14/12, 14/15, 14/18, 14/20, 14/26, 14/27, 15/02, 15/03, 15/04, 15/05, 15/07, 15/11, 15/13, 15/15, 16/03, 16/05, 16/08, 16/09, 16/10, 16/12, 16/13, 17/01, 17/02, 17/03, 17/04, 17/05, 17/07, 18/01, 18/02, 18/04, 18/05, 18/08, 18/13, 18/14, 19/04, 19/05, 19/07, 20/01, 20/02, 20/03, 20/06, 20/07, 20/09, 20/10, 20/17, 20/19, 20/20, 21/01, 21/03, 21/08, 22/01, 22/03, 22/04, 22/05, 22/06, 22/07, 22/12, 22/13, 22/14, 22/15, 23/01, 23/03, 23/05, 23/06, 23/07, 23/08, 23/09, 23/11, 23/13, 23/14, 24/01, 24/04, 24/05, 24/08, 24/10, 24/11, 24/16, 24/19, 25/02, 25/04, 25/06, 25/07 and 26/01 Facilitating construction and carrying out the authorised project; carrying out the authorised project; access for carrying out the authorised project. Work No. 6
District of Broadland 14/11, 14/13, 14/16, 14/19, 14/22, 14/24, 15/08, 15/10, 15/12, 15/14, 16/01, 16/02, 16/04, 16/06, 16/07, 16/11, 16/14, 17/06, 18/06, 18/07, 18/09, 18/10, 18/11, 18/12, 19/01, 19/02, 19/03, 19/06, 19/08, 19/09, 20/04, 20/05, 20/08, 20/11, 20/18, 21/04, 21/05, 21/07, 21/09, 21/12, 21/13, 21/14, 21/15, 21/16, 22/02, 22/08, 22/09, 22/10, 22/11, 22/16, 23/02, 24/02, 24/03, 24/06, 24/07, 24/13, 24/14, 24/15, 24/17, 24/18, 25/01, 25/03, 25/05, 26/02 and 26/04 Laying of hardstanding and improvements to tracks; access for carrying out the authorised project. Work Nos. 5, 6 and 7
Districts of Broadland and Breckland 26/03 Facilitating construction and carrying out the authorised project; carrying out the authorised project; access for carrying out the authorised project. Work Nos. 6 and 7.
District of Breckland 26/05, 26/06, 26/08, 26/10, 26/11, 26/13, 27/02, 27/04, 27/06, 27/13, 28/04, 28/05, 29/05, 29/07, 29/09, 29/10, 29/12, 30/02, 30/03, 30/04, 30/05, 30/06, 30/10, 30/11, 31/02, 31/03, 31/04, 31/05, 32/02, 32/03, 32/06, 32/09, 32/12, 32/13, 32/14, 32/15, 33/02, 33/03, 33/04, 33/12, 34/03, 34/04, 34/08, 34/09, 34/10, 34/11, 34/13, 35/11, 35/12, 36/02, 36/05, 36/06, 36/08, 36/09, 36/10, 36/11, 36/14, 36/15, 36/16, 36/17, 36/21, 37/05, 37/13, 37/14, 38/02, 38/03, 38/05, 38/06, 38/08, 38/12, 39/04, 39/05, 39/06, 39/07, 39/15, 39/16, 40/02, 40/03, 41/05, 41/08, 41/08, 41/08, 41/10, 41/11, 41/13, 41/14b and 41/16 Laying of hardstanding and improvements to tracks; access for carrying out the authorised project. Work Nos. 6, 7
District of Breckland 26/07, 26/09, 26/12, 26/14, 26/15, 27/01, 27/05, 27/07, 27/08, 27/09, 27/10, 27/11, 27/14, 27/15, 27/16, 28/01, 28/02, 28/03, 28/08, 29/02, 29/08, 29/11, 29/13, 30/01, 30/07, 30/08, 30/09, 30/12, 31/01, 31/06, 31/07, 31/08, 31/09, 31/11, 31/12, 31/13, 32/01, 32/04, 32/05, 32/07, 32/08, 32/10, 32/11, 33/01, 33/06, 33/08, 33/11, 33/14, 33/15, 33/16, 34/01, 34/05, 34/06, 34/07, 35/01, 35/03, 35/04, 35/05, 35/06, 35/07, 35/09, 35/13, 35/15, 35/16, 36/01, 36/03, 36/04, 36/07, 36/12, 36/13, 36/18, 36/20, 37/01, 37/02, 37/07, 37/08, 37/09, 37/11, 37/16, 37/17, 37/18, 37/19, 37/20, 37/21, 37/22, 38/01, 38/04, 38/07, 38/09, 38/11, 39/01, 39/02, 39/03, 39/09, 39/10, 39/12, 39/13, 40/01, 40/04, 40/11, 40/12, 40/12b, 40/13a, 40/14, 40/19, 40/22a, 40/24a, 40/24c, 40/24d, 40/25, 40/29, 40/30, 41/03a, 41/03c, 41/06a, 41/06b, 41/06c, 41/22, 41/25a and 42/01 Facilitating construction and carrying out the authorised project; carrying out the authorised project; access for carrying out the authorised project. Work Nos. 7, 8A, 8B, 9, 12A
District of Breckland 40/13, 40/15, 40/15b, 40/15d, 40/20a, 41/07, 41/09, 41/09a, 41/09b, 41/14, 41/14d, 41/14e, 41/15, 41/15a, 41/17, 41/17a, 41/18, 41/18a, 41/26c, 41/26f, 42/02 and 42/03 Construction compound and carrying out the authorised project; worksites for construction and laydown and carrying out the authorised project; access for carrying out the authorised project.Facilitating construction and carrying out the authorised project; worksites for construction and laydown and carrying out the authorised project; park and ride offload area for substation construction; access for carrying out the authorised project. Work Nos. 8A, 8B, 9, 10A, 10B, 10C, 11, 12A

PART 2 — Scenario 2

(1) Area (2) Number of land shown on land plan (3) Purpose for which temporary possession may be taken (4) Part of the authorised project
District of North Norfolk 01/01, 01/02, 01/03, 01/04, 01/05, 01/06, 01/07, 01/08, 01/09, 01/10, 01/11, 01/12, 01/13, 01/17, 01/18, 01/19, 01/20, 02/01, 02/02 and 02/03 Facilitating construction and carrying out the authorised project; construction compounds for carrying out the authorised project; access for carrying out the authorised project. Work Nos. 4B, 4C and 5
District of North Norfolk 02/04, 02/05, 02/09, 02/11, 02/12, 02/13, 02/14, 02/16, 02/18, 02/19, 02/21, 02/22, 02/23, 03/01, 03/02, 03/04, 03/05, 03/06, 03/07, 03/08, 03/09, 03/10, 03/11, 03/13, 04/01, 04/02, 04/03, 04/05, 04/08, 04/09, 04/10, 04/11, 04/12, 05/01, 05/03, 05/04, 05/06, 05/07, 05/08, 05/10, 06/01, 06/02, 06/03, 06/04, 06/05, 06/10, 06/14, 07/01, 07/03, 07/04, 07/06, 07/09, 07/10, 08/02, 08/05, 08/08, 08/10, 08/13, 08/15, 08/17, 08/19, 08/20, 08/21, 08/23, 09/03, 09/07, 09/08, 09/11, 09/12, 09/15, 09/16, 10/01, 10/02, 10/04, 10/05, 10/11, 10/14, 10/15, 10/16, 10/17, 11/01, 11/03, 11/05, 11/06, 11/09, 11/10, 11/12, 11/13, 11/14, 12/02, 12/03, 12/04, 12/05, 12/06, 12/10, 13/02, 13/05, 13/08, 13/09, 13/10, 13/11, 13/13, 14/02, 14/03, 14/04 and 14/05 Facilitating construction and carrying out the authorised project; carrying out the authorised project; access for carrying out the authorised project. Work No. 4A, 4B, 4C and 5
District of North Norfolk 01/14, 01/15, 01/16, 02/06, 02/07, 02/08, 02/10, 02/15, 02/17, 02/20, 03/03, 03/12, 04/04, 05/02, 05/05, 05/09, 05/11, 06/06, 06/08, 06/09, 06/11, 06/13, 07/02, 07/05, 07/07, 07/08, 07/12, 08/03, 08/04, 08/06, 08/12, 09/06, 09/09, 09/10, 09/13, 09/14, 10/07, 10/08, 10/09, 11/02, 11/04, 11/07, 11/08, 11/11, 11/15, 12/01, 12/07, 12/09, 13/01, 13/04, 13/06, 13/07, 13/12, 14/01 and 14/06 Laying of hardstanding and improvements to tracks; access for carrying out the authorised project. Work Nos. 4B, 4C, 5 and 6
District of North Norfolk 04/06, 04/07, 06/07, 06/12, 07/11, 08/01, 08/07, 08/09, 08/11, 08/14, 08/16, 08/18, 08/22, 08/24, 09/01, 09/02, 09/04, 09/05, 10/03, 10/06, 10/10, 10/12, 10/13, 12/08, 12/11, 13/03, 14/08, 14/10, 14/14, 14/21, 14/23, 14/25, 14/28, 15/01, 15/06, 15/09, 18/03, 18/15, 18/16, 20/21, 21/02, 21/06, 21/10, 21/11, 21/17, 23/04, 23/10, 23/12, 24/09, 24/12, 27/03, 27/12, 28/06, 28/07, 28/09, 28/10, 29/01, 29/03, 29/04, 29/06, 31/10, 33/05, 33/07, 33/09, 33/10, 33/13, 33/17, 34/02, 34/12, 35/02, 35/08, 35/10, 35/14, 36/19, 37/03, 37/04, 37/06, 37/10, 0137/12 and 37/15 Facilitating construction and carrying out works including crossings and drill works; mobilisation zone for construction and laydown and carrying out the authorised project; access for carrying out the authorised project. Work Nos. 4C and 5
Districts of North Norfolk and Broadland 14/07 Facilitating construction and carrying out the authorised project; carrying out the authorised project; access for carrying out the authorised project. Work Nos. 5 and 6
Districts of North Norfolk and Broadland 14/08, 19/05 Facilitating construction and carrying out the authorised project; trenchless crossing zone for construction and laydown and carrying out the authorised project; access for carrying out the authorised project. Work Nos. 5 and 6
District of Broadland 14/07, 14/09, 14/12, 14/15, 14/18, 14/20, 14/26, 14/27, 15/02, 15/03, 15/04, 15/05, 15/07, 15/11, 15/13, 15/15, 16/03, 16/05, 16/08, 16/09, 16/10, 16/12, 16/13, 17/01, 17/02, 17/03, 17/04, 17/05, 17/07, 18/01, 18/02, 18/04, 18/05, 18/08, 18/13, 18/14, 19/04, ... 19/07, 20/01, 20/02, 20/03, 20/06, 20/07, 20/09, 20/10, 20/17, 20/19, 20/20, 21/01, 21/03, 21/08, 22/01, 22/03, 22/04, 22/05, 22/06, 22/07, 22/12, 22/13, 22/14, 22/15, 23/01, 23/03, 23/05, 23/06, 23/07, 23/08, 23/09, 23/11, 23/13, 23/14, 24/01, 24/04, 24/05, 24/08, 24/10, 24/11, 24/16, 24/19, 25/02, 25/04, 25/06, 25/07 and 26/01 Facilitating construction and carrying out the authorised project; carrying out the authorised project; access for carrying out the authorised project. Work No. 6
District of Broadland 14/11, 14/13, 14/16, 14/19, 14/22, 14/24, 15/08, 15/10, 15/12, 15/14, 16/01, 16/02, 16/04, 16/06, 16/07, 16/11, 16/14, 17/06, 18/06, 18/07, 18/09, 18/10, 18/11, 18/12, 19/01, 19/02, 19/03, 19/06, 19/08, 19/09, 20/04, 20/05, 20/08, 20/11, 20/18, 21/04, 21/04, 21/05, 21/07, 21/09, 21/12, 21/13, 21/14, 21/15, 21/16, 22/02, 22/08, 22/09, 22/10, 22/11, 22/16, 23/02, 24/02, 24/03, 24/06, 24/07, 24/13, 24/14, 24/15, 24/17, 24/18, 25/01, 25/03, 25/05, 26/02 and 26/04 Laying of hardstanding and improvements to tracks; access for carrying out the authorised project. Work Nos. 5, 6 and 7
Districts of Broadland and Breckland 26/03 Facilitating construction and carrying out the authorised project; carrying out the authorised project; access for carrying out the authorised project. Work Nos. 6 and 7.
District of Breckland 26/05, 26/06, 26/08, 26/10, 26/11, 26/13, 27/02, 27/04, 27/06, 27/13, 28/04, 28/05, 29/07, 29/09, 29/10, 29/12, 30/02, 30/03, 30/04, 30/05, 30/06, 30/10, 30/11, 31/02, 31/03, 31/04, 31/05, 32/02, 32/03, 32/06, 32/09, 32/12, 32/13, 32/14, 32/15, 33/02, 33/03, 33/04, 33/12, 34/03, 34/04, 34/08, 34/09, 34/10, 34/11, 34/13, 35/11, 35/12, 36/02, 36/05, 36/06, 36/08, 36/09, 36/10, 36/11, 36/14, 36/15, 36/16, 36/17, 36/21, 37/05, 37/13, 37/14, 38/02, 38/03, 38/05, 38/06, 38/08, 38/12, 39/04, 39/05, 39/06, 39/07, 39/15, 39/16, 40/02, 40/03, 41/08, 41/10, 41/11, 41/13, 41/16 and 41/22 Laying of hardstanding and improvements to tracks; access for carrying out the authorised project. Work Nos. 6, 7
District of Breckland 26/07, 26/09, 26/12, 26/14, 26/15, 27/01, 27/05, 27/07, 27/08, 27/09, 27/10, 27/11, 27/14, 27/15, 27/16, 28/01, 28/02, 28/03, 28/08, 29/02, 29/08, 29/11, 29/13, 30/01, 30/07, 30/08, 30/09, 30/12, 31/01, 31/06, 31/07, 31/08, 31/09, 31/11, 31/12, 31/13, 32/01, 32/04, 32/05, 32/07, 32/08, 32/10, 32/11, 33/01, 33/06, 33/08, 33/08, 33/11, 33/14, 33/15, 33/16, 34/01, 34/05, 34/06, 34/07, 35/01, 35/03, 35/04, 35/05, 35/06, 35/07, 35/09, 35/13, 35/15, 35/16, 36/01, 36/03, 36/04, 36/07, 36/12, 36/13, 36/18, 36/20, 37/01, 37/02, 37/07, 37/08, 37/09, 37/11, 37/16, 37/17, 37/18, 37/19, 37/20, 37/21, 37/22, 38/01, 38/04, 38/07, 38/09, 38/11, 39/01, 39/02, 39/03, 39/09, 39/10, 39/12 and 39/13 Facilitating construction and carrying out the authorised project; carrying out the authorised project; access for carrying out the authorised project. Work Nos. 7
District of Breckland 40/01, 40/04, 40/11, 40/12, 40/14, 41/03a, 40/15a, 40/23, 40/26, 40/27, 40/31, 40/33a, 41/01a, 41/03, 41/03b, 41/14a, 41/14c, 41/28, 41/30b, 41/30c, 41/30d, 41/33, 41/40, 40/15b, 41/14, 41/15, 41/15a, 41/05, 41/14b, 41/14d, 41/14e, 41/23, 41/23a, 41/24 and 41/25 Facilitating construction and carrying out the authorised project; carrying out the authorised project; access for carrying out the authorised project. Work Nos. 7, 8A, 8B, 9, 10A, 10B, 10C, 11A(E), 11A(W), 12B
District of Breckland 40/31a, 40/15d, 40/20a, 40/17a, 40/20, 40/26a, 40/27a, 40/28, 40/31a, 40/32, 40/33 and 40/33b Facilitating construction and carrying out Work Nos. 7, 8A, 8B, 8B, 9 and 12B, construction and laydown and carrying out the authorised project; access for carrying out the authorised project. Work Nos. 7, 8A, 8B, 9, 10A, 10B, 10C, 11A(E), 11A(W), 12B
District of Breckland 41/01, 41/01b, 41/07, 41/09, 41/09a, 41/09b, 41/17, 41/17a, 41/18, 41/18a, 41/12, 41/27, 41/30, 41/30e, 41/30f, 41/39, 41/40a, 41/41, 41/42, 41/43, 41/44, 41/45, 41/46, 41/47 and 41/48 Facilitating construction and carrying out Work Nos. 10C, 11A(W), 11A(E), 11B, construction and laydown and carrying out the authorised project; access for carrying out the authorised project. Work Nos. 10C, 11A(W), 11A(E), 11B
District of Breckland 42/02, 42/03, 42/04, 42/05 and 42/06 Facilitating construction and carrying out Work Nos. 10C and 12B, construction and laydown and carrying out the authorised project; access for carrying out the authorised project. Work Nos. 10C and 12B

SCHEDULE 9 — Deemed Licence under the 2009 Act – Generation Assets (Licence 1 – Phase 1)

PART 1 — Interpretation

1

  • (1) In this licence—
  • “the 2004 Act” means the Energy Act 2004;
  • “the 2008 Act” means the Planning Act 2008;
  • “the 2009 Act” means the Marine and Coastal Access Act 2009;
  • “the 2011 Regulations” means the Marine Licensing (Licence Application Appeals) Regulations 2011[^f00046];
  • “the 2017 Regulations” means the Conservation of Offshore Marine Habitats and Species Regulations 2017[^f00047];
  • “authorised deposits” means the substances and articles specified in paragraph 5 of Part 2 of this licence;
  • “authorised scheme” means Work No. 1 described in Part 3 of this licence or any part of that work;
  • “cable protection” means measures for offshore cable crossings and where cable burial is not possible due to ground conditions or approaching offshore structures, to protect cables and fibre optic cables and prevent loss of seabed sediment by use of grout bags, protective aprons, mattresses, flow energy dissipation (frond) devices or rock and gravel dumping;
  • “commence” means the first carrying out of any part of the licensed activities save for pre-construction surveys and monitoring and “commenced” and “commencement” must be construed accordingly;
  • “condition” means a condition in Part 4 of this licence;
  • “Defence Infrastructure Organisation Safeguarding” means Ministry of Defence Safeguarding, Defence Infrastructure Organisation, Kingston Road, Sutton Coldfield, West Midlands B75 7RL and any successor body to its functions;
  • “Development Principles” means the document certified as the Development Principles by the Secretary of State for the purposes of the Order;
  • “draft marine mammal mitigation protocol” means the document certified as the draft marine mammal mitigation protocol by the Secretary of State for the purposes of this Order;
  • “draught height” means the distance between the lowest point of the rotating blade of the wind turbine generator and MHWS;
  • “enforcement officer” means a person authorised to carry out enforcement duties under Chapter 3 of Part 4 (marine licensing) of the 2009 Act;
  • “environmental statement” means the document certified as the environmental statement by the Secretary of State for the purposes of this Order;
  • “gravity base” means a structure principally of steel, concrete, or steel and concrete which rests on the seabed either due to its own weight with or without added ballast or additional skirts and associated materials and equipment including scour protection, J-tubes, transition piece, corrosion protection systems, fenders and maintenance equipment, boat access systems, access ladders and access and rest platform(s) and equipment;
  • “HAT” means highest astronomical tide;
  • “in principle Norfolk Boreas Southern North Sea Special Area of Conservation Site Integrity Plan” means the document certified as the in principle Norfolk Boreas Southern North Sea Special area of Conservation Site Integrity Plan by the Secretary of State for the purposes of this Order;
  • “jacket foundation” means a steel jacket/ lattice-type structure constructed of steel which is fixed to the seabed at three or more points with steel pin piles or steel suction caissons and associated materials and equipment including scour protection, J-tubes, transition piece, corrosion protection systems, fenders and maintenance equipment, boat access systems, access ladders and access and rest platform(s) and equipment;
  • “Kingfisher Fortnightly Bulletin” means the bulletin published by the Humber Seafood Institute or such other alternative publication approved in writing by the MMO for the purposes of this licence;
  • “licence 2 (generation)” means the licence set out in Schedule 10 (deemed licence under the 2009 Act – generation assets (licence 2 – phase 2));
  • “licensed activities” means the activities specified in Part 3 of this licence;
  • “maintain” includes inspect, upkeep, repair, adjust, and alter and further includes remove, reconstruct and replace (but only in relation to any of the ancillary works in Part 2 of Schedule 1 (ancillary works), any cable, and any component part of any wind turbine generator, offshore electrical substation, offshore service platform or meteorological mast described in Part 1 of Schedule 1 (authorised development) not including the alteration, removal or replacement of foundations), to the extent assessed in the environmental statement; and “maintenance” is construed accordingly;
  • “Marine Management Organisation” or “MMO” means the body created under the 2009 Act which is responsible for the monitoring and enforcement of this licence;
  • “marker buoy” means any floating device used for marker or navigation purposes, including LIDAR buoys and wave buoys;
  • “MCA” means the Maritime and Coastguard Agency;
  • “mean high water springs” or “MHWS” means the highest level which spring tides reach on average over a period of time;
  • “measurement buoy” means any floating device used for measurement purposes, including LIDAR buoys and wave buoys;
  • “meteorological mast” means a mast housing equipment to measure wind speed and other wind characteristics, including a topside housing electrical, communication and associated equipment and marking and lighting;
  • “monopile foundation” means a steel pile, typically cylindrical, driven and/or drilled into the seabed and associated materials and equipment including scour protection, J-tubes, transition piece, corrosion protection systems, fenders and maintenance equipment, boat access systems, access ladders and access and rest platform(s) and equipment;
  • “Norfolk Boreas Offshore Wind Farm” means the offshore wind farm authorised pursuant to the Order
  • “Norfolk Vanguard Offshore Wind Farm” means the offshore wind farm for which Norfolk Vanguard Limited has sought a development consent order pursuant to an application submitted to the Secretary of State on 26th June 2018;
  • “Norfolk Vanguard East” means the eastern offshore wind site of the Norfolk Vanguard Offshore Wind Farm;
  • “notice to mariners” means a notice issued by the undertaker to mariners to inform them of issues that affect the safety of navigation;
  • “offshore cables” means any cables offshore;
  • “offshore in principle monitoring plan” means the document certified as the offshore in principle monitoring plan by the Secretary of State for the purposes of this Order;
  • “offshore Order limits” means the limits shown on the works plan within which the authorised scheme may be carried out, whose grid coordinates are set out in Part 2 of this licence;
  • “offshore service platform” means a platform to house workers offshore and/or provide refuelling facilities and sheltering facilities for helicopters; “the Order” means the Norfolk Boreas Offshore Wind Farm Order 2021;
  • “outline fisheries liaison and co-existence plan” means the document certified as the outline fisheries liaison and co-existence plan by the Secretary of State for the purposes of this Order;
  • “outline marine traffic monitoring strategy” means the document certified as the outline marine traffic monitoring strategy by the Secretary of State for the purposes of this Order;
  • “outline offshore operations and maintenance plan” means the document certified as the outline offshore operations and maintenance plan by the Secretary of State for the purposes of the Order;
  • “outline written scheme of investigation (offshore)” means the document certified as the outline written scheme of investigation (offshore) by the Secretary of State for the purposes of this Order;
  • “pin piles” means steel cylindrical piles driven and/or drilled into the seabed to secure steel jacket foundations;
  • “relevant site” means a European offshore marine site or a European site as defined in the 2017 Regulations
  • “scenario 1” means the scenario in which the Norfolk Vanguard Offshore Wind Farm proceeds to construction and carries out enabling works, including the laying of onshore cable ducts, to benefit the Norfolk Boreas Offshore Wind Farm;
  • “scenario 2” means the scenario in which the Norfolk Vanguard Offshore Wind Farm does not proceed to construction and Norfolk Boreas Offshore Wind Farm is built out as an independent project including the laying of onshore cable ducts;
  • “scour protection” means measures to prevent loss of seabed sediment around any marine structure placed in or on the seabed by use of protective aprons, mattresses with or without frond devices, or rock and gravel placement.
  • “single offshore phase” means carrying out all offshore works as a single construction operation;
  • “statutory historic body” means Historic Buildings and Monuments Commission for England (Historic England) or its successor in function;
  • “statutory nature conservation body” means an organisation charged by government with advising on nature conservation matters;
  • “suction caisson” means a large diameter steel cylindrical shell which penetrates the seabed assisted by a hydrostatic pressure differential for fixity of foundations;
  • “tetrabase foundation” means a tripod shaped steel frame anchored under its own weight or through pin pile or suction bucket anchoring and associated materials and equipment including scour protection, J-tubes, transition piece, corrosion protection systems, fenders and maintenance equipment, boat access systems, access ladders and access and rest platform(s) and equipment;
  • “Trinity House” means the Corporation of Trinity House of Deptford Strond;
  • “two offshore phases” means carrying out the offshore works as two separate construction operations;
  • “UK Hydrographic Office” means the UK Hydrographic Office of Admiralty Way, Taunton, Somerset, TA1 2DN;
  • “undertaker” means Norfolk Boreas Limited (Company No. 03722058) whose registered office is at 5th Floor, 70 St Mary Axe, London EC3A 8BE
  • “vessel” means every description of vessel, however propelled or moved, and includes a non-displacement craft, a personal watercraft, a seaplane on the surface of the water, a hydrofoil vessel, a hovercraft or any other amphibious vehicle and any other thing constructed or adapted for movement through, in, on or over water and which is at the time in, on or over water;
  • “wind turbine generator” means a structure comprising a tower, rotor with up to three blades connected at the hub, nacelle and ancillary electrical and other equipment which may include corrosion protection systems, helicopter landing facilities and other associated equipment, fixed to a foundation;
  • “works plan” means the plan certified as the works plan by the Secretary of State for the purposes of the Order.

2

A reference to any statute, order, regulation or similar instrument is construed as a reference to a statute, order, regulation or instrument as amended by any subsequent statute, order, regulation or instrument or as contained in any subsequent re-enactment.

3

Unless otherwise indicated—

  • (a) all times are taken to be Greenwich Mean Time (GMT); and
  • (b) all co-ordinates are taken to be latitude and longitude degrees and minutes to two decimal places.

4

Except where otherwise notified in writing by the relevant organisation, the primary points of contact with the organisations listed below and the addresses for returns and correspondence are—

  • (a) Marine Management Organisation

Marine Licensing

Lancaster House

Hampshire Court

Newcastle Business Park

Newcastle upon Tyne

NE4 7YH

Tel: 0300 123 1032;

  • (b) Marine Management Organisation (local office)

Lowestoft Office

Pakefield Road

Lowestoft

Suffolk

NR33 0HT

Tel: 01502 573 149;

  • (c) Trinity House

Tower Hill

London

EC3N 4DH

Tel: 020 7481 6900;

  • (d) The United Kingdom Hydrographic Office

Admiralty Way

Taunton

Somerset

TA1 2DN

Tel: 01823 337 900;

  • (e) Maritime and Coastguard Agency

Navigation Safety Branch

Bay 2/20, Spring Place

105 Commercial Road

Southampton

SO15 1EG

Tel: 020 3817 2426;

  • (f) Centre for Environment, Fisheries and Aquaculture Science

Pakefield Road

Lowestoft

Suffolk

NR33 0HT

Tel: 01502 562 244;

  • (g) Natural England

Area 1C, Nobel House

17 Smith Square

London

SW1P 2AL

Tel: 0300 060 4911;

  • (h) Historic England

Cannon Bridge House

25 Dowgate Hill

London

EC4R 2YA

Tel: 020 7973 3700

PART 2 — Licensed Marine Activities – General

1

This licence remains in force until the authorised scheme has been decommissioned in accordance with a programme approved by the Secretary of State under section 106 (approval of decommissioning programmes) of the 2004 Act, including any modification to the programme under section 108 (reviews and revisions of decommissioning programmes), and the completion of such programme has been confirmed by the Secretary of State in writing.

2

The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act apply to this licence except that the provisions of section 72(7) and (8) relating to the transfer of the licence only apply to a transfer not falling within article 6 (benefit of the Order).

3

With respect to any condition which requires the licensed activities be carried out in accordance with the plans, protocols or statements approved under this Schedule, the approved details, plan or scheme are taken to include any amendments that may subsequently be approved in writing by the MMO.

4

Any amendments to or variations from the approved plans, protocols or statements must be minor or immaterial and it must be demonstrated to the satisfaction of the MMO that they are unlikely to give rise to any materially new or materially different environmental effects from those assessed in the environmental statement.

5

The substances or articles authorised for deposit at sea are—

  • (a) iron and steel, copper and aluminium;
  • (b) stone and rock;
  • (c) concrete;
  • (d) sand and gravel;
  • (e) plastic and synthetic;
  • (f) material extracted from within the offshore Order limits during construction drilling or seabed preparation for foundation works and cable (including fibre optic cable) sandwave preparation works; and
  • (g) marine coatings, other chemicals and timber.

6

The grid coordinates for the authorised scheme are specified below—

Point Latitude (DMS) Longitude (DMS) Point Latitude (DMS) Longitude (DMS)
1 53° 14′ 28.789″ N 3° 3′ 31.257″ E 117 52° 48′ 9.945″ N 2° 51′ 14.086″ E
2 52° 56′ 14.962″ N 3° 8′ 41.012″ E 118 52° 47′ 34.455″ N 2° 46′ 27.112″ E
3 52° 52′ 14.268″ N 2° 45′ 34.286″ E 119 52° 47′ 27.872″ N 2° 45′ 34.071″ E
4 53° 3′ 46.017″ N 2° 45′ 35.676″ E 120 52° 51′ 41.636″ N 2° 45′ 34.220″ E
5 53° 8′ 27.770″ N 2° 48′ 38.429″ E 121 52° 51′ 50.970″ N 2° 46′ 27.714″ E
6 53° 13′ 52.532″ N 3° 2′ 3.556″ E 122 52° 52′ 49.498″ N 2° 52′ 4.152″ E
7 53° 13′ 53.967″ N 3° 2′ 7.131″ E 123 52° 53′ 4.385″ N 2° 51′ 57.093″ E
8 53° 13′ 59.710″ N 3° 2′ 21.440″ E 124 52° 53′ 19.948″ N 2° 51′ 49.713″ E
9 53° 14′ 8.462″ N 3° 2′ 43.249″ E 125 52° 52′ 14.268″ N 2° 45′ 34.286″ E
10 53° 14′ 21.060″ N 3° 3′ 12.673″ E 126 53° 3′ 46.017″ N 2° 45′ 35.676″ E
11 53° 10′ 30.403″ N 2° 59′ 5.331″ E 127 53° 8′ 27.770″ N 2° 48′ 38.429″ E
12 53° 10′ 30.387″ N 2° 59′ 6.176″ E 128 53° 13′ 52.532″ N 3° 2′ 3.556″ E
13 53° 10′ 30.403″ N 2° 59′ 7.022″ E 129 53° 13′ 53.967″ N 3° 2′ 7.131″ E
14 53° 10′ 30.451″ N 2° 59′ 7.863″ E 130 53° 13′ 59.710″ N 3° 2′ 21.440″ E
15 53° 10′ 30.531″ N 2° 59′ 8.699″ E 131 53° 14′ 8.462″ N 3° 2′ 43.249″ E
16 53° 10′ 30.641″ N 2° 59′ 9.524″ E 132 53° 14′ 21.060″ N 3° 3′ 12.673″ E
17 53° 10′ 30.783″ N 2° 59′ 10.336″ E 133 53° 10′ 30.403″ N 2° 59′ 5.331″ E
18 53° 10′ 30.955″ N 2° 59′ 11.131″ E 134 53° 10′ 30.387″ N 2° 59′ 6.176″ E
19 53° 10′ 31.157″ N 2° 59′ 11.907″ E 135 53° 10′ 30.403″ N 2° 59′ 7.022″ E
20 53° 10′ 31.388″ N 2° 59′ 12.661″ E 136 53° 10′ 30.451″ N 2° 59′ 7.863″ E
21 53° 10′ 31.646″ N 2° 59′ 13.389″ E 137 53° 10′ 30.531″ N 2° 59′ 8.699″ E
22 53° 10′ 31.932″ N 2° 59′ 14.088″ E 138 53° 10′ 30.641″ N 2° 59′ 9.524″ E
23 53° 10′ 32.243″ N 2° 59′ 14.756″ E 139 53° 10′ 30.783″ N 2° 59′ 10.336″ E
24 53° 10′ 32.579″ N 2° 59′ 15.390″ E 140 53° 10′ 30.955″ N 2° 59′ 11.131″ E
25 53° 10′ 32.938″ N 2° 59′ 15.988″ E 141 53° 10′ 31.157″ N 2° 59′ 11.907″ E
26 53° 10′ 33.319″ N 2° 59′ 16.548″ E 142 53° 10′ 31.388″ N 2° 59′ 12.661″ E
27 53° 10′ 33.721″ N 2° 59′ 17.066″ E 143 53° 10′ 31.646″ N 2° 59′ 13.389″ E
28 53° 10′ 34.141″ N 2° 59′ 17.541″ E 144 53° 10′ 31.932″ N 2° 59′ 14.088″ E
29 53° 10′ 34.578″ N 2° 59′ 17.972″ E 145 53° 10′ 32.243″ N 2° 59′ 14.756″ E
30 53° 10′ 35.031″ N 2° 59′ 18.356″ E 146 53° 10′ 32.579″ N 2° 59′ 15.390″ E
31 53° 10′ 35.497″ N 2° 59′ 18.692″ E 147 53° 10′ 32.938″ N 2° 59′ 15.988″ E
32 53° 10′ 35.975″ N 2° 59′ 18.978″ E 148 53° 10′ 33.319″ N 2° 59′ 16.548″ E
33 53° 10′ 36.463″ N 2° 59′ 19.214″ E 149 53° 10′ 33.721″ N 2° 59′ 17.066″ E
34 53° 10′ 36.959″ N 2° 59′ 19.398″ E 150 53° 10′ 34.141″ N 2° 59′ 17.541″ E
35 53° 10′ 37.461″ N 2° 59′ 19.531″ E 151 53° 10′ 34.578″ N 2° 59′ 17.972″ E
36 53° 10′ 37.966″ N 2° 59′ 19.610″ E 152 53° 10′ 35.031″ N 2° 59′ 18.356″ E
37 53° 10′ 38.474″ N 2° 59′ 19.637″ E 153 53° 10′ 35.497″ N 2° 59′ 18.692″ E
38 53° 10′ 38.982″ N 2° 59′ 19.610″ E 154 53° 10′ 35.975″ N 2° 59′ 18.978″ E
39 53° 10′ 39.488″ N 2° 59′ 19.531″ E 155 53° 10′ 36.463″ N 2° 59′ 19.214″ E
40 53° 10′ 39.990″ N 2° 59′ 19.399″ E 156 53° 10′ 36.959″ N 2° 59′ 19.398″ E
41 53° 10′ 40.485″ N 2° 59′ 19.214″ E 157 53° 10′ 37.461″ N 2° 59′ 19.531″ E
42 53° 10′ 40.973″ N 2° 59′ 18.978″ E 158 53° 10′ 37.966″ N 2° 59′ 19.610″ E
43 53° 10′ 41.451″ N 2° 59′ 18.692″ E 159 53° 10′ 38.474″ N 2° 59′ 19.637″ E
44 53° 10′ 41.918″ N 2° 59′ 18.356″ E 160 53° 10′ 38.982″ N 2° 59′ 19.610″ E
45 53° 10′ 42.370″ N 2° 59′ 17.972″ E 161 53° 10′ 39.488″ N 2° 59′ 19.531″ E
46 53° 10′ 42.807″ N 2° 59′ 17.542″ E 162 53° 10′ 39.990″ N 2° 59′ 19.399″ E
47 53° 10′ 43.228″ N 2° 59′ 17.067″ E 163 53° 10′ 40.485″ N 2° 59′ 19.214″ E
48 53° 10′ 43.629″ N 2° 59′ 16.548″ E 164 53° 10′ 40.973″ N 2° 59′ 18.978″ E
49 53° 10′ 44.010″ N 2° 59′ 15.989″ E 165 53° 10′ 41.451″ N 2° 59′ 18.692″ E
50 53° 10′ 44.369″ N 2° 59′ 15.391″ E 166 53° 10′ 41.918″ N 2° 59′ 18.356″ E
51 53° 10′ 44.705″ N 2° 59′ 14.757″ E 167 53° 10′ 42.370″ N 2° 59′ 17.972″ E
52 53° 10′ 45.017″ N 2° 59′ 14.089″ E 168 53° 10′ 42.807″ N 2° 59′ 17.542″ E
53 53° 10′ 45.302″ N 2° 59′ 13.389″ E 169 53° 10′ 43.228″ N 2° 59′ 17.067″ E
54 53° 10′ 45.561″ N 2° 59′ 12.661″ E 170 53° 10′ 43.629″ N 2° 59′ 16.548″ E
55 53° 10′ 45.792″ N 2° 59′ 11.908″ E 171 53° 10′ 44.010″ N 2° 59′ 15.989″ E
56 53° 10′ 45.993″ N 2° 59′ 11.132″ E 172 53° 10′ 44.369″ N 2° 59′ 15.391″ E
57 53° 10′ 46.166″ N 2° 59′ 10.336″ E 173 53° 10′ 44.705″ N 2° 59′ 14.757″ E
58 53° 10′ 46.307″ N 2° 59′ 9.524″ E 174 53° 10′ 45.017″ N 2° 59′ 14.089″ E
59 53° 10′ 46.418″ N 2° 59′ 8.699″ E 175 53° 10′ 45.302″ N 2° 59′ 13.389″ E
60 53° 10′ 46.498″ N 2° 59′ 7.864″ E 176 53° 10′ 45.561″ N 2° 59′ 12.661″ E
61 53° 10′ 46.545″ N 2° 59′ 7.022″ E 177 53° 10′ 45.792″ N 2° 59′ 11.908″ E
62 53° 10′ 46.561″ N 2° 59′ 6.176″ E 178 53° 10′ 45.993″ N 2° 59′ 11.132″ E
63 53° 10′ 46.545″ N 2° 59′ 5.331″ E 179 53° 10′ 46.166″ N 2° 59′ 10.336″ E
64 53° 10′ 46.498″ N 2° 59′ 4.489″ E 180 53° 10′ 46.307″ N 2° 59′ 9.524″ E
65 53° 10′ 46.418″ N 2° 59′ 3.654″ E 181 53° 10′ 46.418″ N 2° 59′ 8.699″ E
66 53° 10′ 46.307″ N 2° 59′ 2.829″ E 182 53° 10′ 46.498″ N 2° 59′ 7.864″ E
67 53° 10′ 46.166″ N 2° 59′ 2.017″ E 183 53° 10′ 46.545″ N 2° 59′ 7.022″ E
68 53° 10′ 45.993″ N 2° 59′ 1.221″ E 184 53° 10′ 46.561″ N 2° 59′ 6.176″ E
69 53° 10′ 45.792″ N 2° 59′ 0.445″ E 185 53° 10′ 46.545″ N 2° 59′ 5.331″ E
70 53° 10′ 45.561″ N 2° 58′ 59.691″ E 186 53° 10′ 46.498″ N 2° 59′ 4.489″ E
71 53° 10′ 45.302″ N 2° 58′ 58.964″ E 187 53° 10′ 46.418″ N 2° 59′ 3.654″ E
72 53° 10′ 45.017″ N 2° 58′ 58.264″ E 188 53° 10′ 46.307″ N 2° 59′ 2.829″ E
73 53° 10′ 44.705″ N 2° 58′ 57.596″ E 189 53° 10′ 46.166″ N 2° 59′ 2.017″ E
74 53° 10′ 44.369″ N 2° 58′ 56.962″ E 190 53° 10′ 45.993″ N 2° 59′ 1.221″ E
75 53° 10′ 44.010″ N 2° 58′ 56.364″ E 191 53° 10′ 45.792″ N 2° 59′ 0.445″ E
76 53° 10′ 43.629″ N 2° 58′ 55.804″ E 192 53° 10′ 45.561″ N 2° 58′ 59.691″ E
77 53° 10′ 43.228″ N 2° 58′ 55.286″ E 193 53° 10′ 45.302″ N 2° 58′ 58.964″ E
78 53° 10′ 42.807″ N 2° 58′ 54.811″ E 194 53° 10′ 45.017″ N 2° 58′ 58.264″ E
79 53° 10′ 42.370″ N 2° 58′ 54.380″ E 195 53° 10′ 44.705″ N 2° 58′ 57.596″ E
80 53° 10′ 41.918″ N 2° 58′ 53.997″ E 196 53° 10′ 44.369″ N 2° 58′ 56.962″ E
81 53° 10′ 41.451″ N 2° 58′ 53.661″ E 197 53° 10′ 44.010″ N 2° 58′ 56.364″ E
82 53° 10′ 40.973″ N 2° 58′ 53.374″ E 198 53° 10′ 43.629″ N 2° 58′ 55.804″ E
83 53° 10′ 40.485″ N 2° 58′ 53.139″ E 199 53° 10′ 43.228″ N 2° 58′ 55.286″ E
84 53° 10′ 39.990″ N 2° 58′ 52.954″ E 200 53° 10′ 42.807″ N 2° 58′ 54.811″ E
85 53° 10′ 39.488″ N 2° 58′ 52.822″ E 201 53° 10′ 42.370″ N 2° 58′ 54.380″ E
86 53° 10′ 38.982″ N 2° 58′ 52.742″ E 202 53° 10′ 41.918″ N 2° 58′ 53.997″ E
87 53° 10′ 38.474″ N 2° 58′ 52.716″ E 203 53° 10′ 41.451″ N 2° 58′ 53.661″ E
88 53° 10′ 37.966″ N 2° 58′ 52.742″ E 204 53° 10′ 40.973″ N 2° 58′ 53.374″ E
89 53° 10′ 37.461″ N 2° 58′ 52.822″ E 205 53° 10′ 40.485″ N 2° 58′ 53.139″ E
90 53° 10′ 36.959″ N 2° 58′ 52.954″ E 206 53° 10′ 39.990″ N 2° 58′ 52.954″ E
91 53° 10′ 36.463″ N 2° 58′ 53.139″ E 207 53° 10′ 39.488″ N 2° 58′ 52.822″ E
92 53° 10′ 35.975″ N 2° 58′ 53.375″ E 208 53° 10′ 38.982″ N 2° 58′ 52.742″ E
93 53° 10′ 35.497″ N 2° 58′ 53.661″ E 209 53° 10′ 38.474″ N 2° 58′ 52.716″ E
94 53° 10′ 35.031″ N 2° 58′ 53.997″ E 210 53° 10′ 37.966″ N 2° 58′ 52.742″ E
95 53° 10′ 34.578″ N 2° 58′ 54.381″ E 211 53° 10′ 37.461″ N 2° 58′ 52.822″ E
96 53° 10′ 34.141″ N 2° 58′ 54.812″ E 212 53° 10′ 36.959″ N 2° 58′ 52.954″ E
97 53° 10′ 33.721″ N 2° 58′ 55.287″ E 213 53° 10′ 36.463″ N 2° 58′ 53.139″ E
98 53° 10′ 33.319″ N 2° 58′ 55.805″ E 214 53° 10′ 35.975″ N 2° 58′ 53.375″ E
99 53° 10′ 32.938″ N 2° 58′ 56.364″ E 215 53° 10′ 35.497″ N 2° 58′ 53.661″ E
100 53° 10′ 32.579″ N 2° 58′ 56.962″ E 216 53° 10′ 35.031″ N 2° 58′ 53.997″ E
101 53° 10′ 32.243″ N 2° 58′ 57.597″ E 217 53° 10′ 34.578″ N 2° 58′ 54.381″ E
102 53° 10′ 31.932″ N 2° 58′ 58.265″ E 218 53° 10′ 34.141″ N 2° 58′ 54.812″ E
103 53° 10′ 31.646″ N 2° 58′ 58.964″ E 219 53° 10′ 33.721″ N 2° 58′ 55.287″ E
104 53° 10′ 31.388″ N 2° 58′ 59.692″ E 220 53° 10′ 33.319″ N 2° 58′ 55.805″ E
105 53° 10′ 31.157″ N 2° 59′ 0.445″ E 221 53° 10′ 32.938″ N 2° 58′ 56.364″ E
106 53° 10′ 30.955″ N 2° 59′ 1.221″ E 222 53° 10′ 32.579″ N 2° 58′ 56.962″ E
107 53° 10′ 30.783″ N 2° 59′ 2.017″ E 223 53° 10′ 32.243″ N 2° 58′ 57.597″ E
108 53° 10′ 30.641″ N 2° 59′ 2.829″ E 224 53° 10′ 31.932″ N 2° 58′ 58.265″ E
109 53° 10′ 30.531″ N 2° 59′ 3.654″ E 225 53° 10′ 31.646″ N 2° 58′ 58.964″ E
110 53° 10′ 30.451″ N 2° 59′ 4.489″ E 226 53° 10′ 31.388″ N 2° 58′ 59.692″ E
111 53° 14′ 28.789″ N 3° 3′ 31.257″ E 227 53° 10′ 31.157″ N 2° 59′ 0.445″ E
112 52° 56′ 14.962″ N 3° 8′ 41.012″ E 228 53° 10′ 30.955″ N 2° 59′ 1.221″ E
113 52° 54′ 27.033″ N 2° 58′ 15.457″ E 229 53° 10′ 30.783″ N 2° 59′ 2.017″ E
114 52° 54′ 11.424″ N 2° 58′ 22.820″ E 230 53° 10′ 30.641″ N 2° 59′ 2.829″ E
115 52° 53′ 56.239″ N 2° 58′ 29.982″ E 231 53° 10′ 30.531″ N 2° 59′ 3.654″ E
116 52° 49′ 50.103″ N 2° 56′ 54.167″ E 232 53° 10′ 30.451″ N 2° 59′ 4.489″ E

PART 3 — Details of Licensed Marine Activities

1

Subject to the licence conditions at Part 4, this licence authorises the undertaker (and any agent or contractor acting on their behalf) to carry out the following licensable marine activities under section 66(1) (licensable marine activities) of the 2009 Act—

  • (a) the deposit at sea of the substances and articles specified in paragraph 5 of Part 2 of this licence;
  • (b) the construction of works in or over the sea and/or on or under the sea bed;
  • (c) the removal of sediment samples for the purposes of informing environmental monitoring under this licence during pre-construction, construction and operation;
  • (d) the disposal of up to a total of 37,698,890 m³ of inert material of natural origin within the offshore Order limits produced during construction drilling or seabed preparation for foundation works and cable (including fibre optic cable) sandwave preparation works at disposal site reference HU217 within the extent of the Order limits seaward of MHWS, comprising—
  • (i) 36,000,000 m³ for cable and fibre optic cable installation;
  • (ii) 1,648,824 m³ for the wind turbine generators;
  • (iii) 37,500 m³ for the offshore service platform; and
  • (iv) 12,566 m³ for the meteorological masts; and
  • (e) the removal of static fishing equipment; and
  • (f) the disposal of drill arisings in connection with any foundation drilling up to a total of 399,776 m³

2

  • (1) Such activities are authorised in relation to the construction, maintenance and operation of (in the event of scenario 1 and scenario 2 unless otherwise stated below)—

Work No. 1 (phase 1) in the event of scenario 1 and scenario 2—

  • (a) an offshore wind turbine generating station with an electrical export capacity of up to 1,800 MW at the point of connection to the offshore electrical platform(s) referred to at Work No. 2 comprising up to 158 wind turbine generators each fixed to the seabed by one of the following foundation types: monopile (piled or suction caisson), jacket (piled or suction caisson), gravity base or tetrabase fitted with rotating blades and situated within the area shown on the works plan and further comprising (b) to (e) below;
  • (b) up to one offshore service platform fixed to the seabed within the area shown on the works plan by one of the following foundation types: jacket (piled or suction caisson) or gravity base;
  • (c) up to two meteorological masts fixed to the seabed within the area shown on the works plan by one of the following foundation types: monopile (piled or suction caisson), jacket (piled or suction caisson) or gravity base;
  • (d) up to two LIDAR measurement buoys fixed to the seabed within the area shown on the works plan by one of the following foundation types: monopile (piled) or floating and up to two wave measurement buoys fixed to the seabed within the area shown on the works plan by one foundation type (floating); and
  • (e) a network of subsea array cables and fibre optic cables within the area shown on the works plan between the wind turbine generators, and between the wind turbine generators and Work No.2 including one or more offshore cable crossings.

In the event of scenario 1—

  • (f) a network of subsea cables and fibre optic cables connecting wind turbine generators within (a) above to an offshore electrical platform within Norfolk Vanguard East including one or more offshore cable crossings.
  • (2) In connection with such Work No. 1 and to the extent that they do not otherwise form part of any such work, further associated development comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised scheme and which fall within the scope of the work assessed by the environmental statement and the provisions of this licence including:
  • (a) scour protection around the foundations of the offshore structures;
  • (b) cable protection measures such as the placement of rock and/or concrete mattresses, with or without frond devices;
  • (c) the removal of material from the seabed required for the construction of Work No. 1 and the disposal of up to a total of 37,698,890 m³ of inert material of natural origin within the Order limits produced during construction drilling, seabed preparation for foundation works, cable installation preparation such as sandwave clearance, boulder clearance and pre–trenching and excavation of horizontal directional drilling exit pits; and
  • (d) removal of static fishing equipment;
  • (3) In connection with such Work No. 1, ancillary works within the Order limits which have been subject to an environmental impact assessment recorded in the environmental statement comprising—
  • (a) temporary landing places, moorings or other means of accommodating vessels in the construction and/ or maintenance of the authorised scheme; and
  • (b) beacons, fenders and other navigational warning or ship impact protection works.

PART 4 — Conditions

Design parameters

1

  • (1) Subject to paragraph (2), each wind turbine generator forming part of the authorised scheme must not—
  • (a) exceed a height of 350 metres when measured from HAT to the tip of the vertical blade;
  • (b) exceed a height of 198.5 metres to the height of the centreline of the generator shaft forming part of the hub when measured from HAT;
  • (c) exceed a rotor diameter of 303 metres;
  • (d) be less than 800 metres from the nearest wind turbine generator in either direction perpendicular to the approximate prevailing wind direction (crosswind) or be less than 800 metres from the nearest wind turbine generator in either direction which is in line with the approximate prevailing wind direction (downwind); or
  • (e) have a draught height which is less than the minimum draught height specified for the relevant wind turbine generator capacity in the table below—
Wind Turbine Generator Capacity Minimum draught height
Up to and including 14.6MW 35m from MHWS
14.7 MW and above 30m from MHWS
  • (2) References to the location of a wind turbine generator in paragraph (1) above are references to the centre point of that turbine.

2

  • (1) The dimensions of any offshore service platform forming part of the authorised scheme must not exceed 100 metres in height when measured from HAT, 90 metres in length and 60 metres in width.
  • (2) Each meteorological mast must not exceed a height of 200 metres above HAT.
  • (3) Each meteorological mast must not have more than one supporting foundation.

3

The total length of the cables and the area and volume of their cable protection must not exceed the individual distributions set out in Table 2 of the outline scour protection and cable protection plan and must not exceed the following—

Work Length Cable protection (m³) Cable protection (m²)
Work No. 1(e) and (f) (array) 600 kilometres 198,500 m³ 389,000 m²

4

  • (1) In relation to a wind turbine generator, each foundation using piles must not have—
  • (a) more than four driven piles;
  • (b) in the case of single pile structures, a pile diameter which is more than 15 metres; or
  • (c) in the case of two or more pile structures, have a pile diameter which is more than five metres.
  • (2) In relation to a wind turbine generator, each foundation must not have a seabed footprint area (excluding scour protection) of greater than 1,963m².

5

  • (1) In relation to a meteorological mast, each foundation using piles must not have—
  • (a) more than four driven piles;
  • (b) in the case of single pile structures, a pile diameter which is more than 10 metres; or
  • (c) in the case of two or more pile structures, have a pile diameter which is more than three metres.
  • (2) In relation to a meteorological mast, each foundation must not have a seabed footprint area (excluding scour protection) of greater than 314 m².

6

  • (1) In relation to an offshore service platform, each foundation using piles must not have—
  • (a) more than six driven piles; or
  • (b) a pile diameter which is more than three metres.
  • (2) In relation to an offshore service platform, each foundation must not have a seabed footprint area (excluding scour protection) of greater than 7,500 m².

7

  • (1) In relation to any LIDAR measurement buoys, each foundation using piles must not have a pile diameter of greater than 10 metres.
  • (2) In relation to any LIDAR measurement buoys, each foundation must not have a seabed footprint area (excluding scour protection) of greater than 78.5 m² per buoy and 157 m² in total.
  • (3) In relation to any wave measurement buoys, each foundation must not have a seabed footprint area (excluding scour protection) of greater than 150m² per buoy and 300 m² in total.

Phasing of the authorised scheme and scenarios

8

  • (1) Taken together with works authorised and proposed to be constructed pursuant to licence 2 (generation)—
  • (a) the total electrical export capacity of the authorised scheme must not exceed 1,800MW at the point of connection to the offshore electrical platform(s);
  • (b) the total number of wind turbine generators forming part of the authorised scheme must not exceed 158;
  • (c) the total number of offshore service platforms forming part of the authorised scheme must not exceed one;
  • (d) the total number of meteorological masts forming part of the authorised scheme must not exceed two;
  • (e) the total number of LIDAR measurement buoys forming part of the authorised scheme must not exceed two;
  • (f) the total number of wave measurement buoys forming part of the authorised scheme must not exceed two;
  • (g) the total amount of scour protection for the wind turbine generators, offshore service platform, meteorological masts and measurement buoys forming part of the authorised scheme must not exceed 25,834,269 m³ and 5,166,854 m² and must not exceed the distributed quantities of scour protection set out in Table 1 of the outline scour protection and cable protection plan;
  • (h) the total amount of inert material of natural origin disposed within the offshore Order limits as part of the authorised scheme must not exceed 37,698,890 m³;
  • (i) the total amount of disposal for drill arisings in connection with any foundation drilling must not exceed 399,776 m³; and
  • (j) the total length of cable and the amount of cable protection must not exceed the figures stated in condition 3 of this licence.
  • (2) Prior to commencement of the authorised scheme the undertaker must give notice to the MMO detailing:
  • (a) whether the authorised scheme will be —
  • (i) commenced under scenario 1 or scenario 2; and
  • (ii) constructed in a single offshore phase under this licence or in two offshore phases under this licence and licence 2 (generation).
  • (3) Where the authorised scheme will be constructed in two offshore phases the undertaker must give notice to the MMO detailing —
  • (a) prior to the commencement of phase 1, the total number of wind turbine generators offshore service platform, meteorological masts, LIDAR measurement buoys and wave measurement buoys to be constructed in that phase; and
  • (b) prior to the commencement of phase 2, the total number of wind turbine generators offshore service platform, meteorological masts, LIDAR measurement buoys and wave measurement buoys to be constructed in that phase.

Notifications and inspections

9

  • (1) The undertaker must ensure that—
  • (a) a copy of this licence (issued as part of the grant of the Order) and any subsequent amendments or revisions to it is provided to—
  • (i) all agents and contractors notified to the MMO in accordance with condition 17; and
  • (ii) the masters and transport managers responsible for the vessels notified to the MMO in accordance with condition 17; and
  • (b) within 28 days of receipt of a copy of this licence those persons referred to in paragraph (a) above must provide a completed confirmation form to the MMO confirming receipt of this licence.
  • (2) Only those persons and vessels notified to the MMO in accordance with condition 17 are permitted to carry out the licensed activities.
  • (3) Copies of this licence must also be available for inspection at the following locations—
  • (a) the undertaker’s registered address;
  • (b) any site office located at or adjacent to the construction site and used by the undertaker or its agents and contractors responsible for the loading, transportation or deposit of the authorised deposits; and
  • (c) on board each vessel or at the office of any transport manager with responsibility for vessels from which authorised deposits or removals are to be made.
  • (4) The documents referred to in sub-paragraph (1)(a) must be available for inspection by an authorised enforcement officer at the locations set out in sub-paragraph (3)(b) above.
  • (5) The undertaker must provide access, and if necessary appropriate transportation, to the offshore construction site or any other associated works or vessels to facilitate any inspection that the MMO considers necessary to inspect the works during construction and operation of the authorised scheme.
  • (6) The undertaker must inform the MMO Coastal Office in writing at least five days prior to the commencement of the licensed activities or any part of them, and within five days of completion of the licensed activities.
  • (7) The undertaker must inform the Kingfisher Information Service of Seafish by email to kingfisher@seafish.co.uk of details regarding the vessel routes, timings and locations relating to the construction of the authorised scheme or relevant part—
  • (a) at least fourteen days prior to the commencement of offshore activities, for inclusion in the Kingfisher Fortnightly Bulletin and offshore hazard awareness data; and
  • (b) as soon as reasonably practicable and no later than 24 hours of completion of construction of all offshore activities;

and confirmation of notification must be provided to the MMO within five days.

  • (8) A notice to mariners must be issued at least ten days prior to the commencement of the licensed activities or any part of them advising of the start date of Work No. 1 (wind turbine generators or other offshore construction activities including array cables and fibre optic cables) and the expected vessel routes from the construction ports to the relevant location. Copies of all notices must be provided to the MMO, MCA and UKHO within five days.
  • (9) The notices to mariners must be updated and reissued at weekly intervals during construction activities and at least five days before any planned operations and maintenance works and supplemented with VHF radio broadcasts agreed with the MCA in accordance with the construction and monitoring programme approved under condition 14(1)(b). Copies of all notices must be provided to the MMO, MCA and UKHO within five days.
  • (10) The undertaker must notify the UK Hydrographic Office both of the commencement (ten days prior), progress and completion of construction (within ten days) of the licensed activities in order that all necessary amendments to nautical charts are made and the undertaker must send a copy of such notifications to the MMO within five days.
  • (11) In case of damage to, or destruction or decay of the authorised scheme seaward of MHWS or any part thereof, the undertaker must as soon as reasonably practicable and no later than 24 hours following the undertaker becoming aware of any such damage, destruction or decay, notify MMO, MCA, Trinity House, the Kingfisher Information Service of Seafish, and the UK Hydrographic Office.
  • (12) In case of exposure of cables on or above the seabed, the undertaker must within three days following identification of a potential cable exposure, notify mariners by issuing a notice to mariners and by informing Kingfisher Information Service of the location and extent of exposure. Copies of all notices must be provided to the MMO and MCA within five days.

Aids to navigation

10

  • (1) The undertaker must during the whole period from commencement of the licensed activities to completion of decommissioning seaward of MHWS exhibit such lights, marks, sounds, signals and other aids to navigation, and to take such other steps for the prevention of danger to navigation as Trinity House may from time to time direct.
  • (2) The undertaker must during the period from the start of construction of the authorised scheme to completion of decommissioning seaward of MHWS keep Trinity House and the MMO informed of progress of the authorised scheme seaward of MHWS including the following—
  • (a) notice of commencement of construction of the authorised scheme within 24 hours of commencement having occurred;
  • (b) notice within 24 hours of any aids to navigation being established by the undertaker; and
  • (c) notice within five days of completion of construction of the authorised scheme.
  • (3) The undertaker must provide reports to Trinity House on the availability of aids to navigation as set out in the aids to navigation management plan agreed pursuant to condition 14(1)(k) using the reporting system provided by Trinity House.
  • (4) The undertaker must during the whole period from commencement of the licensed activities to completion of decommissioning seaward of MHWS notify Trinity House and the MMO of any failure of the aids to navigation and the timescales and plans for remedying such failures, as soon as possible and no later than 24 hours following the undertaker becoming aware of any such failure.
  • (5) In the event that the provisions of condition 9(11) and condition 9(12) are invoked, the undertaker must lay down such marker buoys, exhibit such lights and take such other steps for preventing danger to navigation as directed by Trinity House.

Colouring of structures

11

  • (1) Except as otherwise required by Trinity House the undertaker must colour all structures forming part of the authorised scheme yellow (colour code RAL 1023) from at least HAT to a height directed by Trinity House, or must colour the structure as directed by Trinity House from time to time.
  • (2) Subject to sub-paragraph (1) above, unless the MMO otherwise directs, the undertaker must paint the remainder of the structures submarine grey (colour code RAL 7035).

Chemicals, drilling and debris

12

  • (1) Unless otherwise agreed in writing by the MMO all chemicals used in the construction of the authorised scheme, including any chemical agents placed within any monopile void, must be selected from the List of Notified Chemicals approved for use by the offshore oil and gas industry under the Offshore Chemicals Regulations 2002[^f00048] (as amended).
  • (2) The undertaker must ensure that any coatings/treatments are suitable for use in the marine environment and are used in accordance with guidelines approved by Health and Safety Executive and the Environment Agency Pollution Prevention Control Guidelines.
  • (3) The storage, handling, transport and use of fuels, lubricants, chemicals and other substances must be undertaken so as to prevent releases into the marine environment, including bunding of 110% of the total volume of all reservoirs and containers.
  • (4) The undertaker must inform the MMO of the location and quantities of material disposed of each month under this licence. This information must be submitted to the MMO by 15 February each year for the months August to January inclusive, and by 15 August each year for the months February to July inclusive. In the event that no activity has taken place during the reporting period the undertaker must provide a null (0) return to the MMO.
  • (5) The undertaker must ensure that only inert material of natural origin, produced during the drilling installation of or seabed preparation for foundations, and drilling mud is disposed of within disposal site reference HU217 within the extent of the Order limits seaward of MHWS. Any other materials must be screened out before disposal of the inert material at this site.
  • (6) The undertaker must ensure that any rock material used in the construction of the authorised scheme is from a recognised source, free from contaminants and containing minimal fines.
  • (7) In the event that any rock material used in the construction of the authorised scheme is misplaced or lost below MHWS, the undertaker must report the loss to the District Marine Office within 48 hours and if the MMO reasonably considers such material to constitute a navigation or environmental hazard (dependent on the size and nature of the material) the undertaker must endeavour to locate the material and recover it.
  • (8) The undertaker must ensure that no waste concrete slurry or wash water from concrete or cement works are discharged into the marine environment. Concrete and cement mixing and washing areas should be contained to prevent run off entering the water through the freeing ports.
  • (9) The undertaker must ensure that any oil, fuel or chemical spill within the marine environment is reported to the MMO, Marine Pollution Response Team in accordance with the marine pollution contingency plan agreed under condition 14(1)(d)(i).
  • (10) All dropped objects must be reported to the MMO using the Dropped Object Procedure Form as soon as reasonably practicable and in any event within 24 hours of the undertaker becoming aware of an incident. On receipt of the Dropped Object Procedure Form, the MMO may require relevant surveys to be carried out by the undertaker (such as side scan sonar) if reasonable to do so and the MMO may require obstructions to be removed from the seabed at the undertaker’s expense if reasonable to do so.

Force majeure

13

  • (1) If, due to stress of weather or any other cause the master of a vessel determines that it is necessary to make a deposit which is not authorised under this licence whether within or outside of the Order limits because the safety of human life and/or of the vessel is threatened, within 48 hours the undertaker must notify full details of the circumstances of the deposit to the MMO.
  • (2) The unauthorised deposits must be removed at the expense of the undertaker unless written approval is obtained from the MMO.

Pre-construction plans and documentation

14

  • (1) The licensed activities or any part of those activities must not commence until the following (as relevant to that part) have been submitted to and approved in writing by the MMO—
  • (a) A design plan at a scale of between 1:25,000 and 1:50,000 including detailed representation on the most suitably scaled admiralty chart, to be agreed in writing with the MMO in consultation with Trinity House and the MCA which shows, in accordance with the Development Principles—
  • (i) the proposed location and choice of foundation of all wind turbine generators, offshore electrical platforms, offshore service platform and meteorological masts;
  • (ii) the height to the tip of the vertical blade of all wind turbine generators;
  • (iii) the height to the centreline of the generator shaft forming part of the hub of all wind turbine generators;
  • (iv) the rotor diameter and spacing of all wind turbine generators;
  • (v) the height of all lattice towers forming part of all meteorological masts;
  • (vi) the height, length and width of all offshore service platform;
  • (vii) the dimensions of all foundations;
  • (viii) the length and arrangement of all cables (including fibre optic cables) comprising Work No. 1(e);
  • (ix) the proposed layout of all wind turbine generators (in accordance with the recommendations for layout contained in MGN543 and its annexes), offshore service platform and meteorological masts including any exclusion zones identified under sub-paragraph (1)(h)(iv);

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.